Interior Shot
1
2
3
Prespective
Prespective
2
4
4
Shot 1
Shot 1
2
Riad Street
4
Shot 2
Shot 2
120 Parking
01 Project Design
Project Brief The process of designing the building depends on how to create a local familiar building integrate with urban fabric style, combine to the architectural environment , consider the new architectural methods of building structure and meets the of sustainability requirements.
Form Development
The formation of the masses is refliection to the main concept of the project ,accrodingly the masses were designed as cubes growing , each cube could be connected to the other one either horizontally or vertically
01
01
Site Plan Entrance
4
3
Car Path
3
3
2
3
4
Solid and Void
4
1 4
Key 1- Main Entrance 2- Main Hall 3- Offices 4- Parking
01
Plans Ground Plan Level Core
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
B
๏๏๏๏
๏๏
๏๏๏๏
๏๏ ๏๏ ๏
A
๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏ ๏ ๏ ๏ ๏
Key
B ๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏ ๏ ๏๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
A
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏ ๏ ๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
Zoning
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
Entrance Offices Waiting Area Service Core W.C
๏
๏ ๏ ๏ ๏ ๏ ๏ ๏ ๏
01
Plans First - Second Floor Level Core
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
B
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏
๏
๏
๏
๏
B
Offices W.C ๏๏๏๏๏๏๏๏๏
๏๏
๏๏๏๏
๏๏๏๏
A
๏๏๏๏
Key
๏ ๏ ๏ ๏ ๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏ ๏ ๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
A
๏๏๏๏๏
๏๏๏๏
๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
Zoning
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏ ๏ ๏ ๏ ๏ ๏ ๏ ๏
01
Plans Third - Fourth Floor Level Core ๏๏
๏๏ ๏๏ ๏๏
๏๏ ๏๏ ๏๏
๏ ๏๏๏ ๏๏
๏ ๏ ๏ ๏
๏ ๏๏
๏ ๏ ๏
๏๏ ๏ ๏๏๏ ๏ ๏ ๏๏
๏๏ ๏ ๏๏๏๏ ๏ ๏๏
๏๏๏ ๏๏
๏๏๏ ๏๏
๏๏
๏๏๏ ๏๏
๏๏ ๏๏ ๏๏๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏ ๏๏๏๏๏
๏๏๏๏
๏ ๏ ๏ ๏
๏๏๏๏
๏๏ ๏๏ ๏๏ ๏ ๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏ ๏๏
๏๏
๏๏๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏ ๏
๏๏
๏๏๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏ ๏
๏๏๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏
๏ ๏ ๏๏ ๏ ๏
๏
๏๏๏๏
๏๏ ๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏๏ ๏๏
๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏
๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏๏ ๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏๏ ๏๏
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏
๏๏ ๏๏
๏
๏๏๏๏
๏๏ ๏ ๏๏๏๏ ๏ ๏๏
๏๏๏๏๏
๏ ๏
๏๏๏๏ ๏๏๏๏
B
๏๏ ๏ ๏๏๏ ๏ ๏ ๏๏
๏๏๏๏
๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏
๏ ๏ ๏
๏๏๏๏
๏๏
๏๏๏๏ ๏๏๏๏
W.C
๏๏๏๏ ๏๏๏๏
Offices
๏๏๏๏ ๏๏๏๏
๏ ๏๏
Key
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏ ๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏ ๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏
๏ ๏ ๏๏
๏๏๏๏
๏๏๏๏
๏ ๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏
๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏ ๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏
๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏
๏ ๏
๏๏๏๏
๏ ๏
๏๏
๏๏๏๏
๏๏
๏ ๏
๏๏๏๏
๏๏
๏๏
๏๏๏๏
๏ ๏ ๏
๏๏
๏๏๏๏
๏ ๏ ๏
๏๏
๏๏๏๏
๏ ๏ ๏
๏๏๏๏
๏ ๏๏
๏๏๏๏
๏ ๏ ๏
๏๏๏๏
๏ ๏๏
A
๏๏๏๏
๏๏๏
๏๏
๏๏๏๏
A
๏ ๏ ๏
๏๏
B
๏ ๏
๏๏๏๏
๏๏
๏ ๏ ๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏
๏ ๏ ๏
๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏
๏ ๏ ๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
Zoning
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
๏๏
๏ ๏ ๏
๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏
๏ ๏ ๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
๏ ๏ ๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏ ๏ ๏ ๏
๏๏๏๏
๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏ ๏๏ ๏๏ ๏ ๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏ ๏๏
๏๏๏๏
๏ ๏ ๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏ ๏ ๏ ๏ ๏ ๏ ๏ ๏
01
Plans Fifth - Sixth Floor Level Core
๏๏
๏๏๏๏ ๏๏
๏๏ ๏ ๏
๏๏
๏ ๏
๏๏
๏๏ ๏ ๏๏ ๏
๏๏
๏๏ ๏ ๏๏ ๏ ๏๏
๏ ๏๏
๏
๏ ๏๏
๏ ๏๏ ๏๏
๏ ๏๏ ๏๏
๏๏๏๏ ๏๏
๏๏๏๏ ๏๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏๏๏ ๏๏
๏๏
๏๏๏๏ ๏๏๏๏ ๏๏ ๏๏
๏๏ ๏ ๏ ๏๏
๏๏
๏ ๏
๏๏๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏
๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏ ๏ ๏ ๏๏
๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏ ๏๏
๏
๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏๏๏ ๏๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏ ๏๏๏๏ ๏๏ ๏๏๏๏ ๏๏
๏
๏๏๏๏
๏๏๏๏ ๏๏
๏๏๏๏
๏๏๏๏๏๏
๏๏๏๏
๏ ๏๏ ๏๏
๏๏๏๏
๏๏๏๏
๏ ๏๏ ๏๏
๏๏๏๏๏
๏๏๏๏
๏ ๏๏
๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏
๏๏๏๏
๏
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏ ๏๏ ๏
๏
๏๏๏๏
๏ ๏๏
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏
๏
๏๏๏๏
๏๏ ๏ ๏๏ ๏ ๏๏
๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏
๏
๏๏๏๏
๏๏ ๏ ๏๏ ๏
๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏
๏ ๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏
๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏
๏
๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏
๏ ๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏
๏๏๏๏
๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏
B
๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏
W.C
๏๏๏๏ ๏๏๏๏๏
A
๏๏๏๏๏๏ ๏๏๏๏๏๏
Offices
๏๏๏๏
B
๏๏๏๏ ๏๏๏๏
Key
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏
๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏๏
๏๏๏๏
๏๏
๏
๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏
A
๏๏
๏
๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏๏๏
๏๏
๏
๏๏๏๏
๏๏๏๏
๏ ๏
๏๏๏๏
๏๏๏๏
Zoning
๏
๏๏๏๏๏
๏๏๏๏
๏ ๏
๏ ๏
๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏ ๏ ๏ ๏
๏
๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
๏ ๏
๏๏๏๏ ๏๏๏๏
3D Modelling
Ground Floor -Section Box
First Floor -Section Box
01
3D Modelling
Fifth Floor -Section Box
Sixth Floor -Section Box
01
01
3D Modelling Offices Mian Hall Second Entrance
Offices
Parking
Main Entrance Offices
Elevations Eastern Elevation
Northern Elevation
01
Elevations Southern Elevation
Western Elevation
01
3D Sections
01
Offices Offices
Section (A-A)-3D
Offices Section (B-B) -3D
Mian Hall
3D Sections
Mian Hall Offices
Offices
Section (A-A)-3D
Section (B-B) -3D
Offices
01
Vertical Analysis Vertical Analysis Zoning Zoning
Key Key
Main Entrance Main Entrance Service Service Offices Offices Cafe Cafe Offices Offices Main Hall Main Hall
Sixth Plan Level Sixth Plan Level
Circluation Circluation
Sixth Plan Level Sixth Plan Level
Fifth Plan Level Fifth Plan Level
Fifth Plan Level Fifth Plan Level
Fourth Plan Level Fourth Plan Level
Fourth Plan Level Fourth Plan Level
Third Plan Level Third Plan Level
Third Plan Level Third Plan Level
Second Plan Level Second Plan Level
Second Plan Level Second Plan Level
First Plan Level First Plan Level
Key Key
First Plan Level First Plan Level
Core Core
Ground Plan Level Ground Plan Level
Ground Plan Level Ground Plan Level
01 01 01
Visual Sequence
01
01 Visual Sequence
02 Project Design
Project Brief The project is a social platform for diversity by injecting places for social bonding
Form Development
02
Form ๏ ๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏
๏ ๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏
02
Site Plan Entrance
Car Path
4 5 2 Solid and Void
Key 1- Main Entrance 2- Main Hall 3- Offices 4- Parking
3 1
๏๏๏๏๏๏๏
Plans
๏๏๏๏๏๏๏
Ground Plan Level
๏๏๏๏๏๏๏ ๏๏๏
Core ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏๏ ๏๏ ๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
Zoning ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏๏ ๏๏ ๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
Key Theater Acting Room Serivce Admin. Storage W.C
02
๏
02
Plans First Plan Level
๏
Core
๏ ๏
๏๏๏๏ ๏ ๏๏๏๏๏๏๏ ๏๏๏ ๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
๏
Zoning
๏๏๏๏ ๏ ๏ ๏ ๏๏๏๏๏๏๏ ๏๏๏ ๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
Key Theater Acting Room Serivce Admin. Storage W.C
๏
Plans
๏๏๏๏
Second Plan Level
๏ ๏
Core
๏๏๏๏
๏ ๏๏๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
๏๏๏๏ ๏๏๏๏๏๏๏ ๏ ๏๏๏๏ ๏ ๏
Zoning
๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
Key Theater Acting Room Serivce Admin. Storage W.C
02
3D Modelling
Multipurpose hall
Theater
Entrance
02 Admin .
Theater
`cafe
Elevations Southern Elevation
Eastern Elevation
02
Elevations Northen Elevation
Western Elevation
02
02
Vertical Analysis Zoning
Circluation
Key
Key
Theater Admin .
Core
Services Cafe
Visual Sequence
02
๏ ๏๏๏๏ ๏ ๏ ๏ ๏๏๏๏๏๏๏ ๏๏๏ ๏ ๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏๏๏
๏ ๏๏๏๏ ๏ ๏ ๏ ๏๏๏๏๏๏๏ ๏๏๏ ๏ ๏๏๏๏๏๏
03 Project Design
Project Brief The design was based on cubism concept by finding saluations using simple geomtric shapes
03
Plans Ground Plan Level Core ๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏
๏
๏
๏
๏ ๏
๏
๏
๏
๏๏
๏๏๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏
๏ ๏๏๏
๏๏๏
Zoning
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏ ๏๏๏ ๏๏
๏๏๏ ๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏
Key Entrance Core Admin. Service Offices Cafe
๏
๏๏๏
๏๏๏
๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏๏
๏
๏
๏
๏ ๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏ ๏๏
๏๏
03
Plans First Floor Level Core ๏
๏
๏
๏
๏
๏๏
๏๏ ๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏
๏
๏
๏
๏๏๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
Zoning
๏๏๏
๏
๏ ๏๏๏ ๏๏ ๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
Key Entrance Core Admin. Service Offices Cafe
๏๏๏
๏๏๏
๏๏๏๏๏
๏
๏๏ ๏๏ ๏ ๏ ๏ ๏
๏
๏๏๏
๏
๏๏๏ ๏๏
๏๏๏
๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏ ๏๏
๏๏
03
Plans Second Floor Level
๏๏ ๏๏ ๏๏ ๏ ๏ ๏ ๏๏ ๏๏๏ ๏๏
Core
๏๏ ๏๏ ๏๏
๏๏ ๏๏ ๏๏ ๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏ ๏๏๏๏ ๏๏ ๏๏๏
๏
๏
๏
๏
๏
๏๏ ๏๏
๏๏
๏๏ ๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏
๏
๏
๏
๏๏๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏ ๏๏ ๏๏ ๏ ๏ ๏ ๏๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏ ๏๏ ๏๏ ๏๏
๏๏๏
๏๏๏
๏๏๏ ๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏
Key Entrance Core Admin. Service Offices Cafe
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏๏
๏
๏๏ ๏๏ ๏ ๏ ๏๏ ๏ ๏๏ ๏๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏
๏
๏๏๏
๏๏ ๏๏
๏
๏
๏๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏ ๏๏๏๏ ๏๏ ๏๏๏
๏๏๏ ๏๏
๏๏ ๏๏ ๏๏
๏๏๏
๏๏
๏
๏
๏๏๏
Zoning
๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏ ๏๏
๏๏
03
๏ ๏๏๏๏ ๏๏ ๏ ๏ ๏
๏๏ ๏๏
Plans Third Floor Level Core
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏ ๏๏๏
๏๏ ๏๏ ๏ ๏ ๏๏ ๏ ๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏ ๏๏๏๏ ๏๏
๏๏๏
๏๏ ๏๏ ๏๏ ๏๏
๏๏๏
๏๏๏ ๏๏ ๏๏ ๏๏ ๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏๏ ๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏ ๏๏๏
๏ ๏๏๏
๏
๏ ๏๏๏ ๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
Key Entrance Core Admin. Service Offices Cafe
๏
๏๏๏
๏๏๏
๏๏๏ ๏๏
๏
๏๏๏
๏๏๏
Zoning
๏๏๏
๏๏๏
๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
Plans Fourt Floor Level
03
๏๏ ๏๏ ๏๏ ๏ ๏ ๏ ๏๏ ๏๏ ๏ ๏๏
๏๏ ๏๏ ๏๏
๏๏ ๏๏
๏๏ ๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏ ๏๏๏๏ ๏๏
Core
๏๏๏
๏๏ ๏๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏ ๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
Key Entrance Core Admin. Service Offices Cafe
๏
๏๏๏
๏๏๏
๏
๏๏๏ ๏๏
๏๏ ๏๏
๏
๏
๏๏๏
๏๏ ๏๏ ๏ ๏๏๏๏ ๏๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏ ๏๏๏๏๏
๏๏๏ ๏๏
๏๏ ๏๏
๏๏๏
Zoning
๏
๏
๏๏๏ ๏๏ ๏๏ ๏๏
๏๏
๏
๏
๏๏ ๏๏ ๏ ๏ ๏๏ ๏ ๏๏
๏๏๏
๏๏๏
๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
03
๏ ๏๏
Plans
๏๏ ๏๏ ๏๏ ๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏๏ ๏๏๏ ๏๏ ๏๏๏
Basement Floor Level
๏๏ ๏๏
๏
Core
๏
๏
๏ ๏
๏
๏
๏
๏๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏
๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏๏ ๏๏
๏
๏
๏๏๏
๏
๏
๏ ๏๏๏
๏
๏
๏๏๏ ๏๏
๏
๏๏๏
๏๏๏
๏
๏
๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏ ๏๏๏
๏
๏๏๏๏
๏
๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏๏
Key Entrance Core Admin. Service Offices Cafe
๏
๏๏๏
๏๏๏
๏
๏๏๏ ๏๏
Zoning
๏๏๏
๏๏๏
๏๏ ๏๏
๏
๏๏๏
๏๏๏๏ ๏๏๏ ๏๏ ๏๏ ๏๏ ๏๏๏ ๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏ ๏๏ ๏๏ ๏๏
๏๏๏
๏๏
๏
๏๏๏
๏๏ ๏๏ ๏ ๏ ๏ ๏๏ ๏๏ ๏ ๏๏ ๏๏
๏๏๏
๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
๏๏
3D Modelling
Ground Floor -Section Box
Second Floor -Section Box
03
3D Modelling
Fifth Floor -Section Box
๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏ ๏๏๏๏๏ ๏๏ ๏๏๏๏๏ ๏
3D -Section Box
03
Elevations Main Elevetion
03
03
Vertical Analysis Zoning
Circluation
Key
Key
Offices Hall
Core
Admin. Service Cafe Storage
๏
๏๏๏๏๏ ๏๏๏๏๏ ๏๏ ๏๏๏๏๏ ๏๏ ๏๏๏๏๏ ๏
Visual Sequence
03
04
Residental Tower
Project Brief our approach is to give an efficient yet unique and interesting environment to living in which privacy, interaction, and entertainment are equally considered.
04
Concept Creating an internal street to increase the number of units overlooking the street
Vertical Zoning 12 5 4 3 2 1
04
Site Plan Entrance
Block Block
Block
Car Path
Street 8m
Block
Block
Block
Solid and VoidBlock Block
Block
Street 18m
04
Plans Ground Floor Level Core
Street 8m
Street 18m
Street 8m
Zoning
A Street 8m
Street 18m
Key Residential and Administrative Entrance Shop Movement Paths Electricity Room Guard Room W..C
Street 18m
A
Plans First -Second Floor Level Core
Zoning
Key Residential and Administrative Entrance Shop Movement Paths Electricity Room W..C
04
04
Plans Third - Fourth Floor Level Core
Street 8m
Zoning
Street 8m
Key 1 2
Key 1 2 3 4 5 6
3 4 5 6 7 8
Street 8m
8
Plans Typical Floor Level Core
Zoning
Key 1 2
Key Key 1 1 2 2 3 3 4 4 5 5 6 6
3 4 5 6 7
04
Plans Basement Floor Level Core
Zoning
Key Movement Paths
04
04
3D Modelling
4 ๏
๏๏๏๏
2
3D G ๏
๏๏๏๏
Elevations Main Elevation
04
04
Vertical Analysis Zoning
Typical Floor
Circluation
Typical Floor
Third Floor
Third Floor
Second Floor
Second Floor
First Floor
First Floor
Key
Key
Commercial Floor Admin.Floor
Core
Residential Floor
Ground Floor
Ground Floor
04
Sections Towre 1
Towre 2
Section A-A
04
Apartment Unit (1) 2 Area 95m 3D Section
Plan
Area Tabel Room
Dim.
Area
Living.R
7.7*3.5
27
Bed.R
3.53*3.4 3.9*3.33 3.9*3.33
12 13 13
Kitchen
2.5*2.4
6
W.C Corridor
2.3*1.74
4 8
04
Apartment Unit (2) 2 Area 107m Plan
3D Section
Area Tabel Room
Dim.
Area
Living.R
7.7*3.5
44
Bed.R
6.25*4 4.29*3.5 5.85*4.1
25 15 24
Kitchen
3.33*2.38
8
W.C Corridor
1.82*1.65
3 9
04
Apartment Unit (3) 2 Area 114m 3D Section
Plan
Area Tabel Room
Dim.
Area
Living.R
12.43*3.5
47
Bed.R
5.62*3.2 3.5*3.33 3.44*3.2
18 11 11
Kitchen
3.2*2.8
6
W.C Corridor
2.2*1.8
4 8
04
Apartment Unit (4) 2 Area 130m 3D Section
Plan
Area Tabel Room
Dim.
Area
Living.R
10.56*3.5
37
Bed.R
4.96*3.36 3.96*3.36 4.46*3.76
17 18 17
Kitchen
2.9*2.36
7
W.C Corridor
2.62*1.9
5 8
04
Apartment Unit (5) 2 Area 110 m 3D Section
Plan
Area Tabel Room
Dim.
Area
Living.R
13.4*3.46
47
Bed.R
3.92*3.2 3.2*3.1 3.96*3.46
12.5 10 14
Kitchen
3.46*2.26
8
W.C Corridor
1.76*1.66
3 10
04
Apartment Unit (6) 2 Area 90m 3D Section
Plan
Area Tabel Room
Dim.
Area
Living.R
7.26*4.7
34
Bed.R
3.76*3.2 3.75*3.16 3.75*3.16
15 12 12
Kitchen
3.76*2.1
8
W.C Corridor
1.66*1.2
4 5
04
Apartment Unit (7) 2 Area 120m
3D Section
Plan
Area Tabel Room Room
Dim. Dim.
Living.R Living.R
7.7*3.5 11.26*4.6
27 52
Bed.R Bed.R
3.53*3.4 3.47*3.2 3.9*3.33 3.6*3.56 3.9*3.33 6.14*4.26
12 12 13 13 13 21
Kitchen Kitchen
2.5*2.4 2.5*2.4 2.3*1.74 2.3*1.47
6 6 4 4 8 8
W.C W.C Corridor Corridor
Area Area
04
Street 8m
Street 18m
Manual Rendering
Visual Sequence
05 Residental Project
Project Brief As human beings, we thrive in a coherent social environment, and this is exactly what my project is aiming for, by enhanced interaction, welcoming social activity , integrating with nature
Concept Development
Residental Plan
Sketch
05
05
Plans Ground Floor Level
๏๏๏๏๏๏ ๏๏๏๏๏ ๏
Core
๏
๏
๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏๏
๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏
๏๏๏
๏
๏๏๏
๏๏
๏๏
๏๏
๏๏
๏๏๏๏๏๏
๏๏๏
๏๏๏
๏ ๏ ๏
๏
๏๏๏ ๏๏๏ ๏๏๏
๏๏๏ ๏๏๏ ๏๏๏ ๏๏๏
๏๏
๏
๏๏๏ ๏๏๏
๏๏๏
๏
๏๏๏
๏๏
๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏๏
๏ ๏
๏๏๏
๏๏๏๏ ๏๏๏๏
๏
๏๏๏
๏๏๏๏ ๏๏๏๏
๏
๏๏๏
๏๏๏ ๏๏๏
๏
๏๏๏
๏๏๏ ๏๏๏
๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏
๏๏๏๏ ๏๏๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏๏๏ ๏๏๏
๏๏๏
๏
๏๏๏๏๏๏
๏๏
๏๏๏๏
๏
๏๏๏๏ ๏๏๏๏
๏๏๏ ๏๏๏
๏๏๏
๏
๏๏๏๏๏๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏
๏
๏๏๏๏๏๏
๏๏
๏
Zoning
๏๏๏๏๏๏
๏๏
๏
๏๏๏
๏๏๏๏๏๏
๏
๏๏
๏
๏๏๏
๏๏ ๏๏
๏๏
๏
๏
๏๏๏
๏
๏๏ ๏๏
๏๏๏ ๏๏๏
๏
๏๏๏
๏๏๏๏๏๏
๏
๏๏
๏๏
๏๏๏
๏๏๏
๏
๏๏๏
๏๏๏๏๏๏
๏
๏๏
๏๏
๏๏๏
๏๏๏
๏
๏
๏๏
๏๏๏๏ ๏๏๏๏
๏
๏๏๏
๏๏๏
๏
๏๏
๏๏๏๏ ๏๏๏
๏ ๏
๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏๏
๏๏๏
๏๏๏
๏
๏๏ ๏๏๏ ๏๏๏
๏๏
๏
๏๏ ๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏๏๏ ๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏
๏๏๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏๏
๏๏๏
๏๏๏
๏
๏๏ ๏๏๏ ๏๏๏
๏
๏๏
๏๏๏
๏๏๏
๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏
๏
Key ๏๏๏
๏
๏
Cores Shops corridor w.c
๏๏
๏ ๏
๏๏๏๏ ๏๏๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏๏ ๏๏๏๏
๏๏๏
๏๏
๏
๏๏
๏
๏
๏
๏
๏
๏๏๏๏๏๏ ๏ ๏
๏๏ ๏
๏ ๏
๏
๏
๏๏ ๏
๏
๏๏๏๏๏๏ ๏๏
๏๏
๏๏ ๏
๏๏๏๏๏๏
๏๏๏๏๏๏
๏๏
๏ ๏
๏
๏ ๏ ๏
๏๏๏๏๏๏
๏๏
๏๏๏๏๏๏
๏๏
๏๏๏๏๏๏
๏๏
๏๏
๏๏๏๏๏๏
๏๏๏๏๏๏
๏๏
๏๏๏๏๏๏
๏๏ ๏๏
๏๏ ๏๏
๏
05
๏
Plans
๏
๏
First - Second Floor Level
๏ ๏
Core ๏
๏
๏
๏
๏ ๏
๏
๏
๏
๏๏
๏
๏๏๏
๏
๏๏
๏๏
๏๏๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏๏๏
๏
๏๏๏
๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏๏๏
๏ ๏
๏ ๏
๏
๏
๏
๏
๏
๏
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏๏๏
๏
๏๏๏
๏
๏ ๏๏๏
๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
Key Cores Shops corridor w.c
๏
๏๏๏
๏๏๏
๏๏๏๏
๏
๏๏๏
Zoning
๏
๏
๏
๏
๏๏๏
๏๏๏
๏
๏๏๏๏ ๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏๏
๏๏
05
Plans Typical Floor Level Core
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏๏๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏ ๏
๏
๏ ๏๏๏
๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏ ๏ ๏
๏ ๏๏๏๏
๏
๏๏
๏
๏
๏๏๏
๏
๏
๏๏๏
๏
๏
๏๏๏
๏๏๏
๏๏๏๏
๏
๏๏๏๏
๏
๏๏๏
๏๏๏
Zoning
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏๏
Key
๏๏๏
Cores Unit (1) Unit (2)
๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏ ๏๏ ๏๏๏๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏
๏๏๏
๏๏
๏๏
05
Plans Basement Floor Level Core
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏๏ ๏
๏ ๏
๏
๏๏๏ ๏
๏๏๏
๏
๏
๏
๏
๏
๏๏
๏๏
๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏ ๏ ๏๏๏๏
๏
๏๏๏๏
๏
๏
๏๏๏
๏๏๏
Zoning
๏ ๏
๏
๏ ๏
๏๏๏
๏๏๏
๏
๏
๏
๏
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
๏ ๏๏๏
๏๏๏
๏
๏
Key
๏๏๏๏ ๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
๏๏๏
Storage ๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏
๏๏
05
3D Modelling
2
1
G 3D
05
Elevations
๏ ๏
๏
๏
๏
๏
๏
๏
05
Vertical Analysis Zoning
Circluation Typical Floor
Typical Floor
Second Floor
Second Floor
First Floor
First Floor
Key
Key
Commercial Floor Admin. Floor
Core
Residential Floor
๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
Ground Floor
Ground Floor
05 Visual Sequence
06 Villa
Project Brief The Villa stands out for its contemporary design shape combined with the play of volumes and finishes
06
Sketches Concept Development
Vertical Connection
Sketch Shot
Vertical
06
Plans Ground Plan Level
๏
๏
๏ ๏ ๏
Zoning
๏
๏ ๏
B ๏
๏
๏ ๏ ๏
๏
๏
๏ ๏
๏
๏ ๏
๏
๏
๏
๏ ๏๏
๏
๏
๏ ๏
๏
๏๏๏๏
๏ ๏
๏
๏ ๏ ๏
๏
๏
๏
๏
๏๏๏๏
๏ ๏
๏ ๏
๏
๏
๏
A
Zoning
๏
๏
๏
๏
A ๏
๏
๏ ๏
๏
๏ ๏ ๏ ๏
๏
๏ ๏
๏ ๏๏๏
๏
๏ ๏
๏
๏ ๏
๏
๏
๏ ๏
๏
๏
๏
๏๏ ๏
๏
๏
๏ ๏
๏ ๏
B
๏ ๏๏๏
Key Living Room Dinning Room Kitchen W.C Store
๏
๏ ๏
๏
๏
๏
๏ ๏
๏ ๏ ๏
๏ ๏ ๏ ๏
๏
๏
๏
๏ ๏
๏ ๏
06
Plans First Floor Level
๏ ๏
๏๏
๏๏ ๏๏ ๏ ๏
Zoning
๏ ๏
๏ ๏๏ ๏
B ๏ ๏ ๏
๏
๏๏ ๏
๏
๏ ๏
๏ ๏ ๏
๏
๏
๏๏ ๏
๏
๏๏ ๏
๏ ๏
๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏
๏ ๏ ๏
๏ ๏
๏
๏ ๏
๏ ๏
๏
๏
๏๏ ๏
๏๏
๏
๏๏๏๏๏๏
A
๏ ๏
๏ ๏
๏๏๏
A
๏๏๏๏๏
๏ ๏
๏ ๏
๏
๏ ๏
๏๏ ๏ ๏ ๏ ๏
๏ ๏
๏ ๏ ๏ ๏
๏
๏ ๏ ๏ ๏
๏ ๏๏๏
๏
๏ ๏ ๏
๏
๏๏ ๏
๏
๏
๏ ๏
๏ ๏
๏
๏๏ ๏
๏ ๏ ๏
๏
๏๏ ๏
๏
B
๏ ๏
๏
๏๏ ๏ ๏ ๏
๏๏๏
Key Living Room Bed Room W.C
๏ ๏
๏ ๏
๏๏ ๏ ๏ ๏
๏๏
๏ ๏๏ ๏ ๏ ๏
๏ ๏
๏ ๏๏ ๏
Plans ๏๏ ๏๏ ๏๏ ๏ ๏
๏ ๏
06
๏ ๏๏ ๏
Second Floor Level
๏ฌ ๏ ๏
๏ญ ๏๏
Core
๏ ๏๏ ๏ ๏ ๏ ๏ฎ๏ฏ ๏๏ ๏๏ ๏๏
๏๏ ๏ ๏๏๏ ๏ ๏
BB
๏ ๏ ๏๏ ๏ ๏ ๏
๏
๏๏ ๏
๏
๏ ๏
๏
๏๏๏๏ ๏ก๏๏ข๏ฃ๏ข๏ค
๏
๏ ๏ ๏
๏
๏ ๏
๏
๏
๏ ๏
๏ ๏
๏
๏ ๏ ๏ ๏ ๏ ๏ ๏๏๏
๏ ๏ ๏
๏๏๏ก๏ฆ๏๏ง๏๏จ๏ฉ๏ก๏ฅ๏ข๏ช
๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏ ๏๏
๏๏ ๏ ๏
๏๏ ๏ ๏
๏๏๏๏๏๏ ๏๏๏๏๏
AA
๏ ๏
AA
๏๏ ๏ ๏
๏๏ ๏ ๏
๏๏ ๏ ๏ ๏ ๏ ๏๏
๏๏ ๏ ๏ ๏ ๏ ๏๏
๏๏ ๏ ๏
๏๏ ๏ ๏
๏
๏
๏
๏๏ ๏
๏
Key Roof Bed Room W.C
๏๏
๏๏ ๏ ๏
๏ ๏๏ ๏ ๏ ๏
๏ ๏
BB ๏ ๏ ๏๏ ๏ ๏
๏ ๏
๏๏ ๏ ๏
๏ ๏๏ ๏ ๏ฌ ๏ ๏
๏ญ ๏๏
๏ฏ ๏ ๏๏ ๏ ๏๏ ๏ ๏ ๏ ๏ฎ ๏ ๏๏
๏๏ ๏ ๏๏๏ ๏ ๏
3D Modelling
First Floor -Section Box
06
Ground Floor -Section Box
Circluation Second Floor -Section Box
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏
Elevations
๏๏ ๏
๏
๏๏๏ข๏ก๏ ๏๏๏๏๏ ๏
๏ ๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏
๏
Southern Elevation
๏ ๏
๏ G
๏ F
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏ D
06
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ H
๏
๏
๏ C
๏ B
๏๏๏๏๏
๏
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏
๏
๏
๏ ๏
๏
๏
๏ ๏ ๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏
๏
๏๏ ๏
๏
๏ ๏
๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏
๏ F
๏ D
๏ C
๏ B
๏ ๏
๏
๏
๏
๏๏ ๏
๏
๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏
๏
๏
๏ ๏
๏
๏๏๏๏
๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏ ๏๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏ ๏๏๏๏
๏
๏ ๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏
๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏
๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏
๏ G
๏ H
๏ ๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏
๏
๏
๏๏ ๏
๏
๏
๏๏ ๏
๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏
๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏
๏
๏ ๏๏ ๏ ๏ ๏ ๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏
๏๏๏๏
๏ ๏๏ ๏
๏
๏ ๏
๏ ๏ ๏
๏๏๏๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏ ๏๏ ๏
๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
Western Elevation ๏
๏
๏๏ ๏
๏
๏ ๏
๏ ๏ ๏
๏
๏๏๏ข๏ก๏ ๏๏๏๏๏ ๏
๏๏๏๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏
๏
๏
๏
๏
๏
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏
๏๏๏๏ ๏
๏๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏๏๏๏
๏ ๏
๏
๏๏ ๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ H ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏
๏ G
๏
๏ F
๏
๏
๏ D
๏ C
๏
๏
๏ B
๏
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏
๏๏๏๏ ๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏ ๏
๏
๏ ๏
๏
๏ ๏
๏ ๏
๏
๏
๏๏๏๏๏
๏
๏
๏
๏๏ ๏
๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏ ๏ก๏ข๏๏ ๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏
๏๏๏๏
๏
๏
๏
๏
๏
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
Western Elevation ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏ข๏ก๏ ๏๏๏๏๏ ๏
๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏
๏๏ ๏
๏
๏
๏ ๏
๏
๏ ๏
๏ ๏ ๏
๏
๏
๏ ๏
๏ ๏
๏
๏
๏
๏
๏๏๏๏๏
๏๏ ๏
๏
๏ ๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏
๏
๏ ๏
๏ ๏ ๏
๏
๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏ ๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏
๏
๏
๏ ๏ ๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ ๏
๏
๏๏๏๏
๏๏๏๏
๏ B
๏
๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏ C
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏ ๏๏ ๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏
๏
๏
๏
๏
๏ ๏
Sections
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏
๏ ๏ ๏
๏
06
๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
Section (A-A)
๏๏๏๏
๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏
๏
๏
๏๏ ๏
๏
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏
๏
๏
๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏
Section (B-B)
๏๏๏ข๏ฃ๏ค๏๏ฅ๏ ๏ ๏๏ ๏ก๏ ๏๏๏ ๏
๏ H
๏ ๏
๏
๏
๏ G
๏
๏๏
๏
๏ F
๏
๏ D
๏
๏ C
๏
๏
๏ B
๏
๏
๏
๏ ๏
๏
๏ ๏
๏ ๏ ๏
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏ ๏๏๏๏
๏๏๏๏
๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ ๏๏ ๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏
๏๏๏๏
๏๏๏๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏ ๏ ๏๏ ๏
๏
๏
๏ ๏
๏ ๏ ๏
๏
๏๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏
๏๏๏ข๏ฃ๏ค๏๏ฅ๏ ๏ ๏๏ ๏ก๏ ๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏
๏๏๏ข๏ฃ๏ค๏๏ฅ๏ ๏ ๏๏ ๏ก๏ ๏๏๏
๏
3D Sections
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏๏๏๏ ๏๏๏ ๏๏๏๏๏ ๏๏๏๏๏ ๏๏๏๏ ๏๏๏๏
๏
06
๏๏๏ข๏ฃ๏ค๏๏ฅ๏ ๏ ๏๏ ๏ก๏ ๏๏๏
Section (A-A) - Section Box๏ ๏๏๏ข๏ฃ๏ค๏๏ฅ๏ ๏ ๏๏ ๏ก๏ ๏๏๏
๏ ๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏ฆ๏๏๏ง๏ ๏๏๏จ๏ฉ๏ ๏ ๏๏๏๏๏
Section (B-B) - Section Box ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏๏๏๏๏ ๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏
๏
๏
๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏๏ ๏๏๏๏๏
๏
๏๏ ๏
๏
06
Visual Sequence ๏
๏
๏๏ ๏
๏
๏ ๏
๏
๏
๏
๏
๏
๏
๏ ๏
๏ ๏
๏
๏
๏
๏
๏
๏
๏๏ ๏
๏
๏ ๏
Villa
07 Project Design
Project Brief Arches had been always unique items in architecture . The design process merged abstracted features with simple vertical lines to give a unique design which is famous for being a tourist resort
07
Sketches Narrow street of desert cities provides self shading and suitable place to walk and communication with people
Different hights creats self shading and gives building passive cooling
Exposed Stairs
Use of aeches for opening as structure systems for bearing walls Traditional Souk is semi shaded to allow vebtilation and prevent direct sun
Elevations Nourthern Elevation
Southern Elevation
07
Elevations Eastern Elevation
Western Elevation
07
Visual Sequence
07
08 General Hospital (120 beds )
Project Brief Health was sen as astate of normal function that could be disrubted from time to time by disease an example of such a definition of health is รข€œa staste characterized by anatomic phsyologic ,ability to perform personally vauled family ,work and community roles
Concept
Concept Development
08
Main Concept for plan souloution is every department in the hospital are connected to the Main Street thats make workflue in it is very easy Using Contor Line to maximixe value of the land to make lower Basement
Using Dynamo Script to Create Parametric Panel and optimize its sise to makw Equal Panel in curve wall
Sketch
Paramtric Facade Panel
Site Plan Entrance
Car Path
Solid and Void
08
08
Plans Ground Plan Level Core- Circluation
Key
Key
Zoning
Escape Patient Doctor Service Visitor
Key
Key
Patient Doctor Escape Visitor
Emergency In- Patient Radiation Blood Bank
Out Patient
Main Street Corridor
08
Plans First Floor Level Core- Circluation
Key
Key
Zoning
Escape Patient Doctor Service Visitor
Key
Key
Opration ICU Endoscopy Hemodialysis/ Thearby
cont coridor Sterile Main Street Corridor
Patient Doctor Escape Visitor
08
Plans Second Floor Level Core- Circluation
Key
Key
Zoning
Escape Patient Doctor Service Visitor
Key
Key
Women & OBST ICU Admin one-Day- Surgey
cont coridor Sterile Main Street Corridor
Patient Doctor Escape Visitor
08
Plans Typical Floor Level Core- Circluation
Key
Key
Zoning
Escape Patient Doctor Service Visitor
Key
Key
In-Patient
Sterile Main Street
Patient Doctor Escape Visitor
08
Plans Basement Floor Level Core- Circluation
Key Patient Doctor Escape
Key Patient Doctor Service
Zoning
Key Pharamacy Dressing Area CSSD Morgue
Key
Labs Sterile Loundery Main Street Main Serivce Main Stores Kitchen /Restaurant
3D Modelling
08
Elevations Eastern Elevation
Eastern Elevation
08
Sections Section (A-A)
Key Entrance Radiation In- Patient Kitchen /Restaurant Corridor
Section (B-B)
Key Women & OBST Operation In- Patient Kitchen /Restaurant Corridor
08
08
Vertical Analysis Escape
Circluation
Key
Key
Escape
Escape Patient Doctor Service Visitor
08 Visual Sequence
09 Court
Elevations
09
Visual Sequence
09
๏
๏ ๏
๏ ๏
๏
๏
๏
๏
๏
10 preFinal Graduation project (Assiut Train Station )
Project Brief Conceptual design of the railway station in Assiut and apart from railway station. The hub consist of bus station ,recratioal and services, complex all of that has been in unobtrusive manner .
areas, commercial areas ,hotel .
ConceptDevelopment Development Concept 011
02 2
4
Green Area T ota
l Ar
ea
Open Theater
al A
rea
Green Area
Open Theater Green Area
Bus Stop
Drop Of Zone
Green Area 3 Floors
Bus Stop Tot
10
03 3
3
2
ฦฅ ออฮจ ออฮจ ฦฅ วค วค
in
Adm
50% -Shops Drop Of Food 25% Station 25%
Site
1 Floors Zone 1 Floors
3 Floors in
Adm
50% -Shops Food 25% Station 25%
1 Floors 1 Floors
4
Green Area
Open Theater Green Area
Bus Stop
5
Drop Of Zone
-The mass of the building is lifted - The site is surrounded by residential - to maximize mass of the building to provide space for pedestrian access -The mass of the building is lifted ฦค areas, commercial areas ,hotel . ฦฅ ออฮจ to provide space for pedestrian access ฦช support the led screen on the side facing - to maximize mass of the building ออฮจ วฆ อออโอ ศออฮจศ ฦช Elhelaly Street ฦฅ ออฮจ ฦฅ วค วค ออฮจ วฆ อออโอ ศออฮจศ ฦฅ วค วค 043 05 4 06 5
6
Pub
lic S
Pub
lic S
-The mass of the building is lifted ans to provide space for pedestrian access ฦค ฦช support the led screen on the side facing วฆ อออโอ ศออฮจศ Elhelaly Street
5
pac
e
pac
e
ฦค support the led screen on the side facing- Green Walk for social interactive between people - Elhelaly Green Walk for social interactive วฆ Street between people direction .
6
1
10
Site Plan
Plans 4 Entrance cale (1-400)
1
Layout
2 2
2 2
2 2
3 3
2 2
3 3
2 Car Path
4
Layout
1
1
2 2
2 2
2
2 2
3 and Void Solid
2 2
4
4
2
Plans5
Layout
1
1
2 2
4
4
2 2 3 3
2 2
3 3
2
Scale (1-400)
2 2
Key
2 2
1- Main2 Entrance 2- Main Hall 2 3- Offices 4- Parking
SECOND LEVEL
01 Goverment Service 02 ฦฅ
2 4
4 4 03 Shipping service
4
1
Plans1 Ground Level Scale (1-200)
1
2 2
A
2
Drop off Zone
Objectives
03 Gallery
Hyper Market 04Streets & Landmark
3
Bus Stop
Zoning
Waiting Area
Objectives
Parking Shade structure
2
Drop Off zone
Parking
Streets & Landmark
3
Bus Stop
Waiting Area
Shade structure
Shade structure
3
Green Area
1
Experience
Walk way public Event
Shade structure
3
4
2
Water Feature
3
Pinic Public Space
4
3
Accessibility
Open Theater
2 2
1
Drop Off zone
Parking
2
Green Area
Community
public Event
10
4
02 Shops
Parking Plans Scale (1-400) Shade structure
PLANS Ground Plan Level 2 Core 2
Drop off Zone
A
1
Experience
Walk way
Public Space
Shade structure
5
5
B
B
public Event
Connectivity
3 GROUND LEVEL 01
ฦก
02
Bus Stop
03
04
1
1 Bus Stop
6
2 22 22 Open Theater
Main Entrance
6
Public Space
Main Entrance
A
06
Zoning Ground Level Scale (1-200)
1
2 2
1700m 43%
Public Space
4
Objectives
Shade structure
2
3
Waiting Area Parking
3
Green Area
2 2
Experience
Walk way public Event
4
2
Water Feature Shade structure
3
Pinic Public Space
4
Accessibility
Community
3
Public Space
Shade structure
B
5
5 GROUND LEVEL 01
ฦก
02
Bus Stop
03
04
05
06
B
Entrance Bus Stop Drop Off Zone Service Open Theater Public Space
VEL
5
Bus Stop
6
2 2 2
Public Space
Open Theater
Main Entrance
Public Space
A
2
2 B
Drob of
4
Built area
1700m 43%
1
1
1
GROUND LEVEL
PLANS
01
2
Bus Stop
6
ฦก
Public Space
3 3
Bus Stop
03
04
2
1
2
FORTH LEVEL 05
06
6
2 A 2
1
Plans Scale (1-40
Open Theater Main Entrance
02
2 2 2 2
3 2 2
2 2
Connectivity
32
1
1 2
Public Space
Connectivity
Main Entrance
Key
1 5
3
6
1
Gallery
32
Open Theater
public Event
5
1 1 B
Drop Off zone
Shade structure
3
Shops
2
Shade structure
Streets & Landmark
3
Bus Stop
Open Theater
1
Parking
Accessibility
HyperCommunity Market
public Event
A
Drop off Zone
Entrance
1
24 2
Pinic
Public Space
Drob of
Built area
05
Shade structure
4
1
2 2
Water Feature
Main Entrance
Public Space Drob of
FIRST LEVEL
Built area
01 Entrance
1700m 43%
4 4
3
Plans
FIRST LEVEL
2 2
01 Entrance
2
2 2 Fire Exit plan
2 2
First Floor Level Core Fire Exit plan
1
2 2
SECOND LEVEL
01 Goverment Service 2 02 ฦฅ 03 Shipping service Goverment Service 04 Shops 2 05 Adminestration
2
03 Gallery
2
04 Hyper Market
2
oning 2
Fire Exit plan 4
4 3 3
4
3 3
4
5
Hyper Market
0)Key 4
2
SECOND LEVEL
01 Goverment Service 02 ฦฅ
Adminestration
Fire Exit plan
1
Zoning
2
2
1
2
Goverment Service ฦฅ
3 Adminestration
Hyper Market
4
Shops
Shops
2
Entrance Shops
2
Shipping service
2
Gallery
Shipping service
2
Shops
Gallery
Zoning
ฦฅ
02 Shops
Entrance
4
3 3 3 3
2 Zoning
10
5
03 Shipping service
Plans Second Floor Level 1 4 Core Fire Exit plan
Zoning
FIRST LEVEL
SECO
01 Entrance
01 Goverme 04 Shops
1
02 Shops
04 Hyper Market
03 Shipping service stration
2 2
1
1
Goverment Service
Shops
2
1
2 2
Shipping service
Entrance
2
Shops
2
Gallery
2
Goverment Service
1
3 3 2
1
2 ฦฅ
3
2
Adminestration
Zoning
Fire3Exit plan
2 2
Shipping service
Zoning
2 2
Zoning
ฦฅ
2
2 2
2 2
03 Gallery
L
10
1
2
2
Hyper Market
4
4 4
4
Shops
Key
Adminestration
3
Goverment Service Offices Shipping Service Shops Admin.
3 5
Fire Ex
05 Adminestration
5
Plans 1 2 2
1
02 ฦฅ
2 2 Exit plan Fire
THIRD LEVEL
3 01
2 2 2
4 Zoning
1 Zoning
Zoning 1 Zoning
FIRST LEVELFORTH LEVEL 01 Entrance
01 Green Area
02 Shops
02 ฦฅ ฦฅ
Zoning Fire Exit plan
Adminestration
Key
VEL
Entrance
3
2Hyper Market
Fire Exit plan Fire Exit plan
Fire Exit plan Zoning
2 2 2
1
4
3 Entrance
ฦฅ Adminestration
3
Shops Gallery
Green Area
3
Hyper Market
S 1Goverment Service Offices Green Area City Center Admin.
SECOND LEVE
01 Goverment Service 02 ฦฅ 04 Shops 05 Admi
3 Gallery 2
1
2
2 City Center 2 5
2 2
Green Area
3
Green Area
Fire Exit plan
2 Adminestration Shops 03 Adminestration
04 Hyper Market
3 Goverment Service ฦฅ
2 2
1
1
03 Gallery
5
04 Hyper Market
Fire Exit plan
03 Green Area Goverment Service 02 3 ฦฅ 04 City Center 05 Adminestration
10
03 Gallery
03 Adminestration
Third Floor Level Core
3 02 Shops
5
FORTH LEVEL
10
02 ฦฅ
Plans
03 Adminestration
Typiacl Floor Level Core
THIRD LEVEL
Fire Exit 1 plan
Fire Exit plan 01 Goverment Service 02 ฦฅ 04 City Center
FIRST L 01 Entrance FOR
1 Zoning 03 Green Area
01 Green 02 Shops
05 Adminestration
02 ฦฅ 03 Gallery
2 2
2 2
03 Marke Admin 04 Hyper
Zoning Zoning Zoning
3
1
ฦฅ Adminestration
Fire Exit plan
1
Fire Ex
Green Area
3
Zoning 2 2 2 2
4 ฦฅ Adminestration
3
Green Area
Key Offices Admin. Green Area
Goverment Service ฦฅ
2 2
Green Area City Center
Shops Gallery Hyper Market
Adminestration
1
1
3 3 5
Entrance
1 Bus Station To
Car
ept Development pen Concept Market Development 01
2
3
02
No Parking
2
3 03 4
3
10
4 Crowded
Noise
Bus Bridge Station
No Public Service No Waiting Service Food Court Str eet
No Public Service No Waiting Service
ly
Random
2
No Public Service No Waiting Service
Food Court
Food Court
Open Market
Car
Noise
ela ly
Random
3
Noise
Elh
ela ly
Random Crowded
No Parking
Open Market
Open Market
Multi Store Parking
Str
eet
Food Court
ela ly
Random
Elh
No Parking
Open Market
No Parking
1
4 Floors 1 Floors 1 Floors
Car
2 Car
6
eet
06 6
Str
5
Noise
Crowded
Str
5
05
Crowded
eet
04
5
4
4
Car
Elh
To ti Store arking
Elh
ela
e
urt
2
Car
Train Station
No Parking
No Parking
6
6
120 Parking
3D
10
Plans
Concept DevelopmentConO
Ground Floor Level
1
Bus Station Entrance
Core
1
Concept Development
Car
Train Station
1
ket
Train Station
Car
3
Car
Bus Bri Station
Bus Bridge Station
Exit
Mu
Zoning
1
3 Car
2
ket
3
Car
4
3 Car
3
Car
1 Key
Entrance
Car
Food
2 2
Food Court
Bus Parking Waiting Area Offices
32
5
5
ans 2 Adminestration
Plans und LevelFloor Level 3 core First
Scale (1-200) 1
2
Car
To Open Market
ation Entrance
10
Car
Car
Bridge
Car
Car
3
To Multi Store Parking
2
Exit
ale (1-200) 3 Car Core
Car
To Open Ma
Car
ar
3
1 Entrance
ans
Car
3 2
2 2
Car
Bus Station Entrance 1
Car
3 3
2 Car
1
Bridge
und Level ale (1-200) Zoning Level le (1-200)
Bridge
3
3 3
Key
Level Open Market le (1-200) Waiting Area W.C Offices
Bridge
3
3
Car
1
3 1
To Open Ma To Multi Stor Parking
Exit
Bus Station Entrance 3
2
1
2
Car
Car
Car
Car
Bridge
Car
3
Exit
10
Plans Plans Typical Floor Level
01 Wating Area
Core
03 core
02 Adminestration
Bus
Gr Sc
P 01 Wating Area
yoical Level Zoning Scale (1-200)
02 Adminestration
03 core 01 Food Court
02 Open Market 03 Service
Elevation Scale (1-200) yoical Level Key Analysis Scale (1-200) Multi Store Parking
01 Parking
P
Parking
Tyoical Level Scale (1-200)
Waiting Area
01 Food Court
02 Open Market 03 Service
Gr Sc Fir Sc
Fir Sc
OHYH/
O HOHYYHH//
Solar Protection
Sections O HOHYYHH//
Wind Cooling
Level 6 (+31m)
Section A-A
Level5 (+26m)
O HOHYYHH// O HOHYYHH//
Section Analysis
Level 2 (+11m) Level 1 (+6m) Ground Level 0)
Enviromental Analysis
Noise Analysis OOHHYYHH//
OHY H /
OOHHYYHH//
OHYH/ OOHHYYHH// OHYH/ OOHHYYHH// OHYH/
OOHHYYHH// OOHHYYHH// OHYH/ OOHHYYHH// OOHHYYHH// OHYH/ OOHHYYHH// HYYHH// OHYH/ OOH OOHHYYHH// OHYH/ OHYH/ OHYH/
OHYH/
OHYH/ OHYH/ OHYH/ OHYH/ OHYH /
OHYH/
QRLWFH6
QRLWFH6
Govermental Service
Level 7 (+36m)
Green Area Green Area
Govermental Service
Level 6 (+31m) Level5 (+26m)
Adminestrarion Corridor Service
Prespective
Govermental Service
Level 4 (+21m)
Govermental Service
Lecel 3 (+16m) Level 2 (+11m)
Plaza Platform
Gallery
Section B-B PUBLIC SPACE
/HYHO
Hyper Market
Level 1 (+6m) Ground Level 0)
Section A-A (Scale 1-400)
EXPERIENCE Noise
Govermental Service
Section (B-B)
Calm
/HYHO /HYHO Level5 (+26m)
QRLWFH6
2Iร€FHV Green Area 2Iร€FHV
QRLWFH6
EXPERIENCE 6HFWLRQ
PUBLIC SPACE
Corridor
Corridor
(+31m) /HYHO Level /HYHO Lecel 36 (+16m) /HYHO Level5 Level 2(+26m) (+11m) /HYHO
2Iร€FHV
4 (+21m) /HYHO Level Level 1(+6m) /HYHO
2Iร€FHV
/HYHO Lecel 3 (+16m)
Level 2 (+11m) /HYHO Ground Level (0)
2Iร€FHV
Entrance
7(+36m) (+21m) /HYHO Level 4 /HYHO
2Iร€FHV
Section A-A (Scale 1-200)
Admin Entrance
QRLWFH6 QRLWFH6 Q R LW F H 6
/HYHO /HYHO Level 1(+6m)
Entrance Admin Entrance
Platform
Ground Level (0)
/HYHO
Section A-A (Scale 1-200)
rance
Green Walk
SENSE OF BELONGING
OFFICES
City Centre
GREEN WAIK 6HFWLRQ
GALLERY
2Iร€FHV
MAXIMIZE PROFIT
/HYHO Level 7(+36m)
/HYHO Level 6 (+31m)
nce
RETAIL
Section (A-A) OHYH/ OHY H /
Lecel 3 (+16m)
OFFICES
OHYH/
Solar Protection Level 4 (+21m)
ES
O HOHYYHH//
10
Level 7 (+36m)
Water Evaporation
QRLWFH QQRRLLWWFFHH QRLWFH
Section A-A (Scale 1-400)
PUBLIC SPACE
10
Prespective
/HYHO
7(+36m) (+21m) /HYHO Level 4 /HYHO
Green 2Iร€FHV Area 2Iร€FHV
Section A-A (Scale 1-200)
GREEN WAIK SENSE OF BELONGING
Ground Level (0)
Water Evaporation cool the air-flow /HYHO
Section
Entrance
MAXIMIZE PROFIT
Green Walk
Enviromental Analysis
/HYHO /HYHO Level 1(+6m)
Admin Entrance
Platform
Section A-A (Scale 1-200)3D
PUBLIC SPACE
OOHHYYHH// OOHHYYHH// OOHHYYHH//
/HYHO Lecel 3 (+16m)
Entrance
Water Evaporation cool the air-flow
Section Analysis Section (B-B) -3D OOHYH/
2Iร€FHV
Level 2 (+11m) /HYHO Ground Level (0)
Entrance
OOHYH/
4 (+21m) /HYHO Level Level 1(+6m) /HYHO
2Iร€FHV
EXPERIENCE 6HFWLRQ
OHYH/
2Iร€FHV
2Iร€FHV
Admin Entrance
QQRRLLWWFFHH6 6 QRLWFH6
/HYHO Level5 Level 2(+26m) (+11m) /HYHO
Level 7 (+36m) Level 6 (+31m) Level5 (+26m)
CONNECTIVITY
Level 4 (+21m) Lecel 3 (+16m)
COMMUNITY
OHYH/
OFFICES
City Centre
6HFWLRQ
QRLWFH6
(+31m) /HYHO Level /HYHO Lecel 36 (+16m)
2Iร€FHV
Entrance
SENSE OF BELONGING
Green Walk
GREEN WAIK
/HYHO /HYHO Level5 (+26m)
Corridor
OFFICES
Section B-B
/HYHO Level 6 (+31m)
Corridor
MAXIMIZE PROFIT Section (A-A)-3D
GALLERY
/HYHO Level 7(+36m)
Level 2 (+11m) Level 1 (+6m)
OHYH/
Ground Level 0)
OHYH/
Cool
Sections
RETAIL
3D Sections
OFFICES
EXPERIENCE
Wide Path outword
Hot
Narrow Path outword
QRLWFH6 QQRRLLWWFFHH6 6 QRLWFH6
Vertical Analysis
2
1
Station Zone
Zoning
Key
Circluation
Key
Station Approach Ticketing Area
Movement in Typical Floor
Platform Unpaid Area Paid Area
Movement in FirstFloor Movement in Ground Floor
Movement in Second Floor
Circluation
10
Visual Sequence Layout
1001
Interior Shot
01
4
1
03 Interior Shot
Prespective
Shot 2
1 04
2
05 Interior Shot
3 120 Parking
05
1
2
11 Graduation project (Assiut Train Station )
Project Brief Conceptual design of the railway station in Assiut and apart from railway station. The hub consist of bus station ,recratioal and services, complex all of that has been in unobtrusive manner .
11
Design Process Definetions
Needs &Profiit
Design Objectives
Function Structure
ix
03 Green Walk
04 Bus Station Link
1.0 1.0DESIGN DESIGNPROCESS PROCESS
Design Process Commercia Concept Development Issuse 1.1 CONCEPT DEVELOPMENT 1.1 CONCEPT DEVELOPMENT SO WHAT IS THE SOLUTION STRUCTURE
re
PUBLIC SPACE
CONNECTIVITY
Bus Stop
Parking
5
Bus Station
01 Current Condition DEFINING THE PROBLEM 01 Current Condition - Maximize Efficiency . - Connection . dential TIONS SCATTERED COMMUNITY Office Shop . - Commercial . .rking THE SITE - Office . - Social . Site S TRAFFIC SAFTY ite - Bus Stop . - More Safe . - Connection . Area . Connection GREEN WAIK - -Train Level .. - Green OPEN AREA - More -Easy - Commercial . Less. Conflict . - -Parking (Under Ground On Street ) . COMMUNITY - More Safe . Social . Shop
Core
Core
Office Office
ACCESSIBILTY
- Waiting Area . - Connection - Connection. . 07 Movement - Paid -Unpaid Area . - Commercial .. - Commercial LANDMARK
- Bus Stop - Bus Stop . . - Train Level Level . . Movement - Train 08 Over - Parking (Under Ground - On Street - Parking (Under Ground - On Street ) .) .
OFFICES 05 Commercial Screen 05 Commercial Screen
BELONGING
Parking Parking
07
Bus Station Bus Station
6
Bus Stop Bus Stop
- More Safe . RETAILis surrounded by residential - Maximize Efficiency . . - Maximize Efficiency The-site The site is surrounded residential 06 Facade nreas,areas, -by Green Area . Treatment - Shop . . - Shop commercial areasareas ,hotel . . commercial ,hotel - Less Conflict . d - On Street ) . - Office . . - Office
ent
CONNECTIVITY 04 Bus Station Link 04 Bus Station Link - Connection . - More Easy . - More Safe . - Waiting Area . SENSE-Unpaid OF - Paid Area .
Office Office
Enviromental Issuse
Urban Issuse
Social Issuse
Shop
RESTAURANT
Facade Treatment 0606 Facade Treatment
08 Over Looking
- Connection Connection .. - More Easy Easy .. - More Safe Safe .. Waiting Area - Waiting Area .. - Paid -Unpaid -UnpaidArea Area. .
MAXIMIZE PROFIT
- Social - Social. . - MoreSafe Safe . . - More - GreenArea Area. . - Green Looking - LessConflict Conflict. . - Less
07Movement Movement 07
08 Over Looking Looking
2
1
GALLERY
11
Office
SENSE OF ACCESSIBILTY BELONGING 02 Building Use Mix 03 02 Building Use Mix MAXIMIZE PROFIT 03Green GreenWalk Walk
Office
THROUGHO
7 3
- Time Saving
- Ruduces Sun Light Hour .
- Pedestrain - Commercial . - Time Saving - Ruduces Sun Light Hour . - Connection -. Time Saving - Less Conflict . Path . Path r . - Commercial - Pedestrain Pedestrain Path . Time Saving . Ruduces Sun Light Hour . - Reduces Solar Radiation . .. - Attractive Facade From - Reduces. Solar Radiation . - Pedestrain Car. Path Path. . - Car-.Path - Integration More Easy n . - Attractive . Facade From Reduces Solar Radiation . . Car Path . - Provides ThermalComfortZone - Car Path . Al Hilali Street - .Provides ThermalComfortZone Social . Distance ortZone More Safe . - Provides ThermalComfortZone Al Hilali Street . Distance in Interior Spaces . in Interior Spacesin. Interior Spaces . - Parking . - Waiting Area . Time Time . - Paid -Unpaid Area . - Office -Shop - Maximize Efficiency . B
B
B
B
Distance 400M
400M
A
3Min
A
8
A
A
4
Distance 400M
400M
Time 3Min
Time 3Min
3Min
.
- Connection .
- Less Conflict . - Connection . -Integration Less Conflict -- Connection . . . . More Easy -. More -Easy -Social Integration . More Safe Easy.-. More -Safe . -- More . Social . . -- More Safe . . --Parking Waiting Area - Waiting Area Parking .. . -- Waiting Area . . --Office -Shop Paid -Unpaid Area . -- Paid -Unpaid Area .-Unpaid Maximize Efficiency . - Office -Shop - Paid Area - Maximize Efficiency .
. - Maximize Efficiency
11
Site Plan Entrance
5
2
1
Car Path
3 8
Solid and Void
Key 1- Main Entrance 2- Second Entrance 3- Adminestartion Entrance 4- Offices 5- Shops 6-Bus Station 7- Green Walk 8- Parking
6
4
1112
Plans Ground Plan Level Core
B Zoning A
A
B
Key Entrance Offices Waiting Area Service Core W.C
1112
Plans First Floor Level Core
B Zoning A
A
B
Key Offices W.C
12
Elevations Northern West Elevation
Level Of Experience
Elevation Details
11
Elevations Southern East Elevation
Level Of Experience
Elevation Details
Sections Section (A-A)
Section (B-B)
11
11
3D Sections
Section (A-A)-3D
Section (B-B) -3D
Section 3D
Furniture
Green Walk Details
Commercial
13MIN VS 3MINS By Car
Previous Pedestrain Path
New Pedestrain Path
11
Recycled Material
Robot Fabric
Structure Pattern on model Form
From Finding Technique
LED Screen front of helaly street
11
Green Walk Details
11
Enviromental Analysis
Sensor Light Using Arudino
11
Vertical Analysis
Typical floor
Typical floor
Zoning
Key Station Approach Ticketing Area Platform Unpaid Area Paid Area
Circluation Typical floor
Typical floor
Typical floor
Typical floor
Typical floor
Typical floor
Third Floor
Third Floor
Second Floor
Second Floor
First Floor
Key Movement in Typical Floor
First Floor
Movement in Second Floor Movement in FirstFloor Movement in Ground Floor
Ground Floor
Ground Floor
11
Visual Sequence
01
03
11
11
Prespectives
03