Ying Wah Danforth Manchester Floor Plan

Page 1

Rev Date

24/03/17 Area boundaries updated

MW

DS

B

Area boundaries updated to 31/03/17 reflect apartment changes

MW

DS

C

Ensuites added, furniture 05/04/17 updated to reflect latest pack

MW

DS

D

Additional columns added to 10/05/17 area schedule

MW

DS

XC 1

E

X1

D C

DA-00-06 Town House 3B GF

2 B

XA

A

X2 UP

DA-00-05 Town House 2B GF

3

X3 UP

UP

4 DA-00-04 Town House 2B GF

UP

X4

UP

5 H

X5 DA-00-03 Town House 2B GF

Accommodation Areas BOH/Communal Town House 2 Bed

6

DA-00-02 Town House 2B GF 40.03 m² 430.9 ft²

Town House 3 Bed

UP

X6

7

X7

8 UP

X8

9 UP

X9

10 DA-00-01 Town House 3B GF

Area Schedule (GIA) Townhouse Total Area Total Area

Area in Ft

Bath Provision

X10

Balcony Access

1 92 m²

990

Townhouse 02

80 m²

861

Townhouse 03

80 m²

861

Townhouse 04

76 m²

818

Townhouse 05

78 m²

764 840

No No

1 : 100

11 client name

No

Danforth Apartments Fortis Quays Salford M50 3XZ

No project

No

Preliminary status

No

MAR17 date

As indicated @ A1 scale

NOTE: STAGE 3 All floor plans subject to confirmation of extents of existing building structure, proposed structure and M&E design and acceptance of town house and apartment layouts

DS drawn

PL checked

FQ -BOX-DA -00 -DR -A -(08)-001 drawing number

Area Plans - Ground Floor title

D revision

833.02 job number

e: info@boxarchitects.co.uk w: www.boxarchitects.co.uk

Townhouse 06

71 m²

1no. Family Bath, 1no. Ensuite, 1no. WC/Utility 1no. Family Bath, 1no. Ensuite, 1no. WC/Utility 1no. Family Bath, 1no. Ensuite, 1no. WC/Utility 1no. Family Bath, 1no. Ensuite, 1no. WC/Utility 1no. Family Bath, 1no. Ensuite, 1no. WC/Utility 1no. Family Bath, 1no. Ensuite, 1no. WC/Utility

Level 00 Unit GIA

t: 0113 2441133 t: 020 345 70835

Townhouse 01

1 City Square, Leeds, LS1 2ES 2 Angel Square, London, EC1V 1NY

Combined Townhouses

The contractor must check all dimensions, levels and services prior to commencement of any works. Box Architects to be notified of any discrepancy. Do not scale from drawing.

A

The contractor is responsible for ensuring all works comply with all relevent statutory requirements and British standards, whether or not they are noted on this drawing.

F

Drawn by Checked by

This drawing remains the copyright of Box Architects, to be used solely for the project and information as titled. This drawing must not be copied without prior written permission.

G

Details


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.