AR7049 - Unit 14 - Pierre & Pereen D’Avoine Barking Market Hall & River Roding community centre Zimmie Sutcliffe - 4th year - 18015382
Contents
Project Introduction
1. Site
The setting for this programme is a much-forgotten aspect of East London; the Roding River and its environs in the bor-
1.1 Barking wide site plan
ough of Barking and Dagenham. The Roding traverses a varied landscape where it directly interacts with the borough
1.2 Existing site plan
of Barking and Dagenham between the Harts Lane estate in the north of Abbey ward to the myriad of industrial sites
1.3 Proposed site master plan
along River Road. Barking suffers from many of the issues around identity, place and community cohesion seemingly so
1.4 Proposed site sections
common in today’s world, but there is a real sense of optimism and drive within the local leadership and many reasons to view Barking and the Roding river as a place ripe with opportunity rather than beset with problems.
2. Market Hall proposal
2.1 1:100 plans
This proposal is comprised of two aspects; the first being a masterplan proposal extending from the end of East Street
2.2 1: 100 sections
in the town centre, across Abbey Green and ending at town quay wharf; a unused site adjacent to the River Roding.
2.3 1: 100 elevations
The masterplan aims to revitalise the run down Abbey Green, returning it to its position as a hub for the town and its people. A new plaza at the end of East Street is proposed that will house independent retail and work sheds for local
3. East Street public square & independent retail sheds
entrepreneurs and market stall owners, thus extending the success of the existing East Street market. The green is to be
3.1 1: 50 plans, sections & elevations
simplified and remodelled to create a direct route to the Roding. Space for allotments and sports pitches provide much
3.2 1:100 site section
needed activity to the green and allow it to appeal to the whole community.
4. Structural strategy
Secondly, at the end of this masterplan route, will be a new market hall and educational building that sits on the edge
4.1 structural frame diagrams
of the river. This scheme also contains a public plaza in front, mirroring the beginning of the route and book ending
4.2 exploded axonometric
Abbey green. This modest building is founded on principles of simplicity, openness and structural clarity that allow it
4.3 1:50 envelope section
express an accessibility to all members of the community whilst achieving a quality that the people of Barking can be
4.4 1:10 facade study model
proud of. Identifying a lack of creative enterprise opportunities in the borough and responding to the Creative Enter-
4.5 1:10 technical details
prise Zone report, the scheme houses riverside studio and workshop space to be used primarily by Coventry University as well as a new flexible market and community hall to house events, talks and provide a setting to celebrate the
5. Perspective drawings
5.1 Market hall site axonometric
5.2 Internal renders
creative output of the borough.
1
Education facilities map - LBBD - 1:10,000 @ A1
Barking & Dagenham has a high provision of primary and secondary education facilities across the borough, with two primary schools situated on Abbey green itself. However, the provision of tertiary education is less extensive, with no specialist provision for creative courses and making. As a result my project identifies this gap in education provision and provides a building housing studios, workshops and other educational spaces specifically for creative and making based courses including fine art, sculpture and jewellery design. Coventry University currently has a campus in Barking & Dagenham and my scheme would be a space for them to provide creative degree courses, something not currently present in the borough. As my building functions as a market hall and community building as well, the use of studios and workshops would be open to the public but only at specific times, with Coventry University having priority during term time.
Primary
Primary + secondary
Secondary
Tertiary
N 0
2
1km
18
11
9
10
17
16 8 12 2
1
3
4
15
14 7
13
6
5
Site plan- Barking town centre existing - 1:1250 @ A1
1 - River Roding
5 - Gascgoine estate
9 - Abbey ruins
13 - Broadway theatre
13 - Broadway theatre
17 - Ripple Road
2 - Old granary building
6 - St. Josephs RC primary school
10 - Curfew tower
14 - Town Hall
14 - Town Hall
18 - Barking train station
3 - Site at Town Quay Wharf
7 - Abbey Green
11 - St Margarets C of E primary school
15 - Town Hall square & library
15 - Town Hall square & library
4 - A123 road
8 - St Margaret’s parish church
12 - The Broadway/North Street
16 - East Street
16 - East Street
3
N 0
50m
100m
8
Site plan existing 1:500 @ A1
1 - River Roding 2 - Old granary building
9
3 - Site at Town Quay Wharf
13
4 - A123 road 5 - St. Josephs RC primary school 6 - Abbey Green 7 - St Margaret’s parish church 8 - Abbey ruins
7
9 - Curfew tower 10 - The Broadway/North Street 11 - Broadway theatre
10
12 - Town Hall 13 - East Street
2
4 3
6
12
1
11
5
N 0
10m
25m
50m
4
Site plan -proposed 1:500 @ A1
18
1 - River Roding 2 - Old granary building
17
3 - Re routed Highbridge road
19
4 - Market/community hall 5 - Market square/public space
18
6 - Re routed A123 road 7 - Community allotments 8 - Re modelled Abbey Green
15
9 - St. Josephs RC primary school 10 - Sports pitches 11 - Broadway theatre
16
12 - Town Hall 13 - Pedestrianised Broadway 14 - Greenhouses 15 - St Margaret’s parish church
3
14
16 - Public square
2
17 - Curfew tower 18 - Work sheds/ market stalls
7
19 - East Street
4 8
5
1
12
4
10
10
10 13
8 6 11
9
N 0
10m
25m
50m
5
Site sections - 1:200 @ A1
A
Work sheds/market stalls
B
Curfew tower
B
A
0m
25m
62.5m
125m
Site section AA - 1:200 @ A1
Old granary
River Roding
Public space
Community hall building
Market square
A123
Site section BB - 1:200 @ A1
6
Community allotments
Greenhouses
Old granary
St Margarets parish church
Community hall building
Town hall clock tower
Greenhouses
Public square
Market hall building
Curfew tower
Work sheds/market stalls
0
7
5m
10m
20m
Market hall - basement plan - 1:100 @ A1
1 - River Roding
8 - Workshop - 54.4m² x 2
2 - Riverfront public space
9 - Office - 8.9m²
3 - Entrance lobby - 29.5m² x 2
10 - Library - 23.6m² x 2
4 - Art studios - 77.8m² x 2
11 - I.T. server room - 13.4m²
5 - Storage - 2.5m² x 2
12 - Plant room - 15.5m²
6 - Accessible W.C. - 4.3m² x 2
13 - Staff office - 12.1m²
7 - Store - 1.2m² x 2
1
Store 1.2 m²
Accessible W.C. 4.3 m²
7
8
6
9 11
Office 8.9 m²
5
10
Storage 2.5 m²
6000
7
8 I.T. Server room 13.4 m²
Plant room 15.5 m²
12
Staff office 12.1 m²
Store 1.2 m²
Accessible W.C. 4.3 m²
6
13
5
Storage 2.5 m²
Library 23.6 m²
Workshop 54.4 m²
Workshop 54.4 m²
Art studio 77.8 m²
Art Studio 77.8 m²
2 4
6000
4
Entrance lobby 29.5 m²
Entrance lobby 29.5 m²
3
3
3
External public space
2
6000
A
6000
B
6000
C
6000
D
6000
E
6000
F
6000
G
6000
H
6000
I
J
1 N 2m
0
8
0m
5m
2m
10m
5m
10m
5
6000
1
4
6000
7
3
1 Accessible WC. 3.6 m²
Accessible W.C. 3.6 m²
6 6000
6 8
2
6000
Community hall 129.7 m²
2
Market hall 129.7 m²
2
5
4
3 6000
A
6000
B
6000
C
6000
D
6000
E
6000
F
6000
G
6000
H
6000
I
J
Market hall - Level 00 plan - 1:100 @ A1
1 - Market square/public plaza
7 - Ramped access from plaza
2 - Steps to river/seating area
8 - Ramped access to basement level & river front
0m
2m
5m
10m
3 - Sheffield cycle stands 4 - Community hall - 129.7m² 5 - Market hall - 129.7m² 6 - Accessible W.C. - 3.6m² x 2
N 0
9
2m
5m
10m
6000
1
6000
2
3 6000
6000
A
6000
B
6000
C
D
6000
E
6000
F
6000
6000
G
6000
H
I
J
Market hall - roof plan - 1:100 @ A1
1 5 6000
Office 9.1 m²
5
10
6 Office 9.1 m²
Cafe 42.7 m²
Library/I.T. 23.4 m²
7
Break out space 14.6 m²
Kitchen 14.4 m²
Walk in freezer 2.6 m²
12 11
Store 2.7 m²
9
2 Unisex W.C. 7.8 m²
1
13
Youth forum 33.5 m²
Meeting room 15.3 m²
2
16
Accessible W.C. 3.3 m²
Storage 3.2 m²
3
4
0m
8
6000
Female W.C. 11.5 m²
Terrace 66.3 m²
2m
5m
10m
Male W.C. 10.1 m²
14
15
3 6000
A
6000
B
6000
C
6000
D
6000
E
6000
F
6000
6000
G
H
6000
I
J
Market hall - Level 01 plan - 1:100 @ A1
1 - Unisex W.C. - 7.8m²
7 - Breakout space - 14.6m²
2 - Meeting room - 15.3m²
8 - Terrace - 66.3m²
13 - Storage - 3.2m²
3 - Youth forum - 33.5m²
9 - Cafe - 42.7m²
14 - Female W.C. - 11.5m²
4 - Double height space to hall below
10 - Kitchen - 14.4m²
15 - Male W.C. - 10.1m²
5 - Office - 9.1m² x 2
11 - Store - 2.7m²
16 - Accessible W.C. - 3.3m²
6 - Library - 23.4m²
12 - Walk in freezer - 2.6m²
N 0
10
2m
5m
10m
3
2
1
6000
B
0
2m
5m
10m
A
Market hall section BB - 1:100 @ A1
11040
Roof ridge
7765
Roof eaves
7000
L01 Ceiling
5700
L01 Handrail
4600
L01 FFL
1400
L00 Handrail
300
L00 FFL
0
L00
-3300
L-01 FFL
-3600
L-01
6000
A B
A
6000
Market hall section AA - 1:100 @ A1
11040
Roof ridge
7765
Roof eaves
7000
L01 Ceiling
5700
L01 Handrail
4600
L01 FFL
1400
L00 Handrail
300
L00 FFL
0
L00
-3300
L-01 FFL
-3600
L-01
D
C
B
6000
6000
6000
11
F
E
6000
G
6000
I
H
6000
6000
J
6000
J
J 11040
I
6000
I
H
6000
H
G
6000
G
F
6000
F
E
6000
E
D
6000
D
C
6000
C
B
6000
B
A
6000
A
Roof ridge
6000
11040 7765
Roof ridge Roof eaves
7000
L01 Ceiling
5700
L01 Handrail
7765 4600
Roof eaves L01 FFL
7000
L01 Ceiling
5700
L01 Handrail
4600 1400
L01 L00 FFL Handrail
300
L00 FFL
0
L00
1400
L00 Handrail
300
L00 FFL
0
L00
6000
6000
6000
6000
6000
6000
6000
6000
Kalzip standing seam zinc roof
Kalzip standing seam zinc roof
Vertical ship lap western red cedar cladding
Vertical ship lap western red cedar cladding
Baubuche glulam frame and sub frame
Baubuche glulam frame and sub frame
Rodeca polycarbonate panels
Rodeca polycarbonate panels
Market hall - East elevation - 1:100 @ A1
A
A 11040
B
6000
B
C
6000
C
D
6000
D
E
6000
E
F
6000
F
G
6000
G
H
6000
H
I
6000
I
J
6000
J
Roof ridge
Kalzip standing seam zinc roof
Kalzip standing seam zinc roof 6000
11040 7765
Roof ridge Roof eaves
7000
L01 Ceiling
5700
L01 Handrail
7765 4600
RoofFFL eaves L01
7000
L01 Ceiling
5700
L01 Handrail
4600 1400
L01 L00 FFL Handrail
300
L00 FFL
0
L00
1400
L00 Handrail
300 -3300 0 -3600
L00 FFL L-01 FFL L00 L-01
-3300
L-01 FFL
-3600
L-01
6000
6000
6000
6000
6000
6000
6000
6000
Vertical ship lap western red cedar cladding
Vertical ship lap western red cedar cladding
Baubuche glulam frame and sub frame
Baubuche glulam frame and sub frame
Rodeca polycarbonate panels
Rodeca polycarbonate panels
Rodeca polycarbonate panels
Market hall - West elevation - 1:100 @ A1
12
0m0
2m 2m
5m5m
10m 10m
0m
2m
5m
10m
11040
11040
3
2
1
1
2
3
6000
6000
6000
6000
3
2
3
1
2
1
Roof ridge 6000
Roof eaves
7000
L01 Ceiling
Kalzip standing seam zinc roof
Kalzip standing seam zinc roof
eaves 7765 L01 Handrail 5700 Roof
eaves eaves 7765 7765 RoofRoof
L01 Ceiling 7000 L01 FFL 4600
Ceiling Ceiling 7000 7000 L01L01
5700
L01 Handrail
4600
L01 FFL
1400
L00 Handrail
300
L00 FFL
Vertical ship lap western red cedar cladding
FFLFFL 4600 4600 L01L01
Baubuche glulam frame and sub frame
Baubuche glulam frame and sub frame
Rodeca polycarbonate panels
Rodeca polycarbonate panels
L00L00 Handrail
Handrail Handrail 1400 1400 L00L00
300
L00 FFL
FFLFFL 300300 L00L00
0
L00
0 0
L00L00
-3300
L-01 FFL
-3600
L-01
L-01 FFL
-3600
L-01
Vertical ship lap western red cedar cladding
Handrail Handrail 5700 5700 L01L01
1400 0
-3300
6000
ridge ridge 11040 11040RoofRoof
Roof ridge
7765
6000
6000
Market hall - North elevation - 1:100 @ A1
Market hall - South elevation - 1:100 @ A1
North Elevation 1 : 100
North Elevation Internal 1 : 100
1
1
2
3
2
3
6000
6000
South Elevation
6000
1
11040
1
3
2 6000
1 : 100
ridgeridge 11040 11040RoofRoof 6000
2
1 : 100
1
2 6000
3 North Elevation Internal
3
6000
Roof ridge
6000
6000
6000
Kalzip standing seam zinc roof
Kalzip standing seam zinc roof
11040
11040
Roof ridge
Roof ridge
eaves eaves 7765 7765 RoofRoof
7765
Roof eaves
Ceiling Ceiling 7000 7000 L01 L01
7000
L01 Ceiling
Roof eaves 7765 Handrail Handrail 5700 5700 L01 L01 L01 Ceiling 7000 FFL FFL 4600 4600 L01 L01
Vertical ship lap western red cedar cladding
Roof eaves 7765 5700 L01 Handrail L01 Ceiling 7000 L01 FFL 4600
Vertical ship lap western red cedar cladding
5700
L01 Handrail
Baubuche glulam frame and sub frame
5700
L01 Handrail
Baubuche glulam frame and sub frame
4600
L01 FFL
Rodeca polycarbonate panels
4600
L01 FFL
Handrail Handrail 1400 1400 L00 L00
Reinforced concrete retaining wall
FFL FFL 300300 L00 L00
1400
L00 Handrail
300
L00 FFL
1400 0 L00 Handrail L00
1400 0 0
L00 L00Handrail L00
300
L00 FFL
300
L00 FFL
0
L00
0
L00
-3300
Rodeca polycarbonate panels
L-01 FFL
L-01 North Elevation
-3600
1 : 100
Market hall - Internal north elevation - 1:100 @ A1
-3300
L-01 FFL
-3600
L-01
-3300
L-01 FFL
-3600
L-01
Reinforced concrete retaining wall Reinforced concrete retaining wall Reinforced concrete raft foundation
Market hall - Internal south elevation - 1:100 @ A1
North Elevation Internal 1 : 100
South Elevation Internal
3
1
2
0m
2m
5m
1
10m
3
2
0
2m
5m
10m
1 : 100
South Elevation 1 : 100
11040
Roof ridge
6000
6000
13
South Elevation Internal 1 : 100
11040
Roof ridge
0m 6000
6000
2m
5m
10m
1
1 1
2
3000
3000
2876
2876
3420
7098
A
2 Storage 0.6 m² W.C. 2.1 m²
3500
W.C. 2.1 m²
3600
3600
3000
3000
A 1
L01 Ceiling Shed 4800
750
B
2850 2550
1200
850
B
863
L00 FFL 300
0
L00
2128
L00
750
300 0
N 1m
L00 FFL
Work sheds - typical roof plan - 1:50 @ A1
850
0
L00 Ceiling Shed
B
Work sheds - typical 1st floor plan - 1:50 @ A1
500
Work sheds - typical ground floor plan - 1:50 @ A1
300 0
L01 FFL Shed
750
B
A 2100
4500
5100
863
800
863
A
800
2100
B
A
3176
B
800
850
800
4376
B
Workspace 7.1 m²
800
Roof Eaves Shed
2250
1200
A
500
B
4500
Retail space 14.5 m²
500
B
A
4900
4500
4920
A
776
L01 Ceiling Shed 4800 L01 FFL 2850 Shed L01 FFL Shed 2850 L00 Ceiling Shed L00 Ceiling Shed 2550 2550
3176 1200
776
L01 Ceiling Shed
2250
5291
4500
5100
4500
5100
4376
4500
4900
W.C. Workspace 2.1 m² 7.1 m²
3176
1100
4376
4900
4800
3000
A 4500
900
4500
4920
300 500
4500
4920
Retail space 14.5 m²
800
3500
3600
Storage 0.6 m² Workspace 7.1 m²
2
776
Roof Ridge Shed
Roof Ridge Shed Roof Eaves Shed Eaves Shed 7098 Roof 5291 5291
A Retail space 14.5 m²
3500
2
2876
A
Roof Ridge Shed 7098
3500
3000
Storage 0.6 m²
3000
3000
2
3000
2100
900
900
A 1
2
3000
2128
3500
1
2
750
3500
1100
A
2
500
500
2
2
750
3000
300
300
A 1
1
3420
3000
A
1
2250
3420
2
750
2
2128
1
1100
1
1
2.5m
L00 FFL L00
5m
Work sheds - Section AA - 1:50 @ A1
Roof Ridge Shed 7098
B
1
3500
4500
4500
5000
5000
610
7098
Roof Ridge Shed
A
Roof Ridge Shed 7098
1
A
1
A Roof Ridge Shed 7098
Roof Ridge Shed
7098 5291
7098 5291
4800
L01 Ceiling Shed 4800
4800
L01 Ceiling Shed 4800
5291
Roof Eaves Shed
L00
0
L00 FFL L00
300 0
300 0
L00 FFL L00
L00
0
300 0
L00 FFL L00
300 0
300 0
L00 FFL L00
7098 5291 4800
L01 Ceiling Shed 4800
L01 Ceiling Shed
Roof Eaves Shed
1800 1950
L01 FFL Shed
1950
2100
2850 2550
L00 Ceiling Shed L00 FFL 300
610
L01 Ceiling Shed 4800 L01 FFL 2850 Shed L01 FFL Shed 2850 L00 Ceiling Shed L00 Ceiling Shed 2550 2550
L01 Ceiling Shed 4800 L01 FFL 2850 Shed L01 FFL Shed 2850 L00 Ceiling Shed L00 Ceiling Shed 2550 2550
2100
L01 FFL Shed
2100
2850 2550
B
Roof Ridge Shed
Roof Ridge Shed Roof Eaves Shed Roof Eaves Shed 5291
5291
L00 FFL 300 L00
0
300 0
L00 FFL L00 850
1200
850
L01 FFL Shed L00 Ceiling Shed L00 FFL 300 L00
0
1200
300 0
L00 FFL L00 850
Work sheds @ public square - site elevation/section BB - 1:100 @ A1
2850 2550
L00 Ceiling Shed
2100
L00 FFL 300
Roof Ridge Shed 7098
1800
L01 Ceiling Shed
1800
L00 Ceiling Shed
5000
5000
Roof Eaves Shed
2100
2100
L01 FFL Shed
2100
300 0
2100
2850 2550
5000
4500
950
1800
L01 Ceiling Shed
L01 Ceiling Shed 4800 L01 FFL 2850 Shed L01 FFL Shed 2850 L00 Ceiling Shed L00 Ceiling Shed 2550 2550
L01 Ceiling Shed 4800 L01 FFL 2850 Shed L01 FFL Shed 2850 L00 Ceiling Shed L00 Ceiling Shed 2550 2550
4500
B
610
Roof Ridge Shed Roof Eaves Shed Roof Eaves Shed 5291
5291
Roof Eaves Shed
4500
610
2100
5291
7098
950
3500
Roof Ridge Shed Roof Eaves Shed Roof Eaves Shed 5291
1800
L01 Ceiling Shed
A
2
1800
L01 Ceiling Shed 4800
3500
1950
4800
3500
B
A
3000
1800
7098 5291
3000
950
5000
3500
3000
A
2
610
7098 4500
Roof Ridge Shed Roof Eaves Shed Roof Eaves Shed 5291
2
610
Roof Ridge Shed
3000
1
1800
7098
3500
3000
B
2100
2
B
1
1800
3000
1
2100
2
L00 FFL L00 2100
2
L00 FFL L00
1200
0m
14
0m
1m
1m
0m
2.51m m
2.5m
2.5m
5m
5m
5m
111
3000 3000 3000
3500 3500 3500
7098 7098 7098
Roof Roof Roof Ridge Ridge Ridge Roof Shed Shed Shed Ridge Shed 7098
BBB
1
B
AAA
3000
3500
610 610 610
7098 7098 7098
4500 4500 4500
4500
5000 5000 5000
5000
111
A
1
222
3000 3000 3000
3000
3500 3500 3500
3500
AAA
2
7098 7098 7098
950 950 950
7098 7098 7098
950
L01 L01 L01 Ceiling Ceiling Ceiling L01 Shed Shed Ceiling Shed Shed 4800 4800 4800 4800
L01 L01 L01 FFL FFL FFL Shed L01 Shed Shed FFL Shed 2850 2850 2850 2850 L00 L00 L00 Ceiling Ceiling Ceiling L00 Shed Shed Ceiling Shed Shed 2550 2550 2550 2550
L01 L01 L01 FFL FFL FFL Shed L01 Shed Shed FFL Shed 2850 2850 2850 2850 L00 L00 L00 Ceiling Ceiling Ceiling L00 Shed Shed Ceiling Shed Shed 2550 2550 2550 2550
5000
1800 1800 1800 2100 2100 2100
2100
1950
2100 2100 2100 1950 1950 1950
L00 L00 L00 FFL FFL FFL L00 FFL 300 300 300 300 L00 L00 L00 000 0L00
L00 L00 L00 FFL FFL FFL L00 FFL 300 300 300 300 L00 L00 L00 000 0L00
L00 L00 L00 FFL FFL FFL L00 FFL 300 300 300 300 L00 L00 L00 000 0L00 850 850 850
Work sheds - East elevation - 1:50 @ A1
610
L01 L01 L01 FFL FFL FFL Shed L01 Shed Shed FFL Shed 2850 2850 2850 2850 L00 L00 L00 Ceiling Ceiling Ceiling L00 Shed Shed Ceiling Shed Shed 2550 2550 2550 2550
L01 L01 L01 FFL FFL FFL Shed L01 Shed Shed FFL Shed 2850 2850 2850 2850 L00 L00 L00 Ceiling Ceiling Ceiling L00 Shed Shed Ceiling Shed Shed 2550 2550 2550 2550
2100
2100 2100 2100
1800
L01 L01 L01 Ceiling Ceiling Ceiling L01 Shed Shed Ceiling Shed Shed 4800 4800 4800 4800
1800 1800 1800
L01 L01 L01 Ceiling Ceiling Ceiling L01 Shed Shed Ceiling Shed Shed 4800 4800 4800 4800
1800
L01 L01 L01 Ceiling Ceiling Ceiling L01 Shed Shed Ceiling Shed Shed 4800 4800 4800 4800
1800 1800 1800
Roof Roof Roof Eaves Eaves Eaves Roof Shed Shed Shed Eaves Shed 5291 5291 5291 5291
2100
5000 5000 5000
B
Roof Roof Roof Ridge Ridge Ridge Roof Shed Shed Shed Ridge Shed 7098
Roof Roof Roof Eaves Eaves Eaves Roof Shed Shed Shed Eaves Shed 5291 5291 5291 5291
2100 2100 2100
4500
610 610 610
Roof Roof Roof Ridge Ridge Ridge Roof Shed Shed Shed Ridge Shed 7098
Roof Roof Roof Eaves Eaves Eaves Roof Shed Shed Shed Eaves Shed 5291 5291 5291 5291
Work sheds - North elevation - 1:50 @ A1
4500 4500 4500
610
Roof Roof Roof Ridge Ridge Ridge Roof Shed Shed Shed Ridge Shed 7098
Roof Roof Roof Eaves Eaves Eaves Roof Shed Shed Shed Eaves Shed 5291 5291 5291 5291
L00 L00 L00 FFL FFL FFL L00 FFL 300 300 300 300 L00 L00 L00 000 0L00
BBB
A
1800
2
2100
222
Work sheds - South elevation - 1:50 @ A1
850 1200 1200 1200
1200
Work sheds - West elevation - 1:50 @ A1
0m 0m 0m
0m1m 1m 1m
1m
2.252.m 5.5mm 2.5m
B
5m 55mm
B
0
15
2m
5m
10m
5m
Structural strategy Roof:
Exploded structural axonometric drawing
The structural strategy for the scheme is set out across levels, with each level having a distinct structural and material expression. At basement level the key consid-
- standing seam zinc
eration is structural stability in poor soil conditions and water tightness due to the proximity to the River Roding, although the scheme is situated in flood zone 1, with a less than 1 in 100 annual risk of flooding. Concrete retaining walls are used to hold back earth from the site excavation, with a timber frame used to create a lighter, more open feel on the river facing facade. At street level the glulam timber frame system contributes largely to the internal and external expression of the building, highlighting the simplicity and quality of construction. Based on a 6m x 6m module the structure drives the plan layout and facade rhythm of the scheme with translucent polycarbonate cladding revealing the structural geometry behind and providing a contemporary take on the open air ground floor of a traditional market house. Translucent cladding also enhances views through the building to the River beyond.
1st floor:
Vertical western red cedar cladding at first floor level maintains the vertical rhythm of the polycarbonate below but allows for cellular and ancillary spaces to be housed in a more visually controlled envelope compared with the open market and community hall spaces below. The timber clad upper floor also echoes the
- 300x300mm glulam frame
traditional market house with an open air ground floor and solid upper floor.
- secondary timber structure for support and roof application - exposed rafters
Ground floor: - 300x300mm glulam frame - secondary timber structure for bracing and cladding application Glulam frame typical module 1
Glulam frame typical module 2
Basement non retaining: - 300x300mm glulam frame - 600mm reinforced concrete walls - secondary timber structure for bracing and cladding application
Glulam frame typical module 3
Polycarbonate cladding fixed to glulam frame
Basement retaining: - Steel sheet piles - 600mm reinforced concrete retaining walls - 500mm deep reinforced concrete raft foundation
Concealed steel plate and dowel system for
Concealed steel late and dowel system for
glulam cloumn and beam connections
glulam cloumn footings
16
Envelope section - 1:50 @ A1
Envelope
As previously noted the primary material expression comes from the combination of translucent polycarbonate cladding and a glulam timber frame. The 6 x 6m module informs everything from structural grid to plan layout and facade co ordination. This module is divided into 500mm segments, with secondary timber structure and cladding corresponding to this. Polycarbonate was chosen as a cheaper, more robust alternative to glass to enable a transparency to the market hall, showcasing the activity inside and opening it up the public square in front. The model below shows how polycarbonate illuminates at night, showcasing a different structural expression and spatial quality within the market hall.
1:!0 facade model - lighting studies
Typical ground floor facade bay - 1:20 @ A1
Polycarbonate cladding corner detail plan - 1:10 @ A1
17
Technical details
Detail 1.1 - Foundation & polycarbonate to ground, basement level - 1:10 @ A1
Detail 1.2 - Foundation & concrete retaining wall, basement level - 1:10 @ A1 External public space
External public space
Detail 2.1 - Polycarbonate to ground & intermediate floor, Level 00 - 1:10 @ A1
Detail 2.2 - Polycarbonate & timber cladding junction, level 01 - 1:10 @ A1
18
Detail 3.1 - Polycarbonate to external terrace & intermediate floor, Level 01 - 1:10 @ A1
Detail 3.2 - Timber cladding junction to external terrace & intermediate floor, level 01 - 1:10 @ A1
Detail 4.1 - Window to timber wall junction, level 01 - 1:10 @ A1
Detail 4.2 - Roof to wall junction, level 01 - 1:10 @ A1