ABPL30041 CONSTRUCTION DESIGN ASSESSMENT TASK 2
MODEL: (ALL PRIMARY STRUCTURE FROM FOUNDATIONS TO ROOF) (15%) Western BACE Project - Section O
At. Studio Link: https://at.studio/abpl30041_20s2_t10_ jake#model=06536ee0-f64c-11ea-81d54f82cfc8fec2
Student name: Ziyang Yuan - 1025198 Studio No.10 - Tutor: Jake Nancarrow
Load Path
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Front View Facing North
Load Path
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Right Side View Facing West
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Back View Facing South
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Left Side View Facing East
Rough Inner Surface to increase the strength of connection
Bearing Strip allows movement between Hollow Core and Precast beam
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail of the Hollow Core and Beam
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail of Reinforced Wall Bracing
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Details of Hollow Core and First Floor Slab
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Details Ceiling structure
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Details Ceiling structure
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Connection Details
Stopper to avoid screed go through the whole hollow cores
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail of Hollow Core and Beam
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Wall Bracing Detail
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Connection Truss and PC1
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Connection Details
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
PC1 and Footing Connection
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail of Corbel and Connection to Beam
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Ferrule in beams
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail of PC1 and Beam Connection
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Another Detail of PC1 Connection
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
The Bottom of the Hollow Core
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Detail connection between Corbel and Beam
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Other side of the Bottom of the Column
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Three ferrules on top of the column
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow
Bended Hollow Core Screed leveled the first floor
ABPL30041 CONSTRUCTION DESIGN ASSESSMENT TASK 2
MODEL: (ALL PRIMARY STRUCTURE FROM FOUNDATIONS TO ROOF) (15%) Western BACE Project - Section O
ABPL30041 - CONSTRUCTION DESIGN Ziyang Yuan - 1025198 Tutorial No.10 - Jake Nancarrow