B+H West Seattle Bridge Replacement Proposal - Cost and Schedule

Page 3

TABLE OF CONTENTS 1 OVERVIEW 2 BASELINE 1: CAST-IN-PLACE CONSTRUCTION 3 MT STEEL DESIGN: MASS TIMBER- STEEL COMPOSITE CONSTRUCTION 5 CONSTRUCTION SCHEDULE 6 CONSTRUCTION COST 7 CARBON FOOTPRINT 9 POSITIVE EFFECTS ON PHYSIOLOGY AND PSYCHOLOGY 10 AIR QUALITY HEALTH HAZARD DURING MANUFACTURING 10 COMMUNITY AND INDUSTRY IMPACTS 11 TEAM 13 APPENDIX

SCOPE: The scope of this comparative cost and schedule analysis includes the bridge superstructure and substructure, from Piers 15 to 18, incl.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.