WINSTON LIEW PORTFOLIO Twenty21
1.
2.
3.
“PORTFOLIO OF SELECTED WORKS”
WINSTON LIEW PORTFOLIO Twenty21
AS A DESIGNER I AM DRAWN TO THE IDEA OF “NEWNESS” IN ARCHITECTURE. I AM FASCINATED BY THE ROLE DESIGN PLAYS IN MANIFESTING THE CULTURE OF THE TIMES
M A N I Y E N G E S
RESUME
WINSTON LIEW 1271 Botany Rd Mascot, NSW 2020 0438 993 826
EXPERIENCE PROFESSIONAL
winston.liew1@gmail.com
https://www.linkedin.com/in/ winston-liew-119677177/
ARCHITECTURE INTERN 12/2019 - 02/2020 68 George St, NSW 2000 Summer architecture intern for Bechtel h e l p e d w i t h a d m i n i s t r a t i v e t a s k s, u n d e r t o o k s i t e v i s i t s a n d p r e p a r e d a b u s i n e s s c a s e f o r t h e B a r a n g ar o o M e t r o S t a t i o n . ARCHITECTURE PEER TUTOR Sydney University International House Camperdown, NSW 2008 Designer mentored 4 first year architecture students in their studio assignments t h r o u g h o u t t h e s e m e s t e r.
04/2018 - 06/2018
PROJECT DESIGN LEADER 07/2018 - 11/2018 The University of Sydney Camperdown, NSW 2008 Design Leader for the University of Sydney graduate exhibition designed and led a team to produce the drawings for the 2018 architecture exhibition TERRY NOTT ARCHITECTS 01/2016 - 02/2017 Fitzroy, VIC 3065 Architecture Intern assisted the principal architect in the design and layout of various plan and s e c t i o n d r a w i n g s. AWARDS
Vice Chancellor ’s Global Mobility Scholarship
LICENCES AND CERTIFICATION
Revit Certification (Level 1) issued from RMIT University Architectural Visualisation for Photoshop issued from RMIT University
EDUCATION
03/2019 - 11/2020 The University of Sydney 03/2016 - 11/2018 Masters in Architecture (M.Arch & B.DesArch) Attended The University of Sydney for my bachelor and masters degree in Architecture. Studied various design studio briefs (residential, parametric, sustainable, urban design, structure, architecture theor y and histor y). Took an elective in coming up with the design for the graduate exhibition in my last year of my bachelor ’s degree. Attended 2 exchange semesters Ecole de Polytechnique Lausanne (EPFL) 02/2020 - 07/2020 Exchange Semester (2020) S e m e s t e r 1 2 0 2 0 a c c e p t e d i n t o a n e x c h a n g e p r o g r a m i n S w i t z e r l a n d . U n d e r t oo k a n u r b a n p l a n n i n g s t u d i o, a r c h i t e c t u r e t h e o r y u n i t s, s u s t a i n a b i l i t y a n a l y s i s u n i t s a n d b u s i n e s s. 07/2017 - 12/2017 Tsinghua University Exchange Semester (2017) GPA: 4.0 Semester 2 2017 accepted into an exchange program in China. Undertook a digital design studio and urban planning unit, an architecture theory and history class and a `Chinese language unit. Columbia University 07/2016 - 08/2016 Short course (Introduction to Architecture) One month intensive course in New York. Undertook a introductor y design studio that introduced for m, shape and program. University of Melbourne 03/2012 - 11/2015 Bachelor of Science (BSci) M a j o r i n P h y s i o l o g y. To o k e l e c t i v e s i n N e u r o s c i e n c e, A n a t o m y, P s y c h o l o g y, P h y s i o l o g y, B i o l o g y a n d Fr e n c h Camberwell Grammar School High School Certification. ATAR: 98.05 Studied Chemistr y, Physics, Mathematical Methods, Specialist Maths, Indonesian, English.
SKILLS
Revit
Indesign
Rhinoceros 3D
Grasshopper
Photoshop
Unreal Engine
Illustrator
AutoCAD
02/2006 - 12/2011
1.
BEING.Lab
The labora creasing a world and augmente ate virtua one anoth place whe themselve serve the change. S touch wit truer lives
Academic Project The University of Sydney Co-ordinator: Dr. Paolo Stracchi Individual work Semester 2, 2020
atory of being acts as an antidote to the inalienation technology poses in the modern d its future. The building uses virtual and ed reality linked with the user’s mind to creal spaces which can foster connection with her and with the world. The Being.LAB is a ere people visit, experience and learn about es. It is a place where technology is used to individual and inspire growth and positive Shaping the future where people are more in th their being in the world and live more s.
SECTIONAL PERSPECTIVES
GROUND FLOOR
SECOND FLOOR
THIRD FLOOR
2.
HOPE PAVILIO
The stud 2020 an to showc hope and Pavilion” a wish up wishes. T ness surr The pavil reflect ab ty of the g mance of
ON
Academic Project The University of Sydney Co-ordinator: Dr. Arianva Brambilla Group work Semester 1, 2019
dio brief is centered around the Dubai Expo event that is decennial. In 2020, the aim is case advances in sustainability and inspire d positivity concerning the future. The “Hope ” is a space that people can reflect and cast pward to a dynamic ceiling of floating paper The pavilion is designed to address the bleakrounding climate change and sustainability. lion is an architectural vehicle for visitors to bout the future and to showcase the solidariglobal community in an architectural perforf space.
3.
GREAT LAKE HOUSE
The brief as for a retrofi From creat a DA appli tion of the view buildi deliver a be
ES
Academic Project The University of Sydney Co-ordinator: Dr. Sandra Loschke Group work Semester 2, 2020
sked to submit a construction documentation fited house in the Greak Lakes region in NSW. ting an expression of interest, to submitting icaion to following through on the construce house, the core elective prompted us to reing standards, construction codes and finally espoke and well crafted home for our clients.
concept design option 2
5000
4130
B
4500
3480
14615 1965
12650 6995
335
LINE OF THE FLOOR ABOVE
3200
4100
100
2200
1320
9390
EXISTING BLOCKWORK WALL
270
TD
1960
1960
D1
1800
270
270 1700
New decking to engineers future detail.
STUDIO
2975
100
RL FFL +30.00 M
FB
10930
W1 2
1
3
4
5
6
7
8
9
3445
10 11 12 13 14
8970
FR
10930
1800 MB1
6010
3100
BATHROOM D3
Double brick masonry wall, refer wall detail.
MB1
5470
1895
RL FFL + 29.95 M
All windows and doors to comply with BASIX commitments. BAL 29 tested and certified
Refer to railing & balustrade detail.
TD RL FFL +30.00 M
KITCHEN SM
FB
A 00
22 21 20 19 18 17 16 15
SI
STUDIO
ECT
435 270
A 00
6630
2640
Timber decking, refer to schedule.
TD
W2
D2
1730
52.65m²
270
270 530
RL FFL + 29.95 M
2960
2960
BALCONY
5505
270
1870
2950
5995
580
5400
1320
B
12715
1
4
2
6
10
161
0
874
EXISTING A 01 J01 - Kitchen
Purpose of Issue
Date 12/11/2020
86 26
Description Issued for Construction
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All levels and dimensions are to be checked and verified on site prior to the commencement of any work, making of shop drawings or fabrication of components.
Project Management
Quantity Surveryor
Town Planner
Structural Engineer
Service Engineer
Hydraulics & Fire
Project
Client
Architect
Drawing Title
STUDIO SENSE
Ground
Scales 1:100 @ A3 Phase CC
478
A 01 J01 - Kitchen
A 01 J01 - Kitchen
Purpose of Issue
Architect
Hydraulics & Fire
Drawing Title
STUDIO SENSE
WALL-ROOF-GUTTER DETAIL
Scales 1:10 @ A3
Checked by : Gabriella Lindsay / Brij Gohel
Phase CC
Date :
Drawing Number A 00
Revision
Drawn by : Anna Osipova / Winston Liew
Revision
Description
Date
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All levels and dimensions are to be checked and verified on site prior to the commencement of any work, making of shop drawings or fabrication of components.
Project Management
Quantity Surveryor
Town Planner
Structural Engineer
Service Engineer
Hydraulics & Fire
Client
Architect
STUDIO SENSE
Drawing Title
Drawn by : Anna Osipova / Winston Liew
ROOF TO LOUVRE DETAIL
Scales 1:10 @ A3
Checked by : Gabriella Lindsay / Brij Gohel
Phase CC
Date :
Drawing Number A 00
R0
3480
4130
5000
3530
4500
10025
2530
12700 5625
100 x 50 MM, Galvanized steel purlins fixed through steel cleat to conc. slab roof.
9755
100
3760
270
1675
SRC
125
815 270 275
Project
Louvre to consultant detail, refer drawing. Double brick masonry wall, refer wall detail. D4
All windows and doors to comply with BASIX commitments. BAL 29 tested and certified
New decking to engineers future detail. Structural concrete retaining wall.
D7
W6
GARAGE
W1
W2
2700
TH1 TB
EC
STUDIO
STUDIO
1100
Timber decking, refer to schedule.
HOME OFFICE
FB
TD
FB
TD
FB
2600
New decking to engineers future detail.
W6
TH1 TB
1100
Refer to railing & balustrade detail. Timber decking, refer to schedule.
3460
Client
6215
150
Project
2750
Service Engineer
Town Planner
2050
Structural Engineer
Quantity Surveryor
350
Project Management
9435
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All levels and dimensions are to be checked and verified on site prior to the commencement of any work, making of shop drawings or fabrication of components.
2550
Date
350
Description
2750
Revision
2900
Purpose of Issue
2850
Revision 00
46
74
PROPOSED DOUBLE BRICK WALL
Revision
R0
Drawing
LEGEND
5000
4500
4130
3480
8.5m limit
RL +37.00 SRC MB1
W6
2750
MB1
W6 TH1 BW TD
2900
W2 MB1
TH1 TB
TYPE - D3
T
2800
MB1
SOUTH EAST ELEVATION SCALE: 1:100 LEGEND
0
Purpose of Issue Revision 01 02 03 04
TYPE - D7
TYPE - D6
Description First Iteration Second Iteration Changes to annotation Final elevation drawing
Date 20.08.2020 04.09.2020 23.10.2020 14.11.2020
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All levels and dimensions are to be checked and verified on site prior to the commencement of any work, making of shop drawings or fabrication of components.
Project Management
Quantity Surveryor
Town Planner
Structural Engineer
Service Engineer
Hydraulics & Fire
Project
Client
2960
8.5m limit
Architect
1
4
2
3100
SRC
10
Drawing Title
STUDIO SENSE
2640
6
MASONRY BRICKWORK WINDOW TIMBER HANDRAIL 1 BALUSTRADE WIRE CABLE STEEL ROOF EXISTING DOOR
MB1 W TH1 BW SRC Ex D
South East Elevation
Drawn by : Anna Osipova / Winston Liew
Scales 1:100 @ A3
Checked by : Gabriella Lindsay / Brij Gohel
Phase CC
Date : 14/11/2020
Drawing Number AD CC 4001
1895
T
2750
MB1
D5
D4
D4
D4
D4
W5
TH1 TB TD
T
MB1
2900
D2
W1
W1
W1
W1
2800
FIXED GLAZING MB1
TYPE - D8
Quantity Surveryor
Town Planner
Service Engineer
Hydraulics & Fire
SLIDING DOOR
Project
Client
Architect
Drawing Title
STUDIO SENSE
Door Window Schedule-02
Scales 1:50 @ A3
NORTH EAST ELEVATION Phase CC Drawing Number AD CC 7001 SCALE: 1:100
Drawn by : Anna Osipova / Winston Liew Checked by : Gabriella Lindsay / Brij Gohel Date : 05/11/2020
Revision
R0
0
1
4
2
6
10
4130 Purpose of Issue Revision 01 02 03
Description Balustrade update Fixing annotations
Date 08.08.2020 27.10.2020 13.11.2020
Final elevation drawing
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All levels and dimensions are to be checked and verified on site prior to the commencement of any work, making of shop drawings or fabrication of components.
Project Management
Quantity Surveryor
Town Planner
Structural Engineer
Service Engineer
Hydraulics & Fire
1
2
3
4
5
6
7
8
9
10
11
12
13
Project
Client
Architect
STUDIO SENSE
Drawing Title
North East Elevation
Drawn by : Anna Osipova / Winston Liew
Scales 1:100 @ A3
Checked by : Gabriella Lindsay / Brij Gohel
Phase CC
Date : 14/11/2020
Drawing Number AD CC 4002
W6
4130
14
02
02 03 -
22
21
20
19
18
17
16
2900
2640
RL FFL +30.00 M
15
01 Staircase Plan Scale 1:50
02 Section Scale 1:50
03 Stair Detail Scale 1:20 J01 01 A - Kitchen
e of Issue
on
MASONRY BRICKWORK WINDOW TIMBER HANDRAIL 1 BALUSTRADE WIRE CABLE STEEL ROOF EXISTING
MB1 W TH1 BW SRC Ex
Description Issued for Construction
Date 12/11/2020
This drawing is the copyright of and may not be altered, reproduced or transmitted in any form or by any means in part or in whole without the written permission. All
Project Management
Quantity Surveryor
Town Planner
Project
Client
Architect
Drawing Title
Staircase Detail
Drawn by : Anna Osipova / Winston Liew
Revision
R03
Revision
R0
fin.