Wi abm 1602 uw project activity configuration

Page 1

CONTROLLED DOCUMENT: WI-ABM-1602

QMS STANDARDS

BUSINESS UNIT:

ABM 551 Fifth Avenue, Suite 300, New York, NY 10176

STANDARD TYPE:

Work Instruction

PROCEDURE TITLE: Unified Workforce Project Activity Configuration

AREA: Operations TYPE OF PROCEDURE:

Needs Assessment

DOCUMENT NUMBER: WI-ABM-1602 REVISION: 1.2

PROCEDURE STATUS IMPLEMENTED DATE REVISION DATE

Released 06/24/15 06/24/15

UNLOCK DOCUMENT TO EDIT BEYOND THIS POINT 1.0

PURPOSE/SCOPE Unified Workforce (UW) Project Activity will allow UW participants to create project teams influenced by financial and social perspectives. UW Project Activity naturally is anticipated to distribute activity via the UW Queue (UWQ) or work activity paths. However, it is not required. With the initiation of the UW Service Network component, companies have been added to the mix and an opportunity has arisen that allows us to add to the logistical and business variables, a financial set of variables. The total cost of a transaction must contain the existing and the new elements shown under the requirements. Through Project Activity, the local labor contractor will have the ability to manipulate their position on the notification ramp by becoming more competitive from a billable rate perspective. The effective use of Project Activity begins with the onboarding process through which UW users are given the initial ability to leverage its features. In conjunction with onboarding and equally critical, is the configuration process through which specific settings and features are entered and/or validated. This Work Instruction (WI) defines the onboarding process for the use of UW Project Activity.

2.0

RESPONSIBILITIES 2.1

TASK RESPONSIBILITIES   

It is the responsibility of all participants of UW and Project Activity to read, understand and abide by the provisions of this WI. It is the responsibility of the UW Support Team to complete the steps within their purview specific to the configuration of the Queue functions in UW. It is the responsibility of the UW Support Team to ensure the validity and effectiveness of the processes defined in this WI.

2.2 APPROVAL / ESCALATION RESPONSIBILITIES The Senior Vice President of Learning and Quality is the point of escalation for all matters contested or inquired upon this WI.

Procedure Title: UW Project Activity Configuration

Page 1 of 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.