internship tr aining re p ort i nte r nship t raining & re p or t [ A RC 2615]
Jan 9th - March 3rd 2017
name : Andrew Law Zi Hang student id : 0322670 Taylor’s University School Of Architecture, Building & Design internship company : JYP Architect SDN BHD
2
contents 1 2 3 4 5 6 7 8 acknowlegdment
introduction
computer block extension 6-8
countr y view cluster house
econsave taman teratai 13-20
permas shoplots
paradigm mall
minor task
4-5
3
9-12
21-24
25-28
9
site visit 43-46
29-42
10
conclusion 47
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
3 aknowledgement
F i rst of a l l, I wou ld li ke to e x press my ut most g rat itude, t han ks and appre ci at i on to my sup e r v ising arch ite c t Ar. S el amat & Ar. Ng Hong L ing for t he a ccept ance and t he opp or tu n it y to do my inte r nsh ip in J YP Archite c ts. O t her t han t hat, I a ls o want to t han k to my c ol le ague for t he guid ance and enr iche d my work ing exp er ience w it hi n t he f i r m by b e ing helpf u l and f r iend ly. I was exp os e d to dif ferent proj e c t of var i ous s c a le. It’s de f in itely a wonder f u l exp er ience to work here as an inte r n .
I wou l d a ls o li ke to t han ks to our inst r uc tor Mr. Pr ince and Mrs. June for t he i nst r u c t ion and guid anc e t h roug hout t he pro cess. Their a dv ice and guid ance has t r u ly help e d t he stude nt on underst anding t he pur p os e of inter nship. I wou l d a ls o l i ke to t han ks to my v isit ing le c turer, Mr. Angus for p ay ing a v isit to my i nter n i ng of f i c e, to u nde rst and on w hat I’ve b e en t aske d to do in t he comp any for t he f i rst ha l f p e r io d. He has a ls o help e d me w it h t he inter nship and rep or t by gui di ng and answer ing my quest ions.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
4 introduction
T he i nter nsh ip t rain ing c ommence d on Janu ar y 9t h, 2017 (Mond ay ) and ende d on March 3rd, 2017 (Fr id ay ).
JYP Arch ite c t s is lo c ate d at Pe r mas Jay a , Mas ai, Johor. The comp any is r ig ht b ehi nd Ae on Pe r mas Jaya. T he bus ine ss hour is f rom 9.00 A M to 6.00 PM, f rom Mond ay to Fr i d ay. JYP Arch ite c t s is an archite c t f ir m t hat is b as e d in Johor w hich hand l e mo st bi g proj e c t s in Johor such as AE ON, IKE A , Para dig m Ma l l, hig h-R is e and l ow-r is e bu i l d i ng of b ot h c omme rc i a l or resident i a l. The dire c tor of t he f ir m are Ar. Ng Hong L ing , Ar. S el amat, Mr. Keit h & Mr. John.
T he te am c onsiste d of 2 0 + st af f memb ers w hich t he work lo a d and t ask is div i de d and g iven to dif ferent te am . As a c c ording to t he br ie f, t he obj e c t ive of t his mo du le is to int ro duce stu dent to a ne w work ing e nv iron me nt involv ing a c t iv it ies and op erat ion o cc urs w it hi n an arch ite c tu re f ir m. Stude nt s are to t a ke on inter nship to b e exp os e d to t he archite c tu re i ndust r y w he re one c an underst and and b eing aware of t he pr incipl es , and pro c e dure s b e i ng t a ken w it hin an archite c ture f ir m .
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
5 Stu d e nt are a ls o s e ek to apply Unifor m Bui lding by -l aw s and sim i l ar Bui l di ng R e g u l at i ons. Fur t he r more, int ro ducing t he students to t he re quirements of ke epi ng log- b o oks and ac c urate/ infor mat ive proj e c t do c ument at ion.
genera l s cop e of t raining
The list of overa l l t ask and pr a c t ic e t hat is b eing c ar r i e d t h roug hout t he w hole inter nsh ip: 1 . Preliminar y D es ig n Prop os a l 2 . Auto c ad Draw ing 3 . C omment, mo dif ic at ion and amend ment . 4 . Site Vis it 5 . Tr aining and underst and ing on over a l l d e vel opment 6 . Draf t ing 7 . Fi l ing , do c ument at ion
S of t ware applic at ion: AutoC a d, Sketch Up, Photoshop
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/ /
/ /
/
/
/ /
/
/
/
/
/
/
/
/
/
/
Jalan /
/ / /
/
/
/
/
/
/
/
Tun /
/
/
/
/
/
/
/
/ /
/
/
/
/ /
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ / / /
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/ /
/
/ /
/
/
/
/
/
/
/
/ /
/
/
/ / /
/
/
/ /
/
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ / / /
/ /
/
/
/
/
/ /
/
/
/
/
/
/ / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Abdu
/
/
/
l Ra
/
/
zak
/
/
/
/
/
/
(Su
/
/
/
/
sur
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/ /
/ /
IN /
/
/
/
OUT /
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
01 /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
U BARU
/
/
/
/
/
/
/
/
UNAN
/
/
/
/
/
/
/ /
/
BANG / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/ /
/
/
/
/
/
/
/ /
/
/
/
6
/ / / / / / / / / / / / / / / / / / / / / / /
/
/
/ / / / / /
/
/
/
/ / / /
/
/
/
SEKOLAH MENENGAH KEBANGSAAN TASEK UTARA
21568
/ / /
/ / / /
/ / /
/ / /
/ /
/ /
/ /
/
/ / / /
/
/ / /
/ /
/ / /
/ / /
/ / /
/ / / / /
/
7)
/ / / / / / /
KV PERDAGANGAN JB
SITE PLAN /
COMPUTER BLOCK EXTENSION
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All
information used in the report are consulted with and obtained permission from the company. /
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
7 School Block (Computer block) extension of a college Site location: Johor Bahru Specification: School block extension Task: Fittings drawings
T h is proj e c t is ab out an e x te nsion of a computer blo ck for a col lege. The s i z e of t he bu i l d i ng e x te nsion is 5 1 . 0 m ( w) x 12.2m (h). At t he f ront of t he blo ck is t he c ar p ark and is a ls o su r rou nde d by var ious sp or t fa ci lit ies such as f uts a l cour t, b asket b a l l c ou r t and e tc . T he s ite is lo c ate d in Johor B a hr u w it h a s e cond ar y s cho ol l o c ate d ne arby as wel l.
S o, for t h is proj e c t , I was t aske d to do draw ings for f itt ings p ar t w here I ne e d to s e p ar ate t he sp ac e s in e ach f lo or p ar t by p ar t. E a ch draw ing consist of t he i nvolve d sp a c e s , t he image of t he f itt ings and f ur nitures and t he qu ant it y of t he f itt i ng s and f u r n itu re. Eve r yt h ing is t a ken c aref u l ly in order for draw ings w here t he det ai ls , qu ant it y, t yp e of f itt ings c an b e conve ye d cle arly t hroug h t he draw ings. T he dr aw i ng s are che cke d by my c ol le ague and w as t hen che cke d by sup er v ising archite c t s , Ar. S el amat . D raw ings are draw n t hroug h AutoCAD.
From t h is t ask, I’ve unde rst and t he imp or t ance of t he pl a cement of f itt ings (as cert ai n amount of f ur n iture c an f it in cer t ain amount of sp a ces) in a sp a ce w hi ch cou l d b e obs er ve d in t he draw ings t herefore to f u l ly ut i lize t he us e of sp a ce. I’ve a ls o u nd e rst and t he imp or t anc e of t his sp e cif ic t y p e of draw ing , as t his is to subm itte d to b ot h t he c ont rac tor and qu ant it y sur ve yor and to b e comprom is e d.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
8
Fig.1 Original Floor Plan
Fig.2
Splitted furniture layout plan
Fig.3 Furniture layour plan drawn
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
9
A
B
A
CORNER UNIT
A
STANDARD UNIT
B
A
CORNER UNIT
STANDARD UNIT
B
B
1
1
2 3
5
6
7 8 REPEAT
REPEAT
REPEAT
10
REPEAT
10
11 12
12
13
13
DP750 YARD
WET KITCHEN
MAID ROOM
MAID ROOM
WET KITCHEN
YARD
AC 1
12
AC 1
BATH 2
BATH 2
12
11
DRY KITCHEN
DRY KITCHEN
10
A DINING
SHOE RACK
TURF
DINING
SHOE RACK
TERRACE
TERRACE
A
BEDROOM 2
BEDROOM 2
BATH 5
BATH 5
10
A
A FAMILY AREA 1
FAMILY AREA 1
TURF
8 7 LIVING
LIVING
BEDROOM 4
BEDROOM 3
BEDROOM 3
BEDROOM 4
6
5
3 2 CAR PORCH
BATH 4
CAR PORCH
BATH 3
BATH 3
FLAT ROOF
1
BATH 4
FLAT ROOF
1
B
B
02
country
view B
A
A
END UNIT 2 - PTD 190852
STANDARD UNIT - PTD 190851
B
cluster house A
B
END UNIT 2 - PTD 190852
B 1
1 CAR PORCH
CAR PORCH FLAT ROOF
2 3
5
BATH 4
FLAT ROOF
BATH 3
BATH 3
BATH 4
6 BEDROOM 4 LIVING
TURF
TERRACE
SHOE RACK
DINING
A
BEDROOM 3
SHOE RACK
DRY KITCHEN
FAMILY AREA 1
DINING
A
DRY KITCHEN
10
FAMILY AREA 1
A
A BEDROOM 2
BATH 5 YARD
BEDROOM 4
7
11 12
BEDROOM 3
LIVING
8 10
A
STANDARD UNIT - PTD 190851
BEDROOM 2
BATH 5 WET KITCHEN
MAID ROOM
MAID ROOM
WET KITCHEN
12
YARD
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All 13 13 AC 1
UP750
12
BATH 2
BATH 2
UP750
12 information used in the report are consulted with and obtained permission from the company. BATH 5
11 10
10 REPEAT PTD 190867
8
AC 1
SHOE RACK
REPEAT PTD 190868
REPEAT PTD 190867
REPEAT PTD 190868
10 “Spring Meadow Series” Country View 3 Story Cluster House (76 Units) Site location: Mukim Pulai Specification: Cluster House Task: amendment of drawings based on comment by the client, coloring drawing(s)
C ou nt r y Vie w 3 Stor y C luste r Hous e is a 3 stor y cluster hous e for C ount r y Vi e w R es ou rc e s SDN BHD. It has Typ e A (3461 s q.f t) , Ty p e B (3467 s q.f t) w here o dd l ot s have a d i f fe nt i n pl an l ayout and s ite are a (Ty p e E 2 & E 3). It has 76 units on t he w hol e s ite. The s ite is lo c ate d a Mu k im P u l ai, Johor B a hr u.
S o for t h is proj e c t , I was t aske d to amend t he draw ings as a ccording to t he cl i ent’s c om me nt . I was e x p os e d to de t ai le d draw ings w here a l l t he sp e cif ic at ion are prov i de d and l ab el l e d. I have t a ke n pre c aut ion and amend t he draw ing c aref u l ly, s o t hat it’s c onve y able and cle ar e nou g h for t he client to re a d over. It involves bui lding const r u ct i on, bu i lding s e r v ic e s and ot her w hich I have le ar nt f rom t he p ast fe w s emesters . From t he obs e r vat ion of t he draw ings its elves, a lot of det ai ls regarding const r u c t i on and appl i c at ion c an b e s e e n . Ever y det ai ls and sp e cif ic at ion is to b e ensure d w it hi n t he d r aw i ng w h ich is c onve yable for t he const r uc tor and cont ra c tor. Throu g hout t he ame nd i ng pro c e ss, I had mys elf lo ok ing into ver y det ai ls of t he draw ings, t he sp e ci f ic at ion , e ver y t hing is ver y wel l conve ye d.
O t he r t han t hat , I was a ls o t aske d to do color ing on t he pl ans, ele vat ion and s e c t i on of t h is p ar t ic u l ar proj e c t . T h is p ar t ic u l ar t ask is done by using AutoCA D, w it h t he us e of sp e c if ic c olor ing l ayers indic at ing t he sp e cif ic sp a ces or mater i a ls .
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
11
Fig.4 Plan, Section & Elevation
Fig.5 Modified Plan(s)
Fig.6 Modified Plan(s)
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
12
Fig.7 Modified Section(s) and Elevation(s)
F i g . 8 C o l o r e d P l a n ( s ) , E l e v a t i o n ( s ) , S e c t i o n ( s ) o f Ty p e A
F i g . 9 C o l o r e d P l a n ( s ) , E l e v a t i o n ( s ) , S e c t i o n ( s ) o f Ty p e B
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
13
A
FIRE TANK
B
B
DOMESTIC TANK 6MX5MX3M(H)
COOLING TOWER
Estimated Operating Weight 5350kg Estimated Operating Weight 5350kg
Estimated Operating Weight 5350kg
A AWNING
03
ECONSAVE TAMAN TERATAI
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
14 ECONSAVE Taman Teratai Site location: Taman Teratai, Skudai, Johor Specification: Hypermarket Task: detail drawings, drawings amendment
T h is is a proj e c t ab out t he re s ett lement of E C ONSAV E , a wel l k now n hyp er market w h i ch c an b e found abu nd ant ly t hroug hout t he w hole Johor. The ne w site is l o c ate d at Taman Terat ai, Skud ai, Johor. In t h is p ar t ic u l ar proj e c t , I was t aske d to do det ai l draw ing for t his hy p er market . T he list of det ai ls to b e draw n is f u r t he r s e p arate d and dist r ibute d to me and my col le agues. S o, my t ask i n t his proj e c t is to do t he de t ai l draw ing of shoplots w it h var ious sizes, of f ic e, l o adi ng b ay, ho arding and e tc . Howe ver t here’s a desig n p ar t as wel l, I was aske d to do t he d e t ai ls of t he gu ard hous e by desig ning t he out lo ok of it b as e d on t he pl an g iven . T he d e t ai l d r aw ing to ok a fe w d ays to complete w it h v ar ious amendment and cor re c t i on for f i na l submission . In t h is p ar t ic u l ar proj e c t, I w as exp os e d and le ar nt a l ot ab out d e t ai l d r aw ings as I was t aske d to do dif ferent det ai ls of t he hy p er market it s elves . T he d e t ai l draw ings involve s t he applic at ion of mater i a ls, f inishes, sp e cif ic f itt i ng s & d i me ns i ons . Eve r yt h ing has to b e done ver y c aref u l ly as t he s ele c t ion is ver y v it a l and c ou l d i nf lu e nc e t he ove ra l l de sig n & const r uc t ion pro cess. This t ask ha d me go es i n de e p into t he applic at ion of const r uc t ion det ai ls. T he d e t ai l draw ings are done t hroug h AutoCAD w hich involves a lot of hatchi ng and nu me rous of l aye rs du e to dif ferent us e of mater i a ls. I was a ls o exp os e d to more Au to C AD f unc t ion and shor tc ut, en hancing and improve d my AutoCAD sk i l ls .
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
15 O n We ek 5 , af te r t he f irst ame ndment and subm ission, I was t aske d to do amendment on t he d e t ai ls t hat I have draw n we eks ago b as e d on t he com ments f rom t he cl i ent . Fu r t he r more, I was a ls o e x p os e d to ot her det ai l draw ings such as do or and w i ndow s che du l e s as wel l. From t he amendment of draw ing , e ver y t hing has to b e c ons istent ly and c onst ant ly up d ate d b as e d on client’s com ment, s ome cor re c t ion may ne e d to change p ar t of t he pl an and draw ings as wel l. S o, w here t here’s a cor re c t i on , e ver y d r aw ings has to b e gone t hroug h to ensure e ver y t hing are b eing up d ate d.
O n We ek 6 , I was t aske d to ame nd t he m inor problem of t he draw ings b as e d on Archi te c t’s c omme nt in orde r for t he draw ings to b e subm itte d to t he client s .
Parts covered in the drawings
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
16
A
B
C
1
a
b
c
1
2
2
FLOOR PLAN
ROOF PLAN 1
2
1 30°
SECTION A-A A
2
B
C
SECTION B-B
B
C
RIGHT SIDE ELEVATION
FRONT ELEVATION 2
1
30°
30°
A
30°
30°
REAR ELEVATION
C
B
A
30°
LEFT SIDE ELEVATION
CADANGAN PEMBINAAN SEBUAH PUSAT BELI BELAH (ECONSAVE CASH & CARRY) 1 TINGKAT BERSERTA MEZZANIN DI ATAS LOT PTD 60190, TAMAN DESA CEMERLANG, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
JYP ARCHITECT
Fig.10 Detail drawings of Guard House
Fig.11 Design are bas ed on the plan and is drawn in AutoCAD
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
17
A
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft A
SHOP FFL
SECTION A - A
B
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft FFL
tiles
tiles
tiles
tiles
tiles
tiles
RWDP
RWDP
RWDP
B
PART OF FIRST FLOOR
SHOP
SECTION B - B
ECONSAVE TAMAN TERATAI
F i g . 1 2 Ty p i c a l d e t a i l d r a w i n g o f s h o p l o t ( s ) a t f i r s t f l o o r
SHOP 221 sq.ft
SHOP 221 sq.ft
SHOP 221 sq.ft
tiles
tiles
tiles
SHOP
FFL
SECTION A - A
B
A
SHOP 357 sq.ft
A
tiles RWDP
PART OF GROUND FLOOR
SHOP FFL
RWDP
SECTION B - B
B ECONSAVE TAMAN TERATAI
Fig.13
Ty p i c a l d e t a i l d r a w i n g o f s h o p l o t ( s ) a t g r o u n d f l o o r
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
18
F3
F3 BOUNDARY WALL AT THE BACK
TYPICAL ELEVATION OF PERIMETER ANTI-CLIMBING FENCING - SIDE VIEW
F2
F1
F2
F1 ELEVATION OF FENCING /GATE AT BOMBA ACCESS ENTRANCE VIEW 1
PLAN OF FENCING GATE AT BOMBA ACCESS ENTRANCE
VIEW 1
ECONSAVE TAMAN TERATAI
Fig.14 Hoarding Details
Strong Room
Filing Room
Reception Area
Office Area
Conference Room
Buyer Room
Server Room
FFL
FFL
SECTION A - A
SECTION B - B
AC AC
Buyer Room
4 DRAWER 4 DRAWER CABINET CABINET BONELESS RACK
B
LOW CABINET
Conference Room
Server Room
B LOW CABINET
Reception Area
LOW CABINET
BONELESS RACK
BONELESS RACK
AV3 AV3 AV3
TABLE BANQUICK
LOW CABINET
Strong Room AC
LOW CABINET
A
Filing Room
LOW CABINET
AV3
Office Area
LOW CABINET
RACK
LOW CABINET
LOW CABINET
LESS
BONE
LOW CABINET
A
PHOTOSTAT MACHINE
PART OF FIRST FLOOR ECONSAVE TAMAN TERATAI
Fig.15 Office Details
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
19
LOADING BAY
LOADING BAY
LOADING BAY
LOADING BAY
LOADING BAY
FFL
SECTION B - B
A
RWDP
LOADING BAY
B
LOADING BAY
LOADING BAY
LOADING BAY
PART OF GROUND FLOOR
RWDP
LOADING BAY
B
A
ECONSAVE TAMAN TERATAI
Fig.16 Loading Bay details
LOADING BAY
FFL
SECTION A - A ECONSAVE TAMAN TERATAI
Fig.17 Loading Bay section details
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
20
Fig.18 Window & Door schedule labelling at Ground Flo or in AutoCAD
Fig.19 Window and Door S chedule (1)
Fig 20. Window and Door S chedule (2)
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
CEM.REN.
CEM.REN.
ESC.
21
B
E .CS (DN) from upper ground floor
(UP) to upper ground floor
ESC.
ESC. 21
entrance
void
void
(DN) to basement floor
ESC.
(UP) from basement floor
ESC. ESC.
ESC.
04
paradigm mall johor
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
22 Paradigm Mall, Johor Site location: Taman Bukit Mewah, Johor Bahru Specification: Shopping Mall , Condominium and hotel Task: Façade modification on 3D models
Par a d i g m Ma l l is a shopping complex or ig inate d in Pet a ling Jay a , S el angor. D u e to t he fast p ac e d de velopme nt i n Johor B a hr u, many investors and de velop ers st ar t d e vel oping in t he st ate of Johor. Para dig m Ma l l is t he ne w ly a ddit ion to t he st ate w h i ch c ons ist t he f irst l arge st ice r in k in Johor B a hr u. Para dig m Ma l l is a c tu a l ly a re ne w a l shopping c omple x t hat is pre v iously an ab andone d/ ha lf f inishe d shoppi ng ma l l. T he s ite is lo c ate d at Skud ai, Johor B a hr u. It’s st rateg ic a l ly s et on 13 acres of f re ehol d l and. Inclu ding of 6 store y s of ret ai l haven (1.3 m i l lion s q.f t), 4 St ar Hotel and BRIO R e side nc e s. It’s exp e c te d to b e op ene d in t he l ast qu ar ter of 2 0 1 7 .
In t h is proj e c t , I was e x p os e d to SketchUp as it involves 3D ma k ing . I w as t aske d to d o fa ç a de mo dif ic at ion of Para dig m Ma l l at one of t he maj or ent rance. Howe ver, I w as more e x p os e d to R h ino w hich is most of ten us e d in s cho ol proj e c ts. T herefore, it to ok s ome t ime s for me to c atch up and get us e d to a l l t he f unc t ions and shor tc ut s of Ske tch Up. D ur ing t he f aç ade mo dif ic at ion, I f ind SketchUp convenient yet hard i n s ome way, but as t ime go es, I get us e d to it w hi le doing t he 3D mo dif i c at i on on t he e nt ranc e ( s ) of Paradig m Ma l l. In t he pro cess of 3D Mo del ling , I a ls o get to u nd e rst and t he w hole de s ig n, e a ch of e ver y det ai l and fa ç a de applic at ion of t he bu i l d i ng . More ove r, most of t he comp any in nowa d ay s archite c ture indust r y are us i ng Ske tch Up ove r any ot he r 3D S of t ware, I s e ek t his as an opp or tunit y to i mprove and maste r my sk i l l in t he SketchUp 3D Mo del ling . T he fol l ow ing pic ture s are t he p ersp e c t ive of t he Para dig m Ma l l t hat has it s faç ade mo dif ie d.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
23
Fig.21 Exterior perspective of Paradigm Mall
Fig.22 Original Entrance Facade 1
Fig.23 Modified Entrance Facade 1
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
24
Fig.24 Original Entrance Facade 2
Fig.25 Modified Entrance Facade 2
Fig.26 Original Entrance Facade 3
Fig.27 Modified Entrance Facade 3 All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
25
14630
11490
11490
14630
FFL
FFL
FRONT ELEVATION
05
REAR ELEVATION
permas jaya commercial shoplots
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
26 Permas Jaya Commercial Shoplots Site location: Permas Jaya, Masai, Johor Specification: Shoplots Task: Measured drawing and translate into accurate plan(s) and elevation(s) for submission
Permas Jaya Commercial Center is built and located in a commercial a r e a o f P e r m a s J a y a d u r i n g t h e t i m e o f 9 0 ’s w h i c h t h e t o w n h a s j u s t s t a r t e d t o d e v e l o p a n d e m e r g e a s a h o t s p o t i n J o h o r B a h r u . I t ’s a l s o w h e re t h e f i r m , J Y P A rc h it e c t s w h i c h I’m w or k i n g i s l o c at e d at . T h e intention of doing this is because the unit is to be sold to a new owne r a s t h e f i r m w i l l m o v e t o Ta m a n M o u n t A u s t i n f e w m o n t h s l a t e r.
Therefore, I was tasked to do the plans, elevations of the commercial building through measured drawing and to be further translated into a c c u r at e d r aw i n g s by u s i n g Aut o C A D. T h e re fore , I’m s e t t o m e a s u re , sketch and record down the measurement which is therefore translated into technical drawings in AutoCAD bas ed on the sketches and measurement recorded. A brochure of the early stage drawings of the office was given as reference, however it is not as accurate with the final product so this task requires me to remeasure and to finalize it a s d r a w i n g s . Ho w e v e r, f o r t h o s e u n r e a c h a b l e a r e a s u c h a s t h e t o p, I have to consider the general thickness and dimension of the slab and wall thickness to fit the drawing and also with the help of Google Earth, I was able to visualize some unreachable part therefore I can complete the drawings. The drawings includes 3 story floor plan and 2 elevations. All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
27 T he d r aw ing has to b e done ver y a cc urately as t he draw ings are to b e g iven to t he ne x t ow ne r as t he ow ne r ne e d to underst and t he sp a ces t herefore t he us e of sp ace, t he d e s i g n ing of t he inte r ior and me chanic a l applic at ion c an go smo ot h ly. In t his proj e c t s , I’ve applie d t he sk i l l t hat I have le ar nt dur ing S em 2.5 (Me asure d Dr aw i ng s and do c u me nt at ion ) , t herefore I’m able to cop e w it h t he t ask ver y wel l. Fol low ing f igu re is t he draw ing of t he com merci a l bui lding:
Fig.28 AutoCAD progression
Fig.29 Finalized drawings in AutoCAD
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
28
7315
7315
REFUSE
W/C
7315
W/C
OFFICE SPACE
W/C
W/C
UP
DOWN
7315 A/C LEDGE
A/C LEDGE
A/C LEDGE
W/C W/C
W/C W/C
OFFICE SPACE
OFFICE SPACE
OFFICE SPACE
21336
SHOP AREA
SHOP AREA
W/C
18810
W/C
W/C W/C
7315
A/C LEDGE
DOWN
UP
21336
7315
REFUSE
DOWN
DOWN
2601
UP
UP
PASSAGE
GROUND FLOOR
A/C LEDGE
A/C LEDGE
A/C LEDGE
A/C LEDGE
SECOND FLOOR
FIRST FLOOR
Fig.30 Floor Pan(s)
11490
14630
11490
14630
FFL
FFL
FRONT ELEVATION
REAR ELEVATION
Fig.31 Elevation(s)
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
29
06
minor task
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
30 two & three stories shophouses Site location: Taman Forest Height, Seremban Specification: Shoplots T a s k : s i t e p l a n r e n d e r i n g b y p h o t o s h o p.
T h is proj e c t is ab out b ot h 2 & 3 stor ies shophous e w here t he site is lo c ate d at Taman Fore st He ig h , S e re mb an . It’s in prop os a l st age, t herefore t here are t wo di f ferent l ayout of site pl an . The re fore, I w as t aske d to do render ing for t he site pl an , addi ng c ol ors & t re e s to t he s ite pl an s o it c an b e f ur t her v isu a lize d. The t ask is f i n ishe d by us i ng Photoshop. From t h is t ask, I have le ar nt t he imp or t ance of t he us age of di ffe re nt c olors as e ach c olor indi c at ing e a ch t y p e of t he bui lding c ategor y, hards c ap e or s of ts c ap e.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
31
U
Fig.32 Option 1 site plan
Fig.33 Rendering in photoshop
Fig.34
Rendered option 1 site plan
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
32
U
Fig.35 Option 2 site plan
Fig.36 Rendering in photoshop
Fig.37
Rendered option 2 site plan
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
33 Bungalow Site location: N/A Specification: Bungalow Task: amendment of the interior plans
For t h is proj e c t , I was t aske d to do amendment b as e d on t he com ment g iven by t he cl i e nt . It’s a bu nga low ye t to b e bui ld w hich is st i l l in desig n st age. B asic a l ly, t he t ask is to change t he f itt ings and mo dif y sp a ces s o t hat t he us e of e a ch sp a ce c an b e ut i lize d.
Fig.38
Modified Plan with the add of furniture and modification of spaces
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
34 4 story shoplots (29 Units) and 3 story shoplots (19 units) Site location: Mukim Pantai Timur, Kota TInggi, Johor Specification: Shoplots Task: coloring and hatching on the drawings
T h is is a proj e c t t hat c onsist of t wo t y p es of shop lots of 4 stor y (29 unit s ) or 3 stor y ( 19 un it s) lo c ate d at Mu k im Pant ai Timur, Kot a Ting g i. S o, I w as t aske d to do c ol or i ng ( hatch ing) on t he draw ings (Pl ans, S e c t ion, E le vat ion, Site Pl an ) for t he t wo t y p e s of shoplot s. The draw ings are done by using Auto c a d w it h e a ch c ol or i ndi c at ing t y p e, f itt ings or f inishes.
Fig.39 Hatched (colored) site plan
Fig.40 Hatched (colored) Plan(s), Elevation(s), Section(s) All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
35 Optimus Medini Site location: N/A Specification: Condominium Task: amendment on layout of the plan(s) For t h is proj e c t s, I was t aske d to do amendment on t he pl an b as e d on t he com ment and a d d ing sp ac e s such as management of f ice, mu lt ipur p os e sp a ces into t he bu i l di ng . And a ls o to mo dif y t he l ayout of t he pl an and chang ing t he qu ant it y of c ar p arks w it h regards to t he desig n.
Fig.41 drawings of the building
CD.3 135°41'00'' 7.671 BOUNDARY LINE
17.735
CD.3
BOUNDARY LINE
CD.1
BOUNDARY LINE
LV SWITCH ROOM
TRANSFORMER ROOM
BOUNDARY LINE
17.735
135°41'00'' 7.671 BOUNDARY LINE
BOUNDARY LINE
GENERATOR ROOM
KL
LINE 5.499 BOUNDARY
CD.2
CD.1
CD.1
CD.2
KL
CD.2
D INGRESS ( 7.5M)
ESS
A43-1 (PTD 199670)
PTD 199668
ENGRESS ( 7.5M)
( 7.5M)
MULTIPURPOSE
ENGR
MULTIPURPOSE
KL
E
NDA BOU
MULTIPURPOSE
( 7.5M)CD.1
RV
SITE PLAN
TOILET(M)
SS
SE
INGRE
RE
TRANSFORMER ROOM
A
LV SWITCH ROOM
RO
BOUNDARY LINE
GENERATOR ROOM
LINE BOUNDARY
CD.2
CD.1
KL
2
OKU
CD.
LINE
PL 25.00
RY
MANAGEMENT OFFICE
TOILET(F)
PTD 170697 GUARD HOUSE
CD.2
RY LINE BOUNDA5.499
.1
CD
CD
.2
RO
KL
CD
A
.2
D INGRESS ( 7.5M)
EN
A43-1 (PTD 199670)
KL
E
) 7.5M D.1 C
RV
S(
ES
SE
INGR
RE
ES
GR
PTD 199668
ENGRESS ( 7.5M)
S(
)
7.5M
SITE PLAN
RY
LINE
NDA
BOU
CD
.2
00
PL 25.
CD.1
CD
.2
Fig.42 modified site plan with the addition of PTD 170697 v a r i o u s s p a c e s
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
36
125°34'00''
10.144
115°27'10''
15.718
271°17'10''
111°24'50''
66.096 274°43'50''
17.720
12.0
M
SE
TB
AC
IN K L
E
273°07'20''
10.046
115°27'10''
'
17'10 271°
111°24'50''
2
56'40 272°
'
66.0
43'50
96
274°
'
0 17.72
12.0
M
SE
TB
AC
IN K L
E
' 07'20 273°
6 10.04
2
0''
4.90
10'4 270°
135°41'00''
303°08'10''
135°41'00''
125°34'00''
269°31'40''
10.144
115°27'10''
15.718
271°17'10''
111°24'50''
125°34'00''
TURFING
1.468
272°56'40''
274°43'50''
17.720
269°
' 31'40
10.1
44
273°07'20''
10.046
115°27'10''
270°10'40'' 4.902
15.7
18
' 17'10 271°
111°24'50''
0'' 1.468
108°19'4
2 14.46
' 56'40 272°
3'50''
66.0
96
274°4
0
17.72
'
07'20
273°
6
10.04
0'' 10'4 270° 2 4.90
135°41'00''
125°34'00''
Fig.44 Modified 2nd Floor Plan with the addition of carpark and modification of the layout
303°08'10''
'
31'40
269°
10.1
44
115°27'10''
18
15.7
' 17'10
271°
111°24'50''
information used in the report are consulted with and obtained permission from the company.
108°19'40''
14.462
66.096
1.468
0'' 108°19'4
14.46
303°08'10''
2nd FLOOR PLAN
270°10'40'' 4.902
18 15.7
91.217 50'' 31' 35°
AY EW IV DR IX EM PR
1.468
272°56'40''
44 10.1
1st FLOOR PLAN
M WIDE 6.0
108°19'40''
14.462
'
2nd FLOOR PLAN
AY EW IV DR IX EM PR E
91.217 50'' 31' 35°
135°41'00''
269°31'40''
31'40
51 PARKING
1st FLOOR PLAN
M WID 6.0
303°08'10''
125°34'00''
269°
TURFING
TURFING
135°41'00''
TURFING
303°08'10''
91.217
50''
31'
35°
91.217 50'' 31' 35°
91.217 50'' 31' 35°
Fig.43 Modified 1st Floor Plan with the addition of carparks, motrocycle parking lots and modifcation of the layout of the plan.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All
0''
1.468
108°19'4
2
14.46
'
56'40 272°
179° 02' 10''
179° 02' 10''
179° 02' 10''
179°
02'
10''
37 Proposed D’Fortune Restaurant Banquet Hall Site location: Bandar Putra IOI, Kulaijaya Specification: Restaurant Task: modifying layout of banquet hall T h is proj e c t is a re st au rant t hat is to b e s at in a site w it h an a cre of 4. The name of t he re st au rant is D’ For tune. The rest aurant its elf consist of a b anquet ha l l, b ot h ma le and fe ma le toi le t , s ome of f ices, k itchen and a l a -c ar te rest aurant s . For t h is proj e c t , I was t aske d to mo dif y t he b anquet ha l l f rom a 50 t able ha l l to a ha l l t hat is suf f ic ie nt to ac c om mo d ate 100 t able w it h regards to t he human ci rc u l at ion and a ccessibi lit y.
Fig.45 original layout plan of the banquet hall
Fig.46 Modified banquet hall that can accomodate 100 tables
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
38 Cadangan Pembinaan Sekolah Menengah Vokasional Site location: Pagoh, Johor Darul Takzim Specification: School Task: adding and checking title of each drawing to the list of drawing block .
This project is about a high school that is to be built at Pagoh, Johor D a r u l Ta k z i m , w h e r e I w a s t a s k e d t o c h e c k a n d a d d t h e t i t l e o f e a c h drawing (Furnitures & fittings layout) into the list of drawing block o f e a c h c a t e g o r y. I n t h i s p a r t i c u l a r t a s k , I h a v e t o c h e c k t h r o u g h t h e whole piles of drawing to correct and ensure all the title and numbering is the same with the drawing list block.
CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA KERAJAAN MALAYSIA
DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOCK ASRAMA)
DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)
KERAJAAN PERSEKUTUAN
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
as
Arkitek Selamat
Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
PERUNDING JURU JASA SDN. BHD.
Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants
AZRAZ CONSULT
as
PERUNDING JURU JASA SDN. BHD.
Juruukur
Quantity
Arkitek Selamat
Surveyors
Bahan Perunding
& Construction
Cost Consultants
AZRAZ CONSULT
Architects & Development Consultants
Civil & Structure Consultant Engineers (001868227-X)
Civil & Structure Consultant Engineers (001868227-X)
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
DRAWINGS LANSKAP
KERAJAAN MALAYSIA
DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)
KERAJAAN PERSEKUTUAN
CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
as
Arkitek Selamat
Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
PERUNDING JURU JASA SDN. BHD.
Juruukur
Quantity
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
Surveyors
Bahan Perunding
& Construction
Cost Consultants
as
Arkitek Selamat
Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
PERUNDING JURU JASA SDN. BHD.
Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
F i g . 4 7 Va r i o u s “d r a w i n g ” l i s t drawings
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
39
CADANGAN MENYIAPKAN KERJA-KERJA TERTANGGUH SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497, PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA KERAJAAN MALAYSIA
DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (NURSERI BUAH, NURSERI POKOK, RUMAH ORKID, RUMAH CENDAWAN & BENGKEL KEJURUTERAAN)
DRAWINGS STANDARD DETAIL BUILT-IN FURNITURE (BLOK ADMIN & BENGKEL)
KERAJAAN PERSEKUTUAN
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
as
Arkitek Selamat
Architects & Development Consultants 52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
PERUNDING JURU JASA SDN. BHD.
Juruukur Bahan Perunding Quantity Surveyors & Construction Cost Consultants
as
Arkitek Selamat
Architects & Development Consultants
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
DRAWINGS DETAIL BUILT-IN FURNITURE (BLOCK BENGKEL & MAKMAL)
UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
PERUNDING JURU JASA SDN. BHD.
Juruukur
Quantity
Surveyors
Bahan Perunding
& Construction
Cost Consultants
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
as
Arkitek Selamat
Architects & Development Consultants
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOCK KULINARI & HOSPITALITI)
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM
Surveyors
Bahan Perunding
& Construction
Cost Consultants
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
as
Juruukur
Quantity
DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (BLOK BENGKEL PROSES HASIL)
UNTUK :
Arkitek Selamat
PERUNDING JURU JASA SDN. BHD. AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
KERAJAAN PERSEKUTUAN
TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
Architects & Development Consultants
Cost Consultants
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
KERAJAAN PERSEKUTUAN
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
Bahan Perunding
& Construction
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM
UNTUK : TETUAN KEMENTERIAN PENDIDIKAN MALAYSIA
as
Surveyors
KERAJAAN PERSEKUTUAN
CADANGAN PEMBINAAN SEKOLAH MENENGAH VOKASIONAL DI ATAS LOT 3497,PAGOH, JOHOR DARUL TAKZIM
Arkitek Selamat
Juruukur
Quantity
DRAWINGS DETAIL BUILT-IN FURNITURE & LOOSE FURNITURE (RUMAH PENGETUA/PENGARAH)
KERAJAAN PERSEKUTUAN
Architects & Development Consultants
PERUNDING JURU JASA SDN. BHD. AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
PERUNDING JURU JASA SDN. BHD.
Juruukur
Quantity
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
Surveyors
Bahan Perunding
& Construction
Cost Consultants
as
Arkitek Selamat
Architects & Development Consultants
PERUNDING JURU JASA SDN. BHD.
Juruukur
Quantity
Surveyors
Bahan Perunding
& Construction
Cost Consultants
AZRAZ CONSULT
Civil & Structure Consultant Engineers (001868227-X)
52-02, Jalan Permas 9/2, 81750 Masai, Johor Darul Takzim. Tel : 07-3868853 / 8092 / 8092 HP No. :019-7280093 Fax : 07-3868746 E-mail : rasel@pd.jaring.my
F i g . 4 8 Va r i o u s “d r a w i n g ” l i s t drawings
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
40 SOVO Condominium Site location: N/A Specification: Condominium Task: rendering plans accouding to color codes.
For t h is proj e c t , I was t aske d to do render ing on pl ans, site pl ans, and t y pic a l hous i ng pl an w it h sp e c if ic c o de of c olors. E a ch color repres ents e a ch t y p e of unit w here it w i l l b e e asie r to b e dif fe re nt i ate by t he const r uc tor, cont ra c tor, re a der or t he buyer. T h is p ar t i c u l ar t ask is done w it h photoshop maj or it y w it h t he us e of “Mag i c Wand To ol” and “Bucket”.
Fig.49 Rendered second floor plan
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
41
F i g . 5 0 R e n d e r e d Ty p i c a l Un i t P l a n o f Ty p e A & B
Fig.51 Rendered 3rd-16th Floor Plan
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
42
Fig.52 Rendered 17th Floor Plan
Fig.53 Rendered 18th & 19th Floor Plan
Fig.53 Rendered 20th - 22th Floor
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
43
SITE VISIT THE MERIDIN at MERDINI
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
44 Meridin Site location: Nusajaya, Johor Specification: Commercial Centre Task: Inspect each unit ’s condition regarding fittings, finishes and construction progress.
Meridin at Medini, located at a strategic location, Nusajaya, Kota I s k a n d a r w h i c h i s J o h o r ’s n e w a d m i n i s t r a t i v e c e n t e . I t ’s a l s o l o c a t e d near to Legoland Malaysia and Medini Business and half hour from Senai Airport. standing tall on 8.19 acres of prime land, The core design prinicple was d e r i v e d f r o m t h e c h a r a c t e r o f h u m a n a s p i r a t i o n t o r e a c h h i g h e r. T h e design intention is evident in the design language and architecture of this building. On the first day to the site visit, me and my colleagues were told to go for site visit. Once we reach there, we get to meet another colleague w h e r e h e e x p l a i n e d d o a n d d o n t ’s i n t h e s i t e . S o , o u r t a s k o n t h i s s i t e v i s i t i s t o i n s p e c t e v e r y u n i t ’s c o n d i t i o n i n r e g a r d s t o f i n i s h e s , f i t t i n g s , c o n s t r u c t i o n p r o g r e s s a n d e t c . T h e r e w e r e 3 o f u s w h e r e t h e r e ’s 3 0 U n i t s to be checked, so each of us is assigned with 10 units. All the units are s i t t i n g b e t w e e n t h e 1 3 t h f l o o r u n t i 1 5 t h f l o o r. C h e c k l i s t a n d p l a n o f each unit is given in order to do comment on each unit so the workers can refer to the comment and make improvement or follow up with the construction status.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
45
Fig.55 Merdini at the site
Fig.57 Construction on going
F i g . 5 6 Vi e w f rom b ottom
Fig.58 Construction on going
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
46
Fig.59 Construction on going
Fig.60 Construction on going
Fig.61 with Colleagues
Fig.62 Doing inspection on site
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.
47 c onclus ion D u r i n g t h e 8 We e k s o f i n t e r n s h i p s e s s i o n , I w a s g i v e n a l o t o f o p p o r t u n i t y t o b e i nv o l v e d i n d i f f e r e n t k i n d o f p r o j e c t s . Ho w e v e r, a 8 w e e k i n t e r n s h i p s e s s i o n i s q u i t e s h o r t w h e r e I f e e l t h a t t h e r e ’s s t i l l m u c h t o b e e x p o s e d t o t h e a r c h i t e c t u r e i n d u s t r y. A p a r t i c u l a r t a s k m a y t a k e s a few days to finish, some takes a week. In the end, I still learnt a lot especially I was exposed to different scales of projects, from houses to commercial building. Design to details. From manual to computerized project. And also site visitation. I have acquired knowledge from all the task given, every single project and from my colleagues. I really appreciate everything from here. The working experiences have b e e n g r e a t . I t ’s d e f i n i t e l y a f r u i t f u l e x p e r i e n c e o f b e i n g a n i n t e r n i n JYP Architects. These experiences will definitely help me in my future career development. I would like to thank my employer and colleague for enriching my intern working experience.
All files, images, drawings and related documents are owned by the company and protected under the company’s copyright and intellectual right. All information used in the report are consulted with and obtained permission from the company.