1 minute read
We Specialize
Wcll arorled rtoctr at our Lor Angclcr yerd or direct carload rhip- mcntr from mill.
Ofrce end Yard gins. To make promises in a publicity campaign and fail in any way to fulfill them is money worse than wasted. An absollrtely uniform standard of grading in association mills is of first consideration. Some sbrt of i brand, so the prod- uct of association mills may be identified. would bl desirable. People do like branded goods, and lumber and lumber products are no excepton tb this rule. An expert re-inspection service at destination is also essential. -No one, no matter how careful he may be, can perform 100 per cent perfect, and to ass,ert that one does to a customer making a.claim is injurious. A great majority of claims made are intrinsically just. There is a possibility of them arising thru misunderstanding or misinformation, but it is dififrcult to settle them thru correspondence. The just claim should be taken care of fairly and promptly. When claims are unjust, the association members shbuid be furnished with the name of the claimant and all of the details of. the .tra-nsaction, so that they may fully protect themselves in future dealings with fhe unfair buyet.
Position as tumber .rY#3tJ in office of retail yard. Four and one half years experience. Two and one'half years Pacific Coast experienie. Thirty years old. Thoroughly reliable and competent. Best -of references. Address Box 'W-1, care California Lumber Merchant
Highest Quality
CAUFORNIA SUGAR PINE
CALIFORNIA WHITE PINE
SPRUCE, RED AND WHITE FIR
THREE PLY FIR AND SPRUCE PANEIS
Prompt attention givcn ell ordcrr and inquiricr.
BRO\MN and DERRY LUMBER CO. H. J. ATIDERSO]I LUMBER GO.
2055 Eart Fiftv-Firet st" Loa Angeler
T.Lpior.. Axriige rrso
Produgers
Western Red Cedar Poles, and Fir Pilingand Derrick Timbers. We Ship Lengths Up to 120 ft.
New Cameron Lumber Plant Starts Cutting
Albany, Ore., Sept. ll-The nes'lv constructed sawmill of the Cameron Lumber company started cutting recently with a crew of trventy men. The mill has a capacity of 25,000 feet a day. The plant includes besides the sarvmill, a planing shed, dry kiln, rvood and sarvdust racks, and an office, also a mill pond with a capacity of about 500,000 feet of logs. Logs rvill be supplied from the Larrvood camp and later from another camp on Woods creek, near Mary's peak.
With the completion of the Albany mill, C. C. Cameron is operating four mills in this vicinity, and the total combined output rvill reach about 75,m feet per day.