Contents
Speech of Chairman Speech of CEO ORGANIZATION CHART Brief introduction Our Core Values Company Department QA\QC HSE Policy Statement Risk Assessment Policy SCOPE OF BUSINESS
Engineering Procurement Construction pipe line trunk line flow line water injection and water treatment station piping tanks civil work Degassing station Gas Compressor station GTU well Head EQUIPMENT INSTALLATION HDD and boring Instrument Electrical Maintenance NDT Services with other companies as joint venter our Equipment our projects
5 6 7 8 10 14 16 18 21 22 24 26 28 30 38 40 42 44 50 58 66 67 68 70 72 74 76 78 82 84 86 88 92 3 MSK Group
The speech of the President & Chairman's.. Mr. Abdullah Al-Shmeri My friends .... Welcome in Iraq.. During the ten years of success, perseverance, honesty and dedication in work, the (MSK) has been able to build a solid base from which to springboard to global projects. Today the (MSk) group is one of the largest Iraqi companies operating in the field of energy in its technical, engineering, and financial potentials with all the expertise it possesses that qualifies it for the advancement in the oil sector in Iraq and the Middle East. Fifteen Office in Iraq, thirty working site, thirty three offices outside Iraq, and more than 4,000 Iraqi and foreign employees, with this we have been able to keep a clear imprint and correct our steps in the field of energy contracting. From one success to the other, we have been able to mix foreign expertise and Iraqi dedication in the work, with sober plans. Our motto is fast delivery, accuracy and safety. We have carried out hundreds of vital projects in Iraq and we have been important partners with the investment companies in Iraq. We have developed with them a number of oil fields such as Alahdab, Algarraf, Badra and Alhalfaya, Albozorkan, Alrumaila and West Qurna. We have developed the Iraqi personnel working with us by courses inside and outside Iraq in order to develop their technical potential. Our company has given safety and the environment a great attention, a thing that have had a significant impact on the success of our work. Our company owns ISO certificate and possesses certifications in safety and the environment, in addition to many sponsorship books from both, the Iraqi government and foreign companies. We are the best and our goal is to stay at the top and our goal is to be your partners to work in the field of energy and construction in Iraq and all the world. We thank you for your good opinion in our company and we hope to open new doors to cooperate with you in all fields. Our hands and hearts are with you to build a new Iraq. Thank you again...
MSK Group
4
5 MSK Group
M
UP
GR SK O
MSK ORGANIZATION CHART
OIL SERVICE
MSK Group
The speech of the General Manager..& CEO. Engineer
PRESIDENT & CHAIRMAN
Qusay al-Saadi
CEO AND GENERAL MANAGER
The “MSk “ Since its inception, has played a prominent role in contributing to the implementation of the strategy of economic diversification. The strategy is represented in the effective management of the company’s investment projects, the creation of partnerships between the public and private sector, and the direct investment of the group. The success of “MSk” is demonstrated in its management of the subsidiaries of the group; the “ msk’’, which is working in the oil and gas sector also embodies a perfect example of partnership between the public and private sectors. In addition, the portfolio of the direct investments of MSK includes the development and expansion of the oil sector, which represents one of the most prominent and largest integrated companies in the oil industry in Iraq. The “MSk” future plans are centered on achieving further excellence and prosperity and also seek to expand the current projects and target more of the new strategic investments that enhance the economic capacity of the company and contribute to boost the national economy. Perhaps what distinguishes the “MSK” from the other oil companies in Iraq, is the multiplicity of the investment methods, which ranged between direct investment, as is the case in the Gulf region, and through the distinctive and successful partnership investments with the private sector. Today as we are on the threshold of a new phase with our high spirit and an ambitious vision, we promise that we will continue to work and redouble our efforts to remain at the forefront of the working on the development of the private sector and on the fertile source, which is inexhaustible, to create economic entities, with value-added, to contribute to the creation of investment opportunities, the rehabilitation of the national staff and employing them, and strengthen the nation’s march towards sustainable development.
DEPARTMENT OF PROJECTS
DEPT. OF PROJECTS
DEPT. OF HSE
DEP. OF OIL PROJECTS DEP. OF CIVIL PROJECTS (CWP)
DEP.MECH.& ELEC. (MEP)
PLANNING & FOLLOW UP
QA/QC
MACHINES & FACTORIES
RESEARCHES & DEVELOPMENT
DEP. OF MACHINES
PROJECTS FOLLOW UP
DEP. OF FACTORIES
COST & VISIBILITY STUDY
DEPT. LOGESTICS
ADMINSTRATI OF DEPARTMENT
DEP. OF MANTAINANCE ENGINEERING
DEPT. OF
ADMINSTRATION
ADMINSTRATIVE
AFFAIRS
INCOMING OUTGOING PERSONNEL UNIT
HR Division
COMMERCIA DEPT. PROCURMENT DIVISION PROPOSALS DIVISION
PUBLIC RELATION AND MEDIA DEPT.
LEGAL DEPT.
FINNANCE DEPT.
CONTRACTS DIVISION
ACCOUNTS DIVISION
PROCEEDING DIVISION
FINAL ACC0. DIVISION CONTROL AUDIT DIVISION
TRANSLATION UNIT
MSK Group
6
7 MSK Group
1 Brief introduction MSK Group is one of the larger Oil Service and Construction companies specialized in contracting to the petroleum and petrochemical projects in Iraq. Our main activities include Engineering , Procurement and construction (Pipeline, Trunk line ,Flow line, water injection, water treatment injection, piping, Tanks, civil work,Degassing station,Gas Compressor station ,GTU, wellhead, HDD,Boring, Equipment Installation,Instrument, Electrical, Maintenance , commissioning Start –up and Testing NDT) We are abundant in financial capabilities and technical strength, and boast a large group of technical talents and management professionals who are familiar with international practices, advancedtechnologies and rich in experience. We are furnished with state-of-the art technologies, superior engineering and construction equipment and rich resources for Oil and Gas projects. We have thedemonstrated capability to provide comprehensive project services from frontend development to feasibility study, HSE assessment, geo-survey, engineering, procurement, construction, manufacture, PMC, commissioning, start-up, operation and maintenance according to international standards and practices under the plateau, desert and seashore conditions. We consistently abiding by the operation philosophy of “Credibility, Quality, Harmony and Safety” and keep on improving the Q&HSE management system at MSK Group.
MSK Group
8
2 Vision & Mission
Vision
To be the premier choice Oil Service and Construction group in the region.
Mission
To be our clients’ premier choice and most trustworthy partner in all our business verticals through the impassioned and unswerving engagement of our people, by considering every single operation as “mission critical” and successfully delivering the best services available following quality-driven processes in a safe and environmentally responsible manner. To bring significant value to our home communities in all our markets through our responsible culture, being partners in our clients’ success, and protecting our shared environment.
Values
Credibility, Quality, Harmony and Safety
Environment
The environment we live and work in is important to us and we strive to do everything we can to make sure it remains safe and sustainable. The Management have formulated a HSE statement and are working with the latest experts in HSE to continually improve its HSE policy.
Public welfare
Social responsibility is paramount in our practices and ensuring that the communities and people are content is rewarding in itself. These are the principles that support our mission: Credibility, Quality, Harmony and Safety 9 MSK Group
3
Our Core Values
Our Projects: MSK Group provides exceptional performance in all aspects of facility and Oil Service construction; planning, pre-construction services, Design/Build, medical, institutional, and industrial new construction. We believe in building into the future, and recognize the importance of environmental conscientiousness. We incorporate Green Construction practices in all of our projects.
MSK Group 10
Our Clients: Providing excellence in all areas of client service has been the cornerstone of our business. We pride ourselves on listening to our clients, being responsive to their project requirements, and exceeding their expectations. We "do it right" the first time. Our Partners:MSK Group has an exceptional reputation for employing the best trades people in the area and regionally from Turkey, India and Pakistan. Our sub-contractors are our long-term business partners. We hold our sub-contractors to the same high standards of quality and professionalism as we do our employees.
11 MSK Group
4
Our Employees: Working at MSK Group is not just a job; it is our career; and more importantly, it is our passion. Teamwork, mutual respect, and a safe and healthy workplace have been an integral part of our culture for more than 10 years. Our Community: Every Project is part of a community. We take our responsibility of making sure our projects becomes part of the greater neighbourhood and builds on that community spirit and sustainability.
MSK Group 12
Our Promise:As far as we are able, MSK Group aims to provideenvironmentally responsible design and building practices, the construction management, skilled trades, specialized expertise, integrity, professionalism, and services required to accomplish your Projects We are confident that our dedication, experience, and ability to deliver your project with maximum efficiency will exceed your expectations. We have successfully completed the feasibility study, engineering, construction, PMC and EPC contracts of quite a number of long-distance oil/gas pipelines, largescale oil/gas storage terminals and tank farms, power plants, roads, bridges, and other municipal utilities successfully in Iraq. These proud achievements have helped us winning high appraisement and trusts from the clients, local governments and the pubic in general. Last year we won a total project value of more than 200 Million USD and over the recent 10 years, we have constructedmore than 48 Multi-million dollar projects. We look forward to fulfilling your Oil Service and Construction requirements in Iraq.
13 MSK Group
4
Company Department
Technical Structure (authority): A- Department of Projects: 1- Division of Oil projects‌ 2- Division of civil works Projects (CWP). 3- Division of Electrical & Mechanical Projects (MEP). 4- Division of Maintenance. 5- and Division of Engineering designs It is a department run by a group of Professional qualified engineers and consultants and in all disciplines that supervise and manage projects and carry out the completion of engineering designs and maintenance. B- Department of Planning & Follow-up 1- Division of development & Research 2- Division of follow-up of projects. It is a department run by a group of academics engineers that carry out the planning for projects and also the development and follow-up of projects and supervise the training courses. C- Department of Safety & Environment: It is a technical department run by a group of highly trained staff that has international certificated in the field of safety and preserving the environment. D- Department of Quality Control & Quality Assurance (QC/QA): It is a department run by a group of professional engineers that have an experience and certificates of experience in the field of quality control & quality assurance (QC/QA). E- Department of cost and feasibility study: It is a department based on the study of the Iraqi markets and feasibility study of projects. F- Department of Logistics: A department supervises the supplying of all projects' supplies from inside and outside Iraq. G- Department Mechanisms and PRODUCTIVE Factories: 1- Division of Mechanisms. 2- In addition, Division of Factories.
A department includes the supervision on the company's mechanisms and its factories.
MSK Group 14
Administrative Structure (Authority): A- Department of Administration: 1- Division of Human Resources (HR). 2- Division of Administrative affairs:2-A Unit of incoming and outgoing, 2-B Unit of personnel. 2-C Unit of Translation. This department carries out the follow-up on all staff and human resources and the supply of staff to projects. 3- Commercial Department: 3-A Division of Purchase (Procurement). 3-B Division of proposals B- Department of Finance: 1- Division of Accounts. 2- Division of Final Accounts. 3- Division of Control and Division of Audit
This division supervises all financial transactions of the company C- Legal Department: 1- Division of Contracts. 2- Division of proceedings (Claims, lawsuits) This division supervises the contracts and legal claims. D- Department of Public relations (PR) and Media. 1- Division of Media This department supervises the Public relations (PR) of the company and supervising the issuance of publications and newspapers by the company
15 MSK Group
5
QA\QC
Quality policy statement: MSK Group is committed to supplying
construction services of consistent quality that conform fully with company and statutory requirements and in meeting our client’s documented and implied expectations in terms of technical, budget and time compliance. We are dedicated to the continual review, development and improvement of all aspects of our business, in particular: • The development and improvement of our construction services in line with client’s needs and expectations. • The development of an efficient and effective Quality System and generally accepted best practices in the management of Construction Projects, a system which not only ensures that the construction quality is consistent, but also helps to ensure minimal wastage in all our construction phases. • The evaluation, training and development of our employees in order to meet the company’s objectives. • The ongoing development of the corporate culture that incorporates constant problem solving and continuous improvement, encouraging all employees to take total pride in, and responsibility for, their work and the development of better working practices. • Establishing and reviewing quality objectives for all levels that are realistic, achievable and measurable taking into cognizance preventive action for outside influences that could prevent the achievement of the objectives. Management will communicate this policy to all employees and staff in such a way that it is properly understood and followed.
MSK Group 16
17 MSK Group
6
HSE Policy Statement:
The long-term business success of MSK Group depends on our ability to continually improve the quality of our services and products while protecting people and the environment. Emphasis must be placed on ensuring human health, operational safety, environmental protection, quality enhancement, and community goodwill. This commitment is in our best interests and the best interest of our customers, our employees and contractors, our stockholders, and the communities in which we live and work. MSK Group requires the active commitment to, and accountability for, QHSE from all employees and contractors. Line management has a leadership role in the communication and implementation of, and ensuring compliance with, QHSE policies and standards. We are committed to • Protect, and strive for improvement of, the health, safety and security of our people at all times; • Eliminate Quality non-conformances and HSE accidents; • Meet specified customer requirements and ensure continuous customer satisfaction; • Set Quality & HSE performance objectives, measure results, assess and continually improve processes, services and product quality, through the use of an effective management system; • Plan for, respond to and recover from any emergency, crisis and MSK Group 18
business disruption; • Minimize our impact on the environment through pollution prevention, reduction of natural resource consumption and emissions, and the reduction and recycling of waste; • Apply our technical skills to all HSE aspects in the design and engineering of our services and products; • Communicate openly with stakeholders and ensure an understanding of our QHSE policies, standards, programs and performance. Reward outstanding QHSE performance; • Improve our performance on issues relevant to our stakeholders that are of global concern and on which we can have an impact, and share with them our knowledge of successful QHSE programs and initiatives. This Policy shall be regularly reviewed to ensure ongoing suitability. The commitments listed are in addition to our basic obligation to comply withall applicable laws and regulations where we operate. This is critical to our business success because it allows us to systematically minimize all losses and adds value for all our stakeholders. 19 MSK Group
7 Risk Assessment Policy The idea of not increasing lifetime risk by more than one in a million has become commonplace in public health discourse and policy. It is a heuristic measure. It provides a numerical basis for establishing a negligible increase in risk. Environmental decision-making allows some discretion for deeming individual risks potentially "acceptable" if less than one in ten thousand chance of increased lifetime risk. Low risk criteria such as these provide some protection for a case where individuals may be exposed to multiple chemicals e.g. pollutants, food additives or other chemicals. In practice, a true zero-risk is possible only with the suppression of the risk-causing activity.
Stringent requirements of 1 in a million may not be technologically feasible or may be so prohibitively expensive as to render the riskcausing activity unsustainable, resulting in the optimal degree of intervention being a balance between risks vs. benefit. For example, emissions from hospital incinerators result in a certain number of deaths per year. However, this risk must be balanced against the alternatives. There are public health risks, as well as economic costs, associated with all options. The risk associated with no incineration is potential spread of infectious diseases, or even no hospitals. Further investigation identifies options such as separating noninfectious from infectious wastes, or air pollution controls on a medical incinerator. Intelligent thought about a reasonably full set of options is essential. Thus, it is not unusual for there to be an iterative process between analyses, consideration of options, and follow up analysis.
MSK Group 20
21 MSK Group
8 SCOPE OF BUSINESS Construction Procurement Engineering Services
MSK Group 22
23 MSK Group
9 Engineering Our design group has the technical and practical experience for designing and engineering by a professional and high experience design engineers group including all speciality such as mechanical , electrical , instruments , civil , HSE , chemical and processdesign . All design works shall be according to the dependable standards from ( API , ANSI , ASME , and HSE requirements ) . Our design experience in oil and gas design include but not limited the followings : -Pipe line design ( flow line , trunk line , water pipe line , compressed gas pipe line ) -Crude oil manifolds ( field manifold , production manifold , test manifold ) -Industrial and drinking water systems . -Crude oil floating roof and fixed roof tanks ( flow wash tank , storage tank , fire fighting tanks ) according to standard API 620 and API 650 . -Fire fighting system according to NFTA standards . -Pig launcher and receiver design . -River , railway , rods , cable and pipes crossings . -Over all degassing station design -Pumping system design -Cathode protection design -Electrical design ( power , lighting , load calculation ….etc. ) -Process design and calculation according to hisses and gipsa … etc. ) -Civil design for roads , buildings , bridge , earth work ….etc. ) -Instrumentation with pneumatic system ,scada , tv camera , electronic system , …etc Our
MSK Group 24
design works shall be done by the followings programs : - 2 D , 3 D Auto cad, Mech. Cad - Auto plant - Penalty - Cesar II - E- tank - Sketch up - Primavera - Microsoft project management - Microsoft office - Etc.
25 MSK Group
10Procurement Policy Statement It is MSK Groups’ ambition to work on lasting relationships with a selected number of construction partners, in which entrepreneurship and specific knowledge in the field of product, market and process are leading. The making and implementing of the right choices in this are the success factors of the procurement policy. Within decentralisedorganisational structure, the procurement column is organisedin accordance with the coordination principle. No choice has been made for either centralised procurement or decentralised procurement. The level at which to pursue strategic procurement processes is determined for each sub-segment. The MSK Procurement model can therefore be best qualified as a 'coordinated' approach. The benefits of scales of economy are derived by pursuing procurement activities in such a manner
MSK Group 26
that, on the one hand, local management retains the flexibility and control of its processes and, on the other hand, the entire MSK Group organization enjoys the quantitative and qualitative economies of scale. Due to the nature of the sector in which MSK Group is active, primary processes focus on obtaining and completing projects in as efficient and effective a manner as possible. Accordingly, procurement activities should share this focus. As many projects pursued within and outside a specific region or by an operating company, respectively, have shared procurement segments and processes, combining them can generate substantial and structural procurement economies of scale. This applies to supply/equipment supplies, subcontractors, suppliers involved in the supporting facility management process and intra-organisational sup
27 MSK Group
11 Construction
MSK Group 28
29 MSK Group
Pipe line -All works shall conform to the scope of work, SOR .specification approved for construction drawings, data sheets, technical standards, codes and technical specifications - Time schedule and organization chart for our work. - Site Survey works and marking. - Right of way. Clearing and grading - Piping transportation and stringing. - Trenching (Excavation of pipeline ditch according to the design requirements and backfilling with clean soil). - Main roads, secondary roads, and earth roads, railways, small river crossings according to the cross section mentioned in the drawings (API-1102) - Reinforced concrete of pipelines weighting and slabs for Mechanical protection. - All civil works relevant to cathodic protection. - Civil works relevant to terminals, tie-ins, including scraper traps - Preparing the welding procedures (WPS) and procedure qualification records (PQR). - Welders qualification. - Pipeline sections Welding activities (750- 1200) meter / section - NDT - Pipeline lowering & backfilling. - Tie-in welding - Cathodic protection system installation (option) - Pipeline lowering using side booms and roll cradles. - Tie –in welding - Joint coating and repairs of coating or any damage caused to Line pipes during installation - Pig Launching and receiving installation. - Valve station installation (piping, valves, and supports). - Well head connections. - Hydrostatic test preparation (test headers manufacturing, cleaning, filling, dewatering & water supplying) - Pre-commissioning and provide assistance during Commissioning as part of the Commissioning Team - As-Built drawing. MSK Group 30
31 MSK Group
Pipe Line
MSK Group 32
33 MSK Group
Pipe Line
MSK Group 34
35 MSK Group
Pipe Line MSK Group 36
37 MSK Group
Trunk line
MSK Group 38
39 MSK Group
Flow line
MSK Group 40
41 MSK Group
Water Injection And Water Treatment Station
MSK Group 42
43 MSK Group
PIPING
Carbon Steel Stainless Steel Alloy Steel Low-Temperature Alloy Steel GRE pipe
MSK Group 44
45 MSK Group
MSK Group 46
47 MSK Group
MSK Group 48
49 MSK Group
Tanks
Presentation for erection badra tanks 1- Done designs for all the tanks and according to stander ( API650) 2- Manufacture of materials according to drawings and transported to the work site 3- Completion of civil works and reservoir Included foundation& cathode protection 4-Mechanical works included a -Install annular plats& Bottom plats ,Equipment's used (Crane, forklift, welding machine(manual &auto)) Examination( Visual test ,XRAY, Vacuum test) b – Install first course &make fit up& welding for V joint, Equipment's used (Crane, forklift, welding machine ,tools) Examination ( Visual test ,XRAY ,plumpness, Peking ,reduce, penetration test) c- Manufacture Temporary support for floating roof in the work shop of the company(MSK) and Install from inside tank. Examination(level by Surveyor) d- – Install 2nd course &make fit up&welding for V joint, & H joint, Equipment’s used (Crane, forklift, welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking, banding , penetration test)
MSK Group 50
e- Install bottom deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding machine(manual &auto ) ) Examination ( Visual test , Vacuum test ,). f—Install structure roof &make fit up &welding. Equipment’s used (Crane, welding machine, chin look) Examination ( Visual test ,leak test ,) g- Install top deck &make fit up &welding for floating roof. Equipment’s used (Crane, welding machine(manual &auto ) ) Examination ( Visual test , pneumatic test ,). h- Install (3th ,4th.5th.6th .7th .8th course )and make fit up& welding for V joint, & H joint, Equipment’s used (Crane, forklift, welding machine(manual &auto) Examination ( Visual test ,XRAY ,plumpness, Peking, banding , penetration test) i—Install shell Nozzle& roof Nozzle &make fit up &welding. ) Examination ( Visual test , pneumatic test,) k-Install accessories (stairway ,Rolling ladder ,Guide pool, walkway ,Top angle .Roof drain system) . Equipment’s used (Crane, welding machine ,lift Man ) l- Hydrostatic test for the tank.
51 MSK Group
MSK Group 52
53 MSK Group
Tanks
MSK Group 54
55 MSK Group
MSK Group 56
57 MSK Group
Civil Work CIVIL ENGINERING CATEGOREIS: A STRUCTURAL ENGINEERING 1-CONCRETE STRUCTURES 2-STEEL STRUCTURES 3-COMPOSIT STRUCTURES 4 - HYDRAULIC STRUCTURES Pipe Rack Foundation - Tank Foundation - Pipe Support Foundation - Steel Structure Foundation - Equipment Foundation - Light pole Foundation - Under Ground - Steel Structure Construction - Manhole's , Valve Pit , ETC … Pipe Support Foundation - Steel Structure Foundation - Light pole Foundation - Under Ground - Manhole's , Valve Pit , ETC
MSK Group 58
B- GEOTECHNICAL ENGINEERING 1 -SOIL ENGINEERING 2 -FOUNDATION ENGINEERIN ( RAFT , STRIP , DRIVEN PILES , POUR PILES ) C HIGHWAY AND BRIDGES ENGINEERING 1- HIGHWAY ENGINEERING 2- BRIDGES ENGINEERING 3- TRAFFIC ENGINEERING D- IRRIGATION ENGINEERING E- SURVEY ENGINEERING F- PROJECT MANGEMENT ENGINEERING G- SANITARY AND ENVIRNOMENT ENGINEERING
59 MSK Group
driven piles installation
Civil Work
raft foundation
MSK Group 60
61 MSK Group
MSK Group 62
63 MSK Group
MSK Group 64
65 MSK Group
Oil and gas processing MSK-GROUP have the experience to erect Various types of oil and gas stations as follows:
• Degassing station
We have experience in the erection and installation of the stations that separates crude oil and associated gas, where we have the potential to erect large separators (Dry oil banks and wet oil banks installation, Salt processing units, Manifolds fabrication and installation) , rotating machines , pipe fabrication works, electrical works and instrumentation works and also we can do the precommissioning, commissioning and startup .
MSK Group 66
• Gas compressor station
We have the capabilities and expertise accumulated sufficient for the execution of the construction of gas compressor stations (after the completion of the degassing and drying process) and includes the erection of Gas compressor , Gas blower, Gas air cooler assemblage and installation, Piping fabrication and erection , Pumps installation and flare Sticks unit installation
67 MSK Group
• Gas treatment unit (GTU)
Also we carry out the construction of dehydration gas stations, where we have the necessary manpower’s and equipment to implement all the electrical , mechanical and instrumentation works(PLC ,SCADA systems ). Where the works included the following systems • TEG- Gas contactor tower installation • TEG reboiler installation • TEG air cooler installation • Vessels installation • Piping fabrication and installation • Pumps installation • Flare Sticks unit installation
MSK Group 68
• Also we have the expertise for construction the following stations Where we have the human resources and equipment necessary for the implementation of the various stations that are used in the field of industries of oil , gas and energy, as follows • Waste Water Treatment unit • Pigging Station • Pumping Station • Water injection Station • Slug Catcher • Water Treatment Unit
69 MSK Group
Well Head
The scope of MSK services in this part consists of provision of tools, equipment and personnel of Wellhead Services to provide the operations and services of the wellhead equipment installation and maintenance as per Company specifications and contract requirements. MSK could be capable of handling Operation at least on 3 Rigs at the same time. Such applications of these services are rely on one or more of the following features: • Repair and services Gate valves, X-mass tree Valves. Included but not limited to Changing Gate, Seat, o-ring, gaskets, packing, lubricant and so on. • Check & Inspect Spool, fully connect Gate valves on spool side outlets. • Fully Install Spools and tree on position and fully tighten nut & bolt. • Set & remove the VR-Plug in/from spool. (Zero pressure & under pressure operation.) • Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before welding casing head housing • Pressure Test Welding area on Casing Head Housing • Check and preparing Casing slips and seal assembly • Set Casing slips & seal assembly on position. • Supervise Measuring, Cut, Beveling & smoothing the Casing Neck before installing Casing & Tubing Spools • Supervise Measuring, Beveling & welding casing for Extend Old Casing neck • Verify that the pack-off seals are the correct size for the equipment and casing being run. Record the stock number and serial numbers • If the seal assembly is installed in the wellhead equipment. Remove it and inspect the seal holding pocket. Verify that the seals are the correct size for the casing being run and reinstall them. • Injecting and testing of isolation seals energized with sealant for all Casing & Tubing Spools and X-Mass tree Bonnets. • Recovery of sealant for m-install of wellhead equipment. • Check and preparing to Work Tubing Hanger • Inspect the seal pocket of tubing hanger bonnet to be clean and free of gouges or scars. Clean the test port and control line ports to be free of debris. • Drift the X-Mass tree with the BPV. • Rabbit the tubing hanger and any sub to be used. • Set a BPV in the hanger to check the socket. MSK Group 70
• Fully retracted the lockdown screws and guide screws on the tubing head spool • Run in all the lockdown screws making sure they go in 3 to 4 turns before contacting the hanger • Set the BPV through the rotary table. • After BOP Nipple-down, Clean off the hanger mandrel, set seal ring or ring gasket in position, disconnect the excess control line from the top of the nipple or remove the pipe plug whichever was used. Fill the tubing spool bowl with test fluid. • Thoroughly clean the tubing bonnet and pick up the tree in as straight a position as possible. Carefully land the tree onto the tubing hanger • Make up the connection fully • Remove the BPV • Provision of reports: • Detailed Wellhead and X-Mass tree Equipment Technical report • Detailed chronology of operations, • Analysis of technical difficulties encountered, • Inventory list of products and-consumables consumed and remaining on the worksite, • post analysis of any equipment failure or services non-conformance,
71 MSK Group
EQUIPMENT INSTALLATION
MSK Group 72
73 MSK Group
HDD & BORING
Boring machine from 6” to 16” one set. Boring machine from 16” to 24” one set Boring machine from 24” to 36” one set
MSK Groups known as the first Iraqi Private Company that established HDD Techniques in Iran. We have completed lot of River Crossings and pull back 12 inch Up to 40 inch Pipes by HDD Method Successfully Our company focus to use only certify equipments & lifting accessories during HDD & Boring work according to international standards and client requirement. All equipments with inspection certification from
MSK Group 74
international third party companies. boring machine with valid inspection certification. sideboom with valid inspection certification. excavator with valid inspection certification.
HDD machine from 6” to 24” one set. HDD machine from 24” to 36” one set HDD machine from 36” to 56” one set
lifting accessories with valid inspection certification. webbing sling Chackles. Steel wire rope.
75 MSK Group
instruminet Control system works, Design ,maintenance, repair . As we know the control system have two branch's : The first one is the electronic part ,which that deals with electronic equipment's such as PLC ,CONTROLER , INDECATORS ,MONETORING SYSTEMS ,‌ And most of these equipment's fitted inside control rooms buildings The second one is the mechanical part , such as controlling equipment's "valves, mechanical level controller ,pressure regulators , transmitters,‌
Our jobs : DESIGN : Design controlling system for all process by using high technical methods ,and in simples why ,also with high performance and reliability. Maintenance: Of our priorities in maintenance that do all work under safety regulations ,precision at work ,respect the time. MANAGEMENT PROJECTS: Management and run all projects with specialist team "technician & engineering" All team work under high efficiency and experience Adherence to safety standards.
MSK Group 76
77 MSK Group
Electrical Work
ELECTRICITY IS ONE OF OUR SPECIALITIES Electricity: Our company is well known in the field of Electricity for constructing, testing and commissioning of generation, transmission and distribution of sub-station and power networks. The staff of expert engineers and well trained technicians is capable of conducting excellent projects management and accurate performance of maintenance schedules ELECTRICITY: TRANSMISSION: Construction, Testing and commissioning of Power Transmission Networks (400-132 Kv) Substations and Power Lines. DISTRIBUTION: Construction, Testing and commissioning of Distribution Networks including 33/11 Kv Sub-Stations with 33, 11Kv Power Lines. LV PANNELS: Construction of LV Power and Control Panels.
MSK Group 78
79 MSK Group
Cathodic Protection A fully comprehensive service is offered in the field of Cathodic Protection (CP).The Company is committed to designefficient, cost effective cathodic protection systems MSK- provides the following services: • System analysis and design • Terrain (Soil) Conductivity Surveys for Well Casing Cathodic Protection Design • Impressed current system design, installation and commissioning • Sacrificial anode system design and installation • Survey, design & commissioning services for conventional pipeline systems and potential surveys. • Cathodic protection in hazardous environments. • Cathodic protection of reinforced concrete structures. • Evaluation of existing Cathodic Protection System and development of comprehensive CP retrofit. • Provision of specialised pipeline survey techniques and interpretation of results. • Turnkey cathodic protection systems. • CP Design of process plant, storage tanks and large diameter pipelines. • Monitoring and maintenance services on new or existing pipelines.
Cathodic Protection Materials: • Material supply includes: CP Rectifiers (Oil Cooled, Air Cooled-Single Phase Three Phase) Junction Boxes (Aluminum, Stainless Steel & Fiber Glass),Test Stations, Loresco Back Fill, Impressed Current and Sacrificial Anodes, CP Cable and Remote Monitoring System
MSK Group 80
SCADA SYSTEMS
SCADA application in petrochemical industries • Tank Management systems • Blending Control • Industrial water and waste water treatment
SCADA Water Solutions
System Management and Optimization • System-wide integration (multiple plants) • Enterprise historian and report generator • System-wide asset manage¬ment and reliability programs • Interface to LIMS, CMMS, GIS, CIS/FIS, plant security systems, and design database Plant Controls and Monitoring Systems • Distributed control system (HMIs, controllers, network, etc.)
• Plant historian and report generator • Electronic documentation • Integration with other systems and intranet/Internet • Fieldbus solutions (HART, Foundation fieldbus, PROFI¬BUS, DeviceNet, etc.) • Simulation • ControlWave RTUs and PLCs Simulation • First-principle simulation • Algorithmic simulation • Tie-back simulation Equipment Condition Monitoring • Online/portable vibration monitoring • Motor diagnostics • Infrared thermography • Laser alignment/balancing • Oil analysis Intelligent Device Management • Health monitoring • Calibration • Configuration • Audit trails Intelligent Field Devices • Pressure, temperature, flow, and level transmitters • Liquid/gas analyzers • Valves and valve actuators Electrical and Auxiliaries • UPS, Power conditioning, and distribution • Motors • Couplings • Gear reduction drives • Backup power generators
81 MSK Group
Maintenance
MSK Group 82
83 MSK Group
Testing NDT Testing NDT Visual and Optical Testing (VT) Penetrant Testing (PT Magnetic Particle Testing (MT. Electromagnetic Testing (ET) or Eddy Current Testing Radiography (RT Ultrasonic Testing (UT Acoustic Emission Testing (AE Leak Testing (LT Hydro test Conducted according ASME, API, ASTM and ANSI
MSK Group 84
85 MSK Group
12
WORKING AS JOINT VENTURE
Cementing Services • • • • • • •
Cementing and acid treatments job design, Cement slurry design, developing and testing, Cementing jobs, Acid treatments jobs, Cementing and acid treatments operation parameters monitoring and recording Cement plugs, All types of pumping works.
Mud logging In the framework of our Logging-Service, we perform the classical Formation-Logging Service for the continuous geological maintenance, documentation and storage of the drilled geological formations. The recording of the drilled geological formations is essentially based on cuttings and on recovered cores. A drilling fluid gas monitoring service and a drilling progress measurement device (ROP) are deployed if required. If a further on-site processing is required, our Drilling-Monitoring-System with extensive software is available. Formation-Logging Service Depth corrected or lagged sample recovery, sample preparation and processing, the litho logical analysis and the stratigraphic field definition of the samples are the basis of the documentation of the results. The samples are prepared, labeled, either unwashed (in plastic sample bags) or processed (dry samples in glass sample tubes or paper envelopes) and stored.
Further possible tests: • for shows of oil by the use of UV light • automated electronically analysis of the calcite/dolomite ratio (see GeoCalcit • Electronically determination of the cutting/shale density • potassium monitor • Core handling: description, photographic documentation (reflected and transmitted light e.g. salt cores), core sample preparation (e.g. waxing), logistics • Continuous graphical documentation in the form of a mud-log (SamplerLog/LithoLog) • Creation and transmission of reports by E-Mail or other means to the client and the clients’ offices. • Immediate reporting of geological and drilling technical irregularities and their documentation. • Separation, preparation and storage of sample material for further laboratory analysis according to the instructions of the client. • Competent core retrieval, cleaning and oriented storage in core boxes including complete labeling and description. • Photographic documentation of the core runs in reflected and transmitted light: classic or digital. Development, reproduction and storage according to the instructions of the client. MSK Group 86
87 MSK Group
13 Line Item N.
OUR EQUIPMENT Equipment Description
1
Tower Crane
2
Mobile Crane 25 Ton
14
3
Mobile Crane 50 Ton
8
4
Mobile Crane 100 Ton
2
5
Crawler Crane100 Ton
2
6
Diesel Generator 50 KVA
60
7
Electric Welding Set
300
8
Diesel Welding Set
140
9
Fork Lift Truck
20
10
Excavator
50
11
Dump truck
30
12
Backhoe/ Loader
14
13
Sheepfoot Roller
10
14
Vibrating Roller
12
15
Roller
16
16
Plate Compactor
14
17
Air Compressor
20
18
Grader
16
19
Clamp Bending Machine
6
20
Automatic Submerged Arc Welding Machine
20
21
Semi Automatic Gas Shielded Welding Machine
40
22
Manual Welding Machine
300
23
Asphalt Plant Unit
4
24
Concrete Batching Unit
10
25
Spreader
20
26
Boom Truck
30
27
Water Pump
40
28
Bus
20
29
Manhaul Truck
6
MSK Group 88
2
Qty.
30
Jack Hammer
8
31
Spray Painting Machine
10
32
Core Cutting Machine
8
33
Grit Blasting Equipment incl. compressor
20
34
Concrete Vibrator
8
35
Pick-Up Truck - 1/2 Ton 4x 2
20
36
Pick-Up Truck - 3/4 Ton 4x 4
40
37
Dump Truck - 15 C.M.
8
38
Dump Truck - 20 C.M.
10
39
Tractor Unit - 4 x 2
20
40
Water - 3800 Liters with Pump (1,000 GAL)
8
41
Water - 22700 Liters with Pump (6,000 GAL)
8
42
Vacuum - 22700 Liters (6,000 GAL)
6
43
Flatbed - 50 Tons with Tractor
8
44
Lowboy - 80 Tons with Tractor
6
45
Lowboy - 100 Tons with Tractor
4
46
Dolly, Pipe
6
47
Bobcat
14
48
Cat D8 or Equivalent
8
49
Cat D9 or Equivalent
6
50
Cat with Rock Drill
8
51
Trench Roller - Self Propelled - 2 Tons
2
52
Vibratory Roller - 10 Tons
6
53
Vibratory Roller - 20 Tons
4
54
Sheepsfoot Roller 2 x 60”
4
55
Barber-Greene (or equal) Asphalt Layer 10 ft wide
2
56
Road Brush - Self Propelled
6
57
Line Marker - Self Propelled
2
58
Asphalt Cutter
6
59
Steel-Wheeled Roller
8
60
Road Grader
8
61
Flat Bed Trailer 25 ton with Prime Mover
20
62
Low Bed Trailer 50 ton with Prime Mover
10
63
Flat Bed Truck 5 ton
20
64
Flat Bed Truck 10 ton
18
65
Truck 5 ton with Hiab Crane
20
66
Truck 15 ton with Hiab Crane
6
67
Overhead Line Bucket Truck
8
68
10 Ton Tipper Truck
40
69
25 Ton Tipper Truck
20
70
Hydrotest Water Tank
6
71
Feeding Pump 300m³/hr 5 barg
8
72
Filling Pump 210÷300m³/hr 40÷45 barg
8
73
Filling Pump 100÷200m³/hr 40÷45 barg
8 89 MSK Group
74
H. P. Pump 200 l/min 300 barg
8
115
Beveling machine
4
75
H. P. Pump 100 l/min 300 barg
8
116
Hydratest pump
6
76
H. P. Pump 30 l/min 300 barg
8
117
handy hydraulic test pump
8
77
H.P. Test Headers
6
118
pipeline filling pump
4
78
Cleaning Filter Set (400÷600 m³/hr)
4
119
Protable Air compressor
5
79
Hydrotest Equipment Set
8
120
Air paint spraying machine
2
80
140 cfm Compressor
20
121
HP Air paint spraying machine
4
81
250 cfm Compressor
20
122
Internal Clamp
8
82
350 cfm Compressor
16
123
Fuel Tanker
3
83
750 cfm Compressor
8
124
clamp ammeter
5
84
1200 cfm Compressor
4
125
pressure gauge calibrator
19
85
Air Dryer Equipment
8
126
Concrete Plant
12
86
Vacuum Drying Equipment
8
127
Truck mixer
16
87
Induction Heating Seat
30
128
Shovel
6
88
Induction Coils
14
129
Compactor
7
89
Propane gas heating set
8
130
Pickup 1 & ½ Tons
40
90
Wheel Tractor 4 x 4
40
131
Grader machine
8
91
Tow Tractor Cat D6 or equivalent
12
132
Cutting machine
6
92
Tow Tractor Cat D7 or equivalent
8
133
Total station machine
18
93
Motor Welding Machine 400 amp
140
134
Casting machines
4
94
Electrical Welding Machine 400 amp
200
135
Concrete pump machines ( 24 – 40 M )
4
95
Pay welder 1 holder
20
136
Bend & cut steel bar machines
20
96
Pay welder 2 holder x Automatic Weld/System
10
137
Generator 100 KVA
18
97
Pneumatic Internal Clamp 6”÷16”
6
138
Sand, Gravel and Sub-base Plant
2
98
Pneumatic Internal Clamp 18”÷28”
6
139
Asphalt Plant
2
99
Pneumatic Internal Clamp 30”÷40”
6
140
Bulldozer D8
4
100
Cut & Bevelling machine
8
141
Wheel Loader ( shovel )
8
101
Auger Boring/Pushing machine or equivalent
4
102
External Line Up Clamp
20
103
Pipe Bending Machine 38”÷48”
2
104
Pipe Bending Machine 16”÷30”
6
105
Pipe Bending Machine 6”÷20”
4
106
Pipe Facing Machine 32”÷48”
2
107
magnetic cutting machine
4
108
mobil AC ARC weding machine
20
109
inverter welding machine
6
110
plasma cutting machine
8
111
semi Automatic cutting machine
6
112
magnetic drilling machine
2
113
Radial drilling machine
2
114
Bench drilling machine
3
MSK Group 90
91 MSK Group
OUR Projects 2012-2013
8
9
No. Project name 1
2
3
4
5
6
7
MSK Group 92
Pipe line 48 inch 75 Km
Pipe line 32 inch 45 km
Pipe line 18 inch 100 km
Tanks
Tanks degassing station 5
Work Shop Fabrication
Camps
Work location
CLEINT
Baghdad
Ministryof electricity
Baghdad
Ministry of electricity
Basra
Basra south Rumaila
Basra north Rumaila
Basra WQ1
Basra south Rumaila
SOC
CPECC-BP
CPECC-BP
Exxon mobile
CPECC and SOC
Validity& CONTRACT VALUE Continue
COMPLETED
ON GOING
COMPLETED
COMPLETED
Continue
COMPLETED
10
11
12
13
14
15
16
17
Supply Equipment>s& Maintains
Badra OIL Filed
GAZPROM
Continue
Camps
Nasiriya- Thiqare
CPP
COMPLETED
FLOW LINE &Trunk Line
MisanHalfaya
CPECC
COMPLETED
CPF2
Misanhalfaya
CPECC
Continue (Start work )
CPF ll
Al-Ahdab Oil Filed
CPECC
Continue
Water injection 2
Al-Ahdab Oil Filed
CPECC
COMPLETED
Trunk lines
Al-Ahdab Oil Filed
CPECC
COMPLETED
FLOW LINE
Al-Ahdab Oil Filed
CPECC
COMPLETED
Gas station
Al-Ahdab Oil Filed
Civil work tanks foundation
Al-Ahdab Oil Filed
CPECC
CPECC
COMPLETED
Continue
93 MSK Group
18
19
20
21
22
23
24
25
26
27
28
MSK Group 94
Water line 20 inch GRE35 km
Al-Ahdab Oil Filed
CPECC
COMPLETED
DiyalahRiver crossing pipe
Baghdad
Ministry of electricity
Continue
Tank for Ahdab filed
Al-Ahdab Oil Filed
CPECC
COMPLETED
Road 18 km O.G.M
Al-Ahdab Oil Filed
CNBC
COMPLETED
PIPE Line 32 inch 53 KM
Bazirgan oil filed
CNOOC
ON Going
PIPE Line 32 inch 9 KM
Halfaya Oil Filed
CPECC
ON Going
PIPE Line 28 inch 9 KM
Halfaya oil Filed
CPECC
ON Going
SERVISE ROAD
BADRA OIL Filed To Garrf GAZPORM-CPP Oil Filed
Continue
CIVIL WORK and R.W
Garrf Oil Filed TO PS2
PETRONAS-CPP
Completed
CONSTRUCTION 9 Tanks
Badra Oil Filed
Petrofac
Completed
Piping
Badra Oil Filed
Petrofac
Completed
29
30
31
32
Civil work CPF
Badra Oil Filed
Petrofac
Completed
CPF 2
Al-Ahdab Oil Filed
CPECC
ON GOING
Construction 3 Tanks
BADRA OIL Filed
SAMSUNG
ON GOING
Piping ,Steel Structure, Equipment installation
BADRA OIL Filed
SAMSUNG
ON GOING
95 MSK Group
MSK Group 96
M
GRO
UP
SK
OIL SERVICE
MSK Group
Email:info@msk-group.org abdullah@msk-group.org qusay@msk-group.org Tel: 009647801977860 009647801977859 website: www.msk-group.org www.msk-iq.com
MSK Group 98
MSK Group Iraq Office HQ:Baghdad -Al-Kradah -Al-Jadreah Al-Basrah-Al-Jziaer Wassit-Al-Haydreah Irbeal-St.100 UAE -Office Ajmain - Free Zone