ExhibitionCenter in Cerrillos DegreeProject JorgeOlivos/ Arturo Garcia Location:Cerrillos/ Santiago/ Chile. Studio advisor:ManuelAmaya. Date 2005 The goverment bought the Cerrillosairport.The planis to make a huge remodÊlation as a part of the centennial anniversary of the country. The project was approached as 3 bodies, the first one congregates the theatres, the second one, as a bridge of transition, the cafeteria , the third one is the fair ground space of 100.000 square feets. The area of Santiago in which the proyect is , has the complexity of having huge thermal deltas between day and night. To avoid expensive air conditioning , we proposed making a retractile green house. This was achived through a complex double-façade bracket , which holded the photovoltaic panels , and had a circulating system,with rolersto move. During summer this brackets could be folded.
CONVENTION CENTER
ACADEMIA (up left) Cafeteria entrance (down left) Exploded cad from cafeteria (up right) Inner images of theater foyer
CONVENTION CENTER
ACADEMIA
(up left) Cafeteria entrance (down left) Exploded cad from cafeteria (up right) Inner images of theater foyer
CONVENTION CENTER
ACADEMIA (up left) Cafeteria entrance (down left) Exploded cad from cafeteria (up right) Inner images of theater foyer (up right) Inner images of theater foyer
MEDIA CENTER
ACADEMIA
(up left) Cafeteria entrance (down left) Exploded cad from cafeteria (up right) Inner images of theater foyer (up right) Inner images of theater foyer
(down left) Exploded cad from cafeteria
(up right) Inner images of theater foyer (up right) Inner images of theater foyer
ExhibitionCenter in Cerrillos DegreeProject JorgeOlivos/ Arturo Garcia Location:Cerrillos/ Santiago/ Chile. Studio advisor:ManuelAmaya. Date 2005 The goverment bought the Cerrillosairport. The planis to make a huge remodÊlation as a part of the centennial anniversary of the country. The project was approached as 3 bodies, the first one congregates the theatres, the second one, as a bridge of transition, the cafeteria , the third one is the fairground space of 100.000 square feets. The area of Santiago in which the proyect is , has the complexity of having huge thermal deltas between day and night. To avoid expensive air conditioning , we proposed making a retractile green house. This was achived through a complex double-façade bracket , which holded the photovoltaic panels , and had a circulating system,with rolersto move. During summer this brackets could be folded. In winter they could be deploied
ACADEMIA
MEDIA CENTER
HOTEL 17
WORK
Project coordination:CarlosSeisdedos Location: Cerro Concepción / Valparaiso / Chile U6Arquitects.Urquiza-Seisdedos Finished in 2010 The proyect looked to become the first Boutique Hotel specialized in wine tasting. The breath taking view is the scenario for the 11 rooms of the hotel. As a part of a remodellling proyect,the Hotel was an old house from the Concepcion Hill. Built entirely in the inside the main façade has to be left intact. The mayor’s office was strict about not changing the core-structure of the house. A contemporary glass attic was designed to leave more space for new rooms. Several case studies were made for the main façade.
HOTEL 17 (up right) Inner images of theater foyer (up right) Inner images of theater foyer
WORK
(down left) Exploded cad from cafeteria
LA DEHESA HILLS
WORK Project coordination:AlbertoDuarte Location:La Dehesa/ Santiago / Chile GeAiarquitectos UNDER CONSTRUCTION Site plan A-A section B-lT-sertion WORK:Cad+ renders
The 14 minimalist villas are arranged around a series of linked courtyard gardens at each level. The villas are designed with the simple palette of materials, white rendered walls,stone cladding and glass. On the externa elevations openable glazed panels articulate the faรงade andallow the building to maximize the breezescoming off the valley.The route of the staircase through the building was carefully consideredto open up different views of the courtyards and the wider landscape. By manipulating a small number of materials and details each villa appears unique whileoverallthe projectisviewedasa singlesculpturalcomposition.
WORK
LA DEHESA HILLS
LA DEHESA HILLS
WORK
Project coordination:AlbertoDuarte Location:La Dehesa/ Santiago / Chile GeAiarquitectos UNDER CONSTRUCTION The 14 minimalist villas are arranged around a series of linked courtyard gardens at each level. The villas are designed with the simple palette of materials, white rendered walls,stone cladding and glass. On the externa elevations openable glazed panels articulate the faรงade andallow the building to maximize the breezescoming off the valley.The route of the
(down left) Exploded cad from cafeteria (up right) Inner images of theater foyer (up right) Inner images of theater foyer 620
655
495
505
290
500
313
00
3b
4
5a
11a
15
17
19
(up right) Inner images of theater foyer
-1.89 -1.86 -1.88
-2.05
-1.78
Línea Oficial según certificado de Línea Nº217/04-218/04
-1.74
-1.85
-1.75
-1.73
-1.44
-1.83
DESLINDE PONIENTE =54.00 mts.
-1.77
75
20
475
105
16.28 M²
123
123
55
50 110
207
168
80
80
265
60
40
9 36 20
140
151
150
460
72
230
79
370
20
259
310
440
20
752
94
20
386
496
430
330
9
347
764
H
114
J
77
M
331
580 135
9
100
27
100
9
53
160 140
281
7
100
P
140
7
410
548
42
140
270
20
610
Ñ
6
85 20 60
V 34 a: 110 d:210 l:100
PROY.h100
220
48
417
N
5
10
18
4 60
20
3
185
281
Q S
U
eje calzada Avda. Bosques de Montemar
12
350
B1
80
220
281 x 270
128
60
542
390
E
85
20 CL 06
220 x 150
127
68
1248
410
C
20
744
286
266 9
79 271
140
9
135
V 33 a: 70 d:210 ABAT. h140 l: 140
9 22
DORMITORIO 3
BAÑO 2
60
9
1
WORK
100
20
127
0
79 43
31
P3 a70 h230 sc5
25
P3 a75 h230 sc4
10
79
43
B 11
V 35 a: 70 d:210 l:100
ABAT. h140
10 10
P3 a75 h230 sc4
P3a75 h230 sc2
5
V 32 a: 40 d:240 CONJ. h200 l: ***
B 09
25
86
79
74
150
P3 a75 h230 sc5
30 140
ZARPA
420
20
455
20
PLANTA PISO TIPO ( 3 AL 16 ) 530
390
90
465
1355
530
20 45 20
45
555
20
475
20
370
1290
-1.73
20
-1.44
-1.83
DESLINDE PONIENTE =54.00 mts.
-2.08 -1.86
20
-1.75
-1.94 25
-1.85
405
20
-1.78
Línea Oficial según certificado de Línea Nº217/04-218/04
+91.26
ESCALA 1:75
-1.97 570
-0.35
-1.77
F
440
475
I
22.5
108
30 12.5
-1.00
313
54
O
330
R
425
T
495
75
U
269.5
PISCINA EXTERIOR
p2% 20
145
50
550
50
42
-0.50
30
60
60
60
30
Línea de Edificación
30
60
-1.28
50
-1.49
L
245
B2
DREN AA LL.
30
-1.91
K
550
DREN AA LL.
20
30 10
D
495
-1.28 p= 7%
54
B
-1.79
656
50
600
A
600
p= 14%
-1.80
p= 14%
5.0
-1.28
0
m
ANTEJARDIN
ts
313.5
RETORNO
20
90
30
455
30.5 20
475
105.5
-1.74
-1.86
ACERA
.
-1.83
450
REBALSE BAJO SOLERA
REBALSE BAJO SOLERA
-1.89 -1.86 -1.88
-2.05
SUMIDERO
V 33 a: 70 d:210 ABAT. h140 l:140
90
174 x 318
22 20 38.5
79
79
sec.
V 36 a: 100 d:240 l:***
SOLERA
-1.97
B 10
149
205
84
HOME-OFFICE
DORM. SERV.
CONJ. h140.
-2.06
600
B 10
154
DORMITORIO 2
V 37 a: 100 d:240 l:***
BADEN
-1.08
165
PROY.h100
20.5 60
9 84 55 9
CL 03
285
75.5 9149
170
B 07
2C
28 28
60
220
34.5 34.5
5.5 74
16
CL 04
CONJ. h 140
750
Línea de Edificación
261
A
ANTEJARDIN
177
60 CL 08
70
169 x 292
75.5
84
110
P2a70 h230 sc6
65
6
25
125
104
3 309
LOGGIA lav.
444 177 9
271 x 285
TEKA
40
CL 03 9 35
0B
4
7
P3a65 h230 sc3 99
ESTAR
266 x 444
130
155 x 138
9
TDA
10
20
-1.03
A2
135
180
P4 a100 h230 sc8
74
155
456 68
BARANDA
B 19 LOSETA EN JARDINERAS PISOS 2 - 5 - 8 - 11 Y 14.
139
151 x 130
60
9159
108.5
P11 a46 h230 gas
59
rack
120
89
JARDINERAS EN PISOS 2 - 5 - 8 - 11 Y 14.
180 x 220
P3a70 h230 sc5
CL 15 93.5
9
BAÑO 1
13.5 9
80
130 x 130
20
BAÑO 4 SERVICIO
9 29 7
456 x 309
LOSETAS EN PISOS 3 - 4 - 6 - 7 - 9 - 10 - 12 - 13 - 15 Y 16.
d:246 l:762
138
69
108.5
14
V 41 a: 0
CONJ. h246
95
ref. 9 134
90
250
COCINA
PM8 a125 h200
d:200 l:762
CONJ. h200
40
99.5
BAÑO 3 VISITAS
3.5
92.5
79
PUERTAS EN PISOS CON JARDINERAS 2 - 5 - 8 - 11 Y 14.
d:232 l:132
47
74
81
utilero desp.
51
74
12.5
140
elec.
P12 a35 h230
54
88
80
25
187.5
15 20
20 75
81
51
9
P2 a75 h230 sc18
84
9
P6 a90 h230 sc16
9
120
28 28 28 28 28 28 28 28 28 28 28 28 28 28
18.5
54
grada solo en piso 2
392
15 gradas / h= 17.4cms. piso tipo
120
9
40
140.00 mts²
P1a130 h230 sc1
60
9
176
110
87
SALA DE MEDIDORES
10
73
94
176
20
11
79
DEPTO Nº3
50
(ART.4.2.25) EXCEDE 2/3 DEL (ART.4.2.25) EXCEDE 2/3 DEL ANCHO LIBRE REQUERIDO ANCHO LIBRE REQUERIDO 1.2X2/3 =0.80 1.2X2/3 =0.80 6 6 15 gradas / h= 17.4cms. 11 piso tipo
94
30 5
climat. agua
117
94
120
10
2 56.5
60
3
377
140
P6 a90 h230 sc16
90
ASCENSOR
117
150
120
2
20
208
140
536
139.5
70
68.5
220
193
400
94
P3 a75 h230 sc2
377 185
104
204
145 140
ANTEP. H-30 60
TDA
9
20
15
315.5 CL 14
T
CL 12
COMEDOR
140
96
168 9
84.5
P2a80 h230 sc5
96
P1 a130 h230 sc1
100.89 mts² 192
170°
16.5 30
615
610
COMEDOR
84
V 31 a: 110 d:210 l:80
465
193 56
130.5
4 1
84
99.5
59
9
59
16.5
DEPTO Nº2
130 130 x 145 9
36
84
desp.
60
P2 a80 h230 sc5
99 9
5
66
48
76.5
ESTAR
405 x 615
74
104.5 36 9
12
P2 a70 h230 sc6 BAÑO 3 VISITAS
ref.
46 02 9 5CL40
REFRIGERADOR
60 9
9
84
red seca red húm.
370
LOGGIA
TEKA
P4 a80 h230 sc4
103.5
112
V 30 a: 70 d:210 h140 l:170
268
P3 a75 h230 sc4
P3 a75 h230 sc4
10
69
159
P3 a70 h230 sc5
90
145
P3a70 h230 sc5
12 12.5
4
90
210
60
106 9 7 9
79
475 x 336
321 x 610
20
V I.5 a: 0
4
70
4
60
10
29
153
CL 1
297
347 254
251
110
2
230 x 556
CONJ. h 232
V 33 a: 70 d:210 ABAT. h 140 l: 140
30
105 85
50
V 31 a: 110 d:210 l: 80
90
V 40 a: 0
PROY. h 100
DORMITORIO 1 EN SUITE ESTAR
20
105
20
40 105
V 35 a: 70 d:210 l:100
ABAT. h 140
12
236 x 521
CL 09
COCINA
207
150 x 225
11
63
COCINA
260 x 268
205 x 114
338
139.5
9
16
56.5 2
7 34 9
60
79
4
DORMITORIO 3
HOME-OFFICE
201
140 60
9
121
DORMITORIO 4 10
154
49
Niveles : +3.77 - +6.38 - +8.99 - +11.60 - +14.21 - +16.82 - +19.43 - +22.04 - +24.65 - +27.26 - +29.87 - +32.48 +35.09 - +37.7 - +40.31
9 32 11
70
145
76
P2 a80 h230 sc5
94
70
207 x 257
B11
5
79
225 85.5
338
ASCENSOR
100 40
7 9 31
P3a75 h230 sc4
438
BAÑO 2
B11
60
79
15
79 24
70
140.5
69
79
221 x 140.5
100
P3 a70 h230 sc5 BAÑO 3 SERVICIO
10
7 155
327
13.5
86
8
9
61
74
14 151.5
CL 13
P1 a130 h230 sc1
DEPTO Nº1 132.40 mts²
145 x 112 112
61
265 x 341
35 9 33
261 x 271
B 12
331
69.5
104
DORMITORIO 3
V 38 a: 70 d:210 2C h 140 l:150
150
9
184
DORMITORIO 2
P3 a70 h230 sc5
69.5
105
640
9
20
P3 a75 h230 sc4
139
79
CL 05
9 CL 10
152.5
P3a75 h230 sc2
9
64.5
60
260 x 420
420
9 50
204
126
280
B 13
ESTAR
CONJ.
260
V 39 a: 40 d:240 h 200 l:***
20
BAÑO 2
10 10
CL 09
232 74
P3 a75 h230 sc4
88
70
P4 a90 h230 sc8
356 100
79
CL 11
152.5
5 9
80.5 155
40
79
261 x 268
50
36
420
95
DORMITORIO 2
137 95.5
9 12.5
COMEDOR
60
265
115
CL 07
65
569 60
345
160
5
295 x 530 60 95.5
154
4
109 74
20
99.5
268
284
1515
170 170 60 100
CL 12
9
20
CL 15
9
9
34.5 34.5
T 9
204
104 93.5
16
74
13.5 9 24
80.5
P3 a70 h230 sc5
P3 a75 h230 sc2
65.5
28 28 V 31 a: 110 d:210 l:80 PROY. h 100
80
220
85
165
180 x 220
rack
50
V 29 a: 3.5 d:240 h236.5 l:475
1C 1F
50
65
B02
0C
2.5 51.5
TERRAZA V 28 a: 3.5 d:240 h236.5 l:405
1C 1F
1C 1F
70
115 300 9
580
580
CL 14
180
BAÑO 1
T
DORMITORIO 1 17 SUITE
199
TDA
-1.17
1000
20
138
51.5
TERRAZA
7.20 mts² V 27 a: 3.5 d:240 h236.5 l:270
133
151.5
B 06
55
60
50
B02
V 26 a: 100 d:240 2C h 140 l: 210 65
75
LA DEHESA HILLS
20
U
75
20
580
20 V 24 a: 70 d:210 ABAT. h 140 l:130
405
T
110
495 475
220
V 24 a: 70 d:210 ABAT. h 140 l: 130
20
20
20 30 20
20
310
405
865
65
20
S1
385
755 45
151 x 274
420 x 569
475 x 340
305
105
DESLINDE SUR =40.00 mts.
Línea Oficial según certificado de Línea Nº217/04
225
60
R
425
330 270
BAÑO 1
ESTAR
DORMITORIO 1 EN SUITE
30
9
20
20
370
80
30
400
94
30
94
20
2401
764
68
77
N
129
20
100
100
48
p2%
P
42
Q S
617
100
16
15
14
13
12
11
18 estac. simples + 3 estac. dobles (x2)= 21+3=24 594.5
TOTAL ESTACIONAMIENTOS PROYECTO =24+33+39=96
p2%
548
138
p2%
45
1065
p 2.25 %
650
610
610
p2%
1555.5
p2%
20
20
160
163 252 9
% 1
140
164
143
140
tronera
220
315
canal AA.LL.
845
59
p 2.25 %
corte de losa
430
7
V 12 a:3.5 d:270 h266.5 l:315 1C1F
185
135
295
10
114
+0.50 -0.10 niv.losa
20
30
20 171
20
315
U
+0.15
proyección corte de losa
B15
+1.50 15
rampa 8 % h=0.74 / l= 9.275
+2.00
rampa 8 % h=0.76 / l= 9.475
9 gradas de 16,6 cms.
7
8
9
10
250
250
250
250
250
DESCRIPCION OBSERVACIONES
250
250
FECHA
250
REV.
+0.125
250
COTA +93 L.T.
+2.50
500
500
500
500
500
500
500
±0.00
DESLINDE ORIENTE =54.00mts.
+2.00 +1.40 niv.losa
canal AA.LL.
6
tronera
5
600
4
500
500
RAMPA 20 % PENDIENTE l=11.90 mts. h=2.38 mts.
ASIENTO EN OBRA
3
2
500
PM13 a479h188.5
610
tronera
17
700
p2%
1
250
DESCRIPCION OBSERVACIONES
20 410
124.5
454
100
-0.72
+1.00
12
+0.12
-0.48
601
79.5
570
25
417
Ñ
Tronera long. 450 cm
649
580
V 8 a:0 d:356 M.C. h356 l: 610
12
349
114
M
proyección corte de losa
PM14 a h195
602 12.5
-1.08
corte de losa
3 gradas de 18 cms.
2 gradas de 17.5 cms.
600
281 22
381
94
542
B1
500
p2%
500
J
p
77
69
V 13 a:70 d:270 l:100
PROY. h 200
75
20
536
390
H
500
G
B16
7
h=0.50 / l= 3.93+2.32=6.25 rampa 8 %
15
734 94 1248
50
18
+0.50 5a
6
canal AA.LL.
311
360
corte de losa
±0.00 38.5
500
-0.75
20
50
20
600
19
E
-0.175
KITCH.
60
B17
219
19
315
10
rampa 8 % h=0.35 / l= 4.375
9
71
740
C
20
430
V I.4 a:0 d:240 h 240 l:84 ABATIR
SALA MULTIUSO
20
111 40
330
20
140
135
±0.00
120
20 60
890.5
80
ANTEJARDIN
1000
FECHA
9
23
135.5
COTA +93 L.T.
214.5
170
410 440
500
Línea de Edificación
9 21 9
270
7
9
V I.4 a:0 d:240 63 h 240 l:84
±0.00
Toma de aire por cielo
V 14 a:70 d:270 CONJ. h 200 l: ***
PM10 a93.5 h92
REV.
150
BAÑO M.
ABATIR
Z.V.S. 1
2402
p6%
-0.91
74
A2
5
DESLINDE NORTE =40.00 mts.
161
21
500
-1.03
-1.05
95
4
d:356 l:285
PM11 a78.5 h92
23
SALA ESTUDIO
ESCAPE
B04
500
-1.17
-1.00
94
P3 a70h230 sc9
79.5
74
1222
1222
V 10 a:210 d:270 F h60 l:77
101
65
171
V 9 a:0
CONJ. h356
7
20
114
±0.00
77
191
85
59
9
avance
137
79
9
P3 a70 h230 sc9
avance
114 13 67 54
94
10
SAUNA
20 75 9
P6 a90 h230 sc16
51
BAÑO P3a75 h230 sc7
20
avance
84
V 11 a: 210 d:270 P h60 l:79.5
15 40
200
13
94
Z.V.S. 4
DESHUMIDIFICADOR
BAÑO H.
9
82
40
120
148
ESCAPE
1248
COTA +93 L.T.
325
d:240 l:79
295
28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
±0.00
V I.3 a:0
ABATIR h 240
9
54
piso 1
147
79
71
LOCKERS LOCKERS LOCKERS LOCKERS
P3 a90 h230 sc13
Z.V.S. 4
Z.V.S. 2
51
P15 a90 h230 sc22
120 94
a subterráneo 1
-0.25
500
A
p6%
500
20
DREN AA LL.
65
138 430 V I.1 a:70 d:284.5 h214.5 l:203
203
P6 a90 h230 sc16
140
18 gradas / h= 17.17 cms.
a piso 2
P15 a90 h230 sc22
100
ESCAPE
piso 1
Z.V.S. 1
Z.V.S. 3
28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 52
piso 1 10
71
a piso 2
20 gradas / h= 17.95 cms.
+0.1795
370
80
a subterráneo 1
9
117
139.5
210
ASCENSOR
100
ASCENSOR
139.5
117
344
144
149
70
(ART.4.2.25) EXCEDE 2/3 DEL ANCHO gradas / h= 17.17 cms. 21 gradas / h= 17.95cms.LIBRE REQUERIDO 1.2X2/3 =0.80
51
156 175
405
CONSERJE
9
P3 a75h230 sc9
177 18
20
d:240 l:185
P4 a100 h230 sc7
50
94
220
114
V I.2 a:0
P15 a90 h230 sc22
10
2
12
90
12 0
70
70
61
2
71
CONJ.h240
94
120
201
140 9
P2 a80 h230 sc10
68.5
136
P4 a90 h230 sc10
94
CORTE CHALLA SHAFT BASURAS
806
-0.90
45
85 106
337
CONJ.
10 79
P3a75 h230 sc25
2
Z.V.S. 2
-0.40
V 17 a:210 d:270 l:80
±0.00
FIJA
V 1 a:0 d:318 h 318 l:400 400
460
430 161
151
30
ancho rampa 90
136
106
61 G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
MUCAMAS
G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
G-300-2
LOCKERS EQUIMET
V 18 a:210 d:270 l:60 PROY. h 60
V 18 a:210 d:270 l:60 PROY. h 60 PROY. h 60
V 18 a:210 d:270 l:60
V 18 a:210 d:270 PROY. h 60 l:60 V 18 a:210 d:270 PROY. h 60 l:60
90
2400
710.5
915 20 576
441 20
DESLINDE SUR =40.00 mts.
56.5 2
3 gradas de 14 cms. V 15 a:210 d:270 1C1F h 60 l:291
500
Línea Oficial según certificado de Línea Nº217/04
110 20 130 160
60 20 60 20
60
640
20
420
60 20
390
1988
PROY. h 60
250
60
60.5
180 20 60
580
180
CESPED ARMADO
Z.V.S. 3
600
V 16 a:210 d:270 PROY. h 60 l:71
412
Tronera 200 x 50
ESCAPE
piso 1
SALA CINE
170
250
130
G-300-2
250
40
LOCKERS EQUIMET
250
30
367
CL 1 R. SECA R. HUMEDA 170°
338
250
105
79
COTA +93 L.T.
60
.5
75
5 20
500
eje calzada Avda. Francisco Soza
185
73
9
-0.48
500
100
160
16
161
9 21
185
3
AREA ESPARCIMIENTO 38.35m2
359
PROYECCION CIELO
5
500
-1.21
120
1
PM12 a157.5 h92
RECEPCION 135
D
±0.00
11.520
390
11
-1.39
p6%
124.5
17
+0.70
9
-1.15
P2 a75 h230 sc11
54
+0.35
8
l=11.50 mts.
94
±0.00
-1.38
rampa p 8.26 %
P3 a75 h230 sc25
250
-1.27
A1
GIMNASIO
ESTAR
49
250
5
3f
-95
-0.35 0
PISCINA TEMPERADA 38.70m2
V 4 a:0 d:356 M.C. h 356 l: 555
29
250
4
E D I F I C I O
±0.00
B17
ESPEJO DE AGUA
-1.48
C.I. AA.LL. V 7 a: 0 d:356 M.C. h 356 l:370
900
43
813
110
20
Toma de aire por cielo
250
-1.35
V 6 a:0 d:356 M.C. h 356 l: 475
90
PROYECCION CIELO
CRISTAL TEMPLADO EMPOTRADO
V 3 a:-24 d:356 M.C. h 380 l:465
180
-0.48 375
60
138
V 2 a: -24 d:356 M.C. h 380 l:455 55
B18
240
190
-1.12
p= 1%
30
20
ESPEJO DE AGUA
250
3
65
60
p= 1%
V 5 a:0 d:356 M.C. h 356 l: 405
250
65
p= 7%
20
250
2
65
138
138
120
-1.72
250
eje calzada Avda. Francisco Soza
-1.21
4
8
20
45
O
330
2015
REFRIGERADOR
-1.39
-1.15
260
395
L
105
245 210
12.5
120
REFRIGERADOR
-1.38
40
B06
110
-1.48
-1.27
9
261
60
K1
140
50
95
V 21 a: 3.5 d:240 h236.5 l:420
130
1C 1F
331
-1.35
A1
20
V 23 a: 110 d:210 PROY. h 100 l: 120
V 22 a: 3.5 d:240 1C 1F h236.5 l:295
K
90
40
140
70
30
201020
30
95
87.5
V 20 a: *** d:240 h*** l:***
CONJ.
130
70
51.5
TERRAZA 8.13 MTS.²
18.79 m2
50
138
138
123
B 01
B 01 TERRAZA
30
151
J2
370 490
50
TEKA
3
9
5
105
0B 2
295
J1
90 40
100
Línea de Edificación
60
0C
20
I
140
245 40
65
420
295
60
20
20
V 25 a: 100 d:240 l:65
475
420
PROY. h 140
20 30 20
-1.72
H1
335 475
20
229
-1.28
-1.49
F
440
935
600
D
385
495
80
B1
110
138
B
50
60
50
50
-1.91
ANTEJARDIN
5. 00
A
-1.79
250
SUMIDERO
-1.80
N
-1.28
-1.97
935
m ts
.
-1.83
-1.86
PLANTA GENERAL PISO 1 NOTAS
PROYECTO:
PROYECTO
EDIFICIO MIRO CONTENIDO
VICTOR QUIROZ C. RAUL PUELMA Z.
DIBUJO:
PLANTA ARQUITECTURA PISO 1
PROPIETARIO:
INMOBILIARIA DHELOS LIMITADA
R.U.T:
E. VALLVERDU 77.653.450-1
VERSION Nº
ESCALA
+3.00
ARQUITECTO COLABORADOR E.VALLVERDU J. P. GALLEGUILLOS
REVISO: J.P. GALLEGUILLOS
LAMINA Nº
FURNITURE
WORK
SSCC school furniture Location:Vi単a delMar/Chile Work:furniture designed
For this proyect we follow the idea that furniture is the point where the space interact with people andcreateakind of stage wherethe environment isintroduced. In the case of a school, kids are in a growing process so the design should be flexible and safe, but also be stimulating and easy to manipulate. More than creating a school imagine and serie of furniture components, our aim was to give a
(down left) Exploded cad from cafeteria (up right) Inner images of theater foyer (up right) Inner images of theater foyer (up right) Inner images of theater foyer
WORK
FURNITURE
GROOVE TOWER
COMPETITION
Project : Jorge Olivos/ José Tomás Videla Location: Manila / Philippines GeAi arquitectos 2007
The Grove Tower is conceived to provide a comfortable indoor environment using passive means to reduce mechanical means such as air conditioning in at least 35%. The typical floor area of 2,600 m2 is divided in two wings, creating an atrium, just above a ground floor garden, that allows natural daylight go “down” and the indoor air go “up” using the stack effect, improved by the “wing” shape of the building. Plants are also part of the indoor design, moderating the indoor climate, adding shade where needed, and filtering dust. The wings are grouped in a compact shape to protect the building from the strong winds and typhoon effects, that way the atrium became an architectural feature the balance the indoor environment. The façade incorporates shading louvers
GROOVE TOWER The buildings are orientated in its lenghtwise North-South, and the distance between them allows that no shadows from other buildings will cover the south faรงade in the winter midday. This south faรงade have a conservatory, improving the heat gains and keeping the house warm in the night. Building main circulation are all across north faรงade, apartments are duplex and they open both sides, allowing cross ventilation an improving the solar entering angle and heat gains of internal mass in winter. The buildings main circulations and the service rooms in houses works as a buffer zone.
COMPETITION
Beijing Garden Residences Project coordination: Jorge Aguila Location: Beijing / China AA asociados
GROOVE TOWER
COMPETITION
SSCC school furniture Location:Vi単a delMar/Chile Work:furniture designed
For this proyect we follow the idea that furniture is the point where the space interact with people andcreateakind of stage wherethe environment isintroduced. In the case of a school, kids are in a growing process so the design should be flexible and safe, but also be stimulating and easy to manipulate. More than creating a school imagine and serie of furniture components, our aim was to give a
GROOVE TOWER
COMPETITION SSCC school furniture Location:Vi単a delMar/Chile Work:furniture designed For this proyect we follow the idea that furniture is the point where the space interact with people andcreateakind of stage wherethe environment isintroduced. In the case of a school, kids are in a growing process so the design should be flexible and safe, but also be stimulating and easy to manipulate. More than creating a school imagine and serie of
GROOVE TOWER
SUSTAINABILITY WORK
Daylight Factor - winter solstice 12:00
Glare problem in the commercial plaza Summer calculation Glare problem in the commercial plaza Foot candles - winter solstice 12:00
Reflections : Glare & Daylighting analysis ECOTECH - RADIANCE
A daylight analysis was done in order to calculate the amount of light that the commercial plaza was receiving in the winter seaon. For the summer situation, a reflexivity study was necessary.
GROOVE TOWER
For this proyect we follow the idea that furniture is the point where the space interact with people andcreateakind of stage wherethe environment isintroduced. In the case of a school, kids are in a growing process so the design should be flexible and safe, but also be stimulating and easy to manipulate. More than creating a school imagine and serie of
SUSTAINABILITY WORK
SSCC school furniture Location:Vi単a delMar/Chile Work:furniture designed
Sustainable Architecture Master Studies & Consulting Cases Jorge Olivos Architect | LEED AP BD+C MSc. ClimaDesign TU M端nchen, Deutschland
GROOVE TOWER
SUSTAINABILITY WORK
Reflections : Glare & Daylighting analysis ECOTECH - RADIANCE
A daylight analysis was done in order to calculate the amount of light that the commercial plaza was receiving in the winter seaon. For the summer situation, a reflexivity study was necessary.
Daylight Factor - winter solstice 12:00
Glare problem in the commercial plaza - Summer calculation Glare problem in the commercial plaza Foot candles - winter solstice 12:00