XIAOYING LIN TEL (0086)13912785058 EMAIL lxy910121@hotmail.com BIRTH 1991/01 EDUCATION 2013 / 09 —— 2015 / 07
>>> University College London (Bartlett School) MArch Architecture (RIBA Part 2) Master
WORK EXPERIENCE 2015 / 12 —— now
>>>DP Architects (Shanghai) - Architectural Assistant -Huawei Headquater, Guangzhou , China.
(Competition stage )
-TCL Techinical center,Guangzhou, China.
(Competition stage)
---Sketchup , Photoshop, CAD, Indesign, illustrator, PPT --- CAD, Indesign, illustrator,PPT
-IBP center hongqiao,Shanghai,China
(in build)
-Sanya Haishitan Sports center, China
(planning)
--- CAD, Photoshop, sketchup, vray, illustrator,PPT.
---Handsketch, CAD, Indesign, illustrator
-Luneng HongTanag Bay Residential Area
---Sketchup, Photoshop, CAD, Indesign, illustrator,Ecotect,PPT vray
(in build)
-Nanjing Honghua Airport Refreshment --capitalland commercial
---Rhino, CAD, Indesign, illustrator
2009 / 09 —— 2012 / 07
>>> University of Nottingham BArch Architecture (RIBA Part 1) Bachelor (2:1 Honors)
2015 / 07 —— 2015 / 11
>>>JTP/CHINA DESIGN CENTER LONDON
-Kunshan Tourism Area, pavilion and sculpture design
government project, design pavilions, signs and scultures for Kunshan Tourism Area 2008 / 09 —— 2009 / 07
>>> Castle College Nottingham
Architecture Foundation 2006 / 09 —— 2008 / 07
>>>Suzhou High School
2012 / 08 —— 2013 / 08
>>>HASSELL - Architectural Assistant
-Dali Resort, Yunnan Province, China.
---Rhino,V-ray, Photoshop, CAD, Indesign, illustrator
(Competition and work stage 0-3)
-Nanjing complex commercial outlet center, China.
---Rhino, Photoshop, CAD, Indesign, illustrator
-Jiangmen central hospital, Beijing, China
--- Photoshop, Indesign, illustrator
SKILL
>>>Proficient Software
AutoCAD/Rhino/Photoshop/ Hand Drawing/llustrator/InDesign/ V-Ray/Microsoft Office/Sketchup/
>>>Good at Software
Adobe Premiere/Grasshopper/ Ecotecct/
>>>Basic Knowledge
Maxwell/Mircostation/Revit/
>>>Language
(Work stage 1-2)
-Sunshine residential project phase 2, Shengyang, China (Work stage 0-2)
---Rhino, CAD, Indesign, illustrator
-Residential tower project, Russia
(Work stage 0-3)
-Joeone headquarter Project, Guangzhou, China
(Work stage 0-2)
-Wuhan complex commercial project, China
(Work stage 0-1)
---Rhino, Photoshop, CAD, Indesign, illustrator,Ecotect ---Rhino, CAD, Indesign, illustrator ---Rhino,V-ray, Photoshop
-Onlead Furniture Headquater, Nanjing, China
---Rhino,V-ray, Photoshop, illustrator
(Work stage 1)
2011 / 06 —— 2011 / 09
>>>Beijing Space Creator Architectural Design - Summer Internship -Commercial Project , Suzhou SIP, China
(Work stage 0-1)
-Residential Project, Suzhou, China
(Work stage 0-2)
--- Photoshop, CAD, Indesign, illustrator
English/Chinese
(Competition stage)
---CAD, illustrator
2011 / 06 —— 2011 / 09
>>>Beijing Space Creator Architectural Design - Summer Internship -Commercial Project , Suzhou SIP, China
(Work stage 0-1)
-Residential Project, Suzhou, China
(Work stage 0-2)
--- Photoshop, CAD, Indesign, illustrator ---CAD, illustrator
2010 / 06 —— 2010 / 09
>>>Suzhou Institute of Architectural Design - Summer Internship -Suzhou Underground Terminal of Line 2
(The project is including Business Center, Transport hub, Offices, Residential, Schools, Gardens and Storages for Underground. )
-Translating the English-Chinese in the international team. -Preparing for all the paper work for presentations.
REFERENCE Izaskun Chinchilla
(Principal Partner Izaskun Chinchilla Architects. / Bartlett School of Architecture Uint22)
Peter Duncan
(Chairman, HASSELL)
Year 5
' YOU ARE WHAT U EAT'--A children food and taste library (Empowering the traditional food legacy for Generation Z)
Section Components
--Hand drawing, photoshop
Views
--Hand drawing, photoshop,Rhino,V-Ray
Year 5
' YOU ARE WHAT U EAT'
Year 5
' YOU ARE WHAT U EAT'
1:50 Section Model
--Physical Model Making, Hand drawing
Straw Flap Control Touching the Greenish colour to control the speed of flapping in the straw making process The Gradual Change of Green represent different flapping speed.
10 TIMES
5 Seconds
10 Seconds
20 Seconds
5 Seconds
10 Seconds
20 Seconds
5 Seconds
10 Seconds
20 Seconds
5 Seconds
10 Seconds
20 Seconds
5 Seconds
10 Seconds
20 Seconds
5 Seconds
10 Seconds
20 Seconds
20 TIMES
5 TIMES
10 TIMES
30 TIMES
20 TIMES
slow
fast
Straw Flap Panel Holding the original straw from the rice field
Straw Container transparent straw wall
15 mins
Straw Flap Control Stepping on the Greenish colour to control the flapping strength. The Gradual Change of green represent different power weak
Activity Time Length The general time of activities in this making stage
strong
30 mins Activity Time Length The general time of activities in this making stage
Division Control The Campanula would tell the strength of the wind which children produced. Different wind strength could divide different crops and bran
up and down
30 Times
15 Times
10 Times
5 Times
5 Times
10 TIMES
30 Times
30 mins
Paddy Broken Control Jumping to the coherent color according to the screen. In order to control the hitting strength The Gradual Change of Brown represent different hitting strength
20 TIMES
25 Times
10 Times
20 Times
30 Times
25 Times
Activity Time Length The general time of activities in this making stage
5 TIMES
15 TIMES
When it is not working
Rice Container
15 Times
10 Times
30 Times
5 Times
5 Times
20 TIMES
25 Times
30 Times
10 Times
25 Times
20 Times
5 TIMES
30 Times
10 TIMES
15 mins
15 TIMES
Activity Time Length The general time of activities in this making stage
Jumping
The spring up and down
Component 3D
--Rhino,V-Ray,illustrator,Photoshop
Year 5 ' YOU ARE WHAT U EAT'
Year 5 '
YOU ARE WHAT U EAT' (Term1) 1:10 Model
--Physical Model Making
Year 4
Elephant Embassy (The house of the future)
Perspective Drawing
--Hand drawing, photoshop, physical model, Rhino,
M 57°
N
50°
1.Breeding Workshop Space.
(Comparatively parivate, registeration needed Including elephant care, healthy test, healthy data analysis)
2. Private Toliet ( Disable access) 3. Stair Circulation Access 4. Interactive Sound Communication space.
43° L
m 0
5
10
K
(Infrasound wave machine to test the sound of elephant)
15
5.Public interactive open space to look down
36°
(With bamboo section floor)
1
6. Drinking Water Point
(traditional bamboo pump )
7.Disable access lift 8.Public resting space 9. The face to face plateform
(Can check the elephant health situation in a close space) 10. Public Obversation space
29° J
(Obverse elephant through bamboo facade, watch the elephant bathing)
2
22°
I
3
15°
4
H 9°
5 G
2° 7
±0
0°
-5° F
6
8 -12°
9 E
-18°
-25°
D 10
-32°
C
B 1
2
3
A
-39° 4
5
6
7
8
1:50
Year 4 Elephant Embassy (ThePlan houseDrawing of the future) --Hand drawing, CAD
1 0
3 2
m
5 4
6
N
1. Flexible bending roof ( Adjust the angle and sunlight filter according to the user requirments and sun angle)
9. Elephant pathway 10. Plants pod for testing food (green shelter for elephants)
2. The bamboo workshop (Making the bamboo toys for elephants)
11. Elephant shower pump 12. External Staircase (Access to elephant territory)
3. The soft bamboo pieces to conceal human and building. 4. water collected ( through the bamboo pipe)
13. The face to face healthy obversation space. 14. The food supply structure (Opened as shelter as well)
5. Private Breeding lab (staff only)
A
6. Stair Circulation 7.Water drinking points in public interactive space. 8. The bamboo section floor (Can be used for elephant shower and for
A
people obversation. good ventilation) m 0
5
10
15
1
2
3
4
5
14
13
12 6
7
8
9
10
11
Year 4 Elephant Embassy
Section Drawing
--Hand drawing, CAD
1:100
0
5
3
1 2
4
m 6
1
1
2
2
3
4
4 3
5
5
6
6 7
7
8
8
125mm 9
9
300mm
300mm
10
175mm
40mm
13
11
12 13
40mm
14
Year 4 Elephant Embassy
Construction Detail Drawing
--Hand drawing, CAD, model making
Year 3
The Cloud of Landscape
(Bath center/ water purification center)
Concept drawing and models
--Hand drawing, photoshop, physical model,CAD
Year 3
The Cloud of Landscape
Plan/Section/Axo Drawings --Hand drawing, photoshop,CAD
Year 4
Thailand 3 days Workshop
--The Interactive Diagnostic Umbrella
1:1 Bamboo typology
--Model Making, Joints design
Year 5
Costa Rica 3 days Workshop--Pavilion
--Using the construction of Bicycle wheel, tri-pod, and umbrella canopy
1:1 typology
--Model Making, Joints design
DP Architects
IBP Office-HongQiao (in build) -Office and residential area,nearly finished.
DP Architects
Nanjing Honghua Airport refreshment (Government planning,Capitalland Commercial) -plan to be the new commercial center, also including the culure resource and residential area. The runway is going to be the green park.
Concept Diagrams
Section
DP Architects
Nanjing Honghua Airport refreshment (Government planning,Capitalland Commercial)
DP Architects
IBP Office-HongQiao (in build) -Office and residential area,nearly finished.
DP Architects
HongTang Bay Residential Plot E15 E23 E26 -Resicential Area.
Rendering view
--Sketchup, CAD, photoshop
Flat types
DP Architects
HongTang Bay Residential Plot E15 E23 E26 -Resicential Area.
E15
E23
E26
DP Architects
TCL Technical Center
-Office, accomedation, warehouse, Research Center.
DP Architects
LuNeng-Haishitan Sports park (planning)
DP Architects
Huawei Headquater in Guangzhou
Hassell Shanghai
Dali Resort
-Resort area including hotel, restaurant, office,etc.
Rendering view
--Rhino, CAD, photoshop
Hassell Shanghai
Nanjing Life Plaza -commercial complex
Rendering view and concept collages --Rhino, CAD, photoshop
Hassell Shanghai
Jiangmen Hospital
-Environmental friendly hospital including old people habits
collage for concepts -- photoshop
Isosaki+HuQian Studio
2 Days Handmaking Model