Serving up offshore wind solutions

Page 1

Amsterdam IJmuiden Offshore Port Serving up offshore wind solutions

ORT

P SHORE


Amsterdam IJmuiden Port Region – Realizing offshore wind ambitions 7

European Offshore wind projects

8000 TEU 17 breed 7 hoog

6

15 TEU breed

275 m

6000 TEU 17 breed 5 hoog

310 m 347 m

13 TEU breed 3500 TEU 13 breed 4 hoog 10 TEU breed

3500 TEU schip

6000 TEU schip

8000 TEU schip

8000 TEU 17 breed 7 hoog

15 TEU breed

275 m

6000 TEU 17 breed 5 hoog

310 m 347 m

8000 TEU 17 breed 7 hoog

13 TEU breed

15 TEU breed

3500 TEU 13 breed 4 hoog

275 m

3500 TEU schip

6000 TEU schip

6000 TEU 17 breed 5 hoog

310 m 347 m

10 TEU breed

13 TEU breed

8000 TEU schip

3500 TEU 13 breed 4 hoog 10 TEU breed

3500 TEU schip

6000 TEU schip

Amsterdam Amsterdam IJmuiden IJmuiden

8000 TEU schip

8000 TEU 17 breed 7 hoog 8000 TEU 17 breed 7 hoog

8000 TEU 17 breed 7 hoog

15 TEU breed

15 TEU breed

275 275 m 310 m 347 310 m

m

m 347 m

310 m 8000 TEU 347 m 13 TEU 17 breed 7 hoog breed

310 m 3500 TEU schip 347 m

310 m 347 m 3500 TEU schip

3500 TEU schip

3500 TEU

8000 TEU schip

C onstructed out of Amsterdam-IJmuiden port region L icensed wind farms the Netherlands F uture off shore wind farms Great Britain

10 TEU breed

Ambition:

8000 TEU schip

6000 MW off Dutch coast by 2030 25000 MW off UK coast by 2030

London London

Legenda

3500 TEU 13 breed 4 hoog

8000 TEU schip

10 TEU breed

13 TEU breed

10 TEU breed

6000 TEU schip

13 TEU breed

8000 TEU schip

3500 TEU 13 breed 4 hoog

3500 TEU schip

3500 TEU 13 breed 4 hoog 6000 TEU schip

6000 TEU 17 breed 5 hoog

13 breed 4 hoog 6000 TEU schip 10 TEU breed

6000 TEU schip

15 TEU 10 TEU breed breed

8000 TEU schip 3500 TEU schip

13 TEU breed

13 TEU breed

3500 TEU 13 breed 4 hoog

6000 TEU 17 breed 5 hoog 6000 TEU schip

15 TEU breed 6000 TEU 17 breed 5 hoog

8000 TEU 17 breed 7 hoog

15 TEU breed

275 m

275 m

6000 TEU 17 breed 5 hoog

6000 TEU 275 m 17 breed 5 hoog

➜ Distance: • Prinses Amalia: 120 MW, 12.5 NM (Nautical Miles) • OWEZ Egmond aan Zee: 108 MW, 5-1- NM • Q10 Luchterduinen: 129 MW, 16 NM • Q4: 201 MW, 14 NM • East Anglia: 7000 MW, 75 NM • Hornsea: 4000 MW, 130 NM • Dogger Bank: 9000 – 12.800 MW, 170 NM

Our track record: •A ssembly and transportation of wind turbines and the construction, installation and maintenance of OWEZ and Prinses Amalia wind farms off the Dutch coast. •O WEZ/Egmond 2006: 36x Vestas 3MW V90=108 Mw, 18m water depth. •P rinses Amalia 2008: 60x Vestas 2MW=120MW, 19-24m water depth. •V estas has established an offshore Maintenance Center to carry out day-to-day maintenance on North Sea wind farms. •A lso in our area: modification and maintenance of offshore (wind) supply vessels at Shipdock. Development of crew vessels for offshore wind industry at Windcat Workboats. State-of-the-art access technology for wind turbines at Z-technologies.


2006: OWEZ/Egmond wind farm: 108 Mw installed at 18m water depth.

DEEP SEA TRANSPORT 8000 TEU 17 breed 7 hoog

15 TEU breed

275 m

6000 TEU 17 breed 5 hoog

310 m 347 m

8000 TEU 7 breed 7 hoog

13 TEU breed 3500 TEU 13 breed 4 hoog 10 TEU breed

15 TEU breed

3500 TEU schip

6000 TEU schip

8000 TEU schip

6000 TEU 7 breed 5 hoog

A

13 TEU breed

3500 TEU 3 breed 4 hoog 10 TEU breed

2008: Prinses Amalia wind farm, 120Mw installed at 19-24m water depth.

B

(A) IJmondhaven - IJmuiden

(B) Middenhavengebied – IJmuiden

• Space: 100.000m2 (including quays)

• Space: 15.000m2 (excluding quays)

• Quay: 600m. With two specially designed and constructed

• Quay: 640m length, moorings every 15m

reinforced concrete loading platforms for wind turbines.

(Safe Working Load 60 tons/30 tons)

Load varies between 16.5 – 23.5 tons. Moorings every 15 m

• Draft: 9m LAT

(Safe Working Load of 60 tons)

• Vessel capacity: max. LOA 165m, max. beam

• Draft: 10m LAT (Lowest Astronomical Tide) • Vessel capacity: max. LOA 295m, max. beam 70m, max. draft 9.5m • Cranes, warehouses and other services: cranes and lifting equipment available from third parties. Warehousing available

50m/30m, max. draft 8.5 m • Cranes, warehouses and other services: cranes and lifting equipment available from third parties

A unique area... PROXIMITY The Amsterdam-IJmuiden port region is the ideal location for offshore wind logistics: construction, operation and maintenance. Conveniently located at close range of consented and projected offshore wind projects on the North Sea. S PA C E The region offers assembly and storage sites directly on the coast and along the North Sea Canal. From the pilot station to the Amsterdam terminals, takes 2.5 to 3 hours, including the lock passage. The inland area has no tidal restrictions. CONNECTIVITY & ACCESSIBILITY Excellent multimodal hinterland connections. Well connected by inland shipping, road rail and air connections. Amsterdam Schiphol Airport is only a 15-minute drive away.

EXPERIENCE Two offshore wind farms have already been installed from the Amsterdam-IJmuiden region. OWEZ Egmond and Prinses Amalia out of IJmuiden . Together, the port authorities and maritime businesses in the region have a wealth of experience and knowledge in port business and logistics. A UNIQUE NETWORK The area offers a wide network of companies, local authorities and expertise dedicated to offshore wind and focused on offering clever solutions to serve customers. On top of that, we are well connected to knowledge and research centres in the area of offshore wind energy. We offer a network with a high level of flexibility and freedom of choice for the customer.


...with a clever concept The Amsterdam-IJmuiden region is well-situated for the construction and the operation & maintenance for wind farms off the Dutch and UK coast. In the port areas wind turbine blades and other wind turbine components can be stored ready for shipping out to build offshore wind farms in the North Sea.

C

(C) Grote Hout – Velsen • Space: 60.000 m2 • Quay: 400 m, suitable for heavy loads • Draft: 9m, tideless • Cranes, warehouses and other services: 100 tons mobile Gottwald crane and every other mobile crane type available. Warehouse: 1500m2. Stevedoring services available

(E) Hoogtij - Zaanstad • Space: 97 ha, to be developed further, directly located on the North Sea Canal • Quay length: 950m under construction • Water Depth: 9m

Besides fishing vessels, cruise ships and cargo vessels the port basins of IJmuiden, Velsen, Beverwijk, Zaanstad and Amsterdam are also the home base for installation and supply ships, crew vessels, cable layers and other specialised craft, which service the construction and operation & maintenance of the offshore wind farms in the North Sea.

THE CHALLENGE Logistics is, with a share of 20% of the total installation costs, a competitive factor in wind farm construction. Logistic expenses have a significant impact on the profitability of a wind farm. Project developers, contractors and suppliers determine the logistic concept used for construction and installation. But the logistic capabilities and flexibility of the ports and their local businesses can make the difference.

E

(D) Amsterdam Project Cargo Terminal - Amsterdam • Space: 1.300.000 m2 (750.000 m2 paved, 550.000 m2 unpaved) • Storage space: 700.000 m2 covered and uncovered • Quay: 1165m, indented berth 400m, quay can take weights of 20 tons/m2. • Draft: 15m/17m

In most European ports on the North Sea, space is scarce. It is a particular challenge for the maritime supply chain to minimize the effects of disturbances influenced by weather, locks and tidal entrance of a port. If available space in the port becomes scarce, alternative measures have to be examined.

• Cranes: 5 gantry cranes 100 tons, 2 mobile cranes 150 tons • Warehousing: 100.000 m2 • 24 hrs. terminal handling services, quality assurance, inspection and monitoring


O U R S O L U T I O N : T H E T R AY C O N C E P T IJmuiden and Amsterdam have developed a logistical concept that makes your components accessible twenty-four hours a day and seven days a week, the whole year round. This meets the needs of existing and prospective operators to ensure a continuous workflow for the installation of wind farms. At the quays of port basins connected to the open sea in the port of IJmuiden, wind turbine components, foundations and cables can be stored with a round-the-clock accessibility to ensure the highest operating efficiency. A “serving tray” so to speak of turbine components needed for at least a week’s worth of installation time is constantly available on the quay side at our open sea locations.

High quality assembly and storage space is available at locations along the North Sea Canal and in the port of Amsterdam. These additional areas are also available for storage during bad weather periods. A constant flow of turbine components and equipment can be organized from these locations to feed and fill “the tray” at our open sea locations. This concept is the “one-stop solution“ for realizing your wind farm. With our deep-sea basins and terminals, logistic service providers and excellent hinterland connections we offer tailor-made solutions for the offshore wind energy industry. We can optimise your supply chain and we can develop made-to-measure logistics strategies together with our customers. All the turbine components you need on a silver platter by the sea, constantly fed from storage and assembly areas further inland.

(F) Shipdock & Niron Staal - Amsterdam • Space: 160.000m2 (assembly hall 8.000m2, engineering works 5.000m2) • 4 dry-docks with max capacity of 85.000 tonnes dwt. (Panamax size, 250m long) • 6 repair berths ranging from 120 to 420m • Ample crane capacity ranging from 15 to 40/60/90 tonnes. More lifting capacity available on project base. Floating cranes available up to 300 tons • Fully operational steel construction facilities on site

F HINTERLAND CONNECTIONS


A UNIQUE AREA The Amsterdam-IJmuiden port area is perfectly located for serving offshore wind projects. The region is linked to the primary West European shipping routes, and their excellent road, rail and inland waterway connections with a vast hinterland. Amsterdam Schiphol Airport is only a 15-minute drive away, enabling fast air transport of cargo, emergency supplies, executives and personnel. Located in the heart of The Netherlands, the strength of the wider Amsterdam metropolitan area and its fully developed network economy is at the disposal of the maritime and offshore industries: logistics, financial and legal services, supported by IT and creative industries. This enhances the rapid development of new niches, like offshore wind energy. In short, the Amsterdam – IJmuiden port region has everything that´s necessary to serve the maritime sector swiftly, competently, effectively and efficiently. A UNIQUE NETWORK Over the years, Amsterdam IJmuiden Offshore Port (AYOP) has developed into a unique network organization. Our partner list not only includes many oil-andgas, offshore wind and port-related and maritime industries, but local government bodies as well.

This means that communication lines between the local business community and government bodies are very short, allowing for a quick and unified response to new developments. AYOP’s major objective is to provide promotional support to the regional offshore industries and to promote the area’s unique facilities. The Amsterdam IJmuiden Offshore Port network is at your service: Port authorities • Port of Amsterdam • Zeehaven IJmuiden NV Local and regional authorities • Local City Council Amsterdam Noord • Municipality Beverwijk • Municipality Velsen • Municipality Zaanstad • Province Noord-Holland Marine contractors • Ballast Nedam Infra Noord West BV • BAM Civiel Noordwest • DHV BV • De Vries & Van de Wiel • Grontmij Nederland BV • MNO Vervat BV

• Isolatie Combinatie Beverwijk • KVSA BV • MSCY Vastgoed BV • MEO BV • Sleepdienst B. Iskes & Zn • Svitzer Amsterdam BV Offshore suppliers • Airborne Composities B.V. • CMF Central Mudplant & Fluid Serv. • Container Company Amsterdam BV • Gulf Oil • Oliehandel K. de Boer BV • Peterson SBS IJmuiden BV Steel, shipyards, construction and cranes • EPMC Europe • Mammoet Nederland B.V. • Shipdock BV/NIRON Steel • Schot Verticaal Transport BV • Tata Steel IJmuiden BV Insurance & Risk Management • AON Nederland BV Other • IRO, the Association of Dutch suppliers in the oil and gas industry

Maritime services • ASCO Holland (Logistics) BV • Boon Transport

Phone : + 31(0)20 62 73 706 Fax : + 31(0)20 62 64 969 www.ayop.com info@ayop.com

A UNIQUE AREA FOR ALL YOUR OFFSHORE ENERGY REQUIREMENTS

Wind@Work 2012.01

AMSTERDAM IJMUIDEN OFFSHORE PORT – CONTACT DETAILS Havengebouw De Ruijterkade 7, 13th, 1013 AA Amsterdam AMSTERDAM IJMUIDEN OFFSHORE PORT The Netherlands


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.