Local Crescent Floor Plan

Page 1

Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

C RESC E

TH E

NT

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Bin

C2

Ca

6,400

py Cano

6,400

C1

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

NG DI L NG BUI STI EXI Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

35

34

A10

33

32

420 5,

28

31

30

29

E6

E1

E5

Dg

02

6,481

01

E2

6 , 4 0 0

Cd

Ce

27

400 6,

1,031.7

E3

6 , 4 0 0

6, 433

SS FA

A9 Ed

41

120 9,

26 Df

04

03

E4

6 , 4 1 5

06

05

36

37

43 400 6,

Ec

25 08 ° 85 98 . 98

B9

6, 400

07

2, 29 2

Cf

De

B8

6, 804

A8

24

10

09

14

400 6,

18 17 16

5° 11 .0 81

Ro om St or e

19

B6

ore n St Bi ns 14 bi

7, 020

20

Bi n

21

16

22

6, 40 0

A6

Ea

Dd

bi ns

200 3,

13

17 5

40

B7

A7

6, 541

39

Su bs t at i on

Bi cy cl e

38

Sw i t ch

6, 40 0

44

Sw i t chro om

St or e ra ck s

12

11

42

24

Eb

Su bSt a t i o n 6, 875

400 6,

23

15

6, 40 0

A5

1, 850

Dc

Db

7, 30 0

7, 020

500 7,

B5

50

I

7 , 0 2 0

Po st Bo xe s

A3

7 , 0 2 0

D3

02

B3

6 , 5 3 5

D4 6 , 4 0 0

B2

T E E

Ve nd i ng Ma ch i ne

Co f f ee Ma ch i ne

Fi r ep l ac e

30/11/17

Ground floor fenestration amends B1

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/17

Issued for Info.

N

05

R H

E ET T

T Y A G

11 . 31 66 °

Bb

Site General Arrangement Level 00 1:200 @ A1

Bd

Bc

Ac

Ad

Ba

The Crescent

05/11/2015 HF

JB

4, 00 0

Ab

06

Salford

4, 00 0

4,000

Aa

4° 83 .6 78

7,450

S ST TR RE E

General amendments made to GA plans

G

O

° 1 7 .2 5 7

Se at i ng

B1

2, 96 3

Lo un ge

Sh el vi ng

L LM ME E

General amendments made to GA plans

18/12/17

S

Se at i ng

H HU U

04

R

14. 729°

A1

D8

6, 40 0

A2

6 , 4 1 5

D7

03

01/03/18

H

T

6 , 4 0 0

D6

Lo bb y

400 6,

D5

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

O L D F IE L D

B4 400 6,

01

R O A D

A4

Da

Stage 04 Information

05315

MP_02_2200

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

C RESC E

TH E

NT

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Bin

C2

Ca

6,400

py Cano

6,400

C1

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

69

68

A10

67

66

420 5,

62

65

64

63

E6

E1

E5

Dg

6,481

E2

Ce

61

400 6,

6 , 4 0 0

Cd

E3

6, 433

6 , 4 0 0

79

E4

6 , 4 1 5

400 6,

81

Pl a n tSp a c e

° 85 98 . 98

B9

Ed

6, 400

59

71

70

70

Ec

Df

120 9,

A9

80 60

82

Cf

2, 29 2

B8

6, 804

A8

58

IC

De

83

400 6,

6, 875

6, 40 0

Eb

5° 11 .0 81

57

84

72

200 3,

74

B7

A7

6, 541

73

55 53

6, 40 0

A6

Ea

Dd

51 7, 020

49

400 6,

45

B6

47

43 41 56

Dc

A5

52

6, 40 0

1, 850

54 50

GU

Db

48 46 B5

44

500 7,

42

7, 30 0

7, 020

Vo i d

A4

WR

I

R O A D

400 6,

B4

Da

01

7 , 0 2 0

A3

7 , 0 2 0

02

O L D F IE L D

D3

B3

6 , 5 3 5

D4 6 , 4 0 0

E

14. 729°

04

General amendments made to GA plans

18/12/17

General amendments made to GA plans

G

30/11/17

Ground floor fenestration amends B1

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/15

Issued for info.

GU

2, 96 3

S

T

B2

R

A1

D8

6, 40 0

A2

6 , 4 1 5

D7

03

E

6 , 4 0 0

D6

T

400 6,

D5

05

O H

E ET T

Y

T

4° 83 .6 78

Ad

A G

11 . 31 66 °

GU

The Crescent Salford

Bb

Site General Arrangement

GU

Level 00M 1:200 @ A1

Bd

Bc

Ba

Ab

06

05/11/2015 HF

JB

4, 00 0

Aa

Ac

GU

4, 00 0

S ST TR RE E

B1

° 1 7 .2 5 7

4,000

L LM ME E

7,450

H HU U

R

N

GU

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

01/03/18

H

Stage 4 Information

05315

MP_02_2200M

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

C R ESC E

TH E

NT

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

py Cano

6,400

C1

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

Dc 6, 40 0

A5

1, 850

1 , 1 5 5 4 1 0

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

R O A D

B4

Da

7 , 0 2 0

D4

1, 90 0

B3

6 , 5 3 5

6 , 4 0 0

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

G

27/11/17

Internal apartment amends

F

16/11/17

Amendments made to GA plans

E

13/10/17

Amendments made to GA plans

D

08/09/17

Amendments made to GA plans

C

09/08/17

Amendments made to GA plans

B

27/07/17

Amendments made to GA plans

A

25/03/16

Three-bed units added

-

05/11/15

Issued for info.

O H

ET

G

The Crescent Salford

Bb

Site General Arrangement Level 01 1:200 @ A1

Bd

Bc

Ba

11 . 31 66 °

A

Y

T

4° 83 .6 78

Ad

Ac

Ab

Aa

RE

25/03/2016 HF

JB

4, 00 0

ST

B1

° 1 7 .2 5 7

4, 00 0

E

4,000

LM

7,450

HU

R

N

2, 96 3

S

T

B2

R

E

14. 729°

A1

D8

6, 40 0

A2

6 , 4 1 5

D7

E

6 , 4 0 0

D6

T

400 6,

D5

O L D F IE L D

D3

1, 31 5

A3

7 , 0 2 0

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

I H

Stage 4 Information

05315

MP_02_2201

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

C R ESC E

TH E

NT

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

py Cano

6,400

C1

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

B8

2, 29 2

A8

1, 625

Cf

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

615

De

° 85 98 . 98

B9

6, 400

400 6,

Df

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

7, 30 0

7, 020

500 7,

B5

Db

I

A4

400 6,

R O A D

B4

Da

7 , 0 2 0

D4

1, 90 0

B3

6 , 5 3 5

6 , 4 0 0

General amendments made to GA plans

18/12/17

General amendments made to GA plans

G

27/11/17

Internal apartment amends

F

16/11/17

Amendments made to GA plans

E

13/10/17

Amendments made to GA plans

D

08/09/17

Amendments made to GA plans

C

09/08/17

Amendments made to GA plans

B

27/07/17

Amendments made to GA plans

A

25/03/16

Three-bed units added

-

05/11/15

Issued for info.

O H

ET

G

The Crescent Salford

Bb

Site General Arrangement Level 02 1:200 @ A1

Bd

Bc

Ba

11 . 31 66 °

A

Y

T

4° 83 .6 78

Ad

Ac

Ab

Aa

RE

25/03/2016 HF

JB

4, 00 0

ST

B1

° 1 7 .2 5 7

4, 00 0

E

4,000

LM

7,450

HU

R

N

2, 96 3

S

T

B2

R

E

14. 729°

A1

D8

6, 40 0

A2

6 , 4 1 5

D7

E

6 , 4 0 0

D6

T

400 6,

D5

O L D F IE L D

D3

1, 31 5

A3

7 , 0 2 0

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

01/03/18

H

Stage 4 Information

05315

MP_02_2202

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

C R ESC E

TH E

NT

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

py Cano

6,400

C1

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

7, 30 0

7, 020

500 7,

B5

Db

I

A4

400 6,

R O A D

B4

Da

7 , 0 2 0

D3

B3

6 , 5 3 5

D4 6 , 4 0 0

General amendments made to GA plans

18/12/17

General amendments made to GA plans

G

27/11/17

Internal apartment amends

F

16/11/17

Amendments made to GA plans

E

13/10/17

Amendments made to GA plans

D

08/09/17

Amendments made to GA plans

C

09/08/17

Amendments made to GA plans

B

27/07/17

Amendments made to GA plans

A

25/03/16

Three-bed units added

-

05/11/15

Issued for info.

O H

ET

G

The Crescent Salford

Bb

Site General Arrangement Level 03 1:200 @ A1

Bd

Bc

Ba

11 . 31 66 °

A

Y

T

4° 83 .6 78

Ad

Ac

Ab

Aa

RE

30/03/2016 HF

JB

4, 00 0

ST

B1

° 1 7 .2 5 7

4, 00 0

E

4,000

LM

7,450

HU

R

N

2, 96 3

S

T

B2

R

E

14. 729°

A1

D8

6, 40 0

A2

6 , 4 1 5

D7

E

6 , 4 0 0

D6

T

400 6,

D5

O L D F IE L D

A3

7 , 0 2 0

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

01/03/18

H

Stage 4 Information

05315

MP_02_2203

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

B4

Da

7 , 0 2 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

G

27/11/17

Internal apartment amends

F

16/11/17

Amendments made to GA plans

E

13/10/17

Amendments made to GA plans

D

09/08/17

Amendments made to GA plans

C

09/08/17

Amendments made to GA plans

B

27/07/17

Amendments made to GA plans

A

25/03/16

Three-bed units added

B3

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5

B1

2, 96 3

B2

14. 729°

4° 83 .6 78

11 . 31 66 °

Salford Bb

Site General Arrangement Level 04 1:200 @ A1

Bd

Bc

Ac

Ab

Aa

Ad

Ba

The Crescent

25/03/2016 HF

JB

4, 00 0

A1

6, 40 0

A2

° 1 7 .2 5 7

4,000

D8

7,450

6 , 4 1 5

D7

4, 00 0

6 , 4 0 0

D6

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

I H

Stage 3 Pre Construction

05315

MP_02_2204

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

TH E

C R ESC E

NT

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

O L D F IE L D

E

General amendments made to GA plans

01/03/18

General amendments made to GA plans

G

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/15

Issued for info.

O H

ET

T G

11 . 31 66 °

A

Y

Ad

Bb

Level 06 1:200 @ A1

Bd

Bc

Ac

Ab

Aa

4° 83 .6 78

Site General Arrangement

05/11/2015 HF

JB

4, 00 0

Ba

The Crescent Salford

7, 45 0

RE

4, 00 0

ST

B1

° 1 7 .2 5 7

4,000

E

7,450

LM

4,000

HU

R

N

2, 96 3

S

T

B2

R

E

14. 729°

6, 40 0

A2

T

400 6,

B3

A3

6, 40 0

400 6,

R O A D

B4

I

A1

01/03/18

H

Stage 4 Information.

05315

MP_02_2206

I


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

B4

Da

7 , 0 2 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

B3

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5

B1

2, 96 3

B2

14. 729°

4° 83 .6 78

11 . 31 66 °

Salford Bb

Site General Arrangement Level 07 1:200 @ A1

Bd

Bc

Ac

Ab

Aa

Ad

Ba

The Crescent

05/11/2015 HF

JB

4, 00 0

A1

6, 40 0

A2

° 1 7 .2 5 7

4,000

D8

7,450

6 , 4 1 5

D7

4, 00 0

6 , 4 0 0

D6

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

F E

Stage 4 Information

05315

MP_02_2207

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

B4

Da

H

01/03/18

General amendments made to GA plans

G

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/15

Issued for info.

7 , 0 2 0

A3

7 , 0 2 0

D3

B3

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5

B1

2, 96 3

B2

14. 729°

4° 83 .6 78

11 . 31 66 °

Salford Bb

Site General Arrangement Level 08 1:200 @ A1

Bd

Bc

Ac

Ab

Aa

Ad

Ba

The Crescent

05/11/2015 HF

JB

4, 00 0

A1

6, 40 0

A2

° 1 7 .2 5 7

4,000

D8

7,450

6 , 4 1 5

D7

4, 00 0

6 , 4 0 0

D6

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

Stage 4 Information

05315

MP_02_2208

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

B4

Da

7 , 0 2 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/15

Issued for info.

B3

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5

B1

2, 96 3

B2

14. 729°

4° 83 .6 78

11 . 31 66 °

Salford Bb

Site General Arrangement Level 09 1:200 @ A1

Bd

Bc

Ac Ac

Ab Ab

Aa Aa

Ad Ad

Ba

The Crescent

05/11/2015 HF

JB

4, 00 0

A1

6, 40 0

A2

° 1 7 .2 5 7

4,000 4,000

D8

7,450 7,450

6 , 4 1 5

D7

4, 00 0

6 , 4 0 0

D6

4,000 4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

H G

Stage 4 Information.

05315

MP_02_2209

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

F

01/03/18

General amendments made to GA plans

E

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

6, 40 0

B1

2, 96 3

B2

14. 729°

° 1 7 .2 5 7

4,000 4,000

1:200 @ A1

Bd

Bc

Ab Ab

Ad Ad

11 . 31 66 °

Bb

Level 10-14 05/11/2015 HF

JB

4, 00 0

4,000 4,000 Aa Aa

4° 83 .6 78

Site General Arrangement 7, 45 0

Ba

The Crescent Salford

4, 00 0

Ac Ac

7,450 7,450

A1

A2

400 6,

B3

A3

6, 40 0

400 6,

B4

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

Stage 4 Information

05315

MP_02_2210

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

F

01/03/18

General amendments made to GA plans

E

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

6, 40 0

B1

2, 96 3

B2

14. 729°

° 1 7 .2 5 7

4,000 4,000

1:200 @ A1

Bd

Bc

Ab Ab

Ad Ad

11 . 31 66 °

Bb

Level 10-14 05/11/2015 HF

JB

4, 00 0

4,000 4,000 Aa Aa

4° 83 .6 78

Site General Arrangement 7, 45 0

Ba

The Crescent Salford

4, 00 0

Ac Ac

7,450 7,450

A1

A2

400 6,

B3

A3

6, 40 0

400 6,

B4

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

Stage 4 Information

05315

MP_02_2210

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

F

01/03/18

General amendments made to GA plans

E

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

6, 40 0

B1

2, 96 3

B2

14. 729°

° 1 7 .2 5 7

4,000 4,000

1:200 @ A1

Bd

Bc

Ab Ab

Ad Ad

11 . 31 66 °

Bb

Level 10-14 05/11/2015 HF

JB

4, 00 0

4,000 4,000 Aa Aa

4° 83 .6 78

Site General Arrangement 7, 45 0

Ba

The Crescent Salford

4, 00 0

Ac Ac

7,450 7,450

A1

A2

400 6,

B3

A3

6, 40 0

400 6,

B4

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

Stage 4 Information

05315

MP_02_2210

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

F

01/03/18

General amendments made to GA plans

E

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

6, 40 0

B1

2, 96 3

B2

14. 729°

° 1 7 .2 5 7

4,000 4,000

1:200 @ A1

Bd

Bc

Ab Ab

Ad Ad

11 . 31 66 °

Bb

Level 10-14 05/11/2015 HF

JB

4, 00 0

4,000 4,000 Aa Aa

4° 83 .6 78

Site General Arrangement 7, 45 0

Ba

The Crescent Salford

4, 00 0

Ac Ac

7,450 7,450

A1

A2

400 6,

B3

A3

6, 40 0

400 6,

B4

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

Stage 4 Information

05315

MP_02_2210

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

R O A D

C EN T TH E C R E S

O LD F IE LD

B3 B1 B2

LM E

ST RE

ET

400 6,

A9

400 6,

A10

HU

F

01/03/18

General amendments made to GA plans

E

18/12/17

General amendments made to GA plans

D

27/11/17

Internal apartment amends

C

16/11/17

Amendments made to GA plans

B

13/10/17

Amendments made to GA plans

A

08/09/17

Amendments made to GA plans

-

05/11/15

Issued for info.

6, 40 0

B1

2, 96 3

B2

14. 729°

° 1 7 .2 5 7

4,000 4,000

1:200 @ A1

Bd

Bc

Ab Ab

Ad Ad

11 . 31 66 °

Bb

Level 10-14 05/11/2015 HF

JB

4, 00 0

4,000 4,000 Aa Aa

4° 83 .6 78

Site General Arrangement 7, 45 0

Ba

The Crescent Salford

4, 00 0

Ac Ac

7,450 7,450

A1

A2

400 6,

B3

A3

6, 40 0

400 6,

B4

A4

7, 30 0

500 7,

B5

A5

6, 40 0

400 6,

B6

6, 40 0

A6

200 3,

B7

A7

6, 40 0

400 6,

5° 11 .0 81

B8

2, 29 2

A8

B9

° 85 98 . 98

Stage 4 Information

05315

MP_02_2210

F


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

° 85 98 . 98

Cf

B8

2, 29 2

A8

B9

6, 400

400 6,

Df

200 3,

B7

A7

6, 875

6, 40 0

400 6,

5° 11 .0 81

De

400 6,

B6

7, 020

6, 40 0

A6

Dd

6, 40 0

A5

1, 850

Dc

A4

7, 30 0

7, 020

500 7,

B5

Db

400 6,

B4

Da

7 , 0 2 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

-

05/11/15

Issued for info.

B3

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5

B1

2, 96 3

B2

14. 729°

4° 83 .6 78

11 . 31 66 °

Salford Bb

Site General Arrangement Level 15 1:200 @ A1

Bd

Bc

Ac

Ab

Aa

Ad

Ba

The Crescent

05/11/2015 HF

JB

4, 00 0

A1

6, 40 0

A2

° 1 7 .2 5 7

4,000

D8

7,450

6 , 4 1 5

D7

4, 00 0

6 , 4 0 0

D6

4,000

D2

6, 40 0

1 , 8 5 0

7, 45 0

D1

H G

Stage 4 Information

05315

MP_02_2215

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

6, 400

400 6,

Df

A8

Cf

200 3,

A7

6, 875

400 6,

De

400 6,

7, 020

A6

Dd

A5

1, 850

Dc

A4

7, 020

500 7,

Db

400 6,

Da

7 , 0 2 0

D1

1 , 8 5 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

05/11/15

Issued for info.

-

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5 6 , 4 0 0

° 1 7 .2 5 7

Ad

Ac

Ab

Aa

4,000

A1

D8

7,450

6 , 4 1 5

D7

14. 729°

A2

D6

4,000

D2

H G

The Crescent Salford Site General Arrangement Level 17-19 1:200 @ A1

05/11/2015 HF

JB

Stage 4 Information

05315

MP_02_2217

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

6, 400

400 6,

Df

A8

Cf

200 3,

A7

6, 875

400 6,

De

400 6,

7, 020

A6

Dd

A5

1, 850

Dc

A4

7, 020

500 7,

Db

400 6,

Da

7 , 0 2 0

D1

1 , 8 5 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

05/11/15

Issued for info.

-

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5 6 , 4 0 0

° 1 7 .2 5 7

Ad

Ac

Ab

Aa

4,000

A1

D8

7,450

6 , 4 1 5

D7

14. 729°

A2

D6

4,000

D2

H G

The Crescent Salford Site General Arrangement Level 17-19 1:200 @ A1

05/11/2015 HF

JB

Stage 4 Information

05315

MP_02_2217

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

6, 400

400 6,

Df

A8

Cf

200 3,

A7

6, 875

400 6,

De

400 6,

7, 020

A6

Dd

A5

1, 850

Dc

A4

7, 020

500 7,

Db

400 6,

Da

7 , 0 2 0

D1

1 , 8 5 0

A3

7 , 0 2 0

D3

01/03/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

05/11/15

Issued for info.

-

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5 6 , 4 0 0

° 1 7 .2 5 7

Ad

Ac

Ab

Aa

4,000

A1

D8

7,450

6 , 4 1 5

D7

14. 729°

A2

D6

4,000

D2

H G

The Crescent Salford Site General Arrangement Level 17-19 1:200 @ A1

05/11/2015 HF

JB

Stage 4 Information

05315

MP_02_2217

H


Copyright of this drawing is vested in 5plus Architects and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. Do not scale from this drawing.

All Contractors must visit the site and are responsible for taking and checking all dimensions relative to their work. 5plus Architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

CONSTRUCTION - It is considered that the proposed works are within the scope of a competent Contractor and as such no unusual hazards have been identified, refer to relevant Key/ Schedule/ Designers Risk Assessment

B3

5,066 6,400 6,400

B1

6,400 6,400

C6

6,400 5,450

C5

B2

5,450

C4

5,450

C3

Ca

6,400

C2

O LD F IE LD

C9

C8

C7

2 C1

1 C1

0 C1

C1 6

5 C1

4 C1

3 C1

R O A D

C EN T TH E C R E S

6,400

C1

6,400

HU

6,400 6,400

LM E

6,400

ST RE

ET

020 7,

Ca

Cb

020 7,

850 1,

Cc

020 7,

850 1,

Cb

Dh

Cc

020 7,

6, 400

Cd

A10

420 5,

Dg

Ce

120 9,

A9

6, 433

400 6,

Cd

6, 400

400 6,

Df

A8

Cf

200 3,

A7

6, 875

400 6,

De

400 6,

7, 020

A6

Dd

A5

1, 850

Dc

A4

7, 020

500 7,

Db

400 6,

Da

7 , 0 2 0

D1

1 , 8 5 0

A3

7 , 0 2 0

D3

01/13/18

General amendments made to GA plans

18/12/17

General amendments made to GA plans

F

27/11/17

Internal apartment amends

E

16/11/17

Amendments made to GA plans

D

13/10/17

Amendments made to GA plans

C

08/09/17

Amendments made to GA plans

B

09/08/17

Amendments made to GA plans

A

27/07/17

Amendments made to GA plans

05/11/15

Issued for info.

-

6 , 5 3 5

D4 6 , 4 0 0

400 6,

D5 6 , 4 0 0

° 1 7 .2 5 7

Ad Ad

Ac Ac

Ab Ab

Aa Aa

4,000 4,000

A1

D8

7,450 7,450

6 , 4 1 5

D7

14. 729°

A2

D6

4,000 4,000

D2

H G

The Crescent Salford Site General Arrangement Level 20 1:200 @ A1

05/11/2015 HF

JB

Stage 4 Information

05315

MP_02_2220

H


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.