P O R T F O L I O
Selected Architecture Project 2015-2019 Academic and Professional Work of Aries Fadli Prayoga
Introduction
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Hey, his name is Aries Fadli Prayoga. Everyone calls him Yoga. He is recent graduate of Bachelor of Architecture at Bandung Institute of Technology. This portfolio contains his journey while absorbing architecture. He loves the process of solving a problem through design. Hopefully, this portfolio can reflect how his mind works while doing the exploration of the design process and development.
Introduction
i
Curiculum Vitae
EDUCATION 2003 - 2009 2009 - 2012 2012 - 2015 2015 - present
MI Jenderal Sudirman, Malang SMPN 1 Malang SMAN 4 Malang Architecture Undergraduate, Bandung Institute of Technology (149 credits ; GPA 3.38 / 4.00)
SKILL LANGUAGE Bahasa English Javanese
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
HANDS - ON Sketch Graphic Design Digital Painting Watercolour Model Making
Aries Fadli Prayoga
SOFTWARE Drawing & BIM Autocad Archicad Revit 3d Modelling SketchUp Rhinoceros 3d Grasshopper Rendering V-Ray Keyshoot Unity 3d Editing & Layouting Adobe Photoshop Adobe InDesign Adobe Illustrator Corel Draw Microsoft Office
Rembang, 7 April 1997 JL. Cisitu Indah 3 No 6 Rt 04 Rw 04 Kelurahan Dago, Kecamatan Coblong, Bandung. 40133 +62 882 22086600 yogaaries9911@gmail.com linkedin.com/in/yogaaries Graduation: 20 July 2019
OPERATING SYSTEM Mac OS Windows
INTEREST
Participatory Design
Graphic Design
Fundraising
ii
Digital Painting
Carpentry Curiculum Vitae
Curiculum Vitae
WORKING EXPERIENCE 2019
ORGANIZATIONAL EXPERIENCES
Anggara Architeam
Chief Executive of Gaung Bandung 2018
Working as a Junior Architect Sept - Dec . Involved in 2 project as PIC and 5 others as Support 2018
GAUNG BANDUNG 2018, “Menghempas Batas Ruang Kota Kita” Annual Bandung Scale Event
LABO. Architecture + Design
Head of Formatures
Working as an Assistant Architect May - August . Involved in 5 project
GAUNG BANDUNG 2018, IMAG-ITB Annual Bandung Scale event
Dirjen Sumber Daya Air Pusat Bendungan Project name : Pedoman perencanaan pembangunan embung kecil dan bangunan tampungan air lainnya di desa. (Instruksi Presiden No 1 th 2018) Working as Ilustrator 2017
Head of Media & Publication
STEMA ITB, Theater interest based organisation on ITB
Techfest 2017
2017
Head of Rhone
Bandung scale Event, Held by TEC ITB Working as Media Publication Designer
FACADE 2017, Annual Architecture excurtion event of Architecture ITB
COMPETITION AND WORKSHOP 2019
2018
2016
Sayembara Bekasi Keren
“Lapangan Multiguna Berkuala” Competition Submision w/ Keshia Simatupang, Davin Gerry Lineker, Diajeng Nasukha, Adi Nur Khamim
Best Staff Graphic Design
2015
WISOKTO 2015, Annual event of KM ITB
Limited Space Design Competition “River Oriented Development” First Place w/ Faza Nugraha S & Adi Nur Khamim
RESEARCHES AND PUBLICATIONS
Morph Design Competition
“SemuaSamaSemuaSama” Top 15 w/ Fikri Anam, Haidhar Elhaq, Raushan Fikri 2018
The Shift in The Meaning of Nusantara Architecture Research Paper W/ Adi Nur Khamim
Masaraya Workshop
INNOVATION OR DEAD: The Mal Transformation and Paradigm
“Digital Painting” Participant
Research Paper W/ Adi Nur Khamim
Saturuang 2018
“PengAlaman” Competition Submision w/ Fikri Anam & Raushan Fikri
Study of Motorized Vehicle Preference related to Parking Resilience at ITB
2018
Published at IPLBI ITB W/ Pascal Abhijana, Ganda Saputra S., Maharani Stavira I
Dukuh Atas Transport Hub Competition “Transversarium Dukuh Atas” TOP 24 as a Asistant Architect at LABO 2017
2019
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Mentor Staff Division
INTEGRASI ITB 2016, Annual event of KM ITB for freshmen Acceptance
Indonesia Landscape Design Competition
“Sudirman Monumental Streetscape” Competition Submision w/ Afrilia Melati Rahma, Rifki Adrian, & Prisky Kartikasari
Archevent 2017
“Microhouse” First Place Encouragement Prize w/ Keshia Simatupang & Davin Gerry Lineker
Archiray 2017
“Traditional Market” Competition Submision w/ Nugraha S I, Adi Nur K, Fikri Anam & Bonifasius D.
Sriwijaya University Competition “Rumah Panggung” Competition Submision w/ Afrilia Melati Rahma & Kania Athaya 2016
Gaung Bandung 2016 Workshop “Sustainable Residential Technology” Participant
KUM IAI Points : 40
Curiculum Vitae
iii
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Table of Content
iv
Table of Content
Table of Content
02
What if we rip off that pocket area?
12
What if we remove the fences?
18
What if modern meets traditional?
28
What if the river is the new highway?
34
What if everybody is the architect?
42
What if everyone meets in one place?
48
What if we rotate the garden 90o?
52
Hand Drawing & Model Making Works
60
Other works
64
Professional works
Porosity in Pluralism: Mixed-used Redevelopment at Banceuy, Bandung AR 4050 - Undergraduate Final Project
Sukaluyu Estate AR4090 - Masterplanning Project
Sundanese Coworking Space Urban Infill in Crowded Place AR 3190 - 5ft Semester project
Competition Submision of Archevent 2017 w/ Keshia Simatupang & Davin Gery Lineker | BIG 5 | Dari, Oleh Untuk
Transversarium Jakarta MRT Jakarta Competition Project Architect: Deddy Wahjudi Working Internship Project at Labo Architecture + Design
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
River Oriented Developtment | w/ Faza Nugraha & Adi Nur Khamim Competition Texture 2019 - Limited Space | 1st Place
Reboization PoroCity AR4190 Architectural design Studio 5 Mixed-Used Building in Naripan Street
Maquete, Manual Drawing, & Sketches
Unarchitecthural project related
Selected professional works as Junior Architects at Anggara Architeam
Table of Content
1
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
2
What if we rip off that pocket area? The trend of urban development that is focused on the main pathway causes the formation of “backward� areas behind these pathways and decreased space productivity. The backward area is an isolated residential area, surrounded by a dense wall of roadside shopping buildings. Therefore, it is necessary to re-develop or rebuild from the backward area by considering the opportunity to live from the local population, justice for all residents and prospective residents, and equal opportunities for all parties to access the space. One of the backward areas in the strategic area is the Banceuy area which is the design area. This design answers the issue of the principle of correspondence (law of correspondence) and Pluralism.
Porosity in Pluralism: Mixed-used Redevelopment at Banceuy, Bandung Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Undergraduate Final Project | Supervised by Dr. Allis Nurdini, S.T., M.T.
3
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Zoning
Whoops! A Pocket Area
Population Compaction
Zona Komersil Zona Hunian Zona Pemerintahan
Circulation 392,95 people / Ha
Jalan Arteri Jalan Kolektor Jalan Lingkungan Jalan Lokal
Existing
618,58 people / Ha
Ruko Milik (81 unit) Rumah Milik (131 unit) Rumah Informal (56 unit)
4
What if we rip off that pocket area ?
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Main Issue
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
The design of this final project applies the design concept “Porosity in Pluralism” which is realized to the design of the type of unit applied for diversification, expansion, and zoning of location grouping. Besides that, the building also has communal, transitional, and spatiotemporal areas to trigger mutualism interactions between residents. The orientation of the building leads to the river with the design of the site plan concentrating the green open space on the edge of the river. Masses of buildings are formed porous with communal functions on holes in the masses. The height of the building is also designed terraces in order to adjust the city’s network in the Banceuy area. For commercial areas, it is designed to be oriented outward adjusting the potential of shadowing of mass formation.
Correspondence
Pluralism
Mixed - Used
Scan Here ! to find out more about My Final Project What if we rip off that pocket area ?
5
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Whoops!
Expansion Area towards Facade wich can be used as a new room or other fuctions
6
What if we rip off that pocket area ?
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Whoops! Expansion Area towards coridor wich can be used as a comercial area for the residents
Preserving existing Circulation!
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Permeability is a must! ripping the pocket area!
Building orientation towards the river!
Adjusting the mass respecting the urban tissue! What if we rip off that pocket area ?
7
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Shear Wall Structure Plan and Dilation
8
Dilation is given to each curve of the mass and given a balanced reinforcement using the shear wall at the core of the building.
Division of mass structures using dilation
Structure Map Condemnation
After being separated by dilation, each mass is bound with deflection so that when displacement occurs, the dilation is able to accommodate shifting of the structure.
Condemnation is divided into joists and main beams with a grid structure of 8x6 m and 6x6 m columns (tower section), and 8x8 m (podium sections).
What if we rip off that pocket area ?
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if we rip off that pocket area ?
9
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
10
What if we rip off that pocket area ?
Undergraduate Final Project - Porosity in Pruralism: Mixed Used Redevelopment at Banceuy, Bandung
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if we rip off that pocket area ?
11
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
12
What if we remove the fences ? The process of population urbanization is a problem that inevitably occurs in a city. Slum problems, gaps, crime, traffic jams, and so on. It is the impact of a city that is unable to accept the increase in population moving to the city. Bandung city is one of the biggest cities in Indonesia. The flow of urbanization to Bandung city reached 0.5-0.7% of the total population which was registered in the city of Bandung. So it is necessary to increase the density of a city, in this task the author increases the housing capacity in the Sukaluyu area. Usually, area redevelopment uses gated community norms to make a housing area more exclusive. This project is trying to redefine the form of housing to be more inclusive and permeable. Is it possible?
Perumahan Sukaluyu Guyub Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR4090 / 5ft Semester Masterplanning Project
13
AR4090 - Masterplanning Project
Project Description Redeveloptment Area : 115518 m² Site Building Coverage Ratio : 60% Site Green Coverage Area : 20%
Circulation Analysis
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Main road : KH. Hasan Mustofa Street Primary Street : Jalaprang Street Every street is have two lanes. Public transportation can entry the site trough Jalaprang Street
Existing Housing Comunity Park Public & Social Building Housing Type A Housing Type B Housing Type C
Zoning Consist of Housing Zone and public facilities. Sourounded with comercial area. Housing Area Public Facilies Area Comercial Area
Phisycal Analysis Temperature 23.3 Co Rain Average 2173 mm/ year Sun Rise : East Sun Set : West
Site Location Sukaluyu, Cibeunying Kaler, Kota Bandung, Jawa Barat 40123
14
What if we remove the fences ?
AR4090 - Masterplanning Project
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if we remove the fences ?
15
AR4090 - Masterplanning Project
Utilitas
Penutup Atap
Lantai 2
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Sirkulasi
Lantai 1 Zonasi
Massa Bangunan
Vegetasi
16
What if we remove the fences ?
AR4090 - Masterplanning Project
1. Apartment 2. Row House 3. Kindergarde 4. Reading Park 5. Comunity Hall 6. Sport Facilities 7. Mosque 8. Elementary School 9. Shopping Area 10. Security Guard Post 11. Waste Processing Area 11A. Waste Area 11B. Waste Bank Locket 11C. Organic Waste processing area 11D. Non-Organic Waste processing area 12. Communal Parking Area
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if we remove the fences ?
17
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
18
What if modern meets traditional ? Located in Sunda Street, one of the main street of Bandung. Included in commercial and industrial zones. This project aims to design a place that will later become an oasis from the hustle and bustle of the city. The goal of this task is to design public buildings on urban infill land by having good passive air circulation.
Sundanese Coworking Space Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Urban Infill in Crowded Place AR 3190 5ft Semester project
19
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR3190 - Urban Infill Project
20
What if modern meets traditional ?
AR3190 - Urban Infill Project
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if modern meets traditional ?
21
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR3190 - Urban Infill Project
22
What if modern meets traditional ?
AR3190 - Urban Infill Project
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if modern meets traditional ?
23
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR3190 - Urban Infill Project
24
What if modern meets traditional ?
AR3190 - Urban Infill Project
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if modern meets traditional ?
25
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR3190 - Urban Infill Project
26
What if modern meets traditional ?
AR3190 - Urban Infill Project
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if modern meets traditional ?
27
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
28
What if the river is the new highway ? “The river, which should have been the beginning civilization, has begun to be forgotten. The street becomes the main attraction in the city. The city sees the river as the backyard. Could we redefine the river as a new highway? So the river could become the frontage of the city.” The city of Bandung has a linear pattern allotment, formed since the beginning of the growth of the city center. This forms a residential area into pockets which are sandwiched between productive functions. This “back” area is uncontrolled and productivity decreases. The back area is an isolated residential area, surrounded by a dense wall of roadside shopping buildings. This bridge is expected to be a new anchor to attract visitors on the main road.
River Oriented Development Aries Fadli Prayoga Portfolio Selected Works 2015-2019
w/ Faza Nugraha & Adi Nur Khamim | Competition Texture 2019 - Limited Space | 1st Place
29
Competition - Texture 2019 - Limited Space - River Oriented Developtment
Design Transformation
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
1
2
The existing form of the bridge tends to “cover” the view from the river view which is quite slum
Adding public space under the main circulation adds to river exposure.
3
Add the function of a water transportation stop on the lowest level of the bridge.
Add Ramp to make bridges more inclusive.
River Disfunction Cikapundung River dividing Bandung into 2 sides. The 28-kilometer stream cuts the center of Bandung City. The total area of the river is around 154 square kilometers or 15,400 hectares. The river crosses 11 sub-districts in two districts and one city, namely Bandung City, Bandung Regency, and West Bandung Regency.
Pocket Area The city of Bandung has a linear pattern designation, formed since the beginning of the growth of the city center in 1856. Furthermore, this linear pattern developed more rapidly when there was penetration of land in the city center in the form of trade/service activities. This causes residential areas to be formed into pockets which are located sandwiched between productive functions. The tendency of city management to be focused on the city’s main lane makes this “back” area growth uncontrolled and productivity decreases.
Scarcity of Public Space The back area is an isolated residential area, surrounded by a dense wall of roadside shopping buildings. In its growth, the enclaves of these settlements turned into slums and formed social inequalities in the city. In addition, informal housing development without proper planning results in a lack of open space in an area.
30
4
What if the river is the new highway ?
Giving multiple functions to the bridge can make the bridge a new anchor for the region. Bridges still overshadow the main function, namely as access to river crossing, but the provision of additional functions, namely open space anwd bus stops add to shaded activities, thus giving people a reason to come to the bridge. The bridge is a building of micro-sized compound functions that can provide a catalyst effect for the region, namely the interaction, smallscale trade activities, the use of the river as a tourist so that it also increases public awareness of the river, as well as public transportation in the form of boats that can minimize the use of private vehicles so give effect to traffic and reduce carbon emissions resulting from movement activities.
Competition - Texture 2019 - Limited Space - River Oriented Developtment
Bridge as a Public Space Braga St.
Hotel Aston Braga
SI TE
Housing
New Anchor The bridge is currently the only link between RW 3 and RW 8 of Kampung Braga which is very strategic. RW 3 is near the Cikapundung Market and Banceuy Street. RW 8 is near Jalan Braga. Because both of them are in the Bandung Economic Strategic Area, they both have a dependency relationship.
Meeting Space This bridge will play a very important role in connecting the two crossing areas bordered by the Cikapundung River. Activation of bridges with public space, economic space, and transportation space will trigger interaction so as to develop undeveloped recreational socio-economic-economic activities. Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Cikapundung Market
Sourounding Site Analysis
What if the river is the new highway ?
31
Competition - Texture 2019 - Limited Space - River Oriented Developtment
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Bridges As Water Transportation
32
Transportation can be analogous to the blood vessels of a city or other units of civilization. Rivers with sufficient dimensions can be used as transportation routes. Giving the function of transportation in the river can provide a reason for the government and the community to treat the river. The river becomes a negative space because it is not given a function. The provision of transportation functions on the river also offers new experiences for users, so that it can also become a tourist attraction.
1. Taman Hutan Raya 2. Curug Dago 3. Unpar 4. Teras Cikapundung 5. Tamansari 6. Babakan Ciamis 7. Braga 8. Cikapundung Riverspot 9. Alun-alun 10. Lengkong 11. BKR 12. Suryalaya 13. Soekarno-Hatta
1
8
4
10
12
9
What if the river is the new highway ?
Competition - Texture 2019 - Limited Space - River Oriented Developtment
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
This bridge is functioned not only as crossing access, but also as open space, as well as bus stops for boats which are the modes of t ra n s p o r t a t i o n . Giving additional functions makes the bridge interesting to visit, which is able to make movements and other activities. Accommodating various activities on the bridge makes the river no longer a negative space for a city.
What if the river is the new highway ?
33
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
34
What if everybody is the architect ? The main focus of this competition is to designing Microspace for human and to maximalize the space. This microhouse need to accommodate space requirement for 4 people with 12m2 site area. Desain aproach that we use is partisipative design.
Dari, Oleh, & Untuk Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Competition Submision of Archevent 2017 w/ Keshia Simatupang & Davin Gery Lineker | BIG 5
35
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
Slum area in Kebun Binatang, Bandung (acording to local regulations Standards) 1508 Houses built along Cikapundung River, often with ni setback.
Household waste polutes the river
Most of Kebun Binatang resident already live together with their own family up to three generation
36
There are no land in 4000m2 area dedicated for water inflitration Narrow navigation in some cases its only 60 cm wide
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Building Micro Houses with a participatory approach to humanize humans.
What if everybody is the architect ?
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
Why Participatory Approach?
Ownership Building Tools
The participatory approach is used to replace the caricative system which makes the people who are helped do not have a sense of ownership of their own homes. So that the house that has been given to become a commodity for resale.
The participatory approach is crucial in shaping a revitalization of slums that have a sense of ownership in the new home. This can be realized because residents are involved in forming their own homes, both during the design period, and the period of use.
Incremental
Easy to Construct
Cheap
Participatory Concepts. Participatory concepts are realized in incremental designs and buildings with simple construction. So as to be able to produce a micro-housing design that is livable and can support the needs of its residents, and can adjust to the needs of each occupant to foster a sense of belonging to the house.
Ownership can be formed by personal adjustment of each resident to his house because each house has a difference that is identical to its owner. This adjustment can also be used to support the needs of each diverse population The incremental design is focused on the ground floor so that its development can be more diverse. For example the ground floor can be used as a food stall or food.
Mass Transformation
Land Use 12m²
Accommodating incremental designs
Response to tropical climate
With a 12m2 site area limit the mass is formed as a simple turning to maximize the volume formed.
Ground floor coverings are eliminated and accommodate development by residents in accordance with their needs.
Mass changes on the roof respond to the climate of the city of Bandung which has 2 seasons. Asymmetrical trapezoidal shape was chosen to maximize the roof space so that it can be utilized as a room.
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Incremental: Adjustment to needs
Making Legal Moves
According to local regulations, there are no permanent building built along the river bank without certain setback.
We have to relocate packed the settlement in legal land, since land area can’t be changed.
But, the most comon way to develop this kind of project is charity approach.
Charity approach often not able to create the sense of ownership to the relocated settler.
What if everybody is the architect ?
Appliying participatory design approach to micro house design.
37
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Easy and Cheap Construction
38
What if everybody is the architect ?
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
Future Plan
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if everybody is the architect ?
39
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
40
What if everybody is the architect ?
Competition - Archevent 2017 - Microhouse - Dari, Oleh, Untuk
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if everybody is the architect ?
41
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
42
What if everyone meets in one place? Starting from a transverse meaning which has a meaning of meeting point. The meeting point of each line that connects one another. Dukuh Atas is a very strategic place and can shade pedestrians. The formation of these lines creates a building that has the role of a line that intersects and produces a meeting point that can be called the Jakarta Transversarium.
Transvesarium Jakarta
Working Internship Project at Labo Architecture + Design
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
MRT Jakarta Competition Project Architect: Deddy Wahjudi
43
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
MRT Jakarta Competition Project - Internship Project at Labo Architecture + Design
44
What if everyone meets in one place?
MRT Jakarta Competition Project - Internship Project at Labo Architecture + Design
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
During my internship, I was involved in the design process from mass analysis, concept formation, building design, to drawing presentations. From this process I learned many lessons about urban tissue and circulation in buildings.
What if everyone meets in one place?
45
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
MRT Jakarta Competition Project - Internship Project at Labo Architecture + Design
46
What if everyone meets in one place?
MRT Jakarta Competition Project - Internship Project at Labo Architecture + Design
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
What if everyone meets in one place?
47
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
48
What if we rotate the garden 90o? In the second task of Studio PA 5, we were asked to design a mixed-used building that emphasizes the design of building permeability by adjusting the city network.
Reboization PoroCity Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR4190 Architectural design Studio 5 | Mixed-Used Building in Naripan Street
49
Unit Type
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Building Intensity
Pixel Grid 7,2 x 7,2 m
Exploded Axonometry
Permeable Circulation
Configuring Unit Type
Create opening to Let Air and Light Passing trough 50
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
51
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
52
Model Making & Handrawing works Consist of my studio project during college
AR2210 (Form and Space Organization Studio), AR2250 (Construction and Building Material), AR2190 (Architectural Design Studio 1), AR3250 (Form And Structure Studio), AR 3110 (Ste Design and Planning)
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
53
Model Making & Handdrawing works
AR 3110 (Site Design and Planning)
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Located in babakan siliwangi. This project aims to desining spacace and sirculation for foodstall. My concept is to make secuence while exploring this place.
Sketch walk with IMAG ITB
Located at Kampung 300 we aims to experience the Urban village atmosphere. After sketching we are discussing about the story of our drawing.
54
Model Making & Handdrawing works
Model Making & Handdrawing works
AR2210 (Form and Space Organization Studio) This project aims to make public space to connect one urban village to another. My main concept of this project is to deliver the experience of indonesian traditional games, wich is Engklak, gobak sodor, and ular naga. Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR2210 (Form and Space Organization Studio) This project aims to make shelter using differet material. The goals is to use the material tecnonicaly. Using reciprocal pricipal I use analogous design approach to be like a bird.
Model Making & Handdrawing works
55
Model Making & Handdrawing works
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
AR2190 (Architectural Design Studio 1)
This project aims to make pavilioon in the middle of the park. The emphasis of this excercise is to show the thectonic of the matrerial that we use. I choose bamboo as a material then i bend it to make some inviting public space.
AR2190 (Architectural Design Studio 1)
This is my very first maquete in architecture major. This project aims to desining a villa with 2 bedroom. Acomodating 4 people inside. The goals of this project is to arrange programming for a villa.
56
Model Making & Handdrawing works
Model Making & Handdrawing works
AR3250 (Form And Structure Studio) W/ Zahra Nurul Azmi & Grace Natania
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
This project aims to excercise us to use membrane material. We decided to use reciprocal principal to make the star frame using bamboo, than we make cone-shape ring to pull the membran upwards
AR3250 (Form And Structure Studio) W/ Kevin Marseli Grace Natania
&
This project aims to excercise us to use vector active structure. Again, we use the reciprocal principal to make this dome. The components formed from coated wooden planks. Arranged in stacking one another,
Model Making & Handdrawing works
57
AR4121 (Algoritmic Design)
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
In this course we were asked to make a 1: 1 design that was realized as a hanging ceiling. Modeling is formed using Rhino and Grasshopper
58
AR4190 (Architectureal Design Studio 5) In the second task of Studio PA 5, we were asked to design a mixed-used building that emphasizes the design of building permeability by adjusting the city network.
AR4099 (Final Project)
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
For my final project, I made 3 models. The first model is intended to show the location of the site and urban tissue, the second model is the building mass, and the third model is a unit type detail.
59
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Other Works It consists of what I do during college outside the class and studio, such as: Makinh Logo, Poster Design, Photography, Merch Design, etc. From the beginning of the college life, I was quite interested in the business world so that it encouraged me to work with several friends to open Yash Apparel, which sells merchandise to new students. During my studies I also often sought additional income through mockups, illustrations, and digital painting. On the side of the campus organization, I am involved in several activity units, namely TEC, Ludruk, and Stema. In the architecture association itself I had the opportunity to become the chairman of Gaung Bandung 2018.
60
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
61
Gaung Bandung 2018 Incidentally, I got the opportunity to become the chairman of the annual event of IMA-G, the Bandung Gaung 2018.
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Each year, Gaung Bandung raises different issues according to the context of the year, but still refers to the main purpose of Gaung Bandung. The theme of Gaung Bandung 2018 is “Inclusion in Access�.
62
Here I have the opportunity to realize my idea to bring together the designer and the user. From this meeting I hope that dialogue and exchange of ideas between the two parties occur, because in the real world, it seems like the designer is only embodies the dream of the client and often forget who ultimately uses his work is the user.
The user, is a human who utilizes the work of architects. They come from various backgrounds, generally what the designer hears is the majority. Here, Gaung Bandung provides a platform where the designer is able to hear what is needed by the user in order to realize the design results that can be utilized by various parties.
Scan Here ! to find out more about Gaung Bandung 2018
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
63
P r o fe s s i o n a l Wo r ks :
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Du r i n g S e p te m ber - D ecember 2019
INVOLVE MENTS: + BA N K BNI KC BITUNG + ASYA SH OW UNIT GALERY + BANK BNI SYARIAH + APARTM ENT TOD SENTUL + SAYEM BA RA IB UKOTA NE GARA + SAYEM BA RA OJK TOW E R SC BD + OTHERS
h t t p s : //w w w.beh an ce.n et/ yoga a rie s9911
64
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
65
Asya Show Unit Galery Project Desc
Involvements 1 2 3
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Extension Building of Asya Marketing Galery. Located ner the lake, fuctioned as retail show unit of Astra Modern Land tower witch still under construction. Contains 4 type of unit and an office.
66
4 5 6
Brainstorming and doing the research for the design concept with the project team. Creating building designs and detailed drawings by using specialist computeraided design (CAD) and 3D modeling applications. Rendering the 3D modeling by using V-Ray for the presentation with client. Preparing tender applications and presentation. Working with Project manager to assist design changes. Adapting plans according to circumstances and resolving any problems that may arise during construction.
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
67
68 Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
69
70 Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
71
Bank BNI KC Bitung Project Desc
Involvements 1
Brainstorming and doing the research for the design concept with the project team. Creating building designs and detailed drawings by using specialist computeraided design (CAD) and 3D modeling applications. Preparing tender applications and presentation. Working with Project manager to assist design changes. Adapting plans according to circumstances and resolving any problems that may arise during construction. Creating Calculation Area for defining the NFA and SGFA
2 3
Located in a commercial area, between Jalan Sam Ratulangi and Jalan volunto. Bordered by shops (right side) and housing area (back side). The building is an old BNI Bank building revitalization project (total renovation). Building area is estimated at a maximum of 900m2 consisting of 2 floors.
4 5 6
The main concept is to diferentiate the officer and customer circulation.
KANTOR CABANG BNI BITUNG
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
KALKULASI LUASAN BANGUNAN
72
ZONA
LANTAI
LANTAI KE LANTAI
OFFICE BANKING HALL AREA PARKIR & ME
LMR L 2 G F B 1
4,50 3,00 3,50 3,15
KANTOR & FASILITAS
TINGGI
SGFA
11,00 6,50 3,50 0,00 -3,50
TOTAL TOTAL GFA KANTOR TOTAL GFA KANTOR + PARKIR
M2
MOBIL
324,12 345,85 22,28
297,22 317,06
39,02 39,02 24,15 63,52
364,62
11
669,97
614,28
165,71
364,62
11
PROYEKSI
MOTOR
75,26
LUAS DAERAH PERENCANAAN KDB
75,26
KLB
KTB
KDH
296,65
PARKING PROVISION FUNGSI KANTOR DAN FASILITAS TOTAL
PARKIR
SPME
0
75,26
= =
KOEFISIEN DASAR BANGUNAN (KDB) : = LUAS LANTAI DASAR + PROYEKSI = 370,00 + = 445,26 M2 KOEFISIEN LANTAI BANGUNAN (KLB) : = LUAS TOTAL LANTAI x 80% = 686,37 = 686,37 M2 KOEFISIEN TAPAK BASEMENT (KTB) : = 364,62 M2 KOEFISIEN DAERAH HIJAU (KDH) : =
NFA
RATIO 78
LOT PARKIR 11 11
REGULASI RATIO 1 : 100
LOT PARKIR 9 9
EFISIENSI (SGFA/GFA)
39,02 363,14 370,00 85,80 857,96 857,96 1.222,58
EFISIENSI (NFA/GFA)
89,25%
81,85%
89,25%
81,85%
1.000,00 M2 REGULASI DESAIN
0,00 M2 445,26 M2
60,00% 44,53%
REGULASI DESAIN
0,00 M2 686,37 M2
0,00 0,69
REGULASI DESAIN
0,00 M2 364,62 M2
0,00% 36,46%
REGULASI DESAIN
100,00 M2 296,65 M2
10,00% 29,67%
KDB = KOEFISIEN DASAR BANGUNAN
DESAIN LUAS 857,96 857,96
GFA
KLB = KOEFISIEN LANTAI BANGUNAN KDH = KOEFISIEN DASAR HIJAU KTB = KOEFISIEN TAPAK BASEMEN
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
73
Other Projects Project
Involvements 1
+ Bank BNI Syariah
Supporting Concecptual team doing some design studies for facade, massing, landscape, etc.
+ Apartment TOD Sentul + Sayembara Ibukota Negara
2
Making 3d Modelling
+ Sayembara OJK Tower SCBD
3
Presentation documents preparation
+ Menara Mandiri Semarang
4
Analyzing constraint and opportunities from TOR, site, etc
5
Documenting and diagraming conceptual schematic design
+ Others ANALISA KETINGGIAN BANGUNAN
K O N T E K S TA PA K
B
A'
B'
A
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
Skyline bangunan dari arah Jalan Jend. Soedirman (A-A')
74
Skyline bangunan dari arah Jalan Jend. Soedirman (B-B')
Skyline bangunan terhadap bangunan tinggi di Jakarta
12 PROPOSAL DESAIN GEDUNG INDONESIA FINANCIAL CENTER (IdFC)
ANALISA KETINGGIAN BANGUNAN
NTS
137
Aries Fadli Prayoga Portfolio Selected Works 2015-2019
75
ARCHITECTURE PORTFOLIO Aries Fadli Prayoga +62 88 222 08 6600 yogaaries9911@gmail.com
Scan Here ! to find out more project of Aries Fadli Prayoga