Aries Fadli Prayoga's Portfolio 2016-2018

Page 1

SELECTED ARCHITECTURE PROJECT 2016-2018

PORTFOLIO UNDERGRADUATE WORK OF ARIES FADLI PRAYOGA


Aries Fadli Prayoga

Rembang, 7 April 1997 JL. Cisitu Indah 3 No 6 Rt 04 Rw 04 Kelurahan Dago, Kecamatan Coblong, Bandung +62 812 5257 6806 yogaaries9911@gmail.com linkedin.com/in/yogaaries

Hi, my name is Aries Fadli Prayoga. I’m a student at Bandung Institute of Technology majoring Architecture. Now im in 6th semester. I define myself as a pas sionate learner, hard worker, and perfectionist. I work well in team and individually. I’m always curious about learning something new. I love the process of solving problem through design. Therefore, I would like to improve my sense at profesional company.

INTEREST

Participatory Design

EDUCATION 2003 - 2009 2009 - 2012 2012 - 2015 2015 - present

MI Jenderal Sudirman, Malang SMPN 1 Malang SMAN 4 Malang Architecture Undergraduate, ITB (99 SKS ; GPA 3,22 / 4.00)

SKILL LANGUAGE Bahasa English Javanese HANDS - ON Sketch Graphic Design Digital Painting Watercolour Model Making SOFTWARE

Graphic Design

Digital Painting

SketchUp Autocad Archicad Revit Photoshop Indesign Coreldraw Ms Office Rhinocheros OPERATING SYSTEM

Fundraising

Carpentry

Windows Mac OS


ORGANIZATIONAL EXPERIENCES 2015 Best staff Graphic Design WISOKTO 2015, Annual event of KM ITB 2016 Mentor Staff Division INTEGRASI ITB 2016, Annual event of KM ITB for freshmen Acceptance 2017 Head of Media & Publication STEMA ITB, Theater interest based organisation on ITB Head of Rhone FACADE 2017, Annual Architecture excurtion event of Architecture ITB 2018 Head of Formatures GAUNG BANDUNG 2018, IMAG-ITB Annual Bandung Scale event

COMPETITION AND WORKSHOP 2016 Gaung Bandung 2016 Workshop “Sustainable Residential Technology” Participant 2017 Indonesia Landscape Design Competition “Sudirman Monumental Streetscape” Competition Submision w/ Afrilia Melati Rahma, Rifki Adrian, & Prisky Kartikasari Archevent 2017 “Microhouse” Big 5 w/ Keshia Simatupang & Davin Gerry Lineker Archiray 2017 “Traditional Market” Competition Submision w/ Nugraha S I, Adi Nur K, Fikri Anam & Bonif asius D. Sriwijaya University Competition “Rumah Panggung” Competition Submision w/ Afrilia Melati Rahma & Kania Athaya 2018 Masaraya Workshop “Digital Painting” Participant KUM IAI Points : 20

WORKING EXPERIENCE 2017 Techfest 2017 Bandung scale Event, Held by TEC ITB Working as Media Publication Designer 2018 Dirjen Sumber Daya Air Pusat Bendungan Project name : Pedoman perencanaan pembangunan embung kecil dan bangunan tampungan air lainnya di desa. (Instruksi Presiden No 1 th 2018) Working as Ilustrator


01

13

17

25

33

39


01

Sundanese Coworking Space

13

Bank BNI 46

17

Bandung Inovation Hub

25

Dari Oleh Untuk

33

Hand Drawing & Model Making Works

39

Other works

Urban Infill in Crowded Place AR 3190 5th Semester project

Comercial Building AR 3190 5th Semester project

Colaboration space on contoured site AR 3190 6th Semester project

Microhouse Competition Submission

Maquete, Manual Drawing, & Sketches

Unarchitecthural project related


Sundanese Coworking Space Urban Infill in Crowded Place AR 3190 5ft Semester project Located in Sunda Street, one of main street of bandung. Termasuk dalam zona komersil dan industri. Proyek ini bertujuan untuk merancang sebuah tempat yang nantinya akan menjadi oase dari hiruk pikuk kota. Goals dari tugas ini adalah merancang bangunan publik di lahan urban infill dengan memiliki sirkulasi udara pasif yang baik.

1


2


3


4


5


6


7


8


9


10


BNI 46 BANK

Urban Infill in Crowded Place AR 3190 5ft Semester project

Located in Hasanudin street, the main point of this excercise is to make good programming for public building. Then create circulation zone for client and employee.

11


12


Create a circulation zoning for employees and customers, on the 1st and 2nd floor.

Make wide span structure at the middle to make banking hall

Lorming a roof resembling a home to show family values, trust and eliminating rigid impression

Subtract the entrance and make a void for light to enter and have a majestic feeling

The exsisting site have a lot of tree sorounding the site. The sorounding building is housing, so not nuch traffic jam. Radical problem (Critical) Provide a building that has high security but does not seem rigid. Pragmatical (technical) The structural system must be efficient and capable of accommodating space that requires a wide space without columns such as banking hall Formal (Form) Can show credible authority Symbolitical Able to convey the philosophy objectives brought by BNI 46

13


Sawhorse Skylight Gording

Roof Gutters

Wood Facade

Wood Holder

Slab Ceramic tile

Sloof Pedastal Fondation

14


15


16


INNOVATION HUB Colaborative Space at Sloping Site AR 3290 6th Semester project

Located at Cigadung Raya Street. Main focus of this project is to create colaborative space at slooping site. This project aims to meet 3 major stakeholders in the city those are university, goverment, and people .

17


18


Measuring the building intensity. And make coloum grid based on the parking area. Make the zoning space for public, meeting, and private.

To cultivate the value of innovation in this place. The front of the building is made cantilever to give the impression “try new things�. The mass of the building following the site slope consists of two building mass connected on the 2nd and 3rd floor. Using a shear wall structure system. This shear wall structure is replaced with steel arranged in frame truss. For facades using bricks tied with pre-tensioned steel cable. So it can produce rooster from one layer of brick without using cement as adhesive. This facade is made 1m from the glass window to hide the needs of existing utilities.

19

Push the back of the mass to maximalize the amphitheater area. Then, push the second and third floor to create green roof, and make 15m cantilever mass.

Push the front florr up to create entrance to the semi basement as a parking area. Then, push the back of the mass following the slope of the site.


20


21


22


Dari, Oleh, & Untuk

Competition Submision of Archevent 2017 w/ Keshia Simatupang & Davin Gery Lineker | BIG 5

The main focus of this competition is to designing Microspace for human and to maximalize the space. This microhouse need to accommodate space requirement for 4 people with 12m2 site area. Desain aproach that we use is partisipative design.

23


24


25


26


27


28


29


30


31


32


Model Making & Handrawing works Consist of AR2210, AR 2250, AR2190, AR3250. AR3110

AR2210 (Form and Space Organization Studio), AR2250 (Construction and Building Material), AR2190 (Architectural Design Studio 1), AR3250 (Form And Structure Studio), AR 3110 (Ste Design and Planning)

33


34


AR 3110 (Ste Design and Planning) Located in babakan siliwangi. This project aims to desining spacace and sirculation for foodstall. My concept is to make secuence while exploring this place.

Sketch walk with IMAG ITB Located at Kampung 300 we aims to experience the Urban village atmosphere. After sketching we are discussing about the story of our drawing.

35


AR2210 (Form and Space Organization Studio) This project aims to make public space to connect one urban village to another. My main concept of this project is to deliver the experience of indonesian traditional games, wich is Engklak, gobak sodor, and ular naga.

AR2210 (Form and Space Organization Studio) This project aims to make shelter using differet material. The goals is to use the material tecnonicaly. Using reciprocal pricipal I use analogous design approach to be like a bird.

36


AR2190 (Architectural Design Studio 1) This project aims to make pavilioon in the middle of the park. The emphasis of this excercise is to show the thectonic of the matrerial that we use. I choose bamboo as a material then i bend it to make some inviting public space.

AR2190 (Architectural Design Studio 1) This is my very first maquete in architecture major. This project aims to desining a villa with 2 bedroom. Acomodating 4 people inside. The goals of this project is to arrange programming for a villa.

37


AR3250 (Form And Structure Studio) W/ Zahra Nurul Azmi & Grace Natania This project aims to excercise us to use membrane material. We decided to use reciprocal principal to make the star frame using bamboo, than we make cone-shape ring to pull the membran upwards then strengthen it with the cable structure.

AR3250 (Form And Structure Studio) W/ Kevin Marseli & Grace Natania This project aims to excercise us to use vector active structure. Again, we use the reciprocal principal to make this dome. The components formed from coated wooden planks. Arranged in stacking one another,

38


Other Works Consist Digital paintings, Logo making, Poster Design, Photography, and Merchandise works.

My interest in enterpreneurship lead me to formed a business called yash apparel. We designing merchandise then sell it to some freshman. We made handphone case, wristband, totebag, and many more. My interest in Digital painting lead me to receive some illustration commision to ilustrate the proccess of water harvesting in the village. My interest in Graphic design lead me into working with TEC as a media publication designer, I make the grand design of the event. I also do some logo design projects.

39


40


ARCHITECTURE PORTFOLIO Aries Fadli Prayoga +62 812 5257 6806 yogaaries9911@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.