BEAUMONT SPORT AND RECREATION CENTRE
COMING SOON IN 2020 The Project is to be built on the lands adjacent to the Aqua-Fit pool, and include the following amenities: • NHL sized ice with seating and viewing areas
• Concession, multi-purpose rooms, tuck shops and offices
• Fieldhouse that can accommodate indoor soccer, lacrosse, and host events with seating
• Pool improvements to mechanical and the building envelope
• High School gymnasium that can accommodate multicourt play • Climbing wall and running/walking track
10
• Estimated completion time is 20 months and with a project cost of $29.5M (2017 dollars). • Other updates will include mechanical updates to the pool filtration system.
Winter 2020 Activity Guide
Beaumont.ab.ca
For more information visit letstalkbeaumont.ca/BSRC.