х╗║чнСшо╛шобф╜ЬхУБщАЙщЫЖ "3$)*5&$563& 1035'0-*0 :*, 5*/(
目录 CONTENTS
建筑设计作品选集
ARCHITECTURE PORTFOLIO YIK TING
01RETREAT HOUSE
06 BUILDING TECHNOLOGY
02VISITOR INTERPRETATION CENTER
07 PHYSICAL MODELS
03PERSONAL SPACE FOR A KID
08 SKETCHES
04AEP SCHOOL
09 FREELANCE’S PROJECT
05METHOD OF DOCUMENTATION 10 FURNITURE COMPETITION & MEASURED DRAWINGS
01
10
_semester_02
Retreat House
CONCEPT A premitive structure that focus on the space experiences for user with functional structure and daylight.
02
10
_semester_03
Visitor Interpretive Center
Juxtaposition in culture . feeling . senses inspired by the genius loci of macro and micro site. And by studying the morphology of Kuala Sepetand due to historical development and topography. DESIGN INTENTION To enrich and preserve the natural environment. (mangrove forest and river bank) To encourage the intercation and cultural exchange between local and visitor. To understand the background study og Kuala Sepetang.
INTEPRETATION Why mangrove forest is so important and significant to Kuala Sepetang How historical development and topography affected the morphology of Kuala Sepetang (&59:7.3, 9-* 548.9.;* ;.*<8
1.3*&7 &3) (1:89*7 +472 &8 9-* 247J 5-414,> 4+ :&1& *5*9&3,
*=9*3) 4+ ;*79.(&11.9> +742 9-* 2&3J ,74;* +47*89 94 7.;*7 8.9*
80*1*9&1 897:(9:7* &8 94 /:=9&548* .3 9-* 8.9*G
FUNCTION OF VIC To improve the socia-economic of Kuala Sepetang To reminisce the past.
Harmony A strong essence of harmony can be feel at the beginning of journey. Visitor will engage into environment
Journey of light as hope The light penetrate into gallery about mangrove forest. Like the mangrove is the hope of Kuala Sepetang.
Connection The interlocking structure can be see everywgere in VIC. This indicates a strong connection and relationship along the journey. Visitor will loave with strong memory
03
10
_semester_04
Personal Space for Kid
SITE RESPONSE DIAGRAM
Ramp is suggested to connect the hill and field so easy to access.
Proposed site at hill as more spaces with flexibility of function can be designed due to the hierachy of the trees
Public and private zone
Field is remained as public zone so the community still can use it
CONCEPTUAL DIAGRAMS
CONNECTIVITY
05
2
1
3
D
I
10
H G RECEPTION
UP
F ADMIN OFFICE
MEETING ROOM
E UP
_semester_03.5
C
1
CONFERENCE ROOM
2
3
4
PANTRY
WC 1
D B
B
A
A
MULTI PURPOSE HALL
C
B
A D
2
1
3
D
I
H G DIRECTOR ROOM
F LIBRARY/ WAITING ROOM
FINANCE OFFICE (INACCESSIBLE)
E C
1
2
3
4
5
10
C
ID OFFICE DN
Method of Documentation & Measured Drawings
C
5
20
15
12
SURAU WC 2
WC 3
D B
BALCONY
KITCHEN
A
B
A
STUDIO
C
B
A D
1
H G
F
E
D
C
B
A
3
2
1
2226
ROOF LEVEL
9790
4297
CEILING LEVEL
761 2038
4216
1417
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWING IDEA WORKSHOP SDN. BHD. 85, JALAN TENGKERA, TAMAN KOTA LAKSAMANA, 75200 MELAKA
SOUTHWEST ELEVATION
009
09 42
2
3
H
F
G
D
E
CRUCIFORM WROUGHT IRON RAILINGS
WALL GABLE - (JIN) GOLD
VALLEY GUTTER
B
C
ANGLED TERRA COTTA RIDGE TILES WITH CEMENT GROUTING
TIMBER BATTEN
TIMBER PURLIN
TERRA COTTA V-SHAPED ROOF TILES
A
SUSPENDED CEILING
ROOF LEVEL
ROOF VOID
SUSPENDED CEILING SUSPENDED CEILING LEVEL
BUILT-IN FURNITURE MILD STEEL RECTANGULAR HOLLOW SECTION
FINANCE OFFICE
DIRECTOR ROOM
SURAU
STUDIO
KITCHEN
FIRST FLOOR LEVEL VOID (INACCESSIBLE)
SUSPENDED CEILING
SUSPENDED CEILING
SUSPENDED CEILING LEVEL
RC STAIRCASE
RC SLAB AIR VENTI BLOCK GLASS PARTITION
RECEPTION
ADMIN OFFICE
PANTRY
EXHIBITION HALL
WC1
FIVE FOOT WAY
EXPOSED BRICK WALL (ENGLISH BOND)
GROUND FLOOR LEVEL
JALAN TUN TAN CHENG LOCK
ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWING IDEA WORKSHOP, NO.85, JALAN TENGKERA, TAMAN KOTA LAKSAMANA, 75200 MELAKA `
SUSPENDED CEILING
TONGUE AND GROOVE TIMBER DECKING
DOOR LEADING TO HUTONG (SMALL ALLEY)
CERAMIC TILES
GRANITE TILES & STONE SLAB
LIME PLASTER CORNICE
20-01-2017
22
06-03-2017
LONG SECTION
022
1 : 50 TYT
42
MS. SEE KWANG LI ALL
INSIDE
INSIDE
INSIDE
OUTSIDE OUTSIDE
PLAN
OUTSIDE
PLAN
OUTSIDE
INSIDE
PLAN
INSIDE
OUTSIDE
OUTSIDE
INSIDE
RAILINGS TIMBER PANEL THREE-CENTERED TIMBER ARCH
HEADER
HEADER
GLASS HEADER TIMBER PANEL
TIMBER PANEL TIMBER FRAME GLASS
TIMBER FRAME
SECTION
SECTION
AXONOMETRY
C:\Users\ELAINE\Desktop\ng clan logo.jpg
ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWING IDEA WORKSHOP, JALAN TENGKERA, MALACCA
TIMBER FRAME
TIMBER LOUVERED PANEL
GLASS
SILL
TIMBER RAILINGS
SILL
SILL
SECTION
AXONOMETRY
AXONOMETRY
20-01-2017
WINDOWS DETAILS
06-03-2017 1:20 AN, DNA, DKTL, NR MS. SEE KWANG LI GROUP 1, 2
30
30 42
06
10
_semester_05
Building Technology
1
2 9675
3 2850
4
1
2
9675
9675
4 9675
A
4200
4200
sink kitchen
LIVING AND DINING HALL
LIVING AND DINING HALL
3625
C 3625
C
MASTER BEDROOM KITCHEN
UP
BALCONY
hob kitchen
B UP
B
kitchen sink
YARD
KITCHEN
kitchen hob
3875
3875
YARD MASTER BEDROOM
BALCONY
A
3 2850
D
BEDROOM 2
BEDROOM 3
BEDROOM 2
BEDROOM 3
D
PROJECT TITLE
DRAWING NO.
DRAWING TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1 INDUSTRIALIZED BUILDING SYSTEM (IBS)
GROUND BEAM LAYOUT
1
2 9675
DATE
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
3 2850
SHEET NO.
001
PROJECT TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1
01 15
INDUSTRIALIZED BUILDING SYSTEM (IBS)
DRAWING NO.
DRAWING TITLE
GROUND FLOOR PLAN
1
4
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
2 3625
9675
DATE
3 4200
SHEET NO.
005
05 15
4 3875
3600
3875
A
3600
11000
4200
UP
B
3600
3625
C
200
D
PROJECT TITLE
DRAWING NO.
DRAWING TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1 INDUSTRIALIZED BUILDING SYSTEM (IBS)
FIRST FLOOR BEAM LAYOUT
1
2
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
3 2850
SHEET NO.
002
PROJECT TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1
02 15
INDUSTRIALIZED BUILDING SYSTEM (IBS)
LEFT ELEVATION
1
4
DATE
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
2 3625
9675
3 4200
SHEET NO.
011
11 15
4 3875
3600
3600
11000
3600 3600
200
3600 200
11000
DRAWING NO.
DRAWING TITLE
3600
9675
DATE
PROJECT TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1 INDUSTRIALIZED BUILDING SYSTEM (IBS)
DRAWING NO.
DRAWING TITLE
SECTION B - B
DATE
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
PROJECT TITLE
SHEET NO.
014
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1
14 15
INDUSTRIALIZED BUILDING SYSTEM (IBS)
DRAWING NO.
DRAWING TITLE
SECTION A - A
DATE
03-10-2017
SCALE
1 : 100
DRAWN
TAN YIK TING
CHECKED
MR. RIZAL
SHEET NO.
013
13 15
6902,89
10354,33
0
L-SHAPED BEAMS COLUMN
PROJECT TITLE
BLD61403 / ARC3514 / ARC3512 BUILDING TECHNOLOGY 1 INDUSTRIALIZED BUILDING SYSTEM (IBS)
DRAWING NO.
DRAWING TITLE
ISOMETRIC
DATE
03-10-2017
SCALE
1 : 200
DRAWN
TEO KUO CHIEN
CHECKED
MR. RIZAL
SHEET NO.
015
15 15
150
0
40 20
07
10
_semester_01-05
Physical Models
08
10
_semester_01
Sketches
09
7333
4240
4465
500
10
3470
16210 500
19062
4380
500
_freelance 4904
Freelance â&#x20AC;&#x2122;s Projects
2852
6033
LIVING
BEDROOM 3
UP
DINING
BATH 3 KITCHEN ENTRANCE
PRIVATE COURTYARD
MASTER BEDROOM BATH 1
FAMILY DN
BATH 2
BEDROOM 2
DRYING DECK
Fern Yongâ&#x20AC;&#x2122;s Apartment
Horizon Hillâ&#x20AC;&#x2122;s interior
10
10
_fruniture_competition
Furniture Competition
The Cube Furniture for third place A minimal and rugged cube. Flexible in many ways, as a multi purpose furniture. The main purpose by using just one type of module, which allows users to move it and use it as a chair or table, and at the same time it can be stacked together to form a shelving; by placing books, bags and other neccessary elements. It can be rotated in four different directions to create an interesting play with furnitures form.
Mode of arrangements