Local Blackfriars Block 1 Floor Plan

Page 1

Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

T R I N I T Y

W A Y

HEALTH & SAFETY For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

!

Trinity B1-04-2204

05

01

02

03

6,400

6,400

CW 01

04 6,400

CW 01

05 6,400

CW 01

06

07

3,240

CW 01

7,120

CW 01

08 3,240

CW 01

CW 01

09 6,400

10 6,400

CW 01

RWP

CW 01

CW 01

12 6,400

K E Y

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

1A

CW 01

CHANNEL DRAIN

4, 000

RWP

11 6,400

Cleaning/Maintenance Risk of Falling

CW 01

CW 01 B1.00.21 Commercial Unit

Bury

D.B1.00.29 B1.00.26 Accessible WC D.B1.00.27

B1-04-2203

7, 450

1B

Level: 00 D.B1.00.26 FFL: +33.500

B1.00.27 Corridor

Black B1-04-2201

BULKHEAD

FIRE CURTAIN

D.B1.00.22

SVP B1.00.25 Store Room Corridor

RWP

SS

D.B1.00.20

SVP RWP

Riser D

Refuse Chute

Riser C

STAIR CORE B1

B1.00.20 Apartment Reception

LIFT.B1.A

1C D.B1.00.28

B1.00.24 Post Store

B1.00.22 Lift Lobby 4, 000

CW 01

L

03/06/16

Issued for Tender - landscape updated, legal boundary and section references included

K

08/03/16

Issued for Tender Package 02.

J

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

I

26/01/16

Tender Amendments - Rain water outlets indicated. Post room and kitchenette added, window removed. Accessible WC added for concierge staff. Apartment entrance space revised: Revolving door and pass door added, concierge desk, feature wall, fire place, storage unit all added. Commercial unit entrance, including canopy, moved. Louvres omitted adjacent to GL-09 and added adjacent to GL-11.

LIFT.B1.B

CW 01

CW 01

CW 01

CHANNEL DRAIN RWP

CW 01

DR

B1.00.23 Stairwell D.B1.00.21

RWP

RWP CW 01

CW 01

CW 01

CW 01

1D RWO CHANNEL DRAIN W.B1.00.01

CHANNEL DRAIN CW 01

CW 01

CHANNEL DRAIN

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

H

06/11/15

Issued for Tender.

G

03/11/15

Issued for Information and Comment.

F

21/09/15

Refuse Chute lobby removed. Issued for comment.

E

11/09/15

Refuse Chute incorporated in to plan. Issued for comment.

D

13/08/15

External facade revised. Issued for comment.

C

16/06/15

Issued for comment.

B

31/10/14

Landscaping revised, WCs to Block 1 and issued for Planning.

A

25/09/14

Issued for Planning.

B U R

Trinity

Y

Salford Block 1

Ground Floor General Arrangement Plan

S T R

1:100 A1

05.09.14

JBe

MH

E

Tender

E T

05366

_B1_02_2200

L


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

04

6,400

05

6,400

9,628

06

6,400

9,572

07

3,240

08

7,120

9,640

09

3,240

7,120

10

6,400

11

6,400

9,640

Cleaning/Maintenance Risk of Falling

12

6,400

6,400

9,572

9,628

K E Y

W.B1.01.24

W.B1.01.25

W.B1.01.26

W.B1.01.27

W.B1.01.28

W.B1.01.29

W.B1.01.30

W.B1.01.31

W.B1.01.32

W.B1.01.33

W.B1.01.34

W.B1.01.35

W.B1.01.36

W.B1.01.37

RWP

B1.01.08 1 BED E8

W.B1.01.38

W.B1.01.39

W.B1.01.40

W.B1.01.41

1A

W.B1.01.01

RWP

B1.01.10 1 BED E4

B1.01.12 1 BED E4

B1.01.01 1 BED E8

B1.01.13 1 BED E4

CW 15

CW 09

B1.01.09 1 BED E4

4, 000

W.B1.01.23

B1.01.11 1 BED F1

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SS SVP RW P

SVP RW P

SS

SVP SS

SS SVP RW P

SS

SVP

SS SVP

RW P

SS

SVP

SVP SS

RW P SVP SS

SS

B1.01.05 1 BED E6

D.B1.01.13

AP

D.B1.01.03

AP

AP

D.B1.01.04

AP

AP

L.B1.01.02

D.B1.01.02

Black B1-04-2201

SVP SS

STAIR CORE B1

Riser C

D.B1.01.01

7, 450

AP

B1.01.20 Common Corridor

D.B1.01.20

Riser D

AP

W. B1. 01. 02

D.B1.01.24

D.B1.01.12

SS SVP RW P

D.B1.01.22

D.B1.01.23

D.B1.01.05

AP

SS SVP

D.B1.01.11

SS SVP

AP

AP

SVP SS

AP

D.B1.01.10

SVP SS

D.B1.01.06

AP

B2. 01. 23 Cl eaner' s Cupboard / Chut e Room

AP

AP

SVP SS

SVP SS

D.B1.01.09

SS SVP

L.B1.01.01

RW P SVP SS

D.B1.01.07

AP

SVP SS

W. B1. 01. 22

LIFT.B1.A SVP

1C

SVP

D.B1.01.21

B1.01.02 1 BED E2

B1.01.03 1 BED E5

B1.01.04 1 BED E4

B1.01.06 1 BED E4

B1.01.07 1 BED E2

W. B1. 01. 42

B1.01.21 Lift Lobby

LIFT.B1.B

RWP W.B1.01.21

W.B1.01.20

W.B1.01.19

W.B1.01.18

W.B1.01.17

W.B1.01.16

W.B1.01.15

W.B1.01.14

W.B1.01.13

DR

B1.01.22 Stairwell

RWO W.B1.01.11

K

4, 000

SVP SS

B1-04-2203

D.B1.01.08

1B

Access Panel

SVP

CW 16

Bury

SS SVP

SS SVP

SVP

RW P SVP SS

SVP

AP

RWP W.B1.01.10

W.B1.01.09

W.B1.01.08

W.B1.01.07

W.B1.01.06

W.B1.01.05

W.B1.01.04

03/06/16

J

08/03/16

Issued for Tender Package 02.

I

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

H

14/01/16

Tender Amendments - Balcony removed, window type amended. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets added. Canopy location amended. Louvre location updated.

G

06/11/15

Issued for Tender.

F

03/11/15

Issued for Information and Comment.

E

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

D

13/08/15

External facade and balconies revised. Issued for comment.

C

16/06/15

Issued for comment.

B

31/10/14

Amendments made to plan and issued for Planning.

A

25/09/14

Issued for Planning.

W.B1.01.03

1D W.B1.01.12 9,628

9,572

9,640

7,120

9,640

9,572

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

Issued for Tender - commercial canopy highlighted.

9,628

Trinity Salford Block 1

1st Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2201

K


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

05

6,400

9,628

W.B1.05.25

04

6,400

W.B1.05.27

W.B1.05.28

07

3,240

9,572

W.B1.05.26

06

6,400

9,640

W.B1.05.29

W.B1.05.30

W.B1.05.31

W.B1.05.32

08

7,120

7,120

W.B1.05.33

W.B1.05.34

09

3,240

10

6,400

9,640

W.B1.05.35

W.B1.05.36

11

6,400

12

6,400

6,400

9,572

W.B1.05.37

9,628

W.B1.05.38

W.B1.05.40 RWO

Cleaning/Maintenance Risk of Falling

W.B1.05.41

W.B1.05.01

RWO

RW P

1A

B1.05.13 1 BED E1 B1.05.11 1 BED D1

B1.05.10 2 BED A1

B1.05.09 2 BED A1

B1.05.08 2 BED B2

B1.05.01 2 BED B2

B1.05.12 2 BED A1

SVP

4, 000

CW 21

W. B1. 05. 02

W. B1. 05. 24

RW P

K E Y

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

AP

D.B1.05.09

AP

AP

D.B1.05.10

AP

D.B1.05.11 D.B1.05.22

L.B1.05.01

AP

D.B1.05.06

AP

AP

D.B1.05.05

D.B1.05.24

AP

AP

D.B1.05.12

AP

SVP

AP

D.B1.05.13

AP

D.B1.05.01

B1.05.20 Common Corridor

D.B1.05.20 D.B1.05.23

D.B1.05.04

AP

AP

D.B1.05.03

AP

L.B1.05.02

AP

D.B1.05.02

RWP

7, 450

SVP RWP

D.B1.05.08

D.B1.05.07

SVP

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 05. 03

W. B1. 05. 23

SVP

RW P SVP SVP

SVP

Black B1-04-2201

RWP

Riser C

SVP

RW P

SVP

SVP

Riser D STAIR CORE B1

SVP

B1. 05. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP RW P SVP

SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.05.21

B1.05.04 2 BED A1

B1.05.21 Lift Lobby

B1.05.06 2 BED A3

B1.05.02 2 BED B1

B1.05.05 2 BED A2

B1.05.03 1 BED E3

LIFT.B1.B RW P

RW P

B1.05.22 Stairwell DR

CW 21

W.B1.05.20

W.B1.05.19

W.B1.05.18

9,628

W.B1.05.17 9,572

W.B1.05.16

W.B1.05.15

W.B1.05.14

W.B1.05.13

W.B1.05.12

9,640

7,120

W.B1.05.11

W.B1.05.10 9,640

J

03/06/16

Issued for Tender - balconies reinstated.

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets amended to inset terraces.

1D

RWO W.B1.05.21

4, 000

SVP

B1.05.07 2 BED B1

W. B1. 05. 04

SVP W. B1. 05. 22

B1-04-2203

Access Panel

SVP

1B

Bury

AP

RWO

W.B1.05.09

W.B1.05.07 9,572

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.05.06

W.B1.05.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comment.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

5th to 6th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2205

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

05

6,400

9,628

W.B1.05.25

04

6,400

W.B1.05.27

W.B1.05.28

07

3,240

9,572

W.B1.05.26

06

6,400

9,640

W.B1.05.29

W.B1.05.30

W.B1.05.31

W.B1.05.32

08

7,120

7,120

W.B1.05.33

W.B1.05.34

09

3,240

10

6,400

9,640

W.B1.05.35

W.B1.05.36

11

6,400

12

6,400

6,400

9,572

W.B1.05.37

9,628

W.B1.05.38

W.B1.05.40 RWO

Cleaning/Maintenance Risk of Falling

W.B1.05.41

W.B1.05.01

RWO

RW P

1A

B1.05.13 1 BED E1 B1.05.11 1 BED D1

B1.05.10 2 BED A1

B1.05.09 2 BED A1

B1.05.08 2 BED B2

B1.05.01 2 BED B2

B1.05.12 2 BED A1

SVP

4, 000

CW 21

W. B1. 05. 02

W. B1. 05. 24

RW P

K E Y

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

AP

D.B1.05.09

AP

AP

D.B1.05.10

AP

D.B1.05.11 D.B1.05.22

L.B1.05.01

AP

D.B1.05.06

AP

AP

D.B1.05.05

D.B1.05.24

AP

AP

D.B1.05.12

AP

SVP

AP

D.B1.05.13

AP

D.B1.05.01

B1.05.20 Common Corridor

D.B1.05.20 D.B1.05.23

D.B1.05.04

AP

AP

D.B1.05.03

AP

L.B1.05.02

AP

D.B1.05.02

RWP

7, 450

SVP RWP

D.B1.05.08

D.B1.05.07

SVP

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 05. 03

W. B1. 05. 23

SVP

RW P SVP SVP

SVP

Black B1-04-2201

RWP

Riser C

SVP

RW P

SVP

SVP

Riser D STAIR CORE B1

SVP

B1. 05. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP RW P SVP

SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.05.21

B1.05.04 2 BED A1

B1.05.21 Lift Lobby

B1.05.06 2 BED A3

B1.05.02 2 BED B1

B1.05.05 2 BED A2

B1.05.03 1 BED E3

LIFT.B1.B RW P

RW P

B1.05.22 Stairwell DR

CW 21

W.B1.05.20

W.B1.05.19

W.B1.05.18

9,628

W.B1.05.17 9,572

W.B1.05.16

W.B1.05.15

W.B1.05.14

W.B1.05.13

W.B1.05.12

9,640

7,120

W.B1.05.11

W.B1.05.10 9,640

J

03/06/16

Issued for Tender - balconies reinstated.

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets amended to inset terraces.

1D

RWO W.B1.05.21

4, 000

SVP

B1.05.07 2 BED B1

W. B1. 05. 04

SVP W. B1. 05. 22

B1-04-2203

Access Panel

SVP

1B

Bury

AP

RWO

W.B1.05.09

W.B1.05.07 9,572

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.05.06

W.B1.05.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comment.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

5th to 6th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2205

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

05

6,400

9,628

W.B1.11.25

04

6,400

W.B1.11.29 RWO

08

7,120

9,640

W.B1.11.27 RWO

07

3,240

9,572

W.B1.11.26

06

6,400

W.B1.11.31

W.B1.11.32

10

6,400

7,120

W.B1.11.30

09

3,240

W.B1.11.34

12

6,400

9,640

W.B1.11.33

11

6,400

6,400

9,572

W.B1.11.35

W.B1.11.36

W.B1.11.37

9,628

W.B1.11.38

W.B1.11.39

W.B1.11.40

W.B1.11.41

K E Y

W.B1.11.01

RWO

RWP

1A

B1.11.10 1 BED E1 B1.11.11 2 BED A1

B1.11.09 2 BED B2

B1.11.13 2 BED A1

B1.11.12 1 BED D1

B1.11.01 2 BED B2

B1.11.14 2 BED A3

SVP

4, 000

W. B1. 11. 02

RW P

CW 21

W. B1. 11. 24

Cleaning/Maintenance Risk of Falling

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

RWP D.B1.11.09

AP

D.B1.11.10

AP

AP

AP

D.B1.11.07

AP

AP

D.B1.11.11

AP

D.B1.11.12 D.B1.11.22

L.B1.11.01

D.B1.11.08

D.B1.11.06

D.B1.11.23

AP

AP

D.B1.11.13

B1.11.20 Common Corridor

AP

AP

D.B1.11.14

AP

D.B1.11.01

D.B1.11.20

D.B1.11.24

D.B1.11.05

AP

D.B1.11.04

AP

D.B1.11.03

AP

AP

L.B1.11.02

D.B1.11.02

7, 450

SVP

SVP

SVP

RW P

SVP

SVP

SVP

RW P

RW P

SVP W. B1. 11. 03

W. B1. 11. 23

SVP

RWP

RWP

Black B1-04-2201

RWP

SVP

SVP

SVP

Riser D

SVP

B1. 11. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP

STAIR CORE B1

Riser C

SVP

SVP

LIFT.B1.A

1C

D.B1.11.21

B1.11.08 2 BED B1 B1.11.07 1 BED E1

B1.11.04 1 BED C2

B1.11.05 1 BED C1

B1.11.02 2 BED B1

B1.11.03 1 BED C1

B1.11.06 2 BED A2

LIFT.B1.B

4, 000

SVP B1.11.21 Lift Lobby

W. B1. 11. 04

SVP

J I

RW P

W. B1. 11. 22

B1-04-2203

SVP

SVP

SVP

Bury

SVP

RW P SVP

1B

CW 21

RWO W.B1.11.21

W.B1.11.20

RWO

W.B1.11.19

DR

9,572

RWP

W.B1.11.16

W.B1.11.15

W.B1.11.14

9,640

7,120

W.B1.11.13

W.B1.11.12 6,452

W.B1.11.11

08/03/16

Issued for Tender Package 02.

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets amended to inset terraces.

1D

W.B1.11.10

W.B1.11.09

6,375

W.B1.11.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.11.07

W.B1.11.06

Issued for Tender - balconies reinstated.

H

RWO W.B1.11.17

9,628

B1.11.22 Stairwell

03/06/16

W.B1.11.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comment.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

11th to 13th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2211

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

05

6,400

9,628

W.B1.11.25

04

6,400

W.B1.11.29 RWO

08

7,120

9,640

W.B1.11.27 RWO

07

3,240

9,572

W.B1.11.26

06

6,400

W.B1.11.31

W.B1.11.32

10

6,400

7,120

W.B1.11.30

09

3,240

W.B1.11.34

12

6,400

9,640

W.B1.11.33

11

6,400

6,400

9,572

W.B1.11.35

W.B1.11.36

W.B1.11.37

9,628

W.B1.11.38

W.B1.11.39

W.B1.11.40

W.B1.11.41

K E Y

W.B1.11.01

RWO

RWP

1A

B1.11.10 1 BED E1 B1.11.11 2 BED A1

B1.11.09 2 BED B2

B1.11.13 2 BED A1

B1.11.12 1 BED D1

B1.11.01 2 BED B2

B1.11.14 2 BED A3

SVP

4, 000

W. B1. 11. 02

RW P

CW 21

W. B1. 11. 24

Cleaning/Maintenance Risk of Falling

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

RWP D.B1.11.09

AP

D.B1.11.10

AP

AP

AP

D.B1.11.07

AP

AP

D.B1.11.11

AP

D.B1.11.12 D.B1.11.22

L.B1.11.01

D.B1.11.08

D.B1.11.06

D.B1.11.23

AP

AP

D.B1.11.13

B1.11.20 Common Corridor

AP

AP

D.B1.11.14

AP

D.B1.11.01

D.B1.11.20

D.B1.11.24

D.B1.11.05

AP

D.B1.11.04

AP

D.B1.11.03

AP

AP

L.B1.11.02

D.B1.11.02

7, 450

SVP

SVP

SVP

RW P

SVP

SVP

SVP

RW P

RW P

SVP W. B1. 11. 03

W. B1. 11. 23

SVP

RWP

RWP

Black B1-04-2201

RWP

SVP

SVP

SVP

Riser D

SVP

B1. 11. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP

STAIR CORE B1

Riser C

SVP

SVP

LIFT.B1.A

1C

D.B1.11.21

B1.11.08 2 BED B1 B1.11.07 1 BED E1

B1.11.04 1 BED C2

B1.11.05 1 BED C1

B1.11.02 2 BED B1

B1.11.03 1 BED C1

B1.11.06 2 BED A2

LIFT.B1.B

4, 000

SVP B1.11.21 Lift Lobby

W. B1. 11. 04

SVP

J I

RW P

W. B1. 11. 22

B1-04-2203

SVP

SVP

SVP

Bury

SVP

RW P SVP

1B

CW 21

RWO W.B1.11.21

W.B1.11.20

RWO

W.B1.11.19

DR

9,572

RWP

W.B1.11.16

W.B1.11.15

W.B1.11.14

9,640

7,120

W.B1.11.13

W.B1.11.12 6,452

W.B1.11.11

08/03/16

Issued for Tender Package 02.

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets amended to inset terraces.

1D

W.B1.11.10

W.B1.11.09

6,375

W.B1.11.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.11.07

W.B1.11.06

Issued for Tender - balconies reinstated.

H

RWO W.B1.11.17

9,628

B1.11.22 Stairwell

03/06/16

W.B1.11.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comment.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

11th to 13th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2211

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

01

02

03

6,400

05

6,400

9,628

W.B1.11.25

04

6,400

W.B1.11.29 RWO

08

7,120

9,640

W.B1.11.27 RWO

07

3,240

9,572

W.B1.11.26

06

6,400

W.B1.11.31

W.B1.11.32

10

6,400

7,120

W.B1.11.30

09

3,240

W.B1.11.34

12

6,400

9,640

W.B1.11.33

11

6,400

6,400

9,572

W.B1.11.35

W.B1.11.36

W.B1.11.37

9,628

W.B1.11.38

W.B1.11.39

W.B1.11.40

W.B1.11.41

K E Y

W.B1.11.01

RWO

RWP

1A

B1.11.10 1 BED E1 B1.11.11 2 BED A1

B1.11.09 2 BED B2

B1.11.13 2 BED A1

B1.11.12 1 BED D1

B1.11.01 2 BED B2

B1.11.14 2 BED A3

SVP

4, 000

W. B1. 11. 02

RW P

CW 21

W. B1. 11. 24

Cleaning/Maintenance Risk of Falling

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

RWP D.B1.11.09

AP

D.B1.11.10

AP

AP

AP

D.B1.11.07

AP

AP

D.B1.11.11

AP

D.B1.11.12 D.B1.11.22

L.B1.11.01

D.B1.11.08

D.B1.11.06

D.B1.11.23

AP

AP

D.B1.11.13

B1.11.20 Common Corridor

AP

AP

D.B1.11.14

AP

D.B1.11.01

D.B1.11.20

D.B1.11.24

D.B1.11.05

AP

D.B1.11.04

AP

D.B1.11.03

AP

AP

L.B1.11.02

D.B1.11.02

7, 450

SVP

SVP

SVP

RW P

SVP

SVP

SVP

RW P

RW P

SVP W. B1. 11. 03

W. B1. 11. 23

SVP

RWP

RWP

Black B1-04-2201

RWP

SVP

SVP

SVP

Riser D

SVP

B1. 11. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP

STAIR CORE B1

Riser C

SVP

SVP

LIFT.B1.A

1C

D.B1.11.21

B1.11.08 2 BED B1 B1.11.07 1 BED E1

B1.11.04 1 BED C2

B1.11.05 1 BED C1

B1.11.02 2 BED B1

B1.11.03 1 BED C1

B1.11.06 2 BED A2

LIFT.B1.B

4, 000

SVP B1.11.21 Lift Lobby

W. B1. 11. 04

SVP

J I

RW P

W. B1. 11. 22

B1-04-2203

SVP

SVP

SVP

Bury

SVP

RW P SVP

1B

CW 21

RWO W.B1.11.21

W.B1.11.20

RWO

W.B1.11.19

DR

9,572

RWP

W.B1.11.16

W.B1.11.15

W.B1.11.14

9,640

7,120

W.B1.11.13

W.B1.11.12 6,452

W.B1.11.11

08/03/16

Issued for Tender Package 02.

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Rain water outlets amended to inset terraces.

1D

W.B1.11.10

W.B1.11.09

6,375

W.B1.11.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.11.07

W.B1.11.06

Issued for Tender - balconies reinstated.

H

RWO W.B1.11.17

9,628

B1.11.22 Stairwell

03/06/16

W.B1.11.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comment.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

11th to 13th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2211

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

For all the wet area elevations please refer to interior designer's schedule.

B4 B5

B2 B3

B1

HEALTH & SAFETY

!

Trinity

For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

B1-04-2204

05

03

05

6,400

9,572

W.B1.02.29

W.B1.02.30

W.B1.02.31

07

3,240

9,640

W.B1.02.32

W.B1.02.33

W.B1.02.34

08

7,120

W.B1.02.36

W. B1. 02. 26

B1.02.09 2 BED B2

10

6,400

7,120

W.B1.02.35

09

3,240

9,640

W.B1.02.37

W.B1.02.38

W.B1.02.39

11

6,400

12

6,400

6,400

9,572

W.B1.02.40

W.B1.02.41

RW P

W.B1.02.28

06

6,400

9,628

W.B1.02.42

W.B1.02.43

W.B1.02.44

W.B1.02.45

W.B1.02.01

RW P

9,628

W.B1.02.27

04

6,400

B1.02.10 2 BED A3

B1.02.12 1 BED D1

B1.02.11 2 BED A1

1A

B1.02.13 2 BED A1

B1.02.01 2 BED B2

B1.02.14 2 BED A3

SVP

4, 000

02 6,400

W. B1. 02. 02

01

SVP

AP

D.B1.02.10

AP

AP

AP

D.B1.02.07

AP

AP

D.B1.02.11

AP

D.B1.02.12 D.B1.02.22

L.B1.02.01

D.B1.02.08

D.B1.02.06

D.B1.02.23

AP

AP

D.B1.02.13

B1.02.20 Common Corridor

AP

AP

D.B1.02.14

AP

D.B1.02.01

D.B1.02.20

D.B1.02.24

D.B1.02.05

AP

D.B1.02.04

AP

D.B1.02.03

AP

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

L.B1.02.02

AP

D.B1.02.02

RWP

7, 450

SVP

SVP

RWP D.B1.02.09

K E Y

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWP

W. B1. 02. 03

W. B1. 02. 25

Black B1-04-2201

RWP

B1.02.07 2 BED A3

Riser C

SVP

RW P

SVP

Riser D STAIR CORE B1

SVP

B1. 02. 23 Cl eaner' s Cupboard / Chut e Room

SVP

SVP

SVP

SVP SVP

SVP RW P SVP

SVP

SVP

LIFT.B1.A

1C

D.B1.02.21

B1.02.04 1 BED C2

B1.02.05 1 BED C1

B1.02.02 2 BED B1

B1.02.03 1 BED C1

B1.02.06 2 BED A2

W.B1.02.23

W.B1.02.22

W.B1.02.21

W.B1.02.20

9,628

W.B1.02.19 9,572

W.B1.02.18

DR

W.B1.02.17

W.B1.02.16

RW P

LIFT.B1.B B1.02.22 Stairwell

W.B1.02.15

W.B1.02.14

9,640

7,120

W.B1.02.13

W.B1.02.12 6,452

W.B1.02.11

4, 000

SVP B1.02.21 Lift Lobby

W. B1. 02. 04

SVP B1.02.08 2 BED B1

RW P

B1-04-2203

W. B1. 02. 24

Bury

SVP

RW P SVP

1B

SVP

Cleaning/Maintenance Risk of Falling

1D

W.B1.02.10

W.B1.02.09

6,375

W.B1.02.08 6,385

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

W.B1.02.07

W.B1.02.06

J

03/06/16

Issued for Tender - balconies reinstated

I

08/03/16

Issued for Tender Package 02.

H

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

G

14/01/16

Tender Amendments - Balconies removed, window type amended and louvres added. Gable louvres removed, window type amended and internal balustrade omitted. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain).

W.B1.02.05

9,628

F

06/11/15

Issued for Tender.

E

03/11/15

Issued for Information and Comment.

D

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

C

13/08/15

External facade revised. Issued for comment.

B

16/06/15

Issued for comement.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

2nd to 4th. 7th to 10th. 14th to 15th Floor

General Arrangement Plan 1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2202

J


Copyright of this drawing is vested in 5plus Architect and it must not be copied or reproduced without written consent. Figured dimensions only are to be taken from this drawing. DO NOT SCALE OFF THIS DRAWING ...... IF IN DOUBT ASK

All contractors must visit the site and be responsible for taking and checking all dimensions relative to their work. 5plus architects are to be advised of any variation between drawings and site conditions.

Electronic data/ drawings issued as 'read only' and should not be interrogated for measurement. All dimensions and levels should be 'read only' from those values stated in text, on the drawings

B4 B5

B2 B3

B1

HEALTH & SAFETY For a complete list of health and safety notes refer to drawing MP_00_1200 In addition to the usual hazards associated with works of this nature the residual hazards are:-

!

Trinity B1-04-2204

05

03

04

6,400

05

6,400

6,400

06

07

3,240

08

7,120

09

3,240

D.B1.16.26

W.B1.16.24

W.B1.16.25

11

6,400

RWO W.B1.16.23

10

6,400

12

6,400

6,400

RWO

W.B1.16.26

W.B1.16.27

W.B1.16.28

B1.16.07 1 BED E9

W.B1.16.29

W.B1.16.30

W.B1.16.31

B1.16.08 1 BED E9

W.B1.16.32

B1.16.09 1 BED F1

W.B1.16.33

W.B1.16.34

W.B1.16.35

W.B1.16.36

B1.16.10 1 BED E9

W.B1.16.37

D.B1.16.23

B1.16.11 1 BED E9

AP

Access Panel

SVP

Soil Vent Pipe

RWP

Rainwater Pipe

SS

Stub Stack

RWO

Rainwater Outlet

SVP

1B

SVP

RW P

SVP

SVP

RW P

SVP

SVP

SVP

RW P

SVP

SVP

RWO

RW P SVP

SVP

W. B1. 16. 02

W. B1. 16. 22

SVP

K E Y

1A

W.B1.16.01

4, 000

02 6,400

W. B1. 16. 39

01

Cleaning/Maintenance Risk of Falling

RWO

D.B1.16.22

W. B1. 16. 20

RWO SVP

AP

D.B1.16.05

AP

AP

D.B1.16.04

D.B1.16.28

D.B1.16.20

D.B1.16.10

B1.16.20 Common Corridor

D.B1.16.27

B1. 16. 23 Cl eaner' s Cupboard / Chut e Room

L.B1.16.01

AP

D.B1.16.03

AP

Riser D

AP

AP

D.B1.16.11

AP

B1.16.20 Common Corridor

B1.16.01 2 BED G1

D.B1.16.01

AP

D.B1.16.02

AP

AP

L.B1.16.02

Black B1-04-2201

RWO SVP

STAIR CORE B1

Riser C

7, 450

AP

W. B1. 16. 03

D.B1.16.09

W. B1. 16. 04

AP

SVP

D.B1.16.08

SVP

AP

SVP

AP

SVP

D.B1.16.07

D.B1.16.06

SVP

LIFT.B1.A SVP

SVP

1C

D.B1.16.21 SVP

W. B1. 16. 38

B1.16.21 Lift Lobby B1.16.05 1 BED E9

B1.16.04 1 BED E7

B1.16.03 1 BED E9

4, 000

B1-04-2203

AP

B1.16.06 2 BED G1

SVP

Bury

SVP

W. B1. 16. 21

SVP

B1.16.02 1 BED E10

J

LIFT.B1.B

08/03/16

Issued for Tender Package 02.

04/02/16

Amendment to core. Wall between lift and riser moved to accommodate larger lift for glass replacement strategy.

H

14/01/16

Tender Amendments - Gable louvres removed. Podium core window amended and internal balustrade removed. Wardrobe amended from joinery item to door and clothing rail. Store doors amended and washing machines removed (services remain). Louvre fin balustrade amended to verticle flat plate steel balustrade around full terrace. Perimeter column locations amended and gable columns increase in size.

G

06/11/15

Issued for Tender.

I W.B1.16.19

D.B1.16.25

W.B1.16.18

W.B1.16.17

W.B1.16.16

W.B1.16.15

W.B1.16.14

W.B1.16.13

B1.16.22 Stairwell

W.B1.16.11

W.B1.16.10

RWO

W.B1.16.09

W.B1.16.08

W.B1.16.07

W.B1.16.06

D.B1.16.24

W.B1.16.05

1D

RWO

W.B1.16.12 6,778

9,572

9,650

7,110

9,640

9,572

EE

CC

Podium

BB

MP-05-2204

MP-05-2202

B1-04-2202

MP-05-2201

6,778

F

03/11/15

Issued for Information and Comment.

E

11/09/15

Refuse Chute added, Apartment layout revised. Issued for comment.

D

13/08/15

External Facade revised. Issued for comment.

C

16/06/15

Issued for comment.

B

31/10/14

Amendemnets made to plan and issued for Planning.

A

25/09/14

Issued for Planning.

Trinity Salford Block 1

16th Floor General Arrangement Plan

1:100 A1

05.09.14

JBe

MH

Tender

05366

_B1_02_2216

J


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.