Yatra Magazine December 2011 | Buddha Air

Page 1

D

BUD

HA

No. 23 December '11

w w w . b u d d h a a i r . c o m

S

tretching over an area of 25,000 sq ft inside the Tribhuvan International Airport (TIA), the hangar constructed by Buddha Airline has the latest technologies available in the world. We are also proud of the fact that it is the first time in the country’s history that a domestic private airline, which has all along given topmost priority for flights safety, has constructed a closed-door hangar.

Shifting to state-of-the-art hangar, finally

Subsequently, the operation and engineering departments of the airline will be shifted to the state-of-the-art hanger in December-end for better coordination among the departments to increase flights safety. The total construction cost of the hangar, which took a whole long year for its completion, has been estimated to cross Rs 200 million. The airline will pay Rs 5 million annually to Nepal government for the land. The ground floor of the three-storey hangar consists of engineering workshop and store, the first floor has operation and engineering departments, and contd. on page 2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.