internship tr aining re p ort i nte r nship t raining & re p or t [ A RC 2615]

Jan 9th - March 3rd 2017

name : Andrew Law Zi Hang student id : 0322670 Taylor’s University School Of Architecture, Building & Design internship company : JYP Architect SDN BHD


2

contents 1 2 3 4 5 6 7 8 acknowlegdment

introduction

computer block extension 6-8

countr y view cluster house

econsave taman teratai 13-20

permas shoplots

paradigm mall

minor task

4-5

3

9-12

21-24

25-28

9

site visit 43-46

29-42

10

conclusion 47

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


3 aknowledgement

F i rst of a l l, I wou ld li ke to e x press my ut most g rat itude, t han ks and appre ci at i on to my sup e r v ising arch ite c t Ar. S el amat & Ar. Ng Hong L ing for t he a ccept ance and t he opp or tu n it y to do my inte r nsh ip in J YP Archite c ts. O t her t han t hat, I a ls o want to t han k to my c ol le ague for t he guid ance and enr iche d my work ing exp er ience w it hi n t he f i r m by b e ing helpf u l and f r iend ly. I was exp os e d to dif ferent proj e c t of var i ous s c a le. It’s de f in itely a wonder f u l exp er ience to work here as an inte r n .

I wou l d a ls o li ke to t han ks to our inst r uc tor Mr. Pr ince and Mrs. June for t he i nst r u c t ion and guid anc e t h roug hout t he pro cess. Their a dv ice and guid ance has t r u ly help e d t he stude nt on underst anding t he pur p os e of inter nship. I wou l d a ls o l i ke to t han ks to my v isit ing le c turer, Mr. Angus for p ay ing a v isit to my i nter n i ng of f i c e, to u nde rst and on w hat I’ve b e en t aske d to do in t he comp any for t he f i rst ha l f p e r io d. He has a ls o help e d me w it h t he inter nship and rep or t by gui di ng and answer ing my quest ions.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


4 introduction

T he i nter nsh ip t rain ing c ommence d on Janu ar y 9t h, 2017 (Mond ay ) and ende d on March 3rd, 2017 (Fr id ay ).

JYP Arch ite c t s is lo c ate d at Pe r mas Jay a , Mas ai, Johor. The comp any is r ig ht b ehi nd Ae on Pe r mas Jaya. T he bus ine ss hour is f rom 9.00 A M to 6.00 PM, f rom Mond ay to Fr i d ay. JYP Arch ite c t s is an archite c t f ir m t hat is b as e d in Johor w hich hand l e mo st bi g proj e c t s in Johor such as AE ON, IKE A , Para dig m Ma l l, hig h-R is e and l ow-r is e bu i l d i ng of b ot h c omme rc i a l or resident i a l. The dire c tor of t he f ir m are Ar. Ng Hong L ing , Ar. S el amat, Mr. Keit h & Mr. John.

T he te am c onsiste d of 2 0 + st af f memb ers w hich t he work lo a d and t ask is div i de d and g iven to dif ferent te am . As a c c ording to t he br ie f, t he obj e c t ive of t his mo du le is to int ro duce stu dent to a ne w work ing e nv iron me nt involv ing a c t iv it ies and op erat ion o cc urs w it hi n an arch ite c tu re f ir m. Stude nt s are to t a ke on inter nship to b e exp os e d to t he archite c tu re i ndust r y w he re one c an underst and and b eing aware of t he pr incipl es , and pro c e dure s b e i ng t a ken w it hin an archite c ture f ir m .

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


5 Stu d e nt are a ls o s e ek to apply Unifor m Bui lding by -l aw s and sim i l ar Bui l di ng R e g u l at i ons. Fur t he r more, int ro ducing t he students to t he re quirements of ke epi ng log- b o oks and ac c urate/ infor mat ive proj e c t do c ument at ion.

genera l s cop e of t raining

The list of overa l l t ask and pr a c t ic e t hat is b eing c ar r i e d t h roug hout t he w hole inter nsh ip: 1 . Preliminar y D es ig n Prop os a l 2 . Auto c ad Draw ing 3 . C omment, mo dif ic at ion and amend ment . 4 . Site Vis it 5 . Tr aining and underst and ing on over a l l d e vel opment 6 . Draf t ing 7 . Fi l ing , do c ument at ion

S of t ware applic at ion: AutoC a d, Sketch Up, Photoshop

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/ /

/ /

/

/

/ /

/

/

/

/

/

/

/

/

/

/

Jalan /

/ / /

/

/

/

/

/

/

/

Tun /

/

/

/

/

/

/

/

/ /

/

/

/

/ /

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ / / /

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/ /

/

/ /

/

/

/

/

/

/

/

/ /

/

/

/ / /

/

/

/ /

/

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ / / /

/ /

/

/

/

/

/ /

/

/

/

/

/

/ / /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

Abdu

/

/

/

l Ra

/

/

zak

/

/

/

/

/

/

(Su

/

/

/

/

sur

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/ /

/ /

IN /

/

/

/

OUT /

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

01 /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

U BARU

/

/

/

/

/

/

/

/

UNAN

/

/

/

/

/

/

/ /

/

BANG / /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/ /

/

/

/

/

/

/

/ /

/

/

/

6

/ / / / / / / / / / / / / / / / / / / / / / /

/

/

/ / / / / /

/

/

/

/ / / /

/

/

/

SEKOLAH MENENGAH KEBANGSAAN TASEK UTARA

21568

/ / /

/ / / /

/ / /

/ / /

/ /

/ /

/ /

/

/ / / /

/

/ / /

/ /

/ / /

/ / /

/ / /

/ / / / /

/

7)

/ / / / / / /

KV PERDAGANGAN JB

SITE PLAN /

COMPUTER BLOCK EXTENSION

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All

information used in the report are consulted with and obtained permission from the company. /

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/


7 School Block (Computer block) extension of a college Site location: Johor Bahru Specification: School block extension Task: Fittings drawings

T h is proj e c t is ab out an e x te nsion of a computer blo ck for a col lege. The s i z e of t he bu i l d i ng e x te nsion is 5 1 . 0 m ( w) x 12.2m (h). At t he f ront of t he blo ck is t he c ar p ark and is a ls o su r rou nde d by var ious sp or t fa ci lit ies such as f uts a l cour t, b asket b a l l c ou r t and e tc . T he s ite is lo c ate d in Johor B a hr u w it h a s e cond ar y s cho ol l o c ate d ne arby as wel l.

S o, for t h is proj e c t , I was t aske d to do draw ings for f itt ings p ar t w here I ne e d to s e p ar ate t he sp ac e s in e ach f lo or p ar t by p ar t. E a ch draw ing consist of t he i nvolve d sp a c e s , t he image of t he f itt ings and f ur nitures and t he qu ant it y of t he f itt i ng s and f u r n itu re. Eve r yt h ing is t a ken c aref u l ly in order for draw ings w here t he det ai ls , qu ant it y, t yp e of f itt ings c an b e conve ye d cle arly t hroug h t he draw ings. T he dr aw i ng s are che cke d by my c ol le ague and w as t hen che cke d by sup er v ising archite c t s , Ar. S el amat . D raw ings are draw n t hroug h AutoCAD.

From t h is t ask, I’ve unde rst and t he imp or t ance of t he pl a cement of f itt ings (as cert ai n amount of f ur n iture c an f it in cer t ain amount of sp a ces) in a sp a ce w hi ch cou l d b e obs er ve d in t he draw ings t herefore to f u l ly ut i lize t he us e of sp a ce. I’ve a ls o u nd e rst and t he imp or t anc e of t his sp e cif ic t y p e of draw ing , as t his is to subm itte d to b ot h t he c ont rac tor and qu ant it y sur ve yor and to b e comprom is e d.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


8

Fig.1 Original Floor Plan

Fig.2

Splitted furniture layout plan

Fig.3 Furniture layour plan drawn

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


9

A

B

A

CORNER UNIT

A

STANDARD UNIT

B

A

CORNER UNIT

STANDARD UNIT

B

B

1

1

2 3

5

6

7 8 REPEAT

REPEAT

REPEAT

10

REPEAT

10

11 12

12

13

13

DP750 YARD

WET KITCHEN

MAID ROOM

MAID ROOM

WET KITCHEN

YARD

AC 1

12

AC 1

BATH 2

BATH 2

12

11

DRY KITCHEN

DRY KITCHEN

10

A DINING

SHOE RACK

TURF

DINING

SHOE RACK

TERRACE

TERRACE

A

BEDROOM 2

BEDROOM 2

BATH 5

BATH 5

10

A

A FAMILY AREA 1

FAMILY AREA 1

TURF

8 7 LIVING

LIVING

BEDROOM 4

BEDROOM 3

BEDROOM 3

BEDROOM 4

6

5

3 2 CAR PORCH

BATH 4

CAR PORCH

BATH 3

BATH 3

FLAT ROOF

1

BATH 4

FLAT ROOF

1

B

B





02

country

 view B

A

A

END UNIT 2 - PTD 190852

STANDARD UNIT - PTD 190851

B

cluster house A

B

END UNIT 2 - PTD 190852

B 1

1 CAR PORCH

CAR PORCH FLAT ROOF

2 3

5

BATH 4

FLAT ROOF

BATH 3

BATH 3

BATH 4

6 BEDROOM 4 LIVING

TURF

TERRACE

SHOE RACK

DINING

A

BEDROOM 3

SHOE RACK

DRY KITCHEN

FAMILY AREA 1

DINING

A

DRY KITCHEN

10

FAMILY AREA 1

A

A BEDROOM 2

BATH 5 YARD

BEDROOM 4

7

11 12

BEDROOM 3

LIVING

8 10

A

STANDARD UNIT - PTD 190851

BEDROOM 2

BATH 5 WET KITCHEN

MAID ROOM

MAID ROOM

WET KITCHEN

12

YARD

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All 13 13 AC 1

UP750

12

BATH 2

BATH 2

UP750

12 information used in the report are consulted with and obtained permission from the company. BATH 5

11 10

10 REPEAT PTD 190867

8

AC 1

SHOE RACK

REPEAT PTD 190868

REPEAT PTD 190867

REPEAT PTD 190868


10 “Spring Meadow Series” Country View 3 Story Cluster House (76 Units) Site location: Mukim Pulai Specification: Cluster House Task: amendment of drawings based on comment by the client, coloring drawing(s)

C ou nt r y Vie w 3 Stor y C luste r Hous e is a 3 stor y cluster hous e for C ount r y Vi e w R es ou rc e s SDN BHD. It has Typ e A (3461 s q.f t) , Ty p e B (3467 s q.f t) w here o dd l ot s have a d i f fe nt i n pl an l ayout and s ite are a (Ty p e E 2 & E 3). It has 76 units on t he w hol e s ite. The s ite is lo c ate d a Mu k im P u l ai, Johor B a hr u.

S o for t h is proj e c t , I was t aske d to amend t he draw ings as a ccording to t he cl i ent’s c om me nt . I was e x p os e d to de t ai le d draw ings w here a l l t he sp e cif ic at ion are prov i de d and l ab el l e d. I have t a ke n pre c aut ion and amend t he draw ing c aref u l ly, s o t hat it’s c onve y able and cle ar e nou g h for t he client to re a d over. It involves bui lding const r u ct i on, bu i lding s e r v ic e s and ot her w hich I have le ar nt f rom t he p ast fe w s emesters . From t he obs e r vat ion of t he draw ings its elves, a lot of det ai ls regarding const r u c t i on and appl i c at ion c an b e s e e n . Ever y det ai ls and sp e cif ic at ion is to b e ensure d w it hi n t he d r aw i ng w h ich is c onve yable for t he const r uc tor and cont ra c tor. Throu g hout t he ame nd i ng pro c e ss, I had mys elf lo ok ing into ver y det ai ls of t he draw ings, t he sp e ci f ic at ion , e ver y t hing is ver y wel l conve ye d.

O t he r t han t hat , I was a ls o t aske d to do color ing on t he pl ans, ele vat ion and s e c t i on of t h is p ar t ic u l ar proj e c t . T h is p ar t ic u l ar t ask is done by using AutoCA D, w it h t he us e of sp e c if ic c olor ing l ayers indic at ing t he sp e cif ic sp a ces or mater i a ls .

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


11

Fig.4 Plan, Section & Elevation

Fig.5 Modified Plan(s)

Fig.6 Modified Plan(s)

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


12

Fig.7 Modified Section(s) and Elevation(s)

F i g . 8 C o l o r e d P l a n ( s ) , E l e v a t i o n ( s ) , S e c t i o n ( s ) o f Ty p e A

F i g . 9 C o l o r e d P l a n ( s ) , E l e v a t i o n ( s ) , S e c t i o n ( s ) o f Ty p e B

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


13

A

FIRE TANK

B

B

DOMESTIC TANK 6MX5MX3M(H)

COOLING TOWER

Estimated Operating Weight 5350kg Estimated Operating Weight 5350kg

Estimated Operating Weight 5350kg

A AWNING

03

ECONSAVE TAMAN TERATAI

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


14 ECONSAVE Taman Teratai Site location: Taman Teratai, Skudai, Johor Specification: Hypermarket Task: detail drawings, drawings amendment

T h is is a proj e c t ab out t he re s ett lement of E C ONSAV E , a wel l k now n hyp er market w h i ch c an b e found abu nd ant ly t hroug hout t he w hole Johor. The ne w site is l o c ate d at Taman Terat ai, Skud ai, Johor. In t h is p ar t ic u l ar proj e c t , I was t aske d to do det ai l draw ing for t his hy p er market . T he list of det ai ls to b e draw n is f u r t he r s e p arate d and dist r ibute d to me and my col le agues. S o, my t ask i n t his proj e c t is to do t he de t ai l draw ing of shoplots w it h var ious sizes, of f ic e, l o adi ng b ay, ho arding and e tc . Howe ver t here’s a desig n p ar t as wel l, I was aske d to do t he d e t ai ls of t he gu ard hous e by desig ning t he out lo ok of it b as e d on t he pl an g iven . T he d e t ai l d r aw ing to ok a fe w d ays to complete w it h v ar ious amendment and cor re c t i on for f i na l submission . In t h is p ar t ic u l ar proj e c t, I w as exp os e d and le ar nt a l ot ab out d e t ai l d r aw ings as I was t aske d to do dif ferent det ai ls of t he hy p er market it s elves . T he d e t ai l draw ings involve s t he applic at ion of mater i a ls, f inishes, sp e cif ic f itt i ng s & d i me ns i ons . Eve r yt h ing has to b e done ver y c aref u l ly as t he s ele c t ion is ver y v it a l and c ou l d i nf lu e nc e t he ove ra l l de sig n & const r uc t ion pro cess. This t ask ha d me go es i n de e p into t he applic at ion of const r uc t ion det ai ls. T he d e t ai l draw ings are done t hroug h AutoCAD w hich involves a lot of hatchi ng and nu me rous of l aye rs du e to dif ferent us e of mater i a ls. I was a ls o exp os e d to more Au to C AD f unc t ion and shor tc ut, en hancing and improve d my AutoCAD sk i l ls .

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


15 O n We ek 5 , af te r t he f irst ame ndment and subm ission, I was t aske d to do amendment on t he d e t ai ls t hat I have draw n we eks ago b as e d on t he com ments f rom t he cl i ent . Fu r t he r more, I was a ls o e x p os e d to ot her det ai l draw ings such as do or and w i ndow s che du l e s as wel l. From t he amendment of draw ing , e ver y t hing has to b e c ons istent ly and c onst ant ly up d ate d b as e d on client’s com ment, s ome cor re c t ion may ne e d to change p ar t of t he pl an and draw ings as wel l. S o, w here t here’s a cor re c t i on , e ver y d r aw ings has to b e gone t hroug h to ensure e ver y t hing are b eing up d ate d.

O n We ek 6 , I was t aske d to ame nd t he m inor problem of t he draw ings b as e d on Archi te c t’s c omme nt in orde r for t he draw ings to b e subm itte d to t he client s .

Parts covered in the drawings

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


16

A

B

C

1

a

b

c

1

2

2

FLOOR PLAN

ROOF PLAN 1

2

1 30°

SECTION A-A A

2

B

C

SECTION B-B

B

C

RIGHT SIDE ELEVATION

FRONT ELEVATION 2

1

30°

30°

A

30°

30°

REAR ELEVATION

C

B

A

30°

LEFT SIDE ELEVATION

CADANGAN PEMBINAAN SEBUAH PUSAT BELI BELAH (ECONSAVE CASH & CARRY) 1 TINGKAT BERSERTA MEZZANIN DI ATAS LOT PTD 60190, TAMAN DESA CEMERLANG, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM

JYP ARCHITECT

Fig.10 Detail drawings of Guard House

Fig.11 Design are bas ed on the plan and is drawn in AutoCAD

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


17

A

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft A

SHOP FFL

SECTION A - A

B

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft FFL

tiles

tiles

tiles

tiles

tiles

tiles

RWDP

RWDP

RWDP

B

PART OF FIRST FLOOR

SHOP

SECTION B - B

ECONSAVE TAMAN TERATAI

F i g . 1 2 Ty p i c a l d e t a i l d r a w i n g o f s h o p l o t ( s ) a t f i r s t f l o o r

SHOP 221 sq.ft

SHOP 221 sq.ft

SHOP 221 sq.ft

tiles

tiles

tiles

SHOP

FFL

SECTION A - A

B

A

SHOP 357 sq.ft

A

tiles RWDP

PART OF GROUND FLOOR

SHOP FFL

RWDP

SECTION B - B

B ECONSAVE TAMAN TERATAI

Fig.13

Ty p i c a l d e t a i l d r a w i n g o f s h o p l o t ( s ) a t g r o u n d f l o o r

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


18

F3

F3 BOUNDARY WALL AT THE BACK

TYPICAL ELEVATION OF PERIMETER ANTI-CLIMBING FENCING - SIDE VIEW

F2

F1

F2

F1 ELEVATION OF FENCING /GATE AT BOMBA ACCESS ENTRANCE VIEW 1

PLAN OF FENCING GATE AT BOMBA ACCESS ENTRANCE

VIEW 1

ECONSAVE TAMAN TERATAI

Fig.14 Hoarding Details

Strong Room

Filing Room

Reception Area

Office Area

Conference Room

Buyer Room

Server Room

FFL

FFL

SECTION A - A

SECTION B - B

AC AC

Buyer Room

4 DRAWER 4 DRAWER CABINET CABINET BONELESS RACK

B

LOW CABINET

Conference Room

Server Room

B LOW CABINET

Reception Area

LOW CABINET

BONELESS RACK

BONELESS RACK

AV3 AV3 AV3

TABLE BANQUICK

LOW CABINET

Strong Room AC

LOW CABINET

A

Filing Room

LOW CABINET

AV3

Office Area

LOW CABINET

RACK

LOW CABINET

LOW CABINET

LESS

BONE

LOW CABINET

A

PHOTOSTAT MACHINE

PART OF FIRST FLOOR ECONSAVE TAMAN TERATAI

Fig.15 Office Details

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


19

LOADING BAY

LOADING BAY

LOADING BAY

LOADING BAY

LOADING BAY

FFL

SECTION B - B

A

RWDP

LOADING BAY

B

LOADING BAY

LOADING BAY

LOADING BAY

PART OF GROUND FLOOR

RWDP

LOADING BAY

B

A

ECONSAVE TAMAN TERATAI

Fig.16 Loading Bay details

LOADING BAY

FFL

SECTION A - A ECONSAVE TAMAN TERATAI

Fig.17 Loading Bay section details

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


20

Fig.18 Window & Door schedule labelling at Ground Flo or in AutoCAD

Fig.19 Window and Door S chedule (1)

Fig 20. Window and Door S chedule (2)

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


CEM.REN.

CEM.REN.

ESC.

21

B

E .CS (DN) from upper ground floor

(UP) to upper ground floor

ESC.

ESC. 21

entrance

void

void

(DN) to basement floor

ESC.

(UP) from basement floor

ESC. ESC.

ESC.

04

paradigm mall johor

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


22 Paradigm Mall, Johor Site location: Taman Bukit Mewah, Johor Bahru Specification: Shopping Mall , Condominium and hotel Task: Façade modification on 3D models

Par a d i g m Ma l l is a shopping complex or ig inate d in Pet a ling Jay a , S el angor. D u e to t he fast p ac e d de velopme nt i n Johor B a hr u, many investors and de velop ers st ar t d e vel oping in t he st ate of Johor. Para dig m Ma l l is t he ne w ly a ddit ion to t he st ate w h i ch c ons ist t he f irst l arge st ice r in k in Johor B a hr u. Para dig m Ma l l is a c tu a l ly a re ne w a l shopping c omple x t hat is pre v iously an ab andone d/ ha lf f inishe d shoppi ng ma l l. T he s ite is lo c ate d at Skud ai, Johor B a hr u. It’s st rateg ic a l ly s et on 13 acres of f re ehol d l and. Inclu ding of 6 store y s of ret ai l haven (1.3 m i l lion s q.f t), 4 St ar Hotel and BRIO R e side nc e s. It’s exp e c te d to b e op ene d in t he l ast qu ar ter of 2 0 1 7 .

In t h is proj e c t , I was e x p os e d to SketchUp as it involves 3D ma k ing . I w as t aske d to d o fa ç a de mo dif ic at ion of Para dig m Ma l l at one of t he maj or ent rance. Howe ver, I w as more e x p os e d to R h ino w hich is most of ten us e d in s cho ol proj e c ts. T herefore, it to ok s ome t ime s for me to c atch up and get us e d to a l l t he f unc t ions and shor tc ut s of Ske tch Up. D ur ing t he f aç ade mo dif ic at ion, I f ind SketchUp convenient yet hard i n s ome way, but as t ime go es, I get us e d to it w hi le doing t he 3D mo dif i c at i on on t he e nt ranc e ( s ) of Paradig m Ma l l. In t he pro cess of 3D Mo del ling , I a ls o get to u nd e rst and t he w hole de s ig n, e a ch of e ver y det ai l and fa ç a de applic at ion of t he bu i l d i ng . More ove r, most of t he comp any in nowa d ay s archite c ture indust r y are us i ng Ske tch Up ove r any ot he r 3D S of t ware, I s e ek t his as an opp or tunit y to i mprove and maste r my sk i l l in t he SketchUp 3D Mo del ling . T he fol l ow ing pic ture s are t he p ersp e c t ive of t he Para dig m Ma l l t hat has it s faç ade mo dif ie d.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


23

Fig.21 Exterior perspective of Paradigm Mall

Fig.22 Original Entrance Facade 1

Fig.23 Modified Entrance Facade 1

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


24

Fig.24 Original Entrance Facade 2

Fig.25 Modified Entrance Facade 2

Fig.26 Original Entrance Facade 3

Fig.27 Modified Entrance Facade 3 All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


25

14630

11490

11490

14630

FFL

FFL

FRONT ELEVATION

05

REAR ELEVATION

permas jaya commercial shoplots

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


26 Permas Jaya Commercial Shoplots Site location: Permas Jaya, Masai, Johor Specification: Shoplots Task: Measured drawing and translate into accurate plan(s) and elevation(s) for submission

Permas Jaya Commercial Center is built and located in a commercial a r e a o f P e r m a s J a y a d u r i n g t h e t i m e o f 9 0 ’s w h i c h t h e t o w n h a s j u s t s t a r t e d t o d e v e l o p a n d e m e r g e a s a h o t s p o t i n J o h o r B a h r u . I t ’s a l s o w h e re t h e f i r m , J Y P A rc h it e c t s w h i c h I’m w or k i n g i s l o c at e d at . T h e intention of doing this is because the unit is to be sold to a new owne r a s t h e f i r m w i l l m o v e t o Ta m a n M o u n t A u s t i n f e w m o n t h s l a t e r.

Therefore, I was tasked to do the plans, elevations of the commercial building through measured drawing and to be further translated into a c c u r at e d r aw i n g s by u s i n g Aut o C A D. T h e re fore , I’m s e t t o m e a s u re , sketch and record down the measurement which is therefore translated into technical drawings in AutoCAD bas ed on the sketches and measurement recorded. A brochure of the early stage drawings of the office was given as reference, however it is not as accurate with the final product so this task requires me to remeasure and to finalize it a s d r a w i n g s . Ho w e v e r, f o r t h o s e u n r e a c h a b l e a r e a s u c h a s t h e t o p, I have to consider the general thickness and dimension of the slab and wall thickness to fit the drawing and also with the help of Google Earth, I was able to visualize some unreachable part therefore I can complete the drawings. The drawings includes 3 story floor plan and 2 elevations. All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


27 T he d r aw ing has to b e done ver y a cc urately as t he draw ings are to b e g iven to t he ne x t ow ne r as t he ow ne r ne e d to underst and t he sp a ces t herefore t he us e of sp ace, t he d e s i g n ing of t he inte r ior and me chanic a l applic at ion c an go smo ot h ly. In t his proj e c t s , I’ve applie d t he sk i l l t hat I have le ar nt dur ing S em 2.5 (Me asure d Dr aw i ng s and do c u me nt at ion ) , t herefore I’m able to cop e w it h t he t ask ver y wel l. Fol low ing f igu re is t he draw ing of t he com merci a l bui lding:

Fig.28 AutoCAD progression

Fig.29 Finalized drawings in AutoCAD

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


28

7315

7315

REFUSE

W/C

7315

W/C

OFFICE SPACE

W/C

W/C

UP

DOWN

7315 A/C LEDGE

A/C LEDGE

A/C LEDGE

W/C W/C

W/C W/C

OFFICE SPACE

OFFICE SPACE

OFFICE SPACE

21336

SHOP AREA

SHOP AREA

W/C

18810

W/C

W/C W/C

7315

A/C LEDGE

DOWN

UP

21336

7315

REFUSE

DOWN

DOWN

2601

UP

UP

PASSAGE

GROUND FLOOR

A/C LEDGE

A/C LEDGE

A/C LEDGE

A/C LEDGE

SECOND FLOOR

FIRST FLOOR

Fig.30 Floor Pan(s)

11490

14630

11490

14630

FFL

FFL

FRONT ELEVATION

REAR ELEVATION

Fig.31 Elevation(s)

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


29

06

minor task

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


30 two & three stories shophouses Site location: Taman Forest Height, Seremban Specification: Shoplots T a s k : s i t e p l a n r e n d e r i n g b y p h o t o s h o p.

T h is proj e c t is ab out b ot h 2 & 3 stor ies shophous e w here t he site is lo c ate d at Taman Fore st He ig h , S e re mb an . It’s in prop os a l st age, t herefore t here are t wo di f ferent l ayout of site pl an . The re fore, I w as t aske d to do render ing for t he site pl an , addi ng c ol ors & t re e s to t he s ite pl an s o it c an b e f ur t her v isu a lize d. The t ask is f i n ishe d by us i ng Photoshop. From t h is t ask, I have le ar nt t he imp or t ance of t he us age of di ffe re nt c olors as e ach c olor indi c at ing e a ch t y p e of t he bui lding c ategor y, hards c ap e or s of ts c ap e.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


31

U

Fig.32 Option 1 site plan

Fig.33 Rendering in photoshop

Fig.34

Rendered option 1 site plan

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


32

U

Fig.35 Option 2 site plan

Fig.36 Rendering in photoshop

Fig.37

Rendered option 2 site plan

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


33 Bungalow Site location: N/A Specification: Bungalow Task: amendment of the interior plans

For t h is proj e c t , I was t aske d to do amendment b as e d on t he com ment g iven by t he cl i e nt . It’s a bu nga low ye t to b e bui ld w hich is st i l l in desig n st age. B asic a l ly, t he t ask is to change t he f itt ings and mo dif y sp a ces s o t hat t he us e of e a ch sp a ce c an b e ut i lize d.

Fig.38

Modified Plan with the add of furniture and modification of spaces

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


34 4 story shoplots (29 Units) and 3 story shoplots (19 units) Site location: Mukim Pantai Timur, Kota TInggi, Johor Specification: Shoplots Task: coloring and hatching on the drawings

T h is is a proj e c t t hat c onsist of t wo t y p es of shop lots of 4 stor y (29 unit s ) or 3 stor y ( 19 un it s) lo c ate d at Mu k im Pant ai Timur, Kot a Ting g i. S o, I w as t aske d to do c ol or i ng ( hatch ing) on t he draw ings (Pl ans, S e c t ion, E le vat ion, Site Pl an ) for t he t wo t y p e s of shoplot s. The draw ings are done by using Auto c a d w it h e a ch c ol or i ndi c at ing t y p e, f itt ings or f inishes.

Fig.39 Hatched (colored) site plan

Fig.40 Hatched (colored) Plan(s), Elevation(s), Section(s) All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


35 Optimus Medini Site location: N/A Specification: Condominium Task: amendment on layout of the plan(s) For t h is proj e c t s, I was t aske d to do amendment on t he pl an b as e d on t he com ment and a d d ing sp ac e s such as management of f ice, mu lt ipur p os e sp a ces into t he bu i l di ng . And a ls o to mo dif y t he l ayout of t he pl an and chang ing t he qu ant it y of c ar p arks w it h regards to t he desig n.

Fig.41 drawings of the building

CD.3 135°41'00'' 7.671 BOUNDARY LINE

17.735

CD.3

BOUNDARY LINE

CD.1

BOUNDARY LINE

LV SWITCH ROOM

TRANSFORMER ROOM

BOUNDARY LINE

17.735

135°41'00'' 7.671 BOUNDARY LINE

BOUNDARY LINE

GENERATOR ROOM

KL

LINE 5.499 BOUNDARY

CD.2

CD.1

CD.1

CD.2

KL

CD.2

D INGRESS ( 7.5M)

ESS

A43-1 (PTD 199670)

PTD 199668

ENGRESS ( 7.5M)

( 7.5M)

MULTIPURPOSE

ENGR

MULTIPURPOSE

KL

E

NDA BOU

MULTIPURPOSE

( 7.5M)CD.1

RV

SITE PLAN

TOILET(M)

SS

SE

INGRE

RE

TRANSFORMER ROOM

A

LV SWITCH ROOM

RO

BOUNDARY LINE

GENERATOR ROOM

LINE BOUNDARY

CD.2

CD.1

KL

2

OKU

CD.

LINE

PL 25.00

RY

MANAGEMENT OFFICE

TOILET(F)

PTD 170697 GUARD HOUSE

CD.2

RY LINE BOUNDA5.499

.1

CD

CD

.2

RO

KL

CD

A

.2

D INGRESS ( 7.5M)

EN

A43-1 (PTD 199670)

KL

E

) 7.5M D.1 C

RV

S(

ES

SE

INGR

RE

ES

GR

PTD 199668

ENGRESS ( 7.5M)

S(

)

7.5M

SITE PLAN

RY

LINE

NDA

BOU

CD

.2

00

PL 25.

CD.1

CD

.2

Fig.42 modified site plan with the addition of PTD 170697 v a r i o u s s p a c e s

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


36

125°34'00''

10.144

115°27'10''

15.718

271°17'10''

111°24'50''

66.096 274°43'50''

17.720

12.0

M

SE

TB

AC

IN K L

E

273°07'20''

10.046

115°27'10''

'

17'10 271°

111°24'50''

2

56'40 272°

'

66.0

43'50

96

274°

'

0 17.72

12.0

M

SE

TB

AC

IN K L

E

' 07'20 273°

6 10.04

2

0''

4.90

10'4 270°

135°41'00''

303°08'10''

135°41'00''

125°34'00''

269°31'40''

10.144

115°27'10''

15.718

271°17'10''

111°24'50''

125°34'00''

TURFING

1.468

272°56'40''

274°43'50''

17.720

269°

' 31'40

10.1

44

273°07'20''

10.046

115°27'10''

270°10'40'' 4.902

15.7

18

' 17'10 271°

111°24'50''

0'' 1.468

108°19'4

2 14.46

' 56'40 272°

3'50''

66.0

96

274°4

0

17.72

'

07'20

273°

6

10.04

0'' 10'4 270° 2 4.90

135°41'00''

125°34'00''

Fig.44 Modified 2nd Floor Plan with the addition of carpark and modification of the layout

303°08'10''

'

31'40

269°

10.1

44

115°27'10''

18

15.7

' 17'10

271°

111°24'50''

information used in the report are consulted with and obtained permission from the company.

108°19'40''

14.462

66.096

1.468

0'' 108°19'4

14.46

303°08'10''

2nd FLOOR PLAN

270°10'40'' 4.902

18 15.7

91.217 50'' 31' 35°

AY EW IV DR IX EM PR

1.468

272°56'40''

44 10.1

1st FLOOR PLAN

M WIDE 6.0

108°19'40''

14.462

'

2nd FLOOR PLAN

AY EW IV DR IX EM PR E

91.217 50'' 31' 35°

135°41'00''

269°31'40''

31'40

51 PARKING

1st FLOOR PLAN

M WID 6.0

303°08'10''

125°34'00''

269°

TURFING

TURFING

135°41'00''

TURFING

303°08'10''

91.217

50''

31'

35°

91.217 50'' 31' 35°

91.217 50'' 31' 35°

Fig.43 Modified 1st Floor Plan with the addition of carparks, motrocycle parking lots and modifcation of the layout of the plan.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All

0''

1.468

108°19'4

2

14.46

'

56'40 272°

179° 02' 10''

179° 02' 10''

179° 02' 10''

179°

02'

10''


37 Proposed D’Fortune Restaurant Banquet Hall Site location: Bandar Putra IOI, Kulaijaya Specification: Restaurant Task: modifying layout of banquet hall T h is proj e c t is a re st au rant t hat is to b e s at in a site w it h an a cre of 4. The name of t he re st au rant is D’ For tune. The rest aurant its elf consist of a b anquet ha l l, b ot h ma le and fe ma le toi le t , s ome of f ices, k itchen and a l a -c ar te rest aurant s . For t h is proj e c t , I was t aske d to mo dif y t he b anquet ha l l f rom a 50 t able ha l l to a ha l l t hat is suf f ic ie nt to ac c om mo d ate 100 t able w it h regards to t he human ci rc u l at ion and a ccessibi lit y.

Fig.45 original layout plan of the banquet hall

Fig.46 Modified banquet hall that can accomodate 100 tables

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


38 Cadangan Pembinaan Sekolah Menengah Vokasional Site location: Pagoh, Johor Darul Takzim Specification: School Task: adding and checking title of each drawing to the list of drawing block .

This project is about a high school that is to be built at Pagoh, Johor D a r u l Ta k z i m , w h e r e I w a s t a s k e d t o c h e c k a n d a d d t h e t i t l e o f e a c h drawing (Furnitures & fittings layout) into the list of drawing block o f e a c h c a t e g o r y. I n t h i s p a r t i c u l a r t a s k , I h a v e t o c h e c k t h r o u g h t h e whole piles of drawing to correct and ensure all the title and numbering is the same with the drawing list block.

CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA KERAJAAN MALAYSIA

DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOCK ASRAMA)

DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)

KERAJAAN PERSEKUTUAN

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

as

Arkitek Selamat

Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

PERUNDING JURU JASA SDN. BHD.

Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants

AZRAZ CONSULT

as

PERUNDING JURU JASA SDN. BHD.

Juruukur

Quantity

Arkitek Selamat

Surveyors

Bahan Perunding

& Construction

Cost Consultants

AZRAZ CONSULT

Architects & Development Consultants

Civil & Structure Consultant Engineers (001868227-X)

Civil & Structure Consultant Engineers (001868227-X)

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

DRAWINGS LANSKAP

KERAJAAN MALAYSIA

DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)

KERAJAAN PERSEKUTUAN

CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

as

Arkitek Selamat

Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

PERUNDING JURU JASA SDN. BHD.

Juruukur

Quantity

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

Surveyors

Bahan Perunding

& Construction

Cost Consultants

as

Arkitek Selamat

Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

PERUNDING JURU JASA SDN. BHD.

Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

F i g . 4 7 Va r i o u s “d r a w i n g ” l i s t drawings

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


39

CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA KERAJAAN MALAYSIA

DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (NURSERI BUAH, NURSERI POKOK, RUMAH ORKID, RUMAH CENDAWAN & BENGKEL KEJURUTERAAN)

DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)

KERAJAAN PERSEKUTUAN

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

as

Arkitek Selamat

Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

PERUNDING JURU JASA SDN. BHD.

Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants

as

Arkitek Selamat

Architects & Development Consultants

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

DRAWINGS DETAIL BUILT-IN FURNITURE (BLOCK BENGKEL & MAKMAL)

UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

PERUNDING JURU JASA SDN. BHD.

Juruukur

Quantity

Surveyors

Bahan Perunding

& Construction

Cost Consultants

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

as

Arkitek Selamat

Architects & Development Consultants

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOCK KULINARI & HOSPITALITI)

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM

Surveyors

Bahan Perunding

& Construction

Cost Consultants

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

as

Juruukur

Quantity

DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOK BENGKEL PROSES HASIL)

UNTUK :

Arkitek Selamat

PERUNDING JURU JASA SDN. BHD. AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

KERAJAAN PERSEKUTUAN

TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

Architects & Development Consultants

Cost Consultants

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

KERAJAAN PERSEKUTUAN

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

Bahan Perunding

& Construction

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM

UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA

as

Surveyors

KERAJAAN PERSEKUTUAN

CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM

Arkitek Selamat

Juruukur

Quantity

DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (RUMAH PENGETUA/PENGARAH)

KERAJAAN PERSEKUTUAN

Architects & Development Consultants

PERUNDING JURU JASA SDN. BHD. AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

PERUNDING JURU JASA SDN. BHD.

Juruukur

Quantity

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

Surveyors

Bahan Perunding

& Construction

Cost Consultants

as

Arkitek Selamat

Architects & Development Consultants

PERUNDING JURU JASA SDN. BHD.

Juruukur

Quantity

Surveyors

Bahan Perunding

& Construction

Cost Consultants

AZRAZ CONSULT

Civil & Structure Consultant Engineers (001868227-X)

52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my

F i g . 4 8 Va r i o u s “d r a w i n g ” l i s t drawings

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


40 SOVO Condominium Site location: N/A Specification: Condominium Task: rendering plans accouding to color codes.

For t h is proj e c t , I was t aske d to do render ing on pl ans, site pl ans, and t y pic a l hous i ng pl an w it h sp e c if ic c o de of c olors. E a ch color repres ents e a ch t y p e of unit w here it w i l l b e e asie r to b e dif fe re nt i ate by t he const r uc tor, cont ra c tor, re a der or t he buyer. T h is p ar t i c u l ar t ask is done w it h photoshop maj or it y w it h t he us e of “Mag i c Wand To ol” and “Bucket”.

Fig.49 Rendered second floor plan

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


41

F i g . 5 0 R e n d e r e d Ty p i c a l Un i t P l a n o f Ty p e A & B

Fig.51 Rendered 3rd-16th Floor Plan

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


42

Fig.52 Rendered 17th Floor Plan

Fig.53 Rendered 18th & 19th Floor Plan

Fig.53 Rendered 20th - 22th Floor

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


43

SITE VISIT THE MERIDIN at MERDINI

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


44 Meridin Site location: Nusajaya, Johor Specification: Commercial Centre Task: Inspect each unit ’s condition regarding fittings, finishes and construction progress.

Meridin at Medini, located at a strategic location, Nusajaya, Kota I s k a n d a r w h i c h i s J o h o r ’s n e w a d m i n i s t r a t i v e c e n t e . I t ’s a l s o l o c a t e d near to Legoland Malaysia and Medini Business and half hour from Senai Airport. standing tall on 8.19 acres of prime land, The core design prinicple was d e r i v e d f r o m t h e c h a r a c t e r o f h u m a n a s p i r a t i o n t o r e a c h h i g h e r. T h e design intention is evident in the design language and architecture of this building. On the first day to the site visit, me and my colleagues were told to go for site visit. Once we reach there, we get to meet another colleague w h e r e h e e x p l a i n e d d o a n d d o n t ’s i n t h e s i t e . S o , o u r t a s k o n t h i s s i t e v i s i t i s t o i n s p e c t e v e r y u n i t ’s c o n d i t i o n i n r e g a r d s t o f i n i s h e s , f i t t i n g s , c o n s t r u c t i o n p r o g r e s s a n d e t c . T h e r e w e r e 3 o f u s w h e r e t h e r e ’s 3 0 U n i t s to be checked, so each of us is assigned with 10 units. All the units are s i t t i n g b e t w e e n t h e 1 3 t h f l o o r u n t i 1 5 t h f l o o r. C h e c k l i s t a n d p l a n o f each unit is given in order to do comment on each unit so the workers can refer to the comment and make improvement or follow up with the construction status.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


45

Fig.55 Merdini at the site

Fig.57 Construction on going

F i g . 5 6 Vi e w f rom b ottom

Fig.58 Construction on going

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


46

Fig.59 Construction on going

Fig.60 Construction on going

Fig.61 with Colleagues

Fig.62 Doing inspection on site

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


47 c onclus ion D u r i n g t h e 8 We e k s o f i n t e r n s h i p s e s s i o n , I w a s g i v e n a l o t o f o p p o r t u n i t y t o b e i nv o l v e d i n d i f f e r e n t k i n d o f p r o j e c t s . Ho w e v e r, a 8 w e e k i n t e r n s h i p s e s s i o n i s q u i t e s h o r t w h e r e I f e e l t h a t t h e r e ’s s t i l l m u c h t o b e e x p o s e d t o t h e a r c h i t e c t u r e i n d u s t r y. A p a r t i c u l a r t a s k m a y t a k e s a few days to finish, some takes a week. In the end, I still learnt a lot especially I was exposed to different scales of projects, from houses to commercial building. Design to details. From manual to computerized project. And also site visitation. I have acquired knowledge from all the task given, every single project and from my colleagues. I really appreciate everything from here. The working experiences have b e e n g r e a t . I t ’s d e f i n i t e l y a f r u i t f u l e x p e r i e n c e o f b e i n g a n i n t e r n i n JYP Architects. These experiences will definitely help me in my future career development. I would like to thank my employer and colleague for enriching my intern working experience.

All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.