Amsterdam IJmuiden Port Region – Realizing offshore wind ambitions
Located in the heart of The Netherlands, the strength of the wider Amsterdam metropolitan area and its fully developed network economy is at the disposal of the maritime and offshore industries: logistics, financial and legal services, supported by IT and creative industries. This enhances the rapid development of new niches, like offshore wind energy.
European offshore wind projects
In short, the Amsterdam – IJmuiden port region has everything that´s necessary to serve the maritime sector swiftly, competently, effectively and efficiently.
8000 TEU 17 breed 7 hoog
15 TEU breed
275 m
6000 TEU 17 breed 5 hoog
310 m 347 m
A unique area The Amsterdam-IJmuiden port area is perfectly located for serving offshore wind projects. The region is linked to the primary West European shipping routes, and their excellent road, rail and inland waterway connections with a vast hinterland. Amsterdam Schiphol Airport is only a 15-minute drive away, enabling fast air transport of cargo, emergency supplies, executives and personnel.
13 TEU breed 3500 TEU 13 breed 4 hoog 10 TEU breed
3500 TEU schip
6000 TEU schip
8000 TEU schip
8000 TEU 17 breed 7 hoog
15 TEU breed
275 m
6000 TEU 17 breed 5 hoog
310 m 347 m
8000 TEU 17 breed 7 hoog
13 TEU breed
15 TEU breed
3500 TEU 13 breed 4 hoog
275 m
6000 TEU schip
6000 TEU 17 breed 5 hoog
310 m 347 m
10 TEU breed
3500 TEU schip
13 TEU breed
8000 TEU schip
3500 TEU 13 breed 4 hoog 10 TEU breed
3500 TEU schip
6000 TEU schip
Amsterdam IJmuiden
8000 TEU schip
8000 TEU 17 breed 7 hoog 8000 TEU 17 breed 7 hoog
8000 TEU 17 breed 7 hoog
15 TEU breed
15 TEU breed
275 275 m 310 m 347 310 m
m
m 347 m
310 m 8000 TEU 347 m 13 TEU 17 breed 7 hoog breed
275 m 310 m 3500 TEU schip 347 m
3500 TEU schip
3500 TEU schip
6000 TEU schip
8000 TEU schip
13 TEU breed
10 TEU breed
6000 TEU schip
8000 TEU schip
10 TEU breed
The Amsterdam IJmuiden Offshore Port network is at your service:
Amsterdam IJmuiden Offshore Port Serving up offshore wind solutions
8000 TEU 17 breed 7 hoog
15 TEU breed
Port authorities • Port of Amsterdam • Zeehaven IJmuiden NV
275 m 310 m 347 m
Steel, shipyards, construction and cranes • EPMC Europe • Mammoet Nederland B.V. • Shipdock BV/NIRON Steel • Schot Verticaal Transport BV • Tata Steel IJmuiden BV 6000 TEU 80005TEU 17 breed hoog 17 breed 7 hoog
1315TEU TEU breed breed
275 m
Local and regional authorities • Local City Council Amsterdam Noord • Municipality Beverwijk • Municipality Velsen • Municipality Zaanstad • Province Noord-Holland 3500 TEU schip
6000 TEU 3500 TEU 17 breed 5 hoog 13 breed 4 hoog
310 m 347 m
6000 TEU schip
3500 TEU schip
13TEU TEU 10 breed breed
8000 TEU schip
3500 TEU 13 breed 4 hoog 10 TEU breed
6000 TEU schip
8000 TEU schip
8000 TEU 17 breed 7 hoog
15 TEU breed
275 m
6000 TEU 17 breed 5 hoog
310 m 347 m
Insurance & Risk Management • AON Nederland BV 13 TEU breed
3500 TEU 13 breed 4 hoog
8000 TEU 17 breed 7 hoog
Marine contractors • Ballast Nedam Infra Noord West BV 275 m 310 m • BAM Civiel Noordwest 347 m • DHV BV • De Vries & Van de Wiel • Grontmij Nederland BV • MNO Vervat BV 3500 TEU schip
6000 TEU schip
3500 TEU schip
10 TEU breed
6000 TEU schip
8000 TEU schip
15 TEU breed
Other • IRO, the Association of Dutch suppliers in the oil and gas industry 6000 TEU 17 breed 5 hoog
13 TEU breed
3500 TEU 13 breed 4 hoog 10 TEU breed
8000 TEU schip
Maritime services • ASCO Holland (Logistics) BV • Boon Transport
Ambition:
➜ Distance: • Prinses Amalia: 120 MW, 12.5 NM (Nautical Miles) • OWEZ Egmond aan Zee: 108 MW, 5-1- NM • Q10 Luchterduinen: 129 MW, 16 NM • Q4: 201 MW, 14 NM • East Anglia: 7000 MW, 75 NM • Hornsea: 4000 MW, 130 NM • Dogger Bank: 9000 – 12.800 MW, 170 NM
Our track record: • Assembly and transportation of wind turbines and the construction, installation and maintenance of OWEZ and Prinses Amalia wind farms off the Dutch coast. • OWEZ/Egmond 2006: 36x Vestas 3MW V90=108 Mw, 18m water depth. • Prinses Amalia 2008: 60x Vestas 2MW=120MW, 19-24m water depth. • Vestas has established an offshore Maintenance Center to carry out day-to-day maintenance on North Sea wind farms. • Also in our area: modification and maintenance of offshore (wind) supply vessels at Shipdock. Development of crew vessels for offshore wind industry at Windcat Workboats. State-of-the-art access technology for wind turbines at Z-technologies.
Amsterdam IJmuiden Offshore Port – Contact details Havengebouw De Ruijterkade 7, 13th, 1013 AA Amsterdam AMSTERDAM IJMUIDEN OFFSHORE PORT The Netherlands Phone : + 31(0)20 62 73 706 Fax : + 31(0)20 62 64 969 www.ayop.com info@ayop.com
A UN I Q UE A RE A F O R A LL Y O UR O FFSH O RE ENER G Y RE Q U I REMENTS
Wind@Work 2012.01
onstructed out of AmsterC dam-IJmuiden port region Licensed wind farms the Netherlands Future off shore wind farms Great Britain
3500 TEU 13 breed 4 hoog
8000 TEU schip
10 TEU breed
Offshore suppliers • Airborne Composities B.V. • CMF Central Mudplant & Fluid Serv. • Container Company Amsterdam BV • Gulf Oil • Oliehandel K. de Boer BV • Peterson SBS IJmuiden BV
6000 MW off Dutch coast by 2030 25000 MW off UK coast by 2030
London
Legenda
13 TEU breed
AYOP’s major objective is to provide promotional support to the regional offshore industries and to promote the area’s unique facilities.
• Isolatie Combinatie Beverwijk • KVSA BV • MSCY Vastgoed BV • MEO BV • Sleepdienst B. Iskes & Zn • Svitzer Amsterdam BV
8000 TEU schip
3500 TEU 13 breed 4 hoog
3500 TEU schip
3500 TEU 13 breed 4 hoog 6000 TEU schip
6000 TEU 17 breed 5 hoog
3500 TEU 13 breed 4 hoog 10 TEU breed
6000 TEU schip
15 TEU 10 TEU breed breed
8000 TEU schip 3500 TEU schip
13 TEU breed
13 TEU breed
3500 TEU 13 breed 4 hoog
6000 TEU 17 breed 5 hoog 6000 TEU schip
275 m
15 TEU breed 6000 TEU 17 breed 5 hoog
8000 TEU 17 breed 7 hoog
15 TEU breed
310 m 347 m
6000 TEU 17 breed 5 hoog
6000 TEU 275 m 17 breed 5 hoog
A unique network Over the years, Amsterdam IJmuiden Offshore Port (AYOP) has developed into a unique network organization. Our partner list not only includes many oil-andgas, offshore wind and port-related and maritime industries, but local government bodies as well.
This means that communication lines between the local business community and government bodies are very short, allowing for a quick and unified response to new developments.
AMS
M IJM TERDA
UIDE
HORE N OFFS
PORT
...with a clever concept
2006: OWEZ/Egmond wind farm: 108 Mw installed at 18m water depth.
8000 TEU 17 breed 7 hoog
6000 TEU 17 breed 5 hoog
m m
8000 TEU 17 breed 7 hoog
13 TEU breed
15 TEU breed
3500 TEU 13 breed 4 hoog
275 m
10 TEU breed
6000 TEU schip
C
Deep sea transport
15 TEU breed
m
8000 TEU 17 breed 7 hoog
8000 TEU schip
6000 TEU 17 breed 5 hoog
310 m 347 m
6000 TEU schip
8000 TEU schip
available. Warehouse: 1500m2. Stevedoring services
A
13 TEU breed 3500 TEU 13 breed 4 hoog
15 TEU breed
10 TEU breed
6000 TEU 17 breed 5 hoog
schip
p
EU schip
• Quay: 400 m, suitable for heavy loads
Gottwald crane and every other mobile crane type
6000 TEU 17 breed 5 hoog
8000 TEU 17 breed 7 hoog
At the quays of port basins connected to the open sea in the port of IJmuiden, wind turbine components, foundations and cables can be stored with a round-the-clock accessibility to ensure the highest operating efficiency. A “serving tray” so to speak of turbine components needed for at least a week’s worth of installation time is constantly available on the quay side at our open sea locations.
• Space: 60.000 m2
• Cranes, warehouses and other services: 100 tons mobile
10 TEU breed
3500 TEU schip
(C) Grote Hout – Velsen
• Draft: 9m, tideless
13 TEU breed 3500 TEU 13 breed 4 hoog
15 TEU breed
O u r s o l u t i o n : t h e t ray c o n c e p t IJmuiden and Amsterdam have developed a logistical concept that makes your components accessible twenty-four hours a day and seven days a week, the whole year round. This meets the needs of existing and prospective operators to ensure a continuous workflow for the installation of wind farms.
The Amsterdam-IJmuiden region is well-situated for the construction and the operation & maintenance for wind farms off the Dutch and UK coast. In the port areas wind turbine blades and other wind turbine components can be stored ready for shipping out to build offshore wind farms in the North Sea.
available
B
(E) Hoogtij - Zaanstad
8000 TEU schip
13 TEU breed
8000 TEU 17 breed 7 hoog
3500 TEU 13 breed 4 hoog 10 TEU breed
15 TEU breed
8000 TEU schip
275 m
6000 TEU 17 breed 5 hoog
310 m 347 m
13 TEU breed 3500 TEU 13 breed 4 hoog 10 TEU breed
6000 TEU schip
8000 TEU schip
2008: Prinses Amalia wind farm, 120Mw installed at 19-24m water depth.
• Space: 97 ha, to be developed further, directly
(A) IJmondhaven - IJmuiden
• Space: 15.000m2 (excluding quays)
•Q uay: 600m. With two specially designed and constructed
•Q uay: 640m length, moorings every 15m
reinforced concrete loading platforms for wind turbines.
(Safe Working Load 60 tons/30 tons)
Load varies between 16.5 – 23.5 tons. Moorings every 15 m
• Draft: 9m LAT
(Safe Working Load of 60 tons)
•V essel capacity: max. LOA 165m, max. beam
• Draft: 10m LAT (Lowest Astronomical Tide) • Vessel capacity: max. LOA 295m, max. beam 70m, max. draft 9.5m •C ranes, warehouses and other services: cranes and lifting equipment available from third parties. Warehousing available
50m/30m, max. draft 8.5 m •C ranes, warehouses and other services: cranes and lifting equipment available from third parties
A unique area... Proximity The Amsterdam-IJmuiden port region is the ideal location for offshore wind logistics: construction, operation and maintenance. Conveniently located at close range of consented and projected offshore wind projects on the North Sea. S pa c e The region offers assembly and storage sites directly on the coast and along the North Sea Canal. From the pilot station to the Amsterdam terminals, takes 2.5 to 3 hours, including the lock passage. The inland area has no tidal restrictions. C o n n e c t i v i t y & A c c e ssi b i l i t y Excellent multimodal hinterland connections. Well connected by inland shipping, road rail and air connections. Amsterdam Schiphol Airport is only a 15-minute drive away.
E x p e ri e n c e Two offshore wind farms have already been installed from the Amsterdam-IJmuiden region. OWEZ Egmond and Prinses Amalia out of IJmuiden . Together, the port authorities and maritime businesses in the region have a wealth of experience and knowledge in port business and logistics. A unique network The area offers a wide network of companies, local authorities and expertise dedicated to offshore wind and focused on offering clever solutions to serve customers. On top of that, we are well connected to knowledge and research centres in the area of offshore wind energy. We offer a network with a high level of flexibility and freedom of choice for the customer.
With our deep-sea basins and terminals, logistic service providers and excellent hinterland connections we offer tailor-made solutions for the offshore wind energy industry. We can optimise your supply chain and we can develop made-to-measure logistics strategies together with our customers. All the turbine components you need on a silver platter by the sea, constantly fed from storage and assembly areas further inland.
located on the North Sea Canal
(B) Middenhavengebied – IJmuiden
• Space: 100.000m2 (including quays)
High quality assembly and storage space is available at locations along the North Sea Canal and in the port of Amsterdam. These additional areas are also available for storage during bad weather periods. A constant flow of turbine components and equipment can be organized from these locations to feed and fill “the tray” at our open sea locations. This concept is the “one-stop solution“ for realizing your wind farm.
• Quay length: 950m under construction • Water Depth: 9m
Besides fishing vessels, cruise ships and cargo vessels the port basins of IJmuiden, Velsen, Beverwijk, Zaanstad and Amsterdam are also the home base for installation and supply ships, crew vessels, cable layers and other specialised craft, which service the construction and operation & maintenance of the offshore wind farms in the North Sea.
E
(F) Shipdock & Niron Staal - Amsterdam • Space: 160.000m2 (assembly hall 8.000m2, engineering works 5.000m2) • 4 dry-docks with max capacity of 85.000 tonnes dwt. (Panamax size, 250m long) • 6 repair berths ranging from 120 to 420m • Ample crane capacity ranging from 15 to 40/60/90 tonnes. More lifting capacity available on project base. Floating cranes available up to 300 tons • Fully operational steel construction facilities on site
F The challenge Logistics is, with a share of 20% of the total installation costs, a competitive factor in wind farm construction. Logistic expenses have a significant impact on the profitability of a wind farm. Project developers, contractors and suppliers determine the logistic concept used for construction and installation. But the logistic capabilities and flexibility of the ports and their local businesses can make the difference.
(D) Amsterdam Project Cargo Terminal - Amsterdam • Space: 1.300.000 m2 (750.000 m2 paved, 550.000 m2 unpaved) • Storage space: 700.000 m covered and 2
uncovered • Quay: 1165m, indented berth 400m, quay can take weights of 20 tons/m2. • Draft: 15m/17m
In most European ports on the North Sea, space is scarce. It is a particular challenge for the maritime supply chain to minimize the effects of disturbances influenced by weather, locks and tidal entrance of a port. If available space in the port becomes scarce, alternative measures have to be examined.
• Cranes: 5 gantry cranes 100 tons, 2 mobile cranes 150 tons • Warehousing: 100.000 m2 • 24 hrs. terminal handling services, quality assurance, inspection and monitoring
Hinterland connections