Intertidal Mediations
Jimmy Ta Yaxin Zhao Kai Zhu Architectural Association MSc Landscape Urbanism 2017-2018
Landscape Urbanism 2017-2018
Negotiating Nautical Territories
Google Earth Satellite Image Altered by J. Ta
Intertidal Mediations Negotiating Nautical Territories
Jimmy Ta Yaxin Zhao Kai Zhu
Directors Alfredo Ramirez Eduardo Rico Studio Master Clara Oloriz History and Theory Tutor Douglas Spencer Technical Tutors Andrew Barkwith Claudio Campanile Elena Longhin Giancarlo Torpiano Gustavo Romanillos Vincenzo Reale Acknowledgements
Thank you to the Landscsape Urbanism tutors and AA staff. In addition, we thank all collaborators, family, and friends who supported us through out the year: Plymouth University | Gillean Glegg Gregorio Iglesias Jon Miles Olivia Wilson Plymouth Fisheries | Mark Heslop Family and Significant Other | Ann Truong Ta, Zhao, Zhu Family
Architectural Association School of Architecture Landscape Urbanism 2017-2018
Abstract The project focuses on the Tamar Estuary, located in Plymouth, a coastal community south west of England that strives for marine tourism. In response to marine tourism, Plymouth intends to expand its primary industry by proposing a national marine park. However, the existing fishing industry is slowly being forgotten by absence of a developed marine spatial planning and a lack of space along the coastline. Intertidal mediations examine the development of coastal communities, cities located along the coast, in the United Kingdom. Many of these cities have a primary mode of production such as marine tourism, fishing, wind farming, agriculture, etc. As the coastal communities develop, natural resources are exploited through the means of mode of production (Cosgrove 52). However, the exploitation of natural resources, in this case the sea and coastline, provides a conflict between the different actors, creating competition for marine real estate. The marine resource in the United Kingdom are competed for along the coastline. There is a disproportion of coastal ownership and development. Disproportion of coastal economies are due to the lack of a developed coastal and marine spatial planning. Many of these communities are focusing on primary mode of production without the alternative means of economic balance. The project looks specifically at the intertidal areas in Plymouth, which provides an opportunity to expand into other industries while accommodating for the existing fishing community and a future national marine park. The research looks at redefining marine management by informing a design policy that influences the decision making of today’s marine spatial planning. Through various tests, the project looks at physical and digital techniques that informs a diverse landscape that allows for diverse economic prosperity. Through the role of a designer, the deployed techniques include interactive mapping and physical low tide simulation model to assist design decision internally, but not limited to internal use. Through careful case studies, the project seeks to utilize structures at the architectural scale to better inform the development of diverse marine use at the intertidal areas within Plymouth. This scale can be extrapolated at multiple scales to better inform decision making amongst the local actors. Through various scenarios, the project works through the variable of time: economic fluctuations, constant changing of tides, sediment accumulation and eroding processes.
01
Contextual Boundaries
10
02
Competitive Quay
18
Intertidal Composition
30
03 04
Prologue Fish for Thought Maritime Limits New Economic Foundation Social Formation Britain’s Ocean City Plymouth Fisheries First National Marine Park Marine Spatial Planning Conflicting Nautical Quays Geomorphology
Historical Development Coastal Environment Tamar Estuary Ecology
Nautical Translocation
Territorial Formation
38
Furher Quay Development New Economic Foundation Inform Design Policy Case Study | Tollesbury Fish Production Vessel Storage
05 06 07
Digital Articulation
Technical Report
58
Nautical Negotiation Creek Environment Simulation Physical Creek Simulation
Tributary Agglomerations 102
Cartogenesis
Millbrook Intertidal Areas Existing Intertidal Estuary and Potential Model Explorations Tide Conditions Tributary Recongfigurations
Collective Creek Formations
118
Manufactured Grounds
08
Techtonic Manipulations Evaluation of Territory Vertical Materiality Vertical Sequence and Archetypes Evolutionary Scenarios Intersecting Archetypal Grounds
Adaptive Nautical Management Cartogenesis Epilogue Figures List Works Cited Contact Information
150
Contextual Marine Politics Fish for Thought
01
<Plymouth Fisheries> United Kingdom Plymouth
Maritime Limits <Lack of Marine Management> United Kingdom
New Economic Foundation <The Blue New Deal> United Kingdom
Conflicting Interests
Existing and Projected Conditions Competitive Quay
02
<Social Formation> Plymouth
How is it impacting the physical conditions?
Intertidal Composition
03
<Geomorphology>
Digital Methods
Tamar Estuary
Future Scenario | Lack of Management
Nautical Translocation
04
<Territorial Formation> Plymouth
Develop understanding of site conditions in various scenarios
Social Conflict
05
Digital Articulation <Technical Report>
Intertidal Mediations
Dynamic Tool Development | Negotiating between different actors
Redefine a role of a Designer | Marine Management at varying scales and time constraints
8 Drawing by J. Ta
Design Methodology Process and Reflections Varying Scales
In the diagram below, the project examines the existing conditions of Plymouth and its surrounding context. In contextual boundaries, the chapter 1 explores the limitations of Plymouth fisheries, marine management, and New Economic Foundation. By understanding the wider contextual influences in the United Kingdom, Plymouth is affected by the existing and projected site conditions, seen in chapter 2 to 4. The project then explore digital techniques to negotiate among the stakeholders in chapter 5, familiarize with existing creek formations and utilize creek formations in chapter 6, develop along creek formations in chapter 7, and deploy technique at multiple scales in chapter 8. This process is a way of redefining a role of a designer to take decisions at a top down approach.
Site Specifics 06 Tributary Agglomerations
Site Selection | Actor Negotiations
<Cartogenesis> Millbrook Creek
07
Collective Creek Formations <Manufactured Grounds> Tidal Creek
Extrapolate to Multiple Scales | Inform Design Policy
08
Adaptive Nautical Management <Cartogenesis> Tamar Estuary
Landscape Urbanism 2017-2018
Materialize Formations | Architectural Scale
9
Contextual Boundaries
Intertidal Mediations
Prologue
01| Contextual Boundaries The project examines the existing economic opportunities and management in Plymouth, United Kingdom. Plymouth, claims to be Britainâ&#x20AC;&#x2122;s Ocean city, celebrates its marine heritage with many marine activities ranging from marine recreational activities to local fisheries. The city thrives on the varying economies, primarily in marine tourism. Although with the cityâ&#x20AC;&#x2122;s success in marine tourism, the city and as a country currently lacks a developed marine spatial management, equivalent to spatial planning for land. By lacking the ability to manage the cityâ&#x20AC;&#x2122;s sea and coastal areas, the city plans to propose a national marine park, discussed in chapter 2, thus relying on a primary economy without relying on alternative economies. Additionally, the project works with a non-profit organization, New Economic Foundation, examining the need for a diverse economy to allow for coastal communities to be resilient by balancing the varying mode of production. As seen in the drawing above, the existing fishing industry plays a big role within the community and the interaction along the English Channel as a natural resource.
Drawing by J. Ta | Plymouth Fisheries Photograph by J. Ta | Sutton Harbour 2018
Landscape Urbanism 2017-2018
Prologue
11
Fish for Thought Plymouth Fisheries | Main Hub Plymouth
Plymouth plays a big role in the fishing business within the United Kingdom. This is an underappreciated industry and the United Kingdom takes a big role in this economy. Since Plymouth is the main fish market hub in the south west, the city supplies fish throughout the entire UK. This will be further discussed in chapter 2. Fish is important the United Kingdom. In the larger scale of the fishing industry, more than half of the fish in the United Kingdom are exported outside of the country. While most UK consumed fish are imported mostly from the European Union. The global economy plays a role in the territory it faces with the fishing policies and maritime boundary limits (Carpenter 4). As the mode of fish production increases, the economy plays a role in shaping the territoriality of the economic sea boundaries (Elden 800). Through capitalistic interests, nautical boundaries are drawn to define where fishermen can go. The fishing industry is a complex system with different quotas for each fish and different exclusive economic zones. Most of the fish caught in the United Kingdom exported to a foreign country, approximately 76% (Carpenter 4). Since the seas have economic exclusive zones, EEZ, fishermen throughout Europe and United Kingdom fish in the same EEZ and 12 nautical mile sea limit boundary. By allowing the fish vessels to catch seafood in the same boundaries, European Union and United Kingdom are able to share the allowable catches by trading amongst each other(Carpenter 18). However, Brexit plays a role of gaining British seas all for themselves. This notion of British seas lead to a surplus of fish since Britain does not have enough existing fish infrastructure to process all fish for trade. This stems into negotiating territorial seas between European Union and the United Kingdom. The imports and exports are currently exhibiting insufficient middlemen management in the fishery business. The territorial sea conditions begin to influence the supply and demand of the market, thus creating inefficient movement of fish from one facility to another.
[Figure 1.1 - Plymouth Fisheries Website]
Intertidal Mediations
[Figure 1.2 - Plymouth Fish Market]
Photograph by J. Ta | Fish Equipment
12 Drawing by J. Ta
Meters
Landscape Urbanism 2017-2018
NTS
Fish for Thought
N
Maritime Limits Lack of Marine Management United Kingdom
Currently, marine spatial planning is in the beginning phase of development in the United Kingdom. There is a lack sea planning strategy that rivals the equivalent land planning. As of now, marine spatial planning is composed of layered geospatial data. The database is static and does not respond well to a changing landscape. As shown in the drawing to the right, marine spatial planning is zoned in arbitrary drawn lines without considering the fluidity of the marine landscape. A need for a better marine plan is discussed in chapter 2. With the lack of marine management, there tends to be a disproportion in economic development in marine areas.
Intertidal Mediations
[Figure 1.3 - Government Website/Marine Planning]
[Figure 1.4 - Marine Management/Marine Spatial Planning]
14 Drawing by K. Zhu
North East Offshore
North East Inshore
East Offshore East Inshore
South East Inshore
South Inshore
South Offshore South West Inshore
South West Offshore
New Economic Foundation The Blue New Deal United Kingdom
The project further coordinates with a non-profit organization, New Economic Foundation, to develop a more resilient coastal community. Many coastal communities rely on a primary economic strategy, which lends itself to instability and unhealthy local economy (Belata 9). The team coordinated with the organization to understand the importance of a diverse economy and understand the need of stakeholders. Various stakeholders are left forgotten due to the incremental development of coastal communities, such as local fishers in East Sussex, Grahamâ&#x20AC;&#x2122;s story to build a better coastal community (Belata 32). The New Economic Foundation advocates for small actors to provide a resilient community, allowing for communities to retain economic alternatives. In relevance to Plymouth, New Economic Foundation and a diverse economy is further discussed in chapter 4.
[Figure 1.5 - Blue New Deal website]
Intertidal Mediations
[Figure 1.6 - Flamborough Head No Take Zone]
16
[Figure 1.7 - Medway Estuary Fishery Management]
[Figure 1.8 - Fisheries management NEF website]
[Figure 1.10 - Fishers lead management NEF website]
Landscape Urbanism 2017-2018
[Figure 1.9 - Coastal Communities NEF website]
17
500 1,000
2,000
Intertidal Mediations
0
3,000
4,000 Meters
Competive Quay Social Formation
N
02| Competitive Quay This chapter looks at Plymouth, Britainâ&#x20AC;&#x2122;s Ocean City. The city prides itself on its marine activities. However, existing conflict occurs in the coastal areas of Plymouth, especially in the Sutton Harbour. In the map to the left, there is a conflicting interest with the marine tourism outnumbering other harbour uses. This indicates a high concentration of marine tourism economy, with little interest in other industries. The fishing community feels constrained and without further room to grow. This is problematic to Plymouth because the city is not diversifying its economic portfolio. Chapter 4 further discusses the negative impacts relying on one primary marine industry in the Blue New Deal. Additionally, this chapter further discusses the plans Plymouth is proposing in the future in celebration of its marine heritage and marine management.
Drawing by J. Ta Drawing by K. Zhu | Marine Management
Landscape Urbanism 2017-2018
Social Formation
19
Britain’s Ocean City Development along the coast line Plymouth
£218m - Marine Tourism
£13.5m - Fish Industry
Photograph by K. Zhu | Retail development
Intertidal Mediations
Photograph by K. Zhu | Fishers Dock
Photograph by K. Zhu | Yacht Harbour
20 Drawing by J. Ta - Zoom In
As one of the most port cities in the UK, Plymouth has the most major economies spreading along the central coastline. Marine related businesses thrive around the major harbours supporting thousands of local employment opportunities. According to research and report, the marine tourism has pumped £28 million into the local economy while £13.5 million come from fishery industry (Plymouth City Council 78). As for now, there are many commercial and retail business present in the city coast and recreation activities comes along with the fishing community. Most of the revenue source from recreational activities includes kayaking, boating, kiteboarding and yachting.
Plymouth Fisheries Main fish market hub located southwest of England Sutton Harbour
Intertidal Mediations
According to the research, Plymouth Fisheries stand as the second biggest fish market in England within the Sutton Harbour, one of the most historic harbor in the city, and it has provided around 560 fishery jobs out of 770 jobs and generated ÂŁ28 million a year for the local economy (Plymouth City Council 78). However compare with the amount the revenue generated in the harbour, the marina portion contribute much less jobs and profit than the fisheries while it took over majority parts of the harbour space. As seen in the image below, Plymouth fishing community is located in the red, where fishing community is limited 23 boats within 400 recreational boats. There is a lack of space for the fishermen in Sutton Harbour.
Google Earth Satellite Image
22 Drawing by J. Ta
Plymouth Fisheries
First National Marine Park United Kingdomâ&#x20AC;&#x2122;s first national marine park Plymouth
Since 2013, the idea of creating the first National Marine Park in Plymouth area has been brought up in several marine conferences. Last year, the newly dominated Members Parliament Luke Pollard has pushed this concept into a much more realization. Besides the protection of recreational use and ecological habitat, the marine park is about boosting its tourism economy and trying to attract more investors into the new development. However, questions rise against this concept as a marketing tool for the tourism business in particular while neglected the lack of voice in fishery business, which could bring the conflict between the two over the use of water and space. The idea is still undergoing its definition as a unique marine park for Plymouth, whether it is about the protection and promotion for the recreation activities or the re-configuration and development of the boat parking facilities. United Kingdom currently do not have a single designated national marine park. What does a national marine park mean? National marine parks give this impression of a positive effect to a community and benefit marine areas environmentally. However, a national marine park is not the case of providing environmental protection. The notion of a national marine park is the celebration of marine activities, thus protecting the interest of economic prosperity and marine tourism such as marine recreation and leisurely angling and fishing (Rutgar). At first glance, the notion of marine parks provides the notion of marine conservation, but it is quite different from a no-take zone, marine reserves, or special protection areas. In the case of marine parks, not all marine parks are created. For example, Plymouth in United Kingdom currently have various type of special interest groups and different protection zones (Marine protected Areas in the UK). Not all protection areas are created equal. The designated no-take zones in the United Kingdom are located at specific locations (Mzgoulton).
Intertidal Mediations
[ Figure 2.1 - First National Marine Park - Website]
24
Photograph by K. Zhu | Interview
â&#x20AC;&#x153;The city is looking for a boost in the economy. Tourism is one of the sectors. There is the fishing community, but they are a small group.â&#x20AC;? Interviewee: Olivia Wilson | Spatial Planning, Plymouth University
Marine Park
Row Boat
Scuba Dive
Yacht
[ Figure 2.2 - Scuba Diving] Water Ski
Jet Ski
Kayak [ Figure 2.3 - Yacht Acitivity] [ Figure 2.4 - Waterskiing]
Marine Parking
Boating Activities
Photograph by Y. Zhao | Plymouth Sound 2018
Landscape Urbanism 2017-2018
[ Figure 2.5 - Monaco Marina]
25 Drawing by K. Zhu
Primary Coastal Industries Marine Spatial Atlas
NTS
Meters
N
Existing Coastal Industry
Marine Spatial Planning Boundary
Marine Spatial Planning Upcoming Planning for the Sea United Kingdom
What is marine spatial planning? It is a policy discipline. In order to plan and regulate all human uses of the sea, EU commences a process that could gather all stakeholders together and coordinate among each other to make a collaborated decision on the application of marine resources. And right now UK is in the beginning stages of preparing a marine spatial planning. According to Marine Experts, the discussion of the planning would be on how a marine plan is needed for managing a Marine Park. As mentioned in earlier section, the current performance of marine management is not ideal. However, there are criticism rose against Marine Planning as a static map of large-scale land use blocks. With the simple and cruel delineation, the UK Sea is cut into several big chunks by its relative distance to the land (inshore/offshore) without any propositional suggestions. This act seems more in favor of protection over action.
“National parks are not for conservation of ecosystems or it’s not preservation of lifestyles, but it is celebrating things about those areas with recreation. We need marine planning for the sea, similarly to spatial planning for land.” Interviewee: Gillian Glegg | Head of Marine Sciences, Plymouth University
Photograph by Y. Zhao | Interview
Description by J. Ta
Drawing by Y. Zhao Photograph by Y. Zhao | Sutton Harbour
Marine Spatial Planning
• One city or Region
• Static mapping
• Similar to National Parks on land i.e. Lake District or Grand Canyon
• Composed of geospatial data without design decision
• Tend to attract tourism
• More about protection and less about proposition
• Tend to become a way of advetisement
Landscape Urbanism 2017-2018
Marine Park
27
Conflicting Nautical Quays Fisher Community Lash Back Plymouth
As mention earlier in the case of Sutton Harbour, where majority of the docking space were dedicated to marina, fisher community in the area felt intimidated by the idea of Marine Park that promotes more tourism economic growth. Although the fishing community brings 13 million pounds per year to Plymouth economy and also provide fish throughout the entire UK, Marine Park would still pushing out the fishery business gradually and forcing Plymouth Fisheries to further relocate and lose its economic importance that built-up over many generations. The fisher community does not want that to happen because eventually with the growth of tourism economy under the promotion of Marine Park, fishers would have nowhere else to dock their boats. Therefore, with the feeling of left out in the future economy, fishermen raised protests in the city to advocate for their importance in Plymouth harbours. Currently, there are many ongoing protests and backlashes from the fishing communities and complains are associated with the lack of boating spaces for fishers to stay.
[ Figure 2.6 - Fishers Protest, Website]
Intertidal Mediations
[ Figure 2.7 - Plymouth Sound Fisher Protesters]
28
[ Figure 2.8 - Fishers Flare with Smoke]
“Plymouth fish market is the main hub. Plymouth contributes to the local fishermen throughout the south west of England.” Interviewee: Mark Heslop |Plymouth Trawler Agents Limited
[ Figure 2.6 - Plymouth Fisheries]
Photograph by Y. Zhao | Boating Facility
Landscape Urbanism 2017-2018
Photograph by Y. Zhao | Plymouth Fisheries
29
500 1,000
2,000
Intertidal Mediations
0
3,000
4,000 Meters
Intertidal Composition Geomorphology
N
03| Intertidal Composition In order to find a way to intervene the site and construct new landscape typology for the future economy of Plymouth, the natural formation of the estuarine environment needs to be well comprehended and integrated into the later design strategy. By carefully examining the built environment of the coast line and study the intertidal movement in the mudflat area along the entire estuary, the group were able to identify the essential forces that alters and shapes the land. Besides the nature, historical human settlement and infrastructure also reshapes the boundaries of the coastline and gradually change the composition of sediment placement and distribution over decades. All those traits are particularly intriguing for the group to further move on and speculations about those geomorphological processes could be justified for the scope of work. This chapter is about the preliminary study on the current coastal infrastructure and its association with geomorphological forces over long period of time.
[Figure 3.1 - Estuarine Marshlands] Drawing by J. Ta
Landscape Urbanism 2017-2018
Geomorphology
31
Historical Development Coatal Evolvement Tamar Estuary
Historically, the town of Plymouth was situated along the pockets of mudflat landscape. Overtime, harbours and docks were built along the coast, and mudflat gradually transformed into a large port for docking ships and marine trades. Over the years, new development took place and the natural landscape of intertidal ground is gradually dissolving into the Tamar river.
Intertidal Mediations
[Figure 3.2 - Historic Plymouth]
32
[Figure 3.3 - Historic Coastline] Drawing by J.Ta - Zoom In
There are 106 estuaries in Great Britain (UK, excluding Northern Ireland) and the majority of the estuaries fall into five groups (left): (1) rias, or drowned river valleys, are short, deep and steep-sided with small river flows; (2) coastal plain estuaries are long and funnel-shaped with extensive intertidal zones; (3) bar-built estuaries are short and shallow with small river flows and tidal range, and are located along coasts with plentiful supplies of sediment; (4) embayed estuaries are large shoreline indentations with a relatively small amount of fresh water input; and (5) fjords and fjards,
Caption etc
NTS
Landscape Urbanism 2017-2018
Meters
N
Caption etc
33
Coastal Environment Hard Strcuture vs. Soft Structure Tamar Estuary
Through google satellite images of Plymouth, it was discovered that there are various types of practices exist along the coastal line of the city and surrounding towns. Those infrastructure are mostly still in use and mainly used for marine activities, particularly boat docking. However, the use of material and its form varies depending on the location. The group synthesized a catalogue of those different structures to study its potential application in project development.
Seawall Structure
The marina is constructed with reinforced concrete, gabions and boulders. It is does not only offer conventional coastal protection, but also harbour boats. But it require land construction and the construction is rather permanent than floating pontoon and less susceptible to erosion.
Floating Pontoon
Intertidal Mediations
Instead of land construction that might alter the natural coastal environment, the floating structure allows marina to grow overtime. Attaching to the land, the timber pontoon could be added as needed.
34
Drawing by K.Zhu Google Earth Satellite Image
Tidal Control
Watergate persist throughout Plymouth, and those gates were used to generate energy and electricity through mill. Most of them are placed at the fringe of creeks and most of them are no longer in use.
Intertidal Zone
Drawing by K.Zhu Google Earth Satellite Image
Landscape Urbanism 2017-2018
The natural tide events and surface water drain create many small creek fingers overtime. The soil property of the mudflat is fine and sticky.
35
Tamar Estuary Ecology Formation and Condition Millbrook Creek
There are 106 estuaries in Great Britain (UK, excluding Northern Ireland) and the majority of the estuaries fall into five groups (below): (1) rias, or drowned river valleys, are short, deep and steep-sided with small river flows; (2) coastal plain estuaries are long and funnel-shaped with extensive intertidal zones; (3) bar-built estuaries are short and shallow with small river flows and tidal range, and are located along coasts with plentiful supplies of sediment; (4) embayed estuaries are large shoreline indentations with a relatively small amount of fresh water input; (5) fjords and fjards, which occur mainly in Scotland and represent drowned glacial valleys. Estuaries interact with the adjoining coast and can be a sediment source or sink: highly-stratified, short and ebb-dominant estuaries (i.e. bar built estuaries) are likely to be sediment sources, whereas partially-mixed, longer and flooddominant estuaries (i.e. coastal plain estuaries) and embayed estuaries tend to be sediment sinks (Burgess et al., 2002).
[Figure 3.4 - climate change on coastal erosion]
Schematic effects of embanking and reclamation on the estuary form and hydrodynamics.
Intertidal Mediations
Schematic effects of managed realignment (or sea defence failure/abandonment) near the head of an estuary which has previously been embanked (a and b), near the estuary mouth (c and d).
36
[Figure 3.5 - Coastal Sediment Dynamics]
Historical Formation
Devonport Before becoming one of the most important military harbour, deveport region was a small stone dock with a few settlement. It would look much like the other cornwall side of the river at present day.
Sutton Habour As on the UKâ&#x20AC;&#x2122;s most historic ports, the out line of the original mudflat remains while the hard engineered structure enclosed the area. It still functions as the main point for tourism and fishery. However, without the mudflat the region is constantly subject to flooding.
Historical Dam It is a common practice for the people of the region to use mill and watergate to generate electricity and power for the household.
Tamar River
NTS
Formed under the Glacial Movement, the river valley was cut down since the Hoxnian age, and continue to function as the main catchment stream.
Landscape Urbanism 2017-2018
Meters
N
37 Flooding Zone
Mudflat
Current Boarder
Historical Trace
500 1,000
2,000
Intertidal Mediations
0
3,000
4,000 Meters
Nautical Translocation Territorial Formation
N
04| Nautical Translocation Plymouth is currently focusing its economy towards a marine tourist attraction. However, this have some negative implications to the entire sound and the city. As seen in the drawing in the left, the varying routes and potential port locations indicate a projected scenario of development. By developing more ports along the coast line of Plymouth, the harbour beings to exhibit an influx of activities that potentially thwarts the existing development of smaller industries such as the fishing community. This is due to the local member of parliament, Luke Pollard, advocating for a national marine park to be imposed along the greater sound of Plymouth. National marine park impact would include more of a tourist destination and advertisement for the city rather than a preservation of natural resources (Glegg). Heavy marine activities occur because the city operates within its marine environment as an opportunity to exploit natural resources (Cosgrove 49). Plymouth primarily navigates through its marine economy. However, Plymouth lacks the ability to rely on multiple economies. This project looks at alternatives to inform design policy to incorporate a diverse economy as discussed later in the chapter.
Drawing by J. Ta
Landscape Urbanism 2017-2018
Territorial Formation
39 Photograph by Y. Zhao | Smeaton Light Tower
Future Quay Development Plymouth Coastal Development Areas Plymouth
Plymouth is currently going through changes in its sound. Plymouth is shifting its industry towards marine tourism because of a Marine Park. This leaves the existing fishing community pinched for space. In the enlargement drawing to the right, the red circles indicate the potential areas of development due to accessibility by road at the existing slipways. The drawing portrays a scenario in which development could occur throughout this region, but not all ports would be developed. The further explains the physical impacts along the estuaries and the sound due to dredging requirements to dock boats and facilities along coastlines. There is a need for a better management of the coast line exploitation.
Photograph by K. Zhu | Mudflat Millbrook Creek
ECONOMY PROJECTION Plan adapts to the scenarios throughout the design making process
Phase
0
1
2
3
4
Natural Resources
Marine Tourism
40
Drawing by Y. Zhao and K. Zhu Drawing by J. Ta - Zoom In
CRISIS
Time Intensity
Intertidal Mediations
Fish Industry
LACK OF ALTERNATIVE ECONOMY
AVAILABLE NATURAL RESOURCES
New Economic Foundation -United Kingdom
Plymouth is focusing mainly on its tourism economy. In many cases of coastal communities, cities rely on their primary economic industry. Often, cities face a recession or economic crisis within their primary industry, thus struggling to find alternative generated income (Balata 10). Plymouth focuses heavily on their tourism economy. However, tourism economies are quite seasonal and fragile in many cases of low wage and part time employment opportunities only. As a result, Plymouth could struggle from diversifying its economy, leaving it unable to respond to a fluctuating economy. Plymouth needs to see its existing local industries as a shared coastal space for all economies to thrive to diversify its portfolio of generating income (Balata 12).
[Figure 4.1 - NEF Website]
Intertidal Mediations
Photograph by Y. Zhao | Sutton Harbour 2018
42
[Figure 4.2 - Plymouth Fisher Vessels]
Diversifying economies in Plymouth means focusing on the existing fishing industry as a mode of production income. Additionally, existing recreational activities, include: waterskiing, yachting, jet skiing, kayaking, provide marine tourism economy in their marine environment. In New Economic Foundationâ&#x20AC;&#x2122;s Blue New Deal, the organization collaborates with local stakeholders such as fishers in East Sussex to voice their needs in the coastal community. The Blue New Deal strives to diversify many coastal communitiesâ&#x20AC;&#x2122; economic model. In the role of designers, the project is finding a way to inform decision making at a higher level to incorporate spatial qualities and economic prosperity.
[Figure 4.3 - Blue New Deal Website]
[Figure 4.4 - Cawsand Bay, Plymouth]
Landscape Urbanism 2017-2018
Photograph by Y. Zhao | Restaurant
43
Inform Design Policy Introduce precedence and techniques
The project explores the idea of designing spatial strategies to inform more decision making at the policy level that is typically not considered in the architectural scale. To inform decision making, the project researches on the precedence of marine tourism and production economies. In the case of fish production, the local fishing community and major fish market is an important role in the community. However, the project sees potential adjacencies of related development such as mariculture, fish hatcheries, fish stocking that can allow for collaboration of self-sufficient management. Additionally, there is a need for more vessel storage facilities due to influx of boating and recreational activities. Due to lack of space, the project sees opportunities in creating designated fish vessel storage and recreational vessel storage. The project allows for multiple programmatic uses along the coastal areas, thus creating a diverse design policy that informs diverse programmatic uses as discussed in the Blue New Deal.
Diversify Marine Programs
(Alternative Economy = Resilient Mode of Production)
Marine Tourism Economy
Production Economy
+
Intertidal Mediations
Existing Boating Activities (Fishing Boats + Recreational Boats)
44
Drawing by J. Ta
Existing Fishing Community
+
+
Additional Recreational Facilities
Supplemental Production Economy (Seafood Production)
Case Study | Tollesbury South East England | Environmental Agency Management
The case study research has expanded to the other side of the UK coastline, and the group looks at Tollesbury as an example in particular. Situated on the Essex coast at the mouth of the River Blackwater, the village of Tollesbury has a long history in celebrating both plough and sail activities. Its unique geographical location allows harvests from both land and sea. Today Tollesbury marina still functions as a main trading port for oysters. Woodrolfe Creek, one of the main creeks at Tollesbury, became the main sailing route for yachts and boats. With some minimal path construction, the surrounding saltmarshes were acting as trails for boat owners to reach their vessels. According to researches, this area is a nature reserved managed by the Environment Agency as a way of regulating cargo, boating industry, and mariculture and this site creates a diverse economy that responds to the landscape.
[Figure 4.6 - UK Government Website]
Landscape Urbanism 2017-2018
[Figure 4.5 - Boating at Estuary]
45
Intertidal Mediations 46
[Figure 4.7 - Tollesbury Salt Marsh]
[Figure 4.8 - Tollesbury Oyster Farm]
Google Earth Satellite Image | High Tide
Landscape Urbanism 2017-2018
Google Earth Satellite Image | Low Tide
47
Fish Production Supplemental mode of production
The project looks at varying precedence of fish production from the United Kingdom to international scale of fish farming. There are varying types of fish production ranging from high production at the cost quality to low production at higher quality. With the varying case studies of fish production, this allows an implementation of production that finds alternative ways of diversifying Plymouthâ&#x20AC;&#x2122;s mode of production. What makes fish production in the United Kingdom?
Mud Crab
Mussels
Clams
Plymouth Founder
Intertidal Mediations
Herring
48
Images Altered by K. Zhu [Figure 4.8 Lobster V Notch] [Figure 4.9 Lyme Bay Hatcheries]
United Kingdom is one of the leading fish farming industry in the European Union with highest yield in tonnage and third per value (Ellis). With United Kingdom yielding large quantities, various types of aquaculture are produced in the United Kingdom. This chapter examines the various types of aquaculture methodology to further understand the different kind of techniques that can be deployed on maritime boundaries to supplement the fishing industry. This could lead to not only production and consumption, but a subcategory of aquaculture emerges as hatcheries to replenish fish stock for the future of marine ecosystems and fishermen economy.
[Figure 4.10 Fish Stocking]
[Figure 4.12 Fish Hatcheries]
Landscape Urbanism 2017-2018
[Figure 4.11 Mussel Farm]
49
Marine Harvest | Intensive Fish Farm
Mariculture
Intensive aquaculture focuses on the mass production of fish rather than the quality of the fish. In this case, Marine Harvestâ&#x20AC;&#x2122;s salmon farms exhibited high concentration of diseased fish and a sea lice problem(Fraser). Because the fish are confined in small spaces, the salmon live stock suffers from various diseases and pest problems, which are typically solved by supplementing the fish with antibiotics and occasional pesticides to eliminate disease(Fraser).
[Figure 4.13 - Marine Harvest Fish Pan]
Intertidal Mediations
[Figure 4.14 - Intensive Fish Farm]
50
Drawing by J. Ta Google Earth Satellite Image | Invervailort, Scotland UK
Lerøy | Intensive Fish Farm Mariculture
In the case of Leroy, the company tries to focus on the production of fish in mass production, but to supplement the fish living conditions with symbiotic sea fauna and flora (Lerøy). Leroy focuses on the production of mussels to feed to fish, farm seaweed for wrasses or lumpfish spawning to eat sea lice, and create artificial reefs to eliminate the accumulation of concentrated fecal matter.
[Figure 4.15 - Lerøy]
Landscape Urbanism 2017-2018
[Figure 4.16 - Sustainable Mariculture]
Drawing by J. Ta Google Earth Satellite Image |Avløypet, Hardbakke, Norway
51
Aquapod | Semi-Extensive Fish Farm
Mobile Mariculture
As for the case of Aquapod, the approach utilises the broad area of the ocean as an advantage. The goal is to create mass production of fix, but confined fish produces negative impacts in one stagnant location. By producing throughout the vast ocean, the fish swims and moves with the structural unit. This creates an advantage of minimal maintenance and dispersing nutrients from the fish production (Earth Ocean Farms).
[Figure 4.14 - Intensive Fish Farm]
[Figure 4.17 - Deometric Mariculture Dome]
Intertidal Mediations
[Figure 4.18 - Passive Mariculture]
52
Drawing by J. Ta Google Earth Satellite Image | Esterito, La Paz Mexico
Greenwave | Semi-Intensive Fish Farm Mollusc Farming
Greenwave is a company founded in New York, United States, focusing on the production of sustainable polyculture. Most of their production consists of seaweed and seasonal shellfish (Greenwave). By doing so, this creates a seasonal rotating crop that allow a more resilient farming that can resist specific weathers in different seasons. In addition to the higher yield of production, the crops promote different food products on the dinner plate such as seaweed used as noodles. Seaweed and shellfish end up complimenting each other by filtering the sediments in the water together, thus creating a symbiotic relationship between the different crops(Greenwave).
[Figure 4.19 - Seaweed Farm]
Landscape Urbanism 2017-2018
[Figure 4.20 - Mussel Farm]
Drawing by J. Ta Google Earth Satellite Image | Thimble Islands, New York USA
53
Bioaqua | Extensive Fish Farm
Aquaponics
Extensive aquaculture focuses more on the quality of the fish within a smaller yield. In the case of Bioaqua, the farming focuses on aquaponic systems that allow the recirculation of water from the fish and the crops in a closed loop system. In addition, Bioaqua provides an aquaponics programme that allows local communities to take part of classes to either start micro production or commercial production(Bioaqua). As a result, the quality of the fish is sought after as oppose to the mass production of an intensive farm.
[Figure 4.21 - Aquaponic System]
Intertidal Mediations
[Figure 4.22 - Fish Farm Aquaponics]
54
Drawing by J. Ta Google Earth Satellite Image | Blackford, England UK
Veta La Plama | Extensive Fish Farm Eco-Sustainable Aquaculture
On the different scale spectrum, Veta La Palma provides an integrated ecological reserve that serves as a symbiotic relationship between the birds and farmed fish. The aquacultural system imitates a natural system without any added food for the fish, which allows a better cost management to the fish livestock. Veta La Palma proves to be the ideal example of fish farming without any supplemental additives to the livestock(Veta La Palma).
[Figure 4.23 - Extensive Fishing]
Landscape Urbanism 2017-2018
[Figure 4.24 - Eco-sustainable Farm]
Drawing by J. Ta Google Earth Satellite Image | La Puebla de Rio, Sevilla Spain
55
Vessel Storage Fishing boats, yacht vessels,and other recreational activities
Currently, there are various types of storage facilities. There are temporary pontoons, dry stack facilities, kayak storage facilities, and boat docking on shallow waters. In the trophic level of boating activities, many boats situated in marinas tend to block out waters, reducing the chance of wildlife to grow underneath the marinas. Dry stacking units, storage of boats on land, allows for the consolidation of boats stacked vertically. However, dry stacking systems require land development with local slipways and forklifts to bring boats to the waters.
[Figure 4.25 - Boat Perching]
Intertidal Mediations
[Figure 4.26 - Kayak Stacking]
56
Drawing by J. Ta [Figure 4.27 - Boat Dry Stacking]
[Figure 4.28 - Jetty Peppermint Grove]
Landscape Urbanism 2017-2018
[Figure 4.29 - Boatersâ&#x20AC;&#x2122; Quay]
Drawing by J. Ta [Figure 4.30 - Saint Cast Marina]
57
Digital Articulation Technical Report
Prot Development Tool <Scripting / Processing>
Nautical Negotiations <Dynamic Formations> <Decision Making/Site>
Plymouth
Digital Low Tide Creek Simulations <CAESAR - Lisflood, Geomorphological/Landscsape Evolution Model>
Intertidal Composition <Geomorphology> <Understand Tide Behavior>
Tamar Estuary
Physical Low Tide Creek Simulation <Physical Simulation + Generative Design>
Collective Creek Formations <Manufactured Grounds> <Understand Low Tide Creek Formations>
Tidal Creek
05| Digital Articulation The project continues to explore the social conditions in which there is a lack of port space in Plymouth and examine the existing geomorphological conditions as an opportunity to change the way major actors utilizes the space in Plymouth. This chapter discusses the three digital techniques to inform design decisions, assist the understanding of existing geomorphological conditions, and simulate low tide conditions. The first tool focuses on the interactive and dynamic nature of javascript, Processing, as a way informing design decision by giving site constraints and path dependent routes to allow for future potential development along the coast. The second tool utilizes a flooding simulation tool, CAESAR, that examines the tide flooding conditions to better understand Plymouthâ&#x20AC;&#x2122;s intertidal areas. Finally, the third tool utilizes generative design, Grasshopper Firefly, to capture imagery of a physical water and sediment simulation to better inform long term change and development of existing creeks.
Diagram by J. Ta Drawing by J. Ta
Landscape Urbanism 2017-2018
Technical Report | Technology Utilization
59
Nautical Negotiations Dynamic Formations | Interactive Tool Plymouth
This is an interactive tool that responds to the existing marine park and marine spatial planning. Through the development of coastal ports, local stakeholders seek a place to situate their vessels and development. This section discusses an interactive application tool that allows coastal stakeholders to take part of negotatiating port development.
//In response to a future proposal of a National Marine Park, data layers are updated each year by different agency, such as marinas, geomorphology data, etc.
Intertidal Mediations
// click and get the optimal solutions according to the existing conditions. Background data layers can be viewed here as well. Path finding tool is located here as well.
60
// click and drag the timeline to see the live feedbacks for stakeholders.
Drawing by Y. Zhao Scripting by Y. Zhao
This interactive tool is developed with javascripting, processing, as a mean of expressing a method of dynamically involving map interactions. Additional, vistualization and communication has been communicated in Adobe After Effecets to articulate the potential of the tool. Currently, the application tool is at its preliminary stages of development and exhibits potential use in the future. This is a potential tool that responses to design decision making amongst local communities to understand the spatial location of future port development.
//Touristsâ&#x20AC;&#x2122;number fluctuation, time constraint in marine tourism
//file input //zoom in & zoom out
Scan QR Code for Video
https://vimeo.com/289269609
Landscape Urbanism 2017-2018
//In response to marine management, new sets of data are updated each year by different agency.
61
Import Territorial Data To Interface
Geographic information system data are imported into the tool as a way of analyzing the following: marine protected areas, intertidal areas, marine tourism hot spots, and waterfront interest points. All layers are processed and visualized as background information to better understand site conditions to better inform internal decision making. This tool provides an opportunity for stakeholders who use the tool a better understanding of site conditions with live feedback informations. User Interface Data Visualization Layer: Marine Protected Area Input Data // Input Spatial Data into processing from a geological information system toolďź&#x161; 1. Marine Protected Area Hierarchy; 2.Tides Changing Area; 3.Network of Popular Tourism Spots and Waterfront Area Infrastructures
User Interface Data Visualization Layer: Tides Changing Area
Intertidal Mediations
User Interface Data Visualization Layer: Network of Popular Tourism Spots and Waterfront Area Infrastructure
62
Drawing by Y. Zhao Scripting by Y. Zhao
Negotiation Part Stakeholders Negotiation
User Interface
Data Output Examples
Marine Routes Finding User Interface Visualisation
Fish Buyers Fishing Market Fish Buyers
Fish Buyers
Additional Recreational And Production Areas
Landscape Urbanism 2017-2018
Existing Fishing Communities; Existing Fish Buyers; Network Between Fishing Communities And Fish Buyers;
63
Path Finding System | Route Development
Marine Protected Area
Protected Area Hierarchy GIS data
Processing_Marine Area Grid System
Overlap GIS data with Processing Grid
A* Path Finding Method
A* Path Finding Method -
0
10
0 1 4 2 6 3 8
1
2
3
9
3
10
9 11
9
10 1
8 10
4
7 10
5
4 8
4
4
5 8
5
3
6 10
10
8
7
6
1
2
3
4
Numbers in nodes: Top Left = G Score Top Right = H Score Bottom = F Score = Starting Node = Finishing Node = Wall(Unaccessable)
11 = The grey numbers indicate the numerical sequence the algorithm follows, shows the nodes its calculating data for. G = Shortest distance (steps) from start node to current node. H = Estimated distance to finish node. F = G Score + H Score When nodes progress the light blue line represents the first “step”, the dark blue indicates the other steps. So, the light blue just gives an idea on how the algorithm progresses.
In our rules, we using the protected hierarchy cost times the shortest distance from start node to current node instead of the A* method G-Score. Therefore, the optimal path finding rule for marine management in our tool is: Intertidal Mediations
G’ = G*node Cost
64
F = G’ Score + H Score Obstacles added determine port development and port passages as constraints .
Drawing by Y. Zhao Scripting by Y. Zhao
The tool explores the idea of marine path finding as a way of determining the added obstacles such as marine protected zones, port development, etc influencing the port passages along the Plymouth. To determine the tool’s set of rules and criteria, the utilizes A* path finding method, combined with with a grid of vectors and geographical information data. The goal of the tool is to determine the impact of natural resources along the Tamar estuary in Plymouth. By added obstacles, the tool determines the need of protecting Plymouth’s natural resources as a way of maintaining the resilience of the city.
Landscape Urbanism 2017-2018
This tool allows the user to understand the impacts of development through a simulated scenario of impacted passages. This allows an understanding of port development and the environmental impacts on the natural resources that many local communities rely on: marine tourism, fishing industry, seafood production (Balata 21).
65
Users’ Negotiation System | Graphical Interface
in the development of the tool, the tool attempts to utilize the interface as a way of visualization information to the stakeholder decision making options. The tool has the potential to allow major stakeholders to determine which coast line is availble for port development. Through the development of coastlines, the tool sees potential in providing opportunities and capacity constraints to allow for live feedback decision making for users. This provides opportunities such as development in intertidal areas and its capacity. The interface is a visualization in after effects to determine the potential of nautical negotiations. Users’ Interactive Interface Visualization
Users’ Interactive Interface Visualization
0-10 years live feedback
The tourism economy downtown
Users’ Scenario
Intertidal Mediations
This diagram shows the rules how the different stakeholders develop their facilities on intertidal creek based on the marine management through fluctuating time constraints such as economy.
66
Drawing by Y. Zhao Scripting by Y. Zhao
In a superimposed scenario, one fisher wants to be develop a mariculture system along deeper water areas. He/she checks the application to see the availability of port development. When the fisher sees the individual development capacity is full, the application indicates another location. Through time, the application informs live feedback to the user whether ports are available for development. Through time, fishers are able to determine where and when he/she can develop their mariculture system.
Usersâ&#x20AC;&#x2122; Interactive Interface Visualization
10-20 years live feedback
Tool Summary
The interactive tool is a negotiation between varying stakeholders wanting to develop additional ports. The tool is utilized in a way of responding to marine spatial planning at a conversational level while information decision making for development. This is assisted with the path finding feature to inform vessel passages through the impact of development and obstacles, i.e. dredging. This tool has the potential of information marine management.
Marine Management Agency
Marine Plan
Marine Protected Area
Protected Hierarchy Marine Routes
Stakeholders Economy Fluctration
Marine Park Marine Intertidal Area
Fisheries Tourism
Creek Branching Area
Live Feedbacks Infrastructures
Water Depth
Creek Developing Area
Landscape Urbanism 2017-2018
Vessel Drivers
67
Creek Environment Simulation Diagram Simulated Tide Environment Tidal Creek
After observing the mudflat of Tamar Estuary through site visit and satellite images, the group aims to understand the nature of this geomorphological process. The first step was to produce a prototypical model to understand the overall formation of the creek system by using simulation program. Several attempts and adjustments have been made to create the model look the most close to the actual landscape.
SketchUp Model
Experiment Setup <Simulated Environment>
Simulation
CEASAR
Initial Result
<Tidal Environment>
<Comparative Study>
<Fine Grain> <Tide Mode> <Reach Mode>
Experiment Iterations <Possible Interventions>
Intertidal Mediations
Parameter A
68
Drawing by K. Zhu [Figure 4.1 - Plymouth Tidal Creek]
Detail Analysis <Comparative Study>
Parameter B
Parameter
<Natural Formation>
<Both Sides>
<Thin Creek>
<Barrier>
<One Side>
<Wide Creek Middle>
<Dredging>
<More vs. Less>
<Wide Creek Side>
Creek Environment Simulation Tidal Creek
From the simulation result, the model at the bottom represented the most accurate creek system comparing with the other two above. The water followed the creek channel and flowed directly into the larger creek system.
Design Parameters Experiment Setup
CEASAR
<Simulated Environment>
<Tidal Environment>
Initial Setup
6 Water Inlets on both sides
Tide Range
0.1% slope
0.1% slope
Tide Range
0.1% slope
0.1% slope
Intertidal Mediations
Tide Range
70
Simulation by K. Zhu Drawing by K. Zhu
Deeper Channel -2 m @ 0.1% slope
Tidal Pattern
Initial Result <Comparative Study>
Landscape Urbanism 2017-2018
Erosion/Deposition Pattern
71
Creek Environment Simulation After picking out the most suitable simulation model, the group decided to run more tests to see the results of different variations and tried to explore the potential intervention for the later stage. Besides the natural formation process, the group wanted to create two sets of tests: Barrier and Dredging. These are considered as the fundamental strategies in terms of introducing intervention. Another variables was to control the amount of water inlets on both side of the simulation model. That could offer more opportunities to compare and contrast the simulation results.
Experiment Iterations <Possible Interventions>
Intertidal Mediations
Dredging
Barrier
Natural Formation
Both Side
72
Simulation by K. Zhu Drawing by K. Zhu
One Side
More vs. Less
The selected simulation model represented the results of the variation tests. From those results, the group realized that the simulation program cannot accurately capture the geomorphological process in detail while running the tests was a time consuming process due to its large context. The group decides to narrow down the scope of work to a sectional study of the creek instead of a much larger scale.
DEM
Contour
Erosion
Natural Formation One Side
Dredging More vs. Less
Landscape Urbanism 2017-2018
Barrier Both Side
73
Creek Environment Simulation In order to study the specific condition of the creek, the group looked back at the actual landscape and came up with three distinct creek types relating to creek position and width.
Detail Analysis
Tide
<Comparative Study>
Slope 0.1%
DEM
Intertidal Mediations
Contour
74
Erosion
Simulation by K. Zhu Drawing by K. Zhu
Slope 0.1%
Slope 0.1%
From the result of the simulation, the group realized that the computer program has its limits in terms of the details. Although CAESAR was able to capture the geomorphological process, the resolution of the creeks was not as high as expected, therefore hard to related to the actual meandering creek. However, the group get many useful information for setting up further experiment on the physical tank.
Simulation by K. Zhu
Wide Creek Middle
Wide Creek Side
Landscape Urbanism 2017-2018
Thin Creek
75
Creek Formation | Simulation Conclusion By using simulation program, one important thing the group discovered was that the geomorphological force that shaped the creek landscape was coming from the latent energy of tide water retained in the soil. During tide event, part of the tide water was absorbed and stored in the mudflat area. After tide retreat, most of the surface water came back immediately except parts of water retained in the soil. Then the water within the soil slowly release the water towards the lower ground. The flow formed a trace of water channel, which later result the creek.
1. Tide Rises.
2. Water Retained in the Mudflat Soil.
Intertidal Mediations
3. Water Slowly Release Back into the Sea.
76
4. Soil Erosion results Creek Formation. Drawing by K. Zhu
Landscape Urbanism 2017-2018 Google Earth Satellite Images (from low to high tides) Millbrook, UK
77
Physical Creek Simulation Computer Vision + Physical Simulation Physical Simulation
Tidal Creek
This section of the chapter focuses on the merging of the physical simulation and computer vision learning. The project utilizes generative design to detect the changing physical photos in the simulation. In the diagram below, the experiment below curates a juxtaposition of wood barriers within a sand and water environment. The image to the right examines the dynamic shift of sediment movement, creating varying lines of water boundary. This experiment allowed us to understand the principles of that time that is interwoven into the design in chapter 7, Collective Creek Formations. As a result, the physical simulation was instrumental at the individual creek scale.
Design Parameters Design Rules <Angle + Distance Units> Retaining Barrier
Design Results Angle Variations
90°
75°
60°
45°
30°
Design Results <Design Actions>
Filling
Interval Spacing Angle Variable Result Dredging
60mm
120mm
180mm
240mm
Environment Set-Up <Physical Simulation Tank>
2m
Ph 4
Ph 3
Ph 2
Ph 1
Distance Variable Result Design Sequence Electrical Power
1m
Drain Fountain Pump Water Reservoir
Repeat Pipe Camera + Tripod
Run Multiple Iterations
LED Lights
<Repeat simulation with different variables>
Water Output
Intertidal Mediations
Output
78
Evaluate
Design Results
Evaluate Each Iteration
<Adjust Design Optimization>
<Examine the design result variations>
Applicable Result Design Intent <Modifying Creeks> Simulation by J. Ta Drawing by J. Ta Grasshopper Definition by J. Ta
X Non-Applicable Result
Phase 1
35 m2 Ponded Water
200 m2 Sediment Accumulation
Phase 2
25 m2 Ponded Water 120 m2 Sediment Accumulation
Phase 3
30 m2 Ponded Water 70 m2 Ponded Water
Phase 4
20 m2 Ponded Water
Landscape Urbanism 2017-2018
14 m2 Ponded Water
79
Workflow Diagram In chapter 3, Intertidal Composition, the project looks at the development of existing creek formations. It focuses its development on the understanding of creek formations formed by the existing low and high tide conditions. Through the development of understanding the tide conditions, chapter 6 and 7 looks at the long-term effect of tides forming new creeks over time. Through the development of the creeks, the project hypothesizes a branching formation of new creek development. The diagram below sets
Existing Low Tide Creeks <Tamar Estuary>
Introduce Barriers
Introduce Dredging
Introduce Filling
<Retaining structure>
<Excavate Sediment>
<Displacement of Sediment>
Time: Phasing in long term development
Medium Physical Simulation <At Low Tide Condition Testing | Long Term Transformation>
Nozzle + Pipe Waterproofing Membrane
7:8 Kiln Sand + 1:8 Silica Flour Wooden Table Frame 1m x 2m Sealed PVC Drain Reservoir + Pump
Parameters
+
Obstacles <3mm wood board barriers>
75°
Intertidal Mediations
90°
80
Drawing by J. Ta Grasshopper Definition by J. Ta
60°
45°
30°
Distances <Distance Criteria>
50mm
100mm
150mm
200mm
three variables of dredging, filling, and retaining sediment in a physical environment. The physical simulation allowed for quick testing on different angles and distance between the different barriers. This was then captured into the computer for further analysis on shifting sediment and water boundaries. Through many tests, the tests were interpreted as similar site conditions seen in Plymouth.
<Generative Design | Workflow >
<Iterator Count>
<Bitmap Crop > <Color Adjust >
<Bitmap Read >
<Resolution Fix >
<Points 2 Mesh >
<Evaluation >
<Max Height: Color Swatch >
<Contour Mesh > <Water Line > <Land Accumulation>
<Batch Layer Output> <Color Code Range > <Move Objects >
<Output Objects >
Modified Creeks
Diverse Design Programs
<Branching System>
<Multiple Creeks, Ponds, and Accumulated Sediments>
Landscape Urbanism 2017-2018
Computer Visualization
Computer Vision
81
Design Rules | Action Criteria Single Unit / Multiple Units
The physical simulation in the first image and diagram below examines the act of dredging and filling sediment on either side. This experiment looks at the varying effects of creating water ponds and land formations as a strategy to create programmatic uses of aquatic food production or additional boat storage facilities. By examining the varying programmatic uses, seen in chapter 8, in varying sediment levels and water depth conditions, the act of dredging and filling allowed the programs change based on the physical environment. This allowed for the following programs to occur through these actions: boat stacking, hatchery facilities, boating storage, recreation, etc. Dredging, filling, and barriers facilitated these programs to occur in the varying conditions.
Barrier
To allow for variation, added single units allowed for a more diverse program. This allowed for the development of alternative industries to flourish in the intertidal mudflat conditions. As seen in the diagrams below, the experiment conducts angle and distance tests among the single unit intervention. The project hypothesizes the development of varying depths and conditions that allows for a more diverse program. The project sees development in a diverse landscape that informs alternative economies to rely on each other as a way of management (Balata 10).
Hatcheries Drystacking
Filling Dredging
Boating
Aquaculture Recreational
High Tide
Medium Tide
2
1
Simulation by Y. Zhao Drawings by K. Zhu
Diverted Creek
82
Diverted Creek
Intertidal Mediations
2
Diverted Creek
Existing Creek
Simulation by k. Zhu
Low Tide
Experiment Set-Up Conditions | Fabricated Environment The development of the physical tank was a way of understanding the sand and water environment. The project encompasses a coastal community that allowed for the utilization of the experiment. In diagram below, varying parts to build the tank was crucial, such as the extensive waterproofing of the environment. Varying factors include optimal lighting conditions allowed for the development drawings to be clear and concise when visualizing in the computer. Set up of the physical simulation required careful camera placement and water source to allow the experiment to be successful. Additionally, design intent played a major role when utilizing the sand and water environment in phases, which allowed for careful observation and understanding of use. Dim Windows (Control Lighting) Sand Bags (Weight to hold camera)
1m
Water Output (Control flow with nozzle)
LED Lights (Control Computer Vision Output)
Barriers (typical)
Ph 1
2m
Ph 2
Ph 3
Ph 4
Design Sequence
Electrical Power
Drain Fountain Pump Water Reservoir Redirect Water Camera + Tripod Drawings by J. Ta
Landscape Urbanism 2017-2018
7:8 Kiln Sand 1:8 Silica Flour
83
Iterative Evaluation | Catalogue Single Unit - Angles
The simulations to the right looked at the dredging in either the front or back side from the water output location. From the varying experiments, many of the dredging behind the water source and filling in front of the water source diminished over time quickly. This was problematic because it would not allow for further program development. The project goal was to accumulate sediment over time to allow for land programs to flourish.
Intertidal Mediations
On the contrary, dredging in front of the water source allowed for potential boat programs to happen. However, the sediment accumulation would occur in the water ponds over a slow period. This was taken into consideration for the development of programs that would then eventually consolidate itself on land as a strategy for boat storage. Fish production became ideal at the filling location away from the water source. This allowed protection from the water source and a slower rate of sediment accumulation in the recently dredged areas.
84
Photograph by K. Zhu
Video by K. Zhu
https://vimeo.com/289269247 30° - Dredge Front of
Simulation by K. Zhu
Creek
Scan QR Code for Video
https://vimeo.com/289270261
30° - Dredge Back of Creek
45° - Dredge Front of Creek
45° - Dredge Back of Creek
60° - Dredge Front of Creek
60° - Dredge Back of Creek
75° - Dredge Front of Creek
75° - Dredge Back of Creek
90° - Dredge Front of Creek
90° - Dredge Back of Creek
Landscape Urbanism 2017-2018
Scan QR Code for Video
85
Iterative Evaluation | Catalogue Single Unit - Angles
Intertidal Mediations
The simulations to the right looked at the dredging in either the front or back side from the water output location. From the varying experiments, many of the dredging behind the water source and filling in front of the water source diminished over time quickly. This was problematic because it would not allow for further program development. The project goal was to accumulate sediment over time to allow for land programs to flourish.
86
Drawing by Y. Zhao
Landscape Urbanism 2017-2018
On the contrary, dredging in front of the water source allowed for potential boat programs to happen. However, the sediment accumulation would occur in the water ponds over a slow period. This was taken into consideration for the development of programs that would then eventually consolidate itself on land as a strategy for boat storage. Fish production became ideal at the filling location away from the water source. This allowed protection from the water source and a slower rate of sediment accumulation in the recently dredged areas.
87
Iterations | Multiple Units Angles vs. Distances
At the rate of the single units are deployed, multiple units utilized understand the relationship between the distancing of the interventions that are used. The distance in the experiment include the following: 50mm, 100mm, 150mm, and 200mm. The distance begins to inform the shifting locations of sediments. Through the hypothesis of conducting multiple barriers, the project predicted the proximity of the barriers allow for clustering of sediment. However, the experiment showed the further placement of barriers allow for further displacement of the sediment.
Intertidal Mediations
Scan QR Code for Video
88
Video by Y. Zhao Simulation by Y. Zhao Photograph by Y. Zhao
https://vimeo.com/289274285
Landscape Urbanism 2017-2018
This allowed for understanding of creating barriers further to allow for a diverse program throughout the physical simulation. To concluding the studies of the experiments, the multiple dredging and filling units placed further apart allowed for a diverse landscape potential that allowed multiple variations in programming. The variations of sediment and water depths allowed for a diverse landscape that response to a need for Plymouthâ&#x20AC;&#x2122;s lack of economic diversity.
89
Barrier Test Erosion | Distance Dredging in front of the board
Barrier Test Erosion | Distance
Intertidal Mediations
Dredging behind the board
90
Simulation by Y. Zhao Drawing by Y. Zhao Grasshopper Definition by J. Ta
Barrier Test Water Boundary | Distance Dredging in front of the board
Barrier Test Water Boundary | Distance
Landscape Urbanism 2017-2018
Dredging behind the board
91
Barrier Test Erosion | Angle
Dredging in front of the board
Barrier Test Erosion | Angle
Intertidal Mediations
Dredging behind the board
92
Simulation by Y. Zhao Drawing by Y. Zhao Grasshopper Definition by J. Ta
Barrier Test Water Boundary | Angle Dredging in front of the board
Barrier Test Water Boundary | Angle
Landscape Urbanism 2017-2018
Dredging behind the board
93
Intertidal Mediations
Evaluation Outputs: Water Analysis
94
Simulation by Y. Zhao Drawing by Y. Zhao Grasshopper Definition by Y. Zhao
Landscape Urbanism 2017-2018
Evaluation Outputs: Water Depth Analysis
95
Evaluation Outputs: Slope Analysis The analysis is done through generative analysis to help determine the siteâ&#x20AC;&#x2122;s slope potential. This helps inform design decision making through the various interventions used in the later chapters. The workflow indicates the development of varying tests and analysis in conjunction with the physical simulation. This helps build a set criteria to allow for determination of programmatic uses through out the site. The generative analysis are conducted through the water flows, slope analysis, and depths of water.
Point
Topography Mesh
2D Grid With Square Cells
Intersect A Mesh With A Semi-Infinite Ray
Find Closest Point On The Mesh
Mesh Parameter for Closest Point
Evaluate The Mesh At A Given Parameter
Normal Vector At Mesh Parameter
Unit Vector Parallel To The World Z Axis
Compute The Angle Between Two Vectors
Compute The Tangent Of The Value
Compute The Absolute Value
Intertidal Mediations
Methmatical Multiplication of 100
96
Adjust The Color
Preview Drawing by Y. Zhao Grasshopper Definition by Y. Zhao
Evaluation Outputs: Water Depth Analysis
Point
Topography Mesh
2D Grid With Square Cells
Intersect A Mesh With A Semi-Infinite Ray
First Intersection Point
Deconstruct The Point Into Its Component Parts
Deconstruct A Numeric Domain into its Component Parts
Adjust The Color
Preview
Landscape Urbanism 2017-2018
Create A Numeric Domain Which Encompasses A List Of Numbers
97
Informed Design Output Phase 1 | Boat Storage Through the varying tests, the results are broken down into four phases to conduct a scenario in which the fish production and boat storage facilities compensate each other during economic crisis. In the array of drawings below, the lines indicate the land accumulation shown in high tide conditions. In the drawing below, the first barrier is added to allow for boat storage facilities to occur such as pontoons and jetties.
Barrier Added/Boat Storage Facility
Intertidal Mediations
Sediment Accumulation
98
Drawing by J. Ta Grasshopper Definition by J. Ta
Barrier Added/Boat Storage Facility Sediment Accumulation
Informed Design Output Phase 2 | Marine Production In phase 2 drawing on the right, two more barriers, 60° and 45° dredging back of creek, are added to allow for more fish industry to flourish to compensate for the expected economic crisis event. Conducting this scenario puts the project in a situation of responding to the seasonal fall of marine tourism. In this case, the boat infrastructure is potentially utilized by the existing local fishing community. Additionally, production economic models such as mariculture and mollusc farming can flourish in the context of the low intertidal areas.
Diminishing Sediments
Diminishing Sediments
Landscape Urbanism 2017-2018
Barrier Added/Seafood Production
99
Informed Design Output Phase 3 | Incremental Boat Facility In phase 3, two barriers, 90° and 45° dredging front of creek, are added to allow for temporary boating activities to occur. This is in response of the development of the fish industry and the recreational boating industry balancing each other with adjacent programs and activities. At this stage, the barriers allow sediment to accumulate at the previous dredged areas. Overtime, the dredged areas are filled in due to the sediments carried Growing Facility/ Consolidate Boat Storage
Intertidal Mediations
Barrier Added
100
Boating Opportunity Mix Use with Fish Production Drawing by J. Ta Grasshopper Definition by J. Ta
Growing Facility/ Consolidate Boat Storage
Informed Design Output Phase 4 | Marine Production + Boat Facility across the low tide creek system. Through time, the barrier locations allow for the development of recreational and fish industry to balance each other. Similarly, phase 4 barriers, 45° and 30° dredging back of creek, allow for the increasing development of the entire landscape. The diverse landscape allows for many programs to occur.
Barrier Added/Boating Opportunity Mix Use with Fish Production
Consolidate Fish Production
Landscape Urbanism 2017-2018
Barrier Added/Boating Opportunity Mix Use with Fish Production
101
Tributary Agglomerations Cartogenesis
Existing Town Access
Boat Storage Stacking
200m2
Boat Storage Stacking
Rural Area Access
Shellfish Farm
150m2
Existing Town Access 200m2
150m2
100m2 100m2
Shellfish Production
130m
2
120m2
60m2
Existing Marina Deeper Areas
140m2 Fisher Boats
Fisher Boats
Temporary Boat Storage
Yachts Storage Kayak Facility Low Tide Seafood Production
Extensive Fish Farm
Meters
N
Shallow Waters
NTS Perspective
Millbrook Creek
06| Tributary Agglomerations Cartogenesis
Landscape Urbanism 2017-2018
In this chapter, the project examines the relationship between the intertidal areas with the opportunities posed in chapter 2. Intertidal areas discussed in chapter 3 looks at the existing conditions of creek formations and the development of local ports. Many of these develop through the maintenance of dredging and creating barrier marinas. In the case smaller marinas, intertidal areas utilize pontoons that dock itself to adjacent creeks and rivers to allow boat launching to occur in low tide conditions. Tributary agglomerations modify existing creeks to develop varying creek formations that allow for a diverse programmatic use.
Drawing by J. Ta Drawing by J. Ta | Millbrook Creek, Existing Creek System
103
Millbrook Intertidal Areas Activities along the mudflat areas Millbrook Creek
The project looks at Millbrook creekâ&#x20AC;&#x2122;s intertidal area. In the existing tide conditions, boats reside along the creek and sporadically all throughout the mudflats. This gives an opportunity of utilizing the geomorphological process of developing along the creek systems. The creeks are formed by the natural tide processes, thus creating creek formations over time. By utilizing this process, the individual creeks can be diverted to create a diverse intertidal landscape. The project continues to explore the idea of branching technique as shown in the technical report. Since there is a lack of space along the main harbour of Plymouth, development opportunities can occur within the intertidal zones. Currently in Plymouth, there are special protected areas along some parts of the intertidal zones (Marine Protected Areas in the UK). However, natural resources are part of a resilient coastal community. Many local economic sectors, such as marine tourism, fishing, and farm depend on natural resources (Balata 21). Through intertidal areas, creeks serve as a territory of natural resources.
Intertidal Mediations
The intertidal creeks serve as a vessel of space, mode of production, and ownership (Elden 810). Current stakeholders can take control of the intertidal areas as a way of managing their needs by taking territory as a role in the intertidal areas. By doing so, the project looks at the varying types of intertidal areas as a way of managing different type of territorial formations. Located in the Tamar Estuary, Millbrook creek indicates varying depths of tide levels and opportunity for many programs to flourish. Territory can be taken control and negotiated through the constraints of existing creeks. With the need of natural resources to sustain a marine city, development along creeks are limited to a capacity of existing numbers. The existing development are considered as an opportunity, but a constraint is kept in mind to inform a management of preservation of the natural environment that supplies the economic prosperity of the city. As a result, designing along creek systems allow for a negotiation of territorial decisions to inform marine spatial policy in a designerâ&#x20AC;&#x2122;s role.
104
Photograph by K. Zhu Google Earth Satellite Image
Existing Intertidal Estuary and Potential Composition of intertidal areas and locating potentials Tamar Estuary
Intertidal Mediations
The existing intertidal areas are composed of varying subtital, intertidal, and supratidal zones depending on the location of mudflat areas and depth. Through the strategy of planning and understanding of the physical conditions, programmatic areas are optimal at particular depths and conditions. This helps inform a way of interevening with existing creeks to create more diverse economic programs through the intertidal areas.
106 Drawing by Y. Zhao
107
Landscape Urbanism 2017-2018
Intertidal Mediations
Estuarine Potential Development
108 Drawing by Y. Zhao
109
Landscape Urbanism 2017-2018
Model Explorations Tangible Experimentations
Model explorations examines the intersection between the tectonic formations of the intertidal areas through programmatic interventions. In the model below, existing intertidal mudflat areas are examined and then explore the dynamic shift of branching rivers. Through the conventions of adding barriers, dredging, and filling along the creeks as shown in chapter 5, territorial creeks form. The cnc model below informs the sediment accumulation through time as a way of responding to scenarios. In the models to the right, layered tide conditions are studied at different strata to understand the tide conditions at varying depths. The model was formed by setting an orthogonal grid to allow constraints along a creek study model. These series of models helped inform a more detailed approach on a creek system. This is then understood further in chapter 7.
Intertidal Mediations
Collect Creeks
110
Branching System
Physical Model by J. Ta Photograph by Y. Zhao
High Tide Conditions
Low Tide Conditions
Physical Model by J. Ta Model Assembly by Team
Landscape Urbanism 2017-2018
Medium Tide Conditions
111
Tide Conditions Existing Creek Formations Millbrook Creek Change in tide levels every six hours
https://vimeo.com/289269326
Intertidal Mediations
Scan QR Code for Video
112
Video by K. Zhu & J. Ta Drawing by J. Ta Grasshopper Definition By J. Ta
Low Tide to High Tides 00:00-06:00 // 12:00-18:00
High Tides to Low Tides 6:00-12:00 // 18:00-24:00
Developing creeks with unit conditions
Dredging/Filling Unit
Phase 1: Adding Units
Diminishing Units Dredging/Filling Unit
Dredging/Filling Unit
Phase 2: Adding Units, Diminishing Units
Disappearing Unit Diminishing Units Dredging/Filling Unit
Dredging/Filling Unit
Phase 3: Adding Units, Diminishing Units
Remaining Barriers Diminishing Units Dredging/Filling Unit
Dredging/Filling Unit
Phase 4: Adding Units, Diminishing Units
Landscape Urbanism 2017-2018
Disappearing Units
113 Note: See chapter 5 for detailed technique
Tributary Reconfigurations Modification to existing intertidal creeks Millbrook Creek
In the previous pages, the existing Millbrook Creek experiences constant influx of tide flows. Tide runs through its full cycle every 6 hours, creating a water table in the mudflat areas and discharging when over saturated. Through this process, the intertidal creeks form through series of time. In the scenario of economic fluctuations and events, creeks are used to generate a need for leisure and production. Plymouth’s intertidal creeks are the underutilized infrastructure, demystifying today’s definition of creek areas. Similar to the case in Paris’ Seine river as a public infrastructure, Plymouth’s creek system moves from the pastoral landscape to a modification of production and asset (Gandy 33). In the drawing below, the creek is no longer the pastoral landscape. The creek system of Plymouth serves as a multi-functional system that establishes benefit to the existing stakeholders through the modification of creek systems. In this case, diverting flow and collecting sediments
Intertidal Mediations
Scan QR Code for Video
114
Video by K. Zhu & J. Ta Drawing by J. Ta
https://vimeo.com/289269503
Landscape Urbanism 2017-2018
allow reconfiguration of physical creek form and diverse landscape. In the designerâ&#x20AC;&#x2122;s role, manipulating creek as a strategy allows for adjacent development such as towns and agricultural areas. The drawing below shows lighter blue of past development along the creek morphology. As the lines get darker and deeper in blue, the creek system grows and reaches a pinnacle opportunity for adjacent communities to take control of territorial creeks. This is a resource that allows development to decide spatially at a higher level to take control of their needs in diverse landscape characteristics.
115
Drawing by J. Ta
Collective Creek Formations Manufactured Grounds
Existing Creek System
Shallow waters
Existing Town Area
Deeper waters Drystack Boats : 9 larger vessels Drystack Boats : 9 small vessels
Bridge Access
Fish Hatchery Facility Shellfish Production
Path Network Kayak Storage
Accumulated Sediments
Deeper waters Mussel Farms Existing Rural Area
Small Kayaking Storage
1002 Clam Farming
Remaining Potoon System Connecting Path Network
Small Boat Docking
6 Vessels
Meters
N
120m
2
Mariculture Pen
400m2
NTS Perspective
Shellfish Farming
07| Collective Creek Formations Manufactured Grounds
Photograph by J. Ta
Landscape Urbanism 2017-2018
Collective Creek Formations is a composition of challenging the conventional way of information design at a higher level. Today, land and sea are treated differently. However, sea and land have the same territory implications and spatial quality. The sea is simply diluted land with a fluid spatial quality (Steinberg 250). The project examines the blurring between land and water. Through design strategy at the architectural scale, creek formations are manipulated with vertical elements, merging the programmatic use on land and water. The chapter further discusses the development organizing through time as a response to future scenarios of coastal development.
119 Drawing by J. Ta
Tectonic Manipulations Reconfiguring intertidal areas Tidal Creek
The project utilizes the physical simulation as seen in the chapter 5. The physical model is instrumental to see the physical impacts along the existing streams. In time, project takes into account scenarios of events that could occur. This is one sample scenario of development through time. Through various iterations, the project can understand the composition of sediment movements and low tide creek formations. In the drawing to the right, structures are place through time responding to the blurring between use on land and water. Programs storage facilities and seafood production industries merging with their adjacencies to create a diverse landscape.
Intertidal Mediations
This model is shown as a way of self-managing between many stakeholders and a way of marine management at the micro scale. In todayâ&#x20AC;&#x2122;s marine spatial planning, management has been developed through arbitrary lines and points (Steinberg 258). The marine space is constantly in flux and marine spatial planning does not respond to a constant changing landscape. As a result, the project maps out a scenario by responding with cooperative built structures that encompasses a diverse landscape with a diverse set of programs.
Photograph by J. Ta
120 Drawing by J. Ta - Zome In
Evaluation of Territory Generative Analysis
Intertidal Mediations
Tidal Creek
122 Drawing by Y. Zhao
Set Criteria for Vertical Development
Wall Barrier Docking
Kayak + Jetski Mussel Farm
Clam Farm semi ext.
Algae Farm Salt Marsh Temp. Pontoon
Landscape Urbanism 2017-2018
Drystack facility Fish Hatchery
Matrix by Y. Zhao Diagram by J. Ta
123
Intertidal Mediations
Water Depth Analysis | Generative Analysis
124
125
Landscape Urbanism 2017-2018
Intertidal Mediations
Slope Analysis | Generative Analysis
126
127
Landscape Urbanism 2017-2018
Vertical Materiality Varying Case Studies of Structural Development
In the previous pages, generative analysis was conducted to understand the results of the physical simulation. The simulation results indicated certain depths and slope conditions, under 10%, that allowed for path development along the accumulated sediments. The matrix indicates set a depth and slope criteria that allowed for program placement constraints. With the given analysis, the project looked at three case studies in the images below. This includes mud dyke barriers, farming techniques, and barrier lane techniques. These case study systems are used as a way of organizing different programs to allow for resilience amongst the existing and new stakeholders. The programs are added for a diversity of production and tourism/recreation without eliminating the existing stakeholders.
[Figure 7.1 - Seaweed Farm, China]
Intertidal Mediations
[Figure 7.2 - Mud Dyke, Bangladesh]
128
[Figure 7.3 - Bricola Barrier, Venice, Italy]
Vertical Sequence and Archetypes Set Criteria and Sequential Development Materiality
In the drawings below, the project looks at variation of vertical archetypes. These structures form kit of parts that builds upon the sequential time and everchanging landscape. Through a series of growing structures, the development of boat storage and seafood production continue to shift. The structures grow into boat and recreational facilities or seafood production.
Orthogonal Grid:
Contour Barrier Grid:
Density Grid: Retaining Barriers
Sizing Grid: Structural Support
Pontoon
Barriers
Pole Mud Dykes
Mussel/Clam Farm
Walkway
Groynes
Kayak Docking Shellfish Farming
Kayak/Small boat storage
Aquaculture Fish Pens
Dominant Seafood Production Facilities
Wall Barrier
Pontoon
Pontoon + Mussel Farm
Drystack + Recreational Storage
Drawing by J. Ta and K. Zhu
Wall Barrier
Mariculture Pen
Mussel Farm + Recreational Stoage (kayak, small boats)
Fish Stocking Facility + Hatcheries + Small boat storage
Landscape Urbanism 2017-2018
Dominant Boat + Recreational Facilities
Boat Drystacking Fish Hatcheries
129
Evolutionary Scenarios Time-Based Development Responding to Scenarios Tidal Creek
In the catalogue of drawings below, the project takes a sample of an evolutionary scenario. The project responds to the following need: Phase 1 – 100% Marine Tourism, Phase 2 – 70% Marine Tourism, 30% Fishery Industry, Phase 3 – 50% Marine Tourism, 50% Fishery Industry, Phase 4 – 40% Marine Tourism, 60% Fishery Industry. In the series of drawings below, the development of barriers and vertical infrastructural systems coincides with the development of creek formations. This creates micro branching Vertical Archetypes
130
Time Step 1: Initial Creek
Time Step 2: Retaining Barriers
Time Step 3: Lane Barriers
Time Step 1: Retaining Barriers
Time Step 2: Shifting Sediments
Time Step 3: Lane Barriers
Phaes 2: 10 to 20 Years
Intertidal Mediations
Phaes 1: 0 to 10 Years
Retaining Barriers
Path Network by Y. Zhao Drawing by J. Ta
Time Step 4: Pontoon Structure
Time Step 5: Path Network
Time Step 6: Path Development
Time Step 4: Mariculture Pens
Time Step 5: Path Network
Time Step 6: Path Development
Landscape Urbanism 2017-2018
systems within the intertidal areas. This is a response to the territorial nature of fisheries and boating facilities. Rather than competing with the different industries, marine management is spatialized in a coherent diversity. These programs respond to the economic impacts as alterative industries, shifting functionality throughout varying scenarios. This becomes a cooperative approach to change the role of policy making and inform how designers can take a role in the juxtaposition of policy and spatial design.
131
Time-Based Development Responding to Scenarios
Vertical Archetypes
132
Time Step 1: Retaining Barriers
Time Step 2: Shifting Sediments
Time Step 3: Lane Barriers
Time Step 1: Retaining Barriers
Time Step 2: Shifting Sediments
Time Step 3: Lane Barriers
Phaes 4: 30 to 40 Years
Intertidal Mediations
Phaes 3: 20 to30 Years
Retaining Barriers
Path Network by Y. Zhao Drawing by J. Ta
Time Step 5: Path Network
Time Step 6: Path Development
Time Step 4: Consolidating Pontoon and Fish Hatchery Facility
Time Step 5: Path Network
Time Step 6: Path Development
Landscape Urbanism 2017-2018
Time Step 4: Temporary Pontoon System and Consolidating Pontoon System
133
Time-Based Development Responding to Scenarios
Vertical Archetypes
The design bridges between the existing conditions and the sediment accumulation uses. Through the various conditions, time plays an important role in the development of the creek system. As seen in the drawing, multiple programs locate themselves at desired areas. However, adjacent industries coexist together in the creek system, making this coastal community resilient to changes.
Retaining Barriers
Existing Town
Bridge to existing conditions
Accumulated Sediments Drystack Facilities Existing Creek System
Drystack Facilities
Kayak Storage
Mussel Farms
Fish Hatchery Facility
Intertidal Mediations
Mussel Farms
134
Path Network by Y. Zhao Drawing by J. Ta
Shallow water access
6 Vessels
400m2 Mussel Farms
Shellfish Farming
MillBrook Creek
Small Boat Docking
120m2 Mariculture Pen
Bridge to existing conditions
Existing Rural Area
Landscape Urbanism 2017-2018
Shallow water access
135
Time-Based Development Responding to Scenarios
Phase 2
Time Step 1: Initial Creek
Time Step 1: Retaining Barriers
Time Step 2: Retaining Barriers
Time Step 2: Shifting Sediments
Time Step 3: Lane Barriers
Time Step 3: Lane Barriers
Time Step 4: Pontoon Structures
Time Step 4: Mariculture Development
Intertidal Mediations
Phase 1
136
Time Step 5: Marina Development Path Network by Y. Zhao Drawing by J. Ta
Phase 4
Time Step 1: Retaining Barriers
Time Step 1: Retaining Barriers
Time Step 2: Shifting Sediments
Time Step 2: Shifting Sediments
Time Step 3: Lane Barriers
Time Step 3: Lane Barriers
Time Step 4: Consolidating Pontoons
Time Step 4: Mariculture + Pontoon
Scan QR Code for Video
Time Step 5: Drystacking Facility Video by J. Ta
https://vimeo.com/289269631
Landscape Urbanism 2017-2018
Phase 3
137
Path Network by Y. Zhao Drawing by J. Ta
Intersecting Archetypal Grounds Dynamic response to Tectonic Shifts | Existing Creek Section
Intertidal Mediations
Match Line | Existing Creek
The sections portray the development of an architectural scale to alter how marine management can be informed spatially through time and respond to the changing landscape conditions. In the drawing below, the section begins with the existing conditions. Through the various scenarios of development, sediment accumulation and water flows disperse through time. This responses to the changing landscape by the vertical archetypes informing the geomorphological processes. The territory shifts the landscape based on the needs of the existing stakeholders and the fluctuating economic conditions.
140 Drawing by Y. Zhao
https://vimeo.com/289269668
Scan QR Code for Video
https://vimeo.com/289269736
Landscape Urbanism 2017-2018
Match Line | Existing Creek
Scan QR Code for Video
141 Video by Y. Zhao
Intertidal Mediations
142
Drawing by Y. Zhao
Trophic Levels Diagram by K. Zhu Sequester Carbon
Match Line | Phase 1
Shadow Casting
Accumulated Fecal Matter
Marshland Sequester Carbon
Phase 1 | Creek Formations, 0 to 10 years
143
Landscape Urbanism 2017-2018
Accumulated Fecal Matter
Shadow Casting
Shadow Casting
Match Line | Phase 1
Shadow Casting
Shadow Casting
Sequester Carbon
Intertidal Mediations
144
Drawing by Y. Zhao
Trophic Levels Diagram by K. Zhu Sequester Carbon
Filter Water Mariculture Rotation
Filter Water Mariculture Rotation
Match Line | Phase 2
Filter Water Mariculture Rotation
Replemish Nutrients
Phase 2 | Creek Formations, 10 to 20 years
145
Landscape Urbanism 2017-2018
Accumulated Fecal Matter
Accumulated Sediment
Match Line | Phase 2
Replemish Fish Stocks
Sequester Carbon
Intertidal Mediations
146
Drawing by Y. Zhao
Trophic Levels Diagram by K. Zhu Sequester Carbon
Dredged Marina
Oil Contamination
Shadow Casting
Shadow Casting
Match Line | Phase 3
Shadow Casting
Filter Water
Shadow Casting
Phase 3 | Creek Formations, 20 to 30 years
147
Landscape Urbanism 2017-2018
Accumulated Fecal Matter
Oil Contamination
Sequester Carbon
Match Line | Phase 3
Supply Fish Stocking
Sequester Carbon
Intertidal Mediations
148
Filter Water Containminant
Match Line | Phase 4
Drawing by Y. Zhao
Trophic Levels Diagram by K. Zhu Shadow Casting
Sequester Carbon
Filter Water
Phase 4 | Creek Formations, 30 to 40 years
149
Landscape Urbanism 2017-2018
Accumulated Fecal Matter
Accumulated Fecal Matter
Sequester Carbon
Match Line | Phase 4
Sequester Carbon
Adpative Nautical Management
Intertidal Mediations
Cartogenesis
08| Adaptive Nautical Management Adaptive nautical management sees opportunity in Plymouth. This chapter addresses the lack of fish boat docking and economic diversification through the development of intertidal areas. More space is allocated throughout Plymouth, but not exceeding a capacity within the existing creek system constraints. Through the development of intertidal creeks, vertical archetypes influence a way of managing intertidal cooperatives from the architectural scale to the regional scale of marine management. In the drawing to the left, the panel locates all existing slipways as potential of development along existing creek systems. The creek system is monitored and managed at a capacity since natural resources influences the success of marine tourism and production industry, as see in the economic scenario diagram, page 42. This coincides with New Economic Foundationâ&#x20AC;&#x2122;s philosophy of a diverse economy. However, in a designer role, decisions must be made at a higher level to inform design policy with spatial qualities.
Drawing by K. Zhu
Landscape Urbanism 2017-2018
Cartogenesis
151
Intertidal Mediations
In the drawing below, the intertidal areas depict the potential areas of port development that encompasses the capacity of production and vessel storage. Marine spatial planning should be defined by blurring the roles of land and sea as a way of accommodating the varying stakeholders. This becomes a negotiation and dynamic mapping to inform the need of a fluctuating landscape. In addition, economic events and social conflicts are things to consider marine management that is not considered in todayâ&#x20AC;&#x2122;s marine spatial planning. Marine spatial planning is not changing the economy directly, but a way to respond with spatial qualities that help inform cartographic dynamism. Plymouth needs a marine management plan that responds to its advent national marine park proposal. Intertidal creeks in Plymouth become a proposal that reacts as a territory
152
Landscape Urbanism 2017-2018
that serves the local stakeholders as owners to take control of space (Elden 804). Territory or territoriality is not confined to only land but the interface of land and water. The ownership of coastal areas plays a big role in Plymouth. Local fishers play a role in the estuary as much as the recreational activities and the boating activities. The role in which designers consult stakeholders provide a change on how intertidal areas can be altered as oppose to the conventional mudflat creeks of navigation and leisure. Intertidal areas are a territory of interest and provides opportunity for development within the capacity of natural resources relied on marine tourism and the fishing industry (Balata 21). A better marine management across the architectural scale and regional scale is a better resilient coastal community.
153
Intertidal Mediations
Epilogue The project focuses on the blurring between land and water. Existing development along Plymouth’s coast line exhibits marine real estate conflict, which hinders the development of existing fisher community. Because Plymouth is focusing on marine tourism, through an advertisement of a marine park, Plymouth relies on an unstable economy. The blurring between land and sea indicates the opportunities in Plymouth’s intertidal creek regions, creating management along creeks through intervening vertical archetypes. Plymouth needs a better marine management to negotiate between the varying stakeholders at a multiscale level, which is not considered in today’s marine spatial planning. The project sees marine spatial planning at the architectural, regional, and national level to inform design policy to consider the influx of water. Today’s cartography is composed of only lines and boundaries, which are static and does not respond to time: the fluctuations of economy, constant tide movements, and landscape processes. Intertidal mediations are interested in the negotiation of nautical activities that advocate for a diverse coastal community. A coastal community that can take back control in the marine environment as well as on land.
Figure List Chapter 1 Figure 1.1 Plymouth Fisheries. Record Amount Of Fish Landed At Plymouth Fisheries. 2014, http://www.plymouthfisheries.co.uk/ news/2014/11/7/record-amount-of-fish-landed-at-plymouthfisheries. Accessed 13 Sept 2018. Figure 1.2 Rossiter, Keith. Plymouth Fish Market Brings In Record-Breaking £1Million Haul In A Week. 2017, https://www. plymouthherald.co.uk/news/business/plymouth-fish-marketbrings-record-726737. Accessed 13 Sept 2018. Figure 1.3 Marine Management Organisation. Have Your Say On Marine Planning In England. 2018, https://www.gov. uk/government/news/have-your-say-on-marine-planning-inengland. Accessed 13 Sept 2018. Figure 1.4 Marine Management Organisation. Marine Information System. 2018, http://defra. maps.arcgis.com/ apps/webappviewer/index. html?id=3dc94e81a22e41a6ace0bd327af4f346. Accessed 13 Sept 2018. Figure 1.5 New Economic Foundation. Blue New Deal. 2018, http://www.bluenewdeal. org/. Accessed 13 Sept 2018. Figure 1.6 Davison, Heather. Protecting And Restoring Flamborough Head. http://www.bluenewdeal.org/story/ protecting-and-restoring-flamborough-head/. Accessed 13 Sept 2018. Figure 1.7 Clegg, Tom. Protecting Fish And Livelihoods In The Medway. http://www.bluenewdeal.org/story/protecting-fishand-livelihoods-in-the-medway/. Accessed 13 Sept 2018. Figure 1.8 Carpenter, Griffin, and Charles Millar. Fisheries Management Costs. 2018, https://neweconomics.org/2018/08/ management-costs. Accessed 13 Sept 2018. Figure 1.9 Balata, Fernanda, and Griffin Carpenter. Coastal Communities In The Uk. 2018, https://neweconomics. org/2018/08/coastal-communites-in-the-uk. Accessed 13 Sept 2018. Figure 1.10 Pool, Beshlie. Fishers Leading On Improved Management. 2018, http://www.bluenewdeal.org/story/fishersleading-on-improved-management/. Accessed 13 Sept 2018. Chapter 2 Figure 2.1 Google. Plymouth. 2018, https://www.google. co.uk/maps/@50.3677188,-4.1315624,1323m/data=!3m1!1e3. Accessed 13 Sept 2018. Figure 2.2 Luke Pollard MP. Luke Calls For Plymouth Sound To Be The UK’S First National Marine Park. 2018, https://www. lukepollard.org/legacy/2017/05/29/nationalmarineparkcall/. Accessed 13 Sept 2018.
Intertidal Mediations
Figure 2.3 Mittiga, Lorenzo. There Is No Better Feeling For A Scuba Diver Than To Be Neutrally Buoyant, But Many Divers Struggle To Achieve Underwater Nirvana.. 2017, https://www. scubadiving.com/tips-for-wearing-less-weight-underwater. Accessed 13 Sept 2018.
156
Figure 2.4 Bavaria Yachts. Understand Boat Statistics. https:// www.yachtingmonthly.com/news/bavaria-yachts-expectedannounce-administration-65537. Accessed 13 Sept 2018. Figure 2.5 Aphrodite Boat Trips-Kyrenia. Kyrenia Watersports. http://www.kyreniaboattrips.com/kyrenia-watersports/. Accessed 13 Sept 2018.
Figure 2.6 chrispy thoughts. The Yachts Docked At The Port. 2013, https://chrispythoughts.wordpress.com/2013/05/07/all-ina-days-trip-monaco-and-eze/. Accessed 13 Sept 2018. Figure 2.7 Rossiter, Keith. Why Fishermen Are Staging A Mass Protest In Plymouth Today. 2018, https://www.plymouthherald. co.uk/news/plymouth-news/fishermen-staging-mass-protestplymouth-1414375. Accessed 13 Sept 2018. Figure 2.8 BBC NEWS. Fishermen On The Tyne Head For The Demo In Newcastle. 2018, https://www.bbc.co.uk/news/ukengland-43680686. Accessed 13 Sept 2018. Figure 2.9 BBC NEWS. Fishermen Paraded In Plymouth Sound Before A Crowd Of Supporters And Sightseers On Shore. 2018, https://www.bbc.co.uk/news/uk-england-43680686. Accessed 13 Sept 2018. Figure 2.10 Plymouth Trawler Agents. Plymouth Trawler Agents. https://www.plymouthtrawleragents.com/. Accessed 13 Sept 2018. Chapter 3 Figure 3.1 AONB. Tamar Valley. http://geographical.co.uk/uk/ aonb/item/771-tamar-valley. Accessed 13 Sept 2018. Figure 3.2 Google Map. Plymouth. 2018, https://www.google. co.uk/maps/@50.3569016,-4.2137576,593m/data=!3m1!1e3. Accessed 13 Sept 2018. Figure 3.3 A Trve Mapp And Discription Of The Tow. 1643, https://upload.wikimedia.org/wikipedia/commons/9/90/ Wenceslas_Hollar_-_Siege_of_Plymouth.jpg. Accessed 13 Sept 2018 Figure 3.4 Steve Johnson Cyberheritage. Map Of Plymouth. 1540, https://i.pinimg.com/736x/cb/70/e5/ cb70e55fd8ea516046341037d53faae1--plymouth-gaia.jpg. Accessed 14 Sept 2018. Figure 3.5 Masselink, G. & Russell, P.. Impacts of climate change on coastal erosion. 2013. MCCIP Science Review 2013: 71-86. Figure 3.6 Esteves, Luciana & J Williams, Jon. Changes In Coastal Sediment Dynamics Due To Managed Realignment. 2015. 10.1142/9789814689977_0165. Chapter 4 Figure 4.1 New Economic Foundation. Together We Can Build A New Economy Where People Really Take Control.. https:// neweconomics.org/. Accessed 13 Sept 2018. Figure 4.2 Trawlerphotos. Vessels. http://www.trawlerphotos. co.uk/gallery/showphoto.php?- photo=50949. Accessed 13 Sept 2018. Figure 4.3 New Economic Foundation. Blue New Deal Initiative. https://content.gulbenkian.pt/wp-content/uploads/ sites/18/2016/05/14121146/nef.png. Accessed 13 Sept 2018. Figure 4.4 Shop Manager. Oxwich Bay Kayak Fishing Competition 2015. 2015, https://www.bluezonefishing.co.uk/ oxwich-bay-kayak-fishing-competition-2015/. Accessed 13 Sept 2018. Figure 4.5 Peckett, Bruce. SV Brigantia - Ships Log. http:// svbrigantia.blogspot. com. Accessed 13 Sept 2018. Figure 4.6 GOV.UK. Environmental Agency. https://www.gov. uk/government/organisations/environment-agency. Accessed 13 Sept 2018.
Figure 4.8 Goldhanger Digital Archive. The Oyster Beds At Low Tide To The East Of Goldhanger Creek In 2014. 2014, http:// www.churchside1.plus.com/Goldhanger-past/Oysters.htm. Accessed 13 Sept 2018. Figure 4.9 Ideas Home Interior Design. 6 Rarest Colors Of American Lobsters. https://paramountgolfforeste.info/6-rarestcolors-of-american-lobsters. Accessed 13 Sept 2018.
Figure 4.21 Hemmaodlat. Kurs I Aquaponics På Bioaqua Farm. 2016, https://www.pinterest.co.uk/pin/86623992809321564. Accessed 13 Sept 2018. Figure 4.22 European Aquaponics Association. Bioaqua Farm. http://europeanaquaponicsassociation.org/places/ united-kingdom/somerset/blackford/producer/bioaqua-farm/. Accessed 13 Sept 2018. Figure 4.23 Browne Trading. Canals That Were Once Used To Pump Water Out Of The Estate Have Been Used To Help Pump Water Back In!. 2017, https://www.brownetrading.com/blog/ exclusive-us-distributors-veta-la-palma-seafood/. Accessed 13 Sept 2018.
Figure 4.10 Lyme Bay Reserve. Lyme Bay Reserve Seafood. 2018, http://www.lymebayreserve.co.uk/reserve-seafood/. Accessed 13 Sept 2018.
Figure 4.24 The Growing Connection. A Farm That Doesn’T Feed Its Animals. 2010, https://thegrowingconnection. wordpress.com/2010/06/14/farming-outside-the-box/. Accessed 13 Sept 2018.
Figure 4.11 Midwest Lake MANAGEMENT. Tubin Shiners. http:// midwestlake.com/pond-n-lake-fish-stocking/. Accessed 13 Sept 2018.
Figure 4.25 Dog Paddler. Shell Point Dock Low Tide. 2011, http://thedogpaddler.com/EmailPages/110124_LowTide/ LowTide.htm. Accessed 13 Sept 2018.
Figure 4.12 Canadian Aquaculture. Responsible & Sustainable Canada Is A Global Leader In Responsible And Sustainable Best Practices.. http://www.aquaculture.ca/. Accessed 13 Sept 2018.
Figure 4.26 Pensacola Fishing Forum. Kayak Storage Rack. https://www.pinterest.co.uk/pin/713679872170261216/?lp=true. Accessed 13 Sept 2018.
Figure 4.13 Maine Fish & Wildlife Field Notes. Millions Of Trout, Salmon And Togue Eggs Are Stored In These Containers Until They Are Near Hatching. 2013, https://mefishwildlifefieldnotes. wordpress.com/2013/12/13/why-do-you-separate-eggs-in-thehatchery/. Accessed 13 Sept 2018. Figure 4.14 SeaWestNews. Court Dismisses ‘Namgis Application To Stop Restocking Fish Farm. 2018, https://www.seawestnews. com/court-dismisses-namgis-application-stop-restocking-fishfarm/. Accessed 13 Sept 2018. Figure 4.15 Acquisitions Daily. Marine Harvest Bid Rejected By Cermaq. 2013, http://www.acquisitionsdaily.com/2013/05/02/ marine-harvest-bid-rejected-by-cermaq/. Accessed 13 Sept 2018. Figure 4.16 Tallaksen, Eva. Leroy, NGO Launch Multi-Trophic Farming Project. 2013, https://www.undercurrentnews. com/2013/08/16/leroy-ngo-launch-multi-trophic-farmingproject/. Accessed 13 Sept 2018. Figure 4.17 algaeworldnews. Leroy Seafood To Raise Norwegian Salmon On Feed Made With Algae. 2017, http:// news.algaeworld.org/2017/04/leroy-seafood-to-raisenorwegian-salmon-on-feed-made-with-algae/. Accessed 13 Sept 2018. Figure 4.18 Bastyra, Gaby. Free-Range Fish Farming. 2015, https://atlasofthefuture.org/project/aquapod-fish-farm/. Accessed 13 Sept 2018. Figure 4.19 Thimble Ocean Farm. Bren Smith, An Ex-Industrial Trawler Man, Operates A Seaweed Farm In Long Island Sound, Connecticut. 2016, https://www.chinadialogue.net/article/ show/single/en/9993-How-farming-giant-seaweed-can-feedfish-and-fix-the-climate. Accessed 13 Sept 2018. Figure 4.20 Yuan, LinYee. Is Kelp The New Kale? Greenwave’S Model For 3D Ocean Farming Might Feed The World And Restore The Seas. 2016, https://thisismold.com/space/farmsystems/greenwaves-model-for-3d-ocean-farming-might-feedthe-world-and-restore-the-seas#.W5p3NYWcFaR. Accessed 13 Sept 2018.
Figure 4.27 Hamble Yacht Services. Drystack. http://hysgroup. co.uk/service/dry-stacking-hamble/. Accessed 13 Sept 2018. Figure 4.28 I Love Fishing. Freshwater Bay Jetty. https:// ilovefishing.com.au/portfolio-items/freshwater-bay-jettypeppermint-grove/. Accessed 13 Sept 2018. Figure 4.29 I Love Fishing. Success Hill Reserve Jetty. https:// www.quora.com/Whats-the-difference-between-a-harbourport-dry-dock-jetty-quay-and-a-wharf. Accessed 13 Sept 2018. Figure 4.30 Skipper Buds. Daytona Beach Halifax Harbor Marina. http://www.skipperbuds.com/page.aspx/ pageid/38590/page.aspx. Accessed 13 Sept 2018. Chapter 5 Figure 5.1 Google Map. Plymouth. 2018, https://www.google. co.uk/maps/@50.3569016,-4.2137576,593m/data=!3m1!1e3. Accessed 13 Sept 2018. Chapter 6 Figure 6.1 Google Map. Plymouth. 2018, https://www.google. co.uk/maps/@50.3569016,-4.2137576,593m/data=!3m1!1e3. Accessed 13 Sept 2018. Chapter 7 Figure 7.1 Boethling, Joerg. Bangladesh , Village Kalabogi At River Shibsha Close To Bay Of Bengal, Peoples Are Most Affected By Climate Change, Dike Construction. 2007, https:// www.alamy.com/stock-photo/bay-of-bengal-dyke.html. Accessed 13 Sept 2018. Figure 7.2 Images of Network. Seaweed Farm In China. 2017, https://www.reddit.com/r/MostBeautiful/duplicates/5d2jz8/ seaweed_farm_in_china/. Accessed 13 Sept 2018. Figure 7.3 Gatto, D. Bricola. 2018, https://www.eyeem. com/p/120561658. Accessed 14 Sept 2018.
Landscape Urbanism 2017-2018
Figure 4.7 Robinson, Geoff. An Aerial Of Striking Marshland At Tollesbury Marina In Essex Is Used At The Beginning Of The Programme, Which Centres On An Allegation Of Rape. 2017, https://www.dailymail.co.uk/news/article-4985090/Touristsflock-marshland-used-Liar-opening-sequence.html. Accessed 13 Sept 2018.
157
Works Cited
Text Credit
Balata, Fernanda. The Blue New Deal. New Economic Foundation, June 2015, 1-56. New Economic Foundation, https://neweconomics.org/.
Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages Pages
Bioaqua. “Consultancy.” Bioaqua Farm, bioaquafarm.co.uk/ consultancy/. Carpenter, Griffin. “Not in the Same Boat.” New Economic Foundation. Cosgrove, Denis E. Social Formation and Symbolic Landscape. University of Wisconsin Press, 1998. “Earth Ocean Farms.” Earth Ocean Farms, www. earthoceanfarm.com/. Elden, Stuart. The Birth of Territory. The University of Chicago Press, 2013. Ellis, Tim, et al. “CEFAS.” Aquaculture Statistics for the UK, with a Focus on England and Wales, Cefas, Jan. 2015, assets. publishing.service.gov.uk/government/uploads/system/ uploads/attachment_data/file/405469/Aquaculture_Statistics_ UK_2012.pdf. Fraser, Douglas. “Scottish Salmon Farming’s Sea Lice ‘Crisis’.” BBC News, BBC, 14 Feb. 2017, www.bbc.co.uk/news/ukscotland-38966188. Gandy, Matthew, The Fabric of Space: Water, Modernity, and the Urban Imagination. Massachusetts Institute of Technology, 2014, pp. 145-183. Glegg, Gillian, Et al. “Plymouth National Marine Park, Interview.” 22 Mar. 2018.
Book Layout Simulation layout - Y. Zhao Template layout - K. Zhu Chapters and Index layout - J. Ta
Catalogue Pages Pages Pages Pages
70 to 75 84 to 101 112 to 116 122 to 137
Creek Environment Simulations Physical Creek Simulations Tide Conditions Archetypes, Analysis, and Scenarios
Appendix Videos
Lerøy. “Ocean Forest.” Lerøyseafood, www.leroyseafood. com/en/sustainability/innovation/ocean-forest/.
Page Page Page Page Page Page Page
Mzgoulton. “‘No-Take’ Marine Reserves in the UK.” Enviro-Blog, 11 Nov. 2014, mzgoulton.wordpress.com/2014/11/11/no-takemarine-reserves-in-the-uk/. Plymouth City Council. “Plymouth Report 2017.” Plymouth, Oct. 2017, Plymouth.gov. Rutgar. “What Is the Difference between Marine Reserves and Marine Parks? -.” Book Your next Adventure Trip Today, The Scuba Page, 5 Feb. 2018, rushkult.com/eng/scubamagazine/ marine-reserves/. Steinberg, Philip and Peters, Kimberley. Wet Ontologies, Fluid Spaces: Giving Depth to Volume through Oceanic Thinking. Sage Journals, 2015. 247- 265. Sage Journals, journals. sagepub.com/doi/10.1068/d14148p. Veta La Palma. “Welcome to VETA LA PALMA.” Veta La Palma - Parque Natural, www.vetalapalma.es/index.asp?LG=2. Intertidal Mediations
J. Ta K. Zhu J. Ta K. Zhu J. Ta J. Ta Y. Zhao K. Zhu J. Ta Y. Zhao J. Ta J. Ta Y. Zhao J. Ta J. Ta J. Ta J. Ta
“GreenWave.” GreenWave, www.greenwave.org/ greenwaveorg/.
“Marine Protected Areas in the UK.” Marine Protected Areas in the UK, jncc.defra.gov.uk/page-5201.
158
1 to 17 18 to 37 38 to 44 45 to 47 48 to 57 58 to 59 60 to 67 68 to 77 78 to 93 94 to 97 98 to 101 101 to 105 106 to 109 110 to 117 118 to 149 150 to 153 154 to 159
61 85 88 112 114 137 141
Nautical Negotiations Single Unit Simulations Multiple Unit Simulations Tide Conditions Tributary Reconfigurations Evolutionary Scenarios Intersecting Archetypal Grounds
Team vimeo Intertidal Mediations
Jimmy Ta jimmykta@gmail.com Yaxin Zhao yaxin.zhao02@gmail.com Kai Zhu itskksama@gmail.com Disclaimer: The enclosed document is a product of studentsâ&#x20AC;&#x2122; research and drawings with all works cited. However, if there are any discrenpancies, please enquire further information with the provided contact. Thank you.
Landscape Urbanism 2017-2018
Contact:
159
Intertidal Mediations