Architecture Portfolio - University of Bath - 2020 - Yuliya Lapshyna

Page 1

Yuliya Lapshyna University of Bath Graduate

PORTFOLIO Academic Professional Additional work

+447463489943 yuliya.lapshyna@gmail.com


Contents

Mutatio

Basil Spence

Work at YSA

Ventian Fields

Beating the offside trap

For ridge refer to CNSD / 082

Work at POW Architects

35°

For eaves detail refer to CNSD/080-1

Medical Centre

Insulation to roof to consist of 400mm mineral fibre quilt (100mm laid between joists, 200mm laid across the joists, with 100mm lapped across the top)

18mm Chipboard around loft access.

TOP OF WALL PLATE

CL

EA

R

St. 12 11 10 9 8 7 6

C'bd

5 4 3 2

DPC

250mm minimum subfloor ventilated floor void

FOUNDATIONS Trench fill at a depth agreed on site with the local Building Inspector and to conform to NHBC requirements. Structural Engineer to confirm foundation widths.

p4

p 14

p 24

p 26

p 30

p 34

For Windo refer to DE

En-suite

42°

External wall / Floor junction detail refer to DET-903

mm

p 36

1

Hall

2662 Ground FFL to First FFL

ß

00

2000 clear headroom

ß

W8 20

13

2385 Ground FFL to u/s ceiling

ß

Landing

Refer to Specialist Joist manufacturers drawings for detailed layout including trimmer and noggin requirements.

3675

ß

2658 Structural opening

Min 900 mm

5159

For junction detail refer to CNSD/053

2335 First FFL to u/s ceiling

W13

277

1210

274

Refer to Specialist Truss Rafter manufacturers drawings for detailed layout and bracing requirements.

ED1

Door thresh refer to DE


Workshop Theatre

Hearth

Papilio

Pots

Daidala

Additional Work

p 40

p 44

p 47

p 50

p 53

p 56


‘Mutatio’ This proposal is for a new building called Bristol Creative Association (BCA). It aims to challenge the current concept of teaching ART, MUSIC and BALLET, by subverting the idea that each creative area has to be taught in isolation. The school uses all the three mediums to bring the diversity of knowledge and experience into the existing teaching environment. This prevents the preconceived notion of students only being able to learn one chosen area; widely broadening their expertise. Four key principals are consistently followed trough the scheme: the Light, defining territories; the Beacon, attracting visitors; the concept of Flexibility; and the notion of interconnected spaces. The seamless visual and physical interconnections among Art, Music and Ballet sectors result in the formation of a vibrant community, where different artistic mediums are intertwined in order to allow students to learn and constantly inspire each other.

Ground floor plan +0 000

4

First floor plan +5 000

my initial concept


Despite being designed as a primarily after-hours school, the building is intended to be used by citizens and operate for the majority of the day, allowing an occasional passerby to enjoy the facilities and wander trough the architecture as if it is a part of their neighbourhood. This inspiring environment aims to help the final user to slow down and wonder: enjoy the view, indulge in the creative atmosphere, appreciate the music or even learn how to perform arts themselves. The building challenges structural applications of concrete and shows how one material can be utilized in many different ways.

Third floor plan +8 000

5


East Elevation

Balcony on the first floor

Balcony on top of the auditorium

West Elevation

6


ROOF

SECOND FLOOR

FIRST FLOOR

GROUND FLOOR

FOUNDATION

7


8


Entrance

Corridors

Central void view from above

Ballet Studio

9


Internal views

Long section

10

Circulation


Morning lecture

Lunchtime concert

Auditorium

Evening practice

Evening gig

11


enviromental strategy

Short section

BALLET STUDIO: LIGHTING

BALLET STUDIO: RISERS Space in the Ballet Studio wall, dedicated to vertical risers,

BALLET STUDIO: ACOUSTICS Suspended timber panels (500mm gap for services). Sound absorbing slatted timber panels on the walls.

Hot water underfloor heating

12


Refuge points Exit nodes Fire-fighting Core Horizontal Fire Escape from the furthest points

Approach from Arnolfini

Vertical Fire Escape

13


‘Basil Spence’ A joint project with engineers. The main theme was related to creating a FLAGSHIP building which would showcase ‘aerospace’. I came up with the initial concept of the tower as a main exhibition pavilion. Featuring true hyperbolic timber-frame structure, which encompasses primary vertical exhibition space, with a series of presentation rooms revolving around it. Double helix stair in the tower works in tandem with special lifts, enhancing visitors’ experience. Having a very public entrance building also acts as a social hub for the citizens.

Ground floor (street) level

14

First floor (main entrance) level

my initial concept

Third floor level


Typical tower floor layout

15


South Elevation

Sketch showing the internal plaza

16

North Elevation


Both internal and external social spaces are created by the interplay of the facades. Such areas are extremely flexible, allowing for any visitors to interact with the building.

Tower Lifts: Operational method

17


Fire protection cores

18


Bar at the top of the Tower.

Axonometric sketch

19


20


Tower typical floor section

Tower floor-to-lattice build up

Typical floor layout - first phase

Typical floor layout - second phase

21


Vertical Exhibition - first phase

22

Vertical Exhibition - second phase


23


Placement 2019 - Yabsley Stevens Architects Yabsley Stevens Architects is a small practice, consisting of 3 people: 1 director and 2 architectural assistants. Although it is quite a small company they work with wide variety of clients, producing numerous projects, ranging from a very small 1 room refurbishments to expansive redevelopments of private residences. During my time at YSA I had the opportunity to perform a variety of tasks, ranging between stages 0-5. I managed to work on several smaller projects from the concept design, to construction drawings, visited sites and client meetings, prepared documents for presentations and applied for planning.

BARN KITCHEN

POTTING SHED

LAUNDRY / STORAGE

WC/ SHOWER

CINEMA ROOM

GAMES ROOM

VINE SHELVES

OPTION 1 0

Lower Level Floor

1

2

3

4

5

6M

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

Landcombe House As an example of the stage 2 work I have done here is a project where I was involved in creating a variety of floor layout options, including producing facade studies, 3D visualizations and high quality presentations for client meetings.

183

73

6 mm adhesive

6 mm adhesive

12 mm plywood / 12.5mm Marmox board

12 mm plywood / 12.5mm Marmox board

Domus tiles to all the surfaces of the built in niche

1

Proposed Elevation 1

WALL - DOMUS TILES 7.2 SQ M WALL - DOMUS TILES 7.2 SQ M AREA TO BE CHECKED BY CONTRACTOR AREA TO BE CHECKED BY CONTRACTOR Floor Tiles

Floor Tiles

Tiles - Mosa Range - Terra Beige & Brown Colour - 264V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

Tiles - Mosa Range - Terra Beige & Brown Colour - 264V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

Wall Tiles

Wall Tiles

Tiles -

Tiles -

DOMUS

DOMUS

2

Proposed Elevation 2

Domus tiles to all the surfaces of the built in niche

2

102

1210 50

848

848

66

89

50

66

Basin to align with tile dimension 850mm ideally.

Mosa floor tiles 11mm thick 263

350

527

263 146

3

KALDEWEI 1600x700mm shower tray with polystyrene support. If joist directions permit then shower tray to be installed without step-up.

KALDEWEI 1600x700mm shower tray with polystyrene support. If joist directions permit then shower tray to be installed without step-up.

DECF 05 (light) tile to the wall of shower allow for 18mm WBP support only if possible to line themplywood up screw fixed at with the rest of the wall tiles. If not - use 360 centres floor tiles.

allow for 18mm WBP plywood screw fixed at 360 centres

Mosa floor tiles 11mm thick 130

527

446

Proposed Elevation 2

remove existing arhcitreave tile to cover door lining, allow for tile edge bead along exposed edge of tile.

Catalano ZERO basin

Basin to align with tile dimension 850mm ideally.

18mm plywood 350

296

remove existing arhcitreave tile to cover door lining, allow for tile edge bead along exposed edge of tile. 2100

boxing from 50x50 constructed from SW timbers

2100

990

6mm thick glass shelving

boxing from 50x50 constructed from SW timbers

flexible adhesive

18mm plywood

885

446

1

1018

1210 1018

1039

flexible adhesive 135

89

KALDEWEI 1600x700 mm shower tray with polystyrene support

296

Proposed Elevation 1

990

Geberit flush

6mm thick glass shelving

104

Geberit flush

Minimise height to keep the tile dim.

Mirror on 11mm water resistant MDF

154

12 mm plywood / 12.5mm Marmox board on existing exterbal wall

8.3 mm domus wall tiles

mirror with built in shelving behind it

Catalano ZERO basin

1039

885

135

KALDEWEI 1600x700 mm shower tray with polystyrene support

for pricing allow for new foil-backed ceiling

952

12 mm plywood / 12.5mm Marmox board on existing exterbal wall

102

2000

Minimise height to keep the tile dim.

tiled niche

102

990

Mirror

tiled niche

Domus wall tile to this wall. Shade DECF11 (blue)

1035

1035

Domus wall tile to this wall. Shade DECF11 (blue)

for pricing allow for new foil-backed ceiling

Mirror on 11mm water resistant MDF

mirror with built in shelving behind it

Built in shelving. Position of glass shelves tbc on site

JIS Ouse polished stainless steel heated towel rail, hot water only 700mm x 300mm

2000

2358

tbc

tbc

180

JIS Ouse polished stainless steel heated towel rail, hot water only 700mm x 300mm

2358

380

990

2000mm high glass shower screen tbc Built in shelving. Position of glass shelves tbc on site

180

504

8.3 mm domus wall tiles

Mirror

24

183

existing fan to be retained

2000mm high glass shower screen tbc

I started from sketches at 1:50 of rough ideas by hand. After the first meeting I turned them into Vectorworks document, which allowed to create precise working drawings to scale. Afterwards I worked them up to the standards of detail which stage 3/4 requires and handed over to the contractor for the start of work on site.

73

104

extract fan in current location

380

158

existing fan to be retained

504

120

154

extract fan in current location

120

952

A small bathroom refurbishment, which I was singlehandedly responsible for.

512

990

479

102

512

990

479

158

Beechfiled Road

Proposed Elevation 3

3

Proposed Elevation 3

WALLS - DOMUS TILES 5.6 SQ MWALLS - DOMUS TILES 5.6 SQ M AREA TO BE CHECKED BY CONTRACTOR AREA TO BE CHECKED BY CONTRACTOR Floor Tiles

Floor Tiles

Tiles - Mosa Range - Terra Beige & Brown Colour - 264V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

Tiles - Mosa Range - Terra Beige & Brown Colour - 264V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

4

Proposed Elevation 4

130 DECF 05 (light) tile to the wall of shower support only if possible to line them up with the rest of the wall tiles. If not - use floor tiles.

4

146

Proposed Elevation 4


4 3

4 3

1

4 3

1

2

2

4 3

1

1

2

2

BATHROOM

Mirror to be centred on the tile edge

Mirror to be centred on the tile edge

window to be restricted to opening max 100mm

812

1062

LED strip 1843

250

1843

860

1316

1095

1316

126 860

780

780

126

860

762 1012

762

1095

250

250 1262

1012

1012

940

850

150

860

2074

250

2074

Towel rail to be positioned above the sink level

1012

940

850

Towel rail to be positioned above the sink level

935

935

920

241

241

150

PLAYROOM

475

STAFF MICRO FLAT

STORE ROOM

470

3

LIVING

4 3

1STAFF

470 204

400

4 3

1

Proposed Elevation 32 2 BATHROOM

1

1000

400

220 204

1000

220

220

1204

220

600 1204

211

201

600

211

201

4 3

1

Proposed Elevation 3 2

1

1:25 @ A3

1 2

Proposed Elevation 4

2

1:25 @ A3

Proposed Elevation 4

2

1:25 @ A3

WG 02

1:25 @ A3

Door to be re-hung

KEY

KEY

WINE

AREA TO BE CHECKED BY CONTRACTOR

WC

ROOM WALL BATHROOM ELEV WALL 3 - MOSA BATHROOM TILES1:505.5 SQ M3 - MOSA TILES 5.5 SQ M 1:50 @ A3 @ A3ELEV WALL BATHROOM ELEV WALL 4 - MOSA BATHROOM TILES 3.6ELEV SQ M4 - MOSA TILES 3.6 SQ M

STUDY

PLAYROOM

DG 03

Vinyl Flooring Wetroom

AREA TO BE CHECKED BY AREA CONTRACTOR TO BE CHECKED BY CONTRACTOR

CKED BY CONTRACTOR

Wall Tiles Tiles - Mosa Range - Terra Maestricht Colour - 210V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

MASTER BEDROOM

KITCHEN

UTILITY ROOM

A

Planning 731002

1: 25 @ A3

Proposed Wetroom Elevations 395

500

1915

1

Existing Plan 1:50 @ A3

16.08.19

1

190

285

398

Proposed Elevation 1

1

1:25 @ A3

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued. Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

3

1120

KEY

47105

463

190

968285

398

Proposed Elevation 1

2

1:25 @ A3

14 View Road

Existing Floor Plans

820

47105

VOID

820

Tiles on flexible adhesive on 12.5mm marmox on existing wall finish.

Laid to fall

220

Proposed Elevation 2

2

1:25 @ A3

262

David and Ruth Woodburn Cromwell Avenue, London, N6

1:50 @ A3

remove the existing boxing tbc?

remove the existing boxing.

MASTER BATHROOM

DURAVIT Happy D Basin 650x495 mm

Proposed Elevation 2

1076

Power socket

1:50 @ A1 1:100 @ A3

02.07.19

Wall Tiles

Tiles - Mosa Range - Terra Maestricht Colour - 210V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

Tiles - Mosa Range - Terra Maestricht Colour - 210V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

- 07.08.19 Draft issue A 16.08.19 Changing dimensions based on the site visit.

12.5mm plasterboard on 12mm plywood to the sides of niche.

Tiles on flexible adhesive on 12.5mm marmox on existing wall finish.

- 07.08.19 Draft issue A 16.08.19 Changing dimensions based on the site visit.

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued. Any drawing errors or divergences should be brought to

attention of Yabsley Stevens Architects YABSLEYtheSTEVENS ARCHITECTS LTD

18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com ©

1: 25 @ A3 14 View Road

14 View Road David and Ruth Woodburn Cromwell Avenue, London, N6 YABSLEY

1915

Planning

David and Ruth Woodburn Cromwell Avenue, London, N6 16.08.19

731003

Planning

Proposed Wetroom Elevations

A

1915

2514

14 View Road

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

©

David and Ruth Woodburn Cromwell Avenue, London, N6

Existing Floor Plans

00A1002

72

940

Existing position of partiton

950

500

203

DG 01

Block up existing opening to niche

Tiles on flexible adhesive on 12.5mm marmox on existing wall finish.

Skirting to align with the base in the niche.

850

New niche to the existing wall. If not possible, then do on the wall with shower head as shown on corresponding elevation.

Keep the existing toilet. Reposition higher if required due to the new flooring.

Existing structure

Enlarge niche

Proposed Elevation 2

1

1260

New cup'd accessed from kitchen Decline for drainage to start out of the walking area - max 950 mm.

Proposed Elevation 3 1

1:25 @ A3

1:25 @ A3

Proposed Elevation 1 1:25 @ A3

Proposed Elevation 3

Spray painted mdf frame

1:25 @ A3

WALL BATHROOM - MOSA TILES 5.6 SQ M AREA TO BE CHECKED BY CONTRACTOR

©

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

David and Ruth Woodburn Cromwell Avenue, London, N6

14 View Road

Planning David and Ruth Woodburn Cromwell Avenue, London, N6

A

A

07.08.19 Draft issue 16.08.19 Adding towel radiator. Changing dimensions based on the site visit.

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

07.08.19 Draft A issue 16.08.19 Adding dimensions based on the site visit.

David and Ruth Woodburn Cromwell Avenue, London, N6

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

Yabsley Stevens Architects Ltd shall have no responsibility ©

Planning 14 View Road

made of this document other than for that which it was prepared and issued.

David and Ruth Woodburn Cromwell Avenue, London, N6

1: 25 @ A3

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

07.08.19 16.08.19

Draft issue Changing dimensions based on the site visit.

14 View Road

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

Planning

731007

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

©

1: 25 @ A3

Proposed Wet Room & Bedroom

David and Ruth Woodburn Cromwell Avenue, London, N6

1: 25 @ A3

16.08.19

1915

Planning

731001

A

Proposed First Floor Elevations 16.08.19

1915

731008

A

+ 19.42

fence along boundary 1.4M above ground level

16.08.19

731007 Proposed First Floor Elevations

1915

1915

Planning

©

David and Ruth Woodburn Cromwell Avenue, London, N6

Proposed First Floor Elevations

During the time of this project I was able to do stages 0-3. I had the opportunity to go to all the meetings, producing concept design drawings. I managed to produce several layout/elevation options, 3D visualizations, InDesign presentations and finally planning drawings, which allowed me to prepare and submit the planning application before the end of my placement. Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

©

14 View Road

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued. Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

14 View Road

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

16.08.19

731009

A

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

Size 150mm x 600mm x 11mm Wall -Tiles 1: 25 joint @ A3 Allowance for 3mm Tiles - Mosa Proposed First Floor Elevations Range - Terra Maestricht Colour - 210V 16.08.19 Size -07.08.19 150mm 600mm x 11mm 1:x25 @ A3 Draft issue Allowance for 3mm Adding dimensions based on the site visit. 16.08.19 731009 A joint A 1915 Proposed First Floor Elevations

1915

Planning

Proposed Plan 1:25 @ A3

Tiles - Mosa Range - Terra Maestricht Colour - 210V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

1: 25 @ A3

A

fence along boundary 2.5M above ground level

16.08.19

A

+ 19.70 proposed + 19.62 existing decking outline of proposed neighbours extension

existing raised decking to be modified

7673

470

2500

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

2

Wall Tiles

cavity brick wall. brick colour to match the exisiting

1300

Yabsley Stevens Architects Ltd shall have no responsibility

made of this document other than for that © which it was prepared and issued.

WALL BATHROOM INTERNAL - MOSA TILES 2.4 SQ M AREA TO BE CHECKED BY CONTRACTOR WALL BATHROOM INTERNAL - MOSA TILES Wall Tiles 2.4 SQ M Tiles - Mosa Range - Terra Maestricht AREA TO BE CHECKED BY CONTRACTOR Colour - 210V

A

Cholmeley Crescent 14 View Road

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued. Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

B

DINING AREA

DINING AREA

DINING AREA

+ 19.70

KITCHEN

KITCHEN / DINING

DINING AREA

IN

heat

heat

IN

heat

heat

LIVING AREA

IN

IN

LIVING AREA

IN

heat

IN

LIVING AREA

heat

LIVING AREA IN heat

IN heat

IN heat

IN heat

heat

IN heat

LIVING ROOM 2

IN

IN

KITCHEN

IN

IN

KITCHEN

KITCHEN LAUNDRY

LAUNDRY

LAUNDRY WC

LAUNDRY

WC

WC

ENTRANCE HALL

ENTRANCE HALL

ENTRANCE HALL

SITTING ROOM

OPTION 1

WC

OPTION A

ENTRANCE HALL

SITTING ROOM

SITTING ROOM

OPTION B

SITTING ROOM

LAUNDRY

WC

OPTION A

ENTRANCE HALL LIVING ROOM 1

A

Draft issue Adding towel radiator. Changing dimensions based on the site visit.

50mm waste pipe from the shower in 100x100mm boxing. 818

1

BATHROOM - MOSA TILES 2.3 SQ M TO BE CHECKED BY CONTRACTOR BATHROOM - MOSA TILES 2.3 SQ M TO BE CHECKED BY CONTRACTOR

Adding towel radiator. Changing dimensions based on the site visit.

940

New sliding door Portman Door.

360

_

Proposed Elevation 2 1:25 @ A3

sa a Maestricht V mm x 600mm x 11mm r 3mm joint sa a Maestricht V mm x 600mm x 11mm r 3mm joint Draft issue

72

02.07.19

1915

Planning

1:50 @ A1 1:100 @ A3

Hansgrohe 240mm shower head with 390 mm arm

904

2514 850 850

100

keep existing skirting Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

100

1

50mm waste pipe from the shower in 100x100mm boxing.

360

100

1

100

keep existing skirting

100

100

783

FIRST FLOOR

1900 262

A

731003

10mm mirror on top of the new tile. Prefabricated cupboard tbc

keep the existing toilet.

keep the existing toilet.

Skirting 1750

16.08.19

2514

2100 2100

783

1: 25 @ A3

Proposed Wetroom Elevations

STEVENS ARCHITECTS LTD

18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 500 mail@ysa.uk.com 134

Drain tbc

10mm mirror on 12.5mm plasterboard on 12.5mm plywood on existing wall finish. 10mm mirror on 12.5mm plasterboard on 12.5mm plywood on existing wall finish.

keep the existing flush plate.

Obscure glass tbc. 10mm thick glass screen to shower enclosre. Fixed to surface mounted channels tbc

12.5mm plasterboard on 12.5mm marmox.

Yabsley Stevens Architects Ltd shall have no responsibility

made of this document other than for that Tiles on flexible which it was prepared and issued. adhesive on 12.5mm Any drawing errors or divergences should be brought to marmox on existing the attention of Yabsley Stevens Architects wall finish.

tile to the existing niche. BEDROOM 3

BEDROOM

820

©

FAMILY BATHROOM

WET ROOM

In-built nice. Refer to elevations for dimensions.

KEY 1:50 @ A3

HALL

MASTER BEDROOM

175

475

1:25 @ A3

Planning

Wall Tiles

BEDROOM 2

tile to the existing niche. keep the existing flush plate.

600

262

on 12.5 plywood AREA TO BE CHECKED BY CONTRACTOR AREA TO BE CHECKED BY CONTRACTOR

remove the existing boxing.

WG 01

2323

Laid to fall

220

263

12.5 mm plasterboard

remove the existing boxing tbc?

Extend existing floor with timber boarding from existing study room.

968

WALL BATHROOM ELEV 1 - MOSA WALL TILES BATHROOM 4.7 M ELEV 1 - MOSA TILES 4.7 SQ M 12.5 SQ mm plasterboard on 12.5 plywood WALL BATHROOM ELEV 2 - MOSA WALL TILES 6.2 SQ M ELEV 2 - MOSA TILES 6.2 SQ M 00A1002 _ 1915 BATHROOM

YABSLEY STEVENS ARCHITECTS LTD 18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

©

KEY

4111

In-built niches. Refer to elevations for dimensions.

415

1:50 @ A3

3

200 Low boxing to conceal waste from WC

Tiles on flexible adhesive on 12.5mm marmox on 12 wbp plywood on stud.

1010

1012

415

263

FIRST FLOOR LOWER GROUND FLOOR

2538

A

731002

306

2323

2224

306 920 1010

1012

920

860 520

1120

340

340

WINE ROOM

463

GROUND FLOOR

16.08.19

1915

PLANT ROOM

BEDROOM 3 FAMILY BATHROOM

1: 25 @ A3

14 View Road

Proposed Wetroom Elevations David and Ruth Woodburn 395 Cromwell Avenue, London, N6

LTD

18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com Planning

1316 860

780

680 DINNING

Road

David and Ruth Woodburn 500 Cromwell Avenue, London, N6 ARCHITECTS YABSLEY STEVENS

Heating/electric supply to the toilet tbc

STAFF BATHROOMHALL

LIVING

1250

1250 Heating/electric supply to the toilet tbc

A

1316 services

services

18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

520

731006

STORE ROOM

New sliding 14 door View - Portman Door.

YABSLEY STEVENS ARCHITECTS LTD

920

BEDROOM 2

STAFF MICRO FLAT

912

06.08.19

1915

Planning

MASTER BATHROOM

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

©

WG 02

780

18a Broadlands Road London N6 4AN T - 020 8341 5066 F - 020 8341 5938 mail@ysa.uk.com

PLAYROOM

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

©

services

912

364

Proposed Floor Plans

David and Ruth Woodburn Cromwell Avenue, London, N6

YABSLEY STEVENS ARCHITECTS LTD

©

ENTRY HALL

New sliding door - Portman Door.

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

680

LIGHTWELL

Any drawing errors or divergences should be brought to the attention of Yabsley Stevens Architects

WC STUDY

1: 25 @ A3

14 View Road

Yabsley Stevens Architects Ltd shall have no responsibility made of this document other than for that which it was prepared and issued.

the site visit.

- 07.08.19 Draft issue A 16.08.19 Changing dimensions based on the site visit.

Spray painted mdf frame

364

- 07.08.19 Draft issue A 16.08.19 Changing dimensions based on the site visit.

VOID

Spray painted mdf frame

2224

Proposed Plan 1:25 @ A3

Flooring Altro Range - tbc Colour - tbc Applied directly onto screed

DG 01

Mosa Range - Terra Maestricht Colour - 210V Size - 150mm x 600mm x 11mm Allowance for 3mm joint

920

Tiles Fitness Warehouse Range - Standard Solid Colour Tile Colour - Red Size 1000mm x 1000mm x 30mm Chamfered edge next to doorway

2

DG 02

Wall Tiles

LOWER GROUND FLOOR Tiles -

GROUND FLOOR

Floor Tiles Gym

700

940

FLOOR WETROOM - ALTRO VINYL 6.1 SQ M FLOOR BEDROOM - EXISTING

WG 01

731

M - MOSA TILES 1.5 SQ M NESS WAREHOUSE TILE

PLANT ROOM

UTILITY ROOM

KITCHEN

75

DINNING

675

220

Radiance Select E showerpipe 300

830

400

800

4

Chamfered edge

services

services

930

ENTRY HALL

530 900

Built-in niche to this wall if possible. Niche tto be to tile dimensions.

890

360

150

STUDY

219

Kaldewei Superplan 900x800mm with anti-slip finish

250

250

LIGHTWELL WC

470

DURAVIT Happy D basin 500x360 mm

920

750

Swedish wall by supplier. Fix to the wall with appropriate fixings to ensure stability.

1262

2200

2200

Low 100mmx100mm boxing to conceal the drainage from the shower.

150

912

912

LED strip 12.5mm plaster on 12mm plywood on the existing wall to reinforce partition.

1247

478

The next project included all the 5 initial stages of RIBA 2013 Plan of Work. This was a conversion of the existing house to fit the needs of the person with MS. I have learnt the importance of crucial understanding of the particular personal needs. During the time of this project I have been involved in all the meetings, coordinated the suppliers, creating concept design drawings, afterwards adding all the necessary technical information for the contractors to start it on site. I was able to conduct site visits, while the work was being done.

10mm mirror

880

Heated towel radiator to be centered on the existing window.

809

900

Tiles on flexible adhesive on 12.5mm marmox on existing wall finish.

View Road

window to be restricted to opening max 100mm

760

Helios MiniVent (M1/120) extract fan to provide 15 litres per sec. Operational fan tbc

812

Existing WC is kept. To be repositions according to drawings if possible.

Helios MiniVent (M1/120) extract fan to provide 15 litres per sec. Operational fan tbc

760

KEY 1:50 @ A3

1062

KEY 1:50 @ A3

No. 44

No. 46

1

A

23.08.19 Issued for planning.

ground floor

No. 42

25

B


‘Venetian Fields’ A mixed-use building project located in Venice, which explores crucial influence of the particular time and place on the contemporary architecture. The building included boat repair workshop on the ground floor, along with the mask and costume shop to replace the existing facilities. It also accommodated the dentist, to improve medical services in the surrounded area; as well as residential block. Stepped language of the facades, along with other reinterpreted details resemble the existing architecture in Venice and allow for a better environmental strategy. During the development of this complex I have learnt how careful the new building has to be on order to not disturb sometimes fragile historic settings.


27


28


29


‘Beating the offside trap’

30


A joint project with engineers focused on constructing a bridge. This projects explores the importance of current time and cultural influences of the particular area on the building. Being located in Poplar, London, our main objective was to regenerate that ‘industrial’ area and create a ‘catalyst’ project for future developments in the neighborhood. We were able to do that by creating a unity between our building’s proposal and the surrounding landscaping, providing ‘urban gardens’ in order to involve citizens and enhance the connection between two sides of the canal. Working alongside engineers was a very important experience, as it helped to solve several structural difficulties from the start as well as pushed the idea further and improved the design.

31


OFFSIDE

GREEN ROOF

LEVEL 5 - FOOTBRIDGE PRECAST CONCRETE ROOF SLAB

LEVEL 4 - ACCOMODATION LEVEL RETAIL UNIT, WINTER GARDEN,

STEEL FRAME

UPPER NORTH

EDUCATION BLOCK

STREET LOW E ARGON FILLED DOUBLE GLAZING

LEVEL 3 - GREEN TERRACE REINFORCED CONCRETE WALL BRICK CLADDING

LEVEL 2 - GREEN TERRACE TOWPATH PARK

STEEL PORTAL FRAME

FOUNDATION

LEVEL 1 - PARK LEVEL

PRECAST CONCRETE FLOOR SLAB

LEVEL 0 - TOWPATH LEVEL WC & LAUNDRETTE

FOUNDATION

THAMES 21 WORKSHOP

TOWPATH

32


P LA N T D RA I N A GE

B U IL T -IN PLANTER BOXES

IN T E G R A T E D B E N C H E S W IT H T IM B E R S L A T T E D D EC K

SEAT TOP

D RA I N A GE N O M IN A L T O P R E IN F O R C E M E N T

H 10 S H E A R L IN K S

H8 R E IN F O R C IN G BARS

33


Placement 2018 - POW Architects ‘Kilnwood’

1585

3590

1585

4833

2915

300

650

1585

4833

300

4833

650

LC

RWP MJ

300

650

RWP MJ

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

RWP MJ

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

300

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels.

Sussex plot 2016

Sussex plot 2017 PROPOSED SPAN OF BEAM & BLOCK

100

PROPOSED SPAN OF BEAM & BLOCK

SVP

SVP

9515

100

100 Direct connection

200 Incoming water

Incoming

Incoming

electric

gas

supply

supply

5846

GAS

Incoming water

5846

Direct connection

Direct connection

200

200

Direct connection

Incoming water

5846

10115

PROPOSED SPAN OF BEAM & BLOCK

100

100 SVP

Tanking to continue 600mm either side of door to raised ground levels.

ELECTRIC

POW Arch tects s a re at ve y sma pract ce, cons st ng of 8 peop e. The r ma n work s based around a ser es of contractor ed pro ects, where I was respons b e for produc ng p ans, e evat ons and sect ons for the standards requ red at construct on stage. Dur ng th s p acement I earnt how to coord nate and app y the supp ers’ nformat on and mass ve y mproved on the deta ed des gn know edge. By work ng n a t me y manner I a ways de vered tasks on t me, often hav ng extra t me eft to work on other sma er pro ects.

890 300

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

GAS

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

SPECIFICATIONS

supply

gas

Incoming

electric

1

SPAN

OF

SQ.

R.C.

TIE

S.E.

MJ

PROPOSED

gas

Incoming

PROPOSED BEAM & BLOCK SPAN

PROPOSED BEAM SPAN & BLOCK

to

RWP

PANELS

WINDOW

BEAM

SPAN & BLOCK

in

Part DOUBLE accordance 'M' level DOORS threshold with WITH CNSD/012-1 to be SIDE

Tanking either ground side to continue levels.of door 600mm to raised

PROPOSED

TO

RWPMJ

ELEC

300

SQ.

R.C.

TIE

SVP

SPECIFICAT

S.E.

BEAM

threshold SINGLE with CNSD/012-1 to be DOOR

OF

BEAM

SPAN & BLOCK

PROPOSED

to

OF

BEAM

Tanking 600mm to raised either continue ground side of levels. door

RWP MJ

SPAN & BLOCK

PROPOSED

IONS

TO

300

SQ.

R.C.

TIE

S.E.

SPECIFICAT

BEAM

MJ

PROPOSED BEAM SPAN & BLOCK

in

Part 'M' accordance level

GAS

Service accordance meter Gas boxes in accordance with entry in legislation position, CNSD/112 Gas Safe and with gas be Gas to be registered undertaken Safe ducted engineer by a

in

Tanking either ground side to continue levels.of door 600mm to raised

RWP

DRAWINGS

RWP

OF

BEAM

SPAN & BLOCK

PROPOSED

Water entry point

OF

OF

Tanking 600mm to raised to either continue ground side of levels. door

PROPOSED BEAM & BLOCK SPAN

R.C.

TIE

DOUBLE

Tanking either ground side to continue levels. of door 600mm to raised

IONS

TO

SQ.

RWP MJ

PANELS

PROPOSED BEAM SPAN & BLOCK

300

'M' accordance level DOORS threshold with WITH CNSD/012-1 to be SIDE in WINDOW Part

SVP

SPECIFICAT

S.E.

BEAM

threshold SINGLE with CNSD/012-1 to be DOOR

in

Part 'M' accordance level

OF

BEAM

SPAN & BLOCK

PROPOSED

to

Tanking 600mm to raised eithercontinue ground side of levels. door

ELECTRIC

GAS

RWP MJ

RWP MJ

DOOR

GARAGE

supply

supply

electric

gas

Incoming

Incoming

OF BEAM PROPOSED & BLOCK

SPAN

BEAM

supply

RWP MJ

ELEC

GAS

BEAM

TO

S.E.

SPECIFICAT

in

TIE

ELEC

IONS

supply

Gas

GAS

ducted Safe engineerby in a with accordance CNSD/114

boxes

gas Safe and be with to be undertakenGas registered

Gas entry position, legislationin accordance

side levels. continue of door

OF

2

PROPOSED BEAM SPAN & BLOCK

Garag

OF

BEAM

2

Wall

PROPOSED OF BEAM SPAN & BLOCK

SPAN & BLOCK

RWP MJ

Loadbearing

PROPOSED

RWP MJ

MJ RWP

AAV

DC

SVP

entry

point

Plots

2049, Chalgr 2050, ove 2051,

2057

SPAN & BLOCK

PROPOSED

BEAM

Water

OF

57

gas

supply

SOP

MJ

FOR REFER RAISED

Elec

TO

DPC CIVIL & UNDERBUILD ENGINEERS

with

'M'

level

GAS

ELEC

DET-901

in accordance

to be

Part

threshold

Door

Double

Tanking 600mm to raised to continue either ground side of levels. door

MJ

RWP MJ

DOOR

DOOR

Gas

DRAWINGS

e type

RWP

RWP

SOP MJ

accordance Part 'M' level with DET-901 SINGLE threshold

in

supply

MJ RWP

water

Garag

OF

to raised 600mm Tanking ground either

e type

SPAN

OF

to continue side levels. of door

PROPOSED BEAM SPAN & BLOCK

BEAM

2

Wall

SPAN & BLOCK

RWP MJ

Loadbearing

PROPOSED

Loadbearing

2

GARAGE DOOR

SPAN PROPOSED & BLOCK OF BEAM

Garage type

Garag

2

RWP

supply

be

BT

to

Incoming

DOOR

OF BEAM PROPOSED & BLOCK

Incoming

MJ

SOP

AAV

to continue door Tanking of either side 600mm levels. ground to raised

DOOR SINGLE to be in level threshold Part 'M' with DET-901 accordance

ducted gas to be Safe position, Gas Gas entry accordance with by a in and be undertaken engineer legislation registered Gas Safe in accordance Meter boxeswith CNSD/114

SPAN PROPOSED& BLOCK OF BEAM

58

SVP

accordance Part 'M' level with DET-901 threshold

Wall

MJ RWP

to be

GAS

ELEC

to raised 600mm ground Tanking either levels. to side continue of door

MJ RWP

OF BEAM PROPOSED & BLOCK

in

SPAN

SLEEPER

WALL

MJ

SPAN PROPOSED & BLOCK OF BEAM

OF BEAM PROPOSED & BLOCK

RWP

Garage type

SPAN

2

RWP MJ

GARAGE DOOR

49

AAV

RWP

MJ

SVP

RWP MJ

DC

OF BEAM PROPOSED & BLOCK

RWP rendered MJ - only units on

SPAN

water

RWP MJ

SVP

OF

PROPOSED BEAM SPAN & BLOCK

MJ rendered RWP only on units

RWP MJ

PANELS

IONS

RWPMJ

MJ AAV

MJ MJ

MJ

RWP MJ

SVP

with DET-901

entry point Water

Chalgrove Plot 2062

PROPOSED SPAN OF BEAM & BLOCK

Part 'M'

DC

level threshold

RWP MJ

Door

Tanking 600mm to continue either to raised side of door ground levels.

accordance

Double

to be in

SPAN & BLOCK

PROPOSED

BEAM

OF

RWP

PROPOSED SPAN OF BEAM & BLOCK

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered engineer by a Meter boxes with CNSD/114in accordance

REFER TO FOR RAISEDCIVIL ENGINEERS DPC & DRAWINGS UNDERBUILD

AAV

Gas entry position, in accordancegas to be legislation with Gasducted and Gas Safe be undertaken Safe registered by a engineer Meter boxes in accordance with CNSD/114 Tanking 600mm to continue either side to raised ground of door levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

PROPOSED OF BEAM SPAN & BLOCK Door

accordance

Double

to be in

Tanking to continue 600mm either side to raised ground of door levels.

level threshold

PROPOSED OF BEAM SPAN & BLOCK

Part 'M'

RWP MJ

DC entry point Water

SVP

RWP MJ

RWP MJ

Direct connection

Incoming water

SINGLE DOOR

Tanking to continue 600mm either side of door to raised ground levels.

AAV SVP

MJ RWP

Service meter boxes in accordance with CNSD/112

SINGLE DOOR

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Tanking to continue either side of door 600mm to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901

ELECTRIC GAS

Incoming water Direct connection

REFER TO CIVIL ENGINEERS DRAWINGS FOR RAISED DPC & UNDERBUILD

AAV AAV

Direct connection

Incoming water SINGLE DOOR

Tanking to continue either side of door 600mm to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901

MJ RWP

SVP

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Service meter boxes in accordance with CNSD/112

SOP

RWP MJ

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

MJ RWP

SVP

Service meter boxes in accordance with CNSD/112

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Tanking to continue 600mm either side of door to raised ground levels.

3BH Plot 2021

Incoming water Direct connection AAV

REFER TO CIVIL ENGINEERS DRAWINGS FOR RAISED DPC & UNDERBUILD

AAV

Direct connection

Incoming water

3BH Plot 2022

Sleeper Wall

PROPOSED SPAN OF BEAM & BLOCK

SINGLE DOOR

Tanking to continue either side of door 600mm to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901

MJ RWP

Waterproofing membrane to Detail DET-TBC

Service meter boxes in accordance with CNSD/112

SVP

ELEC Service

water

DC

SOP Tie Beam Engineers to Structural specification

PROPOSED OF BEAM SPAN & BLOCK 2No. 150mm 5No. water ducts to supplies

DOOR

2No. 150mm ducts to 5No. Gas supplies

Tanking to either side continue 600mm of door ground to raised levels.

3No. rigid landlords ducts for circuits 90Ø Openreach Duct

Gas entry ducted position, gas Gas Safein accordance to be with undertakenlegislation and registered by a Gas Safebe engineer

water supply

MASONRY

CONCRETEFACED REINFORCED STRUCTURALRETAINING WALLTO ENGINEERS DETAILS

Tie Beam Engineers to Structural specification Incoming

water

GAS

RWP

PROPOSED SPAN OF BEAM & BLOCK

Gas entry ducted position, gas in Gas Safe accordance to be with undertakenlegislation and registered by a Gas Safebe engineer

PROPOSED SPAN OF BEAM & BLOCK

Service meter in accordance boxes CNSD/112 with

Incoming

Tie Beam Engineers to Structural specification

DOOR

Incoming

Service meter in accordance boxes CNSD/112 with

RWP

Tanking to continue either 600mm side ground of door to raised levels.

DC

Tie Beam Engineers to Structural specification

SVP

DOUBLE

Floor gully

DOOR WITH SIDE Threshold PANELS accordance to be in with TBC

DC Incoming water

SVP

PROPOSED SPAN OF BEAM & BLOCK

WITH SIDE

water supply

DOOR DOUBLE

water supply

O

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

Incoming

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD MJ POSITION STRUCTURAL TBC BY ENGINEERS

O

w

DOUBLE

SVP

SVP

PROPOSED SPAN OF BEAM & BLOCK

GAS

GAS

DOOR

with DET to be in 950-2

RWP

RWP

O

DOUBLE PROPOSED SPAN OF BEAM & BLOCK

O

w

SINGLE DOOR Part 'M' level accordance threshold to with DET be in - TBC

Plot 09

meter accordance boxes in with CNSD/112

SINGLE

Part 'M' level accordance threshold with DET to be in 950-2

WITH SIDE PANELS Threshold accordanceto be in with TBC

water supply

DOOR

supply

Incoming

gas supply Incoming

DOUBLE

RCP

PROPOSED SPAN OF BEAM & BLOCK

Floor gully

Incoming

GAS

GAS

GAS

Drive Through PROPOSED OF BEAM SPAN & BLOCK

RWP

MJ RWP

electric

supply electric

Part 'M' level accordance threshold to with DET be in 950-2

RWP

SVP

GAS METERS LOCATED IN 2 ROWS Gas entry OF 2 position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered Service engineer by a meter accordance boxes in with CNSD/112

SINGLE

position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a Service meter accordance boxes in with CNSD/112

1No. duct incoming for electric

Plots 01-08

RWP

GAS Gas entry

Floor gully

Store

PROPOSED SPAN OF BEAM & BLOCK

connection

R

RWP

Floor falls towards gully

SVP Direct

Incoming

water

Water entry point Incoming BT supply Water entry point

gas supply

water supply Incoming

Incoming

Incoming

Incoming Incoming TV supply BT supply

Incoming

Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level threshold accordance to be in with DET-901

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Tanking to continue either side of door 600mm to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

RWP MJ

DOOR SINGLE

1

DOOR

Cycle Store

Refuse & Recycling

Floor falls towards gully

AAV

RWP

Tie Beam Engineers to Structural specification

SINGLE 1No. rigid landlords ducts for circuits

SPECIFICATIONS

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

connection

GAS

Incoming Incoming TV supply BT supply

Direct

Sleeper Wall

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

Tanking to continue either side of door 600mm to raised ground levels.

C L

Cycle Store

PROPOSED OF BEAM SPAN & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

TO S.E.

GAS

supply electric

gas supply

Incoming

Incoming

water supply Incoming

water

ELECTRIC

Incoming TV supply Incoming BT supply

Part 'M' level threshold to be in accordance with DET-901

PROPOSED SPAN OF BEAM & BLOCK

Service meter boxes in accordance with CNSD/112 Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

MJ RWP

SVP

Tanking to continue either side of door 600mm to raised ground levels.

DOUBLE DOORS

Part 'M' level threshold to be in accordance with DET-901

SPECIFICATIONS BEAM TO S.E.

2BH Plot 2018

300 SQ. R.C. TIE

C L

RWP MJ Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

Tanking to continue either side of door 600mm to raised ground levels.

Sleeper Wall

3BH Plot 2019 CL

3BH Plot 2020

Sleeper Wall

Tanking to continue 600mm either side of door to raised ground levels.

Waterproofing membrane to Detail DET-TBC

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

RWP MJ

OF BEAM & BLOCK PROPOSED SPAN

SVP

SINGLE DOOR Part 'M' level threshold accordance to be in with DET-901

MJ RWP

ELECTRIC

supply

gas supply

electric

Incoming

Incoming

BT supply TV supply

Incoming

Incoming

Tanking to continue 600mm either to raised side of door ground levels.

AAV

Wall Loadbearing

PROPOSED SPAN OF BEAM & BLOCK

Garage plot 2063

GARAGE

DOOR

RWP

with DET-901

supply

supply

electric

Incoming

Incoming

gas

supply water Incoming

MJ POSITION STRUCTURAL TBC BY ENGINEERS

PROPOSED OF BEAM SPAN & BLOCK

Garage plot 2062

PROPOSED OF BEAM SPAN & BLOCK supply water Incoming

DOOR

supply electric

supply gas

Incoming

Incoming

supply supply

TV

Incoming Incoming BT

supply water Incoming

supply

supply

gas

electric

Incoming

Incoming

GARAGE

supply supply BT

Incoming Incoming TV

supply

supply

gas

electric

Incoming

Incoming

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

connection Direct

Incoming water

MJ RWP Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

SVP

water

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD

Incoming

accordance

Tanking either to continue 600mm side ground of door to raised levels.

SINGLE DOOR Part 'M' level accordance threshold with DET-901to be in

Service meter boxes with CNSD/112 in

Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

SVP

MJ RWP SOP

MJ RWP Service meter boxes in accordance with CNSD/112 Gas entry position, gas to in be ducted legislationaccordance with Gas and Gas Safe be undertaken Safe by a registered engineer

Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD

SVP Tanking either to continue 600mm side of door to ground raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

SVP

MJ RWP SOP

MJ RWP

Service meter with CNSD/112boxes in accordance

Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered by engineer a

Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level accordance threshold with DET-901to be in

REFER TO FOR RAISEDCIVIL ENGINEERS DPC & DRAWINGS UNDERBUILD

Incoming water

SOP Incoming

gas supply

ELECTRIC GAS

water supply

supply

Incoming

electric

water supply

Incoming

Incoming

Incoming TV supply Incoming BT supply

gas supply Incoming

water supply Incoming

Incoming TV supply Incoming BT supply

supply

supply

gas supply

electric

electric

gas supply

water supply Incoming

Incoming TV supply Incoming BT supply

water supply

Incoming TV supply Incoming BT supply

supply

Incoming

electric Incoming

Tanking either sideto continue 600mm of door ground to raised levels.

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

SVP

MJ RWP

supply

gas supply

electric

Incoming

Incoming ELECTRIC

GAS

supply electric

gas supply

Incoming

Incoming

Incoming

Incoming

Incoming Incoming TV supply BT supply

ELECTRIC

Incoming

RWP

supply water

SVP

SPECIFICATIONS

PROPOSED OF BEAM SPAN & BLOCK

TO S.E. BEAM R.C. TIE 300 SQ.

SVP

Direct connection

SPECIFICATIONS TO S.E. BEAM R.C. TIE 300 SQ.

connection Direct

Incoming water

SPECIFICATIONS TO S.E. BEAM

connection Direct

Incoming water

accordance

Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered engineer by a

Service meter boxes with CNSD/112 in Direct connection

Incoming water

TO S.E.

SVP

connection

Tanking to continue either 600mm side of door to ground raised levels.

Direct SPECIFICATIONS TO S.E.

Sussex plot 2041

PROPOSED OF BEAM SPAN & BLOCK

BEAM R.C. TIE 300 SQ.

SVP

100

Drive Through

DOOR SINGLE

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side door to of raised ground levels.

Part 'M' level accordance threshold to be in with CNSD/012-1

Folly Plot 2042

Garage Plot 2042

PROPOSED SPAN OF BEAM & BLOCK

GARAGE

DOOR

RWP MJ

SVP

ELECTRIC

Incoming

Chalgrove Plot 2063

PROPOSED BEAM SPAN & BLOCK

OF

Service accordance meter Gas boxes in accordance with entry in legislation position, CNSD/112 Gas Safe and with gas be Gas to be registered undertaken Safe ducted engineer by a

in Part SINGLE accordance 'M' level DOOR threshold with CNSD/012-1 to be

TIE R.C. SQ. 300

PROPOSED BEAM SPAN & BLOCK OF

DC

CIVIL DPC ENGINEERS & UNDERBUILD DRAWINGS

Water entry point

RWP MJ Tanking to continue either 600mm side of door to ground raised levels.

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

Tanking to either side continue 600mm of door to ground raised levels.

RWP MJ RWP MJ

SVP

R.C. TIE

LC

SVP

Tanking to either side continue 600mm of door to ground raised levels.

SPECIFICATIONS

Sussex plot 2039

TO S.E. BEAM R.C. TIE 300 SQ.

RWP MJ Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

Tanking either to continue 600mm side of door to ground raised levels.

SVP

SPECIFICATIONS

Sussex plot 2040

PROPOSED OF BEAM SPAN & BLOCK

BEAM R.C. TIE 300 SQ.

C L

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

Waterproofing membrane to Detail DET-TBC

100

100

supply

ELECTRIC

electric

PROPOSED SPAN OF BEAM & BLOCK

Part

DOUBLE

OF

SPAN & BLOCK

IONS

PROPOSED

BEAM

BEAM

TO

S.E.

OF

SPECIFICAT

Tanking either ground side to continue levels.of door to 600mm raised

OF RWP MJ

Incoming gas supply

RWP MJ DOOR

RWP MJ

100

water supply

GAS

supply

gas supply

Incoming

supply

electric

Incoming

Incoming

GAS

supply

BEAM

Gas entry ducted position, gas in to Gas Safe accordance with be undertakenlegislation and registered by a Gas Safebe engineer

Tanking either to continue 600mm side of door to ground raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

Incoming electric

SVP

PROPOSED SPAN OF BEAM & BLOCK

PANELS Part 'M' level accordance threshold

O

O

Incoming gas supply

Cycle Store

SVP

GAS

AAV

ELECTRIC

RWP

O

O

Incoming BT supply Incoming TV supply

Floor falls towards gully

1No. rigid landlords ducts for circuits

Tie Beam Engineers to Structural specification

GAS

AAV

Service meter in accordance boxes CNSD/112 with

Incoming water

Incoming

GAS

R.C. TIE

PROPOSED OF BEAM SPAN & BLOCK

Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level accordance threshold with DET-901to be in

m

RWP

4

2

Tie Beam Engineers to Structural specification

2BH Plot 2010 300 SQ.

SVP

accordance

connection

supply

ELECTRIC

Direct

REFER TO FOR RAISEDCIVIL ENGINEERS DPC & DRAWINGS UNDERBUILD

20

RWP

SVP water

GAS

19

21

3

9

RWP MJ

Tanking to either side continue 600mm of door ground to raised levels.

PROPOSED SPAN OF BEAM & BLOCK

Service meter boxes with CNSD/112 in

Incoming

MJ RWP

supply

Part 'M' level accordance threshold to be in with DET-901 DOUBLE DOORS

Incoming water

U/A

CL

2BH Plot 2011

Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered engineer by a

SOP

Incoming TV supply Incoming BT supply

19 20 21

SPECIFICATIONS

SVP

RWP MJ

O

m

Incoming gas supply

TO S.E.

w

Incoming electric

Incoming

Incoming BT supply Incoming TV supply

supply

Incoming Incoming TV supply BT supply

MJ

CNSD/012-1 to be SIDE in WINDOW

WITH

'M' accordance level DOORS threshold with

Tanking 600mm to raised to continue either ground side levels.of door

PROPOSED BEAM SPAN & BLOCK in

OF

SPECIFICAT S.E. TO

SVP

threshold

CNSD/012-1 to DOOR be

BEAM TIE

SINGLE with

R.C.

Part accordance 'M' level

SQ. 300 PROPOSED BEAM & BLOCK SPAN

ground side

Tanking 600mm to raised to continue either

levels.of door

Tanking either ground side to continue levels.of door 600mm to raised

RWP MJ RWP MJ

DOOR GARAGE

RWP MJ

supply

SINGLE

electric

water supply

gas supply

supply

Part 'M' level accordance threshold with DET-901to be in DOUBLE DOORS

Tanking to continue either 600mm side of door to ground raised levels.

BEAM

w

RCP Incoming electric

ELECTRIC

8 7

5

V

C L

2BH Plot 2012 R.C. TIE

PROPOSED OF BEAM SPAN & BLOCK

SINGLE DOOR Part 'M' level threshold accordance to be in with DET-901

O

Incoming gas

Incoming

Incoming

Incoming BT supply Incoming TV supply

Incoming BT supply Incoming TV supply

water supply

supply

gas supply

Incoming

GAS

Plot 10

Part 'M' level threshold accordance with DET-901to be in DOUBLE DOORS

Tanking either to continue 600mm side of door to ground raised levels.

V 300 SQ.

Tanking to continue either 600mm side ground of door to raised levels.

w

Incoming water

Incoming

water supply

Incoming

supply

supply

gas supply

Incoming

ELECTRIC

22 11

10

Plot 11

Incoming water

SVP

SVP

Incoming water

Incoming Incoming BT supply TV supply

electric

Incoming

Incoming Incoming TV supply BT supply

supply

Incoming

RWP MJ

SVP

SPECIFICATIONS

RWP

Incoming gas supply

water supply

PROPOSED OF BEAM SPAN & BLOCK

Incoming

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

Incoming BT supply Incoming TV supply

GAS

m mm

Incoming electric

Incoming water supply

CL

water supply

PROPOSED OF BEAM SPAN & BLOCK

Incoming TV supply Incoming BT supply

RWP MJ

Sussex plot 2038

gas supply

Incoming

PROPOSED OF BEAM SPAN & BLOCK

electric

Incoming

supply

GAS

supply

Loadbearing Wall

300 SQ.

Incoming

electric

DOOR

w

Incoming TV supply Incoming BT supply

BEAM

gas supply

Incoming

Tanking to continue either 600mm side of door to raised ground levels.

Incoming

supply

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

ELECTRIC

TO S.E.

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

AAV

SINGLE

supply

Incoming TV supply Incoming BT supply

Incoming electric supply

Incoming BT supply Incoming TV supply GAS

BEAM

Direct connection

Tanking to continue either 600mm side of door to ground raised levels.

Part 'M' level accordance threshold to be in with DET-901

w

Incoming water supply

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

RWP MJ connection

O

Incoming gas

Garage type 4

Garage type 4

Garage type 4 Loadbearing Wall

water supply

Sussex plot 2037

Incoming

PROPOSED OF BEAM SPAN & BLOCK

Incoming Incoming BT supply TV supply

Direct

mm

Incoming electric

Sussex plot 2036

water supply

ELECTRIC

gas supply

Incoming

supply

supply

electric

Incoming

electric

Incoming

MJ

gas supply

PROPOSED SPAN OF BEAM & BLOCK

water supply

SOP

water

Incoming

RWP MJ

Incoming

w

mm

GAS

GAS

OF BEAM & BLOCK PROPOSED SPAN

SVP

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

connection

Tanking to either side continue 600mm of door to raised ground levels.

Direct

Incoming water

R.C. TIE

water

supply

MJ

GARAGE DOOR

RWP

PROPOSED OF BEAM SPAN & BLOCK

LC

SUSSEX Plots 2023 PROPOSED OF BEAM SPAN & BLOCK

300 SQ.

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

Incoming

electric

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

Tanking to continue either 600mm side of door to ground raised levels.

Plot 21

V

22

THATCH Plots 2024

SPECIFICATIONS

SVP

connection

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

gas supply

RWP MJ

Sussex plot 2014

PROPOSED OF BEAM SPAN & BLOCK

TO S.E.

Tanking either sideto continue 600mm of door ground to raised levels. Direct

MJ RWP

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD

Incoming

RWP MJ

SVP

SOP

RCP

Incoming

GAS

ELECTRIC

RWP GARAGE DOOR GARAGE DOOR

Garage Plot 2015

Incoming

PROPOSED SPAN OF BEAM & BLOCK

supply

OF BEAM & BLOCK PROPOSED SPAN

Folly Plot 2015

GAS

AAV

MJ RWP

gas supply

RWP MJ

SVP

Drive Through

BEAM

PROPOSED OF BEAM SPAN & BLOCK

DOOR

electric

Tanking to continue either 600mm side ground of door to raised levels.

Part 'M' level threshold accordance to be in with DOUBLE DET-901 DOORS

SPECIFICATIONS

Sussex plot 2016

TO S.E.

PROPOSED SPAN OF BEAM & BLOCK

BEAM

R.C. TIE

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

AAV

SINGLE

Incoming

R.C. TIE

PROPOSED OF BEAM SPAN & BLOCK

Tanking to continue either 600mm side of door to ground raised levels.

Part 'M' level accordance threshold with DET-901to be in

O

LC

300 SQ.

connection

Plot 12

V

RWP MJ

Incoming

Part 'M' level accordance threshold to be in with DOUBLE DET-901 DOORS

SVP

connection

Incoming water

Direct

Part 'M' level threshold accordance to be in with DOUBLE DET-901 DOORS

Tanking to continue either 600mm side of door to raised ground levels.

water supply

RWP MJ

Tanking to either side continue 600mm of door ground to raised levels.

Sussex plot 2017

PROPOSED OF BEAM SPAN & BLOCK

SPECIFICATIONS

Direct

ELECTRIC

water

12

11

C L

ELECTRIC

Plot 22

6 RWP

Incoming

Incoming

1

SPAN & BLOCK

PROPOSED

SVP

TO S.E.

12 RCP

Plot 23

SVP Incoming

RWP

REFER TO FOR RAISEDCIVIL ENGINEERS DPC & DRAWINGS UNDERBUILD

Plot 14

Plot 13

13

Part 'M' level accordance threshold with DET-901to be in DOUBLE DOORS

AAV

GAS

MJ RWP

13

RWP

Tanking to continue either 600mm side of door to ground raised levels.

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

Tanking to continue either 600mm side ground of door to raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

supply

C L

THATCH Plot 2025

SPECIFICATIONS

300 SQ.

connection

SPECIFICATIONS

Direct

14

Sussex plot 2013

water

water supply

gas supply

electric

PROPOSED OF BEAM SPAN & BLOCK

Incoming

ELECTRIC

Incoming Incoming

TO S.E.

DOORS

wO

O

BEAM

TO S.E.

Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered by engineer a water

Plot 20

R.C. TIE

Incoming

BEAM

Service meter boxes in accordance with CNSD/112 Gas entry position, gas to in be ducted legislationaccordance with Gas and Gas Safe be undertaken Safe by a registered engineer

connection

R.C. TIE

PROPOSED OF BEAM SPAN & BLOCK

SVP

Service meter with CNSD/112boxes in accordance

Direct

Plot 19

16

Part 'M' level threshold accordance to be in with DET-901

THATCH Plots 2026 300 SQ.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

ELECTRIC

300 SQ.

RWP MJ

O

RCP

Plot 18

RWP MJ

SVP

Tanking to either side continue 600mm of door ground to raised levels.

SOP

Incoming

RCP 42

RCP

Plot 25 Plot 24

PROPOSED SPAN OF BEAM & BLOCK

Tanking either to continue 600mm side of door to ground raised levels.

GAS

42

w

Plot 17

DOORS

Tanking to continue either 600mm side of door to ground raised levels.

SVP Service meter with CNSD/112boxes in accordance

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

Incoming

BEAM

MJ

U/A

ELECTRIC

SVP

ELECTRIC

Part 'M' level threshold accordance to be in with DET-901

Tanking either to continue 600mm side of door to ground raised levels.

Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered by engineer a

SVP

Plot 26

C L

DOUBLE

water

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD

water supply

OF

RWP MJ

V

14

connection

GAS

Part 'M' level accordance threshold to with DET-901 be in DOUBLE DOORS

THATCH Plots 2027

SPECIFICATIONS

62 63 GAS

ELEC

18

Plot 15

Direct

Plot 27

DOUBLE

TO S.E.

Incoming

Incoming TV supply Incoming BT supply

Garag

Plot 63

16

15

SPECIFICATIONS

23

RWP

Tanking to continue either 600mm side of door to raised ground levels.

BEAM

62 63

REFER FOR TO CIVIL RAISED ENGINEERS DPC & UNDERBUILD DRAWINGS

supply

TO S.E.

Incoming

e type

RWP

SOP

RWP

DOOR GARAGE RWP

SOP

63

TBC BY ENGINEERS

64

BEAM

23

CL

R.C. TIE

electric

water supply

Incoming BT supply Incoming TV supply

24

RWP

AAV

MJ POSITION STRUCTURAL

position,

in

R

ELEC

17

R.C. TIE

24

PROPOSED SPAN OF BEAM & BLOCK

MJ RWP

64

GAS

GAS

300 SQ.

Plot 42

25

DOORS

THATCH Plot 2028 300 SQ.

Incoming Incoming BT supply TV supply

Tanking to continue either 600mm side of door to ground raised levels.

DOUBLE

MJ RWP

SINGLE DOOR Part 'M' level threshold accordance to be in with DET-901

25

Part 'M' level accordance threshold to be in with DET-901

Tanking either to continue 600mm side ground of door to raised levels.

DOOR

RCP

DOOR threshold with DET-901to be

gas supply

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas to with Gas be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

Plot 28

SPECIFICATIONS

AAV

SINGLE

entry

in accordancegas legislation to be ducted Gas and be with Gas undertaken Safe Safe registered by Meter engineer a boxes in accordance with CNSD/114 Tanking 600mm to continue to raised either side ground of door levels.

SINGLE

Part 'M' level accordance

SVP

TO S.E.

Tanking to continue either 600mm side ground of door to raised levels.

Part 'M' level accordance threshold with DET-901to be in

Incoming Incoming

15 MJ RWP

connection

W BEAM

RCP

MJ RWP

Direct

ELECTRIC

water

62

DOOR

Plot 16

Plot 15 position TBC

DOOR

BEAM

RWP MJ Incoming

RWP

REFER TO CIVIL FOR RAISED ENGINEERS DPC & DRAWINGS UNDERBUILD

SPAN & BLOCK

GARAGE

17

R.C. TIE

GAS

GARAGE

R.C. TIE

AAV

GAS

PROPOSED BEAM

DET-901

Gas

300 SQ.

RCP

PROPOSED OF BEAM SPAN & BLOCK

26

RWP MJ

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

Tanking to continue either 600mm side ground of door to raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

supply

Service meter boxes in accordance with CNSD/112 Gas entry position, in accordancegas to be ducted legislation with Gas and Gas Safe be undertaken Safe registered by a engineer

ELECTRIC

DOOR

26

electric

gas supply

water supply

Tanking 600mm to continue either side door to of raised ground levels.

connection

OF

Water entry point

RWP PROPOSED OF BEAM SPAN & BLOCK

Garage plot 2064

Door

in accordance

Incoming Incoming TV supply BT supply

V

GAS

SINGLE

Direct

DC

to be

Chalgrove 2064 ONLY

water supply

Part 'M' level accordance threshold to be in with DET-901

water

SPAN & BLOCK

threshold

plot

DC

ß

connection

Incoming

SVP

SOP

Incoming

PROPOSED BEAM

point

AAV

Incoming water

V

Incoming

PROPOSED SPAN OF BEAM & BLOCK

SVP

water

OF in

'M' level

with

entry

SVP

Direct

RCP

MJ RWP

SVP

RWP MJ

RWP

S.E. SPECIFICATIONS

Garage plot 2032

PROPOSED SPAN OF BEAM & BLOCK

Part 'M' level threshold to be in accordance with DET-901 SINGLE DOOR

300 SQ. R.C. TIE BEAM TO

UP AND OVER GARAGE DOOR

Incoming

be

Double

Part

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered Tanking engineer by a to continue either 600mm side of door to ground raised levels.

Gas

Elec

connection

RWP

Tanking 600mm to continue to raised either groundside of door levels.

point

RCP

Incoming Incoming

Incoming

SINGLE DOOR Part 'M' level threshold accordance with DET-901to be in

AAV

RWP MJ

300 SQ.

Direct

Tanking 600mm to raised either continue ground side of levels. door

DET-901

Plot 62 entry

REFER TO FOR RAISEDCIVIL ENGINEERS DPC & DRAWINGS UNDERBUILD

be in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

Part 'M' level threshold to

TO S.E. SPECIFICATIONS

SINGLE DOOR Part 'M' level threshold to be in accordance with DET-901

Thetford plot 2032

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels.

300 SQ. R.C. TIE BEAM

Plot 42 position TBC

27

THATCH Plots 2029

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas with Gas to be ducted legislation Safe Gas Safe and be undertaken registered engineer by a

Tanking to either side continue 600mm of door ground to raised levels.

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

to

with

Water

SPAN & BLOCK

SVP

Incoming water

AAV

SOP

threshold with DET-901 to

RWP MJ

in accordance

RWP MJ DC

PROPOSED BEAM

Tanking to either side continue 600mm of door to raised ground levels.

DC

Plot 41

Plot 29

Part 'M' level accordance threshold with DET-901to be in DOUBLE DOORS

Part accordance 'M' level

SPAN & BLOCK

in

Incoming TV supply Incoming BT supply

SINGLE DOOR Part 'M' level accordance threshold to be in with DET-901

CL

RWP

SVP

40

C L

Tanking either to continue 600mm side of door to ground raised levels.

RWP MJ

be

Plot Chalgr 2065 ove ONLY

PROPOSED

BEAM

OF

be

MJ RWP

SVP

Part 'M' level threshold accordance to be in with DET-901 DOUBLE DOORS

SPAN & BLOCK

DET-901to

SOP

DC

be in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

Part 'M' level threshold to

Incoming water

S.E. SPECIFICATIONS

Thetford plot 2033

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM TO

SINGLE DOOR Part 'M' level threshold to be accordance with DET-901 in

Tanking to continue 600mm either side of door to raised ground levels.

39

THATCH Plots 2030

PROPOSED SPAN OF BEAM & BLOCK

SVP

PROPOSED

with

ß

ELECTRIC

Plot 40

MJ

BEAM

SINGLE DOOR

Part 'M' level threshold to be accordance with DET-901 in

AAV

RWP MJ

type 3

DOOR RWP

RWP

SVP

MJ RWP

GAS

GAS

PROPOSED OF BEAM SPAN & BLOCK

Garage

GARAGE

CL

SPECIFICATIONS

DRAWINGS D

OF

Gas entry in accordance legislation position, Gas Safe and with gas Meter be Gas to be registered with boxes undertaken Safe ducted CNSD/114 in accordanceengineer by a

Part SINGLE 'M' accordance level DOOR threshold

ELECTRIC

ELECTRIC

40

RWP

TO S.E.

CIVIL DPC ENGINEERS & UNDERBUIL

CIVIL DPC ENGINEERS & UNDERBUILD DRAWINGS

GAS

Wall

type 3

DOOR

41

Tanking to continue either 600mm side of door to raised ground levels.

BEAM

SOP

SVP

Gas

Elec

SIDE ELEVATION

AA NAO AN TCOETSCES

Part 'M' level accordance threshold with DET-901to be in DOUBLE DOORS Tanking either to continue 600mm side of door to ground raised levels.

R.C. TIE

PROPOSED SPAN OF BEAM & BLOCK

REFER FOR TO RAISED

supply

CL

RWP

Garage plot 2033

DOOR

TO S.E. SPECIFICATIONS

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM

UP AND OVER GARAGE

Loadbearing

PROPOSED SPAN OF BEAM & BLOCK

Garage

39

OF

water

SINGLE DOOR

SVP

RWP

Plot 39

28

THATCH Plot 2031 300 SQ.

SVP

REFER FOR TO RAISED

65

ELECTRIC

Wall

type 3

38

RWP MJ

Service meter with CNSD/112boxes in accordance Gas entry position, in accordance gas legislation with Gas to be ducted Safe Gas Safe and be undertaken registered engineer by a

SPAN & BLOCK

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

PROPOSED SPAN OF BEAM & BLOCK

Garage plot 2034

TO S.E. SPECIFICATIONS

REFER TO CIVIL ENGINEERS DRAWINGS FOR RAISED DPC & UNDERBUILD

300 SQ. R.C. TIE BEAM

UP AND OVER GARAGE DOOR

FRONT ELEVATION

PROPOSED BEAM

to

AAV

TBC L ENGINEERS BY

Plot 64

Door threshold

ELEC

Gas

Elec

41

Plot 30

OF

level

GAS

be in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

AAV

Plot 37

DOOR

DOOR

GARAGE

Plot 31

SVP

Double 'M'

MJ POSITION STRUCTURA

RWPMJ

ELEC

Part 'M' level threshold to

Thetford plot 2034

S.E. SPECIFICATIONS

SINGLE DOOR Part 'M' level threshold to accordance with DET-901be in

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels.

300 SQ. R.C. TIE BEAM TO

Loadbearing

PROPOSED SPAN OF BEAM & BLOCK

Garage

38 MJ

27

28

Tanking 600mm to raised either continue ground side levels.of door

Part

GAS

RWP MJ

Incoming water

SINGLE

GARAGE

30

RWP MJ

DOOR

PROPOSED OF BEAM SPAN & BLOCK

DOOR

RWP

31

to

Incoming

RWP MJ

RWP MJ 600mm Tanking to raisedeither to side continue ground of door levels.

GARAGE

CL

DC

SINGLE

SOP

30

in

Openreach

Wall Loadbearing

RWP

in

RWP MJ

Plot 36

W

29

31

be

PROPOSED

SPAN & BLOCK

BT Incoming

2

PROPOSED BEAM SPAN & BLOCK

2

SPAN & BLOCK

PROPOSED GAS

Tanking either to ground side continue of levels. door 600mm to raised

SINGLE Part 'M' accordance DOOR level threshold with DET-901to be

RCP

37

w

SVP

RWP

Plot 38

RWP MJ

RCP

Part SINGLE accordance 'M' level DOOR threshold with DET-901 to

ELEC

SVP

BEAM

PROPOSED OF BEAM SPAN & BLOCK

Garage plot 2065 connection

RWP MJ

36

Plot 33

Plot 32 32

RWP

GAS

Part DOUBLE accordance 'M' level thresholdDOORS with CNSD/012-1 to be in

MJ RWP

OF

OF

Connection

Incoming electric supply

e type

Garag e type

Garag

Fibre

REFER FOR TO RAISED

DOOR GARAGE DOOR GARAGE

RWP

SOP MJ

Plot 61

NS

Direct

Incoming water

SVP

35

m

Gas

Plot 65

SVP SPECIFICATIO

engineer by a

PROPOSED OF BEAM SPAN & BLOCK

ß

m m

w

Elec

S.E.

supply

TO

RWP MJ

RWP MJ

Incoming electric supply Incoming gas supply

32 29

supply

BEAM

gas

TIE

electric

R.C.

Incoming

61

Incoming

SQ.

Service with meter CNSD/112 boxes Gas entry in accordance in accordance legislation position, gas Gas Safe and with Gas to be be registered Safe ducted undertaken

ELECTRIC

Tanking to continue 600mm either side of door to raised ground levels.

SVP

B

WALL

RWP MJ

RWP

66

67

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

RWP MJ

w Bw

61

MJ RWP

SLEEPER

threshold with DOUBLE DET-901to be in DOORS

of door 600mm ground to raised levels.

Sussex plot 2066

PROPOSED OF BEAM SPAN & BLOCK

300

65

37

RWP

MJ

supply

MJ RWP

BT

supply

GAS

Incoming gas supply

RWP

1

RWP MJ Water entry point

RWP MJ

PROPOSED BEAM SPAN & BLOCK

SPAN & BLOCK

PROPOSED

DC

e type

BEAM

in

Tanking 600mm to raised to continue either ground side of levels. door

MJ

MJ - only rendered RWP on units

AAV

OF

threshold with DET-901to be

Part 'M' accordance level

OF

SVP

PROPOSED BEAM SPAN & BLOCK

PROPOSED BEAM SPAN & BLOCK

Garag

Tanking 600mm to raised eithercontinue ground side of levels. door

OF OF

water

GAS

ELECTRIC

GAS

Part 'M' level threshold to be in accordance with DET-901

REFER TO CIVIL ENGINEERS DRAWINGS FOR RAISED DPC & UNDERBUILD

Incoming

Part 'M' accordance level

Tanking either to side continue

CIVIL DPC ENGINEERS & UNDERBUILD DRAWINGS

67

Water

Service meter boxes in accordance with CNSD/112

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken Gas Safe registered engineerby a

SINGLE DOOR

Tanking to continue 600mm either side of door to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901

Sussex plot 2035

PROPOSED SPAN OF BEAM & BLOCK

w

61

RWP rendered MJ - only units on

Incoming

W

Garage plot 2066

DOOR

REFER FOR TO RAISED

w w W w

& BLOCK

SPAN

OF BEAM PROPOSED & BLOCK SPAN

entry Water point

Wall

SPECIFICATION

SVP

SINGLE DOOR

Incoming BT supply Incoming TV supply

to

DRAWINGS

RWP MJ

WALL

S.E.

DOOR

RWP MJ

SVP

Incoming water

Direct connection

D

MJ RWP

SLEEPER

TO

engineer by a

600mm to raised levels.

ELECTRIC

ELECTRIC

RWP MJ

SOP

Water supply

supply

be in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

Part 'M' level threshold to

RWP MJ

W

water

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

Thetford plot 2046

Incoming water DC

TO S.E. SPECIFICATIONS

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM

Tanking to continue 600mm either side of door to raised ground levels.

SINGLE DOOR Part 'M' level threshold to be in accordance with DET-901

34 33

supply

SVP

BEAM

S

of door ground

in

V

Plot 34

Incoming gas supply Incoming electric supply

Water supply

BT

CL

RWP

AAV

33

Incoming

SVP

Gas

Elec

S.E. SPECIFICATIONS

Garage plot 2046

DOOR

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM TO

UP AND OVER GARAGE

TIE

Service with meter CNSD/112 boxes Gas entry in accordance in accordance legislation position, Gas gas Safe and with Gas to be be registered Safe ducted undertaken

Tanking either to side continue

SINGLE Part 'M' accordance DOOR level threshold with DET-901to be

m

SVP

OF BEAM PROPOSED

L

Garage plot 2047

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

S.E. SPECIFICATIONS

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM TO

RWP

REFER TO CIVIL ENGINEERS DRAWINGS FOR RAISED DPC & UNDERBUILD

UP AND OVER GARAGE DOOR

R.C.

GARAGE

36

in

MJ RWP

levels. continueside of door

Loadbearing

PROPOSED OF BEAM SPAN & BLOCK

SQ.

RWP

Part 'M' level threshold to be in accordance with DET-901

35

be

to 600mmraised Tanking ground either

SPAN

AAV

Gas

Elec

W

Incoming electric supply

Incoming gas supply

34

to

Incoming

DOOR

MJ

AAV

RWP MJ

PROPOSED BEAM SPAN & BLOCK

Garage plot 2067

PROPOSED BEAM SPAN & BLOCK

OF

300

connection

MJ RWP

AAV

Incoming water supply

in

D

CIVIL DPC ENGINEERS & UNDERBUIL

MJ SOP

Gas

in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

Part 'M' level threshold to be

TO S.E. SPECIFICATIONS

Thetford plot 2047

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM

Tanking to continue 600mm either side of door to raised ground levels.

SINGLE DOOR Part 'M' level threshold to be in accordance with DET-901

W

PLERP

ß

D DRAWINGS

OF BEAM PROPOSED & BLOCK

Plot 60

GARAGE

Tanking to continue 600mm either side of door to raised ground levels.

Incoming water Direct connection

RCP Plot 35

Elec

Incoming water

Water supply

ß

& UNDERBUIL ENGINEERS

accordance Part 'M' level with SINGLE threshold DET-901

Plot 66

600mm Tanking to raisedeither to side continue ground of door levels.

ß

ß

supply

CL

RWP

DC

ß

ß

DPC

RWP

OF

Sussex plot 2067

SVP

Direct

Service meter boxes in accordance with CNSD/112 Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken Gas Safe registered engineer by a

Incoming water

66

ß

CIVIL

in

C

TO S.E. SPECIFICATIONS

PROPOSED SPAN OF BEAM & BLOCK

SOP

Incoming electric supply Incoming gas supply

Incoming TV supply Incoming BT supply

TO

to

be

side levels. continue of door

DC

Tanking either to ground side continue of levels. door 600mm to raised

THATCH Plot 2044

300 SQ. R.C. TIE BEAM

SVP

FOR REFER RAISED

RWP

to

SVP

threshold DOUBLEwith DET-901to be in DOORS

Incoming water

Beam & block floor / separating wall detail to be in accordance with DET-TBC

SVP

MJ

SPAN

to

to 600mmraised Tanking ground either

Part 'M' accordance level

TO S.E. SPECIFICATIONS

Direct connection

SOP

OF BEAM PROPOSED & BLOCK

accordance Part 'M' level with DET-901 threshold

RWP

RWP

RWP MJ

PROPOSED SPAN OF BEAM & BLOCK

SINGLE DOOR

MJ RWP

60

60

60

MJ RWP

W

RWP MJ

Tanking to continue 600mm either side of door to raised ground levels.

THATCH Plot 2045 300 SQ. R.C. TIE BEAM

Tanking to continue 600mm either side of door to raised ground levels.

AAV

SOP

59

59

Plot 67 V

electric

Plot 59 V

Service meter boxes in accordance with CNSD/112 Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

45

supply

Thetford plot 2048

be in accordance with DET-901 DOUBLE DOORS WITH SIDE WINDOWS

SVP

Tanking to continue 600mm either side of door to raised ground levels.

45 Plot 46

gas

V

Incoming

supply

SVP

46

Incoming gas supply

Incoming electric supply

Water supply

59

Incoming

Part 'M' level threshold to

Incoming water DC

S.E. SPECIFICATIONS

PROPOSED SPAN OF BEAM & BLOCK

300 SQ. R.C. TIE BEAM TO

Tanking to continue 600mm either side of door to raised ground levels.

Part 'M' level threshold to be in accordance with DET-901 DOUBLE DOORS

supply

SINGLE DOOR Part 'M' level threshold to be in accordance with DET-901

46

W

44 C L

supply

gas

supply

Plot 44

Part 'M' level threshold to be accordance with DET-901 in DOUBLE DOORS

gas

Incoming Incoming

44 RWP MJ

electric

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

RWP MJ

AAV

47

Gas

ELEC

43 Plot 47

Incoming

Elec

Garage plot 2048

PROPOSED SPAN OF BEAM & BLOCK

S.E. SPECIFICATIONS

Gas

Elec

47

ß ß

Incoming

V GAS

electric

43

Plot 45

Part SINGLE 'M' accordance level DOOR threshold with DET-901 to be

WALL

RWP MJ

SVP

300 SQ. R.C. TIE BEAM TO

UP AND OVER GARAGE DOOR

43

Plot 48

RWP

SLEEPER

RWP

Incoming electric supply Incoming gas supply

supply

SOP

48

BT

supply

AAV

in

Meter boxes in accordance with CNSD/114

Tanking to continue of door 600mm either side to raised ground levels.

SINGLE DOOR

PROPOSED SPAN OF BEAM & BLOCK

gas to be ducted Gas entry position, Gas Safe in accordance with undertaken by a legislation and be engineer Gas Safe registered

to be Part 'M' level threshold DET-901 accordance with

DRAWINGS REFER TO CIVIL ENGINEERS & UNDERBUILD FOR RAISED DPC

Water supply

RCP

Incoming

Incoming

BY MJ POSITION TBC STRUCTURAL ENGINEERS

MJ RWP

Plot 43

REFER FOR TO RAISED

PROPOSED SPAN OF BEAM & BLOCK

with DET-901

Chalgrove 2051, 2057 Plots 2049, 2050,

RWP MJ

to be in accordance

Double Door

DC

Tanking to continue of door 600mm either side to raised ground levels.

Water entry point

RWP MJ

Part 'M' level threshold

SVP

Water supply

entry Water point

MJ RWP

Plot 58

Plot 49

PROPOSED SPAN OF BEAM & BLOCK

Incoming gas supply

Incoming electric supply

S H

W NDOW DOOR NOTES

electric

supply

RWP MJ

DRAWINGS ENGINEERS TO CIVIL & UNDERBUILD REFER DPC FOR RAISED

Plot 57

Incoming

with DET-901

58

57

SPAN PROPOSEDBLOCK & OF BEAM

Incoming

accordance

TBC BY MJ POSITION ENGINEERS STRUCTURAL

Chalgrove 2057 2050, 2051,

SPAN PROPOSED BLOCK & OF BEAM

Plots 2049,

DC

GARAGE

Double Door

to be in

point

RWP MJ

Water entry

to continue door Tanking of either side 600mm ground levels. to raised

level threshold

SVP

58

RWP

RWP MJ

Part 'M'

57

GARAGE

to continue door Tanking of either side 600mm ground levels. to raised

AAV

DOOR SINGLE to be in level threshold Part 'M' with DET-901 accordance

ducted gas to be Safe position, Gas Gas entry accordance with by a in and be undertaken engineer legislation registered Gas Safe in accordance Meter boxeswith CNSD/114

SPAN PROPOSED& BLOCK OF BEAM

DRAWINGS ENGINEERS TO CIVIL & UNDERBUILD REFER DPC FOR RAISED

Plot 50

50

H WORK NG DRAW NG O B R AD N CON UNC ON W H H CR ANDARD CON RUC ON NO AND H ANDARD WORKMAN H AND MA R A C CA ON

PROPOSED OF BEAM SPAN & BLOCK

with DET-901

RCP

RWP MJ

accordance

TBC BY MJ POSITION ENGINEERS STRUCTURAL

Chalgrove 2057 2050, 2051,

SPAN PROPOSED& BLOCK OF BEAM

Plots 2049,

DC

PANELS

in

water

in

to be in

Double Door

level threshold

point

RWP MJ

Water entry

to continue of door Tanking side 600mm either levels. ground to raised

Part 'M'

SVP

to

be

Meter

SPAN

to raised 600mm Tanking ground either

DOORS accordance WITH Part 'M' level with SIDE WINDOW CNSD/012-1 threshold to

Incoming

DOORS to be

RWP MJ

accordance Part 'M' level with CNSD/012-1 DOUBLEthreshold

OF BEAM PROPOSED & BLOCK

SVP

in

Tanking 600mm to raised to continue either ground side of levels. door

e type

Garag

e type

RWP MJ

be

SINGLE Part accordance 'M' level DOOR threshold with DET-901to be

R.C.

to raised 600mm

to

CIVIL DPC ENGINEERS & UNDERBUILD DRAWINGS

MJ

MJ

DOOR

SPAN

SQ.

ground either Tanking side levels. of to door continue

accordanceSINGLE Part 'M' DOOR level with CNSD/012-1 threshold

electric

SVP

GARAGE

SPECIFICATIONS

OF BEAM PROPOSED & BLOCK

SPAN

supply

RWP MJ

TO S.E.

SPAN PROPOSED& BLOCK OF BEAM

BEAM

(Plot 2051)

R.C. TIE

Gas Safe legislation in accordance registered Gas and entry engineer accordance position,withbe undertaken Service Gas gas Safe by meter with a CNSD/112to be boxes ducted in

SPECIFICAT

OF BEAM PROPOSED & BLOCK

gas

300 SQ.

S.E.

side levels. continue of door

Incoming

TIE

Garage

to

REFER FOR TO RAISED

R.C.

SPAN

to raised 600mm Tanking ground either

AL TBC BY ENGINEERS

SQ.

in

Incoming

DOOR to be in SINGLE level threshold Part 'M' with DET-901 accordance

to continue of side Tanking either 600mm raised ground door to levels.

SPAN PROPOSED & BLOCK OF BEAM

Plot 2052

300

to be

MJ POSITION STRUCTUR

MJ

RWP

DOOR

GARAGE

RWP

SOP

DOOR

to raised 600mm

DOUBLE

49

ß

H

3245

SVP

DC

MJ RWP

DRAWINGS

SPAN PROPOSED & BLOCK OF BEAM

accordance Part 'M' level with CNSD/012-1 SINGLE threshold

ground either Tanking side levels. of to door continue

MJ RWP

50

48

CW CW

300

Incoming

Tanking 600mm to raised eithercontinue ground side levels.of door

MJ

supply

supply

OF

electric

RWP MJ

SPECIFICAT

BEAM

Water entry point

OF

RWP

SPAN

supply

W

Incoming TV supply Incoming BT supply

IONS

TO

300

DOOR

SVP

OF BEAM PROPOSED & BLOCK

Incoming gas supply

W

Incoming TV supply Incoming BT supply

SPAN & BLOCK

PROPOSED

IONS

DC

GARAGE

56

OF BEAM PROPOSED & BLOCK

supply

Incoming electric

K

Incoming gas supply

BEAM

SPAN & BLOCK

DC

MJ RWP

OF

Connection

DRAWINGS

Plot 56

49

DK

Incoming electric supply

OF

BEAM

SVP

Fibre

DPC CIVIL & UNDERBUILD ENGINEERS

electric supply

Incoming water

300 4153

OF

Openreach

TO

IONS

50

1023

Part SINGLE 'M' accordance level DOOR threshold with CNSD/012-1 to be

BT

FOR REFER RAISED

entry Water point

TO

gas supply

1453

4833

1453

D

Incoming

RWP MJ

supply

Incoming

1023

CIVIL DPC ENGINEERS & UNDERBUIL

supply

56

300

Incoming

4153

DOOR WITH SIDE PANELS Threshold accordanceto be in with TBC

RWP

SOP

Floor gully

O

LAVENHAM AREAS M

m

T1 P1

TENDER ISSUE PRELIMINARY ISSUE

Rev.

Description.

Drawing Status:

27/07/18 04/07/18 Date.

BC BC Initial.

TENDER Crest Nicholson Ltd. Crest House Pyrcroft Road Chertsey KT16 9GN Tel: 01932 580 444 www.crestnicholson.com

SITE PLAN

Site:

Kilnwood Vale, Phase 3B

House Type:

Site Plan

Drg Title:

1:500 Drawing No:

Unit Size:

-

Page Size:

Scale:

Drawn:

-

A1

YL

Date:

ft²

Jul '18

Checked:

BC

Revision:

170513-POW-SITE_PLAN-SP-A-500-Site_Plan T1

O

O

O

W

O

W

Land ng En u e ND R R

ß

ß ß

ß

ß

ß

ß

U

MN R

ß

U

D D

C

N

C

H

C K

34

SIDE ELEVATION

C

TENDER

W

REAR ELEVATION

S

C

ß R

GN

www

K w

V

m

P

B

m

m

E Y

BC

ß

C bd

Ha

Incoming electric supply

GAS

type

BLOCK PROPOSED& BEAM OF

in

Tanking either ground side to continue levels.of door 600mm to raised

RWP

DRAWINGS

water

56

RWP

water supply

1023

REFER FOR TO RAISED

Incoming

55

55

Plot 51

SPAN PROPOSED & BLOCK OF BEAM

gas supply

Incoming

Part 'M' level threshold to be in accordance with DET-901

supply

SPAN PROPOSED& BLOCK OF BEAM

ENGINEERS UNDERBUILD TO CIVIL DPC & REFER FOR RAISED

Plot 55

(Plot 2052)

electric

Incoming

MJ RWP

water

Garage

Incoming

650

300

Incoming

SVP

51

water supply

650

Connection

DOOR

Incoming

D

MJ RWP

4833

Incoming gas supply

ELEC

Part SINGLE 'M' accordance level DOOR threshold with CNSD/012-1 to be

D

Fibre

GARAGE

51

300

2915

Openreach

SPECIFICATIONS

52

Plot 52

W

SVP

SINGLE DOOR

Part 'M' level threshold to be in accordance with DET-901

4833

BT

TO S.E.

52

RCP

55

water

SPAN PROPOSED & BLOCK OF BEAM

BEAM

(Plot 2054)

Incoming

RWP MJ

R.C. TIE

54

supply

connection

300 SQ.

water

Garage

SOP

Incoming

S

Part 'M' level threshold to be in accordance with DET-901

300

Incoming

supply

gas supply

Part DOUBLE 'M' accordance level thresholdDOORS with CNSD/012-1 to be in

electric

Incoming

Direct

Incoming

54

B

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe

100

Tanking to continue 600mm either side of door to raised ground levels.

DOOR

Garage

Service accordance meter Gas boxes entry in accordance with legislation in position, CNSD/112 Gas Safe and with gas be Gas to be registered undertaken Safe ducted engineer by a

supply

RWP MJ

51

mB

SVP

SINGLE DOOR

water

54

m

650

Incoming

Plot 54

53

B

SINGLE DOOR

MJ RWP

Connection

Part DOUBLE accordance 'M' level DOORS threshold with CNSD/012-1 to be in

53

RCP

mB

SVP

GARAGE

Fibre

Plot 53

RCP

m

Service meter boxes in accordance with CNSD/112 Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

100

100

Tanking to continue 600mm either side of door to raised ground levels.

SVP

Incoming

RWP

MJ

RWPMJ

Openreach

MJ RWP

SOP

BT

in

MJ RWP

Incoming

53

CNSD/012-1 to be with threshold DOORS accordance 'M' level Part DOUBLE

levels.door groundside of to raised either 600mm to continue Tanking

SOP

DOOR in SINGLE CNSD/012-1 to be with threshold

accordance 'M' level Part

& BLOCK SPAN BEAM OF PROPOSED

100

Tanking to continue 600mm either side of door to raised ground levels.

supply

MJ RWP

PANELS WINDOW SIDE in WITH CNSD/012-1 to be DOORS with threshold DOUBLE accordance 'M' level Part

100

S.E.

Incoming BT supply Incoming TV supply

TO

SVP

CIVIL DPC ENGINEERS & UNDERBUIL

raised levels. door to 600mm ground side of either to continue Tanking

SPECIFICATIONS

REFER FOR TO RAISED

SQ.

S.E.

100

BEAM

GAS

300

TO

ELECTRIC

TIE

Service meter boxes in accordance with CNSD/112

ELECTRIC

R.C.

levels.door groundside of to raised either 600mm to continue Tanking

BEAM

100

supply

SQ.

& BLOCK SPAN OF BEAM PROPOSED

TIE

Service meter boxes in accordance with CNSD/112

ELEC

water

300

& BLOCK SPAN BEAM OF PROPOSED

R.C.

Incoming gas supply

Incoming

& BLOCK SPAN BEAM OF PROPOSED

& BLOCK SPAN OF BEAM PROPOSED

& BLOCK SPAN OF BEAM PROPOSED

Incoming electric supply

Connection

raised levels. door to 600mm ground side of either to continue Tanking

DC

100

Fibre

3245

BT Openreach

registeredundertaken Safe and be Gas Safebe ducted Gas with gas to legislation position, in accordance entry CNSD/112 in Gas with boxes meter accordance Service

in

RWP

SVP

point entry Water

3245

Incoming

RWP MJ

a engineer by

CNSD/012-1 to be with threshold accordance 'M' level DOOR Part SINGLE

DRAWINGS & UNDERBUILD DPC ENGINEERS RAISED FOR TO CIVIL REFER

RWP MJ


THATCH plot 266

RWP

RWP

Refer to EMS for Brick Header

Refer to EMS for Brick Creasing Tile Cill

Refer to EMS for Brick Creasing Tile Cill

35°

35°

Refer to EMS for Brick Header

SIDE ELEVATION 75

1060

1060

SIDE ELEVATION

W4

Refer to EMS for Brick Finish

Refer to EMS for Brick Finish Refer to EMS for Brick Finish

1050

GD1

RWP

Part 'M' level threshold BT Openreach to be in accordance with Fibre Connection CNSD/012-1

DPC

150

ED1

RWP

Semi-concealed wall Semi-concealed mounted electrical wall mounted gas box as CNSD/114 box as CNSD/114

1415

ß

Refer to EMS for Brick Finish

Refer to EMS for Brick Finish

1060

ß

2250

2110

GD1

RWP

35°

75

1060

35°

1060

2250

RWP

GD1

RWP

DPC

RWP

GD1

RWP

RWP

RWPRWP

Semi-concealed wall Semi-concealed mounted electrical wall mounted gas box as CNSD/114 box as CNSD/114

Semi-concealed wall Semi-concealed mounted electrical wall mounted gas box as CNSD/114 box as CNSD/114

FRONT ELEVATION

THATCH plot 267

THATCH plot 266

1060

RWP

FRONT ELEVATION

DPC

RWP

Semi-concealed wall Semi-concealed mounted electrical wall mounted gas box as CNSD/114 box as CNSD/114

W4

1050

ED1

ED1 RWP

BT Openreach Part 'M' level threshold Part 'M' level threshold BT Openreach Fibre Connection to be in accordance with to be in accordance with Fibre Connection CNSD/012-1 CNSD/012-1

CNSD/012-1

DPC

GD1

ß

ß

W1

150

DPC

150

GD1

ß

ß

SIDE ELEVATION

THATCH plot 267

ED1 RWP

BT Openreach Part 'M' level threshold Fibre Connection to be in accordance with

Refer to EMS for Brick Creasing Tile Cill

GD1

RWP

Refer to EMS for Brick Header

1415 2110

ßß

W1 W1

150

RWP

ß

1050 150

DPC

GD1

RWP RWP

ß

Refer to EMS for Brick Finish

W2

1415 1060

1310

W1 W3

DPC

150

ß ß ß ß

ß

THATCH plot 266

Refer to EMS for Roof Tile Finish

1210

ß

ß

W2

Refer to EMS for THATCH plot 266 Brick Finish

2250

ß

Refer to EMS for Brick Finish

Refer to EMS for Brick Finish

75

RWP GD1

1210

ß

ß

W2

W4

1415 1060

Refer to EMS for GD1 BrickED1 Creasing Part 'M' level threshold BT Openreach Tile Cill to be in accordance with Fibre Connection CNSD/012-1 Refer to EMS for Brick Header

RWP

Refer to EMS for Brick Finish

1050

W1

150

2110

ß

2250

ß

150

RWP

40° 1210

1210

ß

Refer to EMS for Brick Creasing Tile Cill

W4

1415

THATCH plot 267

1060

ED1

ED1

RWP

Refer to EMS for Brick Creasing Tile Cill

75

ß

ß

Refer to EMS for Roof Tile Finish

1050

2110 150

W1

150

THATCH plot 267

THATCH plot 266

1060 1050

150

ßß

ß

THATCH plot 266

1415

1415 1060

1310

1050

950

40°

1210

1210

40°

1210

40°

2335 FFL to u/s ceiling 277

ß

BT OpenreachPart 'M' level threshold Part 'M' level thresholdBT Openreach Fibre Fibre Connection Connection to be in accordance with to be in accordance with CNSD/012-1 CNSD/012-1

ß

ß

1415 1060 1050

950

500

500 274 1415

ß

W2

W1

W2

W8

W4

950

ß

240

150

950 1310

ß

1210

ß

2370

ß

ß

10

ß

W9

ß

11

DPC

ED1 GD1

RWP

BT Openreach Part 'M' level threshold Fibre Connection to be in accordance with

ß

ß

ß

ß

ß

FRONT ELEVATION FRONT ELEVATION

Ground Floor Construction 75mm thick sand cement or C25/30 concrete screed reinforced with galvanised A142 mesh laid on 500 gauge DPM, on 150mm deep Springvale Platinum Floorshield EPS70, on 1200 gauge DPM lapped and sealed with all DPCs. Floor construction made of 150mm pre-cast concrete beam Refer to EMS for Finish on load & block suspended floor. Beams to be laidRoof onTileDPC bearing walls. Provide a minimum 250mmRefer ventilated void to EMS for Brick Creasing Tile Cill below PCC beam to suit site ground conditions. Refer to site specific details for variation to this specification Refer to EMS for Brick Header where Radon protection is required.

Bedroom 1

RWP

ß

ß

Refer to EMS for Weatherboard Finish

Refer to EMSlocated for Refer to EMS for All glazing within a door or side light within 1500mm Brick Finish Brick FinishW3 above floor level and 300mm either sideW4of the door shall be carried out using toughened glass. All glazing to ground floor windows and thoseRWP above porches/bays to be toughened or laminated. Any window or glazed panel within 800mm above floor level shall be carried out using safety glass as defined in BS6262 part 4 1994 and BS6206 1981.

13 12

GD1

RWP

ß

CNSD/012-1

Glazing: ß ß All external windows & doors to be double glazed sealed W9 Building W8 units. Generally all glazing to comply with Regulations Part N, BS 6206, BS 6262 and BS 8000 Part 7 Refer to EMS for Refer to EMS for and Crest Nicholson standard specification of workmanship Projecting Stretcher Projecting Stretcher Course Brick Finish Course Brick Finish & materials.

For junction detail refer to CNSD/053

Refer to Specialist Joist manufacturers drawings for detailed layout including trimmer and noggin requirements.

DPC

RWP

ß

ß

Hall

W3

W4

ß

ß

W1

ß

ß

500

DPC

ßß

W2

ß

1310

ß

Bedroom 2

For Head detail refer to CNSD/023

ß

DPC

3220

ß

Window note: RWP Purge ventilation to be provided to all habitable rooms at a rate of not less than 1/20th room floor area when window opens 30deg or more. Windows that open less than 30deg should be at least 1/10th of the floor area of the room.

ß

Canopy Detail TBC

W3

Brick Finish

W4

ß ß

ß

BRAXTED 1.2 plot 268

ß

Brick Finish

ß

ß

ß

THIS WORKING DRAWING IS TO BE READ IN CONJUNCTION WITH THE CREST STANDARD CONSTRUCTION NOTES AND THE BRAXTED 1.2 plot 268 STANDARD WORKMANSHIP AND MATERIALS SPECIFICATION. Refer to EMS for Refer to EMS for

ßß

W2

35°

2142 Structural Opening

W7

ß

Refer to EMS for Projecting Stretcher Course Brick Finish

DPC

2748 W7

ß

ß

W2

W8

Refer to EMS for Brick Header

35°

For Head detail refer to TBC

W9

Refer to EMS for Brick Header

35°

Refer to EMS for Projecting Stretcher Course Brick Finish

For Gable end spandrel panel detail refer to DET/TBC

Refer to Specialist Truss Rafter manufacturers drawings for detailed layout and bracing requirements. Insulation to roof to consist of 400mm mineral fibre quilt ( cross lapped ).

ß

ß

ß

W8

Refer to EMS for Weatherboard Finish

For Gable end spandrel panel detail refer to DET/TBC

1210

ß

W9

Refer to EMS for Brick Header

35°

Placement ‘Cranleigh’

Refer to EMS for Weatherboard Finish

ß

Tile Cill

Refer to EMS for Brick Header

ß

Refer to EMS for Weatherboard Finish

Tile Cill

BRAXTED 1.2 plot 268

BRAXTED 1.2 plot 268

BRAXTED 1.2 plot 268

SIDE ELEVATION

BRAXTED 1.2 plot 268

Refer to EMS for Roof Tile Finish Refer to EMS for Brick Creasing Tile Cill Refer to EMS for Brick Header

Refer to EMS for Roof Tile Finish

Refer to EMS for Roof Tile Finish

Refer to EMS for Weatherboard Finish

Refer to EMS for Weatherboard Finish

Refer to EMS for Projecting Stretcher Course Brick Finish

Refer to EMS for Projecting Stretcher W7 Course Brick Finish

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels.

100

Garage Plot 226 SHERWOOD PLOT 227

Garage Plot 225

PROPOSED SPAN OF BEAM & BLOCK

SHERWOOD PLOT 226

PROPOSED SPAN OF BEAM & BLOCK RWP

DOUBLE DOORS WITH SIDE WINDOW PANELS

Tanking to continue 600mm either side of door to raised ground levels.

Braxted Section B-B

Drg Title:

-

A3

1:50

Drawn:

-

m² Date:

Checked:

AM

Drawing No:

ft²

ED3

RWP

ED3

Part 'M' level threshold to be in accordance with CNSD/012-1

ED2

RWP

ED2 RWP

ED3

ED2

RWP

Refer to EMS for Weatherboard Finish

ß

ED3

DPC

ED2

DPC

RWP

RWP

Revision:

REAR ELEVATION

REAR ELEVATION

P1

1360 900

ß

W2

1360

ß

W3

2110

ß

RWP

RWP

Unibox gas meter TBC

ED1 Semi-concealed wall mounted electrical Part 'M' level threshold to be in box as CNSD/114 accordance with CNSD/012-1

SIDE ELEVATION

SIDE ELEVATION

RWP

SVP

AAV

100

100

DC

200

100 SVP

SVP RWP

Water entry point

BRAXTED 2.1 PLOT 225

RWP

100

Water entry point

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

73

5

PROPOSED SPAN OF BEAM & BLOCK

5523

100

3063

100 SVP

11353

100

1306

Part 'M' level threshold to be in accordance with CNSD/012-1

100

PROPOSED SPAN OF BEAM & BLOCK

328

1810

328

2218

2465

300

1023

2465 10340

2218

328

1810

1023

328

10

2465

328 338

6198 338

2485

2485

338

338

2935 3703

2090

960 100

685

Incoming water supply

Incoming water supply

Incoming BT supply

328

553 6198

113

SOP

215

Incoming electric supply

Incoming gas supply

Incoming electric supply

Incoming gas supply

113

2155

1115 1520

Incoming gas supply

10

338

Incoming water supply

338

Incoming electric supply

328 2485

6300

RWP

328

MJ POSITION TBC BY STRUCTURAL ENGINNERS

Incoming BT supply

553

Incoming BT supply

Incoming gas supply

2485

Incoming water supply

Incoming electric supply

6085

440

73 756

328

AAV

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

RWP

215

5

Tanking to continue 600mm either side of door to raised ground levels.

100

Meter boxes in accordance with CNSD/114

215

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

286

RWP RWP

185 100

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Meter boxes in accordance with CNSD/114 ELEC

RWP

512

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

RWP

ELEC

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

1013

4001 Tanking to continue 600mm either side of door to raised ground levels. Refer to CNSD/12

GAS

AAV

100

100

AAV

ELEC

ELEC

100

GAS

100

Tanking to continue 600mm either side of door to raised ground levels. Refer to CNSD/12

RWP

GAS

GAS

1850

DC

1850

3543

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer Meter boxes in accordance with CNSD/114

MJ POSITION TBC BY STRUCTURAL ENGINNERS

Water entry point

200

200

Water entry point

4001

DC

DC

2648

1023

190 330

328

4040

520

9285

T1 P1

For ridge refer to CNSD / 082

THIS WORKING DRAWING IS TO BE READ IN CONJUNCTION WITH PLOTS 225-229 THE CREST STANDARD CONSTRUCTION NOTES AND THE STANDARD WORKMANSHIP AND MATERIALS SPECIFICATION TENDER ISSUE PRELIMINARY ISSUE

Rev.

20/07/18 08/06/18

Description.

Drawing Status:

Date.

BC BC

Initial.

TENDER Crest Nicholson Ltd.

Window note: Purge ventilation to be provided to all habitable rooms at a rate of not less than 1/20th room floor area when window opens 30deg or more. Windows that open less than 30deg should be at least 1/10th of the floor area of the room. Crest House Pyrcroft Road Chertsey KT16 9GN

Tel: 01932 580 444

www.crestnicholson.com

Horsham Road, Cranleigh

-

ft²

Jun'18

to continue OF

PROPOSED BEAM SPAN & BLOCK

SVP

GAS

269 RWP

RWP

PANELS

Part 'M' accordance DOORS level

WITH

SIDE

CNSD/012-1 with

Tanking either ground side to continue levels. of door 600mm to raised DOORS

DOUBLE

be to level

threshold

Tanking either to side continue of door 600mm ground to raised levels.

'M' Part

RWP

BRAXTE PLOT D 1.2 269

AAV

Gas entry position, legislation in accordance gas Gas and Safe be with to be Meter undertaken ducted with boxesregistered Gas Safe CNSD/114 in engineerby accordance a

DOOR SINGLE

SVP SPAN PROPOSED

BEAM

AAV

point

OF

Garage & BLOCK

Direct Water connection entry

DC DOOR

RWP

TBC BY ENGINEERS

GARAGE

PANELS WINDOW

MJ POSITION STRUCTURAL

SIDE

CNSD/012-1

RWP

with

WITH DOORS

accordance be

in

DOUBLE

to threshold level 'M'

BEAM

Tanking either ground side to continue levels.of door 600mm to raised

Part

SPAN & BLOCK

SVP

RWP

PROPOSED

OF

Gas entry legislationin position, accordance

PROPOSED BEAM & BLOCK SPAN

Gas and gas Safe be with to be undertakenGas ducted Meter registered with boxes Safe CNSD/114 engineerby in accordance a

BRAXTE PLOT D 270 1.1

AAV

PROPOSED OF BEAM SPAN & BLOCK

DC point Water

RWP

entry

in

Tanking either to side continue of door 600mm ground to raised levels.

SPAN & BLOCK

PROPOSED

BEAM

OF

Part accordance 'M' SINGLE level DOOR threshold with CNSD/012-1 to be

AAV

water Incoming

supply BT Incoming

supply

supply electric

supply gas

supply electric

Incoming

Incoming

supply water

RWP

SOP

BT

PROPOSED OF BEAM SPAN & BLOCK

supply

lia 8. ge 0m

Fo

=

Incoming

supply BT Incoming

SPAN

OF BEAM PROPOSED& BLOCK

supply water Incoming

supply electric

gas Incoming

Incoming

supply

OF BEAM PROPOSED & BLOCK

SPAN

supply

supply

gas

electric

Incoming

supply

Incoming

water Incoming

supply BT Incoming

supply BT Incoming

supply water

supply

Incoming

supply

electric

gas

Incoming

Incoming

supply electric

supply gas

Incoming

Incoming

supply BT Incoming

supply water Incoming water

BT

gas electric

supply

Supply OF

PROPOSED BEAM

& BLOCK SPAN

supply

supply

level accordance 'M' Part with

supply

threshold

DOUBLE

to be CNSD/012-1

in

DOORS WINDOW

GAS

SIDE

PANELS

AAV

OF

Incoming gas supply

Incoming water supply

Incoming electric supply

Incoming BT supply

Incoming BT supply

AAV

RWP

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

ELEC

Meter boxes in accordance with CNSD/114

RWP

RWP

RWP

PROPOSED SPAN OF BEAM & BLOCK

MJ POSITION TBC BY STRUCTURAL ENGINNERS

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

ELEC

MJ POSITION TBC BY STRUCTURAL ENGINNERS

Tanking to continue 600mm either side of door to raised ground levels. Refer to CNSD/12

GAS

RWP GAS

Meter boxes in accordance with CNSD/114

AAV

AAV

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels. Refer to CNSD/12

Meter boxes in accordance with CNSD/114 RWP

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

RWP

SOP SOP

PROPOSED SPAN OF BEAM & BLOCK

RWP

Sleeper Wall

ELEC GAS

Wall

MJ

with

Sleeper to Part

'M'

level

be

in

PANELS SIDE

PROPOSED SPAN OF BEAM & BLOCK

Leith Plot 229

SINGLE

CNSD/012-1

accordance

threshold

Garage Plot 230

Tanking either ground side to continue levels. of door to 600mm raised

Garage Plot 229

Part 'M' level threshold to be in accordance

SVP

Part 'M' level threshold to be in accordance

SVP

Part 'M' level threshold be in accordance with CNSD/012-1 SINGLE DOOR

to

Part 'M' level threshold be in accordance with CNSD/012-1

RWP

RWP

RWP

RWP

AAV

Tanking to continue 600mm either side of door to raised ground levels.

DOUBLE

SVP

SVP

RWP

PLOTLEITH 234

DOOR

with

GARAGE to RWP

Part

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels.

PROPOSED SPAN OF BEAM & BLOCK

RWP

PROPOSED SPAN OF BEAM & BLOCK

Garage Plot 226

'M'

level

be

in

CNSD/012-1

accordance

PANELS

threshold

SIDE

Tanking either ground side to continue levels. of door 600mm to raised

WINDOW

WITH

Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels.

SVP

SVP

AAV

SVP

Part 'M' level threshold to be in accordance

with CNSD/012-1

PROPOSED SPAN OF BEAM & BLOCK

RWP Tanking to continue 600mm either side of door to raised DOUBLE DOORS WITH SIDE WINDOW PANELS ground levels.

RWP

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

SHERWOOD PLOT 209

PROPOSED SPAN OF BEAM & BLOCK

GARAGE PLOT 210

SHERWOOD PLOT 208

PROPOSED SPAN OF BEAM & BLOCK

GARAGE PLOT 209

PROPOSED SPAN OF BEAM & BLOCK

GARAGE PLOT 208

SINGLE DOOR

RWP

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

SINGLE DOOR

RWP

SINGLE DOOR

Tanking to continue 600mm either side of door to raised ground levels.

SVP

GARAGE PLOT 207

Tanking to continue 600mm either side of door to raised ground levels.

SVP

SINGLE DOOR SINGLE DOOR

RWP

MJ DOOR SINGLE RWP

Service meter boxes in accordance with CNSD/114 Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

AAV

Garage Plot 225

Tanking to continue 600mm either side of door to raised ground levels.

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

DOUBLE SPAN & BLOCK PROPOSED BEAM

RWP

SVP SVP

Tanking to continue 600mm either side of door to raised ground levels. DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP

Garage Plot 227

DOUBLE DOORS WITH SIDE WINDOW PANELS

Tanking to continue 600mm either side of door to raised ground levels.

RWP

OF

RWP

SVP

DC

Part 'M' level threshold to be in accordance with CNSD/012-1

SHERWOOD PLOT 226

DC Water entry point

PROPOSED SPAN OF BEAM & BLOCK

BRAXTED 2.1 PLOT 210 RWP

PROPOSED SPAN OF BEAM & BLOCK

SHERWOOD PLOT 227

PROPOSED SPAN OF BEAM & BLOCK

Garage Plot 228

with CNSD/012-1

DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP SINGLE DOOR

DOORS

Garage Plot 234

to

SINGLE DOOR

AAV

Water entry point

PROPOSED SPAN OF BEAM & BLOCK Water entry point

DC

PROPOSED SPAN OF BEAM & BLOCK PROPOSED SPAN OF BEAM & BLOCK

Leith Plot 228

with CNSD/012-1

WINDOW

WITH DOORS

point

Water

SPAN & BLOCK

PROPOSED

BEAM

SVP

entry

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

PROPOSED SPAN OF BEAM & BLOCK

BRAXTED 2.1 PLOT 225

SVP

SVP

Water entry point

PROPOSED BEAM

DC

DOOR

RWP

PLOTLEITH

SPAN & BLOCK OF

Gas in entry accordance legislation position, Gas Meter Safe and with gas with be Gas to boxes registered undertaken be CNSD/114 Safe ducted in accordanceengineer by a

Service meter boxes in accordance with CNSD/114

DC

PROPOSED SPAN OF BEAM & BLOCK

SVP Sleeper Wall

PROPOSED SPAN OF BEAM & BLOCK

233

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Water entry point

RWP

SVP RWP Wall Sleeper

OF

RWP

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

SINGLE DOOR

RWP

SINGLE DOOR

RWP MJ

STRUCTURAL POSITION BY TBC ENGINNERS

RWP WITH thresholdCNSD/012-1 DOOR level with 'M' SINGLE Part accordance

SVP

SIDE

BEAM PROPOSED OF

WORDSW PLOTS

Tanking either

SPAN & BLOCK

to

GLASSbe in to

RWP

PANELS side

raised to continuedoor levels. of ground

600mm

ORTH204 203, BEAM PROPOSED OF

SPAN & BLOCK

RWP SOP

RWP

PANELS

RWP

WINDOW

SIDE WITH

raised to 600mm levels.of door continue ground side to either Tanking

level 'M' accordance Part

DOUBLE

threshold

DOORS

in be to CNSD/012-1

with

RWP point entry Water

& BLOCKSPAN

SPAN & BLOCK

RWP in

220, 219, D 205, ORCHAR

sleeper

SVP

PLOTS point entry Water

raised to 600mm levels.of door continue ground side to either Tanking

BY ENGINEERS TBC

STRUCTURAL POSITION MJ

SVP

in CNSD/114 by with boxes engineer Safe ducted undertaken be meter registered be Gas to accordance gas Service Safe and with Gas position, legislation accordance entry in Gas

substructure brick nosed Bull

a

RWP

SOP

up

y

l

a te g y T upp

y upp

rc

py

Grass

l

n ga

e ec

su

l

BY

i

ng

AAV

SVP

Service meter boxes in accordance with CNSD/114

Water entry point

DC Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels.

SINGLE DOOR Part 'M' level threshold to be in accordance with DET 950-2

be

in

point

SPAN & BLOCK

RWP

& BLOCK PROPOSED BEAM OF

SPAN

SVP

MJ RWP

Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels.

in

MJ RWP

in DOOR to be SINGLE threshold level with CNSD/012-1 'M' Part accordance

AAV

l

TBC

p

SINGLE DOOR Part 'M' level threshold to be in accordance with DET 950-2

be to CNSD/012-1 with threshold DOOR level 'M' accordance Part SINGLE ducted to be Safe a Gas by gas with position, undertakenengineer entry accordance be in and registered Safe legislation Gas in accordance 600mm boxes with CNSD/114 to raised to continue Meter of door Tanking side either levels. ground

ng

RWP

DC

s

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

MJ

point

ig

to

Water

SVP

entry

SPAN

s

PROPOSED SPAN OF BEAM & BLOCK

DOOR

Water

& BLOCK PROPOSED BEAM OF

& BLOCK PROPOSED BEAM OF

POSITION ENGINNERS MJ STRUCTURAL

MJ RWP

DOOR GARAGE

wa i g

s

s pp

y

l

ng BT

u

in DOOR to be SINGLE threshold CNSD/012-1 level with 'M' Part accordance

AAV

t

n

ELEC

i

PROPOSED SPAN OF BEAM & BLOCK

SOP

RWP

ducted to be gas Safe by a Gas position, with undertaken entry engineer be Gas and in accordance registered legislation Safe in accordance Gas boxes Meter CNSD/114 with

upp er

y

l

of side to continue Tanking either ground 600mmto raised door levels.

RWP

RWP GARAGE

u

SINGLE DOOR

DOOR

RWP

to be

in

to to continue of door Tanking side either levels. ground

POSITION MJ STRUCTURAL BY TBC ENGINEERS

600mm raised

SVP DC

Water

entry

point

GARAGE

p

sup

ge

nosed threshold CNSD/012-1 Bull substructure level with brick 'M' Part accordance SVP

GARAGE

SPAN

ly

ct i

rc

gas

le

ing

in

ducted to be a gas Safe by Gas position,with undertaken engineer entry be and Gas in accordance registered in boxes legislation Safe CNSD/114 Gas meter with Service accordance

DOOR

GARAGE & BLOCK PROPOSED BEAM OF

y

l s pp

1293

RWP

& BLOCK PROPOSED BEAM OF

RWP

SPAN

sleeper wall

RWP accordance with CNSD/012-1 Part 'M' level threshold to be in

RWP

a

AAV

SVP

Plot 214 Braxted 2.1

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

tion

llec

Water entry point

Co

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

Bin

Are

Bin

1294

T33 Common Oak

Bin

Garage SVP

Sleeper Wall

SVP Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Part ground levels. either side of door to raised Tanking to continue 600mm

RWP SVP

DOUBLE DOORS WITH SIDE WINDOW PANELS

accordance with CNSD/012-1 Part 'M' level threshold to be in

DC

Tanking to continue 600mm either side of door to raised ground levels.

AAV

sleeper wall

PANELS

RWP

Incoming gas supply

Incoming electric supply

Incoming water supply

Incoming BT supply

Incoming electric supply

Incoming gas supply

Incoming water supply

Incoming BT supply

Incoming electric supply

Incoming gas supply

Incoming water supply

Incoming BT Supply

MJ POSITION TBC BY STRUCTURAL ENGINEERS

Tanking to continue 600mm either side of door to raised ground levels.

Part 'M' level threshold to be in accordance with CNSD/012-1

Tanking to continue 600mm either side of door to raised ground levels.

sleeper wall

Water entry point DC

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Service meter boxes in accordance with CNSD/114

DOUBLE DOORS WITH SIDE WINDOW PANELS

Part 'M' level threshold to be in accordance with CNSD/012-1

PROPOSED SPAN OF BEAM & BLOCK

RWP

SOP

RWP

T36 Common Oak

Incoming water supply

Water entry point

Incoming BT supply

600mm raised

SVP

1297 1296

Incoming gas supply

DOUBLE DOORS WITH SIDE WINDOW PANELS

PROPOSED SPAN OF BEAM & BLOCK

Bull nosed brick substructure

Part 'M' level threshold to be in accordance with CNSD/012-1

1298

Incoming BT Supply

SINGLE DOOR

MJ POSITION TBC BY STRUCTURAL ENGINNERS

Collection Area

GAS

Incoming electric supply

PROPOSED SPAN OF BEAM & BLOCK

STRUCTURAL ENGINEERS MJ POSITION TBC BY

SVP

Incoming electric supply

CNSD/012-1

WINDOW

accordance with CNSD/012-1 Part 'M' level threshold to be in

Tanking to continue 600mm either side of door to raised ground levels.

Incoming gas supply

SIDE

RWP

RWP

brick substructure Bull nosed

SVP

MJ POSITION TBC BY STRUCTURAL ENGINNERS

Incoming electric supply

in accordance with

WITH

to to continue of door Tanking sidelevels. either ground

RWP

SINGLE DOOR

PROPOSED SPAN OF BEAM & BLOCK

1295

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1

Incoming water supply

threshold

DOORS

ground levels. either side of door to raised Tanking to continue 600mm SVP

SOP ELEC

ORCHARD PLOTS 205, 219, 220, 235

Incoming gas supply

OF BEAM & BLOCK PROPOSED SPAN

Gas Safe registered engineer legislation and be undertaken by a in accordance with Gas Safe Gas entry position, gas to be ducted

accordance with CNSD/114 Service meter boxes in

RWP ELEC

ELEC

PANELS

RWP

Incoming water supply

OF BEAM & BLOCK PROPOSED SPAN

ELEC

GAS

SIDE WINDOW

.3m

ELEC

RWP

RWP

Meter boxes in accordance with CNSD/114

AAV

AAV

AAV

Incoming BT supply

level

DOUBLE

RWP

Water entry point

GAS

GAS

WITH

Tanking to continue 600mm either side of door to raised ground levels.

Meter boxes in accordance with CNSD/114

ELEC

GAS

GAS

DOORS

Tanking to continue 600mm either side of door to raised ground levels.

Meter boxes in accordance with CNSD/114

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

Meter boxes in accordance with CNSD/114

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Tanking to continue 600mm either side of door to raised ground levels.

Meter boxes in accordance with CNSD/114

Incoming electric supply

'M'

to be

side to continue either Tanking raised 600mm to of door levels. ground

RWP

OF BEAM & BLOCK PROPOSED SPAN SVP

GAS

ELEC

DOUBLE

with CNSD/012-1 be in accordance threshold to level Part 'M'

Ht=1

220

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

RWP

Direct connection Water entry point

GARAGE DOOR

RWP

Direct connection Water entry point

GARAGE DOOR

RWP

Direct connection Water entry point

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

Incoming gas supply

point

SVP

RWP ground levels. either side of door to raised Tanking to continue 600mm

OF BEAM & BLOCK PROPOSED SPAN Water entry point

Sleeper Wall

SVP

Sleeper Wall

GARAGE DOOR

RWP

Incoming water supply

SPAN entry

SPAN

GAS

DOUBLE DOORS WITH SIDE WINDOW

& BLOCK PROPOSED BEAM OF

SPAN

Water

& BLOCK PROPOSED BEAM OF

PANELS

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

PLOTS 205, 219, 220, 235 ORCHARD

ELEC

DOUBLE DOORS

Part 'M' level threshold to be in accordance with CNSD/012-1

Plot 214 Garage

Plot 215Garage Loadbearing Wall

PROPOSED SPAN OF BEAM & BLOCK

Garage

Garage

DC

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1

Incoming BT supply

& BLOCK PROPOSED BEAM OF

ORCHARD202 PLOT

RWP RWP

DC

PROPOSED SPAN OF BEAM & BLOCK

Plot 215 Leith

Plot 216 Garage

Plot 216 Leith

Plot 217 Garage

Plot 217 Leith

PROPOSED SPAN OF BEAM & BLOCK

SVP

Direct connection Water entry point

PROPOSED SPAN OF BEAM & BLOCK

PROPOSED SPAN OF BEAM & BLOCK

Tanking to continue 600mm either side of door to raised ground levels.

AAV

SOP

h

Ditc

Bin Bin Bin

1304

T92 Common Oak

Foliage Ht=10.0m

B/W Ht=1.1m Post

Foliage Ht=8.0m

1306

1305

SINGLE DOOR

RWP

SINGLE DOOR

Part 'M' level threshold to be in accordance with CNSD/012-1

SVP Part 'M' level threshold to be in accordance with CNSD/012-1

SVP Part 'M' level threshold to be in accordance with CNSD/012-1

SVP

Plot 218 Garage

Foliage Ht=10.0m

Meter boxes in accordance with CNSD/114

DOOR

201

RWP SINGLE DOOR

DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP SINGLE DOOR

DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP SINGLE DOOR

Plot 218 Leith

Sleeper Wall

T29 Common Oak

T30 ch Dit 897 Common Oak T31 896 Common Oak T32 Common Oak

SPAN

SPAN BLOCK PROPOSED& BEAM OF

SVP

Wall Sleeper

Garage237 Plot

ti

SINGLE DOOR

898

supply

electric

BLOCK PROPOSED& BEAM OF

Garage236 Plot

LEITH 237 PLOT

SPAN

& BLOCK PROPOSED BEAM OF

l

PROPOSED SPAN OF BEAM & BLOCK

DC

in accordance

threshold

AAV

supply

Incoming

s

Water entry point

gas Incoming

B

threshold CNSD/012-1 level with 'M' DOOR Part accordance SINGLE

DC PROPOSED BEAM OF

PROPOSED SPAN OF BEAM & BLOCK

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

BEAM PROPOSED

BEAM PROPOSED

be

Garage

SOP MJ RWP

DC

i

level

RWP

221

Tanking to continue 600mm either side of door to raised WITH SIDE WINDOW PANELSground levels.

RWP

to

Service meter boxes in accordance with CNSD/112

899

point

p

to be 'M'

SVP

entry

rs

levels.

Part

DOOR

SVP

BEAM PROPOSED

supply water Incoming

Water

w

be to Gas gas with undertaken engineer be position, and entry in accordance registered in Gas Safe ducted legislation boxesCNSD/114 Safe a Gas meter with by

SVP

continue to of door side Tanking levels. either ground

600mm raised to

600mm raised to levels. continue to of door ground side

thresholdCNSD/012-1 level with DOORS 'M' Part accordance DOUBLE

RWP MJ

OF

AAV

in

wall

OF

235

Tanking to continue 600mm either side of door to raised ground levels.

& BLOCKSPAN

be

AAV Part 'M' level threshold to be in accordance with DET 950-2 SINGLE DOOR

Supply

SVP

Wall

SPAN & BLOCK PROPOSED BEAM OF

in

Service accordance

SPAN & BLOCK

WINDOW

thresholdCNSD/012-1 PANELS with

RWP Part 'M' level threshold to be in accordance with DET 950-2

& BLOCK SPAN OF

SVP

BT Incoming

LEITH 236 PLOT

GAS

GAS

BEAM PROPOSED

level

Tanking either PROPOSED SPAN OF BEAM & BLOCK

entry

DC

CNSD/012-1

in accordance

threshold

ELEC

ELEC

OF

accordance SIDE WITH

'M'

to PROPOSED SPAN OF BEAM & BLOCK

Part 'M' level threshold

RWP

MJ

Part

BEAM PROPOSED OF

600mm raised to levels. continue to of door ground side

DOORS level

CNSD/012-1

GAS

Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels.

Tanking to continue 600mm either side of door to raised ground levels. DOUBLE DOORS WITH SIDE WINDOW PANELS

PROPOSED SPAN OF BEAM & BLOCK

246 plots 201, door on No NOTE:

SINGLE

1307

1373

raised to 600mm levels. of door side to continue ground either Tanking

Tanking either DOUBLE 'M'

Sleeper

with

ELEC

PANELS

RWP

PANELS

levels. raised ground door to side of 600mm either to continue Tanking

T93 Common Oak

1374

SVP

to be

Part

WINDOW

GAS

WINDOW

202

with CNSD/012-1

WINDOW

supply

WINDOW

with

levels.

SVP

RWP

SIDE

SPAN

Part 'M' level threshold to be in accordance with CNSD/012-1

SVP

SIDE

accordance

WITH SIDE

gas

KEY P AN

in

SPAN

WITH

DOORS

supply

RWP MJ

PANELS SIDE

WITH DOORS DOUBLE

ground

DOOR SINGLE

214

be to CNSD/012-1 threshold

RWP MJ

PANELS

WITH DOORS DOUBLE

& BLOCK PROPOSED BEAM OF

in

DOORS

to be in

RWP

DOUBLE

electric

908

WINDOW

with

237

222 SINGLE

215 Tanking to continue 600mm either side of door to raised ground levels. DOUBLE DOORS WITH SIDE WINDOW PANELS

Incoming

223

ground

216

217

Incoming

SPAN & BLOCK

Meter boxes in accordance with CNSD/114

AAV Tanking to continue 600mm either side of door to raised ground levels.

DC

Water entry point

DC

SOP RWP

PROPOSED

supply

PROPOSED BEAM

MJ POSITION TBC BY STRUCTURAL ENGINNERS

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

RWP

AAV Tanking to continue 600mm either side of door to raised ground levels.

DC

Direct connection Water entry point

RWP

SINGLE DOOR Part 'M' level threshold to be in accordance with CNSD/012-1

Meter boxes in accordance with CNSD/114

ELEC

Tanking to continue 600mm either side of door to raised ground levels.

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

PROPOSED SPAN OF BEAM & BLOCK Direct connection Water entry point

DC

ELEC

ELEC

BEAM

PROPOSED

Incoming gas supply

SINGLE DOOR

AAV Tanking to continue 600mm either side of door to raised ground levels.

Gas entry position, gas to be ducted in accordance with Gas Safe legislation and be undertaken by a Gas Safe registered engineer

GAS

Garage & BLOCKSPAN Plot 233

Incoming water supply

Part 'M' level threshold to be in accordance with CNSD/012-1

SINGLE DOOR

point

GAS

MJ RWP

entry

GAS

ELEC

PROPOSED

SPAN & BLOCK

Incoming electric supply

Semi-detached house Part 'M' level threshold to be in accordance with CNSD/012-1

Meter boxes in accordance with CNSD/114

GAS

BEAM

Water BEAM

water

SPAN & BLOCK

PROPOSED

BEAM

OF

ELEC

WITH

DOOR GARAGE

DC

SPAN & BLOCK OF OF

ELEC

RWP

in

Tanking either ground side to continue levels. of door 600mm to raised

Incoming

OF

MJ RWP

ELEC

Gas in entry accordance legislation position, Gas Meter Safe with boxes and with gas be Gas to CNSD/114 registered undertakenSafe be in ducted accordance engineer by a

SVP

in

BY

Tanking either side to continue of door ground to 600mm raised levels.

AAV BT

RWP

Part SINGLE accordance 'M' level DOOR threshold with CNSD/012-1 to be

ENGINNER TBC

POSITION

GAS

Part SINGLE accordance 'M' level DOOR threshold with CNSD/012-1 to be

RWP Incoming

GAS

supply

GAS

STRUCTUR MJ

BT

GARAGE

& BLOCK SPAN

PROPOSED

BEAM

ELEC

S AL Incoming

OF

5160

Incoming

Incoming

Incoming Incoming

275

ELEC

GAS

1210

house Semi-detached

RWP

1415

accordance Part 'M' level with CNSD/012-1 threshold SINGLE DOOR to be in

RWP

supply

DOOR

2260

Meter boxes with CNSD/114 Gas in accordance legislation Safe and registered in be undertaken entry accordance engineer position, with Gas by a gas to be Safe ducted

accordance Part 'M' level with CNSD/012-1 threshold SINGLE to be DOOR in

AAV

AAV

CNSD/012-1 be in Part accordance 'M' level with SINGLE threshold DOOR to

SOP water

DOOR

SINGLE

246 on door

45°

Refer either to CNSD/12 Tanking side ground of door levels. to continue to raised 600mm

point

DC Incoming

GARAGE

supply

201, No plots NOTE:

GARAGE

& BLOCK SPAN

electric

PROPOSED

BEAM

supply

OF

gas

Incoming

Incoming

RWP

234

PANELS SIDE WITH DOORS

DOUBLE level 'M' accordance Part

SPAN

2661 Ground FFL to First FFL

entry

RWP

DOOR

to raised 600mm

900 min.

Water

ENGINNERS TBC BY

STRUCTURAL MJ POSITION

GARAGE

PANELS

levels.of door ground side to continue either Tanking

WINDOW

CNSD/012-1

SIDE

with

RWP

WITH

2000 min. headroom

CNSD/112 in accordance Service meter with Gas boxes Safe legislation in accordanceregistered and engineer Gas be entry with undertaken position, Gas by a gas Safe to be ducted

SVP

DOORS

in accordance

236

& BLOCK PROPOSED BEAM OF

42°

AAV

ground either levels. Tanking side of door to continue to raised 600mm

with Meter CNSD/114 boxes in accordance Gas Safe legislation in accordanceregistered and engineer be undertaken Gas entry with position, Gas by a gas Safe to be ducted

be

277

OF BEAM PROPOSED& BLOCK SPAN

RWP

RWP

to

DOUBLE

threshold

SPAN

& BLOCK PROPOSED BEAM OF

2385 Ground FFL to u/s ceiling

Gas

either Tanking side ground of door levels. to continue to raised 600mm

Water Direct entry point connection

PANELS

level

levels.raised side to grounddoor either of to continue 600mm Tanking

'M'

2335 First FFL to u/s ceiling

Water Direct entry connectionpoint OF BEAM PROPOSED& BLOCK SPAN SPAN

OF BEAM PROPOSED& BLOCK

RWP

WINDOW

275

SVP

Wall

Wall SPAN

SIDE

in

1210

Sleeper Sleeper

SVP OF BEAM PROPOSED& BLOCK

WITH

Part

1415

249 LEITH & 250

PLOTS CNSD/012-1

in accordance

248 LEITH & 251

DOORS

Tanking either ground side to continue levels.of door 600mm to raised

threshold with CNSD/012-1 to be

DOUBLE

Part 'M' accordance level

RWP

RWP

& BLOCK SPAN BEAM PROPOSED

230

RWP

1360

CNSD/012-1

in accordance

threshold

SVP

WINDOW

threshold

PLOTS SVP

PROPOSED OF BEAM SPAN & BLOCK

OF

point

SVP

supply

750

'M' level

Incoming

RWP

WINDOW with

SIDE

with 'M' level

SPAN

OF BEAM PROPOSED & BLOCK

SPAN OF BEAM PROPOSED& BLOCK

& BLOCK SPAN

PLOTS 247 SHERWOO & 252 D BRAXTED PLOT 1.1 240

PROPOSED OF BEAM SPAN & BLOCK

entry

electric

supply

DOUBLE

to be

threshold CNSD/012-1 level with 'M' Part accordance

150

SIDE

to be Part

SVP WITH

to be Part

248 Garage & 251

Plots

247 Garage& 252

Plots OF BEAM PROPOSED

Tanking either to side continue of door 600mm ground to raised levels.

Water

5160

either Tanking side ground of door levels. to continue to raised 600mm PANELS WITH

DOUBLE either Tanking side ground of door levels. to continue to raised 600mm

PANELS DOORS DOUBLE DOOR

DOOR SINGLE RWP

SVP

RWP

AAV

PROPOSED OF BEAM SPAN & BLOCK

& BLOCK SPAN BEAM PROPOSED

wall

OF

246

D

sleeper

& BLOCK SPAN BEAM PROPOSED

233

231

229

228

227

238 218

219

SPAN

& BLOCK PROPOSED BEAM OF

level threshold

levels. ground raised to of door either side 600mm continue to Tanking

RWP

P/W

T90Tree Canopy Common Oak Ht=15.0m

Ditch

1302

T40 Turkey Oak

1299

T39 Goat Willow

Ditch

ade

Unm

sed Disu ay

Railw

1:50

Ar

ENGINEERS BY TBC

OF

gas

Incoming

Incoming

212

supply

GARAGE

GARAGE

Part 'M'

RWP

Tel: 01932 580 444

Metric (m² ) Imperial (ft²) 1220.63 113.4 113.4 1220.63

226

224

water

& BLOCK OF BEAM SPAN PROPOSED

entry point

SVP

& BLOCK OF BEAM SPAN PROPOSED

www.crestnicholson.com

4B HA AREAS

ion

ea

235

Incoming

& BLOCK OF BEAM SPAN PROPOSED

wall

& BLOCK OF BEAM SPAN PROPOSED

point

246 201, 232, PLOTS ORCHARD

Crest House Pyrcroft Road Chertsey KT16 9GN

Drg Title:

232,

supply

204

203

RWP

Crest Nicholson Ltd.

Scale:

Bin

ct

STRUCTURAL POSITION MJ

RWP

water

supply

DOOR

DOOR

RWP

& BLOCK OF BEAM SPAN PROPOSED Water entry

Water

BC

Initial.

PRELIMINARY

A4HA0 Section A

PROPOSED SPAN OF BEAM & BLOCK

PANELS

Incoming

211

& BLOCK OF BEAM SPAN PROPOSED

Horsham Road, Cranleigh

232

PROPOSED SPAN OF BEAM & BLOCK

WINDOW

225

210

209

208

207

supply

gas

supply

gas supply

electric

Incoming

Incoming

RWP GARAGE

GARAGE

levels. to raised ground of door either side continue 600mm to Tanking

sleeper

House Type:

Incoming electric supply

SIDE

206

electric

Incoming

Supply

BT Supply

water supply with CNSD/012-1 to be in accordance threshold level Part 'M' brick substructure Bull nosed DOOR SINGLE

SVP

with CNSD/114 in boxes accordance meter Service engineer a by registered Gas Safe and be undertaken Safe with Gas to be ducted legislation gas in accordance position, Gas entry

DC

Site:

Incoming gas supply

WITH

RWP

GARAGE

BT

Incoming

Incoming

RWP

SVP

FOUNDATIONS Trench fill at a depth agreed on site with the local Building Inspector and to conform to NHBC requirements. Structural Engineer to confirm foundation widths.

Incoming water supply

DOORS

PANELS

Gas

RWP

Drawing Status:

Incoming electric supply

in

WINDOW

213

ENGINEERS STRUCTURAL TBC BY MJ POSITION

SOP

B1

Incoming gas supply

DOUBLE

Supply

Tree Canopy Ht=15.0m

T96 Common Oak T95 Common Oak

Date.

Incoming water supply

Incoming water supply

Incoming water supply

Incoming BT supply

Incoming electric supply

accordance Part 'M' level with CNSD/012-1 threshold

to be

SIDE

ground either levels. Tanking side of door to continue to raised 600mm

205

Incoming gas supply

Incoming gas supply

Incoming electric supply

Incoming BT supply

accordance Part 'M' level with CNSD/012-1 threshold

DOORS WITH

Incoming water supply

SPAN

point

DOUBLE

Incoming water supply

Incoming water supply

Incoming electric supply

Incoming gas supply

Incoming gas supply

Incoming electric supply

Incoming water supply

entry

SVP

ground either levels. Tanking side of door to continue to raised 600mm

RWP

DPC

Plot No. Type 377 OPP 378 AS

Incoming BT supply

Water

Incoming BT supply

OF BEAM PROPOSED & BLOCK

SPAN

235

Incoming BT supply

SPAN

OF BEAM PROPOSED & BLOCK wall OF BEAM PROPOSED & BLOCK

220,

Incoming BT supply

ENGINEERS TBC BY

to raised 600mm

sleeper

205, 219, ORCHARD

SPAN

1309

20/07/18

lle

201,

STRUCTURAL MJ POSITION

RWP

PLOTS

1375

PRELIMINARY ISSUE

PLOTS ORCHAR

Supply in

point

OF BEAM PROPOSED & BLOCK

1

Description.

Gas entry in accordance legislation position, Gas Safe and with gas to be Gas be ducted Meter registered undertaken Safe with boxes CNSD/114in engineer by accordance a

point

BT

ground either levels. Tankingside of door to continue

to be

RWP

P1

RWP

entry

Incoming

entry

RWP

Rev.

TBC BY ENGINEERS

Water

supply

Water

Ash

250mm minimum subfloor ventilated floor void

SECTION A

DOOR

GAS

ELEC

accordance Part 'M' level with CNSD/012-1 threshold SINGLE

DC

1308

DPC GL

SVP

DC

water brick Bull substructure nosed

SVP

SVP

First Floor Construction 22mm tongue and grooved moisture resistant chipboard decking glued to timber I joists. I joists (240mm thick) to be installed at a maximum 600mm centres in accordance with specialist designs and supported T99 Ash on uncut internal load bearing block work and to be built-in on external walls and party walls. Holes and notching to be carried out in accordance with manufacturers written Links to right of way network as approved plans and S106 instructions. Lining to underside ofper joists to be 15mm Agreement from Phase 1 plasterboard to achieve 30mins fire resistance.

For Level Threshold Detail refer to DET/950.2

2

raised to 600mm levels. of door ground side to continue either Tanking

Incoming

meter with CNSD/114 Gas Safe boxes legislation in accordance registered in and Gas engineer be entry with undertaken position, Gas gas Safe by a to be ducted

Incoming

3

Bin

Co

in be to CNSD/012-1 with threshold level accordance 'M' DOOR Part substructure brick nosedSINGLE Bull

SVP

supply

supply accordance Service

1408

ED1

Foliage Ht=10.0m

gas

electric

SOP

RWP

1310

Hall

RWP

239 1226

BT

4

Dry Pond

T24 Ash

1311

5

MJ POSITION STRUCTURAL

in

Culvert Wall IL=58.21

Incoming

6

ly

5D

Foliage Ht=10.0m

Incoming

For External Wall / Ground Floor junction refer to DET/950.1

C'bd

ly

pply

T25 Common Oak

Part 'M' SINGLE accordance level DOOR threshold with to be CNSD/012-1

Ground Floor Construction 75mm thick sand cement or C25/30 concrete screed reinforced with galvanised A142 mesh laid on 500 gauge DPM, on 150mm deep Springvale Platinum Floorshield EPS70, on 1200 gauge DPM lapped and sealed with all DPCs. Floor construction made of 150mm pre-cast concrete beam Willow & block suspended floor. Beams to be laid on Goat DPC on load bearing walls. Provide a minimum 250mm ventilated void below PCC beam to suit site ground conditions. Refer to site specific details for variation to this specification where Radon protection is required. T102

1.3m

Living/Dining

7

RWP

ly

Ht=

For Window Cill detail refer to TBC

8

T26 Common Oak

u pp

P/W

W3

9

247

T23 Common Oak

RWP

10

llec

tion Are BinFoliage a Bin Ht=10.0m Bin

Incoming

11

Co

825

820

in

12

Foliage Ht=10.0m

GAS

Common Oak 780 Post T53 T54 779Common Oak 464 T52 Common Oak

to be

13

For window head detail refer to TBC

Direct Water connection entry point

DOORS

PROPOSED OF BEAM SPAN & BLOCK

Gas entry legislationin position, accordance Gas gas and to Safe be with be undertakenGas ducted registered Safe boxes engineerby in a with accordance CNSD/114

Meter

in

CNSD/114 a in by with boxes engineer Safe ducted meter undertaken accordance be registered be Gas Service Safe and with gas to Gas position, legislation in accordance entry Gas

For canopy detail refer to TBC

Part SINGLE 'M' accordance level DOOR threshold with CNSD/012-1 to be

SINGLE

Tanking either to side continue of door 600mm ground to raised levels.

AAV

Incoming

745

SVP

AAV in

RWP

Bedroom 4

ELEC

to raised 600mm ground Tanking either levels. side to continue of door

CNSD/012-1 to be

supply

with

ELEC

GAS

Incoming

supply

Part SINGLE 'M' accordance level DOOR threshold

T56 Common Oak

781

T55 Common Oak

SOP

2744 Structural Opening

W6

248

ELEC

R

RWP

ELEC

EA

Tanking either to side continue of door 600mm ground to raised levels.

CNSD/012-1

GAS

CL

with

ELEC

mm

in accordance

GAS

A/C

00

PANELS be

ELEC

20

WINDOW

threshold

DOORS WITH accordance SIDE Part 'M' level with WINDOW CNSD/012-1 PANELS threshold to be in

Incoming

SIDE

PROPOSED BEAM SPAN & BLOCK

DOUBLE

gas

WITH

Wall

OF

water

Incoming

DOORS

level

to

Sleeper

PROPOSED BEAM SPAN & BLOCK

OF

Tanking either ground side to continue levels.of door 600mm to raised

supply

OF

DOUBLE

'M'

PLOTS LEITH 249 & 250

Wall

SPAN & BLOCK

BT

Ht

SVP

Sleeper

PROPOSED BEAM

GAS

Bedroom 3

Landing

249

SVP

Part

Direct Water connection entry point

OF

Gas entry in accordance legislation position, Gas Safe and with gas Meter be Gas to registered with be undertaken boxes Safe ducted CNSD/114 in accordanceengineer by a

Incoming

PLOTS LEITH 248 & 251

RWP

AL TBC ENGINNERS BY

PROPOSED OF BEAM SPAN & BLOCK

ducted

a

MJ POSITION STRUCTUR

supply

by

Tanking either side to continue of door ground to 600mm raised levels.

CNSD/012-1

electric

engineer

SVP

boxes with

with

supply

Gas entry in accordance legislation position, Gas Safe and with gas be Gas to registered be undertaken Safe

Service

in accordance meter CNSD/112

ELEC

W11

For Bulkhead Detail refer to CSND/073

in accordance

gas

RWP

772

GAS

TOP OF WALL PLATE Insulation to roof to consist of 400mm mineral fibre quilt (100mm laid between joists, 200mm laid across the joists, with 100mm lapped across the top)

be

ELEC

35°

TOP OF WALL PLATE

WINDOW PANELS

to

GAS

For junction detail refer to TBC

SIDE

threshold

Incoming

level

Incoming

WITH

'M'

house

18mm Chipboard around loft access.

SPAN & BLOCK

DOORS

Part

T57 Common Oak

Post

PROPOSED

DOUBLE

All glazing located within a door or side light within 1500mm above floor level and 300mm either side of the door shall be carried out using toughened glass. All glazing to ground floor windows and those above porches/bays to be toughened or laminated. Any window or glazed panel within 800mm above floor level shall be carried out using safety glass as defined in BS6262 part 4 1994 and BS6206 1981.

GAS

270

250

Plots Garage 248 & 251

PROPOSED BEAM SPAN & BLOCK

BEAM

DOOR

OF

Semi-detached

Refer to Specialist Truss Rafter manufacturers drawings for detailed layout and bracing requirements.

Bins/ Cycles

SINGLE

SPAN & BLOCK

OF

DOOR

AAV

RWP

SVP

SINGLE

Plots Garage 247 & 252

PROPOSED BEAM

Tanking either side to continue of door 600mm Refer ground to raised to levels. CNSD/12

to

in accordance

251

RWP

OF

with

WINDOW

in

PANELS

Tanking 600mm to raised either continue ground side of levels. door

PROPOSED OF BEAM SPAN & BLOCK

247 OOD & 252

point

in

threshold WITH with SIDE CNSD/012-1 to be WINDOW

entry

Part SINGLE be 'M' in accordance level DOOR CNSD/012-1 threshold

PROPOSED BEAM SPAN & BLOCK

DOUBLE

to

PLOTSSHERW SVP

Water

DC RWP

SOP

463

Gas in accordance entry legislation position, Gas Service Safe and with Gasgas to be accordance registered undertaken Safe be ducted meter boxes engineer with by in a CNSD/114

GAS

252

813

Foliage Ht=8.0m

services

Common Oak T59 812

Glazing: All external windows & doors to be double glazed sealed units. Generally all glazing to comply with Building Regulations Part N, BS 6206, BS 6262 and BS 8000 Part 7 and Crest Nicholson standard specification of workmanship & materials.

For External Wall / Eaves junction refer to DET/974.2

circuits

600mm

Common Oak 766 T61 767 T60 768 Common Oak 769 T58 Common Oak

T1

Grey Duct duct Car for for telecom incoming Bin/Bikepark lighting services electrical store

Tanking

BC

Part accordance 'M' SINGLE level DOOR threshold with CNSD/012-1 to be

Checked:

OF

Date:

Revision:

RWP

A1

AM

supply

Drawn:

electric

Page Size:

1:50

14791TA-POW-PLOTS 225-229-FP-A-1011-Foundation_Plan

supply

Unit Size: Leith - Sherwood - Braxted Foundation Plan Plots 225-229

Drawing No:

gas

Drg Title:

Incoming

House Type:

Scale:

Incoming

Site:

FOUNDATION PLAN

Unit Size:

-

Page Size:

A3

-

ft² Post

Drawn:

Drawing No:

14791TA-POW-4BAH-FF-A-1025-Section A

AM

Date:

Jun'18

Checked:

BC

Revision:

P1

1372

RWP

Se m bo

W5

ß

ß

W1

100 PROPOSED SPAN OF BEAM & BLOCK

Se m bo

ß

BC

14791TA-POW-BRAXTED 1.1-FF-A-1026-Section_BB

RWP

Unibox gas meter TBC

DPC

ED1

Part 'M' level threshold to be in accordance with CNSD/012-1

Part 'M' level threshold to be in accordance with CNSD/012-1

ß

W1

W2

ß

RWP RWP

Part 'M' level threshold to be in accordance with CNSD/012-1

ß

Refer to EMS for Brick Creasing Tile Cill

DPC

W6

W7 1565

W5

Refer to EMS for Brick Finish

ß

ß

W1

SIDE ELEVATION

ß

W6

ß

ED1wall Semi-concealed mounted electrical Part 'M' level threshold to be in box as CNSD/114 accordance with CNSD/012-1

1060

1060

SIDE ELEVATION

Refer to EMS for Projecting Stretcher W7Course Brick Finish

Refer to EMS for Brick Finish

1415

2110

RWP

Unibox gas meter TBC

1210

Refer to EMS for Weatherboard Finish

Refer to EMS for Brick Creasing Tile Cill

W3

150

RWP

W5

1415

ED1

Part 'M' level threshold to be in accordance with CNSD/012-1

Refer to EMS for Roof Tile Finish

2110

ß

ß

Refer to EMS for Brick Finish

2110

2110

Refer to EMS for Brick Finish

ß

ED2

Part 'M' level threshold to be in accordance with CNSD/012-1

Refer to EMS for Projecting Stretcher Course Brick Finish

1210

1060 1565

1565 150

RWP

Refer to EMS for Roof Tile Finish

Refer to EMS for Projecting Stretcher Course Brick Finish

BRAXTED 1.2 plot 268

ßß

W1 W2

1565

ß

ß RWP

ß ß

ß

ß

ß

Part 'M' level thresholdPart to be 'M'inlevel threshold to be in accordance with CNSD/012-1 accordance with CNSD/012-1

2110

2110

2110 150

150

THATCH plot 267

1415

THATCH plot 266 2110 150 1210

ED2

RWP

Jul'18

ß

1060

1210

1210 1415

THATCH plot 267

1415

150

THATCH plot 266 1210

Unit Size:

Page Size:

RWP

DPC

Refer to EMS for Weatherboard Finish

ßß

900

House Type:

Scale:

ß

ß

ß

BRAXTED 1.2 plot 268

ß

W2

RWP

Part 'M' level threshold to be in accordance with CNSD/012-1

Refer to EMS for Projecting Stretcher Course Brick Finish

ß ß

ß

ß

W6

W7 W5

150

Horsham Road, Cranleigh

ED2

RWP

W3

1415

www.crestnicholson.com

Position of Movement Joint Location

Site:

DPC

RWP

Part 'M' level threshold to be in accordance with CNSD/012-1

Refer to EMS for Brick Finish Refer to EMS for Brick Creasing Tile Cill

150

MJ

ED2 ED3

RWP

Refer to EMS for Brick Finish Refer to EMS for Brick Creasing Tile Cill

ß

Refer to EMS for Weatherboard Finish

W3

ß

ß

Refer to EMS for Brick Finish

ß

Refer to EMS for Brick Finish

Tel: 01932 580 444

BRAXTED 1.2 plot 268 Refer to EMS ß for ß Brick Finish

150

SINGLE DOOR

Refer to EMS for

Location ofBrick airbricks as indicated on drawings Finish at max. 2000mm centres and within 450mm of internal corners. Air bricks to be located on opposite sides dependant on plot configuration.

Refer to EMS for Projecting Stretcher Course Brick Finish

ß

150

2142

Refer to EMS for Projecting Stretcher Course Brick Finish

REAR ELEVATION

2110

100

3120

ß

ß

Part 'M' level threshold to be in accordance with CNSD/012-1

150

2485

2110

2399 1050 150

2110

2384 FFL to u/s ceiling

RWP

450

328

215

SINGLE DOOR

215

910 3049

Chertsey Refer to co-ordinated Civil Engineers drawings for RWP locations KT16 9GN

150

100

100

SVP

SVP

4040 100

3049

House Provide concrete lintels over drainsCrest where passing through walls. Pyrcroft Road

ß ß ß ß

ED2 RWP

ED3

ß

W6

328

Garage Plot 227

PROPOSED SPAN OF BEAM & BLOCK

910 328

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

RWP

100

1453

4693

Imperial (ft²) TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC 4163

Part 'M' level threshold to be in accordance with CNSD/012-1 DOUBLE DOORS WITH SIDE WINDOW PANELS

Tanking to continue 600mm either side of door to raised ground levels.

Garage Plot 228

2710

300

Metric (m² ) TBC TBC TBC TBC TBC 328 TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC

3948

2465

4693

SINGLE DOOR

100

Refer to drawing: 14791TA-POW-PLOTS 225-229-FP-A-1010-Foundation_Plan

2710

Type OPP OPP OPP OPP OPP 2648 OPP OPP OPP OPP OPP OPP OPP OPP OPP OPP OPP OPP OPP

ß ß

1453 328

Plot No. 210 214 221 225 5728 238 100 240 241 265 268 269 270 284 289 294 298 299 308 309

W3

W3

ß

910 3049

RWP

SINGLE DOOR

SECTION B-B

Crest Nicholson Ltd.

Drawing to be read in conjunction with coordinated site setting out plan by civil engineer.

ß

100

REAR ELEVATION

ß

4040 2936

Initial.

ß

910

BC

Date.

RWP

Part 'M' level threshold Part 'M' level threshold to be in to be in accordance with CNSD/012-1 accordance with CNSD/012-1

ß ß

CALL OUT FOR BAY WINDOW Braxted 1.2, 2.1 & 2.2 ONLY 215

20/07/18

PRELIMINARY

BRAXTED AREAS

215

PRELIMINARY ISSUE

BRAXTED 1.2 plot 268

ß

ß ß

ED2 ED2

RWP

ß

P1

Foundation depths to be agreed on site with the local buildingDescription. inspector and to conform to NHBC Rev. requirements. Drawing Status: Refer to ground investigation report to establish if radon or any gas measures are required prior to commencement of works on site.

ED3

ß

FOUNDATIONS Trench fill at a depth agreed on site with the local Building Plot 225 Inspector and to conform to NHBC requirements. Braxted 2.1 Structural Engineer to confirm foundation widths.

Plot 226 Sherwood

Refer to EMS for Brick Creasing Tile ED2 Cill Part 'M' level threshold to be in accordance with CNSD/012-1 Refer to EMS for Brick Header

RWP

ß

ß

Plot 227 Sherwood

Plot 228 Leith

Plot 229 Leith

Dashed foundation widths are shown as indicative only. Refer to structural engineers site specific foundation plans.

ß

ß ß

ß

Garage plot 230

RWP ED3

Refer to EMS for Brick Header

ß

ß

150

Refer to EMS for Brick Creasing Tile Cill

RWP

FOUNDATION NOTES

W3

ß

THIS WORKING DRAWING IS TO BE READ IN CONJUNCTION WITH THE CREST STANDARD CONSTRUCTION NOTES AND THE STANDARD WORKMANSHIP AND MATERIALS SPECIFICATION

W3

Refer to EMS for Weatherboard Finish

ß

250mm minimum subfloor ventilated floor void

Refer to EMS for Roof Tile Finish

Refer to EMS for Weatherboard Finish

ß

KEY PLAN

ß ß

DPC GL

ß

1

DPC GL

ß

For floor junction detail refer to CNSD/010-1

2

Door threshold detail refer to CNSD/010-1

ß

DPC GL

ß

3

W3

W3

ß ß

4

ß

5

ß

Cpd

First Floor Construction 22mm tongue and grooved moisture resistant chipboard decking glued to timber I joists. I joists (240mm thick) to be installed at a maximum 600mm centres in accordance with specialist designs and supported on uncut internal load bearing block work and to be built-in on external walls and party walls. Holes and notching to be Refer to EMS for Refer to EMS for carried out inBrick accordance with manufacturers written Brick Finish Finish instructions. Lining to underside of joists to be 15mm to EMS for plasterboard to achieve 30mins fireRefer resistance. Roof Tile Finish

Living

ß

Kitchen

6

ß

7

ß

8

W3 For Cill detail refer to DET/TBC

ß

W3

ß

1060

9

35

Unibox gas meter TBC


‘Medical centre’

36


A project located in Bath. The brief was to create a Medical Centre facility which will thoroughly address the surrounding context. I decided to create a court-yard type building, where spaces were carefully divided by public and private sectors, providing separate entrances for staff and patients. General permeability of the building allowed for clear views onto the river from the entrance. Roof hierarchy distinguished the entrance and primary facade from the rest of the spaces.

37


38


39


‘Workshop Theatre’

40


A project called ‘Workshop Theatre’, incorporating auditorium space with all the supporting facilities, and a bar. Here is a series of plans and elevations exploring a concept of a building being one with its environment, as its design was mainly informed by the organic nature and curvy of the site. I wanted to push the idea further, by showing building’s relation to context and concept of two prime areas being separated by the public walkway, to create a closer interaction with an existing park.

41


42


Structural and Detailed Design

Candidate number 08461 Student number 169095875

to scale @ A1

Detailed Section 1:25

Detailed Elevation 1:25

1. 2.

A Roof Construction 1:5

D First Floor Construction 45mm Polished screed floor finish 80mm Reinforced concrete Steel Deck for Composite floor construction Rigid Insulation Infill (65mm) 20mm Plywood Deck Secondary steel I-beam floor joist(215mmx100mm, side view) 25 mm Air Cavity 15mm Plasterboard 2mm Ceiling Finish

3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

Shaped wood cap Aluminum coping 20mm Plasterboard 2mm Ceiling Finish Rigid Insulation Infill (95mm) Damp Proof Membrane Steel Deck for Composite floor construction 100mm Reinforced concrete 25mm Firring Plywood Deck 25mm Plywood Deck Vapour Control Layer 150mm Rigid Insulation Laid to Fall

13. 14. 15. 16. 17. 18 19. 20. 21. 22. 23.

18mm Plywood Deck Waterproofing Membrane on top Zinc Standing Seam Roof Finish 320mmx35mm Timber beam Primary steel I-beam floor joist(215mmx225mm) Aluminum bracket with isolation pad Aluminum curtain wall support Rigid insulation infill Soft Insulation VELFAC Argon-filled double glazed window top detail NORSKREEN® M2 Panel

B First Floor Cantilever Construction 1:5

3D Exploded Structural Diagram

Site Plan 1:500

South-East Elevation 1:200

1. 2. 3. 4. 1. 2. 3. 4. 5. 6. 7. 8.

5. 6.

7. 8. 9. 10.

Damp Proof Membrane 45mm Vertical aluminum T section support 20mm Plywood Deck Aluminum bracket with isolation pad Rigid Insulation Infill (65mWm) Damp Proof Membrane Steel Deck for Composite floor construction 80mm Reinforced concrete

9. 10. 11. 12. 13. 14. 15. 16.

11.

12. 13. 14. 15. 16.

45mm Polished screed floor finish NORSKREEN® M2 Panel Aluminum bottom clip Primary steel I-beam floor joist (215mmx225mm) VELFAC Argon-filled double glazed window bottom detail Cavity closer with unfilled insulation Rigid Insulation Infill Aluminum window sill

13.

se

ct

ion

ele

va t

ion

C Ground Floor to Cantilever Construction 1:5 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

Principle Techniques of the Main Structure External envelope of the theatre is made out of concrete (concrete cladding), which provides good thermal insulation and weather proofing with a little use of steel framework. Moreover, steel is mainly implemented in the Bar framework as it has the most suitable properties for a cantilever construction (high strength to weight ration). Though steel is heavily used on the first floor, ground slab is mainly completed out of concrete, with a small steel cantilever construction. All secondary steel beams are spanning less than 6 m. Due to the high loads of the building and limited site conditions pile foundations are going to be used. There is a flat roof, which allows for the building have a certain appearance. Building is permeated with structural columns instead of walls, supporting the weight as well as allowing for wide views.

Principle Techniques of the Main Construction Concrete Cladding NORSKREEN® M2 by Telling Architectural is going to be used for entire outside facade cladding. This will act as a rainscreen, as well as will help to lower carbon emissions, as provided by the British manufacturer. With the glazing being almost a half of the Bar’s facade it is a major contributer to the overall heatloss, therefore a low-E coated argon-filled double-glazing unit is implemented. Moreover it will be provided by a British manufacturer - VELFAC. Zinc stranding roofing system is implemented by a RHEINZINK, to make it easier to construct the building on site.

1. 2. 3. 4. 5. 6. 7. 8.

150mm Hardcore 240mm Concrete Damp Proof Membrane 75mm Rigid Insulation 65mm Screed with Underfloor Heating 50mm Polished Concrete floor finish Rigid Insulation 135mmx190mm Timber Beam

9. VELFAC Argon-filled double glazed window bottom detail 12. 50mm Polished concrete floor finish 10. Secondary C-section steel channel beam (215mmx125mm) 13. Rigid Insulation Infill 11. 45mm Vertical aluminum T section support 14. 20mm Plywood Deck

43

14.


‘Hearth’

44


A project, exploring the nature of the brick, its application and use in modern household. The design came from analyzing client’s profession, prioritizing spaces and exploring the a material application. I have also improved my knowledge about construction process and key strategies for designing residential houses.

45


46


‘Papilio’

47


A project about exhibition center for an architecture department, which would be occupied on the open day at the University. This project fulfilled my knowledge about metal structures and application of such material, as well as gave fundamental understanding of steel frame construction and material connections. My main aim was to explore the relationship of building with its context. At such a small scale the pavilion was influenced by the shape of the lake; with perforations inspired by surrounding trees, acting as a privacy measure.

48


49


‘Pots’

A small project dedicated to exhibition space for a pot. The idea was to create a place which will define and multiply the features of a given object, as well as transfer its identity trough the atmosphere inside the place. First individual project, where I improved time management and hand drawing skills. Moreover, learned the basis of construction on site.

50


51


52


‘Daidala’ Joint project with engineers. A collaborative project with engineers, which focused on creating a model expressing weightlessness. Having built this model, I learned about the nature of materials, type of connections, as well as gained valuable knowledge about working in a team.

53


54



Art

56


57


58


Photography

59


60


Other Interests

61


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.