Group A - Timber - London
Group B - Concrete - London
Group C - Steel - London
Group D - Timber - Paris Detail Construction NCF
1:25 Detail Section Southern Facade
1:25 Elevation Souther Facade 41 40 39
36 35 37 33
38
34 32 42
30 31
29
22 28
21
27 26
25 24 13 12 11 17 16
15
14
19
18
10
6
20
5
9
4
23 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
In situ cast concrete slab, with Cobiax void former spheres Steel flitch plate ground connector and carriage screws Thermal break rigid insulation pad Precast concrete upstand Precast fair faced concrete panel, secured with dowels and grout Damp proof membrane PIR insulation board with acoustic insulation properties Cement levelling screed Hardwood timber floor (Oak) Spruce, Cross Laminated Timber panels Timber inward opening casement window (Acoya (FSC® and Cradle to Cradle Gold certified™)) Triple glazed, argon filled, self cleaning glass with UV coating Applied precast bronze mullion and transom Applied precast bronze strip
1
2 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42.
3
7
8
Timber joist Steel bracket recessed tied to external CLT layer Rafter Purlins Solar panel roof mounted on metal brackets Lapped roofing system, consider zinc standing seam panels for exposed roof slopes without solar array) Warm roof system, insulation board, waterproof membrane and cement screed Waterproof external membrane Timber weather screen panels, secured with timber batons Applied bronze parapet coping Rainwater down pipe (for rainwater collection in basement tank)
1:25 Detail Plan Southern Facade
Group E - Concrete - Paris
Group F - Steel - Paris
Responsibility Bibliography and Appendix | Das Waffelhaus | Barnaby Sheppard | Responsibility Modelling | Das Waffelhaus | Abhiroop Bhattacharya | Barnaby Sheppard | Alyzza Valid |
Category
Code
Quantity Material
Height
Visual
Category
Code
Quantity Material
Height
Visual
Category HDPE drainage board
Code
Quantity Material
Height
RP-21
1
Spruce ribbed panel
RP-22
1
Spruce ribbed panel
RP-23
1
Mineral wool insulation
RP-24
1
RP-25
1
Larch glulam
280
RP-26
1
Larch Glulam
280
RP-27
6
Larch Glulam
280
Visual
Fleece RP-07
RP-08
RP-09
RP-10
5
5
5
5
Spruce CLT and glulam
Spruce CLT and glulam
Spruce CLT and glulam
Spruce CLT and glulam
400
Breather membrane RP-14 5
Cross-laminated spruce walls RP-15
1
Larch glulam
RP-16
2
1
Spruce CLT and glulam
Grade 4 OSB
Spruce CLT and glulam
400
RP-17
1
Spruce CLT and glulam
400
Spruce CLT and glulam
400
Spruce CLT and glulam
400
Spruce CLT and glulam
280
400 Spruce CLT and glulam
400
Spruce CLT and glulam
280
280
RP-18 1 Glulaminated larch beams
RP-12
400
400
Plans | Das Waffelhaus | Abhiroop Bhattacharya | Barnaby Sheppard | Alyzza Valid |
2
and glulam
400
Responsibility
RP-11
Spruce CLT
Spruce CLT and glulam
400
400 Damp proof membrane Sand blinding layer RP-19
RP-13
4
Spruce CLT and glulam
1
Spruce CLT and glulam
Steel reinforcement 400
Concrete
400
RP-20
4
Spruce CLT and glulam
400
3D Fragment Right Rear Isometric Worm’s Eye View | 1:100 36
04
35
83
Group H - Concrete - Berlin
Group J - Timber - Berlin
Group K - Steel - Zurich
Group L - Concrete - Zurich
Group M - Steel - Barcelona
Group N - Concrete - Barcelona
Group P - Timber - Zurich
Group Q – Steel - London
Group R - Concrete - Paris
Group S - Timber - Barcelona
Group T - Steel - Berlin
Group U - Concrete - Zurich
Group V - Timber - Barcelona