Baldwin Park notebook ROA BOARD OF DIRECTORS MEETING BY STACEY FRYREAR The following information is a glimpse of the ROA’s general updates for the month. A copy of the official Oct. 26, 2021, meeting minutes can be obtained on the Community Network, BaldwinParkNetwork.com. n The board approved the 2022 Budget Drafts. n The board approved hiring Communication Consulting Group to investigate bulk contracts. n The board approved the completing insurable evaluations for the townhome and association properties. n The board approved quarterly preventative maintenance inspections of the fitness equipment. n The board approved hardware upgrades for the access control systems.
UPDATES
n Sidewalk panel replacements: A proposal to cut and remove sections of sidewalk, set forms, grade, remove roots, pour new sidewalks, strip forms and cut joints for 500 square feet, including grinding several panels at Longview Park, and 132 square feet, including grinding of two panels at Oak Mews, will be brought back to the November meeting. n Grace Hopper Pool resurfacing: The pool resurfacing project is on schedule. The tile work has been completed. There is one depth marker that needs fixed. n Landscape replacements: Plant installations at the following parks/mews have been completed: Bermuda repairs at Union Park; Bermuda repairs at Parkland Quadrangle (at BrightViews expense,
8
BALDWIN PARK LIVING | DECEMBER 2021
because the sod was damaged by chinch bugs); plant replacements at Longview Park; fill in Mondo Grass at Fenwood Park; replace Bermuda right-of-ways at Parkland Quadrangle with St. Augustine; and fill in Azaleas at Corrine Commons. n The following approved landscape replacements are being held at this time: ARC approved the Pinwheel Jasmine to replace Azaleas at Parkland Quadrangle, with the condition more Pinwheel Jasmine is installed on the other side of the trellis to match. An updated proposal will be brought back to the board; and ARC approved shade-tolerant plant materials to replace Bermuda on the four corners of Parkland Quadrangle, with the condition that the proposed mulch is replaced with Confederate Jasmine. An updated proposal will be obtained for records, although the price won’t change.
HELPFUL INFORMATION FOR OWNERS Do your driveway and sidewalks look dirty? Cleaning these types of surfaces not only improves the overall look of your property, but also it helps to prevent them from becoming potential hazards, such as a fall risk to those visiting your property. Routine pressure washing/ cleaning ensures these surfaces are not slick and slippery from the growth of mold or mildew, which is so common in wet or humid conditions. Any exterior change to your home — including but not limited to painting, replacing or adding gutters, roofs, windows, plant materials/sod/trees, accessories, structural changes, etc. — requires ARC approval. All applications can be found at baldwinparknetwork.com under Home/Association Information/Residential Owners Association/Residential Architectural Review Committee/ARC Forms. If you have questions, please call ARC Coordinator at (407) 740-5838 or email ARC@baldwinparkpoa.com.
n The following replacements were not approved by the ARC: Replacing Bermuda with Mondo Grass at Parkland; replacing Crepe Myrtles at Enders Facility Center with Japanese Blueberries and Jatrophas; and replacing Crepe Myrtles at Grace Hopper Facility Center with Japanese Blueberries
agement has obtained an agreement from Airport Towing. The association’s attorney reviewed it and had some suggested changes. These have been sent to the towing company for review. An update will be brought back to a future meeting.
n Park signage: Signage (park rules and dog waste) was ordered and will be replaced in park areas.
n Timeclock for pools: Management was asked to look into adding timeclocks to Enders and Grace Hopper pools. An update will be brought back to a future meeting.
n Enders AC duct cleaning/air purification/UV lighting: The duct work was inspected by Mr. Black as directed by the board. He confirmed the duct work is galvanized steel and OKed scheduling the approved work. This work was scheduled for Nov. 8 to 11. n Towing agreement for Enders parking lot: The previous company is no longer serving the area. Man-
n 2021 reserve items: Management reviewed the 2020 Reserve Study Full Site Inspection for items due in 2021. For Grace Hopper, this includes replacing vinyl flooring upstairs, downstairs and elevator. Management has requested a proposal from Creative Flooring, and this was scheduled to be brought to the board in November.