Projects Open to Foreign Investment
Hunan, 2017
Development and Reform Commission of Hunan Province Department of Commerce of Hunan Province April 10, 2017
1
Table of Contents 1. INFRASTRUCTURE (100) ................................................................................................................................. 1 1-1 TRANSPORTATION AND ENERGY (24) .............................................................................................................. 1 Construction of Expressway from Jingzhou to Liping (the Border of Hunan and Guizhou) ............................ 1 Construction of Expressway from Zhijiang to Tongren (the Border of Hunan and Guizhou) ........................... 1 Construction of Longshan-Sangzhi Expressway .............................................................................................. 2 Construction of Pingjiang-Wushi Expressway (the border of Hunan and Jiangxi) ........................................... 3 Construction of Wushi–Yiyang Expressway ..................................................................................................... 3 Construction of Nanyue–Baiguo Expressway .................................................................................................. 4 Construction of Guidong-Xintian Expressway in Chenzhou ............................................................................ 5 Construction of Yongzhou-Chenzhou Expressway (Xintian Section) ............................................................... 5 Construction of Yunlong Maglev Express, Zhuzhou ........................................................................................ 6 Construction of General Airport in Youxian County......................................................................................... 7 Construction of Yisuhe-Huashi Highway, Xiangtan City ................................................................................. 7 Construction of Shadi Transportation Junction in Zhangjiajie .......................................................................... 8 Second-line Ship Lock Construction in Xiangjiang River of Zhuzhou County ................................................ 9 Construction of 1000 DWT Wharf in Lengshuitan Port Area ........................................................................... 9 Construction of 1000 DWT Wharf in Lingling, Yongzhou ............................................................................. 10 Construction of 1000 DWT Wharf on Xiangjiang River, Qiyang County ...................................................... 11 Development of General Aviation Industry in Changsha Airport Economic Zone ......................................... 12 Construction of Headquarter Base of Airlines in Changsha Airport Economic Zone ..................................... 13 Production Base of General Aviation in Shaoyang ......................................................................................... 14 500,000m2/a Solar Photovoltaic Curtain Wall Production in Leiyang County ............................................... 14 Investment Attraction for Equity Cooperation of Xiangtan Electric Manufacturing Group Windpower Co., Ltd .................................................................................................................................................................. 15 Construction of First-stage Project of Battery-Charging Pile in Changde ...................................................... 16 Construction of Combined Heat and Power (CHP) of Kingboard (Hengyang) Chemical Holdings Ltd ........ 16 1-2 URBAN CONSTRUCTION (48) ......................................................................................................................... 17 Central Business District Construction of Changsha High-speed Rail (HSR) New Town .............................. 17 Investment Attraction for Changsha Financial Business District .................................................................... 18 Comprehensive Reconstruction Project of Hongxing Commercial Business Area in Changsha .................... 19 A2 Urban Complex Construction in Binjiang New Town of Changsha.......................................................... 19 Investment Attraction for A-1-5 Plot of Binjiang New Town of Changsha .................................................... 20 Comprehensive Financial Business Development in F09/10 of Mexi Lake International New Town ............ 20 The Development of C-17 Plot in Meixi Lake Area ....................................................................................... 21 Development of Songya Lake International Ecological New Town of Changsha County .............................. 21 The PPP Project of Comprehensive Development of Xingsha Industrial Base of Changsha .......................... 22 Construction of Star Hotels and Residence in Xingsha Business District of Changsha .................................. 23 PPP Project of Panpan Road Area in Changsha Economic and Technological Development Zone ................ 24 PPP Project of Huangxing Road and Area Transformation in Changsha Economic and Technological Development Zone ......................................................................................................................................... 24 Development of Tongzipo City Square in Yuelu District ................................................................................ 26 Construction of Changsha East 11th Road Business Complex ........................................................................ 27 Daowu New Town Life Center Construction of Liuyang City........................................................................ 27 The Construction of Changxing Lake Ecological Waterfront New Town in Liuyang ..................................... 28 Urban Development of Puzigang Area of Liuyang ......................................................................................... 29 Comprehensive Development of No.1 Plot in Dongcheng New Town of Ningxiang County ........................ 29 Development of Wufu Square Area of Ningxiang .......................................................................................... 30 Construction of Business Complex before Wuhan-Guangzhou High-speed Railway Station......................... 30 Zhuzhou Rail Transit City Construction Project ............................................................................................. 31 Land Consolidation and Infrastructure Construction of Zhuzhou Wuyunfeng International Ecological New Town ............................................................................................................................................................... 31 Construction of Transportation Junction Business Center of Zhuzhou ........................................................... 32 PPP Project of Infrastructure of XiangJiang New Town of Zhuzhou .............................................................. 33 Riverside Construction and Development of Xiangjiang River Scenic Belt (the Section in Zhuzhou County)
........................................................................................................................................................................ 33 Construction Project of Xiangjiang Avenue of Zhuzhou ................................................................................ 34 Comprehensive Development in Zhuzhou Sports Park Area .......................................................................... 34 Reconstruction and Expansion of Yumu Mountain Landscape Road, Huanyu Road and Qunying West Road of Hengyang ................................................................................................................................................... 35 Comprehensive Land Consolidation in Suzhouwan Area of Hengyang ......................................................... 35 Comprehensive Development of Leiyangxi (Wuhan-Guangzhou) Railway Station Area in Leiyang City ..... 36 Hengyang High-tech District New Energy Resource Transportation Service Station Network Construction 37 The West 2nd Ring Road Construction (phase 2) of Xiangtan City ................................................................. 37 Xiangtan Zhubugang Industrial Site Park and Supporting Facilities Construction ......................................... 38 Xiangtan Wanlou Ecological and Livable New Town Construction ............................................................... 38 The Construction of Hedong Road in Xiangtan High-Tech District ............................................................... 39 The Extending Line of Gaoxin Road(Lvlu Road) Construction in High-Tech Zone of Xiangtan City ........... 39 Xiangtan Qingzhu Lake Comprehensive Park Supporting Service Center ..................................................... 40 Shaoyang Urban Three Ring Fast Lanes and Comprehensive Pipelines Construction Project ....................... 41 Old Town New District Construction in Wugang ........................................................................................... 41 Zijiang River Flood Prevention Scenic Belt and Municipal Supporting Facilities Construction Project of Xinshao County (PPP Project) ........................................................................................................................ 42 The Comprehensive Development of South Bank of Wushui River in Chengbu County ............................... 43 Comprehensive Development of Yiyang Eastern New District Urban Construction ...................................... 44 Urban Complex Construction of Eastern Industrial Park in Yiyang High-tech Industrial Development Zone45 The Urban Complex Construction of Changchun Economic Development Zone .......................................... 45 The Urban Complex Development of Loudi Dake Residential Community .................................................. 46 Loudi High-speed Railway North Distrct Development ................................................................................. 46 The Gold Coast District Development of Loudi Economic and Technological Development Zone ............... 47 Supporting Facilities Construction of Eastern New District of Loudi Economic Development District ........ 48 1-3 URBAN UNDERGROUND PIPE GALLERY AND SEWAGE TREATMENT (16) ...................................................... 49 Construction of Underground Pipe Gallery in Urban Areas of Hengyang City .............................................. 49 Construction of Underground Pipe Gallery in Xiangtan ................................................................................. 50 Construction of Underground Pipe Gallery in Dongshan New Town of Xiangxiang City .............................. 50 Construction of Zhanqian Road and Underground Pipe Gallery in Shaoyang Economic Development Zone 51 Underground Pipe Gallery Construction of Dongkou County ........................................................................ 52 Urban-rural Water Supply Construction of Xiangtan City .............................................................................. 52 The Second Water Source Project on Mountain Papaya in Shaoyang City (PPP Project) .............................. 53 The Fifth Water Plant Construction Project in Xiangyin County .................................................................... 53 Comprehensive Treatment Project of ChangdeYangming Lake Water System............................................... 55 Construction Project of 0.1 Million Tons of Sewage Treatment Plant in Nanjiang, Hengyang ...................... 55 Industrial Sewage Treatment Plant Expansion Project at Changning City Shuikoushan Economic Development Zone ......................................................................................................................................... 56 PPP Project on Full Coverage of Urban and Rural Domestic Sewage Treatment in Zhuzhou County ........... 56 Comprehensive Treatment Project on Heavy Metal Pollution of Yuanshui River and Lishui River ............... 57 Construction of Water Supply and Sewage Treatment Plant in Huilongxu Management District of Yongzhou City ................................................................................................................................................................. 58 Construction of Domestic Sewage Treatment Facilities in Loudi City ........................................................... 59 1-4 NEW SMALL TOWNS (23) .............................................................................................................................. 60 Comprehensive Development of Ancient Town Cluster along the Xiangjiang River ..................................... 60 Construction of International Low-carbon Unique Town inWangcheng Scientific and Technological Park .. 60 Comprehensive Development of Xunlonghe Ecological Art Town in Changsha County ............................... 61 Construction of Lake-surrounding Area of Langli Town in Changsha County ............................................... 62 Comprehensive Development of Small City of Dayao Town in Liuyang City ............................................... 63 Comprehensive Development of Zhentou Town in Liuyang City................................................................... 63 Comprehensive Development of Guandu and Yonghe Ancient Towns in Liuyang City ................................. 64 Development and Construction of Xiangshan Small Town in Ningxiang County .......................................... 65 Ecological Agricultural Sightseeing Development in Ningxiang County ....................................................... 65 Construction of Huashi Town with Characteristic of Lotus Seeds in Xiangtan County .................................. 66 Construction of Luokou Ancient Town in Xiangtan County ........................................................................... 67 Construction of Zhaoshan Life Health Town in Xiangtan .............................................................................. 67 Construction of Jiuhua Unique Town in Xiangtan .......................................................................................... 68
Green and Energy-saving Ecological Demonstration Community of High-Tech Industrial Development Zone in Xiangtan ..................................................................................................................................................... 69 Construction of Maojiachong Hot Spring Small Town in Xinning County .................................................... 69 Construction of Hongqiao Art Ceramic Town in Pingjiang County ................................................................ 70 Development of Wukou Ancient Town in Pingjiang County .......................................................................... 71 Comprehensive Development of Royal Lake Town with Charming Style in Yiyang City ............................. 71 Construction of Beidouxi Town as a Health Care Small Town in Xupu County ............................................ 72 Construction of Fairy Peak Ecological and Health-keeping Town in Loudi City ........................................... 72 Construction of a Unique Small Town of Hunan Army’s Homeland in Yangshi Town of Loudi City ............ 73 Construction of Tourist Towns with Charming Style in Yanghe and Xikou of Cili County ............................ 73 Development of Biancheng Small Town with Charming Style in Xiangxi Autonomous Prefecture .............. 74 2. NEW INDUSTRIALIZATION (178)................................................................................................................ 75 2-1 ADVANCED EQUIPMENT MANUFACTURING (27) ............................................................................................ 75 Zoomlion Hoisting Machinery Construction Project ...................................................................................... 75 Investment Attraction for Urban Rail Vehicle Industrial Park in Changsha High-tech Industrial Development Zone ................................................................................................................................................................ 76 Investment Attraction for Beidou Industrial Park in Changsha High-tech Industrial Development Zone ...... 76 Investment Attraction for Aviation Industrial Park in Changsha High-tech Industrial Zone ........................... 77 Investment Attraction for Military and Civilian Integration Industrial Park in Changsha High-tech Industrial Development Zone ......................................................................................................................................... 78 Investment Attraction for Environmental Protection Industrial Park in Changsha High-tech Industrial Development Zone ......................................................................................................................................... 79 Construction of Aerospace Industrial Park in the Economic Development Zone of Wangcheng District ....... 80 Investment Attraction for Intelligent Manufacturing Industrial Park in Liuyang High-tech Industrial Development Zone ......................................................................................................................................... 81 Investment Attraction for Intelligent Remanufacturing Industrial Park in Liuyang High-tech Industrial Development Zone ......................................................................................................................................... 81 Rail Transit Vehicle Manufacturing and Overhaul Base Construction in Zhuzhou ......................................... 82 The Construction of Aviation Supporting Industrial Park in Zhuzhou ............................................................ 82 General-purpose Plane Manufacturing in Zhuzhou City ................................................................................ 83 Tianyi Intelligent Manufacturing Industrial Base Construction in Xiangtan .................................................. 83 High-end Intelligent Manufacturing Construction in Xiangtan Comprehensive Bonded Zone ...................... 84 New Energy Equipment Industrial Park in Xiangtan High-tech Industrial Development Zone ...................... 85 Investment Attraction for Intelligent Equipment Industry in Xiangtan High-tech Industrial Development Zone ................................................................................................................................................................ 85 Intelligent Machine Tool Manufacturing in Xiangtan High-tech Industrial Development Zone..................... 86 Navigation Equipment and Satellite System Industrial Park Construction in Xiangtan Economic Development Zone ......................................................................................................................................... 86 Fullanti Equipment Manufacturing in Longhui County .................................................................................. 87 Rail Vehicle and Parts Manufacturing in Changde ......................................................................................... 88 High-end Equipment Manufacturing Industrial Park Construction in Yiyang ................................................ 89 Rubber and Plastics Machinery Industrial Park in Yiyang .............................................................................. 90 Investment Attraction for Shipbuilding Industrial Park in Yiyang .................................................................. 90 Drone and Model Airplane Base Construction in Zhuzhou City..................................................................... 91 Industrial Robot Industrial Park Construction in Changde Economic Development Zone ............................. 92 Robot Town Construction in Xiangtan ........................................................................................................... 93 Investment Attraction for Intelligent Robot Industrial Park in Yiyang ........................................................... 93 2-2 AUTOMOBILES AND COMPONENTS (21) ......................................................................................................... 94 Key Automobiles Components Production in Changsha Economic Development Zone ................................ 94 Investment Invitation of Vehicle Components Industrial Park in Wangcheng Economic Development Zone 94 Investment Invitation of New Energy Vehicle Industrial Park in Liuyang High-tech Zone ............................ 95 Industrialization of Integrated Products of Electric Automobile Power System in Zhuzhou .......................... 96 HCNG Energy Engine Project ........................................................................................................................ 96 Intellectualized Reconstruction of New Energy Bus Manufacturing in Zhuzhou ........................................... 97 New Energy Vehicle Industry Park Construction in Xiangtan Economic Development Zone ........................ 98 Construction of Production Base of Vehicle Engine and Components in Xiangtan Economic Development Zone ................................................................................................................................................................ 98
Medium and High-end Passenger Car Parts Production in Xiangtan Economic Development Zone ............. 99 New energy Vehicle Industry Park in Xiangtan New and High Technology Development Zone ................. 100 Vehicle Component Industry Park in Xiangtan High-tech Development Zone............................................. 100 Production Base for Key Parts of Large and Complete Equipment .............................................................. 101 Construction of New Energy Industrial Park in Shaoyang ........................................................................... 102 Establishment of Production and Testing Center of Automated Transmission Component .......................... 103 Dedicated Vehicle Production Base in Chenglingji New Port Area in Yueyang ........................................... 103 Pure Electric Bus Production in Changde ..................................................................................................... 104 New Energy Vehicle Industry Construction of Suxian Industrial Concentration District ............................. 104 Construction of Yongzhou New Energy Vehicle Industrial Park .................................................................. 105 Investment Invitation of New Energy Vehicle Parts Production Base in Yiyang .......................................... 106 Investment Invitation of Supporting Industries of CHANGFENG Leopaard ............................................... 106 Supporting Investment Invitation of Vehicle Component Production ........................................................... 107 2-3 ELECTRONIC INFORMATION (36) ................................................................................................................ 109 Big Data Industrial Park Construction in Wangcheng Economic and Technological Development Zone .... 109 Construction of Hunan Big Data New Industrial Town in Zhuzhou ............................................................. 109 Cloud Computing and Big Data Industrial Park Construction in Yiyang ...................................................... 110 Investment Invitation of Dongjiang Lake Big Data Industrial Park in Zixing .............................................. 111 Big Data Industrial Park Project in Chenglingji New Port Area in Yueyang ................................................ 112 ChinaRS Hunan Science and Technology Park Construction ....................................................................... 112 Construction of Demonstration Base of Information Security Industry in New and High Technology Development Zone in Changsha ................................................................................................................... 113 Construction of Electronic Information Industry Park in Economic Development Zone in Changsha ......... 114 Construction of Electronic Information Industry Park in Airport Economic Zone in Changsha................... 114 Electronic Information Industry Park in Liuyang Economic Development Zone ......................................... 115 Investment Invitation of Waison Information Innovation Project in Anhua .................................................. 115 Construction of Production and Development Base of Smart Phone, Pad, and components in Liuyang Economic Development Zone ...................................................................................................................... 116 Overseas Electronic Products Testing and Maintenance Center in Comprehensive Bonded Area in Hengyang ...................................................................................................................................................................... 117 Constructin of Photo-Electro-Mechanical Integrated Industry Cluster in Hengyang .................................... 117 Construction of Public Service Platform of Collaborative Manufacture in Hengyang ................................. 118 Production of Cover Lens of High-end Phones ............................................................................................ 119 Construction of Laptop and Tablet Production Base in Xiangtan Economic aDevelopment Zone ............... 119 Construction of E-Commerce Industry in Xiangtan New and High Technology Development Zone ........... 120 Construction of Production Base of High-end Smart Phones ....................................................................... 120 Smart City Construction in Xiangtan Economic and Technology Development Zone ................................. 121 A New Generation of Information Technology Industry Project in Shaoyang .............................................. 122 Beidou Navigation System Industry Chain Project in Shaoyang Economic and Technology Development Zone .............................................................................................................................................................. 122 Construction of Shipping Logistics Information Platform in Chenglingji New Port Area in Yueyang ......... 123 Beidou Application Industry Park in Chenglingji New Port Area in Yueyang .............................................. 124 Smart City Building Project for Jinshi City .................................................................................................. 124 Electroacoustic Products Production in Changde Economic and Technology Development Zone ............... 125 Photoelectricity Industry Park Construction in Changde New and High Technology Development Zone ... 126 Central South E-Commerce Industrial Park Investment Invitation in Yiyang High and New Technology Development Zone ....................................................................................................................................... 126 Electronic Information Industrial Park Construction in Yiyang .................................................................... 127 Settling and Investment Invitation of Phone and Component Production Industrial Park in Chenzhou Economic and Technological Development Zone......................................................................................... 127 Construction of Electronic Trading Center for Casting-Forging Products and Raw and Auxiliary Material in Jiahe County ................................................................................................................................................. 128 Investment Invitation of Electronic Information Industrial Park in Daoxian ................................................ 128 E-Commerce Industrial Park in Xinhua County ........................................................................................... 129 Construction and Development of Printed Circuit Board Electronic Industrial Park in Yiyang ................... 130 “Module Semiconductor Industrial Park “in Dingcheng New and High Technology Development Zone .... 131 Electronic Smart Water Meter and Ultrasonic Heat Meter Production ......................................................... 131 2-4 NEW MATERIAL (22) ................................................................................................................................... 132
High-performance Titanium Alloy and Titanium Machining of the Hunan Xiangtou Holdings Group CO., Ltd. ............................................................................................................................................................... 132 Construction of the Additive Manufacturing (AM) Industrial Parks in Changsha Hi-tech Industrial Zone .. 132 Investment Promotion of New Material Industrial Park in Changsha Hi-tech Industrial Zone..................... 133 Production of 4000t/a Targeted-bonding Absorbing Environmental Protection New Materials ................... 134 New Material of Nonferrous Metals Deep Processing Industrial Park ......................................................... 134 Industrialization of the 3G HCPV in Zhuzhou High-tech Zone.................................................................... 135 Aluminum-air Cell,Hawkins Cell/Titanium Lithium Fuel Cell Production ............................................... 136 Zhuzhou Medical Neutral Glass Production ................................................................................................. 136 Industrialization of High Temperature Corrosion Resistant Components of Silicon Carbide Ceramics in Liling City .................................................................................................................................................... 137 New Material Industrial Park Construction in Yanling County .................................................................... 137 Construction of Xiangtan Tianyi New Material Industrial Base ................................................................... 138 Polymer Lithium Battery Production in Changde Economic and Technological Development Zone........... 139 Construction of Eco-Industrial Park of Graphene in Changde Economic and Technological Development Zone .............................................................................................................................................................. 139 Construction of New Material Industrial Park in Changde Economic and Technological Development Zone ...................................................................................................................................................................... 140 Construction of New Material Industrial Park in Yiyang High-tech Zone .................................................... 141 Construction of Non-Mineral New Material Industrial Park in Huishangang Town in Taojiang County ..... 141 Investment AttractionforSettlement in Chenzhou Graphene Industrial Park ................................................ 142 Investment Attraction for Settlement in Amer Rare and Precious Metals Industrial Park in Chenzhou City 143 Yongzhou Lithium Battery Series Material Production ................................................................................ 144 Investment Attraction on Industrial Chain of Deep Processing of Steel Sheet in Loudi City ....................... 144 Special Ceramics and New Material Industrial Park (Phase I) Construction ................................................ 146 Investment Promotion of Hunan Bafang Mining Trading Center in Chenzhou High-Tech Development Zone ...................................................................................................................................................................... 147 2-5 LIGHT TEXTILE, CHEMICAL ENGINEERING AND MEDICINE (38) ................................................................ 148 Investment Promotion of Chenzhou Mineral Gem Industrial Park ............................................................... 148 Settlement and Investment Promotion of Gem-cutting Base in Chenzhou Economic Development Zone ... 149 Comprehensive Development of Tongtian Jade in Linwu County ................................................................ 150 Investment Promotion of Shaping·Embroidery Street in Changsha County ................................................. 150 Construction of Green Building Materials Industrial Base in Ningxiang Economic and Technological Development Zone ....................................................................................................................................... 151 Investment Attraction of Industrial Park of NursingProductsfor Women, Pregnant and Baby in Ningxiang Economic and Technological Development Zone......................................................................................... 151 Construction of “New Town of Lusong Clothing” in Zhuzhou .................................................................... 152 Construction of Production Base of Five-Color Underglazed Ceramics in Liling City ................................ 153 Construction of Energy Saving, Environmental Protection, Intelligent Biomass Boiler Production Base in Hengyang City .............................................................................................................................................. 153 600,000t/a LBP Full-Biodegradable Film Production in Leiyang City ......................................................... 154 Tianyi Digital Printing Industry Base Construction in Xiangtan City........................................................... 154 Packaging and Printing Cultural Industry Park in Heitianpu Town, Shaodong County ................................ 155 Investment Promotion for Supporting Facilities of Industrial Chain of Hair Products in Shaoyang Economic Development Zone ....................................................................................................................................... 156 Brand Clothing Production in Shaoyang Economic Development Zone ...................................................... 156 (Phase I)Construction of Metal Doors and Windows Industry in Shaoyang City ......................................... 157 The Expansion Project of Ammonium Nitrate Products of Shaoyang Baoxing Kefei Co., Ltd .................... 158 Energy-Efficient Burner Production in Yueyang Economic and Technological Development Zone ............ 158 Project of 60,000 tons/year Special Materials for Nylon 6 Film and Engineering Plastic in Yunxi District . 159 Construction of Family Property Industry Park in Xintian County............................................................... 160 Annual Output of 60,000 tons of High-Precision Air-Condition and Refrigeration Copper Tube in Changning City ............................................................................................................................................................... 160 Investment Promotion of Stainless Steel Pipes Deep Processing in Lengshuijiang City .............................. 161 Construction of Industrial Base of Fine (Electronic) Ceramics in Loudi Economic and Technological Development Zone ....................................................................................................................................... 162 Plant, Processing and Production Base of Traditional Chinese Herbal Medicine in Changning City ........... 162 Medical Equipment and Instruments Manufacturing in Wangcheng Economic and Technological
Development Zone ....................................................................................................................................... 163 Construction of Tianyi Food and Drug Industry Base in Xiangtan City ....................................................... 164 Construction of Medical Industry Science and Technology Park in Lianqiao Town, Hunan Province ......... 164 Production and Processing of Borneol in West Dongting Management District in Changde City ................ 165 Investment Promotion of Fine Chemicals (Chemical Raw Medicine) Industry Park in Changde City ......... 165 Artemisinin Extraction Project in West Dongting Management District in Changde City ........................... 166 Industrialization of Special Chinese Herbal Medicine in Zhuzhou County .................................................. 166 Construction of a Planting Base for 10-Chinese-mu GPM Chinese herbal medicine in Sangzhi County ..... 167 Construction of Standardized Planting Base of Chinese Herbal Medicine in Cili County ............................ 168 Extraction Techniques and Applications of Polygonum Cuspidatum of High-Purity Resveratrol in Zhangjiajie Economic Development Zone ...................................................................................................................... 168 Deep Processing of an Annual Output of 10,000 tons of Polygonati Officinalis in Anhua County .............. 169 Development of Chinese Herbal Medicine Industry in Guidong County ..................................................... 170 Processing of Annual Output of Chinese Medicine Decoction Pieces and Herbal Medicine in Hongjiang City ...................................................................................................................................................................... 170 Construction of Yiyang Biotechnology Industry Park .................................................................................. 171 Construction of Yiyang Bamboo Industry Park ............................................................................................ 172 2-6 AGRICULTURAL DEVELOPMENT AND AGRICULTURAL PRODUCTS PROCESSING (34) ........................................... 173 Construction of Agricultural Innovation Park in Ningxiang National Agricultural Science and Technology Park............................................................................................................................................................... 173 Investment Attraction of Jinghua Lake Urban Sightseeing Agricultural Park in Changsha .......................... 174 Construction of Specialty Food Industrial Park in Ningxiang Economic Development Zone ...................... 175 Investment Attraction of Zhongma International Specialty Food Industrial Park in Ningxiang Economic Development Zone ....................................................................................................................................... 175 Construction of Green Food Industrial Park in Wangcheng Economic Development Zone ......................... 176 Development of Changsha Jinxia Food Industrial Park (Second Phase) ...................................................... 177 Deep-processing of Agricultural and Sideline Products in Anxiang County................................................. 177 Investment Attraction of Food Processing Industrial Park in Yuanjiang City ............................................... 178 Investment and Development of Modern Animal Husbandry in Wugang City ............................................. 179 Construction of Black Tea Industrial Park in Linxiang City ......................................................................... 179 Construction of 300,000 Chinese Mu of Standardization Ecological Tea Garden in Sangzhi County .......... 180 Construction and Processing of 100,000 Chinese mu of Tea Garden Base in Cili County ........................... 181 Development of Public Brand of “Chenzhou Fortunate Tea” ....................................................................... 181 Comprehensive Development of Ecological Tea in Yanling County ............................................................ 182 Depth Development of Dani (Giant Salamander )in Economic Development Zone in Zhangjiajie City ...... 183 Production of Officinale in Leiyang City...................................................................................................... 184 Plantation and Processing of Tea-oil Tree in Leiyang City ........................................................................... 184 Demonstration Park of Tea-oil Industry in Suining County .......................................................................... 185 Construction of Tea-oil Tree Plantation Base and Processing of Refined Tea Oil ........................................ 185 Construction of Vegetable Industrial Park in Huaihua City .......................................................................... 186 Deep Processing of Special Alpine Fruit in Yanling County......................................................................... 187 Integrated Construction of Production and Sale of Citrus in Mayang County .............................................. 187 Deep Processing Base of Livestock, Poultry and Aquatic Products in Hengnan County .............................. 188 Annual Production and Processing of 1000 Meat Duck in Zhijiang County ................................................ 189 Development of Selenium-rich Agricultural Product in Cili County ............................................................ 190 Construction and Processing of 300,000 Chinese Mu of Tung Trees Base ................................................... 190 Deep-processing Base of Ginkgo (Gingko) in Hengnan County .................................................................. 191 Planting and Processing Base of Edible Fungi of Hunan Xiangbei Group ................................................... 191 Construction of Processing Base of Non-Residue Ginger in Changning City .............................................. 192 Deep-processing of “Youxian County Bean Curd” ....................................................................................... 192 Deep-Processing Industrial Park of Bamboo Products in Anhua County ..................................................... 193 Production of 6,000 t/a Golden Potato Thin Pancake ................................................................................... 194 50,000 t/a Sweet Potato Starch and Modified Starch Procession .................................................................. 194 3 MODERN SERVICE INDUSTRY (181) ......................................................................................................... 195 3-1 BUSINESS AND LOGISTICS (44) .................................................................................................................... 195 Development and Investment in Changsha Airport Economic Core Area .................................................... 195 (II Phase) Development of Changsha Jinxia Cross-border Industrial & Trade Town ................................... 196
Construction of Import-export Commodity Display Trading Center at Changsha Huanghua Comprehensive Bonded Area ................................................................................................................................................. 196 Bonded Logistics Investment Attraction of Changsha Huanghua Comprehensive Bonded Area ................. 197 Biomedical Processing and Warehousing Logistics of Changsha Huanghua Comprehensive Bonded Area 198 Cold Chain Logistics Construction of Changsha Huanghua Comprehensive Bonded Area ......................... 198 Cross - border E - commerce Industrial Park of Changsha Huanghua Comprehensive Bonded Zone.......... 199 Changsha Modern Service Industry Industrial Park (I Phase) Construction ................................................. 199 The Construction of Cross-border E-commerce Industrial Park and Public Bonded Warehouse at Changsha High-tech Zone ............................................................................................................................................. 200 Integrated TransportationHub Business Matching Projects of Changsha South Bus Station ........................ 201 The Development of Changsha Jinxia Pharmaceutical Circulation Industrial Park ...................................... 202 Construction of Modern Business Logistics Industrial Park in Wangcheng Economic and Technological Zone ...................................................................................................................................................................... 202 Investment Attraction of "Wan Tian • Zhongnan" International Building Material Trade Logistics Zone(Phase II) .................................................................................................................................................................. 203 Construction and Investment Attraction ofShuidu River Agricultural Product Market (Phase II) ................ 204 Business Transformation of International Agricultural Innovation Park in Central China............................ 204 The Construction of New Lusong International Apparel Logistics Townat Zhuzhou City and the Public Service Platform ........................................................................................................................................... 206 The Settlement and Investment Attraction of Zhuzhou Tongtang Bay Bonded Logistics Center (B type) ... 206 Hengyang City Modern Logistics Park of Agricultural Products.................................................................. 207 Huai-Shao-Heng Railway Logistics Park Construction of Hengyang City ................................................... 208 Construction of Modern Logistics Industrial Park in Hengyang High - tech Zone ....................................... 208 Construction of Xinma E-commerce Logistics Park in Zhuzhou High-tech District .................................... 209 Zhuzhou City Agricultural Product Logistics Center .................................................................................... 209 Port-Surrounding Integrated Logistics Park Construction in Xiangtan New and High Technology Development Zone ....................................................................................................................................... 210 Standardized Fresh Agricultural Product Supermarket Construction in Urban Area of Xiangtan ................. 211 Construction of Large-scale commercial Complex in Jiuhua ....................................................................... 211 Logistic Park Construction in East Yard in Shaoyang................................................................................... 212 Shaoyang Bonded Logistics Center Project .................................................................................................. 213 Construction of Longhui County Eastern-City Integrated Market(Bangsheng International Trade City) ..... 213 Wugang Central Street Commerce and Trade Synthesis Project ................................................................... 214 Imported Aquatic Products and Meat Processing and Distribution Center in Chenglingji Comprehensive Bonded Area in Yueyang .............................................................................................................................. 215 Cereal&Oil Trade and Logistics Center in Chenglingji New Port Area in Yueyang ..................................... 215 Warehouse Logistics Base Construction in Chenglingji New Port Area in Yueyang .................................... 216 Imported Automobile Logistics Park in Chenglingji New Port Area in Yueyang ......................................... 216 Aviation Logistics Park and Port Logistics Park Construction in Changde .................................................. 217 Yanguan Port Modern Logistics Center Construction in Changde ............................................................... 218 Ganlu Temple Vegetable Wholesale Market Relocation and Reconstruction Project ................................... 218 Bonded Logistics Center(Type B) Construction in the Economic Development Zone in Changde City ...... 219 The Development of “Jiangnanhui” Commerce and Trade Complex ........................................................... 220 Bulk Commodity Bonded Warehouse Logistics and Spot Trading Center Construction .............................. 220 Million Tons of Garden Stuff Cold Chain Logistics Center Construction in Jiangyong County................... 221 Processing Trade and Logistics Center in Lanshan County .......................................................................... 222 Comprehensive Modern Logistics Park in Jianghua County ........................................................................ 222 Poria Cocos Trade and Logistics Center Construction in Jingzhou, China ................................................... 223 PPP Project of Industrial Logistics Park in Huaihua City ............................................................................. 223 3-2 TOURISM (72) .............................................................................................................................................. 224 PPP Project on Tourism Development of Zhangjiajie Tianmen Mountain Pilot Area ................................... 224 Construction of “Yuanxiang” (Original Hunan Style) Green Road System in the Grand Crayon of Zhangjiajie ...................................................................................................................................................................... 225 Rail Transit Construction from Urban Area of Zhangjiajie to the Core Scenic Area .................................... 225 Construction of Badagong Mountain International Eco-tourism Resort ....................................................... 226 Development of Huanglong Ancient Village in Zhangjiajie ......................................................................... 227 Construction of Zhangjiajie Betel Valley Outdoor Sports Base .................................................................... 227 Tourism Development of Jiangya Forest Park in Cili County ...................................................................... 228
Construction of Folk Customs Ancient Town in Tianzi Mountain ................................................................ 228 Development and Construction of Loushui River Scenic Spot ..................................................................... 229 Comprehensive Development of Yingzhu Mountain Provincial Forest Park in Changsha County .............. 230 Qingshan Mountain International Eco-Tourism Resort Project .................................................................... 230 Quality-Improvement Development of Scenic Spot in Dawei Mountain National Forest Park in Liuyang City ...................................................................................................................................................................... 231 Construction of Outdoor Sports Base in Dongwu Mountain of Ningxiang County ...................................... 232 Comprehensive Development of Qingshuitang Industrial Culture Park in Zhuzhou City ............................ 232 Construction of Camphor Hot Spring Tourism Resort in Yanling County .................................................... 233 Tribe of the Northern Liling Tourism Development ..................................................................................... 233 Comprehensive Development of Dajing Scenic Area in Zhuzhou ................................................................ 234 Tourism Development of Zhuting Ancient Town in Zhuzhou County .......................................................... 235 National Mine Park of Xiangtan Manganese Ore ......................................................................................... 236 Development of Dongting Lake Exposition Park in Yueyang ...................................................................... 236 Construction of Yumu Ecological Scenic Spot in Hengyang ........................................................................ 237 Overall Development of Nanyue Shuilian Cave Scenic Area in Hengyang City .......................................... 238 Construction of Mount Paradise National Forest Park in Changning City.................................................... 238 Infrastructure Construction of Dayi Mountain Tourist Area in Changning City ........................................... 239 Development of Cai Lun Bamboo Sea Scenic Area in Leiyang City ............................................................ 239 Construction of Qi Baishi Cultural Tourism Zone in Xiangtan County ........................................................ 240 Construction of Zhaoshan Aviation Theme Park .......................................................................................... 241 Construction of Shuifu National Tourist Resort in Xiangtan City ................................................................ 242 Cultural Tourism Construction in Wanlou Area in Xiangtan City ................................................................. 242 Protection and Development of Yaowan Historical and Cultural Blocks in Xiangtan City .......................... 243 Development of Fahua Mountain Forest Park in Xiangtan High- Tech Zone ............................................... 243 Construction of Large - scale Integrated Amusement Park in Xiangtan Economic and Technological Development Zone ....................................................................................................................................... 244 Construction of Tourism Industrial Park of Hunan Merchant Culture in Shaoyang City .............................. 245 Construction of Luoxi National Forest Park in Dongkou County ................................................................. 246 Modern Amusement Park in Shaoyang City ................................................................................................. 246 Huayuange National Wetland Park Tourist Facilities Construction in Suining County ................................ 247 Yueyang Bajiao Lake Five-star Hotel Construction ...................................................................................... 248 Changde Huashan Wetland Comprehensive Improvement and Development .............................................. 248 Changde West Dongting Lake Wetland Tourist Resort Development ........................................................... 249 Shanjuan Hometown Tourist Attraction Construction of Changde ............................................................... 250 48 Stockaded Villages Science Spot in Guangfuqiao of Cili County ............................................................ 251 Ancient Tea-Horse Road (Chamagudao) Resort Construction in Anhua County .......................................... 251 Comprehensive Development of Taohuajiang Forest Park (4A Tourist Attraction) ...................................... 252 Tourism Development of Chishan Island, Yuanjiang City ............................................................................ 253 YiyangZhaizilunScenic Spot Development .................................................................................................. 253 Tourism Development of the “Jingui Silver City� in Chenzhou ................................................................... 254 AishangSanhe Eco-Agricultural Leisure Tourism Development in Beihu District, Chenzhou ..................... 255 Hot Spring Leisure Resort Construction in Yichongqiao Town, Zhangjiajie ................................................ 255 Construction of Longnv Hot-Spring Health &Leisure Industrial Park ......................................................... 256 Construction of Xianling Hot-Spring Cultural Park in Beihu District .......................................................... 257 The Development of International Hot-spring Resort Center in Rucheng County ....................................... 257 Tourism Development in Yangtian Lake Scenic Spot ................................................................................... 258 Wangxian Ridges Tourist Resort Development ............................................................................................ 259 Culture Tourism Development of Ancient Folk Residence in Suxian District .............................................. 259 Construction of Huishan Mountain Valley Tourist Area in Guishan County ................................................ 261 National Tourist Resort Development in Mangshan, Yizhang County.......................................................... 261 Jiahe National Forest Park Construction in Jiahe County ............................................................................. 262 Bamian Mountain Ecological Tourism Development in Guidong County .................................................... 263 Comprehensive Tourism Development in YongzhouJiuyi Mountain ............................................................ 264 Yangming Mountain Tourist Resources Full Transferring ............................................................................ 264 Centian River Reservoir Tourist Resort Development .................................................................................. 265 Overall Tourism Development of Siming Mountain Forest Park in Lengshuitan District ............................ 266 Jiemuxi National Nature Reserve Eco-tourism Development ....................................................................... 267
ZhijiangKaixuan International Peaceful Tourism and Cultural Creativity Industrial Park ............................ 267 Overall Development of Bamboo Sea Eco-tourism in Hongjiang Ancient Business City ............................ 268 Tourism Development in Gaoyi Ancient Village, Huitong County ............................................................... 268 TongdaoWanfoshanShenxian Valley Ecological Tourism Construction ....................................................... 269 Xiyou Cultural Park of Boyue Cavity in Lengshuijiang City Development Project ..................................... 269 LianyuanDalongshan (The 1stPhase) Tourism Development ........................................................................ 270 Xinhua County Meishan Old Town Protection and Development ................................................................ 271 Zhuzhou Hi-tech Industrial Development Zone Style Business Water Street Construction .......................... 272 Huxiang Characteristic Style Street Development ........................................................................................ 272 3-3 CULTURE, SANITATION, EDUCATION (59).................................................................................................... 273 Construction of Changsha Cultural and Creative Industry Cluster (Phase 1) ............................................... 273 Construction of Changsha (National) Advertising Industrial Park ................................................................ 273 Construction of Xiangjiang River International Cultural Creativity Industry Park ....................................... 274 Construction of Hunan Cultural Creativity Center ....................................................................................... 275 Construction of Changsha International Art Zone of Houhu ........................................................................ 276 Investment of Mango TV Self-produced Program ........................................................................................ 276 Construction of Xunlong River Film Town .................................................................................................. 277 Capital Increase and Share Expansion of Xiaoxiang Cinema Line ............................................................... 278 The Website Development of “Sports Ape APP” .......................................................................................... 279 Construction of Zhuzhou International Circuit ............................................................................................. 280 Supplementary Development of Liling Pottery Pavilion .............................................................................. 280 Construction of Zhaoshan Cultural and Creative Industry Park ................................................................... 281 Construction of Conference and Exhibition Center of Hengyang High-tech Zone ....................................... 282 Construction of Baishi Art City .................................................................................................................... 282 The “Most Memorable Is Shaoshanchong” Cultural Tourism Synthesis ...................................................... 283 Construction of Miluo Quzi Cultural Park .................................................................................................... 283 Construction of Changde Folklore Museum ................................................................................................. 284 Changde Sun Valley Industrial Park for Regimen and the Aged Service ...................................................... 285 Construction of Li County Lanjiang Cultural City ....................................................................................... 286 Infrastructure Construction of Anxiang County Shuyuanzhou National Wetland Park ................................ 286 Construction of Sangzhi International Film and Television Cultural Tourism City ...................................... 287 Construction of Yiyang Ming-Qing-Dynasty Ancient Alley ......................................................................... 287 Construction of Lianyuan Culture and Art Center ........................................................................................ 288 Female-Script Culture and Creativity Industry Park of Jiangyong County ................................................... 289 Construction of Hunan Science Building for Chinese Medicine Inheritance and Innovation ....................... 290 Investment in International Capacity Cooperation and Technology Research and Development of Sinocare Inc ................................................................................................................................................................. 291 Construction of the Fifth Xiangya Hospital of Hunan Light Industry & Salt Industry Group ...................... 292 Hospital Construction in Changsha Economic and Technical Development zone ........................................ 292 Construction of Comprehensive Hospital (Class 3A) in Changsha Airport Economic Zone ........................ 293 Construction of 3A-class Hospital in Core Area of Liuyang Economic and Technological Development Zone ...................................................................................................................................................................... 293 Relocation and Reconstruction Project of Hengyang TCM Bonesetting Hospital ........................................ 294 Relocation and Aged-service Construction of Xiangtan Traditional Chinese Medicine Hospital ................. 295 Construction of Xiangtan Jiuhua Comprehensive 3A-Level Hospital .......................................................... 295 Construction of Comprehensive 3A-Level Hospital in Xiangtan National Hi-tech Industrial Development Zone .............................................................................................................................................................. 296 Relocation and Expansion of Affiliated Hospital of Changde Vocational Technical College ....................... 297 Construction of 3A-Level Hospital in Loudi ................................................................................................ 297 Construction of Comprehensive Hospital in Loudi Economic and Technical Development Zone ............... 298 Expansion of Changning People’s Hospital .................................................................................................. 299 Business Attracting of Hunan Medical Center (Lugu Park) .......................................................................... 299 Construction of Hengyang International Leisure Resort ............................................................................... 300 Construction of Xinma International Medical and Health City in Zhuzhou Hi-tech Industrial Development Zone .............................................................................................................................................................. 300 Construction of Shennong Health-Cultivation City in Zhuzhou Hi-tech Industrial Development Zone....... 301 Construction of Shennong Health Rehabilitation Center in Yanling County ................................................ 302 Construction of Shaoshan Aged Service Industrial Park............................................................................... 302
Shaoyang Kanghua Medical Treatment and Aged Service Synthesis ........................................................... 303 Construction of Dongjiang Lake Rehabilitation City in Zixing .................................................................... 303 Construction of Yngzhou Jindong Forest Rehabilitation Base ..................................................................... 304 PPP Project of Huaihua Integrated Health Services Facility ......................................................................... 305 Development of Leisure, Tourism and the Aged Service in Zhijiang County ............................................... 306 Construction of Fukang Aged People’s Apartment ....................................................................................... 306 Investment of Comprehensive College of Higher Education in Liuyang National Economic & Technical Development Zone ....................................................................................................................................... 307 Construction of Production and Education Integration Demonstration Base of Vocational Education in Hengyang ...................................................................................................................................................... 308 Construction of Cold Chain Storage and Logistics Base in Chang-Zhu-Tan Universities ............................ 308 Construction of Hunan Domestic Business School....................................................................................... 309 Construction of Minor Social Practice Base in Zhuzhou County ................................................................. 310 Construction of International Bilingual Middle School in Chenglingji Xingang District of Yueyang .......... 310 Construction of Chenzhou General Navigation College of China Southern Airlines ................................... 311 Construction of Chenya International School ............................................................................................... 312 Construction of Full-time School in Eastern New District of Loudi ............................................................. 312 3-4 FINANCE (6) ................................................................................................................................................ 313 Investment Attraction of The Belt and Road Strategic Investment Fund of Hunan High-tech Venture Capital Investment Group Co., Ltd. .......................................................................................................................... 313 Capital Raising for Black and Odorous Water Disposal of Xiandai Investment Co., Ltd. ............................ 314 Hanpu Project Financing of Hunan Construction Engineering Group (HNCEG) ......................................... 314 Investment Attraction of Hunan Financial Center XiangJiang New Area ..................................................... 315 HNAC Technology Co,. Ltd Strategic Cooperation Investment Attraction .................................................. 316 Zhuzhou China Power Valley Innovation Venture Capital Guidance Fund .................................................. 317 4-1 INDUSTRIAL PARK INFRASTRUCTURE (31) ....................................................................................... 317 Construction of Changsha Airport Economic Zone ...................................................................................... 317 Construction of Changsha Airport Business District .................................................................................... 318 Investment Attraction Project of Changsha Huanghua Comprehensive Bonded Zone ................................. 318 Construction of Innovative Achievement Transformation Core Area in Yuelushan National University Science City .................................................................................................................................................. 319 Construction of Innovation and Creativity City in Wangcheng Economic and Technological Development Zone .............................................................................................................................................................. 320 Construction of Hunan Geomatics Industry Park ......................................................................................... 322 Changsha Xingsha Doctor Innovation and Entrepreneurship Park Construction .......................................... 322 Construction of Changsha High-tech Civilian-military Integration Industry Park ........................................ 323 Changsha Jinxia Modern Architecture Demonstration Industrial Park the Phase One Construction ............ 324 Investment of Ethiopia & Hunan Province Equipment Manufacturing Cooperation Park ............................ 324 Construction of Liuyang Innovation and Entrepreneurship Park in High-tech Zone .................................... 325 Investment of Enterprise Headquarter City in Wangcheng Economic and Technological Development Zone ...................................................................................................................................................................... 326 Construction of Power Valley Independent Innovation Park of Zhuzhou High-tech Zone ........................... 327 PPP Project of Independent Entrepreneurship Park Construction in Tianyi Technology City ...................... 327 PPP Project of Zhuzhou Qingshui Lake Technological and Innovative Park ................................................ 328 Construction of New Materials Industrial Park in Shaoshan High-tech Zone .............................................. 328 Infrastructure Construction of Xiangtan Xianfeng Modern Industrial Park .................................................. 329 Xiangtan High-tech Green Construction Industrial Park Project .................................................................. 330 Construction of Headquarter Building in Xiangtan High-tech Industry Development Area ......................... 330 Construction of Academician Innovation Industrial Park of Xiangtan High-tech Industry Development Area ...................................................................................................................................................................... 331 Construction of Xingang Area Civilian-military Integrated Application Industry Park in Chenglingji of Yueyang ........................................................................................................................................................ 332 Investment of Zhuzhou High-tech Area Innovation and Entrepreneurship Park........................................... 332 Investment of Shanghai Zhongkun Headquarter Economic Park ................................................................. 333 Construction of China South Agriculture Machinery Equipment Manufacturing Industry Park .................. 334 Construction of Innovation and Entrepreneurship Scientific Industry Park in Loudi Economic and Technological Development Area ................................................................................................................. 334
Construction of Lodi Electric Power Science and Technology Industry Incubation Park ............................. 335 Investment Attraction of SMEs (Innovative) Incubator in Loudi Economic and Technological Development Park............................................................................................................................................................... 336 Investment of Xiangzhong International Logistics Park in Loudi Economic and Technological Development Area .............................................................................................................................................................. 336 Construction of Enterprise Headquarter Base in Loudi Economic and Technological Development Area ... 337 Investment of Standard Plants of 80,000 Square Meters of Hunan Merchants Industry Park in Shaoyang County .......................................................................................................................................................... 338 PPP Project of Standard Plants and Road in Nan County Engineering Economic Development Area ......... 338
1. Infrastructure (100) 1-1 Transportation and Energy (24) Construction of Expressway from Jingzhou to Liping (the Border of Hunan and Guizhou) I. Project Background In accordance with the latest national and Hunan provincial planning of expressway network, this project will get through an important outward channel of southwest Hunan. The project will strongly promote the communication between Guizhou and Hunan provinces, accelerate the economic development of southwest Hunan and enforce the traffic and guard ability of national defense road. II. Project Content According to the construction plan, this expressway will start from Huaihua-Tongdao Expressway and meet the expressway of Guizhou at the end. The recommended route starts from Xinchong Reservoir located in the south of Jingzhou County. A new Xingchong Interchange should be built here to connect to the existing Baotou-Maoming Expressway (stake mark K2285+650). Then the route will change its line along southwest, crossing Qu River and Jiaozuo-Liuzhou Railway (stake mark K1322+280), meeting G209 (stake mark K2664+350) in the south of Jingzhou County, where a Jingzhou South Interchange is supposed to be set. The route will continue along G356 corridor (north of Paiya Mountain), passing Pukou township and Outuan township, setting a landing interchange at Outuan, going southwest to pass Pincha town, at last arriving the boundary tablet of Hunan and Guizhou. The controlling factors of the whole route: Jingzhou urban area, Jiaozuo-Liuzhou Railway, Qu River, Feishanzhai and Paiya Mountain Nature Protection Area and the terminal connecting positions. The expressway is designed with an overall length of 55.78km, a four-lane standard main line, a speed of 100km/h and a roadbed width of 24m. The expressway is planned to be paved by asphalt concrete. The loading level of the bridge and culvert is Highway-I. Flood frequency grand bridge 1/300, large, medium and small bridge water draining structure 1/100 should be designed. III. Project Investment The overall length of recommended line of the project is 55.78km and the estimated total investment is RMB 5.133 billion yuan. The project owner will raise the capital fund, which occupies 25% of the whole investment. The other 75% investment will be raised by asking domestic banks for loaning. After the expressway’s openness to traffic, the principal and interest will be paid by tolls charging. IV. Cooperation Way PPP pattern V. Project Initiator Project Initiator: Foreign Capital Promotion Project Office, Communications Department of Hunan Province
Construction of Expressway from Zhijiang to Tongren (the Border of Hunan and Guizhou) I. Project Background The project, "Huaihua (Zhijiang) to Tongren (border of Hunan and Guizhou)" Expressway, is located in the western Hunan Province, the junction of Hunan and Guizhou provinces and Wuling Mountain area. It is the “Hunan Section” of the national road network planning “five verticals”---“Chongqing passing Tongren to Huaihua Channel”. The construction of the project will promote the exchange of Hunan and Guizhou, accelerate the development of tourism 1
resources along the route, speed up the development of concentrated destitute areas in Wuling Mountain and enhance the national unity. II. Project Content The starting point of the project located in Aitouping interchange, northwest of Aitouping Township of Zhijiang County, corresponding to the mainline stake mark K18+700 of Huaihua-Zhijiang Expressway. The route keeps extending along west, passing Jinchangping Reservoir, Wulangxi Township, Tuochong Township and Yao Township, ending in the west side of Shenaopo (Luoshuitian), a place in the border of Hunan and Guizhou, connecting the Tongren-Huaihua Expressway (Tongren Section). The overall construction length is 35.577km, across the board three interchanges will be set up. The expressway is designed with a four-lane standard mainline, a speed of 80km/h and a roadbed width of 24.5m. III. Project Investment The overall length of recommended line of the project is 35.577km and the estimated total investment is RMB 4.2192 billion yuan. The average cost of per kilometer is RMB 118.5959 million yuan, excluding bridges and tunnels; the average cost of per kilometer is RMB 89,123,300 yuan. The project owner will raise the capital fund, which occupies 20% of the whole investment (including interests incurred during construction). Asking domestic banks or policy banks for loaning will raise the other 80% investment (including interests incurred during construction). IV. Cooperation Way This project uses the pattern of PPP. V. Project Initiator Project Initiator: Foreign Capital Promotion Project Office, Communications Department of Hunan Province
Construction of Longshan-Sangzhi Expressway I. Project Background In accordance with the latest national and Hunan provincial planning of expressway network, this project belongs to one section of G5515 “Zhangjiajie-Nanchong” Expressway. It is an important part of national and Hunan provincial highway network and an important grand high-speed channel of northwestern Hunan, taking the responsibility of undertaking the north and south, connecting the east and west. The project will strongly promote the communication among Hubei, Chongqing and Hunan provinces and accelerate the economic development of northwest Hunan. II. Project Content The starting point of the route is located in Maoping Township, Longshan County, setting an interchange with the "T-type" cross of Longshan-Yongshun Expressway being constructed. The route is going to set lines and positions along the northeastern foot of the mountain, passing Ciyantang Township, Xinchang’ao, Shuitianba, Shanghexi, Sabuxi, Chenjiahe and Lianghekou, ending at the Helong Electric Power Station, meeting the Sangzhi-Zhangjiajie Expressway. The overall length of the route is 68.394km. The expressway is designed with a four-lane standard mainline, a speed of 80km/h. The expressway is planned to rebuild four connecting lines (112.96km long): Maoping Interchange Hub Line (6.06km), Xinchangao, Longshan County-Wuya Township Line (30km), Chenjiahe, Sangzhi County-Nanmuping Line (45.7km), Lianghekou, Sangzhi County-Yongshun Line (31.2km). III. Project Investment The estimated total investment is RMB 8.7791 billion yuan (including connecting lines). The mainline is 68.394km long, and the estimated investment is RMB 8.7056 billion yuan. The Maoping Interchange Hub connecting line is 11.06km long, and its estimated investments is RMB 73.53 million yuan, and the cost per kilometer is RMB 6.65 million yuan. The project owner will raise the capital fund, which occupies 20% of the whole investment (including interests incurred during construction). Asking domestic banks or policy banks for loaning will raise the other 80% investment (including 2
interests incurred during construction). IV. Cooperation Way This project uses the pattern of PPP. V. Project Initiator Project Initiator: Foreign Capital Promotion Project Office, Communications Department of Hunan Province
Construction of Pingjiang-Wushi Expressway (the border of Hunan and Jiangxi) I. Project Background The project is the most eastern part of Expressway Network Planning of Hunan Province. It is an important regional economic trunk line in the northeastern part of Hunan province, constituting the grand channel connecting the east and west of Hunan with “Pingjiang (Wushi) –Yiyang” Expressway, “Yiyang- Majitang-Anhua” Expressway. The project is also the high-speed inter-provincial channel of Hunan and Jiangxi, constituting four inter-provincial channels of northern Jiangxi and Hunan with G60 Shanghai-Kunming Expressway, Daweishan-Liuyang Tonggu-Nanchang Expressway, Changsha-Liuyang - Shangli-Nanchang Expressway. The project will connect “Xiushui, Jiangxi- Nanchang – Jiujiang”, run through "Pingjiang - Miluo - Yiyang", and link up areas of “Hunan Granary” with fairly-developed agriculture, forestry, husbandry and fishery industry around Dongting Lake, so as to make the industry of alongside counties and cities and the industry of urban agglomeration to achieve complementary advantages. II. Project Content The starting point of the route is located in Kuoda Village, Shiniu Town, the border of Jiangxi and Hunan. Passing Longmen Town, Changshou Town, Jiayi Town, south Pingjiang County, Wengjiang Town and Wukou Town, the route ends at Wushi Town, meeting the Peking-Hong Kong-Macao Highway. The expressway is designed with an overall length of 94.44km, a four-lane standard mainline, a speed of 100km/h and a roadbed width of 24.5m. III. Project Investment The estimated total investment is RMB 10.1291 billion yuan. The average cost of per kilometer is RMB107.44 million yuan. The project owner will raise the capital fund, which occupies 20% of the whole investment (including interest incurred during construction). Asking domestic banks or policy banks for loaning will raise the other 80% investment (including interest incurred during construction). IV. Cooperation Way This project uses the pattern of BOT. V. Project Initiator Project undertaker: Foreign Capital Promotion Project Office, Communications Department of Hunan Province
Construction of Wushi–Yiyang Expressway I. Project Background The project, “Pingjiang (Wushi)- Yiyang Road”, is the eastern section of the Pingjiang (the border of Hunan and Jiangxi)-Anhua Expressway, the third horizontal road of the “seven verticals and seven horizontals” of Hunan. Sitting in the northeastern Hunan, by the south of Dongting Lake, crossing Yueyang and Yiyang, this project belongs to the region of Dongting Lake Ecological Economic Zone and "3 +5" urban agglomeration core overlapping area, enjoying an excellent regional advantage and developed social economy. However, the regional transporting infrastructure is constrained by the Xiangjiang River, Zijiang River and Dongting Lake. The high cost, the large historical debts, especially the weak horizontal traffic infrastructure, only one G356 (original S308) connects 5 county cities and 4 highways, are all difficult to support the Dongting Lake ecological economic zone construction and "3 +5" urban agglomeration. Therefore, speeding up the construction of regional infrastructure has become the primary prerequisite for promoting 3
regional social and economic construction. II. Project Content The starting point of the route is located in Zhongzhoushang Village, south to Wushi Town ,connecting up to the Peking-Hong Kong-Macao Highway, extending along the west, passing Tongjiaduan, Bali Village (crossing G107), connecting down to Wuhan-Guangzhou Express Railway from Lutangchong, north to the Miluo East Railway Station, passing Qiulichong, Public Tea Factory, Gupei Village, crossing Beijing-Guangzhou Railway, passing south Liqiao Village, Haigongba, Huangjiawan (crossing Peking-Hong Kong-Macao Highway multiple track), passing Tufeng Village (north Xiangyin County), crossing the main shipping lane of Xiangjiang River to Xinzhou Village, Xinquansi Town, passing south Xilingang, Phoenix Lake Farmland, meeting the Ring Expressway of Yiyang in Sujiaba, Bijiashan Town, east Yiyang. The expressway is designed with an overall length of 83.515km, a four-lane standard mainline, a speed of 100km/h and a roadbed width of 26.0m. The expressway is planned to be paved by the asphalt concrete. III. Project Investment The estimated total investment is RMB 8.913 billion yuan. The project owner will raise the capital fund, which occupies 20% of the whole investment. The other 80% investment (including interest incurred during construction) can be raised by asking domestic banks for loaning. IV. Cooperation Way This project uses the pattern of BOT. V. Project Initiator Project Initiator: Foreign Capital Promotion Project Office, Communications Department of Hunan Province
Construction of Nanyue–Baiguo Expressway I. Project Background The project starts from Hengyang Nanyue Mountain, connecting to Hengyang-Yueyang Expressway, Peking-Hong Kong-Macao Expressway, ending at Baiguo Town, Hengsha Mountain, meeting Yueyang-Linwu Expressway (Xiangtan-Hengyang West Expressway). The construction of the project, from the southeast to northwest, connecting Peking-Hong Kong-Macao Expressway, Hengyang-Kunming Expressway, Yueyang-Linwu Expressway, Shanghai-Kunming Expressway and Changsha-Zhuzhou-Xiangtan Ring Highway, etc., is perfect and effective supplement to the expressway network of Hunan Province. II. Project Content The start of this project is connected to the Hengyang-Yueyang Expressway, rebuilding the existing Nanyue Interchange, passing Nanyue Planned District, Hengshan Wuguang New Urban Planned District, Shaquan Township, Futianpu Township and Baiguo Town, etc., meeting Yueyang-Linwu Expressway and building Baiguo North Interchange. The overall length of the route is 38.9km. The expressway is designed with a four-lane standard mainline, a speed of 100km/h and a roadbed width of 25m. The expressway is planned to be paved by the asphalt concrete. Due to the short distance of the expressway, no service zone will be set. The Nanyue East Interchange, Shaquan Interchange and Lingpo Interchange can be directly linked to existing national roads or provincial roads or municipal roads, therefore, no connecting lines will be set either. III. Project Investment The estimated total investment is RMB 3,434,711,711 yuan. The average cost of per kilometer is RMB 88,295,930 yuan. 20% of the total investment in construction is capital fund; the remaining 80% are from the domestic bank loans with interest rate of 4.9%; financial benchmark discount rate is 4.26%. IV. Cooperation Way This project uses the pattern of BOT. V. Project Initiator Project Initiator: Foreign Capital Promotion Project Office, Communications Department of Hunan Province 4
Construction of Guidong-Xintian Expressway in Chenzhou I. Project Background The construction of Guidong-Xintian Expressway is conducive to change the status of lacking the channels which linking the east to the west of Hunan. The construction is helpful for the long-term plan of connecting Dalian-Guangzhou Expressway (through Suichuan, Jiangxi Province). This expressway connects Yongzhou and Guangxi in the west and south, enhancing the existing highway network overall efficiency and emergency capacity; can push the regional economic development, and further enclose the relation among Hunan, Beibu Gulf Economic Zone, Chengdu-Chongqing Economic Zone and Western Taiwan Straits Economic Zone, promoting the integration of Hunan-Guangdong-Jiangxi "Red Triangle" large tourism economic circle and the poverty alleviation development of Luoxiao Mountain Area. II. Preliminary Work In 2011, Guidong-Xintain Expressway was accepted into the Expressway Planning in Hunan Province in the “Twelfth Five-Year Plan”, becoming the eighth horizontal road of the “seven verticals and nine horizontals”. In August 2013, the provincial government approved the Chenzhou municipal government as the main body for investment promotion in document X.Z.B.H[2013] No.95. So far, the FSR of this project has been assessed, and the report has been submitted to the Communications Department of Hunan Province after the trial. In accordance with the procedures, the construction design has started, and the investment promotion is underway. III. Project Content This project starts from Baizhu, Zhaiqian Town, Guidong County in the east, connecting with Yanling-Rucheng Expressway in Sidu Town, Guidong in the west, passing Qingshi (Zixing), Xingning, Beiji to Xianghua, crossing Dongjiang River and Beijing-Guangzhou Railway in the west, connecting Peking-Hong Kong-Macao Expressway. After passing Matouling (Suxian District), Heyeping, Tuanjie, Maiziping (Guiyang County), Guidong-Xintian Expressway arrives at Yutian Township, connecting with Guiyang-Linwu Expressway. The overall length of this project is 162.7km.The 25km of Guidong section has been incorporated as key projects into the national Luoxiao Mountain area contiguous poverty alleviation. There are 192 bridges /40138 meters, 28 tunnels /28220 meters, 12 interchanges. The project uses 1050.8 square kilometers of land, setting two second-class highway lines, which are 26 km long. IV Project Investment The total investment of the project is RMB 18.412 billion yuan, of which the capital fund, RMB 4.655 billion yuan, occupies 25%; the remaining 75% is RMB 13.815 billion yuan. The Project Initiator, as the main body for financing, will carry out financing work by social capital. V. Benefit Analysis From the financial evaluation, in the case of 1.1 times charge coefficient, the project has a certain financial profit and ability of anti-risk, but the anti-risk ability of the capital is not very strong. Taking the capital ratio of 20% before financing, the internal rate of return will be 5.60%, higher than the benchmark rate of return of 5.5%. From the loan repayment ability, it is financially viable for the project to pay the loan in the evaluation period of 28.5 years. From the national economic evaluation, the economic internal rate of return is 10.2%, which is greater than the social discount rate of 8%.The economic net present value is 395,131 million. The cost ratio is 1.31, greater than 1, which indicating that the project is economically feasible. Through the sensitivity analysis, when the cost increases by 10% and the benefit is reduced by 10%, the internal rate of return is 8.5%, which is greater than the benchmark discount rate of 8%, indicating that the project is better economically resistant. VI. Cooperation Way Contractual joint venture, PPP pattern (BOT + EPC + equity cooperation + appropriate government subsidies) VII. Project Initiator Project Initiator: Chenzhou Municipal Bureau of Communications
Construction of Yongzhou-Chenzhou Expressway (Xintian Section) 5
I. Project Background Yongzhou-Chenzhou Expressway is an important expressway in the south of Hunan Province. This under-planning project starts from the existing Yueyang-Rucheng Expressway in Guidong County, Chenzhou, passing Zixing, Suxian District of Chenzhou, Guiyang County and Xintian County, ending at Pojiaping Town, connecting to Erenhot-Guangzhou Highway, linking the four expressways together: Yueyang-Rucheng Expressway, Beijing-Zhuhai Expressway, Beijing-Zhuhai Expressway Sub-line and Erenhot-Guangzhou Expressway. The overall length of the Yongzhou-Chenzhou Expressway is 207km. The Xintian section is 30km long. The project is the major economic trunk from the east to west between Chenzhou and Yongzhou two cities. After the completion of the project, the distance from Chenzhou to Yongzhou can be shortened by 30-80 km, and the distance from Chenzhou to Jinggangshan can be shortened by 151 km. The construction of the project will open up the rapid channel between Xintian and the outside world and promote the rapid flow of people and logistics, changing the history of having no expressway in Xintian, speeding up the circulation of Xintian and Hengyang, Chenzhou, Yongzhou and southern coastal cities, promoting the economic development. II. Preliminary Work The project has entered into the Expressway Planning Network of Hunan Province. It has completed the early work such as preliminary design, feasible research work, and the Chenzhou section has started the construction. III. Project Content The expressway is designed with a four-lane standard mainline, a speed of 100km/h and a roadbed width of 26m. IV. Project Investment The total investment of this project is RMB 3 billion yuan. V. Benefit Analysis In 2014, the traffic volume of this project was 8068 cars / day, the growth rate was 8.3% in 2014-2020, the growth rate in the 2020-2025 year was 6.6%, the growth rate of 2025-2033 was 4.8%, and the growth rate of 2033-2045 was 2.7%. It is predicted that the traffic volume of this project will be 34,177 vehicles/day in 2044. In accordance with the 30-year charging right of expressway management, the project is expected to recover the investment cost in 18 years. VI. Cooperation Way This project uses the pattern of BOT. VII. Project Initiator Project Initiator: Communications Bureau of Xintian County
Construction of Yunlong Maglev Express, Zhuzhou I. Project Background Zhuzhou already has a complete medium and low speed magnetic industry chain. The CRRC Zhuzhou Locomotive Co., LTD has the key technology of the low-speed maglev train. Changsha Airport Maglev Express, which using the technology of CRRC Zhuzhou Locomotive Co., LTD, has come into operation, and its technical indicators work normally. In order to speed up the development of Zhuzhou urban transport infrastructure and the development of Yunlong Demonstration Zone, actively docking the construction of the capital city, Changsha, it is necessary to set up the Changsha-Zhuzhou Maglev Express from Changsha South Railway Station to Zhuzhou Yunlong. II. Preliminary Work The planning of the route has been completed, and the related preliminary work is in progress. III. Project Content According to the early plan, the Changsha-Zhuzhou Maglev Express from Changsha South Railway Station to Zhuzhou Yunlong starts from Dafeng Station (Yunlong Urban Railway), ending at Yunfeng Road (Tourist Distributing Center). The overall length is 12km and it will come into use in 2020. In 2025, the Special Maglev Line from Yunlong Station (Dafeng Station) to Changsha South Railway Station will be completed. IV. Project Investment 6
The total investment is RMB 2.8 billion yuan. V. Cooperation Way The cooperation is in the form of joint venture by CRRC Zhuzhou Locomotive Co.,LTD, government platform company, strategic investment and private company, or using the pattern of PPP. VI. Benefit Analysis The expected annual rate of return is no less than 6%. VII. Project Initiator Project Initiator: Department of Investment Promotion and Cooperation, Management Committee of Yunlong Demonstration Zone, Zhuzhou
Construction of General Airport in Youxian County I. Project Background The international experience shows that when per capita GDP reaches more than $4,000, general aviation will enter the stage of rapid development. The per capita GDP of Zhuzhou has reached RMB 33,064 yuan (about 4723 US dollars). The city has had a necessary economic base of developing general aviation; meanwhile, as a city with better foundation of developing aviation industry in Hunan Province, Zhuzhou has basic conditions of accelerating the development of general aviation. As one of the 25 airports planned in the Planning for the Construction of General Airports in Hunan Province, Youxian General Airport has been included in the forthcoming 13th Five-Year Plan of Civil Aviation of Central-South China. II. Preliminary Work The preliminary work is underway. III. Project Content The project is located in Youxian County, Zhuzhou, covers an area of 500 Chinese mu, including the new general airport, air sports base, emergency rescue center, aviation town, forest protection plant service station, aviation flight school and aviation logistics park. IV. Project Investment The total investment is RMB 1 billion yuan. V. Cooperation Way The cooperation ways include sole proprietorship, joint venture, contractual joint venture and so on. VI. Benefit Analysis General aviation industry includes flight training, air patrol, forest shelter, pesticides spraying, emergency rescue, business charter flights, aerial photography, scenic spots, aerial performances and etc. It is expected that after the completion of the project, the estimated annual income will reach RMB 100 million yuan. VII. Project Initiator Project Initiator: Development and Reform Bureau of Youxian County, Zhuzhou City
Construction of Yisuhe-Huashi Highway, Xiangtan City I. Project Background Yisuhe-Huashi Highway in Xiashesi, Xiangtan City, as the important channel of communicating the north and south, including Xiangtan urban area, Yisuhe, Shebu and Huashi towns in Xiangtan County, will organically link the towns and villages alongside the highway with the regional road network. At the same time, a rapid track will be set in the hinterland of Xiangtan County, bearing the regional short-distance traffic volume, effectively solving the contradiction of regional traffic supply and demand. The project will effectively promote the development of land and regional economy. II. Preliminary Work The feasibility study report has been prepared, and Department of Communications of Hunan Province has organized a review meeting. The reply to feasible research work of engineering and Phase-1 project has been completed. It is allowed to set up the project and call for bids through the 7
social capital. The project company can be established as well. III. Project Content The project starts from the crossroad of South Jianshe Road and Shuyuan Road, Yuetang District, Xiangtan, from north to south, along the planning Diangong road, building a new bridge across the Xiangjiang River, entering Yisuhe Town, Xiangtan County, along the planning Xianglian Avenue to the south, passing Shebu Town, after connecting with the exit of Heling Interchange, G60 Liling to Loudi Expressway expansion project, then linking to the planning S219 in the north side of Jishuqiao, Dujiawan, continuing to the south, after passing Shitanba, in Xuanfengqiao meeting the planning S219 again, ending at the junction with the planning S218 at the south of Huashi Town planning area. The overall length is 47.112km. In addition that the call for tenders from social capital of the 1st -phase project has been completed, the overall length of 2nd- and 3rd -phase projects is 43.012km. The road is designed with first-class standard, a speed of 80 km /h, a roadbed width of 30 meters and six-way lanes. IV. Project Investment The total investment is RMB 2.5 billion yuan. V. Benefit Analysis The project will not set up a toll station. After the completion of the project, it will add a fast track to the Xiangjiang historical and cultural tourism axis. It is of great significance to promote the development of regional tourism resources and to support the construction of Xiangtan-Huashi traveling corridors. The managing profit comes from the development of the land, the construction of refuel and gas station, outdoors advertising revenue and the construction of integrated service area. VI. Cooperation Way The project can take the mode of government purchasing service and cooperating with social capital. The time limit of cooperation is more than 12 years (excluding construction period). During the term of the cooperation, the project capital will be calculated maximally 20% higher than the benchmark loan interest rate stipulated by People’s Bank of China for the corresponding period. The social investment partners in principle, are responsible for raising all the funds except for the capital fund, the ROI of the non-project capital part during the cooperation period will be calculated maximally 10% higher than the benchmark loan interest rate stipulated by People’s Bank of China for the corresponding period. VII. Project Initiator Project Initiator: Xiangtan Transportation and Development Group Co., Ltd.
Construction of Shadi Transportation Junction in Zhangjiajie I. Project Background The project is located in the north of Shadi High-speed Railway Station, Shati Township, Yongding District, Zhangjiajie, the east side of Zhangqing Middle Road (S306), which is sat in the core scenic area from Zhangjiajie to Wulingyuan. The project is 15 km far from the core scenic area, 8.5 km far from Hehua Airport, 10 km far from the railway station, adjacent to the high-speed railway station and Zhangjiajie-Huayuan Expressway, so the transportation is very convenient. The construction of the project meets the demand of improving the development of modern integrated tourism and transportation network and optimizing the layout of Zhangjiajie being the transportation hub of Wuling Mountain Area. II. Preliminary Work Preliminary work of the project such as site selection, conceptual design, land approval, EIA approval, safety assessment, reply on project approval has been finished . According to the plan, the construction of project will be launched in the first half of 2017 and finished at the end of 2018. III. Project Content It plans to use 200 Chinese mu of land to build a new integrated passenger transport station in accordance with the national first-class standard, construct supporting tourism and commercial facilities, and set up a public parking lot with about 1,200 parking spaces. The total construction area will be 79,631 square meters. 8
After completion, the project will become the only junction road, and the comprehensive transportation hub of high-speed railways and urban railway transit in Shati new urban areas of Zhangjiajie. IV. Project Investment The total investment of the project is RMB 890 million yuan. V. Cooperation Way BOT, PPP or other agreed ways VI. Benefit Analysis The annual operating income is about RMB 120.37 million yuan, and the average annual cost is about RMB 46.1940 million yuan. The annual tax contributions are RMB 19.1395 million yuan, and the average annual net profit is about RMB 39.3629 million yuan. The annual return rate on investment is about 4%, and capital profit margin is about 19.68%. VII. Project Initiator Project Initiator: Zhangjiajie Transportation Construction and Investment Co., Ltd
Second-line Ship Lock Construction in Xiangjiang River of Zhuzhou County I. Project Background With advantages of strong water transporting capacity, low energy consumption, low tariffs, less impact on the environment and ecology, the shipping in Xiangjiang River has a more competitive advantage than the railway road in transporting the cargo container and bulk commodities. According to the relevant planning, the hub fairway from Hengyang to Zhuzhou in Xiangjiang River Basin is ranked as level II, while the fairway from Zhuzhou hub to Chenglingji is ranked as level II and above. According to the traffic forecast, the crossing-dam traffic of Zhuzhou hub in 2020 will reach 24.87 million tons, while the crossing-dam traffic capacity of existing first-line ship lock is only 8.82 million tons, far from being able to meet the development needs. It is imperative to build the 2000 DWT second-line ship lock in Zhuzhou navigation-power junction in Xiangjiang River. II. Preliminary Work The project involves 3 villages in Zhouping Township, Zhuzhou County, including Hetang, Jiangbian and Caihuaqiao. The project has respectively received the official reply to engineering feasibility study report from Ministry of Transport and National Development and Reform Commission in 2014 and 2015. In November 2015 , the project officially started construction. III. Project Content Constructing level II (3) ship lock which can allow the navigation of 2000-ton ship, and the effective scale of the ship lock is 280 Ă— 34 Ă— 4.5 meters. The navigable net height is 10 meters, and its annual single-direction passing capacity is designed to be 21.7 million tons. A fish channel should also be constructed, and three fords should be renovated. IV. Project Investment The total investment of the project is RMB 1.397 billion yuan, including the demolition and equipment, etc., among which the ship lock project costs RMB 789 million yuan, the fish channel costs RMB 1.13 billion yuan and other expenses are RMB 495 million yuan. V. Cooperation Way Joint venture, contractual joint venture VI. Benefit Analysis Combining navigation and electricity, using electricity to support the navigation, this project is a comprehensive project which taking into account the benefits of transport and irrigation. The internal economic rate of return of the project is 16.98%, the net present value is RMB 4814.05 million yuan, and the benefit cost ratio is 2.65. VII. Project Initiator Project Initiator: Hunan Water Transportation Construction & Investment Group Co., Ltd
Construction of 1000 DWT Wharf in Lengshuitan Port Area I. Project Background 9
The project, 1000 DWT Wharf of Lengshuitan, Yongzhou Port, Xiangjiang River is located in Yangtang Group, Siqiutian Village, Shanhu Township, Yongzhou Economic Development Zone. It is only 2km far from Yongzhou Avenue, the transportation and logistics are both convenient. The construction land is about 400 Chinese mu. The project is aimed to build the biggest cargo port and water transport logistics base in Hunan-Guangxi canal and in upstream of Xiangjiang River. Located in the southwest of Hunan, Yongzhou is the important channel for connecting Hunan directly to Guangdong and Guangxi, Hainan and the Great Southwest, and Hong Kong and Macao. As an important part of the integrated transportation system, the water transport conditions of Yongzhou are convenient. Xiangjiang River and its first-class tributary Xiaoshui River are navigable in the four seasons. Yongzhou has five ports in total, divided into 28 port areas, with total bank line length of 18,000 meters, the terminal extension is 10,028 meters, the land area of port area is 462,000 square meters, water area is 2.3107 million square meters. The berths are 262 in total, of which 33 berths have the capacity above 300 DWT, the largest berthing capacity is 500 DWT. As the fairway construction is lagging behind, the perennial sailing of 500 DWT vessels cannot be guaranteed, leading to a lot of goods being transported by land carriage, or transported to the downstream Qiyang, Hengyang port by vehicles. The advantage of water transport has not been fully exploited. But with the economic development of Yongzhou, the demand for waterway goods transportation in Yongzhou continues to grow. According to the throughput forecast, in 2020 and 2030, the throughput of Yongzhou urban port will be 10.344 million tons and 19.44 million tons. However, the current function and scale of the port cannot meet the requirements of urban industrial layout and economic development. In 2017, 1000 DWT channel in Xiangjiang from Yongzhou to Hengyang will start to be constructed, 1000DWT vesselss can navigate through the entire Xiangjiang River. Therefore, it is imperative to construct the 1000DWT wharf in Lengshuitan. II. Preliminary Work At present, the project has completed the planned site selection. Lengshuitan District government commissioned the Hunan Provincial Institute of Survey and Design to prepare the engineering feasibility study report. 14 subordinate reports such as EIA, safety assessment, soil and water conservation, assessment of mineral resources below the constructed project, etc. are being carried out simultaneously. III. Project Content Four berths in the 1000 DWT wharf in Lengshuitan will be built, including two 1000-ton general wharf berths and two general cargo wharf berths. The bank line length is 2645.2m, including 990m-freight bank line and 1500m-reserved bank line. The depth of terrain is 450m,and the total area reaches 267,300m2. The annual passing capacity of the wharf is designed to be 2.381 million tons of general cargoes and 105,000 TEU containers. IV. Project Investment The total investment of the project is about RMB 280 million yuan, and the investment of each 1000 DWT berth is about RMB 42 million yuan. V. Benefit Analysis After the completion of 1000 DWT channel from Ping Island, Yongzhou to Hengyang, the 1000DWT vessels can reach Changsha, the Yangtze River, Dongting Lake freely and smoothly, which will greatly save transportation costs and bring good social and economic benefits to the development of the project. VI. Cooperation Way Sole proprietorship, contractual joint venture or joint venture is proposed to be adopted. The project will be given the relevant national, provincial and municipal subsidies for policy considerations, and subsidies granted by the state and province for each berth amount to RMB 6 million yuan, and the surrounding land will be given to the developer for development as compensation. VII. Project Initiator Project Initiator: Communications Bureau of Lengshuitan District, Communications Bureau of Yongzhou City
Construction of 1000 DWT Wharf in Lingling, Yongzhou 10
I. Project Background The project, 1000 DWT wharf in Lingling, Yongzhou Port, Xiangjiang River is located in Luping Village, Lingling Industrial Park, Yongzhou. The project plans to build two new1000 DWT berths; the area of construction land is 122.35 Chinese mu. Located in the southwest of Hunan, Yongzhou is the important channel for connecting Hunan directly to Guangdong and Guangxi, Hainan and the Great Southwest, and Hong Kong and Macao. As an important part of the integrated transportation system, the water transport conditions of Yongzhou are convenient. Xiangjiang River and its first-class tributary Xiaoshui River are navigable in the four seasons. Yongzhou has five ports in total, divided into 28 port areas, with total bank line length of 18,000 meters, the terminal extension is 10,028 meters, the land area of port area is 462,000 square meters, water area is 2.3107 million square meters. The berths are 262 in total, of which 33 berths have the capacity above 300 DWT, the largest berthing capacity is 500 DWT. As the fairway construction is lagging behind, the perennial sailing of 500 DWT vessels cannot be guaranteed, leading to a lot of goods being transported by land carriage, or transported to the downstream Qiyang, Hengyang port by vehicles. The advantage of water transport has not been fully exploited. But with the economic development of Yongzhou, the demand for waterway goods transportation in Yongzhou continues to grow. According to the throughput forecast, in 2020 and 2030, the throughput of Yongzhou urban port will be 10.344 million tons and 19.44 million tons. However, the current function and scale of the port cannot meet the requirements of urban industrial layout and economic development. In 2017, 1000 DWT channel in Xiangjiang from Yongzhou to Hengyang will start to be constructed, 1000DWT vessels can navigate through the entire Xiangjiang River. Therefore, it is imperative to construct the 1000DWT wharf in Lengshuitan. II. Preliminary Work At present, the project has completed the planned site selection. Lengshuitan District government commissioned the Hunan Provincial Institute of Survey and Design to prepare the engineering feasibility study report. 14 subordinate reports such as EIA, safety assessment, soil and water conservation, assessment of mineral resources below the constructed project, etc. are being carried out simultaneously. III. Project Content The project is about to build two new 1000t berths, among which the upstream berth is for general cargo use; the downstream berth is for bulk cargo use. The ship is designed as 1000t-class cargo ship; the annual throughput is 830,000 tons. The total length of the wharf bank line is 231.5m. The project occupies the bank line of 231.5m long, the depth of terrain is 237m, the land width is 231.5m, the main channel is 15m, and the roadway is 9m wide. The road is arranged in a ring-shape. The main channel is connected with the national highway G322, the total area of the port area is 8.16 hectares. IV. Project Investment A total investment is RMB 140 million yuan, including construction costs (RMB 100 million yuan), other costs (RMB 30 million yuan) and reserve costs (RMB 10 million yuan). V. Benefit Analysis The project is located in Lingling Industrial Park. S207 has been opened to traffic through the upgrading; a first-class highway from Lingling to Shuangpai is about to open to traffic. It is expected that the 1000 DWT wharf will benefit Shuangpai County, Dao County, Jianghua County and Jiangyong County etc., greatly reducing the logistics cost of Yongzhou, improving the position of Yongzhou as the transportation hub of Lingling and regional competitiveness. VI. Cooperation Way This project uses PPP pattern as the cooperation way. VII. Project Initiator Project Initiator: Communications Bureau of Lingling District, Communications Bureau of Yongzhou City
Construction of 1000 DWT Wharf on Xiangjiang River, Qiyang County I. Project Background The project, kiloton wharf in Qiyang County, Xiangjiang River is located in Economic 11
Development Zone, Qiyang County, 5km away from the Qiyang County. The project covers an area of 120 Chinese mu, building four new 1000t berths; the ship type is designed as 1000t class cargo ship, and the annual throughput is 1.4 million tons. Qiyang County is in the junction of Guangdong and Guangxi, enjoying superior waterway conditions. Along the fairway in Qiyang, the distance to Yongzhou is 70km, and the distance to Hengyang is 170km. The waterway passes Dongting Lake in Changsha, flowing into Yangtze River. With the construction of expansion and implementation of Yongzhou-Songbai level â…˘ Fairway, the 59km-long fairway from Wuxi Hub to Xiangqi Hub will be upgraded from grade VI to grade â…˘. The navigation conditions will be greatly improved. The logistics costs will be greatly reduced and the status of Qiyang transport hub and regional competitiveness will be enhanced. At the same time, the river of the proposed location of the construction is stable, and the shoreline is straight; the water flow and the flow rate will not impose a negative impact on the project. The construction of the port can rely on the existing roads, water, and electricity of the Economic Development Zone. The essential raw materials can be imported from existing ports. The backfill can be taken from the Economic Development Zone. Most of the soil inside the river is vegetable soil, having no demolition tasks; external conditions are particularly superior. II. Preliminary Work At present, the Planning Report of Qiyang Port and the Engineering Feasibility Study Report of Qiyang Port have been completely finished. Among the 14 subordinate reports, there are 4 reports have been prepared and estimated and have been approved by Water Resources Department of Hunan Province and Hunan Administration of Work Safety: Soil and Water Conservation Report, Safety Pre-evaluation Report, Geological Hazard Assessment Report Registration, Energy-saving Registration Record. The other reports have basically finished the preparation works, and their social investigation, advice consultation and publicity have been finished. III. Project Content The project will be constructed as a kiloton wharf combining commodity distribution, warehousing, processing and distribution, and information services. Four new berths will be built, including 3 grocery berths and a bulk berth. The style of the ship is designed for the 1000t class cargo ship; the annual throughput of the wharf is 1.4 million tons, of which 800,000 tons are commodities and 600,000 tons are bulk cargoes. According to the plan, the shoreline of Qiyang port is 700m long, and the project will occupy 437.5m of the shoreline; the land depth is 212.5m (of which the office area of land is 57.5m deep); the land width is 390m. IV. Project Investment The estimated total investment is RMB 220 million yuan, of which the construction cost is RMB 179.43 million yuan. The project will apply for the special subsidy from Ministry of Transportation, which is RMB 52 million yuan, and the special subsidy from Hunan Department of Transportation, which is RMB 28 million yuan. V. Benefit Analysis According to the data from Qiyang County Bureau of Statistics, the freight volume of road in Qiyang was 12.8 million tons in 2015, and the water cargo throughput was 600,000 tons. After the completion of the port, the cargo throughput of Qiyang port will reach to 84.0 million tons and 120 million tons in 2018 and 2020. At the same time, located in Economic Development Zone of Qiyang County, Qiyang kiloton wharf is an important part of the South Hunan National Demonstration Area of Undertaking Industry Transfer. After the completion of Qiyang port, it will provide a green, convenient and low-cost water transport channel. The economic benefits generated by the social benefits and comprehensive development will be significant. VI. Cooperation Way BTO, BOO, BOT, etc.; VII. Project Initiator Project Initiator: Communications Bureau of Qiyang County
Development of General Aviation Industry in Changsha Airport Economic Zone I. Project Background With the gradual expansion of low-altitude airspace, the demand for general-purpose aircraft such as business and private aircraft has been gradually strong. China has ushered in the golden time 12
for general aviation development. II. Preliminary Work To meet the general aviation needs of Hunan Province, the commercial aviation operation base is under construction around the project, and it is expected to put into use in the second half of 2017. At the same time, the infrastructure surrounding the project is laying out; the airport avenue and other related roads in the area are under construction. Other systems like water, electricity, net and gas have been laid along with the road. III. Project Content The project is located in the north of Siyuan Road, on both sides of Linkong North Road, Changsha Airport Economic Zone, with an area of about 800 Chinese mu and a land plot ratio of 2.0-2.5. The main construction of the project is to build the sales center of navigation aircraft, flight training center, aircraft display center, aircraft maintenance center, general aviation museum and so on. IV. Project Investment The total investment of the project is about RMB 3 billion yuan. V. Cooperation Way The project is run by sole proprietorship or joint venture, the system of land use right listing-for-sale shall be adopted. We sincerely invite domestic and foreign major general aviation manufacturing, training and services, and other enterprises to participate in the project. VI. Project Initiator Project Initiator: Administration Committee of Airport City, Changsha County
Construction of Headquarter Base of Airlines in Changsha Airport Economic Zone I. Project Background The throughput of passengers of Changsha Huanghua International Airport reached 23.64 million in 2016, the throughput of cargoes and mails reached 131,600 tons. There are 60 airlines settled in Huanghua International Airport, executing 191 regular air routes directly arriving 109 domestic and foreign cities, and 22 of the airlines fly 36 international regional destinations. With the rapid increase of the throughputs of both passengers and cargoes, Changsha Airport Economic Zone plans to build an integrated aviation headquarters base group surrounding Huanghua International Airport, so as to meet the airlines’ demands for centralized working, training, flying and attendance. At present, for the sake of accelerating the development of airport economy, the government of Changsha County has enacted Preferential Policies on Promoting Economic Development and Introducing the Airlines to attract subsidiaries of airlines and base airlines. At the same time, the second runway of Huanghua International Airport has been put into use, and the third runway and T3 terminal has began to plan and design. It is expected that by 2020, the throughput of passenger of Huanghua International Airport will be close to 33 million, the cargo and mail throughput will be 380,000 tons. By 2040, the throughput of passenger of Huanghua International Airport will be 71 million; the cargo and mail throughput will be 1.8 million tons. II. Preliminary Work The project is located at the exit of Metro Line 6, and the intersection of the Renmin East Road and S207. The project has introduced OKAIR Hunan Branch and Xiamen Air, Hunan Branch. The two companies are currently built up or under construction. The demolition work has been completed. III. Project Content The planning land area of the project is about 200 Chinese mu. The land is mainly used to construct the office and training buildings, airline catering buildings, centralized attendance and ancillary facilities and so on. IV. Project Investment The total investment of the project is about RMB 1 billion yuan. V. Cooperation Way The project is run by sole proprietorship or joint venture, the system of land use right listing-for-sale shall be adopted. We sincerely invite domestic and foreign major airlines to settle in. 13
VI. Project Initiator Project Initiator: Administration Committee of Airport City, Changsha County
Production Base of General Aviation in Shaoyang I. Project Background The policy environment of general aviation in China is improving progressively. According to the Opinions on Deepening the Reform of Low-altitude Airspace Management in China(GF〔2010〕 No.25)of the State Council and the Central Military Commission, the reform experimentations have been promoted to the whole country from 2011 to 2015, setting up the initial low-altitude airspace operation management and service security system. By 2020, the complete low-altitude airspace operation management system and related laws and regulations should be established, reasonably exploring the low-altitude airspace resources. With the deep reform of low-altitude airspace management in China, the general aviation will usher into an exploding increase. II. Preliminary Work The project has completed the initial site selection. And the land approval is launching. III. Project Content With the planned area of about 2,000 Chinese mu, this project is located in Shaoyang Economic Development Zone. The land location is east to the Jinzhan Road, south to Xincheng Avenue, west to Zhaoyang Road and north to Baima Avenue. Plans to introduce 1-2 general aviation production enterprises and several supporting enterprises. IV. Project Investment The total investment of the project is about RMB 10 billion yuan. V. Benefit Analysis The estimated annual output value of the production, sales and maintenance of general aviation aircraft and aviation training is RMB 10 billion yuan. The investment recovery period is5-8 years. VI. Cooperation Way Sole proprietorship or joint venture VII. Project Initiator Project Initiator: Management Committee of Shaoyang Economic Development Zone
500,000m2/a Solar Photovoltaic Curtain Wall Production in Leiyang County I. Project Background Solar photovoltaic curtain wall is a kind of new ecological constructing materials, which transfer solar into electricity through sealing the solar conversion template inside the double tempered glass. It has a positive market outlook because it can be used to generate electricity with no consumption of fuel and any no pollution of flue gas, waste heat, noise and waste residue. The kaolin and quartz stone reserves of Leiyang can provide adequate high-quality pulse quartz, soda ash, feldspar and other raw materials to the project, thereby the production costs can be greatly reduced. Leiyang Economic Development Zone is the frontier of undertaking industrial transfer demonstration area in the south of Hunan Province, having many advantages such as convenient traffic, developed small-size hydropower and sufficient local power. II. Project Content The project plans to construct the production line of thin film solar photovoltaic curtain wall with the annual output of 500 thousand m2, workshops and supporting facilities. III. Project Investment The total investment of the project is about RMB 1.5 billion yuan, which can be invested in two phases. IV. Benefit Analysis It is expected that the project will recover costs in 3-4 years. The annual profit will be RMB 500 million yuan; the annual taxes will be RMB 100 million yuan. And the project will provide jobs for 5,000 people. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture; 14
VI. Project Initiator Project Initiator: Investment Promoting and Cooperation Bureau of Leiyang City, Investment Promotion Bureau of Leiyang Economic Development Zone
Project of 50MW Photovoltaic Power Generation in Tongdao County I. Project Background Photovoltaic power generation is an important strategic emerging industry of our country. Greatly promoting the application of photovoltaic power generation plays an essential role in qualifying the energy structure, securing the energy safety, improving ecological environment and changing the way of using energy in both urban and rural areas. Due to its wide application, the distributed photovoltaic power generation has a bright market prospect in fields like urban and rural construction, industry, agriculture, transportation and communal facilities. Tongdao County has a wide area, and its annual sunshine volume can reach 1386 hours. There are rich resources can be used. In addition, photovoltaic power generation projects can enjoy the national energy subsidies, so the prospects are very optimistic. II. Preliminary Work At present, the distributed photovoltaic power generation has established an agreement of combining into the power grid with electric power department. The centralized photovoltaic power generation has declared the index to Energy Bureau of Hunan Development and Reform Commission. III. Project Content The project plans to build up centralized and distributed photovoltaic power generation with the installed scale of 50MW. The project covers an area of 3,000 Chinese mu. The temporary location of the first-phase project of centralized photovoltaic power generation (1000 Chinese mu) is Yatunbao Town. IV. Project Investment Calculated by investment of RMB 800,000 yuan per Chinese mu, the first-phase project covers an area of 1000 Chinese mu, the total investment is estimated to be RMB 800 million yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis Per kilowatt-hour can enjoy RMB 0.62 yuan of national energy subsidies, plus the regular electricity price of RMB 0.456 yuan per kilowatt-hour, the income of per kilowatt-hour is RMB 1.076 yuan; calculated by the annual light volume of 1386 hours (95% conversion rate), the annual income per kilowatt is RMB 1416.77 yuan. The benefits are very considerable. The investment return period is 8 years. VII. Project Initiator Project Initiator: Development and Reform Bureau of Tongdao County, Huaihua City
Investment Attraction for Equity Cooperation of Xiangtan Electric Manufacturing Group Windpower Co., Ltd I. Project Background Xiangtan Electric Manufacturing Group Windpower Co., Ltd (XEMC Windpower) is the wholly-owned subsidiary of the listed platform, Xiangtan Electric Manufacturing Co., Ltd (600416), which belongs to Xiangtan Electric Manufacturing Group Co., Ltd. XEMC Windpower was founded in 2006, locating in Xiangtan National High-Tech Industrial Development Zone, covering an area of 220,000 m2. The existing registered capital of XEMC Windpower is RMB 3.569 billion yuan, and the total ledger asset is more than RMB 9.2 billion yuan. The company is specialized in the production of large-scale wind power equipment, mainly engaged in: the import, export, development, manufacture and sales of wind power generation systems, wind turbines and components, electromechanical products, rubber products and the import and export of required raw materials and equipment of the products; the R&D, installation and services of megawatt-class direct-drive wind turbine generator and components. XEMC Windpower currently has 2 wind power design and research institutes: a domestic one and another is in Netherlands. The company has the only State Key Laboratory of Test and Technology of Offshore Wind Power 15
and National Energy Wind Turbine R&D Center. The group has developed into the leading enterprise of China's large wind power equipment manufacturing industry. II. Project Content XEMC Windpower already has the annual production capacity of 4000 megawatt-grade wind turbines; the products cover the models of 2 MW, 2.5 MW, 3 MW and 5 MW, and the amount of sales reached RMB 5 billion yuan in 2016. After the introduction of strategic investors, the company will further improve the research, development and serialization of low-speed and high-altitude wind turbines, accelerate the intellectualization of the products, develop the offshore wind power, complete the design and serialization of 5 MW turbine, research and develop 8-10 MW offshore wind turbines, and form an annual production capacity of 500 4 MW and 5 MW offshore wind turbines. III. Project Investment The total investment of the project is no less than RMB 2 billion yuan. IV. Cooperation Way It is planned to improve the governance structure with coordinated operation and effective balance by introducing investors related to power station development, power grid operation and power investment, cooperating with them through increasing in capital and share or transferring stock right, setting up diversified ownership. Returns of investment will be dividend on shareholding. V. Benefit Analysis Through the introduction of strategic investors to implement the equity structure optimization, to further enhance the quality and speed of development, by 2020 to achieve annual production and marketing scale of more than 10 billion yuan, becoming the world's leading wind power equipment manufacturers. VI. Project Initiator Project Initiator: Xiangtan Electric Manufacturing Group Co., Ltd.
Construction of First-stage Project of Battery-Charging Pile in Changde I. Project Background In order to fully promote the development of new energy automotive industry, encourage energy-saving and emission reduction, optimize the urban and rural environment, enhance the construction of urban and rural charging pile network and other supporting infrastructure of new energy vehicles, and accelerate the development of new energy vehicles, new energy vehicles are now expanding from mainly used in public service areas to be used both by public and individual. At present, it is very urgent to constructing battery-charging facilities rapidly. II. Preliminary Work The project has been set up. III. Project Content The total construction area of the project is 24,820 m2; 70 new electric battery-charging stations for vehicles (including 50 public charging stations and 20 fast charging stations) will be built up, and 3810 charging piles are about to be arranged. IV. Project Investment The total investment of the project is RMB 600 million yuan. V. Cooperation Way Sole proprietorship, contractual joint venture VI. Benefit Analysis The main benefits of the project include the sale of electricity. The annual sales of electricity under the normal operation is RMB 487.789 million yuan, and the total cost is RMB 281.6163 million yuan; the value-added tax is RMB 32.282 million yuan; the total annual profit is RMB 170.6624 million yuan. VII. Project Initiator Project Initiator: Hunan Leshan New Energy Co., Ltd.
Construction of Combined Heat and Power (CHP) of Kingboard (Hengyang) Chemical Holdings Ltd 16
I. Project Background At present, in Songmu Economic Development Zone, Hengyang, there are 23 companies using industrial gas, including the companies that are already put into operation, or under construction or proposed to be built. Except for the 5 boilers owned by “Hengguang Chemical”, “Xinli Chemical”, “Kingboard Chemical” and “REANG Biomass Power Plant” can offer 340t of thermal energy in total, most of the other boilers are coal-fired boilers with small tonnage, among which 8 coal-fired boilers firing less than 10t coals per hour. Due to the small capacity, the low thermal efficiency and the high coal consumption of the existing industrial boilers, it is difficult for the boiler flue gas purification equipment to make the exhaust gas to meet the requirements of the new boiler standard. To facilitate the development, the construction of this project is in badly need. II. Preliminary Work After the completion of the project, the existing 35t/h and 75t/h boilers of Kingboard Chemical will be demolished; the 10t/h and below coal-fired boilers in Songmu Economic Development Zone will be removed. Enterprises that are under construction or proposed to be constructed will no longer build their own coal-fired boilers, but to change the model into collectively supplying heat and gas. III. Project Content It is planned to add 175.8 Chinese mu of land to the north of the zone and build a CHP project. Two sets of 440t/h domestic circulating fluidized bed boilers with ultra-high pressure and high temperature and once reheat in the middle will be built up, one is for operation and the other is for standby. A 60MW backpressure unit will be set as a supporting facility, its annual generating capacity is about 509.9×106kW/h, providing 730.99×104GJ heat per year. IV. Project Investment The total investment of the project is RMB 855 million yuan. V. Cooperation Way Sole proprietorship or contractual joint venture VI. Benefit Analysis In accordance with the designing requirement of "near zero emission", the transformation of unit costs RMB 160-200 thousand yuan/MW, which means the 600 MW unit will cost about RMB 96-120 million yuan. The cost of coal is RMB 0.3-0.4 yuan per kilowatt hour; after the transformation, the cost will increase RMB 0.01-0.015 yuan per kilowatt hour, which is much lower than the price of natural gas. It is economically viable. VII. Project Initiator Project Initiator: Kingboard (Hengyang) Chemical Holdings Ltd.
1-2 Urban Construction (48) Central Business District Construction of Changsha High-speed Rail (HSR) New Town I. Project Background The Changsha HSR New Town is located in the southeast of Changsha along the Liuyang River. The planned total land area of Changsha HSR New Town is 46.9 square kilometers with 18.92 square kilometers in regulatory plan. This area covers Lituo Sub-district and Dongshan Sub-district with 18 residential communities (Preparatory Committee). The total population in this area is 31,863. As one of two planned sub-centers in Changsha, the Changsha HSR New Town is divided into the eastern part (29.1 square kilometers of Huangxing area) and the western part (17.8 square kilometers of Wuhan-Guangzhou High-speed Railway Station area), with Liuyang River as the axis. In 2007, Ministry of Land and Resources designated this area as pilot zone for economical and intensive land use. II. Preliminary Work The total planned area of the project is 3640 Chinese mu with overall floorage of 6630,000 square meters. Currently, there are one finished project (Evergrande Oasis) and other six projects in 17
progress (Vanke¡The City of Charm, New Huadu¡Sunshine City, The Window of Greenland, Evergrande International Plaza, The Star Building and Ming Sheng City ). III. Project Content The central business district (CBD) is in the core of Wuhan-Guangzhou High-speed Railway Station area, covering 4 square kilometers. The CBD is planned to be constructed by investment attraction, with headquarters economy, technological finance, cultural innovation and medical treatment and health as main business arms. IV. Project Investment The estimated investment for the project is RMB 30 billion yuan. V. Cooperation Way Land bid invitation, auction and listing Reward way: gaining profits from rental, shopping, entertainment and services. VI. Project Initiator Project initiator: The Management Committee of Changsha HSR New Town.
Investment Attraction for Changsha Financial Business District I. Project Background Changsha financial business district is situated along both sides of Mid Furong Road, an arterial road of Changsha. At present, the district gathers 60% of total financial volume in Changsha, and provincial branches and dozens of bank outlets of four state-owned commercial banks: Bank of China, Agricultural Bank of China, Industrial and Commercial Bank of China, China Construction Bank. And 59 internationally and domestically renowned banks have set their regional headquarters in this financial business district, including Bank of China, China Citic Bank, Postbank, Standard Charted Bank and Shinhan Bank. A large number of securities companies, insurance companies and comprehensive financing institutions such as Western Securities, Shenyin & Wanguo, PINAN Property and Casualty Insurance and China Life Insurance have also settled there one after another. Moreover, some new-type commercial activities like financial intermediaries, financial agencies, Internet finance is snatching the market share right here. II. Preliminary Work In Changsha financial business district, some large-scale financial buildings have been built and some are under construction, such as VVMALL, Wall Street Center, China International, Greenland Center, and Fuxing World Financial Center. Banking and financing institutions as China Unionpay, Shinhan Bank and Standard Charted Bank, insurance and financial companies as PINAN Property and Casualty Insurance and China Life Insurance, as well as world top-level accounting firms like Price Water House Coopers, Deloitte Touche Tohmatsu and Ernst & Young ,all can be found here. III. Project Content The project contains four main districts: the core financial district in Mid Furong Road, the high-end elite international community in Dongfeng Road, the central cultural and commercial district in Huangxing Road, and the high-end commercial district in Xiangjiang Road. The planned land for selling is the 18 plots of old north train station area as well as along North Huangxing Road and the No.1 metro line, which covers an area of 472 Chinese mu, where the premium office buildings, high star-level hotels, commercial complex, supermarkets, department stores, high-end residential quarters and others can be constructed. IV. Project Investment The total investment for the project is around RMB 30 billion yuan. V. Cooperation Way Develop land through land bid invitation, auction and listing pattern by sole proprietorship or joint venture. Investors in a favorable position to develop large-scale commercial real estate or commercial complex are welcomed. VI. Benefits Analysis At present, financial industry ranks first in terms of tax revenue in Kaifu District. After the implementation of the project, with the promotion of Changsha financial and commercial district 18
development, tremendous magnetic effect in financial field is bound to take shape. This district has potential to be a strategic site for global financial institutions to bid for, and become the largest financial capital core in central China. VII. Project Initiator Project initiator: Administration of Commerce and Tourism in Kaifu District of Changsha.
Comprehensive Reconstruction Project of Hongxing Commercial Business Area in Changsha I. Project Background Hongxing area, located in Yuhua District, presents as a southeastern gateway of Changsha City and adjoins provincial CBD. Due to the backward municipal administrative infrastructure and insufficient public service facilities, the demands of urban development are failed to be met. The area meets with a grim situation caused by illegal buildings, and terrible environment and sanitation. Poor construction quality, undesirable residential environment with dense population and crowded building layout bring about plenty of hidden dangers. Besides, business and commercial services are still in a lower state owing to a lower starting point. Therefore, an optimized and improved urban plan is exactly the focus of Yuhua District to enhance both economic social development and urban construction. II. Preliminary Work A construction headquarter has been established in Hongxing area. The total demolished construction area is around 830,000 square meters in this area, covering 2 sub-districts and 6 villages or residential communities. III. Project Content Comprehensive reconstruction project of Hongxing business area covers an area of around 520 hectares or 7795 Chinese mu, including 2289 mu in Hunan Forest Botanical Garden. 2 Sub-districts (Jingwanzi Sub-district and Dongjing Sub-district), 9 villages or residential communities are covered with a total population of nearly 60,000. The preliminary investigation indicates that about 1218 Chinese mu of land can be developed. IV. Project Investment The total investment for project construction is RMB 12 billion yuan. V. Cooperation Way Joint development VI. Benefit Analysis 1. There are 1218 mu of land which can be developed. Total investment of land consolidation would be around RMB 11.45 billion yuan with demolition cost per mu of RMB 9.4 million yuan. 2. Excluding the municipal administrative supporting land, there are 950 mu of land that can be transferred. Calculated by the current price for land and commodity house transaction in Changsha, the average land price in this area could reach RMB 15000 yuan per square meter (for commercial or residential purpose). The transferring floor price would be around RMB 6000 yuan per square meter (calculated with plot ratio of around 3.5%), and the average transferring price is RMB about 12 million yuan per mu. Thus the land revenue would reach RMB 11.4 billion yuan (including overground real estate construction and underground comprehensive transportation junction development). To sum up, an overall balance in funds for reconstruction of this area can be reached. VII. Project Initiator Project initiator: The Construction Headquarter of Hongxing Area in Yuhua District, Changsha.
A2 Urban Complex Construction in Binjiang New Town of Changsha I. Project Background Changsha Municipal Government has earnestly strengthened the “Two Sides of the River” Development Strategy and implemented the plan of “Construction along River and Development over River”, so as to transform Changsha to a high-end new city. This project targets at Binjiang New Town (the financial center of Hunan province) which has been witnessing increasingly mature development. A host of financial institutions have entered this area such as China Mingsheng Bank Corp, Guangdong Development Bank, Shanghai Pudong 19
Development Bank and Bank of Changsha. With a strong financial atmosphere in this area, a financial center is in embryo. The project covers an area of 149,681 square meters, which equals around 224.52 Chinese mu. It aims to build the largest composite urban complex in commercial and financial core area of Binjiang New Town. II. Preliminary Work Planning and investment attraction work is underway. III. Project Content The overall floorage is 600,000 square meters, which is for a large complex near both the intercity transit station and metro station with class A office buildings, five-star hotels, incubator base of innovative financial enterprises, apartments and shopping centers. IV. Project Investment The total investment for the project is RMB 6 billion yuan. V. Cooperation Way Land grant or cooperative development Urban operators with qualification and rich experiences for business development are welcomed. VI. Project Initiator Project initiator: Changsha Binjiang New Town Construction and Development Co., Ltd.
Investment Attraction for A-1-5 Plot of Binjiang New Town of Changsha I. Project Background The A-1-5 Plot of Changsha Binjiang New Town is in the east of Yinshan Road and north of Beijincheng Road, with a net land use of 56.093 Chinese mu. Binjiang New Town is designed as a business circle assorted of cultural, entertaining and tourist activities, and a composite metropolis residential center. Enjoying convenient location and traffic, this project area is highly potential for appreciation. Besides, with Xiangjiang River scenic belt to the east, Beijincheng Relics Park and Yuehua Park to the north, this area boasts rich ecological resources and pleasant environment. In terms of education, there are many primary and middle schools nearby, forming a complete education system. II. Preliminary Work Demolition and regulation work has been finished. This project has been listed in key project proposals for investment attraction and in the 2017 land transfer scheme of Yuelu District. III. Project Content Under the jurisdiction of Binjiang New Town, the project has been planned for commercial purpose. This area is featured by plot ratio of 3.2, maximum headroom of 80 meters and residential to commercial areas ratio of 2:8. This area is built to be a high-end residential and commercial zone in the north of Binjiang New Town with building density ≤35% and green space ratio≼30%. IV. Project Investment The total investment for the project is about RMB 700 million yuan. V. Cooperation Way All renowned real estate developers at home or aboard are welcomed to buy the plot via land bid invitation, auction and listing pattern. VI. Benefit Analysis Profits would be gained in the course of project development and marketing as well as following commercial operation. VII. Project Initiator Project initiator: Changsha Lushan Urban Construction and Investment Co., Ltd.
Comprehensive Financial Business Development in F09/10 of Mexi Lake International New Town I. Project Background The general strategy of Changsha Mexi Lake International New Town is to build a national green 20
low-carbon demonstration zone, a model zone for resource-conserving and environmental-friendly society in central China, and a dynamic region that is most international, ecological and livable in Changsha. The project locates in the CBD core area of Mexi Lake International New Town, which is highly promising in commercial development for its convenient traffic with seamless connection with metro line No.2, which contribute to its metro commercial and property development. II. Preliminary Work The preliminary work includes planning and investment attraction is underway. III. Project Content The overall floorage covers 210,000 square meters, which is for an integrated financial commerce project. Once upon completion, business office buildings, high-quality businesses, high-end shopping centers, five-star hotels, enterprise headquarters, innovative financial enterprises and apartments can be found here. IV. Project Investment The total investment for the project is RMB 3 billion yuan. V. Cooperation Way Land grant or cooperative development; The prospective investors are those qualified and experienced urban operation enterprises for commercial development. The profits would be gained through development, marketing and commercial operation. VI. Project Initiator Project initiator: Kinmaw Investment (Changsha) Co., Ltd.
The Development of C-17 Plot in Meixi Lake Area I. Project Background As a key development area of XiangJiang New Area, the Mexi Lake district is located in an internationally high-end urban functional domain which is environmental-friendly and fully equipped. The Mexi Lake C-17 plot borders Tianding Road to the east, Xiufeng Road to the south, Yanlong Road to the west and Branch seven to the north, with net land use of 69.78 Chinese mu. The 3000-Chinese mu Mexi Lake is an adjoining neighbor, a natural ecological oxygen bar providing desirable environment and fresh air , thus a water-loving life can be enjoyed right here. II. Preliminary Work Demolition and regulation work has been finished, which is planned to be submitted to Land Management Committee for deliberation. This project has been listed in key project proposals for investment attraction in Yuelu District and 2017 land transfer scheme. III. Project Content Under the jurisdiction of Mexi Lake international service district in XiangJiang New Area, the project has been planned for commercial purpose. This area is featured by plot ratio of 3.0, maximum headroom of 100 meters, and residential to commercial areas ratio of 2:8. This area is built to be a high-end residential as well as commercial zone in the northern part of Mexi Lake area along Longwanggang basin, with building density ≤30% and green space ratio ≼40%. IV. Project Investment The total investment for the project is around RMB 1 billion yuan. V. Cooperation Way All renowned real estate developers at home or aboard are welcomed to bid for this project by land bid invitation, auction and listing. VI. Benefit Analysis Profits would be gained in the course of project development, marketing and following commercial operation. VII. Project Initiator Project initiator: Changsha Lushan Urban Construction and Investment Co., Ltd.
Development of Songya Lake International Ecological New Town of Changsha 21
County I. Project Background In order to promote the city grade, improve urban ecological environment, perfect city supporting facilities, and speed up the development of modern service industry, Changsha County has designated Songya Lake International Ecological New Town as a significant integrated development project. II. Preliminary Work In Songya Ecological Park, excluded from the reserved land for investment attraction, all other infrastructure facilities and landscape engineering have been completed. There are over 3000 Chinese mu of land have been approved to build the Songya New Metropolis project. Apart from 13 municipal roads under construction, preliminary work of schools, hospitals and relevant public supporting facilities have been already launched. III. Project Content The regulatory-planned area of Songya Lake International Ecological New Town is 16.97 square kilometers, consisting of Songya Ecological Park and Songya New Metropolis. The Songya Ecological Park covers an area of 7345 Chinese mu, among which 4000 Chinese mu are water surface. With a total investment of RMB 5 billion yuan, centering on the Songya Lake, 8 urban functional districts such as “Left Bank” cotel, “Amusement Port” shopping and recreational zone can take shape. Thus an integrated park for relaxation, sightseeing, entertainment as well as fitness is created. The Songya New Metropolis project covers an area of 7035 Chinese mu, aiming at creating a new metropolis that integrates office buildings, residences, hotels, and retailing stores. At present, the focus in this area is on Amusement Port shopping and recreational zone, family adventure zone, ecological hotels in health experience zone, etc. IV. Project Investment The total investment for Amusement Port shopping and recreational zone is around RMB 3 billion yuan, for family adventure zone is RMB 300 million yuan, and for ecological hotels in health experience zone is around RMB 500 million yuan. V. Cooperation Way Land grant or cooperative development VI. Benefit Analysis The tentative calculation indicates that the annual sales revenue would reach RMB 4 billion yuan after the Amusement Port development project is completed. And in terms of 15% annual return on investment, the investment capital is to be recouped within 7 years. Then the annual sales revenue of the family adventure zone project would reach RMB 1 billion yuan after completion. And in terms of 20% annual return on investment, the investment capital is to be recouped within 5 years. Last, the annual sales revenue of the health experience zone project would reach RMB 1 billion yuan on completion. In terms of 20% annual return on investment, the investment capital is also to be recouped within 5 years. VII. Project Initiator Project initiator : Changsha County Songya Lake Administration.
The PPP Project of Comprehensive Development of Xingsha Industrial Base of Changsha I. Project Background The industry economy in Xingsha industrial base has taken shape, and a population of about 100,000 is estimated to gathere in this area by 2020. However, as a new-type urban district, the lives of white-collar elites, industrial workers, residents in communities, and students are of great demands, so does the enterprises. So infrastructures including road network, landscape architecture and pipe network, public facilities for educational training, medical treatment and public health, health care for the elderly and leisure taking, and supporting facilities of modern service industry such as elite apartments, cultural entertainment, shopping malls and supermarkets, business offices, and industrial real estate, are in urgent need for establishment. This project is in the Xingsha Industrial Base. Of the planned land area of 4.7 square kilometers, 700 Chinese mu has been developed and 6350 Chinese mu is to be developed. II. Preliminary Work 22
The project has been incorporated into Changsha County PPP project library and is being identified. III. Project Content 4 parts of the project: infrastructure, land acquisition, demolition and consolidation, supporting projects of commerce and service industry, and development of industrial real estate. 1. Infrastructure construction: the total length is 12km, including the construction of North Longfeng Road, Changfeng Road, Xinxiang Road, Changjie Road (East Kaiyuan Road to East Binhu Road) and other urban main roads; broadening project of northern side of East Kaiyuan Road, and auxiliary facilities for power supply, water supply and drainage. 2. Land acquisition, demolition and consolidation: About 4000 Chinese mu of land is planned to be demolished, reserved and leveled, covering both sides of North Longfeng Road (Kaiyuan Road - Leiming Road) and other commercial and residential item plots. 3. Supporting projects of commerce and service industry: The coverage of 2700 Chinese mu includes commercial facilities such as characteristic business street, commercial complex, warehouse logistics, and public welfare facilities such as parks, green land, schools and others for medical treatment, health care for the elderly and relaxation. 4. Development of industrial real estate: The coverage of 800 Chinese mu includes mono- or multi-layer factories, centralized office buildings, and buildings for research and development. IV. Project Investment The total investment for the project stands at RMB 5 billion yuan, among which: 1 billion yuan is used for infrastructure, 1 billion yuan for land acquisition, demolition and consolidation, 2.5 billion yuan for supporting projects of commerce and service industry and 0.5 billion yuan for development of industrial estate. V. Cooperation Way Contractual joint venture, joint venture or sole proprietorship Any experienced partner in urban development, construction, operation and management is sincerely welcomed to cooperate with us in PPP project. VI. Project Initiator Project initiator: Administration Office of Xingsha Industrial Base, Changsha County
Construction of Star Hotels and Residence in Xingsha Business District of Changsha I. Project Background Changsha Xingsha Business District is a CBD in Changsha Economic and Technological Development Zone, which integrates cultural leisure, business entertainment, business office, financial service, conference communication and top-grade residence. Currently, the infrastructure in this area is in gradual improvement and perfection such as roads, schools, hospitals, parks and parking lots. With crowd mass, prosperous commerce and logistics, it presents as a favorable land for investment and business start-ups. The project belongs to mature urban zone with convenient transportation particularly bus transport and dense population. It is fully equipped with all infrastructures, and in the surroundings are international schools, primitive and secondary schools, hospitals, large-scale shopping malls, entertainment base of Hunan TV, parks, etc. The project aims to construct a special modern block, integrated with culture, landscape, historical deposits, sentiments, and neighboring harmony. II. Preliminary Work The land consolidation of project site is underway. III. Project Content The project, covering an area of 95 Chinese mu, locates in the intersection of West Xiangli Road and Bancang Road, which is planned to build a characteristic community integrating star hotels, supporting commerce and residence. IV. Project Investment The total investment for the project is RMB 600 million yuan. V. Cooperation Way Land is transferred by listing, then developers can construct in accordance with the urban planning. 23
Quality real estate, hotel de branding and relevant service industries are planned to be introduced, which will be operated independently after land listing. VI. Project Initiator Project initiator: Investment Department of Changsha Economic and Technological Development Group.
PPP Project of Panpan Road Area in Changsha Economic and Technological Development Zone I. Project Background To boost up infrastructure construction efficiency, relieve pressure of fiscal expenditure, accelerate the transformation of government function and enhance the investment and innovation activities, the Management Committee of Changsha Economic and Technological Development Zone has confirmed to adopt PPP model in this project so as to attract social capital for municipal infrastructure construction. II. Preliminary Work At present, the list of sub-projects has been confirmed. The feasibility of the project has been discussed and tested time and again. The review and approval of the project is in strict accordance with relevant regulations. III. Project Content The project covers 31 sub-projects. Among them, 26 are non-operational items such as the construction of road and bridge, electric power facilities and landscape architecture. Other 5 operational items include the underground parking in Quantang Park, public transport terminal, Renmin gas station in East 5th Road, Yingxia oil-gas station in East 11th Road, and cultural and sports center in new town. IV. Project Investment The total investment for the project stands at around RMB 1.251 billion yuan. V. Cooperation Way 1. The project is to be practiced in PPP (public-private-partnership) model. 2. The Economic and Technological Development Zone selects social capital through government procurement. 3. A project company (SPV) will be founded and funded by the social capital of the winning bidder and the Economic and Technological Development Group. The PPP CONTRACT, signed by the Management Committee of Economic and Technological Development and SVP, will authorize SVP to take charge of investment, financing, construction, operation, and maintenance of the project. The district financial department is obligated to provide viability gap funding to SVP. 4. After the expiration of the PPP CONTRACT, the project company shall transfer all project assets to government-appointed departments with no charge. The project is a quasi-operational project with “viability gap funding” as its return mechanism. VI. Project Initiator Project initiator: Investment Department of Changsha Economic and Technological Development Group.
PPP Project of Huangxing Road and Area Transformation in Changsha Economic and Technological Development Zone I. Project Background The construction of Changsha Huangxing Road and the corresponding district aims to improve the current transportation of Huangxing Road, Luositang Road and South 2nd Line in this area. At the same time, it can promote the development of supporting business and convenience of residents’ lives here. As one of arterial roads in Changsha Economic and Technological Development Zone road network, Huangxing Road bears a large amount of transport collection, distribution, and transition. Due to long-time operation, the pavement condition is crowded and the driving comfort is poor. Plus the monotonous road greening, Huangxing Road fails to form either its own characteristics or a new development style as a modern industry new town. Without characteristics and innovation, 24
the Huangxing Road shall be reconstructed and upgraded in compliance with the overall positioning of Changsha Economic and Technological Development Zone. II. Preliminary Work By now, the project approval, feasibility study report compilation and approval, and competence assessment have been completed. As preliminary recognition and preparation for PPP model have been accomplished, the next procedure is procurement. III. Project Content The project construction contains: the overall improvement of Huangxing Road (from East Kaiyuan Road to Airport Expressway ), several municipal roads, and public supporting facilities on both sides of roads in this area; other 32 items such as Quanxing Park, Longhua Park, Zhongzhou Civilians Service Center, Huaxiang Venture Building, Huaxiang Gas Station, etc. A detailed description is as follows: No. Project Name Project Location 1 Overall Improvement of From East Kaiyuan Road to Airport Expressway Huangxing Road Project 2 Luositang Road From East 6th Road to East 7th Road (western section) From Huangxing Road to East 10th Road (eastern section) 3 4 5 6 7 8 9 10 11 12 13
South 2nd Line Changqiao Road Huanbao Road (Xingluo Road) South 3rd Line East 9th Line Kangqiao Road Huangxing Road Paitou Road Zhongzhou Road Xichong Road Nanzhuyuan Road
From East 6th to East 10th Road From Luositang Road to Panpan Road From Luositang Road to South 2nd Line From East 9th Line to Huaxiang Road From South 2nd Road to Panpan Road From Huangxing Road to Panpan Road From Lixiang Road to Yuanda Road From Huangxing Road to Changxiang Road From Lixiang Road to Dayuan Road From East 10th Line to East 12th Line From East 10th Line to Zhongzhou Road From East 10th Road to East 12th Line
14 15 16
17 18 19 20
21
Hongshupo Road Jinghua Road (Changqiao Road) Huangshanpo Road
Chuangye Road (Changqiao Road) Yingxia Road Branch of The First Middle School Xiaotang Road
22
Boya Road and Green Land along Boya Road East 7th Line
23 24
Dayuan Road 8 refuse transfer stations
From East 7th Road to East 11th Road From Renmin Road to Dayuan Road From Huangxing Road to East 10th Line From East 10th Line to East 11th Line From East 11th Line to East 12th Line From Yingxia Road to Renmin Road From East 6th Line to Zhongzhou Road From East 7th Road to Huangxing Road From Luositang Road to Lixiang Road From Lixiang Road to Panpan Road From Panpan Road to Yuanda Road From East 6th Road to Huangxing Road The northern branch of Yuanda Road From Yuanda Road to Renmin Road From Dayuan Road to Longhua Road From East 8th Line to East 10th Line The location of convenience stores, public toilets and refuse transfer stations along the roads shall conform to 25
25
20 public toilets
26
Original and Terminal Station of Huaxiang Bus
27
The Improvement of Attached Roads Quanxing Park
28 29 30
31
Longhua Park Huaxiang Entrepreneurship Building and Underground Parking Huaxiang Gas Station
the planning and design documents then. The location of convenience stores, public toilets and refuse transfer stations along the roads shall conform to the planning and design documents then. The northwest of intersection of East 12th Line and the old Yuanda Road with an area of 0.55 hectares. In the reconstructed area The southwest of intersection of Shetang Road and Xiaotang Road A total area of 4.7 hectares The south of Lixiang Road and the east of Huaxiang resettlement area The north of Yuanda Road and the east of Huaxiang resettlement area
IV. Project Investment The total investment for the project stands at RMB 1.25468 billion yuan. Among that, 1.00561 billion yuan is for engineer construction, 60.43 million yuan for other charges in engineer construction, 85.28 million yuan for basic budgetary reserve. And the interest incurred during construction is RMB 1.03617 billion yuan. V. Cooperation Way The project adopts PPP model. Through public bidding, the selected social capital is bound to set up a joint venture with Changsha Economic and Technological Development Group (representative of government capital), and the joint venture shall take charge of design, construction, operation, and maintenance of the project. The viability gap funding of the project can guarantee the project joint venture (cooperative social capital) recoup the capital outlay and gain proper profits. The upper limit of financing rate of the venture is 18% higher than the benchmark interest rate for an over-5-year loan. VI. Project Initiator Project initiator: Investment Department of Changsha Economic and Technological Development Group.
Development of Tongzipo City Square in Yuelu District I. Project Background Tongzipo City Square project, covering an area of 250 Chinese mu, is located in Tongzipo area of Yuelu District, which is a major project of shanty towns renovation in Changsha. The project is adjoining the core area of XiangJiang New Area Binjiang New Town, southwest of the intersection of Tongzipo Road and Yinpenling Road. With the transfer station of metro line No.4 and NO.6 nearby, and the Yinpenling Bridge and Yingpan Road River-crossing Tunnel adjacent, this area boasts convenient transportation. Located in a well-developed residential community which is populous and fully-equipped, the project enjoys abundant resources in education as well as medical health. And the neighboring Xiangjiang River Scenic Belt provides a splendid landscape. What’s more, residents here are able to gain much convenience through one-stop service life with a myriad of entertaining facilities nearby. II. Preliminary Work The demolition work has been basically completed and adjustment planning is in progress. This project has been listed in key project proposals for investment attraction in Yuelu District and 2017 land transfer scheme. III. Project Content Attached to the core area of Tongzipo district, the project covers a net land use area of 209 Chinese mu (including 74 mu planned land for educational purpose). The plan regulates supporting lands for residence, business, and education in a plot ratio of 3.0, 6.0, and 0.8 respectively (the index of plot shall subject to the final announcement). Thus, a large-scale urban 26
complex integrating hotel, office building, large scale business, entertainment and leisure, as well as high-end residence is about to be founded. IV. Project Investment The total investment for the project is estimated about RMB 3.2 billion yuan. V. Cooperation Way All renowned real estate developers at home and aboard are sincerely welcomed to bid for this project by land bid invitation, auction and listing. VI. Benefit Analysis Profits would be gained in the course of project development marketing and following commercial operation. VII. Project Initiator Project initiator: Changsha Lushan Urban Construction and Investment Co., Ltd.
Construction of Changsha East 11th Road Business Complex I. Project Background To accelerate the city-industry integration and district-county integration, and promote the supporting facilities in the project area, a commercial complex project is planned to be constructed in the core area of the 1st-phase CBD project of Changsha East Renmin Road. The East Renmin Road CBD reaches East 12th Line to the east, East 4th Line to the west, Airport Expressway to the south and Yuanda Road to the north. In accordance with the positioning in self-dependent innovation demonstration area, a “self-dependent innovation core area” is to be built and connected with Changsha Airport New Town and High-speed Rail New Town. II. Preliminary Work This area is already prepared for land listing or cooperative development at present. III. Project Content The project locates at the intersection of East Renmin Road and East 11th Road, presenting as an “eastern gate” of Changsha Economic and Technological Development Zone. Covering an area of 261.72 Chinese mu, a modern demonstration plot of service industry is to be created, which integrates shopping center, office building, star hotel, quality apartment, business street and special leisure. IV. Project Investment The total investment for the project stands at RMB 2.5 billion yuan. V. Cooperation Way Cooperative development Top-ranking commercial estate developers and high-end modern service operators at home and abroad are to be introduced. VI. Project Initiator Project initiator: Investment Department of Changsha Economic and Technological Development Group.
Daowu New Town Life Center Construction of Liuyang City I. Project Background Recent years have seen rapid development of Liuyang City, which has created the “Liuyang Speed” in terms of county economic growth in China. In 2005, Liuyang ranked the 28th among 100 economically-strong counties. As the city surrounding highway has been built and opened to traffic, the urban area of Liuyang City is continuously expanded, and the area adjoining Daowu Mountain Scenic Spot has been planned as a new area for urban construction in Liuyang. The Daowu New Town covers an area of 25 square kilometers, among which 18 square kilometers are construction land. The project aims to create a new urban district integrating facilities of education, medical health, culture and sports, tourism, etc. II. Preliminary Work The detailed regulatory plan of the new town area is in progress. The 9.26 km long Northwest Ring Road and urban arterial road, Daowu Road, have been open to traffic, with total investment of RMB 940 million yuan and RMB 460 million yuan respectively. 27
The People’s Hospital starts building, and other major items such as Daowu School, Urban Planning Library, Liaoyuan Park, and New Wuling Park are in progress systematically and orderly. III. Project Content It is planned to build a special and well-known town that integrates ecological tourism, business and finance, health care, cultural relaxation, science and education training. Meanwhile, create a modern new district that is favorable for working, living as well as travelling. 1. Daowu New Town: the planning area covers 1200 Chinese mu, with plot rate of 2.5, which is planned for real estate development. 2. Heath regimen: the planning area covers 1200 Chinese mu, with plot rate of 2.5, which is planned for medical regimen and relaxation, vacation development and etc. 3. The south side of the Northwest Circle Line: the planning area covers 1000 Chinese mu, adjacent to picturesque Daowu Mountain scenic spot and Hongqi reservoir, with plot rate of 2.5, which is planned for real estate development. IV. Project Investment The total investment for the project stands at RMB 5.8 billion yuan. Among that, 2 billion yuan for Daowu New Town, 2 billion yuan for heath regimen project and 1.8 billion yuan for south side of the Northwest Circle Line. The average land price is around RMB 1.7 to 1.8 million yuan per Chinese mu. V. Cooperation Way In compliance with state’s land bid invitation, auction and listing system, the project shall be developed independently or constructed jointly. Enterprise headquarters, and enterprises of business and finance, modern service, relaxation and tourism, high grade residence are all welcomed to invest and settle here. VI. Project Initiator Project initiator: Liuyang Urban Construction Group Co., Ltd.
The Construction of Changxing Lake Ecological Waterfront New Town in Liuyang I. Project Background Changxing Lake district locates in the northeast of Liuyang City, near the Liuyang administration center. On eastern and southern side embraces the winding Liuyang River and water surface of 1200 Chinese mu of Changxing Lake. The district covers a total area of 8 square kilometers. With the construction of the Northwest Circle Line in Liuyang City, a seamless connection would be achieved between Changxing Lake Ecological Waterfront New Town and other old or new towns. Centering on Changxing Lake, a high-grade comprehensive residential community and an urban comprehensive park shall be built, with one center, one axis, two corridors and four districts in the field. A urban ecological waterfront new town is to be built that integrates diverse functions such as business and finance, commercial services, cultural creativity, conference and exhibition, travel and leisure, characteristic residences and etc. II. Preliminary Work Liuyang Water Conservancy Construction and Investment Co., Ltd. has been founded to launch the project of Changxing Lake. The detailed regulatory plan of waterfront new town and the landscape planning of waterfront garden have been compiled. III. Project Content The total development area is 7418.1 Chinese mu, among which 2962 Chinese mu is for infrastructure construction. 960 Chinese mu of land has been developed, and 887.5 Chinese mu has been planned for public facilities construction such as park, sport, primary school, theater and medical service. 3546.7 Chinese mu of development area can be developed and transferred. IV. Project Investment The total value of the project land is RMB 7.1 billion yuan. An area of around 3546.7 Chinese mu in the district can be transferred, of which “Yintian Lake No.1” has been listed for transfer with the average price of RMB 2.03 million yuan per Chinese mu. V. Cooperation Way 28
Overall strategic cooperation and investment attraction divided for plots pattern shall be accepted. VI. Benefit Analysis The average commercial price of surrounding real estate is RMB 25,000 yuan per square meter, with an average rental of RMB 50 yuan per square meter per month. The average price of surrounding residence is RMB 4200 yuan per square meter, with an average rental of RMB 15 yuan per square meter per month. In all, the cost of construction and installment is around RMB 1800 yuan per square meter. VII. Project Initiator Project initiator: Liuyang Water Conservancy Construction and Investment Co., Ltd.
Urban Development of Puzigang Area of Liuyang I. Project Background The project locates in the south bank of Liuyang River in urban area. In the total area of 500 Chinese mu, 300 Chinese mu are for net land use, which shall be coordinately developed by Liuyang Urban Construction Group Co., Ltd. II. Preliminary Work Almost 200 Chinese mu of area has been demolished, and thorough investigation and demolition plan of 100 Chinese mu of land in business district are in progress. III. Project Content Four major functional centers including Liuyang Southern Urban Business Center, Waterfront Business and Service Center, Waterfront Culture and Tourism Center and High-end Residential Center are planned to be built. IV. Project Investment The total investment for the project stands at RMB 2.4 billion yuan. V. Cooperation Way Overall development or development of different sub-items; It is planned to introduce strategic cooperative partners at home who are prestigious in the field, and have tremendous economic strength, rich experience particularly the experience of successful operation of large-scale urban complex. VI. Project Initiator Project initiator: Liuyang Urban Construction Group Co., Ltd.
Comprehensive Development of No.1 Plot in Dongcheng New Town of Ningxiang County I. Project Background The project locates to the east of the Binjiang Avenue of Weishui River, the west of Ningshao Road, and reaches Jintan Road in the north, Dongcheng Road in the south. After the construction of the No.1 plot in Dongcheng new town, a properly-distributed, fully-equipped, multifunctional and environmental-friendly urban business-residence complex is to be built. For 100,000 permanent residents here with strong consumption capability, rich human resources are able to be availed. Moreover, the opening of Yueyang-Ningxiang Road enables to shorten the time from here to capital city Changsha to mere 30 minutes. II. Preliminary Work Planning and design, land demolition, and supporting facility construction regarding the project have been all in set, and the construction of Dongcheng primary school nearby has been completed as well. III. Project Content The total plot area is 236 Chinese mu, which is designed for both commercial and residential purposes. In the residential area, a high-rise and quality residential community is to be built, while in business area, large-scale hotel, business streets and office building are planned, with the plot ratio no more than 2.5, the greening rate is no less than 40% and the building density is no more than 30%. IV. Project Investment The total investment for the project stands at RMB 0.6 billion yuan. V. Cooperation Way 29
Sole proprietorship and phased development VI. Benefit Analysis Return of investment can be gained through real estate sales and property management income. VII. Project Initiator Project initiators: Ningxiang County State-owned Assets Management Co., Ltd, Changsha. Ningxiang County Investment Attraction Service Center, Changsha
Development of Wufu Square Area of Ningxiang I. Project Background The project locates in the southwest entrance of Ningxiang County of Changsha and at the intersection of urban main road Baima Road and Renfu Road. The project aims to create an urban complex as a new landmark which is properly distributed, fully-equipped, multi-functional and favorable for living and working. Embracing advantages of riverside and central downtown location, the Baimaqiao Village proactively boosts up the construction of a series of major projects such as Liuzizhou Bridge, Yumei Road, Riverside Road, Jinlong Road, Ankang Road, scenic belt along river and Yutan Park. Thus the urban land value has been promoted further, boasting promising investment potential. As a populous county with strong economy, Ningxiang County is home to over 400,000 people. With solid foundation of consumption in this regard, it presents as a golden land for investment and business promotion. II. Preliminary Work Planning and design of the project have been completed, 260 Chinese mu of land has been demolished, and supporting facilities are basically in set. III. Project Content The total plot area is 300 Chinese mu for an urban complex which integrates both business and residence. The plot ratio is from 2.6 to 3.0 with no less than 30% of greening rate. No high limit yet. IV. Project Investment The total investment for the project stands at RMB 0.8 billion yuan. V. Cooperation Way Sole proprietorship and phased development VI. Project Initiator Project initiator: Baimaqiao Sub-district Office, Ningxiang County, Changsha. Ningxiang County Investment Attraction Service Center, Changsha
Construction of Business Complex before Wuhan-Guangzhou High-speed Railway Station I. Project Background The project is situated in the plot No.3 and No.4 of Wuhan-Guangzhou High-Speed Rail New Town in Tianyuan District, Zhuzhou. Close to Tiansuo Square, the square in front of Wuhan-Guangzhou High-speed Railway Station and located on southern and northern sides of Yandi Road, a municipal urban main road, the project composes a significant part of the Tiansuo Square business circle. It is also a core plot in the development of Wuhan-Guangzhou High-speed Rail New Town. Under the aegis of high-speed railway station, enormous passenger volume and flow of materials and goods, as well as convenient transportation all bring advantages to this project. Hence, the project strives to develop business, trade, finance and service industry, and to establish an urban complex which integrates five-star hotel, high-grade residences, apartment, large-scale business, and underground parking lot. II. Preliminary Work The land approval and demolition have been completed. This land with all demolition work done can be transferred for investment attraction. III. Project Content 30
The net land use of the project covers an area of 247.81 Chinese mu, with total floorage of 800,000 square meters. Major items include five-star hotel, a large department store or specialized market covering 50,000 square meters, numerous A grade and B grade office buildings, quality apartments and residences, large-scale parking lot, etc. IV. Project Investment The total investment for the project stands at RMB 2.74 billion yuan. V. Cooperation Way Joint venture or contractual joint venture VI. Benefit Analysis The value of the project will reach RMB 4 billion yuan upon completion. VII. Project Initiator Project initiator: Zhuzhou Wuhan-Guangzhou High-speed Rail New Town Development and Construction Co., Ltd.
Zhuzhou Rail Transit City Construction Project I. Project Background The project locates in the north of Shifeng District of Zhuzhou, belonging to the core area of Changsha-Zhuzhou-Xiangtan Business Circle. In this region crisscross Changsha-Zhuzhou Expressway, Shanghai-Kunming Expressway, Changsha-Zhuzhou-Xiangtan Intercity Railway and Yunlong Road, forming remarkable transportation advantage. II. Preliminary Work RMB 7.51 billion yuan for financing has been approved since the project was launched in 2015. And the investment had amounted to RMB 3.631 billion by 2016. 6644 Chinese mu of land has been demolished in the project area (about 2551 Chinese mu of land has been approved), and part of the infrastructure construction has started. III. Project Content The project covers a total area of 13,930 Chinese mu, with expected construction period from 2015 to 2020. The major project contents are: land consolidation, infrastructure construction such as roads in the project field. The first phase: to launch primary land development, reserve part of land for business, and construct the road network in an all-round way. The second phase: to establish headquarters economic zone, central park, comprehensive service mansion, school, hospital, standard factory and etc. The third phase: to promote industrial development and supporting facilities construction for business and residence. IV. Project Investment The total investment for the project stands at RMB 10 billion yuan. V. Cooperation Way Joint venture, contractual joint venture or sole proprietorship VI. Benefit Analysis The value of the project will reach RMB 14 billion yuan upon completion. VII. Project Initiator Project initiator: Zhuzhou State Capital Investment Rail Science and Technology City Development Co., Ltd.
Land Consolidation and Infrastructure Construction of Zhuzhou Wuyunfeng International Ecological New Town I. Project Background Due to rapid development of economy and society, the space structure and layout of Zhuzhou urban construction have undergone great changes. At this moment, the development of Tianyuan District is confronted with the bottleneck of space expansion. In accordance with the urban construction planning of expanding southwards, an urban space structure featured with one main 31
body and three poles, one main city and four sub-cities shall take shape. The Wuyunfeng area in Tianyuan District is a key part in the southward development of Zhuzhou. Boasting outstanding ecological environment and sufficient land, this area composes a vital part of Zhuzhou new and hi-tech sub-city project and a new area of urban construction and expansion. II. Preliminary Work As a major project of Zhuzhou urban construction, the compilation of regulatory plan has been completed. III. Project Contents The project is the development of Wuyunfeng International Ecological New Town in Tianyuan District of Zhuzhou, which includes project land acquisition and demolition, road and infrastructure construction, underground utility tunnel, etc. The total land area is 11315.50 Chinese mu with 9045.34 Chinese mu of land consolidation. The newly constructed roads and infrastructures cover an area of 2270.16 Chinese mu, with overall road length of 59.86 kilometers. And the newly constructed underground utility tunnel is 7.486 kilometers long, which is planned to be built in four phases. IV. Project Investment The total estimated investment for the project is RMB 7.96 billion yuan. V. Cooperation Way This project adopts building-operation-transfer (BOT) model. Hunan Tanyes Group Co., Ltd and the investor of social capital that won the bidding shall found the PPP project company taking charge of the investment, financing, construction, operation, maintenance and transfer. VI. Project Initiator Project initiator: Hunan Tanyes Group Co., Ltd.
Construction of Transportation Junction Business Center of Zhuzhou I. Project Background As a top-grade large station at the junction of Beijing-Guangzhou Railway and Shanghai-Kunming Railway, Zhuzhou Railway Station is the busiest central area gathering people, goods as well as capitals, and it is the core business district of Zhuzhou. Its long-standing history has seen the ageing of buildings, so the Zhuzhou Municipal Government and Guangzhou Railway (Group) Co., Ltd. have planned to demolish and reconstruct Zhuzhou Railway Station. And then incorporate it into the construction of intercity railway station in Zhuzhou, so as to build a large-scale comprehensive transportation junction in Central South China. Centering on the new comprehensive transportation junction, this project aims to develop commerce and trade, property management and surrounding business in core area. II. Preliminary Work The project design is in progress. The construction area covers 420,000 square meters and the demolition work of 310,000 square meters has been completed. III. Project Content The project positioning is to build a large-scale urban complex covering a total area of 493 Chinese mu, with 244 Chinese mu for business running purpose. The project includes 5 functional divisions: comprehensive transportation junction in front of the station, cultural experience and business center in north of the station, apparel exhibition and trade and transaction supporting center in south of the station, Yuetang business and relaxation zone, and Donghu ecological and relaxation residential district. The construction area is 750,000 square meters by the plot rate of 5.0. IV. Project Investment The total investment for the project stands at RMB 7 billion yuan. V. Cooperation Way Joint venture, contractual joint venture, or other modes VI. Benefit Analysis The estimated sales revenue of the project is RMB 8 billion yuan and the gross profit is RMB 1 billion yuan. VII. Project Initiator Project initiator: Zhuzhou Shantytown Transformation Investment Co., Ltd. 32
PPP Project of Infrastructure of XiangJiang New Town of Zhuzhou I. Project Background XiangJiang New Town is situated in the south part of the main urban area of Tianyuan District of Zhuzhou. Covering a total planning area of 36.48 square kilometers, this new town provides services for life and production in Tianyi Science and Technology City, and the two contribute to each other’s development. The project area locates in the northernmost side of XiangJiang New Town and covers one principal station of intercity railway. Thus a transportation, science and technology, and cultural center in XiangJiang New Town of Zhuzhou shall take shape. II. Preliminary Work The preliminary work is in progress. III. Project Content XiangJiang New Town covers an area of 3.99 square kilometers. The main items are as follows: 1. The main road network in the first phase, which includes seven municipal roads of Leshui Avenue, Hehua Avenue, Jiankang Avenue, Mancheng Road, Chuangxin Road, Qiantang Road, and Cangshui Road (among which Leshui Road, Hehua Road, Jiankang Road are urban main roads). 2. The landscape engineering of Cangshui Lake with an area of 943 Chinese mu. 3. The land consolidation of 3183 Chinese mu of land. IV. Project Investment The total investment for the project stands at RMB 2.9 billion yuan. V. Cooperation Way PPP(Public-Private Partnership) model. VI. Benefit Analysis The project shall be repurchased by the government within 5 to 8 years after completion of the construction, and the government would provide repurchase guarantee. VII. Project Initiator Project initiator: Zhuzhou XiangJiang New Town Development and Construction Co., Ltd.
Riverside Construction and Development of Xiangjiang River Scenic Belt (the Section in Zhuzhou County) I. Project Background The Xiangjiang River Scenic Belt (the section in Zhuzhou County) is a significant juncture which connects the development of Zhuzhou County area and main urban area. It’s also a space carrier enabling Zhuzhou County to upgrade its industries. Located in the upper reaches of Xiangjiang River in Zhouzhou section, Zhuzhou Xiangjiang River Scenic Belt reaches Jianning Bridge in the north, navigation-power junction in the south, and adjoins Xiangjiang River in the west. The riverside bottomland and sub-districts along the scenic belt are planned to be upgraded so as to create a riverside scenic belt which integrates urban service, relaxation and vacation, as well as cultural presentation. II. Preliminary Work The construction and development in Zhuzhou city area have been completed. III. Project Content The overall length of the project is 17 kilometers. The main items are as follows: 1. the scenic belt in the east bank of Xiangjiang River, which connects the Lujiang River Scenic Belt; 2. the transformation old streets and shanty towns to antique-looking business streets; 3. the construction of riverside roads connecting Xiangjiang River and Lujiang River so as to form a traffic grid in Zhuzhou county town; 4. the development of high-end riverside residences to attract higher-income group of residents. IV. Project Investment The total investment for the project stands at RMB 3 billion yuan. 33
V. Cooperation Way Sole proprietorship, joint venture, or contractual joint venture VI. Benefit Analysis The land use for urban construction covers an area of 660.81 hectares, which is for the development of business streets, high-end residences, riverside scenic belt for relaxation and so on. Thus a new business circle and business-residence district shall take shape so as to promote the urban development in Zhuzhou County. VII. Project Initiator Project initiator: Luxiang Urban Construction and Investment Co., Ltd. of Zhuzhou County.
Construction Project of Xiangjiang Avenue of Zhuzhou I. Project Background There are 9 longitudinal plus 14 latitudinal provincial roads, and the Xiangjiang Avenue is one section of the 9th longitudinal road. This pivotal regional economic artery crossing the west side of Xiangjiang River in Zhuzhou, is also a main road in the development plan of “Promotion of the West and Expansion of the East” in Zhuzhou City. This project can further perfects, coordinates, and improves the current comprehensive transportation system in Zhuzhou, so as to make transportation grid layout more proper and urban public transportation service more complete. II. Preliminary Work Relevant approval process has been finished. The project is divided into 4 phases, among which the first phase shall be completed by the end of this year and the second phase is to be launched soon. III. Project Content The project starts from Wangjiaping Interchange of Zhuzhou and terminates in the south of Jiuqiu’ao of Zhuting Town, connecting Zhuting Interchange line of Beijing-Hong Kong-Macao Expressway. The total length is 51.682 kilometers plus 2.899 kilometers of Sanmen Town line. The construction from starting point to k11+200 abides by the city expressway construction standard, and the construction from k11+200 to the end conforms to the first-class highway standard. IV. Project Investment The budget estimate of the project stands at RMB 3.22 billion yuan. V. Cooperation Way Sole proprietorship. VI. Benefit Analysis Government Purchase; the project shall be repurchased by the government within 3 to 5 years after completion of the construction, and the government would provide repurchase guarantee. VII. Project Initiator Project initiator: Zhuzhou Guoshun Road Development and Construction Co., Ltd.
Comprehensive Development in Zhuzhou Sports Park Area I. Project Background Zhuzhou Sports Park locates in the Lusong District of Zhuzhou, adjacent to Shennong Park. It grows out of the old campus of Hunan Vocational College of Railway Technology and Zhuzhou Sports Bureau. In the campus, most of the buildings were built from 1960s to 1980s, which are in great need of renovation in urban shanty town area. The Zhuzhou old city renewal plan states that Zhuzhou sports park is to be built as the central business circle and new business landmark in Zhuzhou. Therefore, this area boasts enormous potential for business development. II. Preliminary Work The preliminary work is in progress. III. Project Content The total net land use of the project covers an area of 43486.73m2 (around 65.23 Chinese mu). 34
With planned plot ratio of 4.8, the total construction area is 208736.3 square meters. The project includes shopping center, featured delicious food court, indoor stadium, and high-end office building. IV. Project Investment The total investment for the project stands at RMB 1.3 billion yuan. V. Cooperation Way Joint venture VI. Benefit Analysis The estimated sales income would reach RMB 1.67 billion yuan upon the completion of the project. VII. Project Initiator Project initiator: Zhuzhou Xiangjiang Group Co., Ltd.
Reconstruction and Expansion of Yumu Mountain Landscape Road, Huanyu Road and Qunying West Road of Hengyang I. Project Background The Yumu Mountain Landscape Road in Zhengxiang District of Hengyang is a main east-west running arterial highway connecting the 2nd Ring West Road and Yumu Mountain Scenic Spot. Via Xiangtan- Hengyang West Expressway, this road crosses the whole area of Yumu Mountain area and intersects with several primary or secondary roads, and finally terminates at the 2nd Ring West Road. Huanyu Road, Qunying West Road, Yumu Mountain Landscape Road and Xiangtan- Hengyang West Expressway have formed a small annularity road network with each other. Upon the completion of the project, the infrastructure in this area would be greatly improved which is favorable for accelerating the urban and regional economic development and relieving traffic pressure of surrounding main roads. As a major urban construction project of Hengyang City, Hengyang Municipal Government has exerted full support to the demolition and resettlement work in this area and formulated corresponding preferential policies as well, so as to lay a solid foundation for project construction. II. Preliminary Work Part of the preliminary work has been completed. III. Project Content The major items are road, traffic, water supply and drainage, illumination, landscape engineering, reserved space for laying power lines, fuel gas pipes and communication lines. There will be 3 major urban roads in construction with a total length of 4139.384 meters. 1. Yumu Mountain Landscape Road (from Xiangtan-Hengyang West Expressway to 2nd Ring West Road): the road grade ranks as urban main road with a total length of 2262.312 meters, of which the width of red line is 60 meters and the design speed is 60 kilometers per hour; 2. Huanyu Road (from Qunying West Road to Yumu Mountain Landscape Road): the road grade ranks as urban secondary main road with a total length of 1054.421 meters, of which the width of red line is 30 meters and the design speed is 30 kilometers per hour; 3. Qunying West Road (from Yunmu Mountain Scenic Spot to Huanyu Road): the road grade ranks as urban secondary main road with a total length of 822.651 meters, of which the width of red line is 30 meters and the design speed is 30 kilometers per hour. IV. Project Investment The total investment for the project stands at RMB 320 million yuan. V. Cooperation Way PPP(Public-Private Partnership) model. VI. Project Initiator Project initiator: Hengyang Urban Construction and Investment Co., Ltd.
Comprehensive Land Consolidation in Suzhouwan Area of Hengyang I. Project Background Following the spirit of the 18th National Congress of the Communist Party of China, Hengyang 35
Municipal Party Committee and Hengyang Municipal Government have decided to improve the infrastructure in this area and optimize land resource distribution so as to boost up the balanced urban and rural development in the east bank of Xiangjiang River in Hengyang. They have focused on comprehensive land consolidation to strengthen urban infrastructure construction and would carry it on in a stronger way. II. Project Content The planned land area of the project is 608 Chinese mu. Among that, 250 Chinese mu is for construction and 358 Chinese mu for exploitation. The road engineering in the east bank of Xiangjiang River is 2.96 kilometers long and 30 meters wide. The construction items include: land demolition and resettlement, land consolidation, road construction, pipe network laying, greening construction, auxiliary management room and other supporting facilities. III. Project Investment The total investment for the project stands at RMB 660 million yuan. Among that, 300 million yuan is for engineering cost, 245 million yuan for construction land, 23.18 million yuan for other costs of engineering construction, 29.76 million yuan for budget reserve, and 60 million yuan for financing affairs. IV. Cooperation Way PPP model shall be adopted and the profits will be gained through primary land development. V. Project Initiator Project initiator: Xiangjiang River Water Conservancy Investment and Development Co., Ltd. of Hengyang.
Comprehensive Development of Leiyangxi (Wuhan-Guangzhou) Railway Station Area in Leiyang City I. Project Background To fully leverage on the location, ecology and land resources advantages in Wuhan-Guangzhou High-speed Railway(HSR) New Town area, supporting public service facilities shall be improved, and Nanbei Road and Shunyi Road shall be opened up as well to connect major scenic spots in Shunhu Park and to relieve the life pressure in urban areas, hence building Leiyangxi Railway Station area into a livable life functional zone. II. Preliminary Work All feasibility study report, environmental impact assessment, and land procedures have been completed. III. Project Content 1. Reconstruction project of Shunhu Park. The project covers an area of 334 Chinese mu. All together 105650.78 square meters of rigid pavement, 52240.24 square meters of plant coverage, 25524.55 square meters of open-air garden, 13016.7 square meters of wooden pavement, and 8576.71 square meters of sports field are to be constructed. Besides, the construction includes items such as supporting roads in the park, accessorial buildings, public toilets, garbage cans, water supply and drainage facilities, street lamps and etc. 2. Station Square reconstruction project. The project covers an area of 120 Chinese mu. Social parking lots on both sides of the square would be reconstructed to increase around 100 parking spaces. Besides, the construction includes items such as supporting roads of the square, accessorial buildings, water supply and drainage facilities, garbage cans, greening, street lamps and etc. 3. Construction of surrounding road network and supporting facilities of Shunhu park. The project item covers an area of 650 Chinese mu. 3 main roads of surrounding road network of the park shall be reconstructed, which are the first grade city main roads with a total length of 3.199 kilometers. 4. Land consolidation of surrounding area of 500 Chinese mu. IV. Project Investment The total investment for the project is RMB 7.9 billion yuan. Project capital fund accounts for 30% of total investment, and the rest of capitals would be gained via bank loans. V. Benefit Analysis The duration of investment cycle is 15 years with 6% of annual rate of return 36
VI. Cooperation Way PPP model and government repurchase. VII. Project Initiator Project initiator: Housing and Urban-rural Construction Bureau of Leiyang City.
Hengyang High-tech District New Energy Resource Transportation Service Station Network Construction I. Project Background With an increasing amount of oil drilling and exploration, oil exhaustion is bound to happen in the near future. Plus the public awareness of severe environment pollution caused by traffic emission, the calling for new clean energy automobile is roaring up. Hence, electric mobile arises at the right moment. Hengyang High-Tech District is a pioneer developing new energy industry in Hengyang City. To promote rapid development of new energy automobiles and ease relevant charging problems, a new energy transportation service station network is built, contributing to industrial restructuring, industrial upgrading and breakthrough making in the energy development bottleneck. The project is planned to locate in Lujiayumu New District, which shall be equipped with sufficient and properly-distributed electricity stations, thus enabling total planning and construction of the service station network. II. Project Content A new energy transportation service network integrating charging station, service quarter, and office building is planned to be built. With that, 5 new energy battery charge and swap stations, 1 charging station for vehicles of environmental sanitation and logistics, 1500 charging piles for taxies, service cars and privates cars, 200 scattered public charging piles, 2 intercity fast-charging stations would be constructed. On top of that, a medium battery charge and swap station equipped with 200 chargers,400 battery-pack charging stations and 8 vehicle-carrying charging facilities are to be built, thus enabling the station to meet daily charging demands of over 200 vehicles, with maximum of 300 per day. III. Project Investment The total investment for the project is RMB 1 billion yuan, which shall be invested by stages. It covers the costs for land and house demolition, new houses and infrastructure building, equipment and installment, engineering construction, reserve fund, initial working capital and other expenditure. IV. Cooperation Way Sole proprietorship V. Project Initiator Project initiator: Hengyang High-tech Industrial Development Zone
The West 2nd Ring Road Construction (phase 2) of Xiangtan City I. Project Background The old town in the west of Xiangjiang River in Xiangtan City has seen its road network saturation, and the traffic jam in the eastern part is starting to appear. Therefore there is much traffic pressure in the crossing-river road. Besides, the improperly-set road network, as well as the fact that many roads with no end or less branches, has caused salient imbalance between road demand and supply, thus limiting urban development. To complete the phased construction of 2nd Ring of Xiangtan to connect it with the North 2nd Ring, the construction of West 2nd Ring (phase 2) is quite necessary and timely, thus reducing urban traffic pressure of the western part with less vehicles crossing downtown area. II. Preliminary Work The compilation of feasibility study report and environment impact assessment has been completed, and the location blueprint has been confirmed. At present the preliminary investigation is in progress by Land and Resources sector. III. Project Content 37
The project is city highway construction with designed speed of 80 kilometers per hour and road width of 60 meters. With asphalt concrete pavement and two-way six-lane design of a total length of 3921 meters, this expressway includes 3 interchanges covering an area of 47577 square meters. Roads, water supply and drainage facilities, greening landscape, illumination, transport facilities and other items are incorporated. IV. Project Investment The total investment for the project is RMB 1.119497 billion yuan. Of that, 569.7433 million yuan is for engineering cost, 520.06 million yuan for other costs of engineering construction, and 29.69 million yuan for budget reserve. V. Cooperation Way Contractual joint venture with over 10 years of partnership (excluded from construction period). VI. Project Initiator Project initiator: Xiangtan Urban-rural Construction Development Group Co., Ltd.
Xiangtan Zhubugang Industrial Site Park and Supporting Facilities Construction I. Project Background Zhubugang area is in the Yuetang Economic and Technological Development Zone, which is an old chemical industry base of over 50 years’ history as well as one of fourteen national fine chemical industry bases. Since 2013, Zhubugang old industrial region has cut down the proportion of second industry and earnestly developed the tertiary industry, closed or removed some chemical industry enterprises and carried out environmental protection and improvement. All of these have laid a sound foundation to build Zhubugang area into a riverside new town. II. Preliminary Work Project proposal, PPP model implementation plan, financial bearing capacity demonstration, and investor’s qualification preliminary investigation announcement have all been put on the website. III. Project Content 1. Industrial Site Park: the project covers an area of 146.2 Chinese mu, mainly for the construction of water eco-park, sport and recreation park, plants-purifying park, and statue-art square (the plants-purifying park includes industrial site museum and other sites). 2. Supporting facilities: this project covers an area of 161.5 Chinese mu, mainly for the construction of fashion creativity center, cultural innovation sub-district and part of public facilities. IV. Project Investment The total investment for the project is RMB 1.04 billion yuan. V. Cooperation Way PPP (Public-Private Partnership) model. Return of investment: land value-added revenue, operating profits or income from rent or sale. VI. Project Initiator Project initiator: Management Committee of Yuetang Economic and Technological Development Zone.
Xiangtan Wanlou Ecological and Livable New Town Construction I. Project Background As one of core cities in Changsha-Zhuzhou-Xiangtan National Two-type Society Construction Demonstration Area, Xiangtan lags behind Changsha and Zhuzhou in economic development. Due to backward urban construction and slow upgrading of old towns, the city’s service function is calling for improvement and perfection. Wanlou New Town is located in the core area of Wanlou district, enjoying position advantages with only 5-minitues’ ride from business circles of Xiangtan and 20-minitues’ ride to Changsha and Zhuzhou. The planned introduction of 2 elite primary and middle schools plus medical health project would provide top-grade educational and medical services for residents. Apart from that, this area is endowed with fine ecological environment and profound cultural history, therefore it 38
can shoulders the responsibility to promote urban appearance as well as city upgrading. II. Preliminary Content The project covers a total area of 289 Chinese mu with plot area of 3.0 and overall floorage of 578000 square meters. High-rise residences, shops facing the street, and clubs shall be constructed. In doing so, it would be made into a cultural and tourist new town, business and commercial new town, and an ecological and livable new town. III. Project Investment The total investment for the project is RMB 2.5 billion yuan. IV. Benefit Analysis BBK New Field is a project in this area for sale. In 2015, it has sold 896 houses at an average price of RMB 4500 yuan, ranking No.1 in the housing marketing in Xiangtan City. In 2016, it has sold 578 houses at an average price of RMB 4800 yuan, ranking No.5. As the construction and operation of Wanlou scenic spot and the introduction of schools and medical projects, the value of this district is bound to rise further. V. Cooperation Way Cooperative development or land transfer. Details shall be confirmed in contract after discussion. VI. Project Initiator Project initiator: Xiangtan Real Estate Group Co., Ltd.
The Construction of Hedong Road in Xiangtan High-Tech District I. Project Background The project locates in the High-tech Zone of Xiangtan. This north-south running road would improve the road network nearby and bring much convenience to the residents. Besides, it enables the development on both sides of the road, so as to promote the economic prosperity. II. Preliminary Work From Ji’an Road to Chuangye Road, the project consists of the 1100m long earth and rock engineering with 60 meters wide, the roadbed and pavement engineering, and the illumination and greening engineering. And 3 bridged are included (which is 70 meters, 70 meters and 100 meters long respectively). III. Project Investment The total investment for the project is RMB 294 million yuan. IV. Cooperation Way Contractual joint venture or joint venture; Details shall be confirmed in contract after discussion. V. Benefit Analysis This project construction would accelerate the land development so as to bring enormous benefit of land appreciation. The urban infrastructure construction is bound to promote the economic development of surrounding roads, thus increasing the differential land benefit and bringing land appreciation income. I. Project Initiator Project initiator: Xiangtan High-tech Industrial Development Zone
The Extending Line of Gaoxin Road(Lvlu Road) Construction in High-Tech Zone of Xiangtan City I. Project Background The project locates in the High-tech Zone of Xiangtan. This north-south running road would improve and complete the road network nearby and bring much convenience to the residents. Besides, it enables the development on both sides of the road, so as to promote the tourism prosperity in Fahua Mountain area. II. Preliminary Work Xiangtan High-tech Industrial Development Zone (High-tech Zone for short) was founded in 1992. On March 18th, 2009, it has upgraded to a national high-tech zone with the approval of the State Council. Located in the center of “One point and One line” economic corridor of Hunan province, Xiangtan High-tech Zone composes a pivotal part of Changsha-Zhuzhou-Xiangtan integration 39
The High-tech Zone is in the southeastern part of Xiangtan, with Xiangtandong Railway Station to the north, water transport dock to the south, and is merely 1.6 kilometers away from Beijing-Zhuhai Expressway eastwards and 3 kilometers from city center westwards. With salient transportation position advantages, this area is endowed to develop export-oriented economy and cargo logistics industry. III. Project Content The project locates in the High-tech Zone of Xiangtan, from South Keji Road to Bingjiang Road, with a length of 3800 meters and a width of 36 meters. IV. Project Investment The total investment for the project is RMB 0.4 billion yuan. V. Cooperation Way Contractual joint venture or joint venture. Details shall be confirmed in contract after discussion. VI. Benefit Analysis The completion of this project construction would accelerate the land development so as to bring enormous land appreciation benefit. The urban infrastructure construction is bound to promote the economic development of surrounding roads, thus increasing differential land benefit and bringing land appreciation income. VII. Project Initiator Project initiator: Xiangtan High-tech Industrial Development Zone
Xiangtan Qingzhu Lake Comprehensive Park Supporting Service Center I. Project Background The “13th Five-year Plan” of Xiangtan focuses on the development of service industry and takes it as the strategic point to create new supply and release more demands. While attaching great importance to the construction of Jiuhua New Town, the connection with the Changsha Xiangjiang New Area and acceleration of city-industry integration and coordinated development, it also put a premium on the construction of 60-square-kilometers Binjiang New Town as well as the planning and construction of commercial zone, ecological landscape zone, modern resident zone and metropolis relaxation zone. Thus a high-quality new industrial district and riverside new town in Changsha-Zhuzhou-Xiangtan city cluster shall be created. Ten years’ development has seen Jiuhua ascend to an one-hundred-billion level industrial park with an astonishingly rapid industrial development. Currently, Jiuhua is undergoing its golden period of “second business-starting” to reach the development goal. To gain further development, Jiuhua will have to give a booth to and increase the market share of the tertiary industry. Hence this project is of vital importance for Jiuhua to reach its future development goals. II. Preliminary Work The project locates in the Economic and Technological Development Zone of Xiangtan, bordering the national Xiangtan Comprehensive Bonded Zone in the north. It is 5 kilometers away from the center of Xiangtan to the south, 27 kilometers away from city center of Changsha to the north. Covering a total area of 138 square kilometers, this area is home to 195,000 people. At present, the developed area has amounted to 40 square kilometers in the economic and technological development zone, with 350 enterprises settled and 222 companies having invested here. Three leading industries have already taken shape. The project conforms to the general planning and construction land planning of Xiangtan Economic and Technological Development Zone. The site selection and feasibility study report of the project have been completed and now the planning and design are in progress. III.Project Content The project locates in the Economic and Technological Development Zone of Xiangtan, covering an area of about 2000 Chinese mu, which is designed to serve for workers and residents in Xiangtan Economic and Technological Development Zone and Xiangtan Comprehensive Bonded Area. What’s more, as the image display area and supporting service area of Xiangtan Comprehensive Bonded Area, this project aims to build a comprehensive leisure park integrating business services, industry, residence, sports, leisure as well as offices. IV. Project Investment The total investment for the project is around RMB 2 billion yuan. V. Benefit Analysis 40
The project construction period spans 3 years, reaching an estimated annual revenue of RMB 0.8 billion yuan after completion. VI. Cooperation Way PPP, joint venture and sole proprietorship are feasible. International or domestic comprehensive supporting facilities of park, quality enterprises and projects shall be introduced. VII.Project Initiator Project initiator: Management Committee of Xiangtan Economic and Technological Development Zone.
Shaoyang Urban Three Ring Fast Lanes and Comprehensive Pipelines Construction Project I. Project Background To make full use of the traffic function of expressway and strengthen fast traffic connections between Shaoyang urban area and Xinshao, Shaodong, Shaoyangbei Station of Shanghai-Kunming High-speed Railway and other urban clusters, the construction of three ring fast lanes is in great need. The three ring fast lines can perform the basic function of cross-boundary traffic, outbound traffic and fast traffic connections between the downtown clusters, so as to relieve the cross-boundary traffic pressure and reduce the impact brought by outbound traffic on internal traffic in urban area. And it would help in the expansion of city development space and improvement of transportation. II. Preliminary Work The compilation of feasibility study report, project approval from National Development and Reform Commission, preliminary approval of Land and Resources Department, planned land use claim, environmental impact assessment, planning and design condition book, and survey and design bidding work have all been completed. III. Project Content The project is divided into the road construction part (including bridges, railway bridges and tunnels) and the pipeline corridor part. The road part consists of Jinji Road, Huxingshan Road (L3 Line), Shaoxi Road (New G320), Xincheng Road and etc. The pipeline corridor covers an underground comprehensive pipeline of 46.7 kilometers in urban three ring lines. IV. Project Investment The total investment for the project is RMB 11.379089 billion yuan. Among that, 8.01675 billion yuan is for engineering cost, 1.516513 billion yuan for other costs of engineering construction, and 0.762661 billion yuan for budget reserve. V. Cooperation Way Government direct investment would be put into the road construction. As for the pipeline corridor, PPP model shall be adopted and the return mechanism is financial viability gap funding. VI. Project Initiator Project initiators: Shaoyang Housing and Urban-Rural Construction Bureau. Shaoyang Expressway and Road Project Construction Co., Ltd.
Old Town New District Construction in Wugang I. Project Background Wugang has long been hailed as a communication junction connecting three provinces and “the strategic point in Wuzhou of Sichuan and Qianzhou of Chongqing�. Since the Emperor Wen and Emperor Jing of Han have established the county system, Wugang, has always been the seat of local government for over 2200 years. It was also a military strategic site as well as the political, economic and cultural center of Southwestern Hunan. Of particular note, Wugang is the only historic and cultural city that integrated the capital city of marquis-states, seat of the tetrarch, and the state capital city (of South Ming Dynasty). The Min King of the Ming Dynasty Zhu Pian has conferred a dukedom and passed his power to following 14 generations here, remaining ancient city walls and gate towers, palaces and old streets everywhere until now. In August 2011, Hunan 41
Provincial People’s Government has approved Wugang as a provincial historic and cultural city, which boasts enormous potential for historic and cultural tourism development. II. Preliminary Work Preliminary work such as feasibility study report, energy conservation assessment report and environmental impact assessment report have been completed. The land reserve is 210 Chinese mu. III. Project Content The new district of Wugang old town covers a planned area of 579310 square meters, which is a main entrance and exit of the old town. The plan includes countryside and urban landscape, aiming at creating a multi-functional ecological new district with both modern dynamism and ancient style, which integrates business and finance, culture and entertainment, tourism and service, performance center, residence and leisure. The main items include historic and cultural center (museum), visitor reception center, performance and art center, parking lots, intangible cultural experience walking street, antique market demonstration zone, snack and entertainment street, and cultural innovation industrial cluster. 1. Overall floorage covers an area of 284621 square meters, among which 43882 square meters is for residential housing, 206844 square meters for commercial buildings, and 33895 square meters for cultural buildings. 2. Overall length of road engineering is 5192.86 meters with total pavement of 82324.4 square meters, pedestrian and greening space of 52834.82 square meters. And there are altogether 414 street lamps and 106 sets of transport facilities along with it. 3. Pipeline engineering. Under primary and secondary roads are paved with 4053.59 meters long water supple sub-main pipe DN800, and 3579.26 meters long water supply branch pipe DN300. Drainage project covers sewage pipe DN400~DN800 of 6071.77 meters, rain pipe DN400 of 4471.26 meters, and newly-built open channel of rainwater drainage of 1409.13 meters. Fuel gas: Medium-pressure gas pipeline of 1571.84 meters and low-pressure gas pipeline of 998.5 meters would be paved. And 2 more regulator stations would be built. 4.701.73-meters long river channel is planned to be opened, covering 81995 square meters of ground works, 22793 square meters of river hardening, 1035 square meters of revetment, and 3128.14 square meters of greening and brightening. IV. Project Investment The total estimated investment for the project is RMB 2.3200092 billion yuan. Among that, 1.2900596 billion yuan is for engineering cost, 0.1345774 billion yuan for other costs of engineering construction, 0.1424637 billion yuan for budget reserve, and 0.7529085 billion yuan for land costs. V. Benefit Analysis It is estimated that the new district can be opened to tourists in 2019, with an annual reception of 500,000 people. The average consumption would reach RMB 500 yuan per tourist, bringing a total revenue of RMB 0.25 billion yuan. In this way, all investment would be recouped within 7 years and profits be gained as well. VI. Project Initiator Project initiator: Protection and Development Management Committee of Old Town in Wugang.
Zijiang River Flood Prevention Scenic Belt and Municipal Supporting Facilities Construction Project of Xinshao County (PPP Project) I. Project Background As home to 836600 people, Xinshao County has attained its gross product value of RMB 12.72 billion yuan by 2016. Due to low standard of former flood prevention design in Zijiang River drainage basin of Xinshao County, many areas have suffered severe rain wash. As for flood prevention ability in the new town, it can merely withstand the worst flood in the past 5 years since the built urban segments have not formed closed flood embankment. Hence the flood problem has not been solved yet, which extremely lags behind the economic development. With the accelerating pace of new-type urbanization, the renovation of old municipal facilities in the county is pressing. 42
Based on the construction of urban flood embankment, this project shall build matching municipal projects and riverside scenic belt construction project so as to offer a high-quality leisure site for urban residents and boost up city civilization development. II. Preliminary Work The project feasibility study report has been finished. The approval procedures concerning environment protection, land resources, conservation of soil and water, and water conservancy are about to be completed. III. Project Content 1. Supporting facilities of garden landscape: Including: footway, leisure square, riverside scenic street, booths and waterside pavilions, chairs, stone benches, fitness equipment, accessorial featured landscape, as well as supporting public sanitation facilities, greening and brightening of plots along the river. 2. Comprehensive pipeline engineering: Including: rain pipe, water supply pipe, sewage pipe, power supply pipe, weak current pipe ditch, heating power pipe, gas pipe, catch basin and bilge well. 3.Water conservancy and flood control project. By the urban range designated in the Xinshao County Overall Planning, the bank line of flood control project is 13.4 kilometers long, among which 3.0 kilometers are planned for construction of flood embankment. IV. Project Investment The total investment for the project is RMB 560 million yuan with the construction period spanning 3 years and the operational period of 9 years. V. Cooperation Way PPP model is planned to be adopted. Of the project company’s stock equity, 10% would be financed by government, 90% by social capital. The cost of investment can be recouped by government payment and reasonable profits would be gained. VI. Benefit Analysis The cost of investment can be recouped by government payment and reasonable profits would be gained. VII. Project Initiator Project Initiator: Hengxin New Town Construction Investment and Development Co., Ltd. of Xinshao Counry.
The Comprehensive Development of South Bank of Wushui River in Chengbu County I. Project Background The south bank of Wushui River is in the south side of Chengbu County, boasting excellent natural conditions with both mountains and rivers here. It starts from Tuxichong Bridge in the west, reaches Shizi Mountain in the north, and borders Bailiao Islet in the east and Xiaojiazhuang in the south. The project enjoys convenient traffic as well. The close connection of ring road network in the development zone has brought a connected walking system and wonderful ecological pattern along the Wushui River. Close to the city power producer especially the business center of old town, the planned area is bound to be the most dynamic and characteristic region of Chengbu County. II Preliminary Work The detailed planning of the area has been completed, covering around 400 Chinese mu of land acquisition in development zone. The connecting line of Rulin Bridge, the road from Xianshapin to Xiaojiazhuang, is in construction, which would be completed in October. The connecting line construction has been finished. III. Project Content The project construction mainly includes business residence, tourism, commerce, leisure, 43
passenger transport, logistics, and entertainment. With plot rate of 0.13 to 2.66, building density≤30% and greening rate≥40%, an ecological residential district with complete facilities shall be built, which centers on comprehensive business zone, folk custom street, Wuhui River scenic belt and Bailiaozhou folk village and distributes diverse items along the periphery. IV. Project Investment The available land for development is 2 square kilometers and the housing construction land covers 1.2 million square meters. The total investment for the project is RMB 4.2 billion yuan. The investor shall raise funds via investment attraction, bank loans or other financing ways. V. Cooperation Way Contractual joint venture, joint venture or sole proprietorship VI. Benefit Analysis The total sales income of the project is around RMB 5.2 billion, with the net profit of 1 billion yuan. And the return on investment is around 15%. VII. Project Initiator Project initiator: Shaoyang Chengbu Miao Autonomous County People’s Government.
Comprehensive Development of Yiyang Eastern New District Urban Construction I. Project Background The planned area covers 120 square kilometers with the core area of 61.38 square kilometers. Of that 20 square kilometers are available land for construction. Now the construction and improvement of infrastructure in this area is in great need, therefore the project aims to build the Eastern New District into a high-end Tertiary Industry New District, Urban New District and Ecological New District. II. Preliminary Work The project feasibility study, implementation plan, value-for-money assessment, and financial bearing capability all have been demonstrated, examined and approved. Thus the project has become the fourth group of provincial demonstrative projects. III. Project Content Altogether there are 7 sub-items for construction: 1. Folk town concentrates on residential area (the first phase), with a planning area of 371261 square meters and overall floorage of 199,700 square meters; 2. The North Old Town Road engineering, which is 1576 meters long and 45 meters wide; 3. The Sifang Mountain Road engineering, which is 1328 meters long and 42 meters wide; 4. The Baolin Road engineering, which is 5760 meters long and 42 meters wide; 5. The Huanyuxing Mountain Reservoir Walkway engineering, which is 11697 meters long, 3 meters wide and covers a waterside stage of 3000 square meters; 6. Yushan Mountain Scenic Spot road engineering, which is 8274 meters long, with commuting road of 6 meters wide and leisure pedestrian walkway of 3 meters wide; 7. Supporting road engineering of Ecological Resettlement Area, which is 1608.5 meters long and 30 meters wide. IV. Project Investment The total investment for the project is RMB 1.1 billion yuan, which shall be divided into 7 parts for sub-items. The construction funds would be organized at the rate of 2.5:7.5, among which RMB 0.27 billion yuan is raised by the project company and RMB 0.83 billion yuan is from financing. V. Cooperation Way The project adopts the Building-Operation-Tranfer model, with the cooperation period of 20 years (including 3 years’ construction period). The capital fund of the project accounts for 25%, which would be invested by the government and social capital at the rate of 1:9. Capital from external financing accounts for 75%, which is raised mainly via bank loans. The tentative rate of return on investment is set as 7% per year, and annualized cost of external financing shall float up to 20% on the benchmark interest rate for loan of People’s Bank of China at current period. VI. Benefit Analysis The project is a quasi-operational project, adopting viability gap funding for government who 44
shall be responsible for part direct payments. VII. Project Initiator Project initiator: Yiyang Eastern New District Management Committee.
Urban Complex Construction of Eastern Industrial Park in Yiyang High-tech Industrial Development Zone I. Project Background The Eastern Industrial Park in Yiyang High-tech Zone is 10.5 kilometers away from city center of Yiyang and 40 kilometers away from Changsha, enjoying convenience transportation. The planning area of the Industrial Park is 133.3 square kilometers, with the core area of 19.6 square kilometers and starting area of 18.7 square kilometers. By 2030, the total population is estimated to reach 570000 to 660000. At present, around 100 industrial enterprises have been introduced in the park, but some supporting service facilities are in need of perfection. So the project is planned to be constructed, in the northwest corner of intersection of Yincheng Road and Yuxingshan Road. II. Preliminary Work The field engineering has been completed. Now the graphic design and building planning are underway. III. Project Content Total control area covers 1200 Chinese mu, including such main items for construction: 1. 6000 public rental housings, 500 housings for civil servants and 300 apartments for experts are planned to be built; 2. central service area(a 30-storey office building, conference and exhibition center, as well as a 30-storey incubator building); 3. the Yiyang Hi-tech Development Zone Headquarter building, with overall floor area of 100,000 square meters; 4. a five-star ecological hotel, which is one of the eight landmark projects in the park; 5.10 primary schools, 15 schools providing 9-year compulsory education and 9 senior schools shall be constructed; 6. a municipal comprehensive hospital, 6 community health care service stations, 4 cultural centers, and 2 municipal sports centers. IV. Project Investment The total investment for the project is around RMB 3 billion yuan, of which 600 million yuan is for infrastructural construction, and 2.4 billion is raised by enterprises in the park. V. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VI. Project Initiator Project initiator: Department of Economic Development of Eastern Industrial Park of Yiyang High-tech Industrial Development Zone.
The Urban Complex Construction of Changchun Economic Development Zone I. Project Background Yiyang Changchun Economic Development Zone covers a planning area of 709 hectares, 370 hectares of which has been developed. Altogether there are 3 residential communities and 6 Estate Committees under its jurisdiction, with a total population of over 50000. With the prosperity and expanding of the zone, this area is badly in need of an urban complex that can meet people’s cultural and material demands in life. II. Preliminary Work The planning and design of the project land have been completed with no demolition work. The land is for business and residential purpose, with plot rate≤3.0, building density≤3.0, greening space rate≥35%. And the rate of business area to residential district is 1:7. III. Project Content 45
The project aims to build an urban core business circle integrating high-end residence, business service, and business leisure with overall floor area of 100,000 square meters. IV. Project Investment The total investment for the project is around RMB 350 million yuan, among which 280 milllion yuan is for construction and installation costs, 50 million yuan for recreational facilities and 20 million for other costs. V. Cooperation Way Sole proprietorship. VI. Benefit Analysis Calculating by the current price of commercial and residential housing and that of business shop in Yiyang, the rate of return on investment of this project is no less than 32%. VII. Project Initiator Project initiator:Yiyang Ziyang District Urban Construction Investment Co., Ltd.
The Urban Complex Development of Loudi Dake Residential Community I. Project Background With the development of urban construction in Loudi, urban residents have higher demands for living environment and supporting facilities. In order to elevate the city grade, improve living environment, attract foreign investment and accelerate urban construction process, the Dake Residential Community in Louxing District of Loudi City is planned to be upgraded. In doing so, it would be built into a new-type urban complex integrating education, health care for the elderly, fitness, medical health and business development. II. Preliminary Work Planning, land and resources, environmental impace assessment, feasibility study report and other preliminary work have been completed. The land demolition work is underway currently. III. Project Content The project construction land covers an area of 342363 square meters. Main items include land demolition in the residential community, surrounding road network construction, urban complex, and residence and supporting projects (kindergarten, middle school, primary school, eldery health care and service center, fitness center, Community Management Committee, property management center, business supporting facilities and etc). IV. Project Investment The total investment for the project is RMB 1.0898 billion yuan. V. Cooperation Way Loudi Municipal People’s Government will authorize Loudi Urban Construction Investment Group Co., Ltd. as the implementation agency, and then start the construction work via joint venture and contractual joint venture and other patterns. VI. Project Initiator Project Initiator:Loudi Urban Construction Investment Group Co., Ltd.
Loudi High-speed Railway North Distrct Development I. Project Background Located in the center of Hunan province, Loudi is an important juncture city in Changsha-Zhuzhou-Xiangtan City Cluster One-hour Economic Circle and Shanghai-Kunming High-speed Railway Economic Belt. In Loudi, there are railway network shaping like a Chinese character “mi” , expressway network like a Chinese character ”jing”, and a cross-shaped high-speed railway network(Shanghai-Kunming High-speed Railway and Hohhot-Nanchang High-speed Railway) is formed soon. With convenient transportation, Loudi owns a national level II logistics park. Meanwhile, recent years have seen a rapid economic development of Loudi, with its GDP reaching RMB 140 billion yuan in 2016. On December 16th, 2014, the Loudi South Station of Shanghai-Kunming Railway has been in operation, representing that Loudi entered into the high-speed railway era. As the main road 46
network has been open to traffic, Wanbao New District Management Committee has decided to attract investment in north area of the high-speed station. As a core area of Wanbao New District and a significant carrier of modern service, the north area of high-speed station has been designed by Patrick Chavannes Architects of France. II. Preliminary Work At present, the construction of main road network in this area has been completed. South Louxing Road, South Xinxing Road, Jingan Street, Wanbao Road and other arterial roads have all been opened to traffic. Part of the land approvals and land demolition work pf plots has been finished as well. III. Project Content The project covers an area of 1.5 square kilometers, which aims to creat an urban central business district integrating “finance, business, hotel, office, culture,and residence�. Financial central business district, ultra-large type business shopping center, underground commercial area, super five-star hotel, 5A smart office building, quality residence, new urban high-end apartment and else are planned to be constructed here. In addition, focus would be put on the introduction and nourishment of new-developing tertiary industries. Through favorable commercial facilities and complete supporting services, high-end tertiary industries would be attracted to settle here, such as finance, trade, investment, insurance, security, intermediary agent and etc. Thus a regional distributing center would take shape, distributing passengers, goods, capital, information and culture. IV. Project Investment The total investment for the project is RMB 10 billion yuan. V. Cooperation Way 1. Strong and experienced enterprises in urban business and urban complex development at home or abroad are sincerely welcomed to invest and develop here. 2. Cooperation way: developers are required to hold a certain proportion of commercial real estates and run operation. Then a certain number of qualified companies with famous brands will be introduced. VI. Benefit Analysis Preliminary estimation indicates that the total investment for the CBD development and construction will reach RMB 10 billion yuan, while the output would be over RMB 20 billion yuan. VII. Project Initiator Project Initiator: Department of Investment Attraction and Development in Wanbao New District of Loudi Shuifu Demonstration Area.
The Gold Coast District Development of Loudi Economic and Technological Development Zone I. Project Background The Gold Coast District locates in the north of Loudi central urban area, a part of Loudi Economic and Technological Development Zone cluster. The planning development area is 164 hectares, directly connecting with the Loudi express ring road and Loudinan Railway Station. Enjoying convenient transportation, this district plays a significant role for Loudi Economic and Technological Development Zone to realize coordinated development of the second industry and the tertiary industry, as well as the city-urban integration. II. Preliminary Work The feasibility study report has been compiled, and land is reserved. III. Project Content The project locates in the north of Loudi central urban area, starting from the Loudi-Lianyuan Road in the north, reaching Lianshui River in the south, North Xinxing Road in the west and Loudidong Railway Station in the east. Detailed construction items are as follows: 1. Land requisition and demolition The area of land requisition and demolition covers the whole plot of 2460 Chinese mu. 2. Infrastructure It is divided into several parts: municipal road engineering, flood wall, riverside scenic belt, park 47
and public parking lot. Among that, Yonganxin Brigde is 207 meters long and 39.5 meters wide. Meanwhile, 7 urban roads are planned to be constructed with a total length of 11665 meters and a width of 20 to 60 meters. Flood wall and river scenic belt along the Lianshui River and Qinfeng River would be constructed with a total length of 6365 meters. 2 Parks would be constructed. Longyan Park covers an area of 7.40 hectares with floor area of 7730 square meters; Meizi Park covers an area of 9.5 hectares with floor area of 9450 square meters. 6 public parking lots would be constructed, covering an area of 3.2 hectares with 1920 parking spaces. 3. 4 business projects, which include: The Smart Building of enterprise headquarter: covers a site area of 1.33 hectares and floor area of 66667 square meters. The Smart Square: covers a site area of 2 hectares and floor area of 40000 square meters. The waterfront service center: covers a site area of 5.33 hectares and floor area of 106667 square meters. The Urban Balcony: covers a site area of 6.67 hectares and floor area of 133334 square meters. IV. Project Investment The total investment for the project is RMB 3.75 billion yuan. Among that 1.76 billion yuan is for demolition and other costs, 1.85 billion yuan for construction and installation, 0.14 billion yuan for interests. V. Cooperation Way PPP model. VI. Benefit Analysis The calculated period of the project is 18 years (3 years’ construction period and 15 years’ operational period). The project income is about RMB 240 million yuan after it is put into operation, which will increase at a rate of 5% triennially. VII. Project Initiator Project initiator: Management Committee of Loudi Economic and Technological Development Zone.
Supporting Facilities Construction of Eastern New District of Loudi Economic Development District I. Project Background Loudi Economic and Technological Development Zone has reached a total income of RMB 117.2 billion yuan in industrial and trade development, 1.4 billion yuan in general financial revenue. As an extending area of Luodi urban development and a sub-center, the Eastern New District of Economic and Technological Development Zone has a total population of 120000 under its jurisdiction. However, current urban culture, business and commerce, education and other facilities can not meet the demands of social development and population growth. Thus in order to perfect the living environment, road networks and relevant facilities in the Eastern New District are planned. In doing so, the Eastern New District is to be built into an urban benchmark which integrates humanism and entertainment, scientific research, culture and education, business and trade, finance and city-industry integration. II. Preliminary Work A detailed regulatory plan of the Eastern New District has been completed. Now the land use, and environmental impact assessment work are in process. III. Project Content The project covers a total area of 263.5 hectares and the specific items are as follows: 1. Land acquisition and demolition Land acquisition and demolition area covers a whole project plot of 263.5 hectares. 2. Flat base project covers an area of 24.4 hectares. 3. Municipal road projects 9 urban roads are planned to be constructed, with a total length of 13686 meters and road width of 48
24 to 60 meters. 4. School covers a site area of 7.73 hectares and floor area of 57975 square meters. 5. The Exchange and Exhibition Center of Art and Cultural Products covers a site area of 5.33 hectares and floor area of 106667 square meters. 6. Hanlin Cultural Corridor Hanlin Cultural Corridor covers a site area of 5.33 hectares and floor area of 80000 square meters. 7. Cultural and Leisure Center Cultural and Leisure Center covers a site area of 4 hectares and floor area of 80000 square meters. 8. Film and Television Convention Center Film and Television Convention Center covers a site area of 2 hectares and floor area of 40000 square meters. IV. Project Investment The total investment for the project is RMB 3.5 billion yuan. Among that, 1.7 billion yuan is for land acquisition, demotion and other costs, and 1.8 billion yuan is for construction and installation engineering costs. V. Cooperation Way PPP model VI. Benefit Analysis The project income is about RMB 120 million yuan per year after it is put into operation, which will increase at a rate of 5% triennially. VII. Project Initiator Project initiator: Management Committee of Loudi Economic and Technological Development Zone.
1-3 Urban Underground Pipe Gallery and Sewage Treatment (16) Construction of Underground Pipe Gallery in Urban Areas of Hengyang City I. Project Background In order to improve urban life service facilities and environments, ensure normal operation of cities, carry out related requirements posed by the country, and greatly improve underground pipe networks, the government of Hengyang has applied for financial allocation from the provincial government in support for building a piloting city of constructing underground pipe gallery. II. Preliminary Work The project mentioned before has got approval from both the Development and Reform Commission of Hengyang (H.F.G.T [2015] No. 56) and Environmental Protection Bureau (H.H.P [2015] No. 079). Other procedures for early stage are under progress. III. Project Content The planned construction items are listed below: Zhengxiang South Road(6.14km), Hengzhou Road(22.8km), Cailun Road(13.16km), Chuanshan Road (9.68km), Second Ring East Road (8.0km), Second Ring West Road (12.926km) and Zhengshui South Road (2.25km), totaling 74.956km. IV. Project Investment A total of RMB 6 billion yuan will be allocated to the project construction. V. Cooperation Way A pattern of PPP will be adopted. VI. Project Initiator Project Initiator: Hengyang Urban Construction and Investment Co., Ltd. 49
Construction of Underground Pipe Gallery in Xiangtan I. Project Background The construction of urban underground pipe gallery facilitates solving repeated excavation of road pavement, tense overhead line networks and frequent pipeline accidents, arranging the planning, construction, and management of various municipal pipelines, boosting the intensively efficient development and the transfer of Xiangtan, improving the comprehensive carrying capacities of the whole city and raising effective investment into public goods. In accordance with the ‘Three-year Plan for Xiangtan’s Underground Pipe Gallery Construction ’, a total of 54.3km underground pipe gallery will be constructed between 2016 and 2018, with an investment of RMB 4.95 billion yuan. II. Preliminary Work The construction of 13 underground pipe gallery projects was launched in 2016. Xiangtan has been awarded as “Hunan’s provincial model city of underground pipe gallery construction “and got funds of RMB180 million yuan. III. Project Content Piloting projects total 28, including 54.3km of underground pipe gallery with an investment of RMB 4.95 billion yuan. Primary projects are listed as below: 1. At Hutan West Road, Chima Road, Jiangnan Road, West Ring Road and Xinma Road: 7.9km of underground pipe gallery plus 7 compartments will also be constructed. Pipelines linked with the gallery include water supply, electricity, communications and sewage pipelines. 2. At Xichun North Road, Lianbin Road, Wanlou Road, Dongping Road and Yangtang Road: 8.5km of underground pipe gallery plus 11 compartments will be constructed. Pipelines connected with the gallery include water supply, sewage, rain, electricity, and communications pipelines. 3. At Shangcheng Road, Multiple Track of Furong Road, Bantang No.17 Road, Bantang No. 11 Road, Hetang Branch Road 11: 9.5km of gallery and 9 compartmrnts will be constructed. Pipelines connected with the gallery include water supply, sewage, rain, electricity, communications and gas pipelines. 4. At Hetang Branch Road 13, Chuangxin Road, Keji Road, Binjiang South Road, Changxin Road: 9.2km of underground pipe gallery plus 9 compartments will be constructed. Pipelines connected with the gallery include water supply, sewage, rain, electricity and communications pipelines. 5. At the expanded part of Changxin Road: 1.4km of pipelines and compartments will be constructed. Pipelines connected with the gallery include heating pipelines (at the expanded part). 6. At Renlun Road, Xinglong Road, Fazhan Road, Shilian Road, Tanggao Road, Jiuzhao East Road, and Furong Avenue: 17.8km of underground pipelines plus 10 compartments will be constructed. Pipelines connected with the gallery include water supply, sewage, rainwater, electricity, communications, and gas pipelines. IV. Project Investment A total of RMB4.95 billion yuan will be allocated to the project construction. V. Cooperation Way The project will be funded by the incomes collected through developing road alongside. Investors can enjoy favorable policies related with investment attraction in Xiangtan, and “One Thing, One Decision” approach may be applied to determine specific favorable policies. VI. Benefit Analysis The construction of gallery will effectively address urban “zipper “road problems to ensure smooth traffic, lay foundation for developing urban underground space, eliminate urban “overhead cobweb lines” to build a cleaner environment and conserve valuable land resources. At present, cost budget of constructing urban underground pipe gallery is under counting. Constructing expenses and the costs from maintaining and preserving are funded by incomes collected through developing road alongside and user payments collected by installing unit of underground pipe gallery. VII. Project Initiator Project Initiator: Department of Housing and Urban-Rural Development of Xiangtan City
Construction of Underground Pipe Gallery in Dongshan New Town of Xiangxiang City 50
I. Project Background Construction of underground pipe gallery constitutes the main part of mid-longer term infrastructure construction and operation in cities. Since the construction is large as well as difficult and the costs are high, the nation encourages launching the construction and operation of underground pipe gallery by adopting PPP (Public-Private Partnership) model. Therefore, the investment enterprises can reach franchise operation agreement with the government to get project operation right. Long-term and stable returns can be provided for the operation party through collecting connecting fees for the gallery and daily maintenance fees. Specific public-use pipelines connected with the underground pipe gallery include: 66kv and 10kv power cables, communication cables, water supply pipes, pipes containing water for miscellaneous use, and heating pipes. Complete ancillary facilities like fire protection, power supply, ventilation, drainage, signals, camera monitoring and alarming are well equipped. II. Project Content The project is located at Dongshan New Town of Xiangxiang City and 13 roads are involved in. The overall length of underground pipe gallery is 27.282km, of which circular-shaped primary pipe gallery is 8.549km and branch pipe gallery is 18.733km. III. Project Investment The investment of the project construction totals RMB1, 970,080,000yuan, and the construction period lasts for three years. IV. Cooperation Way The pattern of PPP will be adopted. V. Project Initiator Project Initiator: Xiangxiang Urban Construction Investment and Development Co., Ltd.
Construction of Zhanqian Road and Underground Pipe Gallery in Shaoyang Economic Development Zone I. Project Background Shaoyang Economic Development Zone, the east gate of Shaoyang, enjoys traffic advantage of Hengyang-Shaoyang-Huaihua Railway, Shanghai-Kunming Expressway and Airport Expressway, becoming a distribution center of human flow, goods flow, information flow and finance flow. At the same time, taking into consideration of the requirements of industrial development, planning layout and comprehensive matching set, the “Century Road—Mashi Road” and underground pipe gallery are going to be constructed to boost the area’s development of modern logistics industry. II. Preliminary Work At present, demolition survey of the requisition land has been completed and it is estimated that such work as designing and inviting tenders will be finished at mid-2017. III. Project Content The land for construction use amounts to 373 Chinese mu. Zhanqian Road (including underground pipe gallery) is intended to construct from the Century Road to Mashi Road with length of 3452 meters and width 36 meters. IV. Project Investment Project investment totals RMB 496.4 million yuan, among which RMB 223.8 million yuan will be used for the acquisition of land, RMB 100 million yuan will be used for constructing Zhanqian Road and RMB 172.6 million yuan will be used for underground pipe gallery. The cost of acquisition of land is estimated to be RMB 600,000 yuan per Chinese mu. V. Cooperation Way Sole proprietorship or joint venture The investor gets compensation from rent incomes and appreciation gains. VI. Benefit Analysis One-off connecting gallery expenses, gallery usage rent fees, property management fees for the gallery and other cash returns collected will be used for compensating operation costs and fixed asset depreciation. VII. Project Initiator Project Initiator: Planning and Construction Bureau of Baoqing Industrial Cluster in Shaoyang 51
Underground Pipe Gallery Construction of Dongkou County I. Project Background The construction of underground pipe gallery constitutes an important content of improving urban infrastructure. In order to avoid “zipper road� problems resulting from repeated excavation, improve pipeline safety level and anti-disaster capabilities, gradually eliminate overhead cobweb-style lines in main streets, improve urban landscapes and boost the regional economy, Dongkou County intends to construct supporting facilities of underground pipe gallery in the new urban area to meet the building need of urban planning. II. Preliminary Work Related early-stage preparation is underway. III. Project Content 44.8km of supporting underground pipe gallery are planned to be constructed, among which 17.2km are of Dongkou Road, 19.4km are of Chengdong Road, 5.5km are of Zhanqian Road, and 2.7km are of Wenchang Road. IV. Project Investment The total investment of the project is RMB 1.45 billion yuan. V. Cooperation Way Sole proprietorship, joint venture or contractual joint venture, the specific way will be determined after negotiating and concluding a contract. The investor gets compensation from operation returns. VI. Benefit Analysis The project construction period is 5 years, and the estimated payback period is 20 years. VII. Project Initiator Project Initiator: Housing and Urban-Rural Development Bureau of Dongkou County
Urban-rural Water Supply Construction of Xiangtan City I. Project Background Urban-rural water supply construction is a systematic project in the interests of millions of civilians. Constructing urban-rural water supply project, improving the conditions of drinking water in both urban and rural areas, raising living standards of urban and rural residents are new measures of building new socialist countryside and harmonious socialist society. According to landscapes, and the distribution of water as well as population in Xiangtan County, 17 townships are divided into 5 water supply areas. According to landscapes, and the distribution of water as well as population in Xiangxiang City and Shaoshan City, they are divided into 6 water supply areas. II. Project Content The contents mainly include building and renovating part of water plants, pressure pump stations and water distribution networks in both urban and rural areas. 1. Sub-projects in rural areas: build 4 new water plants and renovate 14 water plants with total increased water supply amount of about 90,000 tons in Xiangtan County; build 1 new water plant and renovate 13 water plants with total increased water supply amount of about 71,000 tons in Xiangxiang City; and 3 water planted will be renovated and expanded with increased water supply amount of about 5,000 tons in Shaoshan City. 2. 16, 18 and 6 pressure pump stations will be installed in Xiangtan County, Xiangxiang City, and Shaoshan City respectively. 3. 810km, 750km, and 280km of pipelines will be built in Xiangtan County, Xiangxiang City, and Shaoshan City respectively. III. Project Investment The entire investment of the project totals at RMB13, 134,000,000yuan, among which RMB 570 million yuan will be used for water plants, RMB 120 million yuan for pressure pump stations and RMB 644 million yuan for water distribution networks. IV. Benefit Analysis In the next three years, water supply construction and management activities will be carried out in order to achieve 85% of water supply coverage in rural areas (77% in 2016, 80% in 2017, and 52
85% in 2018). V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture Details will be decided through further negotiation. The investor will get compensation through fixed returns. VI. Project Initiator Project Initiator: Xiangtan Environment and Water Affairs Investment Co., Ltd.
The Second Water Source Project on Mountain Papaya in Shaoyang City (PPP Project) I. Project Background With only the YangtzeRivertributaries serving as water source, the water source in Shaoyang City, Longhui County and Xinshao County is single, resultingin weak anti-risk capabilities. As many cities in the country are improving the comprehensive functions of water environment and have developed the second water source for emergency use, Shaoyang will draw on their successful experiences to build the second water source project on Mountain Papaya as a water supply guaranteed system which meets Shaoyang’s practical situation. II. Preliminary Work Early-stage work is positively progressing. Feasibility Study has got approval from the ChangjiangWater Resources Commission and initial designing is being started. III. Project Content In order to reach the intended supply amount of water, 10m will be heightened based on the existed height at the Papaya Mountain reservoir dam. Water supply project will extract water from the Papaya Mountain reservoir, whose pipes pass from Xiansu River, Xiyang River, Hengban Bridge, the county town, Yu Mountain, Zhouwang, Yankoupu, ChangyangPu, and Chayuantou at Beita District to Jiangbei Water Plant which is connected with tap water pipe network of Shaoyang. pressuring station will be set up at Yushan town. Flow from the Papaya Mountain to pipes is designed to be 4.7 m3 /s, and the whole route is paved with φ3.0m precast concrete pipes. A total of 118.6km main pipes will be used for carrying water, among which 1 place is located at the a tunnel, accounting for 6.5km, 23 places are located at culverts, accounting for 7.3km, and 15 places are located at aqueducts, accounting for 2.5km. The flow of branch pipes between Taohuaping of Longhui County to the tap water plant of Longhui County is designed to be 0.6 m3 /s, with a length of 2.5km. The flow of branch pipes between Jiangbei water plant of Shaoyang and New Shaodaping Area is designed to be 0.6 m3 /s, with a length of 16km. IV. Project Investment It is estimated that a total of RMB 2.52 billion yuan will be invested into the second water source supply project of Shaoyang City, among which RMB 570 million yuan will be used for expanding the Papaya Mountain Reservoir and RMB 1.95 billion yuan will be allocated for water-carried pipeline network. V. Cooperation Way A pattern of PPP will be adopted. VI. Benefit Analysis The common water supply amount of the second water source supply project of Shaoyang stands for 280,000 tons per day and the maximum amount is 400,000 tons per day. According to charging standards of water supply projects in other cities, per cubic meter of water will charged for 0.8 yuan. After project construction, average economic benefit is RMB 80 million yuan in several years. VII. Project Initiator Project Initiator: Planning and Finance Section of Shaoyang Water Conservancy Bureau
The Fifth Water Plant Construction Project in Xiangyin County I. Project Background In order to improve water supply functions in urban areas of Xiangyin County and ensure water demand of urban residents, Xiangyin County Urban Construction Investment Co., Ltd. intends to build a new water plant to meet water supply demand. The project is located at Xiangyang Village 53
of Wenxing Town of Xiangyin County, north to Yangshahu Road. It is mainly responsible for domestic water supply in urban areas of Xiangyin County. II. Preliminary Work The preliminary work of handling relevant procedures has been completed and other work related to land expropriation and housing demolition is underway. III. Project Content The water intake head and lift pump room are proposed to be constructed on the bank of Xiangjiang River, screen pre-ozonation service reservoir, mechanical-mixing baffle flocculation and horizontal-flow sedimentation tank and so on, will be built within the plant. It covers an area of 17.160 square kilometers, with a total floorage area of 6,750 square kilometers. Meanwhile, 18,060 meters of main water-carried pipeline will be constructed, supported by such infrastructure as greening, roads, water supply and drainage. IV. Project Investment An estimation of RMB 301,031,900 yuan will be invested into the project construction, of which construction costs account for RMB 239,867,100 yuan, expenses for land expropriation and housing demolition, construction unit management, project survey and design take up RMB 293,188,000 yuan, and preparatory expenses, loan interest during construction and initial working capital account for RMB 32,026,000 yuan. V. Cooperation Way The project adopts a pattern of PPP (cooperation between the government and social capital). Return of investment can be collected from tap water fees after the construction. VI. Benefit Analysis From economic analysis, main technical and economic indicators of the project investment are listed below. Table 1 Main Technical and Economic Indicators No.
Items 1
Total investment
Unit Million yuan
Indicators
Notes
301.0319
Investment for construction 1.1
Million yuan
281.9639
Loan interest during construction Liquid capital
Million yuan
14.2560
Million yuan
4.8120
2
Sale revenues per year
Million yuan
45.1.89
3
Total cost per year
Million yuan
26.9138
3.1
Fixed cost per year
Million yuan
19.8989
3.2
Variable cost per year
Million yuan
7.0149
4
Operational cost per year
Million yuan
9.8315
5
Million yuan
20.5893
5.1
Total pre-tax profits Business taxes and surcharges per year
Million yuan
0.2684
5.2
Total profits per year
Million yuan
17.9867
5.3
Million yuan
2.3342
6
Value-added tax per year Financial internal rate of return
7
Financial net present value
Million yuan
8
After-taxing investment returning period
1.2 1.3
%
year 54
8.78 66.0054 14.84
Post-tax Post-tax Including construction period
No.
Items
Unit
Indicators
10
Loan repayment period Financial internal rate of return
11
Financial net present value
Million
97.3286
12
%
4.48
13
Return rate of investment Profit and tax investment rate
%
6.84
14
Project return on equity
%
22.11
9
Notes Including construction period
year
12.59
%
9.99
Pre-tax Pre-tax
15 Break-even point % 52.52 The profit-generating ability of the project is acceptable. Cash flow of the project can ensure the enterprise to normally run, recoup investment and costs, support the enterprise to pay for further investment of updating and renovating equipment. The enterprise is equipped with the ability of surviving financially and developing. VII. Project Initiator Project Initiator: Xiangyin Urban Construction and Investment Co., Ltd
Comprehensive Treatment Project of ChangdeYangming Lake Water System I. Project Background As the construction of sponge city in Changde is progressing, 12.5 square kilometers of area with Yangming Lake water system as a center will conduct the connection between lake and lake as well as between river and lake according to the planning concept of “Yangming water town�. Aimed to achieve a sponge layout with multiple levels, it is combined with the requirements of flood prevention and drainage, connected lakes and rivers and water environment so that the city can breathe freely like the sponge. II. Preliminary Work Preliminary work has been completed. III. Project Content The project occupies related areas of 2,640 Chinese mu, of which the water accounts for 2,100 Chinese mu and the land account for 540 Chinese mu. It mainly includes connecting water system, lake dredging, treating dirty and odorous water, water diversion, shoreline management, supported facility construction and so on. IV. Project Investment The total investment amounts to RMB 1.7 billion yuan. V. Cooperation Way Joint venture, contractual joint venture VI. Project Initiator Project Initiator: ChangdeYangming Lake Investment & Development Co., Ltd.
Construction Project of 0.1 Million Tons of Sewage Treatment Plant in Nanjiang, Hengyang I. Project Background As companies in Hengyang Baishazhou Industrial Park have become more and more modern and the production scale has also expanded along the way, production and domestic wastewater has been steadily raising. Existing facilities cannot meet the development of enterprises, rendering certain negative effects on the surrounding environment. Therefore, sewage treatment project which is capable of discharging over 0.1 million tons of wastewater is urgently needed. II. Preliminary Work The project has completed planning design and site selection. 55
III. Project Content Located in Baishazhou Industrial Park, the project will occupy an area of 120 Chinese mu. The intended construction scale of it can treat 0.1 million tons of sewage per day, which is mainly from industrial and domestic wastewater produced by the industrial park. The treatment process will adopt AA0 biochemistry processing technology and the treated water will meet A grade of the first discharging standard explained in “Pollutants Discharge Standards of Urban Sewage Treatment Plant ”(GB18918-2002). IV. Project Investment The total investment amounts to RMB 250 million yuan. V. Cooperation Way Contractual joint venture, sole proprietorship VI. Benefit Analysis The project can effectively address pollution problems of rivers as well as underground water triggered by wastewater discharge from enterprises in the park, improve the environment, raise sanitary level and protect local residents’ health. VII. Project Initiator Project Initiator: Hengyang Baishazhou Development, Construction and Investment Co., Ltd.
Industrial Sewage Treatment Plant Expansion Project at Changning City Shuikoushan Economic Development Zone I. Project Background In recent years, with rapid social and economic development taking place at Changning City, more and more enterprises settle into Shuikoushan Industrial Park and at the same time, more sewage will be poured into rivers. The pollution of river courses has become increasingly serious, which directly influences investment environment of Changning and residents’ normal life and constrains social and economic development. II. Preliminary Work The project has finished administrative approval procedures such as environmental impact assessment, planning, land resources, energy conservation evaluation and feasibility study. At present, initial design and land transfer procedures are being handled. The feasibility study has got approval from the Development and Reform Commission of Changning City (C.F.G.H.Z [2016] No.3) in January 10,2016. III. Project Content The project, depending on original pretreatment system, equalization basin, electricity supply system, will expand 20,000t/d combination pool and ultrafiltration system as well as other treatment facilities for industrial wastewater and recycled water pump station. 34km of sewage pipe network and 74km of recycled water pipe network will be built with pipe diameter being DN300-1000 and DN100-600 respectively. IV. Project Investment The total investment amounts to RMB 0.3 billion yuan. V. Cooperation Way Joint venture, sole proprietorship VI. Benefit Analysis By the time the project is completed, the pollution condition of Xiangjiang River will be greatly eased, and the safety of drinking water for residents in the lower reaches of Xiangjiang River will be ensured. Also, pollution of farmland and land produced by industrial wastewater from Shuikoushan Economic Development Zone will also be solved, and local heavy metal pollution can be effectively prevented from happening thus bringing benefits for improving local residents’ living environment. Return of investments is from operational incomes and the estimated payback period last for 15 years. VII. Project Initiator Project Initiator: Changning Environment Investment and Protection Co., Ltd.
PPP Project on Full Coverage of Urban and Rural Domestic Sewage Treatment in Zhuzhou County 56
I. Project Background Domestic sewage contains a lot of organic matters and nutrients. If not effectively processed and directly discharged into the natural water, it will lead to the eutrophication of water, causing a huge waste of water resources. To effectively manage environmental pollution in rural areas of towns and counties, create "beautiful villages" and characteristic towns, improve the living environment of rural areas, and accelerate the construction of a comprehensive well-off society, "Project on sewage treatment in towns, counties and villages of Zhuzhou County" is hereby proposed in accordance with requirements of the "13th Five-Year Plan" at Zhuzhou County. II. Preliminary Work Zhuzhou County is listed as one of national demonstration counties of rural sewage treatment in 2016. The project construction area includes Longtan Town, Longmen Town as well as Longchuan Town, 24 villages and 14,000 scattered rural households. III. Project Content 2027 new rural sewage treatment plants are built with a total sewage treatment capacity of 6400m3 per day, sewage-containing pipe network will be paved, and water quality after being treated can reach A class. Among these treatment plants, three plants are equipped with a daily processing capacity of 400 tons water, 24 plants with a daily processing capacity of 50 tons of water, and 2000 plants with a daily processing capacity of two tons of water. IV. Project Investment Total investment amounts to RMB 346 million yuan (expenses on land expropriation and housing demolition are excluded). V. Cooperation Way Contractual joint venture, sole proprietorship VI. Benefit Analysis As an environment public service project, livelihood projects, the project is conducive to improving the competitiveness of townships, and the establishment of ecological civilization and harmonious society. VII. Project Initiator Project Initiator: Housing and Urban-rural Planning and Construction Bureau of Zhuzhou County
Comprehensive Treatment Project on Heavy Metal Pollution of Yuanshui River and Lishui River I. Project Background Located in the west bank of the Dongting Lake, Changde City is an important part of the ecological economic zone along the Dongting Lake with the Yuanshui River and the Lishui River running through its whole territory. Changde is a hometown of non-ferrous metals, and the concentration of heavy metals in the soil is relatively high. The long-term development of the mining, metallurgy, electroplating industries has resulted in the continuous discharge of heavy metal elements, making the city's heavy metal pollution problems along the Yuan River and Li River more prominent. In order to implement the national and provincial special treatment plan of the heavy metal pollution, meet general requirements of "source control, gradual progress, solid-source and diversion, slope protection and reducing pollution, ensuring the people's livelihood", gradually establish and improve the long-term mechanism of heavy metal pollution prevention and control, highlight the comprehensive management of heavy metal pollution in key areas, significantly reduce the producing and discharge of pollutants, and improve the ecological environment, this project is deliberately proposed. II. Preliminary Work Part of the project is being conducted or the preliminary work is underway. III. Project Content The project intends to carry out the comprehensive management in important areas along the Yuanshui River and Lishui River and its main contents are described as follows: 1. Dredging work will be done to the Huangshui River in Xionghuang mining area, Shimen County, arsenic-containing sludge and waste residue will be safely disposed, and farmland 57
polluted by the heavy metal will be rehabilitated. Dangerous waste landfill site is intended to be built; 5.11 km of Huangshui River at Heshan Village of Baiyun Township section will be dredged; 2.4km of berm and hardened riverbeds will be built. 2.2500 Chinese mu of arsenic contaminated soil at the Xionghuang mining area, Shimen County will be managed; comprehensive treatment project on contaminated soil in the water-level-fluctuating zone of Xianyang Lake will be launched, covering an area of 500 Chinese mu; rehabilitation project on affected farmland at the Xionghuang mining area will be launched, covering an area of 6,500 Chinese mu. 3. Slag, waste water and soil left in gold mining areas of Taoyuan County, Hanshou County and Dingcheng District will be restored, among which gold mining areas in Taoyuan County account for 8 square kilometers, those in Hanshou County account for 5 square kilometers and those in Dingcheng District account for 22 square kilometers. 4. Comprehensive management will be carried out for heavy metal slag in Wu Gong Zui of Jin Shi City, production facilities of alum refining plant will be removed, 240 cubic meters of wasteful production water left at the original alum refining plant will be treated; a solid-waste landfill site will be built; ecological restoration will cover the soil of the entire area under management. 5. Heavy metal pollution left by Jishan Alum Refining Plant in Xiumei Town, Linli County will be treated; 3,000 tons of alum residue, 50 tons of heavy metal waste water, the remaining production facilities and the contaminated soil will be safely disposed; supported landfill site for solid-waste will be built; regional ecological restoration and management will be carried out. IV. Project Investment Total investment amounts to RMB 1.17 billion yuan. V. Cooperation Way Joint venture, contractual joint venture, sole proprietorship VII. Project Initiator Contact Entity: Environmental Protection Bureau of Changde City
Construction of Water Supply and Sewage Treatment Plant in Huilongxu Management District of Yongzhou City I. Project Background The project is located in Huilongxu Management District of Yomgzhou City. Water plant which can supply 6,000 tons of water per day and a sewage treatment plant which can treat 5,000 tons of sewage per day are newly built with supporting pipe network construction. As the national Agricultural Reclamation Modern Agriculture Demonstration Zone, green food production base and foreign trade export base of Ministry of Agriculture, and high-quality agricultural products export base of Hunan Province, Huilongxu Management District covers an area of 107 square kilometers with a population of 35,200. Currently, there are water plants (Leijing Water Plant and Goutou Water Plant) at the management district with backward processing facilities. A lack of sound water quality testing equipment, frequent water-carrying pipe accidents, serious condition of leakage, poor maintenance and high risks of secondary pollution pose huge negative effects on the social and economic development of the management district. As a result, facilities of water supply as well as drainage and sewage treatment are urgently needed. II. Preliminary Work The project land acquisition and planning design have been completed. Water, electricity, roads, and other facilities are well equipped. III. Project Content The existing water supply project will be improved and reconstructed. A new water plan with a daily supply capacity of 6,000 tons will be built; a sewage treatment plant with a daily treatment capacity of 5,000 tons will be built; 60km of water pipe network will be paved, 10km of diversion network of rain and sewage at old urban areas and other supporting pipe network facilities will be constructed. IV. Project Investment The total investment of the project is RMB200 million yuan, mainly raised by the enterprises themselves. The government of the management district will offer relevant preferential policies 58
and financial subsidies. V. Cooperation Way Joint venture, contractual joint venture or BT VI. Benefit Analysis After the completion of the project, the new water supply project of the water supply plant will supply 4000m3 of water per day recently (2017 ~ 2020) and the population served for will be 13400. And it will reach 8000m3 per day in long term. VII. Project Initiator Project Initiators: Environmental Protection Bureau of Huilongxu Management District, Water Conservancy Bureau of Huilongxu Management District
Construction of Domestic Sewage Treatment Facilities in Loudi City I. Project Background The first sewage treatment plant of Loudi City has been running at full capacity. The Xiangzhong Logistics Park Area of the eastern area of Economic and Development Zone will be built and put into operation. About 10,000 tons of domestic sewage is produced per day and is directly discharged into Lianshui River in the above-mentioned area. In order to meet urban development, it is intended to expand the Phase III Project of the First Sewage Treatment Plant (50,000 tons per day) and the Phase I Project of the Third Sewage Treatment Plant (2,5000 tons per day) in accordance with requirements of the environmental protection department. In addition, over 70 newly built domestic sewage plants and supporting pipe network project will be improved within the area. II. Preliminary Work Preliminary work on planning is ongoing. III. Project Content 1. The first sewage treatment plant: the Phase III project (50,000 t/d) will be newly built according to the A level of the first class ; the Phase II and III projects (100,000t/d) will be improved from the B level to the A level of the first class; sludge dewatering equipment of the renovated and expanded sewage treatment plant will have a sludge dewatering rate of 60% or less. The estimated investment registers at RMB 210 million yuan. The project will be started in 2017 and be completed and put into operation in 2018. 2. The second sewage treatment plant: the Phase I project(50,000 t/d) will be improved from the B level to the A level of the first class; sludge dewatering equipment of the renovated and expanded sewage treatment plant will have a sludge dewatering rate of 60% or less. The estimated investment registers at RMB110 million yuan. The project will be started in 2017 and be completed and put into operation in 2018 3. The third sewage treatment plant: the Phase I project of the third sewage treatment plant (25,000t/d) and the supporting pipe network will be newly built according to the A level of the first class. The newly built sludge dewatering equipment will have a sludge dewatering rate of 60% or less. The estimated investment registers at RMB150 million yuan. The project will be started in 2017 and be completed and put into operation in 2018 4. Sewage treatment plant at townships and supporting pipe network construction: over 70 newly-built domestic sewage treatment plants and supporting pipe network will be built in areas under Loudi’s administration. Such projects will be unitedly built and managed by the counties, cities and districts. The estimated investment registers at RMB1.8 billion yuan. 21 sewage treatment facilities will be constructed at townships in 2017, 18 in 2018 and the remaining will be completed and put into operation between 2019 and 2020. IV. Project Investment The total investment amounts to RMB 2.27 billion yuan, of which RMB470 million yuan will be used for sewage treatment facilities at the central urban areas of Loudi, and RMB 1.8 billion yuan will be used for sewage treatment facilities in townships and supporting pipe network project. V. Cooperation Way PPP model will be adopted. Social investors and the investment platform at the county and city level will cooperate in building related domestic sewage treatment facilities. VI. Benefit Analysis The financial incomes of the project are mainly from sewage treatment incomes, and the 59
insufficient part will be funded by the fiscal subsidy. VII. Project Initiator Project Initiator: Housing and and Urban-rural Construction Bureau of Loudi City
1-4 New Small Towns (23)
Comprehensive Development of Ancient Town Cluster along the Xiangjiang River I Project Background With the increasing development of tourist industry, tourist development has been entering a refining process from a extensive model and has become the significant green engine of the development of economy and city culture. Along the north section of Xiang River, there are many ancient towns located in Wangcheng District that forms a rare ancient town cluster including Jinggang, Qiaokou, Xinkang, Tongguan, Shutang, Dingzi and so on. These towns all have their own unique characteristics. For example, Jinggang Town witnessed an interesting story of our famous general Zeng Guofan. And others are famous for its food, drama culture, pottery culture, school culture and art culture. In 2016, Changsha Municipal Party Committee and Government put forward a ‘3-year action plan’ to enhance the development of the ancient town cluster along the Xiang River and to create the most charming ancient town cluster of the whole China. II Preliminary Work The main part of the first phase project of Macrolink Tongguan Kiln International Cultural Tourism Resort has been capped; the construction of Tongguan Kiln Museum has completely finished. These projects promote the development of tourist spots and resorts. The improvement and transformation projects of Jinggang Ancient Town, Xinkang Drama Village and Shutangshan Ouyang Xun Cultural Park are smoothly undergoing. III Project Content 1. Promoting the construction of National Archaeological Park of Changsha Tongguan Kiln and Town-industry Integration Demonstration Area of Jinggang; 2. Cultural tourism projects including MacrolinkTongguan Kiln International Cultural Tourism Resort of Changsha, Shushantang Town for studies of Chinese ancient civilization, and craftsman in Tongguan. 3. Bring in some large cultural tourism companies to develop these ancient towns including Jinggang, Qiaokou, Xingkang, Dingzi and so on. 4. Improving the tourism supporting infrastructures like travel distribution service, tourist toilet and parking lots. IV Project Investment Total investment: RMB 30billion yuan. V Cooperation Way Sole proprietorship, joint venture, contractual joint venture, PPP, etc Participate in the development, construction and operation of sub-projects. VI Project Initiator Project Initiator: Wangcheng District Bureau of Commerce, Changsha City Project Initiator: Tourism Bureau of Wangcheng District, Changsha City
Construction of International Low-carbon Unique Town inWangcheng Scientific and Technological Park I Project Background In 2016,according to Notice about Carrying out the Incubation of Unique Towns released 60
by the Ministry of Housing and Urban-Rural Development, National Development Reform Commission and Ministry of Finance, by 2020,China will cultivate 1000 unique and vibrant towns with various characteristics including leisure tourism, trade logistics, modern manufacturing, education, science and technology, traditional culture, beautiful and livable. Green and low carbon becomes the important idea to the national development. Thus the construction of low carbon unique town conforms to national plan for urban and rural construction and is of great demonstration significance to explore new urbanization. There are five green hills including Wu Mountain, Gu Mountain, Shutang Mountain, Heimi Peak and Jiufeng Mountain in Wangcheng District. On both sides of 70 miles along the Xiangjiang River, the water system of ‘one River, four lakes and five rivers’ was formed. There are six isles formed naturally including the Moon Isle, Xianglu Isle, Fengjia Isle, Caijia Isle, Hongjia Isle and Zhenpi Isle. Superior natural conditions lay a good foundation for the construction of low carbon and unique towns. II. Preliminary Work Agriculture development in Wangcheng has its distinctive characteristics. Leisure agricultural enterprises represented by Qianlong Lake, Xiangtai Agricultural Park and Keke Agriculture give priority to the protection of rural zoology, rural folkways and rural cultural sites and form industry-driven leisure agriculture focusing on customs and folks, agricultural activities experiences, leisure activities in farmer’s home, melon and fruit picking, sightseeing agriculture, scale planting and breeding and business reception. Leisure agriculture and rural tourism becomes one of the pillar industries of Wangcheng District. III. Project Content This project controls planning area of 1000-1500 Chinese mu for application functions of ‘unique towns’ including the construction of international conference and exchange center, low carbon and green products exchange center, advanced production equipment transaction and exhibition center, experience and practice center for industry chain system(plant factory, sightseeing factory) that planting and processing agricultural and technological productions, low carbon and ecological farm and inns(farming life experiencing center), leisure and recreation center, business (health preservation) supporting center, training and incubation college of innovation and entrepreneurship. IV. Project Investment The investment of the project is planned to be RMB 250 million yuan, and the investment period is three years, and the capital will be raised by PPP. V. Benefit Analysis The development and operation of low carbon platform and base will charge investigation and survey fees, consultant fees, designing and programming entrusted service fees through low carbon platform design to gain profits. The development and operation of low carbon platform gains profits through construction fees, management cost, profit-sharing stock system and start-up incubation. VI. Cooperation Way With government guidance and international investment attraction, we sincerely invite the listed companies with relevant experiences, and leading enterprises of agricultural industrialization to invest through the ways of sole proprietorship, joint venture, contractual joint venture to participate in the development, construction, and operation of the project. VII. Project Initiator Project Initiator: Management Committee of Wangcheng National Agricultural Science and Technology Park in Hunan
Comprehensive Development of Xunlonghe Ecological Art Town in Changsha County I Project Background Xunlonghe Ecological Art Town has superior national conditions and historical and cultural resources. With several years’ development by Hunan Palm Xunlonghe Ecological Agriculture Development Co., Ltd, the Town focuses on five industries including ecology, culture, education, 61
tourism and livability and has already constructed and been operating STARPARK, sakura valley theme park and water world theme park. A new short-term suburbs tourism comes into being with characteristics of leisure agriculture, mountain and river sightseeing, cultural tourism and fitness, gaining favorable social reflection and reputation. This Town is rated by Ministry of Housing and Urban-Rural Development as one of the national beautiful and livable towns. In order to explore the economic transition, this project makes use of some new technologies like internet ,big data and e-commerce to build a new model of industry --‘internet+rural resources’, and create a new example of ‘beautiful village’. II. Preliminary Work We have already enacted complete strategies ‘internet 3+’(internet + rural tourism, internet+ rural e-commerce, internet + innovation and entrepreneurship), and formed a detailed construction plan for the project. In 2017, we will start 22 public works. III. Project Content This project covers a total area of 11,584 Chinese mu which is mainly used for the construction of flora and fauna theme park, sports theme park, movie and television cultural village, folk-custom streets, large parking lots and boot camp. IV. Project Investment In 2017, the amount of intended investment is RMB 600 million yuan. V. Cooperation Way Direct investment, equity investment, contractual joint venture VI. Benefit Analysis Long-term sales gains can be achieved from tourism, amusement, catering, accommodation, transportation, shopping and other industries in the project area. It is expected that 1 million people will consume in this town and over 80 million yuan will be gained in 2017. VII. Project Initiator Project Initiator: Hunan Palm Xunlonghe Ecological Agriculture Development Co., Ltd. Hunan Xiaxiangke Xunlonghe Cultural Tourism Co., Ltd
Construction of Lake-surrounding Area of Langli Town in Changsha County I. Project Background Langli, an ancient town with 1500 years of history, is endowed with profound culture, distinctive regional advantages, developed transportation network and mature industrial development, and it is a supporting industrial base for national economic and technological development zone. This project, relying on the natural waterscape of Liuyang River and river basin, and ancient architecture of Tao Gong Temple built in Wei and Jin dynasty,basing on the theory of “the most primitive,the most natural, the most harmonious”, recovers the style and features of ancient town, increases traditional business, promotes Hunan customs,rebuilds “eight scenes along LijiangRiver” and brings in some modern elements including slow happiness culture, leisure and fitness and ecological living so that we can change streets into commercial streets that are beautiful, well-equipped, scale-proper and historical, creating a water ancient town that we can join amusement activities and keep healthy with Hunan culture and humanity characteristic. II. Preliminary Work We have finished project planning and regulatory plan and comprehensive realignment of the water environment including anti-flood wall of Liuyang River and high drainage channel of Lijiang port. Meanwhile, we have started bidding procedures for the project of pump station and gate of Lijiang port and sewage interception project of Shuangqiao port. III. Project Content This project is mainly for the construction of reservoir lake and landscape around lake. It will be implemented into three phases: the first is the construction of lake-surrounding area of Lijiang port; second is the east area construction in central and north; and the third is the west area construction in north. The construction of the lake-surrounding area contains many sub-projects:infrastructures like two reservoir lakes in Lijiang port and Shuangqiao port, and roads linking up the two areas, etc., supporting facilities of public service and scenic belt construction of Liuyang River. 62
IV. Project Investment The total investment is RMB 2 billion yuan among which the investment for initial period is RMB 500 million yuan. V. Cooperation Way Government platform financing company, together with cooperating partners, will establish a project company, which is authorized by the government to carry out financing, operation, construction operation and maintenance during the franchise period. VI. Project Initiator Changsha Langli Urban Construction and Development Co., Ltd
Comprehensive Development of Small City of Dayao Town in Liuyang City I. Project Background Dayao Town is a central town in Liuyang City with rapid development of economy, distinctive industrial features and prominent urban buildings. At present, some symbolic public facilities and business supporting facilities including Li Tian Cultural Square, China Firecracker Culture Pedestrian Street, China Firecracker Raw and Auxiliary Materials Exhibition and Exchange Center, China Firecracker Culture Museum, Dolton Commercial Plaza, Huatian Hotelhave been established. In conclusion, Dayao Town has been equipped with the basic conditions to be a small city. II. Preliminary Work The conceptual planning of this project has been finished. III. Project Content 1. Comprehensive development of Dayao cultural park. 250 houses will be pulled down on both sides of the Nanchuan River in Dayao Town to make room for this wetland cultural park which is integration of tourism and real-estate development, business office, commerce and trade service, ecological leisure, folk-custom experience and cultural innovation, reflecting profound firecracker culture and characteristic of folk houses in the south of the Yangtze River. 2. International firecracker collage. It will be located in Dayao Town, covering an area of 300 Chinese mu with a floorage of 30,000 square meters. It can enroll 3,000 full-time students. 15,000 people will participate in industrial safety training and test for professional qualification every year. 3. Firework art experience center. It will be located in Dayao Town with pseudo-classic architecture. Firecracker impression tower, Large firework displaying filed, Reviewing stand, Traditional handicraft learning and experiencing park, small firework displaying area and auditorium to enjoy traditional dragon and lion dance and drama will be built to create the only tourist resort featured by firework art experiencing in China. IV Project Investment The project investment totals RMB 5.78 billion yuan, among which 5.2 billion yuan will be used for the comprehensive development of Dayao cultural park, 380 million yuan will be used for the construction of International firecracker collage and 200 million yuan will be used for the construction of Firework art experiencing center. V Cooperation Way Sole proprietorship VI Project Initiator Project Initiator: Dayao Town Chengyao Investment and Development Co., Ltd. in Liuyang City
Comprehensive Development of Zhentou Town in Liuyang City I Project Background Zhentou Town, under the jurisdiction of Liuyang City and as the political, economic and cultural center of the western area of Liuyang,is one of the five key central towns to develop of Changsha City. It covers a total area of 158 square kilometers with a population of 56,000, governing 13 63
communities and administrative villages. It’s planned to develop the Zhongfo Temple cultural tourism and connecting line between Zhentou Town and ‘Pingjiang-Rucheng Expressway’ to carry out the comprehensive development of the small town. II Preliminary Work 1.The implementation plan of Zhongfo Temple cultural tourism development project has been determined. 2. Planning and design of the connecting line construction development project as well as land acquisition and demolition work have been done. And the construction of Temple of Three Gods, Buddhist Building, Temple of Di Zang God and Tower of Founder of Buddhism have been finished. III Project Content 1. Zhongfo Temple cultural tourism development. This project covers an area of 200 Chinese mu. Based on Zhongfo Temple, Arhat Formation, Tower of Thousands of Gods, Auspicious Bell Tower, Park of the Founder of Buddhism are planned to be constructed with the commercial and residential land in surrounding areas developed to create a AAA tourism resort. 2. Zhentou connecting line construction and development. The total length of this line will be 10 kilometers and it will be constructed on the standard of secondary road with the roadbed’s width of 15 meters and the road surface’s width of 12 meters. The design speed for this road is 80 kilometers per hour. The cement concrete pavement will be transformed into urban main roadin the future. ROI comes from the land development of both sides of the road. IV Project Investment The project investment totals RMB 200 million yuan, among which each sub-project occupies RMB 100 million yuan. V Cooperation Way Sole proprietorship, contractual joint venture VI Project Initiator Project Initiator: People’s Government of Zhentou Town of Liuyang City
Comprehensive Development of Guandu and Yonghe Ancient Towns in Liuyang City I Project Background In recent years, Changsha municipal government proposed a plan to construct the Liuyang River cultural tourism industrial belt with an aim to develop the Liuyang River basin into a high-quality cultural tourism industrial belt integrating sightseeing and leisure activities, vacation tour and health care, folk-custom and ecological industry, becoming a showcase of Changsha. This project includes the comprehensive development of Guandu and Yonghe ‘chrysanthemum fragrance’ ancient towns which are key towns to develop of ‘ the impression of Liuyang River’ tourism development project. II Preliminary Work Yonghe project planning has been completed. ‘Golden Street’ business street and chrysanthemum stone cultural square have already been built. 20 chrysanthemum stone stores have been brought in. ‘Chrysanthemum fragrance town’ is rated as demonstration town and street of start-up business in Changsha City. Guandu Ancient Town has finished the construction of supporting facilities, including upgrading and rebuilding of Hui style houses on both sides along the river, brightening the light of night scene, rest area of visitors. Meanwhile, Guandu Town has successively held ‘Taste Special Xiang Food’ activity twice. III Project Content 1. Yonghe ‘Chrysanthemum Fragrance’ Town. Construction of chrysanthemum stone cultural museum and transaction and exhibition center, comprehensive supporting projects, chrysanthemum stone tourism product walk street and Tianya stockade leisure nursing center. 2. Guandu Ancient Town. Investment attraction of the cultural industry in Guandu Ancient Town, development of tourist real estate in Hexi, development of ‘ First Bay Hotel’ along the Liuyang River. IV Project Investment The project investment totals RMB 410 million yuan, among which the comprehensive 64
development of Yonghe ‘Chrysanthemum Fragrance’ Town accounts for 290 million yuan and that of Guandu Ancient Town takes up 120 million yuan. V Cooperation Way Sole proprietorship and contractual joint venture VI Benefits Analysis ROI is composed of income from commerce and trade, tourism and consumption. VII Project Initiator Project Initiator: People’s Government of Guandu Town of Liuyang City
Development and Construction of Xiangshan Small Town in Ningxiang County I Project Background Xiangshan Small Town, located in Xiaduopu Town, Ningxiang County, Changsha City, boasts superior regional advantages. Next to Xiangshan National Forest Park and Beautiful China Cultural Theme Park, it is known as the East Gate of Ningxiang. Scenic spots such as Xiangshan Reservoir and Phoenix Hill National Forest Park provide advantaged resources for the construction of this project. The project aims to develop Xiangshan Small Town into the purest town in China, attaching great importance to ecological environmental protection and the harmonious coexistence of human and nature. II Preliminary Work Because of the development of Xiangshan Reservoir and Phoenix Hill National Forest Park in Xiaduopu Town, the supporting facilities of the small town have been increasingly completed and town facade reconstruction has almost been finished. III Project Content Xiangshan Small Town construction includes town facade reconstruction, municipal construction, and the construction of Ningxiang Gate, Xiangshan Story Square and Old Grain Depot. Town facade reconstruction involves 766 empty stores in Xiaduopu Town and Tianma Town and is conducted in the light of European style towns. IV Project Investment The project investment is estimated to total RMB 500 million yuan. V Cooperation Way Sole proprietorship VI Project Initiator Project Initiator: People’s Government of Xiaduopu Town Project Initiator: Investment Attraction Service Center of Ningxiang County of Changsha City
Ecological Agricultural Sightseeing Development in Ningxiang County I Project Background Huaminglou Town is the homeland of a great man named Liu Shaoqi. As a national AAAAA scenic spot, Huaminglou Town has received nearly 4 million visits every year with a huge tourism development potential. Huaminglou Town has its obvious regional advantages. Located at the intersection of Ningxiang County, Shaoshan City and Yuelu District, Huaminglou Town is within the Chang-Zhu-Tan economic circle where it only takes half an hour from Changsha to Zhuzhou or to Xiangtan and is the bridgehead between Ningxiang County and Chang-Zhu-Tan City Cluster. Hence, it has prominent regional advantages. Over the past three years, Huaminglou Town has successfully created four national brands: the third group of national development and reform pilot town, national AAAAA scenic spot, national key town and national livable town. II Preliminary Work Relevant supporting facilities have been completed. Site area and range have been confirmed with Huaminglou Village, with no house removing involved. There is abundant water resource, suitable terrain and soil and livable climate. III Project Content 65
This project plans to cover an area of 370 Chinese mu, among which water area is about 100 Chinese mu and dry area is about 270 Chinese mu, used to build various tourist projects including flower border gallery bridge, ship terminal with charming style, paradise for children, twelve flower lanes, the water maze, sea of European roses, waterside cherry blossoms gallery. IV Project Investment The project investment totals RMB 110 million yuan, among which 20 million yuan will be used for the infrastructure construction and 90 million yuan will be used for landscape construction. It will be divided into three phases. V Cooperation Way Sole proprietorship, joint venture Project Initiator: People’s Government of Huaminglou Town, Ningxiang County, Changsha City Project Initiator: Investment Attraction Service Center of Ningxiang County of Changsha City
Construction of Huashi Town with Characteristic of Lotus Seeds in Xiangtan County I Project Background Huashi Town is located in southern Xiangtan County. As a unique small town in provincial level, it has the largest production base and trade center of lotus seeds, thus rated as ‘lotus seeds capital of the world’. Beautiful landscape, old bridge, old alley, stone wharf, mountains and rivers can be seen in Xiangtan County, which is really a good place to go on holidays. II Preliminary Work This project has been listed in the comprehensive planning of tourism development in Xiangtan county. Specialized Planning of Huashi Town Tourism has been compiled. A detailed construction plan of local Huashi Town tourism is being prepared. III Project Content It’s planned to cover an area of 10,000 Chinese mu for the construction of : 1. Vocational village with the characteristic of lotus culture: relying on the splendid resource of Huashi Lake, a vocational village with the characteristic of lotus culture will be built. 2. Meditation center: a theme hotel will be built for people who like meditation. 3. Love theme vocational village: ‘Lotus seed’ (xianglian in rising tone) and ‘love’ (xianglian in falling tone) sound alike in Chinese. Thus, love is chosen as the theme of the to-build landscape of sea of lotus flower, and vocational village with love as the theme will also be constructed. 4.Lotus happy land: to create artistic conception of ‘sea of lotus flower’ and to build four major tourist projects including water park, photography base for lotus lovers, beautiful view of shadow of lotus flower, long corridor over dam. 5. Lotus park of ‘moonlight over the lotus pond’: relying on the Huashi Lake, large scale water landscape featured by ‘moonlight over the lotus pond’ will be built. 6. Leisure waterfront with lotus light: To construct a leisure waterfront on theme of lotus. 7. Lotus food workshop: to comprehensively demonstrate the benefits of every part of lotus seeds with lotus food culture as the theme. 8. Live-action performance of Ode to Lotus Flower: Zhou Dunyi, an idealist of Song Dynasty wrote a famous Chinese classic ode to the lotus flower after he went into seclusion. The scene in the work is reproduced through live-action performance on the background of water lotus flower with dynamic audio and video, lotus flower boat and light and shadow, etc. IV Project Investment The project investment totals RMB 1 billion yuan. V Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI Benefits Analysis In the first year, the number of expected visitors is about 100,000 people. Calculated with the visitors’ per capita consumption of RMB 400 yuan, the income will reach RMB 40 million yuan. As to catering and service industry, calculated with the visitors’ per capita consumption of RMB 500 yuan, annual income will reach 50 million yuan. After reducing the operating costs of 3 million yuan, the returns will be 60 million yuan. Real estate development will gain profits of 400 million yuan . It is expected that the cost can be recovered within 4 to 6 years. 66
Project Initiator: People’s Government of Huashi Town of Xiangtan County Project Initiator: Culture,Tourism and Sports Bureau of Xiangtan County
Construction of Luokou Ancient Town in Xiangtan County I Project Background Luokou Ancient Town locates in northwest of Xiangtan County and is the intersection of Xiangjiang River, Juanjiang River and Lianshui River. Luokou is one of the four rice markets in Ming and Qing Dynasty and also the ditributing centre and transfer station of wood. At that time, Luokou Ancient Town is a political, economic, cultural and supplies distribution hub in Xiangtan County with lots of merchants here, being very prosperous. There are famous ‘three streets, six lanes and nine wharfs’ in the Luokou Town which possesses old granite streets that are best-preserved and of largest-quantity in the whole China. Old wharf and houses add heavy color to its ancient folk architectural culture. Relying on the historical background and profound culture of Luokou Ancient Town, the old folk houses will be kept and repaired to recover the characteristics of ancient town and the traditional architecture will be combined with special business to create a cultural and leisure tourism street which is the integration of culture and leisure, art, shopping, catering and accommodation, and custom experience. II Preliminary Work This project has been listed in Xiangtan tourism special planning. We are now making up Conceptual tourism planning of Yisuhe Ancient Town along Xiangjiang River tourism belt. III Project Content The project, located in Yisuhe Town, covers a total area of 48.15 hectare including Yisuhe old street, Xiaojiahu lake, Guajuzhou, etc. It’s planned to: 1. construct Longyu wharf, Guoshan wharf and Yangchuan wharf. 2.rebuild Yufeng grain depot, Shichang thrash rice workshop, Hengchang grain depot and pave granite road to reproduce the style and features of architecture of rice market. 3. rely on the themes of rice market, old cities, celebrities, religion and customs and idyllic scenery to construct a comprehensive creativity village which is the integration of creativity culture, writing and sketching, art exhibition. 4. construct a unique business street based on ‘old city, old street’ to recreate the prosperity of three streets and six lanes. 5. reconstruct the waterfront road, develop countryside, orchard and ecological wetland around lake and construct landscape footway, antique pavilion and unique Hunan guild hall. IV Project Investment The project investment totals RMB 2.5 billion yuan. V Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI Benefit Analysis Calculated with 800,000 visitors per year, ticket profits will be RMB 120 million yuan. As to catering and service industry, calculated with visitors’ per capita consumption of RMB 450 yuan, annual income will reach RMB 360 million yuan. After reducing the operating costs 230 million yuan, the profits will be 250 million yuan. The earning of Real estate development will reach RMB 1.2 billion yuan. It is expected that we can recover the cost within five years. VII Project Initiator Project Initiator: Merchants and Cooperation Bureau of Tianyi Demonstration Zone of Xiangtan
Construction of Zhaoshan Life Health Town in Xiangtan I Project Background Infiltrating in HuXiang culture for thousand years, Zhaoshan mountain is famous for its beautiful scenery of ‘clear and mist of mountain city’ which is one of the famous ‘eight views of Hunan’. Zhaoshan Ancient Temple was founded in the glorious age of Tang Dynasty with profound 67
Buddhist culture. In 2014, Zhaoshan mountain scenic spot was rated as National 4A scenic spot. In 2015, Zhaoshan Demonstration Zone was awarded first batch of creating unit of ‘National Universe Tourism Demonstration Zone’. II Project Content This project is located in Baihe Village in Zhaoshan Demonstration Zone, covering an area of about 1,800 Chinese mu. Focusing on the functions of rehabilitation therapy, medical tourism with medical treatment science and education, health care for the elderly, ecological tourism, cultural leisure, it’s planned to construct a unique town with the characteristics of life health industry, folk customs of the Yangtze River delta and Hunan culture and to construct a vocational community integrating health-keeping with health care for the elderly. III Project Investment The project investment totals RMB 5 billion yuan with the construction period being 5 to 8 years. IV Cooperation Way Sole proprietorship, contractual joint venture, joint venture; after signing the contract, more details can be negotiated. V Benefit Analysis This project can recover the costs through commercial and residential property rental and sales, ecological tourism, vocational leisure, industrial development, endowment and recuperation and high-end outdoors operation. VI Project Initiator Project Initiator: Merchants Business Travel Department of Zhaoshan Demonstration Zone of Xiangtan
Construction of Jiuhua Unique Town in Xiangtan I Project Background The National Plan for 13th Five-Year clearly proposed that ‘to construct unique, City-Industry integration and charming small towns by adjusting measures to local conditions’. In July,2016, Ministry of Housing and Urban-Rural Development, National Development and Reform Commission and the Ministry of Finance jointly issued a notification about cultivation of unique small towns which mentions that by 2020, 1000 unique and vibrant small towns will be constructed. II Preliminary Work Economic technology development in Xiangtan was started at the end of 2003. In September,2011, it was approved to be National Economic and Technical Development Zone. In September, 2013, Xiangtan National Comprehensive Bonded Zone was approved to be settled into park. The total size of the park reaches 138 square kilometers with population of 190,000. In 2016, RMB 171.5 billion yuan was gained in technology, industry and trade, RMB 101.2 billion yuan of total industrial output value and RMB 3.76 billion yuan of finance and taxation, ranking among the top three among all parks in Hunan Province. Xiangtan Economic Development Zone, located in the center of Changsha, Zhuzhou, Xiangtan, has its unique regional advantages with its environment increasingly optimizing. Comprehensive transportation network formed with six vertical lines and five horizontal lines and beautiful Jiuhua Lake park, He Ping primary school, Red Star Macalline have already settled in the park. BBK commercial syntheses project is undergoing. And Guang Yi Middle school, Yali Middle school, National University of Defense and Technology Attached primary school and center hospital are to be constructed soon. Moreover, the construction of free WIFI, cable television, public transport, 12-year compulsory education and public bike renting system will be started soon. A charming and intelligent city is towering at the bank of Xiangjiang River. III Project Content This project will cover an area of 1000 Chinese mu for the construction of a unique small town in north area of Jiuhua. Combined with the culture and features of Jiuhua in Xiangtan , this town will focus on the development of commerce, trade and tourism. IV Project Investment The project investment totals about RMB 5 billion yuan. V Cooperation Way PPP, etc; the specific cooperation way can be determined with a contract after negotiation. 68
VI Benefit Analysis Unique small town can rapidly attract many visitors to realize the centralization of city and appreciation of the land. Meanwhile, this project is correspond with the strategic requirements of Xiangtan Economic Development Zone--perfecting supporting modern service and improving popularity of the park. VII Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
Green and Energy-saving Ecological Demonstration Community of High-Tech Industrial Development Zone in Xiangtan I Project Background This project is located in Xiangtan High-Tech Zone which is a new developing area in Xiangtan City. This site is superior because it’s the political, economic and cultural center of Xiangtan and is next to the core of government affairs including municipal party committee, city government and municipal people’s congress. The number of land parcel is A4-08. This land covers an area of 69590.48 square meters (104 Chinese mu) for both commercial and residential use. There are some surrounding developed projects including Xiangtan Wanda Plaza , Xiangtan BBG life plaza Dongfanghong store and some middle and top grade real estate like Evergrande jade metropolis, Tengen meijule,etc. Project planning and design will be fully integrated with urban construction concepts including eco-city, smart city and sponge city. The building uses a centralized cooling and heating system, and makes use of the Group resource advantages in the construction layout, building materials, energy use, insulation and noise control, and operational control, takes the leading domestic technical measures to make it even higher than the Three stars standard of National Green Building. To ensure that the project will become energy-saving environmental protection demonstration project in Hunan Province and even in the entire Central-South region. II Project Content Construction of energy-saving official building, energy-saving and environmental protection demonstration community, demonstration primary school, energy-saving and environmental protection science popularization education base, regional energy supply station; This project covers an area of 104 Chinese mu, in which: 1. 6666.7 square meters (10 Chinese mu) will be used for the construction of agricultural trade market. 2.38247.73 square meters (57.4 Chinese mu) will be used for the construction of primary schools. 3.24458.43 square meters ( 36.7 Chinese mu) will be used for the construction of comprehensive community. III Project Investment The project investment totals about RMB 1 billion yuan. The government has already spared 10 Chinese mu to construct the agricultural trade market. A public primary school that can accommodate 36 classes will be constructed in this planned area. (gratis land) IV Cooperation Way Energy-saving and environmental protection enterprises can join us with the construction. Sole proprietorship shall be adopted for each sub-project. V Benefit Analysis The average prices of Xiangtan’s commercial housing have been increasing all the time. Till the beginning of 2016, the price reaches RMB 4000 yuan per square meter and several city high grade projects break RMB 5000 yuan per square meter. Owing to the development of city industry and the perfection of supporting transport, the housing price will continue to increase. VI Project Initiator Project Initiator: Xiangtan High-Tech Industrial Development Zone
Construction of Maojiachong Hot Spring Small Town in Xinning County I Project Background 69
With the development of leisure tourism economy, visitors have changed their travel model from basic level of sightseeing to high level of leisure, fitness and vocation. Thus, tourism begins to upgrade. Lang mountain belongs to World Natural Heritage Site and then be successively rated as National 5A Scenic Spot. To meet the need of development of tourism in Xinning, we will make the most use of its geothermal resources to exploit the leisure and fitness-keeping tourist projects with the characteristics of unique hot spring which can plays a positive role in promoting economic benefits, increasing popularity, adding energy to local culture and life and increasing the city grade. II Preliminary Work The project area has been drilled out 55℃ hot spring and the water yield of single well is 50 cube per hour. Spring is clear and contains variety of microelements that meet the standard of every index of physical therapy and showering, satisfying the basic condition of the construction of hot spring small town. This project is located in Maojiachong brickyard parcel in Jinshi Town. III Project Content This project covers an area of 600 Chinese mu mainly for the construction of bath center, vocational hotel, property hotel, shopping mall, leisure sightseeing park, supporting facilities of infrastructure of the town. This town will be a integration of hot spring tourism, spa service, aquatic product cultivation in the hot spring, bath, leisure and recreation activities, vocational hotel, commerce and trade, health care for the elderly, culture and sports and accommodation. IV Project Investment The project investment totals about RMB 2 billion yuan. V Cooperation Way Sole proprietorship or joint venture VI Benefit Analysis Project investment totals RMB 2 billion yuan, among which 1.5 billion yuan are fixed asset investment. After the construction of the project, annual total business turnover will reach RMB 800 million yuan with profits of RMB 350 million yuan. ROI is 17.5% and payback period will be six years. VII Project Initiator Project Initiator: Langshan Mountain Scenic Spot Administration Bureau of Xinning County, Shaoyang City
Construction of Hongqiao Art Ceramic Town in Pingjiang County I Project Background Ceramic town, located in Renyi Village in Hongqiao Town, is the first official birthplace of wood kiln ceramic art ---Hushan kiln which is built with the harmonious integration of the form of ancient kiln and local landscape. Abound in its high-quality wood, Li Liangdong ,the starter, strictly follow the rules of firing ceramics in ancient times. Every piece of work is undergone tens of precise and refined processes including purchase of materials, processing, preparation, shaping, glazing, firing and drawing. Thus, every work has its own lingering charm. Since the foundation of Hushan kiln, seventeen batches of works are taken out of the kiln. Every time opening the kiln, ceramic lovers both at home and abroad will come in a continuous stream. Hushan kiln plays a significant role in this industry. This project plans to construct an art town on the theme of ceramic to meet the need of widely promoting the construction of Beautiful Village in China. II Preliminary Work This project has superior regional advantages. It’s next to provincial road 308 and it only takes one 40 minutes to drive to the county and no more than 1 hour to Changsha and Yueyang. On the theme of Ceramic, this project has a great influence at both home and abroad. At present, it has been included in the 13th Five-Year Year plan of the Muhu Mountain National Forest Park. This project is located in Hongqiao Town, Pingjiang County where there is beautiful scenery, organic tea in high mountains and ecological breeding and sightseeing zone, enjoying reputation in Pingjiang County. III Project Content This project covers an area of 2000 Chinese mu for the construction of an art town named ‘Fushan Kiln’. IV Project Investment 70
The project investment totals RMB 300 million yuan. V Cooperation Way Sole proprietorship or joint venture VI Benefit Analysis On the background of history and handicraft, this project is unique and charming and has a great influence in this industry with good prospect of developing. VII Project Initiator Project Initiator: Tourist Bureau of Pingjiang County, Yueyang City
Development of Wukou Ancient Town in Pingjiang County I Project Background Wukou Town is a historical ancient town along the Miluo River with the Pingwu Road acrossing it. Wukou Town is with features and style of Yangtze River delta watertown in Pingjiang County with beautiful scenery, lots of temples and mountains and rivers around it. Wukou Town is an ideal leisure summer resort. In here, we can go on a pilgrimage up the hills and go fishing along the river. We can also enjoy the geographic wonder of ‘God’s Letter in Yanghe Cave’ and appreciate the artistic conception of ‘Small Bridge, Running Water, Houses’. Many celebrities are from Wukou Ancient Town and now are working all over the China. Thus, with over 120 celebrities including modern successful people and historical figures, Wukou Ancient Town is a famous homeland of mass culture and art and one of the birthplaces of national dragon boat culture. Wukou Town is worth investing with rich mineral and agricultural resources of zinc,wolfram and gold. II Preliminary Work According to the initial planning, the first is to improve the infrastructure construction in Wukou Ancient Town; the second is to build an ecological tourism experiencing and sightseeing zone; the third is to build a production base of special agricultural products; and the last is to create a leisure recreation and health-keeping zone in farmhouses for visitors. III Project Investment The project investment totals RMB 200 million yuan. IV Cooperation Way Sole proprietorship or joint venture V Benefit Analysis This project focuses on the theme of ‘water’ and aims to construct a historical ‘ancient town’ with local custom and culture and resources of mountains and rivers. It is expected that annual returns on investment will reach 20%. VI Project Initiator Project Initiator: Tourist Bureau of Pingjiang County, Yueyang City
Comprehensive Development of Royal Lake Town with Charming Style in Yiyang City I Project Background This project is located in north of Ziyang District of Yiyang City and also in National Ecological Tourist Park. It’s about 7.5 kilometers from central urban area of Yiyang and 11 kilometers from Yiyang station of Changsha-Shimen Railway and Luoyang-Zhanjiang Railway. The surrounding comprehensive plant garden boasts rich natural resources with large flowers and plants nursery stock base and lakeside protective and scenic forest. Royal Lake lake in the park is one of ten freshwater lakes in Hunan province with a total are of 11.67 square kilometers. The water quality of Royal Lake lake is superior and it has rich aquatic resources and beautiful scenery with great tourism development potential. II Preliminary Work Now, one 220,000 volt substation, two waterworks to supply 30,000 tons of water every day, one sewage treatment work to treat polluted water 5000 tons every day have already been built. 71
Natural gas pipeline has already been laid down in the whole area. III Project Content The planned area of this project is 4,090 Chinese mu, used for the construction of Royal Lake Town with charming style which is the integration of food, accommodation, amusement, shopping and recreation by making full use of the unique natural and cultural resources of Royal Lake region to reconstruct the town and conduct comprehensive development of the surrounding regions while developing some participatory and experiencing tourist items including display of customs, tourist commerce and trade, leisure inns and agritainment. IV Project Investment The project investment total RMB 1 billion yuan. V Cooperation Way Sole proprietorship, contractual joint venture, joint venture VI Project Initiator Project Initiator: Management Committee of Royal Lake Tourism Development and New Village Demonstration Zone
Construction of Beidouxi Town as a Health Care Small Town in Xupu County I Project Background South Xupu Station of Shanghai-Kunming High-Speed Railway is in Beidouxi Town in Xupu County. Beidouxi Town is rated as the fourth batch of National Beautiful and Livable Village and National Ancient Village, etc. It covers an area of 170.56 square kilometers, among which 205,000 Chinese mu are forest land. Forest coverage rate reaches 80.1%. There are lots of mountains, streams and beautiful scenery in Beidouxi Town. It is an ideal leisure and fitness resort. II Preliminary Work Regulatory Plan and Site Plan of High-speed Rail New City in Beidouxi Town, Xupu has been worked out, reviewed and approved by the county government. Before February, 2017, planning of Erdu River ecological landscape and planning of supporting highway of south Xupu high-speed railway station in new Beidouxi Town, planning of comprehensive improvement of five core villages in new town and planning of tourism of new special Beidouxi Town were compiled. III Project Content It’s planned to construct a comprehensive nursing center, particular group care center, rehabilitation center, health-keeping park, thousands of Chinese mu of sea of flowers and green and ecological park. IV Project Investment The project investment totals RMB 557 million yuan. V Cooperation Way Franchise rights transfer, PPP, sole proprietorship VI Benefit Analysis The expected annual economic benefits will be RMB 90 million yuan after the project is finished . VII Project Initiator Project Initiator: People’s Government of Beidouxi Town of Xupu County
Construction of Fairy Peak Ecological and Health-keeping Town in Loudi City I Project Background With China’s per capita GDP exceeding 4000 dollars in 2010, China’s health industry has entered its rapid-growth period. Leisure tourism becomes hot with family tourism being its main form. Fairy Peak has beautiful natural scenery, well-preserved vegetation and profound culture. Tianlai Temple on the mountain is the key temple in provincial level with people visiting it all the year round. Relying on its high-quality natural resources and combining health-keeping with leisure tourism, Fairy Peak- Jianshan Mountain ecological and health-keeping town can satisfy people’s need for health tourism and bring in new development space for Loudi tourism, being an important way to realize the growth of tourist economy and development of leisure industry. II Preliminary Work 72
Supporting road networks around the project area have taken shape. Water and power supply are fully guaranteed. III Project Content This project covers a total area of 5,000 Chinese mu, mainly used for the construction of health-keeping zone, culture experience zone, vocational zone and high-end residential zone. IV Project Investment The project investment totals RMB 2 billion yuan. V Cooperation Way First, regional integrated development will be undertaken through strategical Cooperation investment. Second, development and operation of sub-projects will be undertaken through sole proprietorship or joint venture. VI Benefit Analysis It is expected to receive 200,000 visits every year. VII Project Initiator Project Initiator: Merchants Development Department of Wanbao New Zone of Shuifu Demonstration Zone of Loudi City
Construction of a Unique Small Town of Hunan Army’s Homeland in Yangshi Town of Loudi City I Project Background Yangjiatan is a historical ancient town with profound culture and is creating conditions to be an unique town in national level. Relying on its unique culture of Hunan army’s homeland, Yangshi Town explores the Lishan charity culture and traditional Chinese medicine and health-keeping culture deeply to construct a unique historical ancient town with clear cultural features that meets the development requirement. II Preliminary Work Conceptual planning and design of Yangjiatan Ancient Town tourism, overall planning of central urban area, detailed repair planning and construction design of ancient buildings including Morality-depositing Hall, Old Pines Hall and Peng’s Ancestral Hall have been completed. 20 hectares tourist land have been programmed and prepared. III Project Content The project investment totals RMB 1.86 billion yuan for the following projects: 1. 460 million yuan will be used for the repair and protection of former house cluster of Hunan army. 2. 320 million yuan will be used for the construction of a leisure park and square on the theme of Hunan army culture. 3. 280 million yuan will be used for the reconstruction and protection of the ancient roads. 4. 680 million yuan will be used for the construction of ‘King of Medicine’ traditional Chinese medicine and health-keeping center and industrial park. 5. 120 million yuan will be used for the construction of landscape road of integrated tourism of village and town. IV Cooperation Way This project will be constructed through PPP model. Construction and operation period is no less than 20 years. V Benefits Analysis As a PPP project, tickets, business income in hotel and shopping, income of land appreciation and business income of health industry will be the main returns of investment. VI Project Initiator Project Initiator: People’s Government of Yangshi Town
Construction of Tourist Towns with Charming Style in Yanghe and Xikou of Cili 73
County I Project Background This project is located in Xikou Town, Cili County. Xikou Town is a famous historical ancient town in the Lishui River basin with profound culture and history. Some customs like Tujia song, boat trackers’ song, hitting glutinous rice cake, drinking party have been inherited for thousand years. Xikou Town was built in the end of Ming Dynasty and the beginning of Qing Dynasty and rapidly developed in Qing Dynasty. In this ancient town, the total construction area of Tujia stilts reaches 29,000 square meters, among which well- preserved area reaches 15,000 square meters. Walking on the stone road in the town is like going back to the past.‘Flower Bridge in the shape of wooden house’ in Dujiaxi Village was built during the time of reign of Guangxu in Qing Dynasty with its four eaves cocked up and beams and pillars painted and carved. A camphor tree in this ancient town has been growing for over 1600 years from the beginning of Tang Dynasty, being the oldest one in Asia. Xikou Town is the main base of the second and sixth group of the Red Army. In 1934, He Long and Xiao Ke established the Soviet regime in Xikou Town. This old site is well-preserved with area of 600 square meters. In February, 1935, well-known blocking action in Mianhuashan Mountain was started here. Some trenches and blockhouses of this action are still preserved. Red Army Hospital, Xikou Committee of Soviet and old sites of the second and sixth group of Red Army are listed in provincial cultural relic protection units. Xikou Town has beautiful scenery with Lishui River acrossing it for 30 Chinese li. The landscape of rapids and DanXia terrain along the river is glorious and unique. Bajiao Cave is divided into many layers in a length of over 20 kilometers.It is said that the views in Bajiao Cave are more peculiar than in Huanglong Cave. II Preliminary Work Six items including Zhangjiajie ice world, tourist resort of Tiancishan Mountain, unique inns of Daijiashan Mountain have been brought in. Conceptual planning of leisure resort in peninsula of Lishui River has completed. Land transference of 10,000 Chinese mu has completed in planning area. III Project Content This tourist project is mainly supported by People’s Government of Zhangjiajie. It covers a planned area of 28,000 Chinese mu, among which 20,000 Chinese mu is land area, 8,000 Chinese mu is water area. The terrain there is relatively flat with little population. So it is good for development of large scale land with low cost. It will also provide more space for sustainable development of national tourist distribution center and tourist destination. Main content of the project is the construction of theme parks, creation workshops streets, recreation streets, commercial and residential real estate for elderly care and vocation and ancient town scenic spots, etc. IV Project Investment The project investment totals RMB 10 billion yuan. V Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI Project Initiator Project Initiator: Tourism and Foreign Affairs Bureau of Cili County
Development of Biancheng Small Town with Charming Style in Xiangxi Autonomous Prefecture I Project Background Huayuan County is the throat land of Hunan, Guizhou and Chongqing and is also the central area of Wuling Mountain. It is usually known as ‘if you are in Huayuan County ,you stand on three provinces’, ‘southwest gateway of Hunan’, ‘large area of Miao minority’. Huayuan County is the prototype of Biancheng Town in a famous book Border Town written by Shen Congwen. Huayuan County covers an area of 1,108 square kilometers with population of 311,000 among which 80% are Miao people. Huayuan County has its superior regional advantages. Baotou-Maoming Expressway, Zhangjiajie-Huayuan Expressway, China National Highway 319 and China National 74
Highway 209 intersect in Huayuan County. Xiangxi airport settled in outskirts of Huayuan County. In 2016, 2.6 million people traveled to Huayuan County and tourist income of RMB 720 million yuan was achieved. This project is located in Biancheng Town which is rated as National Famous Historical and Cultural Town and Cultural Tourism Town with Hunan Style. Biancheng Scenic Spot is now National 3A Scenic Spot and National Water Conservancy Scenic Area. II Preliminary Work This project is included in the 13th Five-Year Plan of Huayuan County. Upgrade and reconstruction of Chadong Ancient Town, land acquisition and demolition for new area of the town, roadbed construction of tourist channel have completed. III Project Content On the background of Chadong Town, the prototype in Border Town of Shen Congwen, this project is mainly to develop some key scenic spots including core area of the ancient town, the new town of cultural tourism, celestial valley and supporting infrastructures of tourist reception services of Biancheng Town with charming style. This project aims to make Chadong Ancient Town in Biancheng a national AAAAA scenic spot and a famous vocational resort with customs experiencing, ancient town leisure, water landscape and cultural experience as the core functions. IV Project Investment The project investment totals RMB 1.35 billion yuan. V Cooperation Way PPP mode VI Benefit Analysis It is expected to receive 2.2 million visits, generating annual average direct tourist income of RMB 190 million yuan after the project is completed. VII Project Initiator Project Initiator: Xiangxi Biancheng Town Tourist Investment and Development Co., Ltd.
2. New Industrialization (178) 2-1 Advanced Equipment Manufacturing (27) Zoomlion Hoisting Machinery Construction Project I. Project Background To meet the demand of enterprise production and national economic development and seize the new opportunities in tower crane industry brought by new urbanization, Zoomlion decided to invest in Zoomlion hoisting machinery construction project in Guanxi Industrial Park in Changde City after feasibility analysis. II. Project Content Total requisition land for the project is 529,515 square meters, with 502,420 square meters for construction and the total floorage is 218,503 square meters. It’s divided into two phases: Phase 1: By 2018, 1233 proprietary brand tower cranes and 6336 plus sections for small and medium-sized tower cranes will be produced annually. Among them, there are 930 hammerhead tower cranes, 241 flat-head tower cranes, and 62 tower cranes with luffing boom. Phase 2: By 2020, products of autocranes will be increased, with annual output of 5000 autocranes and sales revenue of RMB 44,573 yuan . III. Project Investment Investment totals RMB 1.8 billion yuan and RMB 1 billion yuan is planned to be introduced. IV. Cooperation Way Financing V. Investment Promotion and Investment Return Way The investment period is 5 to 10 years and its repaid through amortization with quarterly interest. VI. Project Initiator 75
Project Initiator: Changsha Zoomlion Heavy Industry Science & Technology Development Co., Ltd.
Investment Attraction for Urban Rail Vehicle Industrial Park in Changsha High-tech Industrial Development Zone I. Project Background The project is located in the advanced manufacturing park area of Changsha High-tech Industrial Development Zone, with a planned land area of about 1,000 Chinese mu (500 Chinese mu for the first-phase project). The park has brought together a number of high-quality enterprises engaged in equipment manufacturing, precision machining, electrical equipment, composite materials, power battery, embedded system and software development. It has a good industrial supporting base. The project will mainly focus on the introduction of enterprises that manufacture and carry out R&D of urban tramcars and light rail vehicles, key components and systems of rail vehicles. II. Preliminary Work The park has completed land acquisition, demolition work and the perfection of infrastructure facilities such as roads, water and electricity. A number of advanced manufacturing enterprises and upstream and downstream supporting enterprises of rail transportation industry, including Zoomlion, Honeywell, Corun, Hunan Boyun New Materials, gather here. Recently, CRSC (China Railway Signal&Communication Corp), the leading enterprise in trail transit, has been introduced. CRSC has a complete industrial chain involving railway and urban rail transit communication signals system integration, R&D, equipment manufacturing, construction operation and maintenance. Its the authorized company to set the standard for China railway communication signals system with advanced technology and equipment in high-speed railway train control system across the world. III. Project Content The plan is to cultivate 1 leading rail vehicle manufacturer with core competitiveness and an annual output value over RMB 10 billion yuan, 4 to 6 pillar enterprises with an annual output value of over RMB 500 million yuan, 10 key enterprises with an annual output value more than RMB 100 million yuan, thus bringing into being a rail transit industrial cluster whose output value exceeds RMB 20 billion yuan. IV. Project Investment The total investment of the project is RMB 5 billion yuan, RMB 4 billion yuan in fixed assets and 1 billion yuan in working capital. The project construction period is 3 years. Three years after the project is put into operation, it is estimated to reach its design capacity. It is expected to achieve annual sales income of RMB 20 billion yuan, annual net profit of RMB 1.5 billion yuan and 30% of the investment profits. After paying for income tax, the payback period for project investment is 9 years starting from the year when its construction begins. V. Cooperation Way This project will mainly focus on introducing projects of urban rail vehicle manufacturing and key components and systems manufacturing and R&D to promote the rapid development of rail vehicle industry in this park and further improve the industrial chain. VI. Project Initiator Project Initiator: Management Committee of Changsha High-tech Industrial Development Zone
Investment Attraction for Beidou Industrial Park in Changsha High-tech Industrial Development Zone I. Project Background According to the national strategic requirements, Changsha City has included the Beidou industry in the list of emerging industries with ongoing priority for development and has enacted "Changsha Beidou Satellite Navigation Industry Development Plan (2014-2020)" and "Opinion on Accelerating the Development of Beidou Satellite Navigation Application Industry". It has clearly put forward that Changsha Beidou industrial base is to be developed with the high-tech industrial 76
zone as the core, and has signed the "National Beidou Data Center Hunan Sub-Center Strategic Cooperation Agreement" with the State Information Center on January 12, 2017, thus bringing into being the first local Beidou data center. Relying on Changsha City Beidou satellite navigation industry alliance and other high-quality platforms, we will make good use of resources such as Beidou satellite navigation industry backbone enterprises, major achievements and projects to accelerate the scale development and the formation of clusters for Beidou navigation industry. II. Preliminary Work At present, over 60 key Beidou enterprises are located in Changsha High-tech Industrial Development Zone. Some examples are GWI, Hunan Aerospace Electronics, Hunan Beidou Microchip, Bynav, Hunan Copote Science & Technology Co., Ltd. 2016 witnessed the output value surpassing RMB 10 billion yuan and the initial shaping of an industrial cluster, which integrates high-end technology(chips, COS, remote sensing), high-end products, special application demonstration, product testing and has its core advantage. III. Project Content This project covers a land of 500 Chinese mu. Its projected that 3 to 5 Beidou production-oriented enterprises will be introduced to cooperate in the construction of the Hunan sub-center of national Beidou data center, comprehensive buildings that accommodate mainly R&D and service enterprises, and supporting public technical service platforms. IV. Project Investment Project investment is estimated to total RMB 5 billion yuan with RMB 1.5 billion yuan initial working capital. The project construction period is 2 years. V. Cooperation Way Joint venture, contractual joint venture, holding, sole proprietorship We will focus on the introduction of high-quality enterprises in Beidou satellite navigation industry, which engage in chip R & D and production, ground station equipment R&D, navigation terminal manufacturing, public platform construction and operation, navigation and value-added services. VI. Benefit Analysis The project will reach its design capacity within three years after it is put into production. Its estimated to achieve annual sales revenue of RMB 10 billion yuan, annual net profit of RMB 2.5 billion yuan, and ROI 50%. VII. Project Initiator Project Initiator: Management Committee of Changsha High-tech Industrial Development Zone
Investment Attraction for Aviation Industrial Park in Changsha High-tech Industrial Zone I. Project Background Hunan Province plans to build Asia's largest, the world's third largest aircraft wheel and brake system manufacturing core base in Changsha. In September 2016, Hunan aviation industry development leading group was formed to promote the development of aviation industry in Hunan. Changsha High-tech Industrial Development Zone has gathered well-known R&D enterprises in aerospace industry, such as Honeywell, Hunan Boyun New Materials, Hunan Aerospace Communication Technology Co., Ltd., Changsha Xiangjihaidun Sci-tech Co., Ltd, Jingjia Micro. An aerospace industrial cluster, focusing on aerospace material, aerospace electronic information, satellite and application, general aircraft and supporting equipment, has preliminarily taken shape with an output exceeding RMB 7 billion yuan. II. Preliminary Work Land use planning has been done and R&D and production center for landing gears and brake pads made of carbon composite materials has been basically established. III. Project Content This project covers an area of 500 mu. It’s planned that 5 to 10 comprehensive enterprises as well as supporting equipment production and service enterprises will be introduced. Workshops, office buildings and public service platforms will be constructed in line with the needs of enterprises for 77
production and work. We mainly focus on the R&D of low-altitude low-speed general aircraft, equipment production, assembly manufacturing, sales operation and maintenance, piloting training, general air transport, small airport and station construction, flight insurance business, flight operations. IV. Project Investment The project investment is projected to total 5 billion yuan with RMB 1.5 billion yuan initial working capital. V. Cooperation Way Joint venture, cooperation, holding, sole proprietorship VI. Benefit Analysis The project construction period is 2 years. Its estimated to reach its design capacity two years after its constructed and put into operation. Its expected to achieve an annual revenue of RMB 10 billion yuan, net profit of RMB2 billion yuan, and ROI 40%. VII. Project Initiator Project Initiator: Management Committee of Changsha High-tech Industrial Development Zone
Investment Attraction for Military and Civilian Integration Industrial Park in Changsha High-tech Industrial Development Zone I. Project Background Hunan Provincial Industrial Technology Collaborative Innovation Institute co-founded by National University of Defense Technology and China Hunan Provincial Science&Technology Department has introduced about 30 military and civilian integration industrial projects, focusing on the development of key fields such as supercomputers, Beidou Navigation Satellite System, laser gyroscope, aviation and spaceflight. Changsha High-tech Industrial Development Zone and Hunan Provincial Industrial Technology Collaborative Innovation Institute have made joint efforts to promote the construction of Military and Civilian Integration Industrial Park in Changsha High-tech Industrial Development Zone. 2015 witnessed an output value of more than RMB20 billion yuan in the park with a growth rate of 48% and over 300 enterprises achieving the direct conversion of dual-use technology of military and civilian and doing business both in military and civilian market. This park has gathered over 80% of the Beidou Navigation enterprise in Hunan Province, including GreatWall Information Industry, Hunan Aerospace Electronics, Zhongsen Communication, Guoxin Junchuang and ranked the top throughout the country in chip research and development, military applications, engineering machinery positioning, postal logistics and navigation, intelligent city. It’s also home to the only state-level authorized testing center in the central region. II. Preliminary Work The park has gathered a number of military and civilian integration enterprises like China Electronics, China Aerospace Times Electronics Corporation, Highland Photoelectric, Yinhe Electric, Aerospace Universal and has close cooperation with colleges and universities such as National University of Defense Technology. Thus, a good military and civilian integration industrial base and supporting service conditions are created. III. Project Content This project is located in the Information Industrial Park in Changsha High-tech Industrial Development Zone with a total planned investment of RMB 5 billion yuan. It’s planned to use an area of 1,000 Chinese mu, one phase of it accounting for 500 Chinese mu. And its projected to introduce about 30 military and civilian integration industrial projects and cultivate a group of enterprises whose output value exceed RMB1 billion yuan . IV. Project Investment The planned project investment totals at RMB5 billion yuan with RMB4 billion yuan fixed assets and RMB1 billion yuan working capital. The project construction period is 3 years. V. Cooperation Way Joint venture, contractual joint venture, holding, sole proprietorship We will focus on the introduction of high-quality enterprises in Beidou satellite navigation 78
industry, which engage in chip R & D and production, ground station equipment R&D, navigation terminal manufacturing, public platform construction and operation, navigation and value-added services. VI. Benefit Analysis Three years after the project is put into production, its estimated to achieve an annual sales revenue of RMB10 billion yuan, annual net profit of RMB2 billion yuan and ROI 40%. The payback period after paying for income tax is seven years. VII. Project Initiator Project Initiator: Management Committee of Changsha High-tech Industrial Development Zone
Investment Attraction for Environmental Protection Industrial Park in Changsha High-tech Industrial Development Zone I. Project Background Changsha High-tech Industrial Development Zone was founded in 1988 and was approved as the first batch of state-level high-tech zones in 1991. Its comprehensive economic strength and economic aggregate ranked the 15th among all the state-level high-tech zones. In 2016, the total income of the enterprises reached RMB280 billion yuan; the output value of high-tech industry exceeded RMB 150 billion yuan; the total output value of large-scale industries amounted to RMB145 billion yuan. Six industrial clusters came into being, namely, high-end equipment manufacturing, electronic information, energy conservation and environment protection and new energy, bio-medicine, new materials and modern service industry. The total number of enterprises of various kinds in the park exceeded 15,000. The total number of listed companies was more than 40, accounting for 40% of the province and enterprises listed in the New Three Board took up 35% of the province. The park has gathered a batch of environmental service providers, such as Changtian International Engineering and Research Corporation, Hunan Yonker Water Affairs, Hunan Kaitian Heavy Metal Pollution Control Engineering, Lunan Desulfurization, Hasky Environmental Protection, and a group of environmental protection equipment manufacturers such as Zoomlion Environmental & Sanitation Corporation, Lunan Desulfurization, Henkai Environmental Protection Group, Puhui Environmental Protection Machine, Lihero Technology. There are over 200 enterprises of environmental protection industry, among which about 70 are above-scale enterprises with an output value of RMB5 billion yuan. An industrial cluster centering on energy conservation and environmental protection has been initially formed. In 2016, the annual output value surpassed RMB30 billion yuan, generating over RMB60 billion yuan revenue of the upstream and downstream industries. II. Preliminary Work In 2016, the construction of the Environmental Protection Industrial Park was launched with an planned area of 500 Chinese mu. The first international low-carbon technology trading center of the central region has been established and a low-carbon comprehensive service platform integrating technology transfer, research and development, trade and product display. III. Project Content The planned area of the two phases of the project is 500 Chinese mu. We plan to build a self-contained accelerating space and cultivate 1 leading environmental protection enterprise with an annual output value of over RMB1 billion yuan and core competitiveness, 4-6 pillar enterprises with an annual output value of more than RMB 500 million yuan, 10 backbone enterprises with an annual output value of over RMB 100 million yuan to form an environmental protection industrial cluster. And we strive to create a new industrial cluster whose total output value exceeds RMB 100 billion yuan on the basis of the solid foundation of the current environmental protection industry. IV. Project Investment The total investment is RMB 10 billion yuan with RMB 5 billion yuan fixed assets and RMB 500 million yuan working capital. The project construction period is 3 years. Its estimated to reach its design capacity three years after its put into production and achieve an annual sales revenue of RMB 20 billion yuan with annual net profit of RMB 3 billion yuan and 79
ROI 30%. V. Cooperation Way Joint venture, contractual joint venture, holding, sole proprietorship VI. Benefit Analysis Its estimated to reach its design capacity three years after its put into production and achieve an annual sales revenue of RMB 20 billion yuan with annual net profit of RMB 3 billion yuan and ROI 30%. VII. Project Initiator Project Initiator: Management Committee of Changsha High-tech Industrial Development Zone
Construction of Aerospace Industrial Park in the Economic Development Zone of Wangcheng District I. Project Background Aerospace industry is one of the most challenging and greatly influential high-tech fields in todays world and has become a national strategic high-tech industry. According to the "Thirteenth Five Year "Plan of the in-depth Development of the Military and Civilian Integrated National Defense Technology Industry of Hunan Province, by 2020 a new system of national defense technology industry with high degree of military and civilian integration will have been established in Hunan and the total industrial output value will exceed RMB 200 billion yuan. In the light of the status quo and laws of the development of aerospace equipment industry, the Economic Development Zone of Wangcheng District has relied on Avic Landing Gear Advanced Manufacturing Corporation and Spacemagnets, etc to create an aerospace industrial cluster featured by outstanding characteristics, strong creativity, military and civilian integration and well-known brands and broaden application areas. It has already built an important base for aerospace product R&D and manufacturing across the country. II. Project Content The total planned area of the industrial park is 4300 Chinese mu with an investment of RMB 21 billion yuan. It has already introduced some quality projects of Avic Landing Gear Advanced Manufacturing Corporation, Spacemagnets, Tianying Machinery, Zihard, AECC Zhongchuan Transmission Machinery and achieved an output value of RMB 3 billion yuan. The second phase of the project is scheduled to be completed in 2019. The output value will reach RMB 5 billion yuan by 2020. The project will be supported by the National University of Defense Technology and Central South University, focusing on the development of light aircraft, aviation power, landing systems, aircraft maintenance, satellite applications and enterprises operating through the Internet of Things. III. Project Investment The project investment is about RMB 21 billion yuan. Its mainly used by the enterprises in Aerospace Industry Park for plant construction, production equipment purchase, R&D for new products, testing and personnel training. Its mainly raised by enterprises themselves. IV. Cooperation Way Sole proprietorship and contractual joint venture as the first approach ; Joint venture and contractual joint venture as alternative V. Benefit Analysis The construction of this project can extend the aerospace industry chain and gather resources like talents, technology, market, policy of this industry, which is conducive to the development of aerospace industrial cluster. The project is expected to achieve an output value of RMB20 billion yuan within five years , which brings tax of RMB800 million yuan . VI. Project Initiator Project Initiator: Management Committee of Economic and Technological Development Zone of Wangcheng District
80
Investment Attraction for Intelligent Manufacturing Industrial Park in Liuyang High-tech Industrial Development Zone I. Project Background Liuyang High-tech Industrial Development Zone makes use of the advantages of its manufacturing industry to develop intelligent equipment manufacturing and networking industry and to cultivate intelligent manufacturing demonstration enterprises. It has now gathered more than 20 intelligent equipment manufacturing enterprises including Anda Automatic, Huaheng Robotics, Jinfenglin RFID, Heracles, Canpump, laying a good industrial base. II. Preliminary Work Land use planning and estate planning have been accomplished. And the application for land has been submitted. III. Project Content The project is located in the northeast area of Liuyang Hi-tech Industrial Development Zone in Hunan. The planned area is 400 Chinese mu, which is divided into enterprise investment and construction area and small and medium-sized enterprise incubators. It mainly introduces high-end automated machinery and equipment, advanced CNC machine tools, complete sets of medical (pharmaceutical) machinery and equipment, advanced rail transportation equipment and industrial robot project. IV. Project Investment The project construction investment totals RMB1.8 billion yuan. V. Cooperation Way Sole proprietorship, joint venture VI. Benefit Analysis The project is estimated to achieve output value of RMB5 billion yuan after its put into operation. It will provide 30,000 jobs and improve the level of the intelligent manufacturing industrial cluster in the park. VII. Project Initiator Project Initiator: Merchants Department of Liuyang High-tech Industrial Development Zone
Investment Attraction for Intelligent Remanufacturing Industrial Park in Liuyang High-tech Industrial Development Zone I. Project Background Remanufacturing, as an advanced form of cyclic economy, can generate economic and environmental benefits and is both an important way and an effective measure to promote the construction of "Two-Oriented Society"(resource-economical and environment-friendly society). Since 2008, Liuyang High-tech Industrial Development Zone(former Liuyang Manufacturing Industrial Base of Hunan Province) has been exploring the remanufacturing in the sector of engineering machinery, auto parts, machine tools. It was designated the national mechanical and electrical products remanufacturing cluster pilot zone by Ministry of Industry and Information Technology in 2009 and was approved by the National Development and Reform Commission as the first national remanufacturing industry demonstration base in 2013. Working hard to develop the remanufacturing industry and introduce remanufacturing enterprises is an important way to build the park on its characteristics and transform and upgrade it. II. Preliminary Work Procedures for project land approval have been accomplished, so has the preliminary land planning and industrial planning. III. Project Content The project is located in the northwest area of Liuyang High-tech Industrial Development Zone, focusing on the introduction of high-tech remanufacturing enterprises engaged in auto parts, engineering machinery, CNC machine tools, office equipment and other public platforms of remanufacturing information center, detection and identification, industrial supporting facilities and so on. IV. Project Investment The project construction investment totals about RMB 1.1 billion yuan. 81
V. Cooperation Way Sole proprietorship, joint venture VI. Benefit Analysis Its estimated to achieve output value of RMB 5 billion yuan and provide 20,000 jobs after implementation. VII. Project Initiator Project Initiator: Merchants Department of Liuyang High-tech Industrial Development Zone
Rail Transit Vehicle Manufacturing and Overhaul Base Construction in Zhuzhou I. Project Background Rail transit industry is one of the leading industries in the "Thirteenth Five Year" plan of Hunan Province. Its output value exceeded RMB 100 billion yuan in 2015 and is expected to reach RMB 200 billion yuan in 2020, ranking among the top in the national rail transit industry. Zhuzhou is the province's center for the development of rail transit industry. Zhuzhou Carriage Works has an annual output of 5,000 rail transit vehicles. It achieved output value of RMB 110 billion yuan in 2016 and its products are sold in 70 countries and regions. Therefore, constructing a rail transit vehicle manufacturing and overhaul base in Zhuzhou enjoys a good industrial and market basis. The project, located in the south of Jinshan New Town, fully exploits and utilizes the technical advantages and talents of CRRC branches in Zhuzhou, Zhuzhou CRRC Times Electric and Guangzhou Railway Zhuzhou Rolling Stock Depot, etc., and integrates the resources and advantages of existing small and medium-sized enterprises that support rail transit to build an industrial base featured by railway trucks, special vehicle manufacturing and supporting overhaul. II. Preliminary Work At present, the preliminary application for approval is underway. III. Project Content This project covers a total area of 286 Chinese mu with the floorage totaling about 280,000 square meters. These areas are mainly used to construct workshops, buildings of integrated office and supporting service room as well as roads and railways within the base. IV. Project Investment The project investment is planned to total RMB 2 billion yuan. V. Cooperation Way Sole proprietorship, joint venture VI. Benefit Analysis After implementation, this project is estimated to achieve sales revenue of RMB2 to 3 billion yuan. VII. Project Initiator Project Initiator: Management Committee of Jinshan Science and Technology Industrial Park in Zhuzhou
The Construction of Aviation Supporting Industrial Park in Zhuzhou I. Project Background To implement Plan of General Aviation Industry Development in Hunan Province(2013-2020) and Several Policy Measures on Supporting the Development of Aviation Equipment Industry issued by the Hunan Provincial Government, speed up the construction of Hunan (Zhuzhou) Aviation Industry Demonstration Park and boost the development of aviation equipment industry in Hunan Province, the Aviation Supporting Industrial Park in Zhuzhou is to be established. This project, located in the core supporting area of the key projects of Zhuzhou General Aviation City, will give priority to the introduction of dual-use aviation supporting enterprises engaged in composite materials, precision manufacturing, control system, key components, high precision transmission for civil use, engine and gas turbine maintenance and logistics to accelerate the transformation and application of advanced dual-use aviation technology and to promote the development of general aviation industry. II. Preliminary Work The preliminary planning has been done. Infrastructure is gradually in place. Zhuzhou General 82
Airport is about to be put into operation. More than 10 related aviation supporting enterprises have settled in the park. III. Project Content This project is located in Zhuzhou General Aviation City. Its planned area is 255 Chinese mu, total floorage 100,000 square meters, mainly used to construct workshops satisfying industrial standards and supporting facilities. IV. Project Investment The investment is planned to total RMB 1 billion yuan. V. Cooperation Way The investors will cooperate with New Lusong Group (joint venture) in land development, construction and marketing within the park. Project investment enjoys preferential policies in the relevant aviation industry in Zhuzhou City. VI. Benefit Analysis The project is estimated to achieve annual output value of over RMB2 billion yuan in regular operation. VII. Project Initiator Project Initiator: New Lusong Group Co., Ltd. in Zhuzhou
General-purpose Plane Manufacturing in Zhuzhou City I. Project Background General aviation is China's strategic emerging industry. According to international practice, when per capita GDP reaches 4,000 US dollars, general aviation will develop at a high speed. In 2016, per capita GDP of Hunan reached 6,500 US dollars, which means the economic conditions are mature for general aviation development. Zhuzhou is China's largest small and medium-sized aero-engine reform pilot zone with tens of thousands of professional and technical talents in Chinas aviation industry. According to the Plan of General Aviation Industry Development in Hunan Province(2013-2020), Zhuzhou General Airport is about to be put into operation, and its approved controlled airspace can provide the settled enterprises with legitimate airspace for the use of experimental and exemplary planes. The project will promote the perfection of the aviation industry chain of Zhuzhou through the introduction of general-purpose plane manufacturing projects. General aviation machine manufacturing will generate annual sales revenue of RMB 20 billion yuan by 2020. II. Preliminary Work The preliminary work is underway. III. Project Content The project focuses on the introduction of manufacturing projects of multipurpose planes integrating training, entertainment, aerial mapping functions and special planes used for rescue, fire fighting, forest protection, water transport. IV. Project Investment The investment is planned to total RMB 1.5 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis The project is estimated to achieve annual output of 200 planes with output value of RMB1.2 billion yuan after its put into production. VII. Project Initiator Project Initiator: New Lusong Group Co., Ltd in Zhuzhou
Tianyi Intelligent Manufacturing Industrial Base Construction in Xiangtan I. Project Background Based on the existing industrial base and under the guidance of Made in China 2025, the project adheres to the in-depth integration of the key development directions of high-end equipment manufacturing industry with informatization and industrialization and vigorously cultivates and 83
develops the intelligent manufacturing equipment industry. Coordinating with Lugu of Changsha, Power Valley of Zhuzhou and Intelligent Manufacturing Valley of Xiangtan, its aimed to create a new pattern of the intelligent equipment manufacturing industry development . II. Preliminary Work At present, an industrial system has been initially formed in the park, which is mainly based on auto parts, new energy equipment, mining equipment, high-end construction machinery and equipment, ceramic machinery. More than 50 large-scale intelligent equipment manufacturing enterprises gather here . III. Project Content The total planned area of the project is about 6,000 Chinese mu. Its planned to introduce over 400 enterprises that engage in aerospace equipment supporting parts, advanced energy conservation and electrical equipment, advanced environmental protection equipment, industrial robots, new energy automobiles, automobile manufacturing and spare parts, advanced marine equipment and supporting parts, advanced mining equipment, special engineering equipment, equipment operation information systems and industrial software, 3D printing and equipment, electronic control and telecommunications equipment. IV. Project Investment The project investment totals about RMB 12 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Project Initiator Project Initiator: Merchants and Cooperation Bureau of Tianyi Demonstration Area in Xiangtan
High-end Intelligent Manufacturing Construction in Xiangtan Comprehensive Bonded Zone I. Project Background With the accelerated integration of the household appliances industry with IT including Internet, big data and cloud computing, intelligent energy-saving household appliances are increasingly favored by the market. Xiangtan Comprehensive Bonded Zone combine the functions of bonded areas, export processing zones, bonded logistics areas and ports with "bonded, tax-free, tax rebate" policy advantages, enabling it to develop international transit, distribution, procurement, entrepot trade and export processing. The core components needed for production in the intelligent equipment manufacturing enterprises in Changsha, Zhuzhou and Xiangtan each year are worth several billion yuan. Large machinery and equipment production enterprises have settled in Xiangtan with Jiangnan Industries Group, Jianglu Machinery&Electronics Group, Tidfore, Xiangtan Electric Manufacturing Group Heavy-Duty Equipment and Capital Engineering&Research Incorporation Limited included, which will promote the high-end intelligent manufacturing industry. II. Preliminary Work Xiangtan Bonded Goods Exhibition Center and cross-border e-commerce comprehensive service platform have been established in Xiangtan Comprehensive Bonded Zone. At the same time, 32 projects have been introduced. Preparations are now made for the establishment of Xiangtan International Trade Comprehensive Service Center. III. Project Content The total planned area of the project is about 430 Chinese mu. It is planned to build a base for the processing, manufacturing, importing and exporting of the core parts of 6 intelligent manufacturing fields, such as smart household appliances, wearable equipment, new energy equipment, marine equipment, advanced mining equipment and industrial robots. IV. Project Investment The project investment totals about RMB 1.5 billion yuan. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship VI. Project Initiator Project Initiator: Management Committee of Xiangtan Comprehensive Bonded Zone 84
New Energy Equipment Industrial Park in Xiangtan High-tech Industrial Development Zone I. Project Background Faced with the demand for energy of global economic and population growth, the depletion of traditional energy and the deterioration of human living environment, developing clean and renewable energy is the only way to realize human sustainable development. After several decades of development, the new energy equipment industry with XEMC as its core has taken shape in Xiangtan City. The main products include 5 MW offshore direct drive fan, 1.5 MW plus asynchronous generator, 1.5 MW plus permanent magnet generator, 2.5 megawatts plus machine system integration, 20 kilowatts small fan, solar thermal power generation system, high voltage converter with distributed energy supply system and soft switch, direct drive wind power converter control system, wind turbine design and manufacturing. In 2015, the total industrial output value stood at nearly RMB 20 billion yuan, making it a pillar industry in Xiangtan City. According to Specialized Plan of the Development of the Strategic New Industry--New Energy Industry in Hunan Province, by 2020 the new energy industry will have achieved an added value of RMB 54 billion yuan, of which solar energy takes up RMB 24 billion yuan, wind energy RMB 20 billion yuan, smart grid RMB 6 billion yuan and biomass energy RMB 4 billion yuan. In order to give full play to the existing industrial advantages and quickly expand the new energy equipment industry, the project is put forward. II. Preliminary Work 1. XEMC and XEMC Windpower are both located in the high-tech zone. Their 2MW-5MW wind turbine has a leading position in terms of its technical level in China. 2. Xiangtan is equipped with strong new energy supporting capacity. Therefore, parts of key systems can be matched. III. Project Content The project covers an area of about 1,000 Chinese mu, mainly used for the construction and development of projects such as wind power equipment, photovoltaic equipment, biomass energy equipment and smart grid equipment. IV. Project Investment The total investment is planned to total RMB 3 billion yuan with the construction period of 1 to 2 years. V. Cooperation Way Contractual joint venture, joint venture VI. Benefit Analysis The project is estimated to achieve output value of RMB 2 billion yuan in 2017 after its completed and put into production with its profits and taxes reaching RMB 80 million yuan. The output value of 2020 can amount to RMB 3 billion yuan with its profits and taxes arriving at RMB 120 million yuan. VII. Project Initiator Project Initiator: Xiangtan High-tech Industrial Development Zone
Investment Attraction for Intelligent Equipment Industry in Xiangtan High-tech Industrial Development Zone I. Project Background Intelligent equipment, including three core technologies of sensing, control and drive is an important part of high-end equipment manufacturing strategic emerging industries. Equipment manufacturing enterprises like Valin Steel, XEMC, Jiangnan Industries Group, Jianglu Machinery&Electronics Group, located in Xiangtan, occupy important positions in the industry at home. And 6 key emerging industrial clusters have gradually taken shape including advanced equipment, new energy, electronic information, automotive and parts as well as food industry. In 2016, the city saw the added value of above-scale industries reach RMB 84.395 billion yuan. Among them, there are 1137 enterprises in Xiangtan High-tech Industrial Development Zone, of 85
which more than 430 are industrial enterprises and over 150 are scale enterprises. II. Project Content The project covers an area of 152 Chinese mu. Application for land approval and the demolition have been partially completed. Its planned to develop 3D printing, core accessories of industrial robots and intelligent instruments and so on. III. Project Investment The project investment totals about RMB 500 million yuan. IV. Cooperation Way Contractual joint venture, joint venture V. Benefit Analysis The project is estimated to achieve output value of RMB 500 million yuan after its completed and put into production, with taxes and profits totaling RMB 15 million yuan. In 2020, the output value will reach RMB 800 million yuan with profits and taxes of RMB 24 million yuan. VI. Project Initiator Project Initiator: Xiangtan High-tech Industrial Development Zone
Intelligent Machine Tool Manufacturing in Xiangtan High-tech Industrial Development Zone I. Project Background The intelligent machine tool is the product of advanced manufacturing technology, information technology and intelligent technology deeply integrated and is the advanced form of the development of CNC machine tools. China is in the development stage of CNC machine tools and lags behind the international advanced level in the high-speed, high-precision, multi-axis linkage control, multi-channel compound machining, network communications and other numerical control technology. Xiangtan National High-tech Industrial Development Zone will focus on the development of intelligent manufacturing and spare no efforts to build the "Intelligent Manufacturing Valley". Therefore, the construction of the intelligent machine tool project enjoys great prospects. II. Project Content The project covers an area of about 440 Chinese mu. It’s mainly used for the development and production of intelligent machine tools, including the R & D and manufacturing of complete machines and key parts, industrial finance, science and technology incubation. III. Project Investment The total investment of the project is RMB 2 billion yuan. Investment scope: construction and development, industrial investment, operation and production and other related costs. IV. Cooperation Way Contractual joint venture, joint venture V. Benefit Analysis The annual sales volume is estimated to exceed RMB 1 billion yuan after the project is completed and put into production. VI. Project Initiator Project Initiator: Xiangtan High-tech Industrial Development Zone
Navigation Equipment and Satellite System Industrial Park Construction in Xiangtan Economic Development Zone I. Project Background Hunan Province, with unique regional advantages and resource superiority, is one of the most suitable regions for the development of cloud computing and big data industries in China. The construction of Hunan Province Beidou data sub-center project plays an irreplaceable role in promoting the economic development in Hunan Province and Central China, supporting The Belt and Road initiative and reformulating the rules of cyberspace. 86
II. Preliminary Work Xiangtan City was the key military industry zone to develop in the "First Five Year" Plan and the "Second Five Year" Plan, so it has a good military industry base. After decades of construction and development, military industry enterprises have sped up integrating into the local economy, exerting certain influence on the country. In 2012, Xiangtan was approved as National New Industrialized Military and Civilian Integration Industry Demonstration Base. It has 19 enterprises with military industry production qualification and 105 collaborative enterprises. The number of practitioners of military and civilian integration industry exceeded 30,000 with the annual output value of about 40 billion yuan. Products mainly of XEMC, Jianglu Machinery&Electronics Group, Jiangnan Industries Group and Jiangbin Group were used in the celebration (as well as the military parade in) of the 60th anniversary of the funding of PRC and the 70th anniversary of the victory of the War of Resistance. III. Project Content Its planned to construct navigation equipment and accessories production bases, satellite and system R&D centers, large health industry parks, the Cullian and banks. Navigation equipment and accessories production base: to produce Beidou products developed by the R&D centers. Satellite and system R&D centers: to focus on the research on time and space services, communications services, map services, supporting services of technologies, and their wide applications in the fire rescue, intelligent public transport, people's livelihood, urban logistics and distribution, municipal fine management, underground pipe network safety, precision agriculture and intelligent tourism while at the same time further chip development. Large health industry park: to vigorously cultivate bio-medical industrial clusters, establish traditional Chinese medicine and biological center for entrepreneurship, found conditioning center and rehabilitation center for the elderly in the hospital of traditional Chinese medicine, and create United Nations Ecological Safety and Healthy Living Environment Demonstration Park. The Cullian: a transnational cooperation projects promoted by senior officials of the government of China and the African Union Commission to establish a comprehensive information base on Sino-African trade, investment, tourism, culture and education so as to promote bilateral development. Banks: to rely on the Beidou Digital Center cloud platform, and apply a series of core technologies with independent property rights including satellite communications technology, SOMAX network technology, information security technology to establish a RMB financial settlement system. IV. Project Investment The total investment of the project is RMB 13 billion yuan, mainly used for the construction and purchase of housing, the purchase and installation of production equipment, other construction costs, reserve funds, working capital. The capital is mainly raised by the investors. V. Benefit Analysis The construction period is 5 years and its estimated to achieve annual output value of RMB 20-30 billion yuan after its completed and put into production. VI. Cooperation Way Contractual joint venture, joint venture, sole proprietorship Introduce quality service enterprises and projects at home or abroad in the military and civilian integration industry. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
Fullanti Equipment Manufacturing in Longhui County I. Project Background The project centers on intelligent manufacturing with huge market demand. It can drive the complete integration of the upstream and downstream industry chains of the high-end manufacturing industry such as IT electronics and automotive assembly. II. Preliminary Work The project conforms to national, provincial and municipal policies. The preliminary work is 87
underway. III. Project Content The planned area of this project is about 50 Chinese mu, with a total floorage of 40,000 square meters. The comprehensive plot ratio of this project is 2.2 and the ratio of green space is 30%. The first-phase project consists of four major functional zones, namely, tool manufacturing industrial park, intelligent manufacturing software industrial park, intelligent manufacturing production zone and life supporting zone. The second-phase project expands into other industries, and further constructs R & D creativity zones, productive service nesting zones and headquarter office zones, etc. on the basis of the first-phase project. IV. Project Investment The project is planned to be implemented in two phases. The first-phase project will develop land of 20 Chinese mu with cumulative investment of about RMB 150 million yuan. The implementation time is from 2017 to 2019. The second-phase project will develop land of 30 Chinese mu with cumulative investment of about RMB 150 million yuan. The implementation time is from 2019 to 2021. V. Cooperation Way After the developers obtain the land through bid, auction or listing, develop the land based on sole proprietorship or joint venture. Sales revenue, rental income and appreciation returns. VI. Benefit Analysis The project investment totals RMB 300 million yuan and it’s estimated to achieve annual sales revenue of RMB 450 million yuan with annual profit of RMB 50 million yuan after its put into production. VII. Project Initiator Project Initiator: Dongguan Fullanti Inc Co., Ltd
Rail Vehicle and Parts Manufacturing in Changde I. Project Background On September 4, 2013, China South Locomotive and Rolling Stock Corporation Limited(CSR) and People's Government of Changde City signed a strategic cooperation framework agreement to jointly promote the bilateral cooperation in urban rail transit, aluminum alloy profiles, new energy vehicles, power batteries, automobile axles, polymer materials. CSR will strongly support Changdes plan to establish new urban rail transit and provide the corresponding products as well as maintenance services. It will also actively discuss the issue of investing in and constructing rail vehicle production line or assembly line in Changde. In order to undertake the industrial transfer of CSR and to attract relevant supporting enterprises, Changde City has set up a special supporting industrial park for CSR in the National Economic Development Zone of Changde and provides full-service for those projects settled in Changde . II. Preliminary Work Preliminary feasibility study report and preliminary site selection have been done. At present, it is seeking strategic partners. III. Project Content The project is located in Changde Economic Development Zone with a planned area of 1000 Chinese mu used to construct production or assembly line of rail transit vehicles, developing the ability to manufacture the bogie, body and complete vehicle of rail transit vehicles. III. Project Investment The project investment totals RMB 4 billion yuan. IV. Cooperation Way Joint venture, contractual joint venture and so on V. Benefit Analysis After the project is put into production, it will reach annual output value of more than RMB 5 billion yuan, forming a more integrated industrial chain of rail vehicle production. RMB 200 million yuan will be paid for taxes and 2,000 jobs will be created. VI. Project Initiator Project Initiator: Merchants and Cooperation Department of Economic and Technological Development Zone in Changde. 88
High-end Equipment Manufacturing Industrial Park Construction in Yiyang I. Project Background Yiyang High-tech Industrial Development Zone is a national high-tech industrial development zone with a total planned area of about 67.07 square kilometers, among which the planned area of Chaoyang Industrial Park is 42.68 square kilometers and that of the Eastern Industrial Park is 24.39 square kilometers. Over 40 equipment manufacturing enterprises have been introduced, which include Yiyang Rubber & Plastics Machinery Group, Sany Group, Sino-wind Energy Group, Chuangyuan High-tech, China High-tech Group. The park has thus witnessed the initial formation of a high-end equipment manufacturing industrial chain based on high-end engineering machinery and equipment, energy saving and environmental protection equipment, high-end CNC machine tools and the application of industrial robots, agricultural machinery and equipment and is designated National New Industrialization Promotion Demonstration Base by National Ministry of Industry and Information, China Torch Plan Yiyang Advanced Manufacturing Technology Industrial Base by Ministry of Science and Technology. The park has been striving to develop high-end equipment manufacturing, which is of great strategic significance to the improvement of core competitiveness of the manufacturing industry in the park and the optimization and upgrading of industrial structure. II. Preliminary Work Standardized plant of about 598,000 square meters, incubation building of 43,000 square meters and supporting housing of 140,000 square meters have been built and part of the land acquisition, demolition and field-leveling work have been done. III. Project Content The project is located in the Eastern Industrial Park of Yiyang High-tech Industrial Development Zone with a planned area of about 2500 Chinese mu. It focuses on the development of key technical equipment including intelligent special equipment, high-end CNC machine tools, ships and marine equipment; it develops high-end emerging equipment including rail transit, aviation equipment, sensors and intelligent instruments, servo gear and control systems, industrial robots and additive manufacturing equipment; it strives to improve basic manufacturing level of high-speed precision heavy-duty drivers, high-pressure hydraulic components, high-reliability sealing elements, large-scale precision molds, advanced manufacturing basic technique and facilitate the upgrading of equipment manufacturing industry to become more intelligent and high-end oriented. IV. Project Investment The total investment of the project is about RMB 5 billion yuan. The investment of a single land acquisition project is not less than RMB 100 million yuan, and the investment of the plant leasing project is not less than RMB 30 million yuan. V. Cooperation Way 1. If the investors construct projects based on sole proprietorship, discounts will be given in land price, tax, construction application and other aspects. 2. Investors with projects in line with the planning requirements can enjoy plants and supporting facilities constructed with preferential rents. 3. Projects of scientifically and technologically incubated enterprises can enjoy funds based on the scientific and technological content of the project and free incubation plants and supporting services. VI. Benefit Analysis After the project is put into production, the total ROI will be about 30%, the internal income will be 25%, and the static payback period (including construction period) will be 4 years. VII. Project Initiator Project Initiator: Department of Economic Cooperation in Yiyang High-tech Industrial Development Zone
89
Rubber and Plastics Machinery Industrial Park in Yiyang I. Project Background Yiyang National High-tech Industrial Development Zone, whose total planned area is about 67.07 square kilometers, accommodates 22 rubber and plastics machinery and equipment manufacturers and supporting enterprises including Yiyang Rubber&Plastics Machinery Group, Yiyang Yishen Rubber Machinery, Yiyang Xin Huamei Mechanical&Electrical Technology, Yiyang Jiangnan Rubber&Plastics Machinery Manufacturing Group. Among them: Yiyang Rubber&Plastics Machinery Group is a key enterprise specializing in the production of whole sets of heavy rubber machinery products in China. Its comprehensive technology has reached the international advanced level. The sound industrial base and the supporting enterprises provide strong technical support and facility basis for the project. II. Preliminary Work Land acquisition, demolition and field leveling work have been partially done. Some enterprises have already settled down. III. Project Content The project is located in the Eastern Industrial Park of Yiyang High-tech Industrial Development Zone with a planned area of about 1000 Chinese mu. It’s planned to develop and produce intelligent internal mixer, vulcanizing machine, rubber extrusion and extension equipment IV. Project Investment The total investment of the project is RMB 2 billion yuan, among which the total investment of the first-phase project is about RMB 500 million yuan. It’s required that the investment of a single land acquisition project should not be less than RMB 100 million yuan and the investment of the plant leasing should not be less than RMB 30 million yuan. V. Cooperation Way 1. If the investors construct the project based on sole proprietorship, discounts will be given in land price, tax, construction application and other aspects. 2. Investors with projects in line with the planning requirements can enjoy plants and supporting facilities constructed with preferential rents. 3. Projects of scientifically and technologically incubated enterprises can enjoy funds based on the scientific and technological content of the project and free incubation plants and supporting services. VI. Benefit Analysis Within three years after the first-phase project is fully completed, the total output value is expected to exceed RMB 1 billion yuan and the annual ratals will exceed RMB 54 million yuan. VII. Project Initiator Project Initiator: Department of Economic Cooperation in Yiyang High-tech Industrial Development Zone
Investment Attraction for Shipbuilding Industrial Park in Yiyang I. Project Background Yiyang Shipbuilding Industrial Park, located in Baisha New Port, Yuanjiang City, is the only shipbuilding industrial park in Hunan. Its planned area is 6 square kilometers, in which the core area occupies 2.5 square kilometers. And 80 berths are planned to be built with the overall shipping ton of 1 million tons. This park is planned to be developed into the country's largest high-performance composite yacht manufacturing base, the country's largest inland engineering shipbuilding base and the largest steel shipbuilding base in Hunan Province. II. Preliminary Work At present, the infrastructure of the shipbuilding industrial park has begun to take shape. The road skeleton network of the park has been formed; water and electricity are available now; three bases 90
have been established: the production base of FRP composite ships, the production base of special steel ships and the production base of ship supporting parts. Public service platforms of ship inspection and testing, information services, design research, education and training have been initially established. The carrying capacity of this industry has been further enhanced. III. Project Content Its planned to introduce 20 shipbuilding enterprises. IV. Project Investment The total investment of the project is RMB 5 billion yuan. The focus is on the introducing of large-scale manufacturing enterprises whose investment surpasses RMB 100 million yuan. V. Cooperation Way 1. Plants will be built in accordance with the requirements of investors and rents will collected for the use of these plants. 2. Brand enterprises with certain amount of investment should buy land themselves. Corresponding discounts will be given by the government. 3. The price of the land is made by the park. The park holds stake in it and will choose desirable investors to cooperate with. VI. Benefit Analysis It is estimated that by 2020 the shipbuilding industry will achieve industrial output value of RMB 20 billion yuan with profits of RMB 2.26 billion yuan. VII. Project Initiator Project Initiator: Management Committee of Shipbuilding Industrial Park in Yiyang
Drone and Model Airplane Base Construction in Zhuzhou City I. Project Background In recent years, due to drones wide application in aerial photography, express delivery, post-disaster search and rescue, data collection and so on, China has witnessed exceptionally rapid development in drones. In 2015, sales volume of drones exceeded 20,000 with its sales revenue surpassing RMB 4 billion yuan; its estimated that by 2020 the annual sales volume of drones will reach 290,000, maintaining a growth of more than 50%. Drones enjoy a bright prospect. New Lusong Group, working with leading enterprises in drone and model airplane fields including Shenzhen Sanye Precision Machinery and Sunward, develops, produces and maintains aircraft and flight control equipment, forming a basis for the development of professional drone market. And they have co-established a vocational training school featured by professional drone operation teaching. II. Preliminary Work The project is located in Wulidun Village, Lusong District, Zhuzhou City. Zhuzhou General Airport close to it is about to be put into operation. The approved airspace of the airport can provide settled enterprises with legitimate airspace for the use of experimental drones and exemplary drones. The preliminary work is underway. III. Project Content The total planned area of the project is 474 Chinese mu, the development of which is divided into three phases. The first-phase project occupies 145 Chinese mu, mainly used to build the R & D base of drones and a 30,000-m2 workshop; the second-phase project takes up 156 Chinese mu, used to build a 10,000-m2 model airplane production and processing center, a 40,000-m2 flight simulation center, and a 20,000-m2 exhibition center; the third-phase covers 173 Chinese mu, used to create drones, model airplanes competitive center(mainly the competitive environment) and a 100,000-m2 semi-open arena . IV. Project Investment The total investment of the project is RMB 1 billion yuan, in which the investment of the first-phase project is RMB 100 million yuan, that of the second-phase project is RMB 400 million yuan and that of the third-phase project is RMB 500 million yuan. V. Cooperation Way Joint venture, contractual joint venture 91
VI. Benefit Analysis The annual output value is estimated to reach RMB 1.5 billion yuan after the project is put into operation. VII. Project Initiator Project Initiator: New Lusong Group Co., Ltd.
Industrial Robot Industrial Park Construction in Changde Economic Development Zone I. Project Background The project is planned to implement the requirements of Hunan Industrial Robot Industry Development Plan (2014-2020) by speeding up the development of industrial robot industry, promoting the research and manufacture of industrial robot application system, expanding the extensive application of robots, enhancing the level of industrial automation and intelligent equipment to facilitate the industrial and economic transformation and upgrading of Changde Economic Development Zone and enhance industrial competitive advantage. In the middle of the "Thirteenth Five Year" Plan, its planned that 3-5 industrial robot parts manufacturing enterprises and 1-2 complete sets of equipment manufacturing enterprises will be introduced and the focus is on the introduction of industrial robots manufacturing enterprises and upstream supporting enterprises in the fields of the engineering machinery, electrical engineering and electrical appliances, automobile manufacturing, rail transportation, electronic information, iron and steel smelting, light industry and textile, commercial explosive and so on. At the end of the "Thirteenth Five Year" Plan, an industrial robot demonstration industrial park will take shape, which integrates robot R&D, production, integration, experience and talent training with annual parts and machine output of 2000 and annual output value of RMB 1.5 billion yuan. II. Preliminary Work Preliminary feasibility analysis and site selection have been done. Its now seeking strategic partners. III. Project Content In the initial stage, 6 major functional zones will be constructed: major production enterprise gathering zone, integrator gathering zone, research and development center, experience and exhibition center, academic center, logistics support zone. The project focuses on the construction of the headquarter office, research and development center, workshop and exhibition center, etc.. IV. Project Investment Industrial robots project is located in the 3-square kilometers High-end Machinery and Equipment Manufacturing Industrial Park (west of Deshan South Road and north of Tongde Road) in Changde Economic Development Zone. The total investment is RMB 1.25 billion yuan with a planned area of about 200-300 Chinese mu. V. Cooperation Way The project intends to adopt sole proprietorship and contractual joint venture, etc., focusing on the introduction of domestic and foreign industrial robot production leaders and its parts manufacturing enterprises, or small and medium-sized technology-based enterprises in the stage of entrepreneurship or research and development. VI. Benefit Analysis The end of the "Thirteenth Five Year" Plan will see the annual output of parts and machine reach 2000, the annual output value amount to RMB 1.5 billion yuan and taxes exceed RMB 100 million yuan. VII. Project Initiator Project Initiator: Merchants and Cooperation Department in Changde Economic and Technological Development Zone
92
Robot Town Construction in Xiangtan I. Project Background Xiangtan High-tech Industrial Development Zone was established in 1992 and upgraded to National High-tech Industrial Development Zone in 2009. There are over 430 enterprises, among which 150 are above-scale; In 2016, it achieved total revenue(consisting revenue created in R&D, production and trade) of RMB 121.33 billion yuan, in which the total output value of above-scale industries was RMB 63.85 billion yuan. And 3 major industries including new energy equipment manufacturing, high-quality steel deep processing and mechatronics were formed. According to the development plan of Xiangtan in the Thirteenth Five Year, to promote the upgrading and transformation of Xiangtans industry in the light of Industry 4.0, to introduce and develop intelligent manufacturing enterprises, Xiangtan High-tech Industrial Development Zone will take the initiative to communicate with some intelligent manufacturing enterprises such as Sinsun and its planned to co-build the Robot Town in Xiangtan. It also aims to introduce relevant supporting enterprises through investment promotion to extend robot manufacturing industrial chain and achieve technological innovation and intensive development, thus bringing into being a center of robot innovation and production. II. Preliminary Work Connection and communication with domestic robot manufacturers have been done. III. Project Content The project covers an area of about 1,800 Chinese mu, mainly used for the production of all-purpose industrial robots, intelligent mobile robots, special robots and intelligent service robots and so on. At the same time, technology and culture, industrial tourism and life services will be developed to build an ecological town featured by intelligent manufacturing. IV. Project Investment The project investment totals about RMB 10 billion yuan. V. Cooperation Way Contractual joint venture, joint venture VI. Benefit Analysis The project is estimated to achieve annual output value of RMB 17.8 billion yuan after it’s completed and put into production. VII. Project Initiator Project Initiator: Xiangtan High-tech Industrial Development Zone
Investment Attraction for Intelligent Robot Industrial Park in Yiyang I. Project Background Yiyang High-tech Industrial Development Zone is a National High-tech Industrial Development Zone. Its total planned area is 67.07 square kilometers, in which the planned area of Chaoyang Industrial Park is 42.68 square kilometers and that of Eastern Industrial Park is 24.39 square kilometers. At present, there are Chemchina, Sunsom,Vikko, Dongguan Full Wealth Optronics, Sanyong, JINI, ZhiBo and other electronic manufacturers in this park. It covers fields of R&D and production of intelligent rubber and plastics machinery and equipment, touch screens, LCD, mechanical arms and automation equipment, intelligent robots. II. Preliminary Work A 598,000-square meter standard workshop, a 43,000-square meter incubation building and a 140,000-square meter supporting housing have been established. III. Project Content The planned area of this project is about 1,000 Chinese mu, mainly used to construct 5 platforms of R&D and mass innovation, scientific and technological achievements transaction, academic exchange, international capital docking, public laboratory and 2 bases of sci-tech tourism and industrialization. Its planned to introduce robot manufacturing enterprises at home and abroad and construct an industrial park featured by the whole industrial chain in robot industry, integrating robot R&D, 93
production, experience, exhibition, transaction, financing and science popularization. IV. Project Investment The total investment of this project is about RMB 3 billion yuan, in which the investment of a single acquired land construction project is required to be not less than RMB 100 million yuan and that of the plant leasing project not less than RMB 20 million yuan. V. Cooperation Way Sole proprietorship, joint venture or plant leasing VI. Benefit Analysis According to preliminary calculation, the ROI is about 25%, FIRR 19% and static payback period 5.26 years after the project is put into production. VII. Project Initiator Project Initiator: Department of Economic Cooperation in Yiyang High-tech Industrial Development Zone
2-2 Automobiles and Components (21) Key Automobiles Components Production in Changsha Economic Development Zone I. Project Background As a pillar industry of Hunan province, automobile component industry has been developed fast over recent years. In Changsha Economic Development Zone, Shanghai Volkswagan, GAC Fiat, GMMC, Beiqi Foton, Changfeng Group, Zotye Auto has become the core of vehicle manufacture, driving the common development of the component industry chain in the zone. At present, there are over 120 supporting enterprises covering chassis, cabins, seats, axles, frames, springs, lights, electrical appliances, and moulds, forming the initial rudiment of industry cluster containing regional features. All of these make it a major component production base in Hunan province. However, component matching level is low; components do not fit vehicles well; key components are of low degree of self-efficiency. All these problems still exist. Therefore, this project, aiming at promoting the development of automobile industry in Changsha or even in Hunan, is targeted at solving these problems. II. Preliminary Work Land has been planned and feasibility analysis has been finished. III. Project Content Project is designed and constructed by investors. Construction land amounting to 400 Chinese mu has been planned in the zone. Construction content includes testing workshop, accessory warehouse, finished product warehouse, battery production workshop, electric vehicle assembly shop, machine controller and powertrain workshop, research and development building and office building. Covered area reaches 138,000 square meters. IV. Project Investment Construction duration is two years. Annual income amounts to RMB 2.5 billion yuan in the year reaching target output of the project. Its profits reach to RMB 300 million yuan per year with a 30% ROI. Payback period (including construction period) is 6.5 years. V. Cooperation Way Sole proprietorship VI. Project Initiator Project initiator: Management Committee of Changsha Economic and Technological Development Zone
Investment Invitation of Vehicle Components Industrial Park in Wangcheng 94
Economic Development Zone I. Project Background The fast development of Chinas economy brings automobile consumption into an express line. As the implementation of Provisions on the Liability for the Repair, Replacement and Return of Domestic-use Automotive Products, industry of parallel-import cars and component production industry have been going through great changes. A standardized and normalized service system is needed for the market. Automobile component production park project in Wangcheng Economic Development Zone makes use of the huge market of automobile after-sale market in Hunan province and other five provinces in central-southern China(Henan, Hubei, Guangdong, Guangxi, Hainan) and take advantages of production capacity of aluminum products of Wangcheng national high and new technological industrial base for intensive processing new nonferrous metals in Changsha and the advantages of vehicle industry clusters in Chang-Zhu-Tan City Cluster, aiming at establishing vehicle manufacturing base, vehicle components manufacturing base, new product development base, vehicle selling and maintenance center and staff training center. II. Project Content Land of this project covers 1000 Chinese mu. Total investment reaches RMB 12 billion yuan. In the first phase, the project has introduced projects of high quality, including CITIC Dicastal project (annual output of 12 million wheel hubs and 40 thousand tons of Kathman alloy components), Seth, Chengjin Auto, Alistar, and Yongtong Auto Town. It plans to finish the second phase construction during 2017-2019 with annual output value amounting to RMB 10 billion yuan by 2020. In Wangcheng Economic Development Zone, there are many great projects including the biggest parallel-import automobile trading project in central China, Cultural Industry Quarter of Changsha Dahexi Lantian Automobile, Seth, Emgrand, forming strong industrial base. The project plans to introduce car body made of aluminum alloy, research and development institutions, component manufacturing enterprises and relevant enterprises. III. Project Investment Total investment is about RMB 12 billion yuan, mainly being used for workshop construction, purchasing equipments, and developing new products. It is mainly raised by enterprises themselves. IV. Cooperation Way Sole proprietorship of joined enterprises and contractual joint venture are the main forms. Joint venture and contractual joint venture can be adopted depending on situations in Wangcheng Economic Development Zone. V. Project Analysis It is estimated that annual sales income of vehicle components and matching facilities would amount to around RMB 10 billion yuan in 3 years after the completion of the project and tax revenue would be over RMB 500 million yuan. VII. Project Initiator Project Initiator: Management Committee of Changsha Economic and Technological Development Zone
Investment Invitation of New Energy Vehicle Industrial Park in Liuyang High-tech Zone I. Project Background Changsha has gathered many new energy vehicle manufacturing enterprises including BYD, Hunan CSR Times Electric Vehicle, Changsha Zotye, BAIC Zhuzhou, Zoomlion, Changsha Meihua and over 200 electric vehicle component production enterprises. New energy vehicle industry chain in Hunan has initially formed. Liuyang High-tech Zone Auto Component Industrial Park, with the sound automobile industry 95
base, has formed eight major product systems including engine, electric motor, axle, driving system, interior and exterior decorations, frame and others, which provides supporting services for more than 20 Well - known vehicle companies at home and abroad.Pengxiang Xingtong Auto with the production capacity of the vehicle and Suzhou Ankao Power have been completed and put into production. Monda New Energy will be completed and put into operation by the end of this year. II. Preliminary Work Land usage plan, industrial plan, and national land approval of this project have been finished. III. Project Content It plans to introduce 2 electric vehicle production projects, including dedicated logistics cars and dedicated municipal administration cars; 1 hybrid passenger project, components assembly of lithium-containing batteries and motors. 2 lithium battery projects and 4 power battery assembly lines will be introduced as the supporting projects. Additionally, 2 electric vehicle dynamo and electronic control projects whose annual production of dynamos reaches to 200,000 and annual production of electronic control production plants and assembly lines amounts to 250,000 and one professional electric vehicle testing center with construction area of 20,000 square kilometers are about to be introduced as well. VI. Project Investment Total investment is RMB 3 billion yuan. V. Cooperation Way Joint venture, contractual joint venture VI. Project Initiator Project Initiator: Investment Promotion Bureau of Liuyang High-tech Economic Development Zone
Industrialization of Integrated Products of Electric Automobile Power System in Zhuzhou I. Project Background New energy vehicle is a rising star of power industry in new and high technology zone in Zhuzhou. It has been developing fast over recent years. A vehicle industry cluster with BAIC Motor Company, CRRC, and AECC Hunan South Astronautic Industry as its core is speeding up to take shape. Among them, Zhuzhou base of BAIC has the production capacity of annual production of 200,000 vehicles and 200,000 engines. It will develop its annual production capacity to 500,000 vehicles and 500,000 engines after the completion of investments. In order to form a production chain and promote electric vehicles, the project is planned. II. Preliminary Work Integrated Products of Vehicles Power System has come into the development of the third version and vehicle tests. It can provide more than 400 integrated products of vehicle power system for the whole plants. III. Project Content Construction area covers around 3000 square meters, including assembly lines, power battery pack and BMS, vehicle laboratory, and office area, with the annual production capacity of 800 power systems. IV. Project Investment Total investment is RMB 50 million yuan. V. Cooperation Way Contractual joint venture The way of returning is sales revenue. VI. Project Initiator Project Initiator: Investment Promotion and Cooperation Bureau of Zhuzhou High-tech Zone Cooperator: Hunan Hongxunyian New Energy Technology CO.,LTD.
HCNG Energy Engine Project 96
I. Project Background HCNG is Hydrogen enriched compressed natural gas with another name called hythane. HCNG engine reduces carbon emission effectively, reducing the emission of CH and NOx. It also facilitates that natural gas cab burn more efficiently. At present, vehicles with HCNG engine has been promoted all over the country, realizing ultralow emission (China VI emission standard). In demonstration phase, it will launch demonstration operation of HCNG bus and HCNG filling station in cities or areas with suitable conditions, such as Chengdu, led by Ministry of Industry and Information Technology of the Peoples Republic of China, National Development and Reform CommissionNational Energy Administrationand Ministry of Environmental Protection. It will also introduce some supportive policies (supporting funds included) and set standards for HCNG vehicles, gaining experience for promoting HCNG hybrid vehicle in the whole country. In the process of Zhuzhous creating a national civilized city, it uses electric buses and promotes riding bikes. And it also tries to make taxi companies use HCNG and prepare for adopting project in advance. It makes out industrial layout of HCNG engines in advance by introducing the key technology of making HCNG engines through cooperation with Tsinghua University. II. Preliminary Work Zhuzhou vehicle industry has time-honored history with strong industry foundation, having a lot of vehicle manufacturers, such as BAIC and CRRC and other vehicle components production enterprises. Relevant preliminary work is in process at present. III. Project Content The project covers an area of around 20 Chinese mu and it will build 20 HCNG engine assembly lines. IV. Project Investment Total investment is about RMB 1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Project Analysis After the completion of the project, it is estimated that the annual value of production will reach RMB 5 billion yuan and more than 200 jobs will be created. VII .Project Initiators Project Initiator: Zhuzhou Municipal Bureau of Commerce and Grain
Intellectualized Reconstruction of New Energy Bus Manufacturing in Zhuzhou I. Project Background The project locates at Liyu Industrial Park in New and High Technology Park in Zhuzhou. Its cooperator is CRRC which is the first enterprise that get the aptitude of manufacturing new energy vehicles in China. It has Industrial Base of High Technology Achievement Transformation and China Torch Program Achievement Transmission Base with strong technical strength. Also, it takes advantages of key core technologies including electric drive and control technology, working in field of new energy vehicle for 16 years. By the end of 2015, CRRC sold 15,000 electric vehicles and 30,000 electric drive system and key components. Safe operating mileages amount to 3 billion kilometers. This project plans to introduce automated equipments, such as intelligent automated shipping transmission. And it plans to use RFID and PLM, MEX, HDRS, after-sales service system, making digitization and intelligentization of designation, crafts, and management of supply chain come true. II . Preliminary Work Feasibility study is finished. The preliminary approval work is underway. III. Project Content The project takes advantages of the current platform of CSR, establishing a flexible production system and developing annual production capacity to 10,000 new energy buses. At the same time, it plans to upgrade the management system of marketing, designing, crafting, logistics, and after-sale; add test platform for production development and intellectual vehicle development; add key components production, and intellectual testing management equipment and software; 97
construct intellectual storage and shipping system. IV. Project Investment Total investment is about RMB 100 million yuan. V. Cooperation Way Joint venture, contractual joint venture VI. Project Analysis After it is put into operation, it is estimated that annual value of production reaches to RMB 7 billion yuan. VII. Project Initiator Project Initiator: Investment Promotion Bureau of Zhuzhou High-tech Zone
New Energy Vehicle Industry Park Construction in Xiangtan Economic Development Zone I. Project Background Xiangtan Economic and Technological Development Zone is in Changsha-Zhuzhou-Xiangtan city cluster, being a national pilot zone for overall reform of creating resource-saving and environment-friendly society and the only nation level economic development zone with integrated free trade zone. Population is 190,000 and the total area is 138 square kilometers with vehicle and components manufacture, electronic information, and advanced equipment production as its pillar industries. Geely Automobile in the park produces 200,000 passenger vehicles per year, driving Fortune Top 500 including Schaeffler, Everspaecher of Germany, Tower of America, Magna of Canada, Faurecia of France, Katcon of Mexico and vehicle component enterprises including Hibboridd, Lingyun Industry Cooperation, Zesun, Luoyou, Ditong Automobile, and Weifu to join the park. Huayan Laboratory under construction will offer technology development, innovation, pre-production, testing and test cooperation. International racing track and vehicle cultural industry park contain vehicle theme park, museums, second-hand car trading markets, car clubs, and restaurants and so on. II. Preliminary Work Land used for the project has finished Nine availables and one accessible: Water, electricity, heat, gas, sewage, post, telecommunications, and closed circuit. Project planning and investment attraction are in process. III. Project Content The planned land use area totals about 1,000 Chinese mu, mainly used for building and purchasing buildings, and purchasing and installing manufacturing equipment. It plans to develop and produce EIC system of new energy vehicles and charging facilities. IV. Project Investment Total investment is about RMB 3 billion. V .Cooperation way Contractual joint venture, joint venture, sole proprietorship VI. Project Initiator Project Initiator Management Committee of Xiangtan Economic and Technological Development Zone
Construction of Production Base of Vehicle Engine and Components in Xiangtan Economic Development Zone I. Project Background Xiangtan Economic Development Zone once was rewarded as National Special Industry Base for Mechatronics and one of China Top 50 Vehicle and Components Industry Clusters, and a national demonstration zone of photovoltaic power generation, being an industrial park with the best investment attraction and development potential. Population is 190,000 and it covers 138 square 98
kilometers with vehicle and components manufacture, electronic information, and advanced equipment production as its pillar industries. Geely, the first enterprise joined the park, produces 200,000 passenger cars per year, driving Fortune Top 500 includidng Schaeffler, Everspaecher of Germany, Tower of America, Magna of Canada, Faurecia of France, Katcon of Mexico and vehicle component enterprises including Hibboridd, Lingyun Industry Cooperation, Zesun, Luoyou, Ditong Automobile, and Weifu to join the park. Huayan Laboratory under construction will offer technology development, innovation, pre-production, testing and test cooperation. II. Preliminary Work Land used for the project has finished Nine availables and one accessible: Water, electricity, heat, gas, sewage, post, telecommunications, and closed circuit. Project planning and investment attraction are in process. III. Project Content Land for this project is about 1,000 Chinese mu, including 200 Chinese mu for production base of vehicle engines and 800 Chinese mu for production base of vehicle components. It plans to develop and manufacture engines and chassis, steering, running gear and braking systems, build plants and purchase and install manufacturing equipment. IV. Project Investment The total investment is RMB 3.5 billion yuan, including RMB 2 billion yuan for engine production base and RMB 1.5 billion for component production base. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship VI. Project Initiator Project Initiator Management Committee of Xiangtan Economic and Technological Development Zone
Medium and High-end Passenger Car Parts Production in Xiangtan Economic Development Zone I. Project Background Xiangtan Economic and Technological Development Zone was established at the end of 2003. It was approved as a national economic development zone in September, 2011. It was listed in one-hundred-billion-yuan parks in Hunan province in 2013. And in September, it was approved to establish national comprehensive bonded area. It employs world first-class level JURONG International cooperation. It makes overall plan and industrial development plan covering 138 square kilometers with vehicle and component production, electronic information industry and advanced equipment manufacture as its core industries. Geely Automobile produces 200,000 vehicles, 300,000 engines and 300,000 gearboxes per year. In 2016, yield amounts to 170,000 and production value reaches to RMB 15 billion. The project of Volvo SUV new energy project, with investment of RMB3.5 billion yuan and annual yield of 300,000, goes into production, driving the parts production value amount to RMB10 billion yuan. Also, it attracts Fortune Top 500 including Schaeffler, Everspaecher of Germany, Tower of America, Magna of Canada, Faurecia of France, Katcon of Mexico and vehicle component enterprises including Hibboridd, Lingyun Industry Cooperation, Zesun, Luoyou, Ditong Automobile, and Weifu to join the park. Total income of this industrial park reached to RMB 171.5 billion yuan in 2016, including its total industrial production value RMB 101.19 billion yuan and tax revenue RMB 3.76 billion yuan. It attracted investments RMB 60 billion yuan, ranking the top 3 among all industrial parks in Hunan Province. II. Preliminary Work Land used for the project has finished Nine availables and one accessible: Water, electricity, heat, gas, sewage, post, telecommunications, and closed circuit. Project planning and investment attraction are in process. III. Construction Content Land use area of the project is about 1000 Chinese mu for building a medium-high end vehicle production base with the annual production exceeding 200,000. 99
IV. Project Investment Total investment is about RMB 3 billion yuan, including fees for building and purchasing plants, purchasing and installing production equipment, construction fees, budget reserves and working capitals. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship Detailed ways will be determined in contract after negotiation. VI. Project Analysis It plans to raise production value to RMB 100 billion yuan, including vehicle production RMB 60 billion yuan, component production RMB 40 billion yuan. It is going to make the ratio of independently supported localized parts up to more than 80%. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
New energy Vehicle Industry Park in Xiangtan New and High Technology Development Zone I. Project Background Vehicle industry is both a pillar industry in national economy and an iconic industry showing national competitiveness. Yield of new energy vehicle in 2016 reached to 517,000 and 507,000 were sold, respectively making 51.7% and 53% year-on-year growth. By 2020, perfect power system for electric vehicles and technology system for industry chain must have been established, with its points being at 6 innovations, including power battery and battery management, motoring and power electricity, intellectual electric vehicles, fuel cell power system, , and pure electric power system. II. Preliminary Work There are almost 200 new energy vehicle manufactures in Hunan including Changsha BYD, Zhuzhou CSR, Jiangnan Zotye, Zhuzhou BAIC, Xiangtan Geely, Meihua Aut and new energy vehicle component manufacturing enterprises such as Changsha Shanshan, Hunan Corun, Soundon. Many key components of new energy vehicle production enterprises are doing businesses in Xiangtan High and New Technology Zone. III. Project Content Planning area in Industry Park in Xiangtan High and New Technology Zone covers about 400 Chinese mu, mainly used for development and production of EIC system. It contains the development, manufacture and assembling of key materials including lithium battery industry, cell fuel industry, motoring, battery control system, and charging facilities. IV. Project Investment Total investment is RMB 3 billion yuan. It includes construction and development, industry investment, sector fund, management and production. V. Cooperation Way Contractual joint venture, joint venture VI. Project Analysis After the completion of the project, it is estimated that annual sales of industry park reaches to RMB 2 billion yuan, bring more than 10 enterprises to do businesses here and creating over 1000 jobs. VII. Project Initiator Project Initiator: Xiangtan New and High Technology Development Zone
Vehicle Component Industry Park in Xiangtan High-tech Development Zone 100
I. Project Background The vehicle production capacity in Hunan province is expected to exceed 2 million and component production enterprises above designated size reach to over 1,000. Changsha-Zhuzhou-Xiangtan area holds over 70% production factors with more than 300 vehicle and component production enterprises. Xiangtan New and High Technology Development Zone has introduced many vehicle component enterprises, including China Yifeng, Ningbo Autowin, YHKAM, XEMC, Jiangsu Huanyu, and Shanghai Qinhua. This project is close to Shanghai VW (production base in Changsha), Mitsubishi Motors, GAC FCA, BAIC, BYD, Changfeng Motors, Geely, Zotye, which can reduce production cost by reducing shipping cost. II. Preliminary Work Main row materials needed for production can be purchase domestically. Supply is efficient which meet production demands perfectly. III. Project Content Planning area for component industry park is 600 Chinese mu, including 1. Seats, seat parts, and interior decoration production It covers 80 Chinese mu with investment of RMB 300 million yuan, producing sedan seats, child car seats, passenger vehicle seats, heavy truck seats and other main supporting products. 2. Stamping parts of car body It covers 60 Chinese mu with investment of RMB 200 million yuan, producing stamping parts of car body including car gates, two hoods, right and left fender, left and right body panels, and car roof. 3. Gearbox It covers 100 Chinese mu with investment of RMB 300 million yuan producing gearboxes. 4. Front and rear independent suspension assembly and other chassis parts It covers 80 Chinese mu with investment of RMB 300 million yuan. It produces 300,000 front and rear suspension assemblies, 400,000 steering linkages and 900,000 torsion-bar springs. 5. Development and manufacture of rearview mirror, bumper, wheel cap, and other plastic body parts It covers an area of 80 Chinese mu with total investment of RMB 300 million yuan, producing all kinds of sedan, body parts, rearview mirror, bumper and so on. 6. Automobile cover mould project It plans to expropriate land of 100 Chinese mu with the total investment of RMB 400 million yuan and 24-month construction duration. After the completion of the project, it will be able to design, produce and debug1,000 automobile cover mould per year. IV. Project Investment Total investment is RMB 2.4 billion yuan, including construction engineering, construction and installation costs, electricity, water supply, environmental protection, roads and afforestation fees. V. Cooperation Way Sole proprietorship VI. Project Analysis According to the average level of vehicle components industry, after deduction, general VAT is 3%-4% and ratio of income as a percentage of sales is 8%-10%. After the completion of the industry park and achieve its intended purpose, annual sales income will reach to more than RMB 5 billion yuan. And it will pay almost RMB 200 million yuan tax every year. VII. Project Initiator Project Initiator: Xiangtan New and High Technology Development Zone
Production Base for Key Parts of Large and Complete Equipment I. Project Background As a time-honored industrial base, Xiangtan has certain scale and strength in mechanical equipment manufacturing industry. Most special accessories of some key parts with high quality and technology reply on import, but they are necessary to some key projects. Imported products are expensive and the maintenance fees are expensive as well. Sometimes, accessories cannot be sent in time. Therefore, producing key mechanical parts with high quality and great 101
price/performance ratio to replace imported ones becomes the development goal. At present, Xiangtan is home to complete plants of ports and mines, including TIDFORE, Xiangtan Electric Manufacturing Group Heavy-Duty Equipment Company, MCC Capital Engineering & Research Incorporation. Increasing the abilities of producing large equipment and key parts of complete plants is good for increasing the market share of local enterprises and their competitiveness. II. Preliminary Work There are 58 advanced equipment manufacture enterprises doing businesses in Xiangtan Economic Development Zone, producing large material handling equipment, listing equipment, electronic instruments, 400-ton mine truck and its accessories. The value of annual demands of key components reaches to RMB 10 billion yuan. Building production of key parts can reduce purchasing cost effectively and raise degree of aggregation of industry. III. Project Content Planning area is around 300 Chinese mu. And it plans to build production base for parts of engineering machinery and equipment used in ports and mines, including, steel structures of bulk materials conveying equipment, lifting equipment, conveyor, pneumatic, AC low-voltage distribution cabinet, screwshipunloading conveyor, oil cylinder, multi-way operating valve, electrical cabinet. IV. Project Investment Total investment is around RMB 750 million yuan, including for fees of plant construction, purchasing and installing production equipment, engineering construction, budget funds, working funds. It plans to build large factories, office buildings, mess halls, afforestation and roads and squares inside industrial park. Fees are mainly raised by investors. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship Detailed ways will be determined in contract after negotiation. VI. Project Analysis It is estimated that production value of equipment manufacture reaches to RMB 30 billion yuan by 2016. And after completion, it achieves sales income of RMB 2 billion yuan. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic Development Zone
Construction of New Energy Industrial Park in Shaoyang I. Project Background New energy vehicles will climb up to 5 million over the coming five years. It is estimated that yield of new energy vehicles will keep compound annual growth rate of 40% before 2020. As the implementation of national policy of supporting new energy industry, new energy market with over RMB 100 billion market value should be explored. II. Preliminary Work Project planning and site selection are completed. Land has been submitted for approval. III. Project Content This project contains two sub projects. 1. 700 Chinese mu of the planning industrial site is used to introduce one new energy enterprises and some supporting enterprises. 2. Use 400 Chinese mu of available land in Longxutang Industrial District to construct power batteries, motors, electronic control system, new energy vehicles and introduce assembly lines of new energy passenger vehicles. IV. Project Investment Total investment is RMB 6.2 billion yuan, including RMB 4 billion for sub-project 1 and RMB 2.2 billion for sub-project 2. V. Cooperation Way Sole proprietorship or joint venture VI. Project Analysis After it is completed and put into operation, it will realize annul production value of RMB 10 billion yuan and annual interest rate of about 15%, the payback period is 5-7 years. VII. Project Initiator 102
Project Initiators: Shaoyang Economic Development Zone Hunan Lead Industrial Group Co,. Ltd.
Establishment of Production and Testing Center of Automated Transmission Component I. Project Background Transmission is one of major parts of vehicle transmission system. Automated transmission directly decides or affects the smoothness, fuel economy, and dynamic property. Therefore, all automobile giants invest a lot into this industry, competing for developing all kinds of automated transmission. Topological structure, working principle and corresponding control mode of automated transmission are still keeping developing and reforming. The research and development of automated transmission have entered a brand new fast developing phase. II. Preliminary Work Baishazhou Industrial Park in Hengyang has convenient transportation. It has relatively perfect upstream and downstream industrial chains, making it meet construction condition. This project has already finished feasibility study and planning.
III. Project Content The project covers an area of 400 Chinese mu. It plans to build standard plant covering 60,000 square meters, office building covering 8,000 square meters and living building covering 3,000 square meters. IV. Project Investment Total investment is RMB 860 million yuan. V. Cooperation Way Sole proprietorship, contractual joint venture, joint venture VI. Project Analysis After it is put into operation, it is estimated that it would have an annual income of RMB 250 million yuan and annual profit and tax of RMB 30 million yuan. VII. Project Initiator Project Initiator: Investment Promotion and Development Reform Bureau of Baishazou Industrial Park in Hangyang
Dedicated Vehicle Production Base in Chenglingji New Port Area in Yueyang I. Project Background Xingang District has established an equipment manufacturing industrial park covering 4.7 square kilometers, consisting of heavy equipment manufacturing park, engineering mechanical industrial park, and vehicle component production park. Zoomlion, Sinohydro Bureau 8 Electromechanical Device Manufacturing Project, Kaida Kewang Automobile Parts Project, Yuanxiang Aerial Work Platform Vehicle Manufacturing Project, Xinyongli Dedicated Vehicle Project are doing their businesses there. The industry is of great momentum. II. Preliminary Work There are plenty of lands in the park and facilities such as water supply, electricity, transportation, and telecommunication are in place. III. Project Content Planning area is 1000 Chinese mu. It is mainly used for building development bases, manufacture bases and supporting bases of compression refuse collector, sweeper, vacuum sweeper, aerial platform vehicle, civilian hooklift, pavement maintenance truck, petrol drilling truck, rail tank car, nearshore oil storage and refueling system car, pressurized pipeline refueling vehicle, semi-trial fuel truck. IV. Project Investment Total investment is RMB 5 billion yuan. 103
V. Cooperation Way Sole proprietorship, contractual joint venture, joint venture VI. Project Analysis After its completion, annual sales income climbs up to RMB 20 billion yuan and annual tax revenue amounts to RMB 600 million yuan. VII. Project Initiator Project Initiator: Investment Promotion and Liaison Department of Hunan Chenglingji New Port Area
Pure Electric Bus Production in Changde I. Project Background Dahan Group Automobile Co., Ltd. in Changde Economic Development Zone signed a strategic cooperation agreement with CRRC Times Electric Vehicle Co., Ltd. in April, 2016. Both sides will combine with their technology advantages, having all-round cooperation in whole industrial chain in the development, manufacture, sales, and operation of new energy vehicle. CRRC Times Electric Vehicle Company will offer Dahan Automobile Company support in new energy tech and qualification. Sharing advantages of each other, both companies will develop new energy touring coaches, group coaches, and bus together. Changde Economic Development Zone integrate some supporting enterprises including Dahan Automobile, Jinfuli Lithium, , Liyuan New Material to promote the development of new energy vehicle industry such as electric coaches. It extends new energy vehicle industrial chain plans to create a pure electric bus manufacture base in Changde. II. Preliminary Work Site selection of project of Nine Supplies and One Leveling (road, rain water, sewage, running water, gas, electricity, telecommunications, heat, closed circuit TV and land leveling) is available in Changde. It will offer the best policy for the project and set up a special team for coordinating and offering service during the whole journey. III. Project Content Planning area is 500 Chinese mu. It plans to invest RMB 1 billion yuan for the first phase, developing the annual production capacity of 2000 pure electric buses. For the second phase, it plans to invest RMB 500 million yuan, producing another 1000 pure electric buses. IV. Project Investment Total investment is RMB 1.5 billion yuan. V. Cooperation Way The project may adopt sole proprietorship. Or it may adopt joint venture and contractual joint venture with Dahan Automobile Company. VI. Project Analysis After the project is completed and put into production, it may achieve annual output value of RMB 2.5 billion yuan. And it may pay taxes RMB 200 million yuan per year and create 2000 jobs, driving the development of the tertiary industry in surrounding areas massively. VII. Project Initiator Project Initiator: Investment Promotion and Cooperation Bureau in Changde Economic Development Zone
New Energy Vehicle Industry Construction of Suxian Industrial Concentration District I. Project Background National government issued Development Planning of Energy Conservation and New Energy Vehicle Industry (2012-2020) and "Twelfth Five-Year Specialized Plan of Electric Vehicle Technology Developmentin 2012. A brand new industrial chain of new energy vehicle industry gradually formed. Suxian District is cooperating with Shenzhen Optimum Nano Energy Cooperation, emphasizing on creating a new energy vehicle industrial park in industrial area in Suxian. It gradually succeeds in producing new energy vehicles through industry chains, including 104
assembling, producing batteries, motors, electric controlling systems, special automated transmission, downstream charging facilities and battery recycling. II. Preliminary Work New Energy Vehicle Park is located in Industrial Area in Suxian, Chenzhou. The park is equipped with complete infrastructures including water supply, electricity, transportation, and telecommunication and so on. It basically meet Four Availbles and One Accessibilityroad, water supply, electricity, telecommunication and leveled ground.It has a waterworks offering 10,000 tons of water every day. And a substation for 110 kv is also put in use. The standard workshop needed during project phase one has been build, covering 130,000 square meters. Projects as new energy vehicle power battery PACK production, ,,, are doing business in the park. III. Project Content Planning area covers 800 Chinese mu (Phase one takes 300 Chinese mu of land.), being divided into two phases: In phase one, it hires workshops in Medium and Small Business Incubator Base and Innovation and Entrepreneurship Park in Xinglin, Suxian and produces there. They cover 130,000 square meters altogether. In phase two, it takes 500 Chinese mu of land, mainly used for building new energy vehicle lithium battery production base, research center, office building and living facilities. IV. Project Investment Total investment is around RMB 5 billion yuan. It may be implemented by stages. Investment for phase one is RMB 2.4 billion yuan. V. Cooperation Way Joint venture, sole proprietorship, contractual joint venture VI. Project Analysis It is estimated that annual output value is RMB 10 billion yuan, tax revenue is over RMB 500 million yuan, and offer 800-1,000 jobs. VII. Project Initiator Project Initiator: Suxian Industrial Concentration District of Chenzhou
Construction of Yongzhou New Energy Vehicle Industrial Park I. Project Background Yongzhou Economic Development Zone owes Hunan Leopaard and other 9 supporting enterprises, representing 43.8% of overall production value of the park. In 2014, it got Zhejiang Fisker New Energy Vehicle Production project to do business here. Zhejiang Fisker New Energy Vehicle Production project is project specialized in development and production with investment of RMB 3 billion yuan. And its annual output is 100,000 vehicles. New energy vehicle development base is being built. Relying on the industrial advantages of Changfeng Motor and its supporting enterprises in Yongzhou and Hunan Fisker Automobile Co., Ltd, it plans to build new supporting industrial park aiming at developing and manufacturing new energy vehicles.
II. Preliminary Work At present, the project has finished feasibility study and began to select site. New energy vehicle development base is under construction. III. Project Content Planning area covers 800 Chinese mu. It lays emphasis on introducing development and manufacture enterprises of key component of vehicle assembly and power batteries, motors, electric control, powertrain, and hybrid power engines. IV. Project Investment Total investment of the project is about RMB 3-5 billion yuan, mainly raised by enterprises. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Project Analysis After it is completed and reaches its production target, it is estimated that the annual output value will be RMB 20 billion yuan, adding over RMB 2 billion yuan of tax and over 1,000 jobs. 105
VII. Project Initiator Project Initiator: Investment Invitation Team of Yongzhou Municipal Commission of Economy and Information Technology
Investment Invitation of New Energy Vehicle Parts Production Base in Yiyang I. Project Background Yiyang New and High Technology Industrial Development Zone is a nation-level new and high tech industrial development zone set by State Counsil on 15th June, 2011. Planning area of Sunrise Industry Park is 42.68 square kilometers while planning area of Eastern Industrial Park is 24.39 square kilometers. At present, over 50 new energy component enterprises including Corun Group, DAQIN POWER, CYCLEAN ENERGY, Yangsheng Power Battery have settled in, generally forming a new energy vehicle key component industry chain with power batteries of pure electric vehicle, driving motors and electric control system as its main body. The zone has been rewarded as Featured Industry Base of Vehicle Component in Yiyang Hunan by China Hunan Provincial Science & Technology Department in May, 2015. II. Preliminary Work At present, standardized workshop of 598,000 square meters, incubating building of about 43,000 square meters and supporting buildings of 140,000 square meters have been built. And parts of land requisition and demolition, and field leveling have been finished. III. Project Content It selected eastern industrial park as its site. Planning control area is about 7,500 Chinese mu. It plans to establish Featured New Energy Vehicle Component Production Base in Yiyang Hunan. IV. Project Investment It is estimated that the total investment is RMB 150 billion yuan. For single land requisition projects, fixed asset investment of no less than RMB 100 million yuan is required. For workshop leasing projects, fixed asset investment of no less than RMB 10 million yuan is required. V. Cooperation Way Sole proprietorship, contractual joint venture VI. Project Analysis After the project is put into operation, it is roughly estimated that total return on investment is about 28%, financial internal return rate is 21%, and static payback period (including construction period) is 4.5 years. VII. Project Initiator Project Initiator: Economic Cooperation Bureau of Yiyang High and New Technology Industrial Development Zone
Investment Invitation of Supporting Industries of CHANGFENG Leopaard I. Project Background Yongzhou Economic and Technology Development Zone was founded in 1988. And it was approved to be the provincial key development zone by provincial peoples government in 1990. Area of 22 square kilometers has been built, including industrial parks of 14 square kilometers. It is home to over 50 up-scale enterprises. Five pillar industries including vehicle and component production, deep processing of foods and agricultural products, biological pharmacy, electronic information industry and solar photovoltaic industry have formed up initially. There are 9 vehicle manufactures and relevant enterprises producing seats, interior decorations, air conditioners, electronic devices and vehicle components with production capacity of 100,000 vehicles and production value of over RMB 20 billion yuan. CHANGFENG Group is an iconic enterprise in Hunan province, being the leader of automobile 106
industry and more of the leading industry in Yongzhou Economic Development Zone. At present, it can produce 60,000 vehicles and is expanding its production capacity. After its expansion, it is estimates that double sifting production capacity reaches to 100,000. As it seeks to improve the automobile industry chain, improve the local-supply rate of vehicle components, reduce vehicle production costs and improve market competitiveness of Leopaard, this Zone plans to introduce supporting projects of Leopaard. II. Preliminary Work At present, feasibility study and site selection are finished. Planning and designation are in process. III. Construction Content The project plans to use land of 200 Chinese mu and introduce one engine production enterprise and one wheel hub production enterprise. At the same time, it also attracts investment of other supporting enterprises. IV. Project Investment Total investment is RMB 650 million yuan, including RMB 400 million yuan for vehicle engine project and RMB 250 million yuan for wheel hub project. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture The park grants the project the related national, provincial, and municipal policy subsidies. VI. Project Analysis After vehicle engine project is completed and meet production target, the annual value of production is estimated to be over RMB 300 million yuan and it may add extra RMB 30 million yuan tax revenue. Estimated annual value of production of vehicle wheel hub project is over 100 million yuan and it may add extra tax revenue of 12 million yuan. Both projects may create over 300 jobs. VII. Project Initiator Project Initiator: Investment Promotion and Cooperation Bureau of Yongzhou Economic and Technological Development Zone
Supporting Investment Invitation of Vehicle Component Production I. Project Background Vehicle and vehicle component production is a key industry in Loudi, being as a core industry of Loudi Economic Development Zone. At present, a lot of vehicle supporting industries, including VAMA with total investment of 12.3 billion yuan and annual yield of 1.6 million tons, Valeo(company producing vehicle air conditioners),Dafenghe Electric Vehicle, Jinhua Vehicle, ZHUOERZHOUWA, have settled in this industrial park. II. Preliminary Work It issued special preferential policies. It has made initial site selection. And land use plan has been partly approved. III. Project Content This project is located in the second industrial park of Loudi Economic Development Zone. It covers 3,500 Chinese mu of land altogether, among which 500 Chinese mu of land is used for vehicle component production. It emphasizes on creating a vehicle and component production base in central Hunan. Detailed investment projects are as follows: 1. Tailor laser welding Tailor weld blanks has been broadly used in automobile industry. By using this technology, manufacturing cost, weight of vehicle, assembly tolerance, oil consumption and rejection rate may be reduced. It also helps to reduce the amount of exterior stiffeners and simplify assembly procedures. To build two assembly lines with annual yield of 100,000 tons of blanking, one slitting line with annual yield of 200,000 tons, and three laser welding assembly lines, estimated investment is RMB 200 million yuan. 2. Produce 150,000 axles per year It plans to produce 50,000 axles of all kinds of heavy trucks and 100,000 axles of all kind of 107
sedans. It covers 100 Chinese mu of land with RMB 200 million yuan of investment. It mainly builds workshops, products testing centers, developing centers, office buildings, and warehouses for raw materials. 3. Produces 100,000 car frames per year It plans to produce 100,000 frames for all kinds of heavy trucks and sedans. It covers 80 Chinese mu of land with RMB 100 million yuan of investment. The land is mainly used for building workshops, office building of 2,400 square meters and green coverage of 1,840 square meters. 4. Produce 1 million wheel hubs It plans to produce 1 million 10-30 inches aluminum wheel hubs. It covers land of 70 Chinese mu with investment of RMB 120 million yuan. Lands are mainly for building workshops, office buildings, technology centers and products exhibition centers. 5. Produce 2,000 vehicle lights per day It covers land of 30 Chinese mu with investment of RMB 50 million yuan. It mainly produces xenon lights, xenon metal halide lights and supporting electronicballast. And it mainly builds workshops, office buildings of 800 square meters, testing centers, and technology centers. 6. Front and rear independent suspension and other parts of chassis It may produce 300,000 front and rear suspensions, 400,000 steering linkages and 900,000 Torsion-Bar Springs. Total investment is RMB 200 million yuanand covers 80 Chinese mu of land. 7. Automobile steering system Total investment is RMB 200 million yuan, covering land of 80 Chinese mu. It produces plumbing arms for car use, drag links, adjustable transmission assemblies, hydraulic steering gears, and electric steering gears, making annual yield of steering assembly, all types of plumbing arms and drag links of 1.5 million. And it mainly builds workshops, office buildings, and technology centers. 8. Development and production of drum brake pads and disc brake pads Total investment of the project is RMB 60 million yuan and it covers land of 30 Chinese mu, producing heavy truck, bus, drum brakes and disc brakes of sedans. It mainly produces workshops, technology testing buildings and office buildings. 9. Production of rearview mirrors, bumpers, wheel cap and other car body parts Total investment is RMB 50 million yuan and the project covers land of 50 Chinese mu. It produces sedans and heavy trucks plastic parts of 1 million, rearview mirror of 500,000 and bumper of 800,000. 10. Production of gears of gearboxes Planning investment of this project is RMB 400 million yuan, including fixed asset of RMB 300 million yuan, capital fund of RMB 100 million yuan. It is going to build a production base of gears of transmissions, being able to produce gears and axles of transmissions of all kinds of vehicles and farm trunk of 10 million and transmissions of 50,000. 11. Turbocharger This project coves land of 100 Chinese mu. And total investment of RMB 500 million yuan, including fixed asset of RMB 275 million yuan. It produces turbochargers of small vehicles of 500,000 per year. 12. Seats, seat parts, and interior decoration production It covers lands of 30 Chinese mu with investment of RMB 30 million yuan, producing sedan seats, children seats, coach seats, heavy truck seats and other facilities. 13. Produce automobile stamping parts of 200,000 Automobile stamping parts include four car gates, two hoods, right and left fender, left and right body panels, and car roof. It plans to request land of 100 Chinese mu with total investment of RMB 135 million yuan which includes fixed asset of RMB 105 million yuan and initial working capital of RMB 30 million yuan. 14. Produce 60,000 tons of high-end fasteners per year Total investment of this project is RMB 250 million yuan, including fixed asset of RMB 200 million yuan and initial working capital of RMB 50 million yuan. It plans to take land of 100 Chinese mu and use land of 30,000 square meters to build construction buildings for preparation, cold heading, producing special fasteners, processing heat treatment and storage and other supporting utility facilities. It is going to produce 60,000 tons of high-end fasteners every year. 15. Produce 1 million steering rims 108
Total investment is RMB 70 million yuan, and planning area is of 60 Chinese mu. It plans to introduce advanced production equipment from home and abroad to produce light rim products with high strength. IV. Project Investment Total investment is RMB 400 million yuan. V. Cooperation Way Contractual joint venture based on industrial chain, sole proprietorship or construction and operation as a joint venture VI. Project Initiator Project Initiator: Investment Promotion Bureau of Loudi Economic and Technological Development Zone
2-3 Electronic Information (36) Big Data Industrial Park Construction in Wangcheng Economic and Technological Development Zone I. Project Background Nowadays, science and technology are advancing rapidly. Modern information technology, such as internet, cloud computing and big data, are changing the way of people think, produce, live and study deeply. The development of Big Data has great impact on upgrading and transformation of industrial manufacturing, enterprise operation and education, showing the prospect of the world’s development. It plans to set up a high standard Big Data Industrial Park in Wangcheng Economic and Technological Development Zone. By doing this, information infrastructure construction will be strengthened and internet and real economy will get further integrated. II. Project Content Planning area of this project is 3 square kilometers, including core industrial area, commercial and residential area, and ecological recreational area. It plans to create a high-end production and R&D transformation base, an innovative and creative industry cluster, and an important advanced production industry in central China. SZZT Electronics Internet Big Data Science and Technology Industrial Park(Changsha Cloud Valley), which has settled in the park, with the total planning area of 236,000 square meters, provides 20,000 IDC rack with high reliability, catering to the demand of 260,000 computer servers. III. Project Investment Total investment is RMB 30 billion yuan, which will be used for building workshops, purchasing production equipment, developing and testing new products, and training personnel. IV. Cooperation Way Give priority to sole proprietorship and contractual joint venture. Joint venture and contractual joint venture are acceptable depending on situations. The project sincerely welcomes Big Data, mobile internet, internet of things, cloud computing, communication device, electronic information and enterprises of other fields to settle in the park. V. Benefit Analysis The project plans to spend 5 years meeting its goals. By that time, it may have annual output value of RMB 20 billion yuan, tax revenue of RMB 1.2 billion yuan, and attract over 50,000 people. VI. Project Initiator Project Initiator: Management Committee of Wangcheng Economic and Technological Development Zone in Changsha
Construction of Hunan Big Data New Industrial Town in Zhuzhou I. Project Background 109
Zhuzhou Yunlong Demonstration Zone is one of the five demonstration zones of comprehensive supporting reform experimental region of two-oriented society construction of Chang-Zhu-Tan City Cluster. Planning area of the project is 105 square kilometers. It prioritizes travel and recreation industry, cultural and creative industry, financial innovation, science, education and research. Zhuzhou has been approved to be one of the first batch of pilot cities for building smart cities by Ministry of Housing and Urban-Rural Development in 2013. As it seeks to fasten the development of electronic information industry in Zhuzhou, it set up “Yunlong International Electronic Information Industrial Park”. In 2014, Zhuzhou Municipal Government signed a cooperation contract with Microsoft to build Hunan Microsoft Innovation Center (MIC) and industrial park together. This MIC project was directly authorized by headquarter of Microsoft and is the only Microsoft innovation center in central China. Total investment is RMB 10 billion yuan. Investment for the first phase is RMB 2 billion yuan, prioritizing cloud platforms for government administration, vocational education, basic education, medical care, development and testing, package design, and office of small and medium enterprises. China Mobile Hunan Data Center settled in Yunlong Demonstration Zone in 2015. Planning area of the project covered 350.17 Chinese mu with its overall built-up area being 180,000 square meters. Total investment exceeded RMB 3 billion yuan. And the project was divided into three construction phases. Project of the first phase was planned to be finished and put into operation by the end of 2016, while the second and third phases would be finished in 3-5 years. As it seeks to encourage and support construction and development of the new information technology industrial park, Hunan provincial government and Zhouzhu municipal government issued a series of supporting policies in succession, actively creating a sound environment for laying development foundation of the project and getting a guarantee for industrial system. II. Preliminary Work MIC and China Mobile Data Center have been doing businesses here. III. Project Content The project is adjacent to Chine Mobile Hunan (Zhuzhou) Data Center and Digital Technology Town with total planning area of 1000 Chinese mu. It contains industrial land of 600 Chinese mu, commercial land of 200 Chinese mu and residential land of 200 Chinese mu. The first phase is the area locating at northern Yunhai Avenue covering land of 462.51 Chinese mu. Planning construction period is 2017-2020, mainly being used for building standard workshop, research center, talents apartments, supporting infrastructure. Total construction area is 1.2 million square meters. IV. Project Investment Total investment is RMB 9.86 billion yuan. V. Cooperation Way Joint venture, contractual joint venture and other ways VI. Project Analysis After the project is put into operation, it may realize an output value of RMB 10 billion yuan and annual tax contributions of RMB 750 million yuan. The annual average earnings before interest and tax will be about RMB 700 million yuan, and total rate of return on investment is 10.11%. VII. Project Initiator Project Initiator: Zhuzhou Huaqiang Yunfeng Lake Area Construction and Development CO., Ltd.
Cloud Computing and Big Data Industrial Park Construction in Yiyang I. Project Background Yiyang New and High Technology Industrial Development Zone is a national zone with a total planning area of 67.07 square kilometers, including sunrise industry park of planning area of 42.68 square kilometers and eastern industry park of planning area of 24.39square kilometers. Shanghai Jingshuoyun Information Technology Co,. Ltd has settled in the park. With investment of about RMB 5 billion yuan and planning area of 450 Chinese mu, it plans to build “Furong Cloud Computing Data Center”. This project plans to set up a cloud computing data center with total capacity of high-density rack server(6000 for the first phase) ,a cloud computing platform and a cloud computing management 110
center. This data center adopts the most advanced and highest T4 level in the world. Installed power of each rack server is 15Kw. The data center, which is being built and will soon be put into operation, is the biggest and most advanced data center in Asia. The project has a talent support consisting of over 10 national top universities including National University of Defense Technology, Central South University, and Hunan University. It is 60 kilometers away from Hunan college town. Especially, National University of Defense Technology is one of the three national supercomputing centers, having the world-leading supercomputing technology. The rapid development of Hunan internet and mobile internet has laid foundation for the development of Big Data industry. II. Preliminary Work Part of land requisition and demolition work has been finished. III. Project Content Site selected is in eastern industry park of Yiyang High-tech Industrial Park, covering land of 1,000 Chinese mu. This project takes “Furong Cloud Computing Data Center” as its core, prioritizing Big Date Gathering Platform, Big Data Application Platform, and Big Data Exchange Platform. Taking Bid Data Center as the platform, it plans to try to establish a “Cloud Computing Valley” with complete upstream and downstream industrial chain and loop-locked products in this industrial park in central Chine within 3-5 years. IV. Project Investment Total investment is around RMB 8 billion yuan. Investment for single land requisition construction project should not be less than RMB 200 million yuan, and investment for workshop leasing project should not be less than RMB 30 million yuan. V. Cooperation Way 1: As for projects constructed by sole proprietorship of investors, preferential policy will be offered in terms of land price, tax, and construction application. 2: As for projects meeting planning requirements, workshops and supporting facilities will be built with a preferential leasing price for investors. 3: As for technological incubating enterprise projects, certain amount of financial support will be offered according to project’s technology content. And incubator and supporting services will be offered for free. VI. Benefit Analysis After the project meets production goal, annual revenue will reach to about RMB 20 billion yuan with total ROI of 20%-30% and payback period of about 4-5 years. VII. Project Initiator Project Initiator: Economic Cooperation Bureau of Yiyang High-tech Industrial Development Zone
Investment Invitation of Dongjiang Lake Big Data Industrial Park in Zixing I. Project Background As the development and rise of internet, cloud computing and internet of things, data size of the world is boosting. Data center, as the carrier and transport entity of terminal mass data, usher in a time of rapid development. Big Data requires harsh conditions of constant temperature and humidity and needs a lot of energy to keep it going. At present, PUE of most of Big Data centers in China is above 1.5. Because of the high energy consumption and high operation costs, energy conservation has become the commanding height of Big Data construction. Dongjiang Bay is at the core area of Zixing city in Chenzhou. There are beautiful sceneries, level ground, wide and clean water, convenient transportation and complete facilities for sports and living along both sides. Also, there is no need to prevent flood, waterlogging, and drought thanks to 8.12 billion cubic meters water stored in Dongjianghu Lake in the upriver and the protection of Dongjiang Dam. It stays in national water quality Class I and water keeps 11-12 ℃ throughout the year. Cold water of over 4 billion cubic meters gathers and goes through here every year, making this place rich in cold water resources. 1800,000 KW thermal power and 600,000 KW water power gather near Dongjiang Bay. This place has unique conditions for building a nation-level, even world-level Big Data Center. 111
II. Preliminary Work Dongjianghu Lake Big Data Industrial Park Project has finished general planning and construction of supporting infrastructure of main road and underground pipe network. At present, a Big Data center has settled in Dongjiang Bay. Dongjianghu Lake Big Data Industrial Park has been approved as one of China’s first batch of pilot projects of reform on incremental power distribution business. III. Project Content The overall planning area of Dongjianghe Lake Big Data Industrial Park is 3,000 Chinese mu with total investment of RMB 1.2 billion yuan. It plans to build workshop of 45,000 square meters, meeting demands of 200,000 servers. It mainly introduces 1,000 upstream and downstream enterprises including cloud computing, Big Data exchange, e-commerce headquarters, software development, cultural and creative industry and electronic manufacture and so on. IV. Project Investment Total investment is RMB 10 billion yuan. V. Cooperation Way Sole proprietorship VI. Benefit Analysis Calculating by planning area of 3,000 Chinese mu, 1 million M2 Computer rooms, and 200,000 storage racks, production value will reach to RMB 23 billion yuan and tax will amount to RMB 1.5 billion yuan. It will indirectly drive the development of tertiary industry and other value-added services, including convention and exhibition, hotels, e-commerce. Estimated total value of production will climb up to more than RMB 25 billion yuan and tax will amount to over RMB 1.8 billion yuan. VII. Project Initiator Project Initiator: Bureau of Economy Informatization and Commerce of Zixing City
Big Data Industrial Park Project in Chenglingji New Port Area in Yueyang I. Project Background In accordance with the national development goal of “Internet Plus”, construction of large-scale data centers will become the key of infrastructure construction in the future. Yueyang is located in Yangtze River region in central China, facing Dongtinghu Lake in the north. It has large-scale water supply, which is needed in construction of Big Data centers. It has low-cost cold water resource. Site selected is in Baiyanghu Lake and Songyanghu Lake basins, being 3 kilometers away from Huaneng Power Plant. The project may use waste heat of power plant for refrigeration by “Steam–driven Lithium Bromide Refrigeration”, providing low-cost electricity and hot steam. II. Preliminary Work Site selection is done and primary program study has been finished. III. Project Content The project covers land of about 300 Chinese mu and total floorage is 240,000 square meters, including 200,000 square meters for data center, 40,000 square meters for supporting facilities. It plans to set up “Big Data Center Cloud Computing Industrial Park”, which can provide 30,000 racks(There will be more than 400,000 servers in total.) IV. Project Investment Total investment is RMB 2.3 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, and contractual joint venture VI. Benefit Analysis After it is completed and put into operation, annual sales revenue will be RMB 2.8 billion yuan and annual tax contributions will be RMB 200 million yuan. VII. Project Initiator Project Initiator: Investment Promotion and Liaison Department of Chenglingji New Port Area in Yueyang
ChinaRS Hunan Science and Technology Park Construction I. Project Background ChinaRS is a leading enterprise in geographic information industry and the achievements transfer 112
base of State Key Laboratory of Remote Sensing Science, owing over 50 independent property rights and many patents for invention. In order to open Hunan market, ChinaRS and Hunan Jiuwei Real Estate Co., Ltd work together to develop ChinaRS (Hunan) Scientific and Technological Park, attracting geographic information development enterprises to gather here. This project integrates and develops remote sensing satellite technology and remoter sensing unmanned aerial vehicle technology and drive the development of other relevant industries. It devotes its efforts to deepen industrial application and create a professional base of remote sensing Spatial Information technology showing features of Hunan through remote sensing cloud service and remote sensing date service. II. Preliminary work The project has been approved. Designation and environment impact assessment have been finished. Construction of building No.7, 9,10,11,12,14,15,16 is ongoing. Subject area that has been built is 130,000 square meters. III. Project Content Planning floorage area of ChinaRS Hunan Science and Technology Park is 600,000 square meters. Phase one aims to offer remote sensing city service; phase two aims to offer remote sensing information sharing service for the park and relevant enterprises; phase three plans to achieve the ability of analyzing and applying big date of time and space, serving for commercial institution and the public. IV. Project Investment Planned investment is RMB 3 billion, being divided into three phases. V. Cooperation Way Contractual joint venture VI. Benefit Analysis Taking China RS as the leading enterprises, it will attract midstream and downstream geographic information enterprises to join this park with a remarkable investment efficiency. VII. Project Initiator Project Initiator: Hunan Jiuwei Real Estate Co., Ltd.
Construction of Demonstration Base of Information Security Industry in New and High Technology Development Zone in Changsha I. Project Background Relying on the second phase of CEC Software Park, this project adopt innovative and entrepreneurial carrier platform of information security and its supporting project, emphasizing on introducing industries of development of basic software and hardware of information security industry, production of complete machine, service of information security. It plans to develop and gather incubating projects of information security and create a national industry base of information security. As the application of independent controllable computer terminal and servers spreading in government and public institutions, scale of this industry will exceed RMB 100 billion yuan rapidly and keeps expanding at the rate of over 20%. II. Preliminary Work Changsha municipal government and China Electronics Cooperation signed a strategic cooperative agreement on building an industry base of national information security in 2014 III. Project Content Planning area of this project is 200 Chinese mu, emphasizing the introduction of great enterprises in fields of independent control and dependable computing in information industry. It mainly includes businesses such as development of basic software and hardware, production of complete machine, security application and information security service. IV. Project Investment Total investment is RMB 2 billion yuan, including RMB 1.6 billion fixed assets and RMB 400 million initial working capitals. It consists of investment attraction of RMB 500 million yuan, investment from enterprises of RMB 800 million yuan, and bank loans of RMB 700 million yuan. V. Cooperation Way 113
Joint venture, contractual joint venture, holding, sole proprietorship VI. Benefit Analysis Construction period is 2 years. And it is estimated that annual sales income reaches to 5 billion yuan, annual net profits amounts to 1 billion yuan and return of investment is 50% in 3 years after the project is put into production. VII. Project Initiator Project Initiator: Management Committee of New and High Technology Development Zone in Changsha
Construction of Electronic Information Industry Park in Economic Development Zone in Changsha I. Project Background Electronic information industry has always been the new and high tech industry focused and supported by China. Total sales income of electronic information industry in China in 2015 amounted to RMB 15.4 trillion yuan, making a year-on-year growth of 10.4%. Among them, main business income of electronic information manufacturing industry reached to RMB 11.1 trillion yuan, making a year-on-year growth of 7.6%; software income of software and information technology service industry amounted to RMB 4.3 trillion yuan, making an year-on-year growth of 16.6%. At the same time, regional developments of electronic information industry in China appear different layouts. Although electronic information industry in China has made a great progress, it still has a big gap between developed countries, such as the United States and there are many problems existing in the industry. The establishment of this project is of great meaning for regional information industry, information manufacturing industry and software development. II. Preliminary Work The project has finished area planning and feasibility study. III. Project Content The project is located in Economic Development Zone in Changsha with planning construction area of 500 Chinese mu. It plans to introduce wafer upstream and downstream enterprises and other kinds of electronic information industry enterprise. Construction content includes: wafer production area, display device area, consumer electronics production area, electronic component production area, informationization equipment production area, dedicated instruments production area, other hardware production area. They are designed and constructed by the investor. IV. Project Investment Total investment is RMB 1.5 billion yuan, including fixed assets of RMB 1.35 billion yuan and working capital of RMB 150 million yuan. Construction period lasts 2 years. It is estimated that annual income will climb up to RMB 3 billion yuan, annual profits will reach to RMB 450 million yuan, return of investment will be 30% and payback period will be 6.2 years (including construction period)after it meet its production goal. V. Cooperation Way Sole proprietorship It plans to introduce Jingyuanb upstream & downstream enterprises and other kinds of great electronic information enterprises. VI. Project Initiator Project Initiator: Management Committee of Changsha Economic Development Zone
Construction of Electronic Information Industry Park in Airport Economic Zone in Changsha I. Project Background Electronic Information Industry is a new industry on the basis of development and application of electronic science and technology and it is one of the six featured industry clusters in Changsha. As it seeks to expand and strengthen electronic information industry in Changsha, according to development plan of airport economic zone, it plans to set up this project in airport economic zone relying on the aviation advantages of Changsha Huanghua comprehensive bonded area. 114
II. Preliminary Work This project is close to Changsha Huanghua comprehensive bonded area. It plans to operation prior to 30th may 2017. The roads surrounding the project lands have be equipped with supporting facilities including water, electricity, network and gas supply. Demolition and land empty work has been started. III. Project Content Planning area of this project is about 246 Chinese mu with land volume rate of 1.2-2.0. Relying on advantages of aviation logistics and closeness to nation–level Changsha Economic and Technological Development Zone, it plans to build development building of electronic information products, office building, production center, electronic products exhibition and trading center, creating a comprehensive electronic information industry park combining development, production, exhibition, and trading of electronic products. IV. Project Investment Total investment is about RMB 1 billion yuan. V. Cooperation Way Sole proprietorship or joint venture Developing by land list transferring Airport preferring electronic information enterprises and large real estate enterprises with experience of developing electronic information industrial park are sincerely welcomed. VI. Project Initiator Project Initiator: Management Committee of Airport Town in Changsha County
Electronic Information Industry Park in Liuyang Economic Development Zone I. Project Background Liuyang Economic Development Zone was approved as “Industry Demonstration Base of National New Industrialization (Electronic Information)” in 2015 by Ministry of Industry and Information Technology of the People’s Republic of China. Total production value of the industrial park in 2016 reached to RMB 100.3 billion yuan. Production value of electronic information amounted to RMB 51.515 billion yuan. As it seeks to seize the important opportunity of carrying the work of industry transfer, the park initially take the work of transferring coastal electronic information industry. Making full use of advantages of its strategic location, resources and environment and infrastructure and combing the advantages and specialties of the park, the park will promote the integration of information industry and traditional industry, advanced manufacturing industry and modern service industry so as to promote the transfer, upgrade and development of electronic information industry in the park. II. Preliminary Work Regulatory plan has been done. III. Project Content Planning area of the project is 1000 Chinese mu. It plans to establish electronic equipment development and production industry and electronic information industry of all kinds of electronic components, devices, instruments. It emphasizes on introducing industries such as television equipment, communication and navigation devices, electronic computer, electronic components, electronic instruments, and other special electronic devices. IV. Project Investment Total investment is RMB 2 billion yuan. V. Cooperation Way Sole proprietorship (may purchase land for building plant or lease standard workshop in E area in the park) VI. Project Initiator Project Initiator: Liuyang Economic Development Zone
Investment Invitation of Waison Information Innovation Project in Anhua 115
I. Project Background Waison Group had initial public offering in Hong Kong in December 2005. It is the only service provider who offer solutions of energy measurement and energy efficiency management of all energy chain of electricity, water, gas, and thermal. The number of current staffs is over 4,000. Production value reached RMB 5.02 billion yuan in 2016. Hunan Waison Information Technology CO., Ltd and Hunan Weiming Energy Technology CO., Ltd are core sub companies of Wainson Group, focusing on energy internet. In order to respond to the spirit of documents of anti-poverty of the central government, Waison Group moved its sub companies Waison Information and Weiming Energy to Anhua Country in Yiyang. They will work for the overall development planning of Anhua County and combine business of energy internet and local superior resources, trying to become the demonstration project of anti-poverty work in Hunan Province and making practical contributions to poverty alleviation. II. Project Investment Total investment is about RMB 2 billion yuan. III. Benefit Analysis At present, Waison Information Company has begun to conduct share reform, creating a way of direct financing in capital market in China for Waison industry. After its completion, it is estimated that Waison will pay at least RMB 20 million income taxes to poverty-stricken county per year, supporting their finance. IV. Cooperation Way It plans to attract RMB 1.2 billion yuan and adopts joint venture. V. Project Initiator Project Initiator: Waison Group Holding CO., Ltd.
Construction of Production and Development Base of Smart Phone, Pad, and components in Liuyang Economic Development Zone I. Project Background According to the strategic deployment of Hunan provincial government of carrying coastal industry transfer initiatively, the industrial park has begun to strive to develop electronic information industry since 2006. After a decade, the scale of total production value reaches to RMB 100.3 billion yuan, forming a three-industry cluster consisting of electronic information, biomedicine and healthy foods. Among them, production value of electronic information amounted to RMB 51.515 billion yuan. It introduced Lens Technology which is the biggest production enterprise of high-end glass panel of mobile phones in the world. Also, it established the smart mobile terminal industrial park created by Fn-link and there are a batch of supporting enterprises for electronics production including PCB Photoelectric glass chemicals of Lier Electronics, high polymer materials of chips of Sunshine New Materials, and Hongtai New Materials. Liuyang Economic Development Zone was approved as “Industry Demonstration Base of National New Industrialization (Electronic Information)” in 2015 by Ministry of Industry and Information Technology of the People’s Republic of China. Next, the park will further strengthen its electronic information industry cluster relying on the advantages and specialties, striking to create the biggest development and production base of smart phones, tablets and components in central China. II. Preliminary Work Planning area of development base project is 1000 Chinese mu. Regulatory plan has been finished. III. Project Content According to the project planning, it will build four production bases, including enterprise headquarter, smartphone production, pad production, and component production of smartphones and tablets 1. Enterprise headquarter base: it is used to introduce enterprise headquarters in and outside Hunan province, branches, development center, and financial institutions. 2. High-end phones production base: building a smartphone production base with annual production of 100 million smartphones, and a phone development, sales and deliver center. 3. Pad production base: building a smart pad production base with annual production of 100 116
million, a development center, and a sale and deliver base. 4. High-end component production base: it includes productions of power source, backlight, earphones, telephone receiver, keypad, circuit board, new materials, other major components and so on. IV. Project Investment Total investment is RMB 2.5 billion yuan. Investment of the four sub-projects is respectively RMB 1 billion, RMB 1 billion, RMB 1 billion, and RMB 500 million yuan. V. Cooperation Way Sole Proprietorship It plans to introduce 3—5 whole-device producers (phones and tablets) and 200-300 supporting enterprises of smart terminal industry chain within 3-5 years, creating an industry cluster of mobile smart terminal industry. VI. Project Initiator Project Initiator: Liuyang Economic and Technological Development Zone
Overseas Electronic Products Testing and Maintenance Center in Comprehensive Bonded Area in Hengyang I. Project Background As electronic industry in China is showing a momentum of rapid development, different kinds of electronic products are becoming an important part of people’s daily life. However, many electronic products testing centers are lack of informationized electronic products testing system, testing and maintenance for overseas precision electronic products in China cannot meet the international standard, therefore, for maintaining overseas electronic products, they always need to be shipped back to the original plant. Due to the current tax regime of China, customers always have to afford the high maintenance fees. Building a overseas electronic produces testing and maintenance center in comprehensive bonded area helps to make full use of supportive policies in comprehensive bonded area and conduct testing and maintenance for different overseas electronic products. II. Preliminary Work At present, Hengyang Comprehensive Bonded Area and Shenzhen Fengyuan Electronic Co., Ltd have had preliminary cooperative intentions. Shenzhen Fengyuan Electronic Co., Ltd have obtained the maintenance authorization of many kinds of overseas electronic products and is applying for a license for testing and maintaining overseas electronic products in Hengyang Comprehensive Bonded Area. III. Project Content This project plans to lease the workshop in Hengyang Comprehensive Bonded Area, covering 3,000 square meters. And it is going to invest and establish an overseas electronic products testing and maintenance project. IV. Project Investment Total investment is RMB 30 million yuan. V. Social and Financial Benefits Analysis After the project is put into operation, it is estimated that import and export volume will reach to 100 million dollars. VI. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VII. Project Initiator Project Initiator: Economic Development Bureau in Hengyang Comprehensive Bonded Area
Constructin of Photo-Electro-Mechanical Integrated Industry Cluster in Hengyang 117
I. Project Background Hengyang makes full use of relevant policies of taking industry transfer and developing demonstration industries over recent years. Thanks to this, it built an information industry development park, and successfully introduced electronic information manufacturing industry prioritizing consumer electronic products and photovoltaic industry development chain, filling an industry gap in information industry and photovoltaic industry in the park. Electronic Information Industry Park in Hengyang is established in December 2008. It is a provincial key industry park with a total floorage area of 500,000 square meters consisting of workshop of 457,000 square meters and supporting facilities of 43,000 square meters. It has three electronic information innovation parks: the first electronic information innovation park covers 138,000 square meters; the second electronic information innovation park covers 61,000 square meters; and the third electronic information innovation park covers 258,000 square meters. All of the three parks have completed and been put into use. At present, cluster development of advanced equipment manufacture, photovoltaic information industry and modern logistic industry has been realized in this park. II. Project Content This project takes Photo-Electro-Mechanical Integrated projects as its core, including development of photovoltaic products precision machinery instruments and testing equipment. And it introduces other component production enterprises to form an industrial chain with high add value of products. Project construction mainly includes workshop construction and equipment purchase. III. Project Investment Total investment is about RMB 500 million yuan. IV. Benefit Analysis After it is put into production, estimated annual sales income will reach RMB 400 million yuan and annual profits will climb up to RMB 50 million yuan. V. Cooperation Way
Sole proprietorship VI. Project Initiator Project Initiator: Economic and Information Commission of Hengyang
Construction of Public Service Platform of Collaborative Manufacture in Hengyang I. Project Background Collaborative manufacturing is a production pattern based on agile manufacturing, virtual manufacturing, network manufacturing and global manufacturing. It breaks the restrain of time and space, sharing customer, design, and production information with enterprises and partners on the supply chain through internet. At present, Public Service Platform of Collaborative Manufacture is at the founding stage. This platform helps to integrate current resources of production, cold chain, storage and logistics. Thanks to this, it offers a shorter the time –to-market, shorter producing period , and quicker response to customers’ demands. It is good for reducing operating cost, improving qualities and customers’ satisfaction. II. Preliminary Work The project has been set up. III. Project Content The project covers land of 31.67 Chinese mu. And total floorage area is 58,000 square meters, mainly used for building innovation and development base, products exhibition and experiencing area, and promoting and service area. Being oriented to medium and small production and manufacturing enterprises, the projects offer them services, including innovative design crowdsourcing, individual demand collection, production capacity resource integration, smart production system improvement and production quality control. Also, it cooperates with internet enterprises and production automation enterprises, establishing an industrial Big Data resource center and a Big Data analysis service system. IV. Project Investment Total investment is about RMB 600 million yuan. 118
V. Benefit Analysis After the project is put into production, the estimated annual revenue will reach to RMB 75,550,000 yuan. VI. Cooperation Way Sole proprietorship VII. Project Initiator Project Initiator: Investment Promotion and Development Reform Bureau of Baishazhou Industrial Park in Hengyang
Production of Cover Lens of High-end Phones I. Project Background Cover lens need to be of high hardness and high scratch resistance due to the high surface abrasion of phones and tablets; also, in order to improve the sense of beauty and individuation of phones and tablets, special processing methods like silk-screen and coating film are needed. They help to improve fingerprint and sweat stain resistance and ability of blasting and anti-reflection, and show a better color and special logo, making a great visual effect. Also, protectors of different functions need to be coated on cover lens in order to offer multifunctional using effects and displaying effects. At present, only America and Germany are able to produce cover lens of high-end phones. By cooperating with German group Eglass to introduce patented technology, we plan to establish this project with investment partners together. II. Preliminary Work This project is located in Qingshuitang Science and Technology Innovation Park in Zhuzhou. Supporting conditions are complete and relevant preliminary work is in process. III. Project Content This project covers land of 200-400 Chinese mu. It plans to adopt advanced overflow technology, building 4 high alumina ultra-thin raw glass sheet assemblies with product thickness of 0.3—0.7 mm and annul output of 11 million m2. The project will be constructed in two phases. Annual output of the first phase is 2 million m2; and annual output f the second phase is 9 million m2. IV. Project Investment Total investment is RMB 3.5 billion yuan, including investment of the first phase of RMB 1.05 billion yuan and investment of the second phase of RMB 2.45 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis After the completion of the first phase, estimated annual sales revenue will reach to RMB 400 million yuan and profit tax amounts to RMB 100 million yuan; after the complete of the second phase, estimated annual sales revenue will climb up to RMB 1.35 billion yuan and tax profits of RMB 330 million yuan. VII. Project Initiator Project Initiator: Zhuzhou Business and Grain Bureau
Construction of Laptop and Tablet Production Base in Xiangtan Economic aDevelopment Zone I. Project Background Xiangtan Economic Technology Development Zone is in Changsha-Zhuzhou-Xiangtan city cluster, being a national pilot zone for overall reform of creating resource-saving and environment-friendly society and the only nation level economic development zone with 119
integrated free trade zone. Population is 190,000 and it covers 138 square kilometers with vehicle and components manufacture, electronic information, and advanced equipment production as its pillar industries. As one of the leading industries in this park, development scope of Electronic Information Industry is expanding. It introduces laptop production enterprise, promotes industry upgrading and transformation, and attracts upstream and downstream enterprises to settle in, having great significance on promoting regional development. II. Preliminary Work Land department and planning department have agreed with this project. Site selection is finished. Planning and investment attraction are in process. III. Project Content This project is located in Xiangtan Economic Technology Development Zone with planning area of about 500 Chinese mu. It is mainly used to build large workshop, office buildings, mess hall, landscape engineering, pavements and square in the park. It aims to create a production, development and sales base of laptops and tablets. IV. Project Investment Total investment is about RMB 1 billion yuan. V Cooperation Way Contractual joint venture, joint venture and sole proprietorship VI. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
Construction of E-Commerce Industry in Xiangtan New and High Technology Development Zone I. Project Background New and High Technology DevelopmentZone seizes the trend of rapid development of e-commerce over recent years, sticking to introduce and develop e-commerce industry chain group enterprises. It emphasizes on supporting public service platform of e-commerce and great backbone enterprises to get stronger and better. And it also gathers a lot of e-businessmen and service provider rapidly, including almost 70 registered e-commerce enterprises. Sum volume of e-commerce transactions in the park in 2015 reached to RMB 1.5 billion yuan. And it was approved to be “E-commerce Demonstration Base in Hunan� in 2013. As it seeks to improve the regional competitiveness of e-commerce in New and High Tech Zone, it plans to establish a e-commerce industry base, promoting industry gathering and scale development. II. Project Content The project is located in College Student Science and Technology Business Incubator in Xiangtan New and High Tech Development Zone, covering land of 50 Chinese mu. Floorage land of workshop is about 30,000 square meters. And there are a 7-floor staff dormitory and a staff mess hall. This project plans to reconstruct and re-plan the current area. It is going to build four function areas including e-commerce incubator, supporting storage, supporting logistics, and live service. III. Project Investment Total investment is about RMB 100 million, including RMB 70 million for project fees such as restructuring and the second fitting up, RMB 20 million for other fees of project construction, and RMB 10 million for basic budget reserve. IV Cooperation Way Sole proprietorship, joint venture and contractual joint venture V. Project Initiator Project Initiator: Xiangtan New and High Tech Development Zone
Construction of Production Base of High-end Smart Phones I. Project Background 120
Top 500 including Tower of America, Samsung, Taiwan UMC Group, China minmetals Cooperation, China Huadian Cooperation, Geely Holding Group, MCC Capital Engineering & Research Incorporation TIDFORE and other enterprises being famous home and abroad have been introduced into Xiangtan New and High Tech Development Zone, forming an industry cluster of automobile and components, electronic information, and advanced equipment manufacture. Total revenue of this park reached to RMB 171.5 billion yuan in 2016 with total industrial output value of RMB 101.19 billion yuan and fiscal revenue of RMB 3.76 billion yuan. As one of the leading industries in Xiangtan New and High Tech Development Zone, it lacks a large-scale communication terminal production enterprise. Introduction of this project have a great influence on promoting industry upgrading and transformation and transformation of development mode, attracting upstream and upstream enterprises to settle in, and promoting the development of Xiangtan New and High Tech Development Zone and even Xiangtan. II. Preliminary Work This project is consistent with the general planning of industry development of Xiangtan New and High Tech Development Zone. Site selection is finished and planning is in process. III. Project Content The project is located in Xiangtan New and High Tech Development Zone, and planning area covers land of 200 Chinese mu. It plans to build a production base with annual output of 10 million smart phones, including assembly plant, precise processing workshop, office building, integrated workshop, test base, staff dormitory, mess hall and supporting facilities and so on. IV. Project Investment Total investment is about RMB 800 million yuan. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship Detailed ways will be determined in contract after negotiation. Return of Investment: investment and operation obtain legal return and take risks according to market principle in theory. Profit sharing and specific negotiation are acceptable. VI. Benefit Analysis After its completion, estimated annual sales revenue will reach to RMB 5 billion yuan. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technology Development Zone
Smart City Construction in Xiangtan Economic and Technology Development Zone I. Project Background New information technology represented by cloud computing, Big Data, internet of things, and mobile internet has become an important measure of local governments for improving administrative efficiency, saving administrative cost, solving social problems and improving public services. “Internet Plus” offers new opportunities for making administration innovation and service innovation. As the rapid development of Xiangtan Economic and Technology Development Zone, process of urbanization is changing with each passing day. Problems such as urban management and source allocation are becoming increasingly evident, which hinder the further rapid economic development of the zone. New smart city construction will make urban information sources clear. And it will help make urban management smarter and more precise, public service more individual and initiative, administration more effective and coordinate, government’s decisions wiser. II. Preliminary Work Xiangtan Economic and Technology Development Zone became the only systematic reform pilot among all zones in Huan, being listed in smart city pilot zone. Jiuhua Maker Space successfully became a “national maker space”. At present, there are 3 academician workstations, 25 national innovation platforms, 28 enterprises with famous trademarks, 13 provincial and above technology development centers. III. Project Content 121
Relying on national smart city pilot park, the project adopts mode of PPP, introducing and building “Smart Jiuhua� information infrastructure, urban public data base, Big Data platform, One-Card system in the park, digital urban management, comprehensive grid management service system, smart transportation, smart community, low-carbon energy platform, education management platform, government review and approval platform, enterprise information service platform, comprehensive collection of the customs duties platform, social credit management platform and enterprise and residence service space. IV. Project Investment Total investment is about RMB 770 million yuan. V. Cooperation Way PPP mode will be adopted and detailed ways will be determined in contract after negotiation. Return on Investment: investment and operation obtain legal return and take risks. Profit sharing is adopted. VI. Benefit Analysis This project will improve the scientization and modernization of management of Xiangtan Economic and Technology Development Zone, simplify procedures, reduce working hours, improve administrative efficiency and quality, strengthen supervision ability and service ability in the park, meet the most of the demands of growing public services of urban and rural residences in Xiangtan, promote the rapid economic development and development of social information. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technology Development Zone
A New Generation of Information Technology Industry Project in Shaoyang I. Project Background A New Generation of Information Technology Industry is a rising high tech industry with huge market potential and broad development prospect. Taking information technology industry as a leader, Shaoyang Economic and Technology Development Zone has attracted Tuoqi Technology, Suzhou Fangjin Electronics, Xunyuan Electronic, and Soshare to settle in the park. The park plans to build a New Generation of Information Technology Industry famous in south central China by further undertaking new generation of information technology industry in coastal area to inner land. II. Preliminary Work Site selection, land approval and land requisition and demolition have been finished. III. Project Content Total planning area is about 900 Chinese mu. It plans to set up all kinds of electronic information technology leading enterprises and supporting enterprises. IV. Project Investment Total investment is RMB 2 billion yuan. V. Cooperation Way Sole proprietorship or develop together by a single enterprise. VI. Benefit Analysis Annual production value will reach to RMB 1 billion with annual profit rate of 20% and estimated payback period is 5-8 years. VII. Project Initiator Project Initiator: Shaoyang Economic Development Zone
Beidou Navigation System Industry Chain Project in Shaoyang Economic and Technology Development Zone
I. Project Background 122
Softstone Information Technology Co., Ltd is the leader of China Smart City and Industrial Internet (Internet Plus) Construction and an innovative technology and service provider. Its Beidou Navigation System is at a rapid expanding stage and is speeding up setting stations all over the country. There is no station in Hunan yet. Shaoyang is located in central Hunan with favorable regional advantages. II. Preliminary Work Softstone Information Technology Co., Ltd has had many talks with leaders of Shaoyang Economic and Technology Development Zone,Shaoyang Economic and Information Technology Commission and municipal government, getting basic conditions of cooperation intension. III. Project Content The short-term project is to set up a wholly-owned subsidiary with office area of 1000 square meters in Baogong District. It is used for building Beidou Urban Innovative and comprehensive service system and it saves another 2000 square meters office area for introducing related supporting enterprises. Long-term project is to establish five innovation systems, including Beidou Industry Cloud Platform, enterprise innovation incubator, academy of innovation, innovation and study center, and innovation industry funds, creating a Big Data service platform. IV. Project Investment Estimated investment is RMB 1 billion yuan, including RMB 100 million yuan for short-term project. V. Cooperation Way Sole Proprietorship and contractual joint venture VI. Benefit Analysis It is estimated that Beidou Industry Cloud Platform will have up to 10,000 enterprise members, offer over 200 commercial application products, have 50 innovative incubated enterprises, introduce RMB 1 billion industry supporting funds, introduce and settle 5 ecological industry partners. After it is completed and put into production, annual income will reach to RMB 5 billion yuan. VII. Project Initiator Project Initiator: Economic and Information Commission of Shaoyang Shaoyang Economic Development Zone
Construction of Shipping Logistics Information Platform in Chenglingji New Port Area in Yueyang I. Project Background The project strikes to build a synthesis of “base and Internet” and “commerce and trade”, which is a platform combining commodity gathering and distribution, transition, and distribution processing and offering professional, intensive, networked, information services. This platform has multifunction including wholesale, purchase, distribution processing, delivery, sorting, storage, holding convention and exhibition, business, information transaction, offering live facilities. And the newest cloud computing technology and internet of things technology will be adopted. This platform will be a leading e-commerce trading and service supporting platform with advanced technology, data safety and stable system in the country. And it will adopt an operation mode of “online plus offline” and “base plus e-commerce”, promoting the balanced development for the whole logistics industry in New Port Area and Yueyang. II. Preliminary Work This project is included in the general plan of New Port Area. And feasibility study of the project is in process. III. Project Content Planning area of the project is 500 Chinese mu. And it plans to build 5 functional zones: procurement and wholesale of commodities zone, sorting and storage zone, logistics and distribution zone, e-commerce zone and logistics supporting zone. IV. Project Investment Total investment is RMB 2 billion. 123
V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture Return on Investment: operating profits VI. Benefit Analysis After its completion, estimated annual volume of business transactions will amount to RMB 10 billion yuan and annual profits reach to RMB 500 million yuan. VII. Project Initiator Project Initiator: Investment Promotion and Liaison Department of Hunan Chenglingji New Port Area
Beidou Application Industry Park in Chenglingji New Port Area in Yueyang I. Project Background BeiDou Navigation Satellite System is composed of three parts: the space section, the ground section and the user section. Among them, the space section and the ground section of Beidou Navigation Satellite System are the key and basic parts, made relying on state investment. The user section consists of basic products(antenna, chip, board card, cartographic information service,terminal devices, system integration, operation service, meeting social demands mainly by market operation. Yueyang Military and Civilian Satellite Application Industry was approved as “Hunan Military and Civilian Satellite Application Industry” by Hunan provincial government on 27th January 2015. Planning area of the park covers 3,000 Chinese mu. Relying on advantages of Yueyang being “Beidou Satellite Application Demonstration City”, it emphasizes on developing military and civilian combining industries, including satellite application, smart city, Big Data, cloud computing, unmanned equipment. II. Preliminary Work At present, 12 enterprises has settled in the park, including: Academy of Space Technology of Aerospace Science and Technology Group, GuoXinJunChuang 6906, Central Innovation Group, Jihua 3517, Shanghai Zhenheng Photoelectricity, Changsha Tuling Technology, Jinqiuhongri, Xindeng Military and Civilian Incubator. III. Project Content It plans to build a national satellite research center and test center. And it plans to introduce high-tech enterprises of satellite application field such as function module enterprise, components and parts production, and terminal production and to make satellite navigation technology use for civilians and industrialized, make satellite remote sensing technology used for civilians and engineered, and make satellite communications widespread. IV. Project Investment Total investment is RMB 1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis After it is completed and put into operation, annual turnover will reach to about RMB 5 billion yuan, annual tax will be RMB 460 million yuan and will create 5,000 jobs. VII. Project Initiator Project Initiator: Investment Promotion and Liaison Department of Hunan Chenglingji New Port Area
Smart City Building Project for Jinshi City I. ProjectBackground Since Jin-Li integrated city has been listed as a national new urbanization pilot city, infrastructure of Jinshi City has been improving with social security assistance, medical care and environmental protection being improved a lot. Smart city building project for Jinshi City is put forward as it seeks to promote the integration between Lixian and Jinshi City and accelerate reform of medium and small cities. It plans to effectively integrate advanced city management and service idea with advanced technology, such as communication network of new generation, internet of things, cloud 124
computing, and Big Data. II. Preliminary Work Project Feasibility Study has been prepared. III. Project Content 1. It plans to newly build 15 engineering data bases, 3 information service platforms.(emergency command center covering 5,000 square meters, citizen information, rural comprehensive information) 2. It plans to newly build 1800 high definition monitor message sharing platforms, 109 smart communities, offering smart elderly care and informationized community service. 3. Integration of forest fire prevention, food security, and ecology monitoring system will be achieved. IV. Project Investment Total investment is RMB 500 million yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis Through the construction and operation of smart city, relatively long-term smart city construction and operation right and franchise right will be obtained. VII. Project Initiator Project Initiator: Jinshi Jiashan Industrial Co., Ltd.
Electroacoustic Products Production in Changde Economic and Technology Development Zone I. Project Background Changde Economic and Technology Development Zone has planned build an electroacoustic industry park covering land of 100 Chinese mu. Standard workshop covering 110,000 m2 (including public renting houses of 12,000 m2) has been built. Production and living facilitiesincluding water, electricity, gas, and communication are set up. Over 20 enterprises including JUNEED Technology and Qin Yin Technology have settled in the park. It emphasizes on introducing electroacoustic terminal enterprises and upstream and downstream supporting enterprises including Bluetooth product production, portable audio products, speaker system, microphones, earphones, earphone receivers, transmitters, transmission sets, communication helmets, sound pick-up and relevant accessories production. II. Preliminary Work Electroacoustic industrial park has been put into operation and now it is attracting investments. III. Project Content The project plans to lease standard workshop covering 30,000 m2 in electroacoustic industrial park, forming the annual production capacity of electroacoustic device of 200 million. IV. Project Investment Total investment is RMB 200 million yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis After the project is completed and put into production, it will achieve an annual production value of RMB 500 million yuan and tax revenue of RMB 10 million yuan. Also, it will create over 500 jobs for local people. VII. Project Initiator Project Initiator: Investment Promotion and Cooperation Bureau in Changde Economic and Technology Development Zone
125
Photoelectricity Industry Park Construction in Changde New and High Technology Development Zone I. Project Background Planning construction area of photoelectricity industrial park is about 700,000 square meters. It has introduced a module semiconductor lighting industry park project with investment of RMB 5 billion yuan. Based on this project, it plans to introduce medium LED chips of large and small power production, LED driving power production, raw materials of semiconductors production, cutting, processing and encapsulation of semiconductor devices, semiconductor module encapsulation, LED PC cover production II. Project Content The industrial park keeps planning to introduce key photoelectrical industries including TFT-LCD panel production, glass substrate production, and flat panel TV production. For surrounding plan, it introduces upstream and downstream supporting enterprises including semiconductor, color filters, driver IC, polarized light, backlight production, striving to create a photoelectrical industry agglomeration. III. Project Investment Total investment is RMB 13 billion yuan. Selected site is located in Guanxi Industrial Park in Changde High and New Technology Development Zone, covering land of about 1,000 Chinese mu. IV. Benefit Analysis After the project is completed and put into production, estimated annual production value is RMB 50 billion yuan and tax of over RMB 1.5 billion yuan. It will create 3,000 jobs. V. Cooperation Way Joint venture, sole proprietorship; VI. Project Initiator Project Initiator: Management Committee of Changde High-tech Zone
Central South E-Commerce Industrial Park Investment Invitation in Yiyang High and New Technology Development Zone I. Project Background As it seeks to seize opportunities of e-commerce development, Yiyang High and New Technology Development Zone sets up central south e-commerce industrial park. The park has got rapid development by relying on industries such as special local snacks, bamboo sleeping mat, baby and maternal products, dark tea and so on. At present, there are more than 2,100 e-commercial enterprises in New and High Technology Development Zone with more than 30,000 people working here. Annual transaction volume of e-commerce amounts to over 10 billion yuan. II. Preliminary Work Mixed-use area has been almost built up, including main business building of 40,000 square meters, incubator of 17,000 square meters, living service building of 12,000 square meters, office building of 8,000 square meters and two apartment blocks whose floorage areas together are 48,000 square meters. Facilities including grocery stores, gyms, parking lots, cafes, ATMs, canteens have been established in the park. III. Project Content Planning area of this project is 1408.8 Chinese mu, mainly being used for building “Internet Plus Action� demonstration base, e-commerce demonstration base, industry upgrading and transforming demonstration base, and public entrepreneurship demonstration base. IV. Project Investment Total investment is over RMB 2 billion yuan. V. Cooperation Way Joint venture, contractual joint venture and sole proprietorship; VI. Project Initiator Project Initiator: Management Office of Central South E-commerce Industrial Park 126
Electronic Information Industrial Park Construction in Yiyang I. Project Background Planning area of Yiyang national New and High Tech Development Zone is 67.07 square kilometers, including sunrising industrial park of 42.68 square kilometers, and eastern industrial park of 24.39 square kilometers. The park enjoys a great location and has convenient transportation. It is only 80 kilometers away from Changsha which only takes 40 minutes by driving on expressway. It is a “bridgehead� for matching with Changsha. The park has introduced electronic-information-Oriented enterprises, such as Hunan Corun, Vesun, Xp, Hunan Guoju, Hunan Idea, Yiyang Consenwell, Yiyang Honglijie, Guangzhou Jujiu, Shenzhen Kotan, Shenzhen Xuchong and Dongguan Full Wealth Optronics, formingrelatively complete electronic information industries including electronic information equipment manufacture, photovoltaic industry, consumer electronics, electronic display, and electronic components. II. Preliminary Work Parts of land requisition and demolition work and field leveling have been finished. And some enterprises have settled in. III. Project Content Selected site is located in Yiyang New and High Technology Zone in Eastern Industry Park. Planning area is about 500 Chinese mu. The project mainly includes: 1. Carrying on progressive transfer of electronic information enterprises famous at home and abroad 2. Introducing manufactures famous at home and abroad, producing displays and electronic components of phones and computers. 3. Developing high-end electronic information manufacturing industries, emphasizing on cloud computing, photovoltaic, consumer electronics, electronic displays IV. Project Investment Total investment is RMB 1 billion yuan , among which, investment for single land requisition project is no less than RMB 100 million yuan and investment for workshop leasing project is no less than 20 million yuan. V. Cooperation Way 1: Favorable price will be given to project constructed by sole proprietorship of investors in terms of land price, tax, and project application. 2. For projects meeting demands of planning, workshops and supporting facilities may be built for investors and be leased at a favorable price. 3. For technologic type of incubating enterprises, certain amount of funds will be offered according to its technology content and incubating workshops and supporting facilities will be offers for free. VI. Project Initiator Project Initiator: Economic Cooperation Bureau of Yiyang High and New Technology Industrial Development Zone
Settling and Investment Invitation of Phone and Component Production Industrial Park in Chenzhou Economic and Technological Development Zone I. Project Background A batch of phone component production enterprises has settled in Chenzhou Economic and Technological Development Zone Shigaitang Industrial Park. Weisheng Electronics is a leading enterprise in phone charger production. Market share of UV products produced by Chenzhou Dijing Chemistry is listed among top 3 in China. Its products are mainly supplied for well-known brands, such as Samsung, HUAWEI. Tianlong Technology is an enterprise for machine assembly and exporting. There are over 700 enterprise entered this park. And service industries are settling 127
in, including bank, investment, finance, technology, convention and exhibition, insurance, and consultant. II. Preliminary Work Shigaitang Industrial Park relies on Xiangnan International Logistics Park which is a national key logistics park. It is very convenient for enterprises to pass the customs, pass commodity inspection and exchange foreign exchanges. III. Project Content The project covers land of 500 Chinese mu. And it plans to introduce over 30 phone production enterprises and supporting enterprises, making up a phone production cluster with a whole industry chain. IV. Project Investment Total investment is RMB 2 billion yuan. V. Cooperation Way Sole proprietorship and joint venture; VI. Benefit Analysis It will meet annual phone production capacity of over 10 million, annual production value of over RMB 1 billion, tax of over RMB 100 million, and create over 5,000 jobs.
VII. Project Initiator Project Initiator: Investment Promotion Bureau of Management Committee of Chenzhou Economic Development Zone
Construction of Electronic Trading Center for Casting-Forging Products and Raw and Auxiliary Material in Jiahe County I. Project Background Over 400 casting and forging enterprises gather in Jiahe County and they are closely linked with nearly 400 casting and forging enterprises started by Jiaher in Guangdong. 620,000 ton of castings and 2.6 billion forgings are produced in Jiahe County every year. II. Preliminary Work Market surveys of project process gathering service integration, auxiliary material production, raw material collaborating supply, electronic trading platform establishment have been finished, and they are at collaborator-selecting and comparing phase. III. Project Content Project planning area is 100 Chinese mu, including 22 Chinese mu for building one building for electronic trading, product exhibition, and service, 8 Chinese mu for afforestation and roads, 40 Chinese mu for logistics storage warehouse and supporting facilities, 10 Chinese mu for casting and forging and auxiliary materials manufacturing shops and supporting production equipment, 20 Chinese mu for workshop of casting and forging process gathering service and supporting equipment. IV. Project Content Total investment is RMB 300 million yuan. V. Cooperation Way Joint venture and sole proprietorship. VI. Benefit Analysis Product markets of this project are mainly casting and forging enterprises in Jiahe County and nearly 400 casting and forging enterprises started by Jiahers in Guangdong. Total annual profits are RMB 20 million yuan and payback period is 8 years. (taking financial costs of investment into consideration) VII. Project Initiator Project Initiator: Management Committee of Jiahe Economic Development Zone in Hunan
Investment Invitation of Electronic Information Industrial Park in Daoxian 128
I. Project Background Daozhou Electronic Information Industrial Park is located in central park of Daozhou industrial city. Total planning area is 3 square kilometers. And main function is to develop electronic information industry in the park, supporting and match-making with electronic information industries in Pearl River Delta and Yangtze River Delta. It plans to build industry park brand, strengthening the future economic development potential. Daoxian electronic information industrial park is one of the 15 key electronic information industries and its total planning area is 3 square kilometers. At present, 28 enterprises including Sunmoolin Electronics, Kelier Real Estate, Netshare, Xuntian Technology have settled in. Investment of RMB 2.63 billion has been ensured on contracts, and actual investment is RMB 1.38 billion yuan. II. Preliminary Work Workshops of 100,000 square meters have been built up and are waiting for leasing. Basic supporting facilities covering over 500 Chines mu have been completed. III. Project Content It plans to mainly introduce over 60 supporting production enterprises, including electronic components and materials, smart terminals production, and integrated circuit production. IV. Project Investment Investment for electronic information industrial park is over RMB 4 billion yuan. Investment for single enterprise depends on realities. V. Cooperation Way It plans to take joint venture and sole proprietorship. And it is going to introduce leading enterprises in electronic information industry. Enterprises manage themselves independently and are responsible for their own profits and loss. Policy-related preferential discounts and subsidies will be offered. VI. Benefit Analysis After its completion, estimated annual production value will be over RMB 10 billion yuan, tax over RMB 300 million yuan and create over 5,000 jobs. VII. Project Initiator Project Initiator: Daoxian Business and Grain Bureau
E-Commerce Industrial Park in Xinhua County I. Project Background Xinhua is located in west-central of Hunan Province and at the midstream of Zi River, covering national land of 3636 square kilometers with population of 1.48 million. Xinhua is a county with large population, vast land, great agriculture and abundant special agricultural products. In history, Xinhua County emphasizes on e-commerce. According to incomplete statistics, there are over 3000 e-commerce enterprises in Xinhua County and over 30,000 people work in e-commerce industry. In 2014, value of retail sales of e-commerce was ranked the ninth among national poverty-stricken counties and the top among Hunan poverty-stricken counties. Since the centralized development level of e-commerce industry is low, it is badly in need of transformation and upgrading, extending upstream and downstream value chain, promoting transformation and upgrading of modern manufacture. It is very important to build an e-commerce industry. II. Preliminary Work Selected site is in Wuting Village Shangmei Town. Preliminary assess of Development and Reform Commission, National Land Bureau, Planning Bureau, Housing and Rural-Urban Development Bureau, and Environmental Protection Bureau. III. Project Content Planning area is about 200 Chinese mu and total floorage area is 250,000 square meters. It mainly introduces emerging industries including electronic business, information software, and design and development, building a professional industrial park with an e-commerce industrial chain. 129
IV. Project Investment Total investment is RMB 300 million yuan. V. Cooperation Way Sole proprietorship VI. Benefit Analysis After the project meets its production goal, annual production value is about RMB 1 billion, profits will be RMB 80 million yuan, and payback period is 5.2 years. VII. Project Initiator Project Initiator: Business and Grain Bureau of Xinhua County in Loudi
Construction and Development of Printed Circuit Board Electronic Industrial Park in Yiyang I. Project Background According to China Market Research Website, it is estimated that market scope of global PCB industry will reach to 65.7 billion dollars. Demands of downstream industry of PCB are promoting the rapid development of PCB industry. As informationization in China is deepening all-around, marketization level improving, residences’ income growing, domestic demands expanding, consumption structure upgrading, development of computer industry, communication device, IC packaging, consumer electronics will obtain new momentum and development and upgrade of new products will offer PCB industry a more broad market. II. Preliminary Work There is a relatively good base for carrying on PCB industry in Ziyang District in Yueyang. It is the only PCB industry park in Hunan province, having industry land for PCB industry of 3,000 Chinese mu. China Printed Circuit Association (CPCA) and Shenzhen Printed Circuit Association (SPCA) stay optimistic about development of PCB industry in Yiyang. And they have built strategic cooperation relations. Aoshikang Group, ranking the third in China, has settled in Ziyang. It plans to introduce 5 large circuit board enterprises within 2—3 years, 10 small and medium circuit board enterprises, over 20 supporting enterprises so as to create a well-known special printed circuit board industrial park. And it plans to produce 20 million square meters of circuit board every year and meet annual production value of RMB 20 billion yuan and annual tax of over RMB 1 billion yuan. III. Project Content Construction Scale: total planning construction area is 3,000 Chinese mu, divided into two phases. Planning area of the first phase is 1,200 Chinese mu while planning area for the second phase is 1,800 Chinese mu. It mainly introduces advanced electronic circuit industry chain enterprises including printed circuit board, dedicated device, raw and auxiliary materials from home and abroad and emphasizes on carrying on circuit board industries in Yangtze River Delta, Pearl River Delta, Taiwan, Hong Kong and so on. IV. Project Investment Total investment is RMB 10 billion yuan. And it emphasizes on introducing single enterprises with investment scale of over RMB 100 million yuan. V. Cooperation Way 1. Integrated development of the park: all or part of the park may be sold. And enterprises are in charge of preparing detailed regulation and investment attraction, enjoying independent management right and usufruct. 2. Standard workshops are for leasing (selling). It is enterprises that invest and fit up workshops, purchase equipment, and manage and operate workshops. VI. Project Initiator Project Initiator: Bureau of Commerce in Ziyang District in Yiyang
130
“Module Semiconductor Industrial Park “in Dingcheng New and High Technology Development Zone I. Project Background Hunan Mooular Lighting Technology Co., Ltd set up by Anhui HEDAR Co., Ltd and Yuegang Venture Capital Co., Ltd., made investments and built a module semiconductor lighting industrial park in Dingcheng New and High Technology Zone in Changde. And it plans to make three industrial parts, including “production base of module semiconductor lighting products (high power lighting with integration of chip and radiator), headquarter (development and testing base and e-marketing platform) and business development”. With advances technology, the project replaces current standards of 39 traditional lighting products with standards of three kinds of module products. It now needs to introduce related lighting manufacturing enterprises to create a great lighting cause. II. Preliminary Work Preliminary work of the project has been started. III. Project Content The project covers land of 1000 Chinese mu with total investment of RMB 5 billion and it is divided into two phases: land of 400 Chinese mu for the first phase and land of 600 Chinese mu for the second phase. It plans to build headquarter, light net and so on. IV. Project Investment Total investment is RMB 5 billion yuan, including RMB 2 billion yuan for the first phase and RMB 3 billion yuan for the second phase. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship; VI. Benefit Analysis After the first phase of the project is put into production, it is estimated that annual production value will reach to RMB 10 billion yuan and tax over RMB 500 million yuan; after the first and the second phase are put into production as a whole, it is estimated that annual production value will amount to RMB 50 billion yuan and tax over RMB 1.5 billion yuan. Also, it will create 10,000 jobs. VII. Project Initiator Project Initiator: Hunan Mooular Lighting Technology Co., Ltd
Electronic Smart Water Meter and Ultrasonic Heat Meter Production I. Project Background For a long time, there are many problems existing in traditional mechanical water meters, including blocked easily by impurities in water, fogging on meter glass, unstable measuring, non-measuring of water dropping, self-rotation. And the traditional mechanical water meter does not have the function of remote meter reading in modern society. Therefore, market demands for the electronic water meter are increasing. At the same time, southern provinces are promoting central heating project. Also, the original measure way, collecting heating cost on the basis of area is unscientific and goes against market working rules. Therefore, household measuring by ultrasonic heat meter will be more common. II. Preliminary Work Feasibility study report has been prepared. III. Project Content Total planning area is 300 Chinese mu and total floorage area is 220,000 square meters. It mainly plans to build office building, workshops, warehouses; at the same time, it will purchase equipment including automated heat meters calibration instruments, screen printers, and reflow soldering. IV. Project Investment Total investment is RMB 500 million yuan. V. Cooperation Way Contractual joint venture and sole proprietorship; 131
VI. Benefit Analysis After its completion, it will be able produce 2 million electronic smart water meters and 1 million ultrasonic heat meters. And normal annual income will reach RMB 800 million yuan and tax will climb up to RMB 150,163,300 yuan, creating 300 jobs. VII. Project Initiator Project Initiator: Hunan Changde Water Meter Production CO., Ltd
2-4 New Material (22) High-performance Titanium Alloy and Titanium Machining of the Hunan Xiangtou Holdings Group CO., Ltd. I. Project Background According to the National Industrial Policy and the development strategy for hi-tech of the Hunan Xiangtou Holding Group CO., Ltd, the Hunan Xiangtou Jintian Technology Group plans to invest in constructing high-performance titanium and titanium alloy material, high-performance titanium plate and high-performance welding ti-pipe so as to offer solutions to the plight which the high-end processing of wrought titanium and down-stream titanium cannot be self-sufficient at home, to provide significant material support for rapid development of defense industry, ocean engineering, high-end consumer goods and high-end equipment. The deep processing industrial clusters and high-value-added products generated by this project possess great market prospect and driving force and prominent economic and social benefit. Ⅱ.Project Content The Hunan Xiangtou Titanium Co., Ltd, the Hunan Xiangtou Jintian New Material Co., Ltd and Hunan Titanium Industry Co., Ltd respectively founded in Changsha, Yiyang and Changde have corresponding responsibility to construct high-end product market of titanium alloy material featuring high-value-added and hi-tech, to invest in constructing projects of high-performance titanium and titanium alloy material, high-performance titanium plate and high-performance ti-pipe. Ⅲ. Project Investment Project investment totals about RMB 4.137 billion yuan. This project plans to attract capital of RMB 3 billion yuan. Ⅳ. Cooperation Way Cooperative development. The mode lasts 10 years and the interest will be paid by year. The repayment of principal will be started from the sixth year. Ⅴ. Project Initiator Project Initiator: Hunan Xiangtou Jintian Technology Group Co., Ltd
Construction of the Additive Manufacturing (AM) Industrial Parks in Changsha Hi-tech Industrial Zone Ⅰ. Project Background Relying on a group of 3D-printing companies including Farsoon and Rahma Life Sciences Group, Changsha Hi-tech Industrial Zone has formed complete 3D printing industrial chain by developing 132
and increasing the complete equipment of 3D printing and the research and development and production of major parts. It has the most cutting-edge technology in the world, especially in the sector of SLS. It has already reached international advanced level in SLS equipment and sintermetalle, breaking the long-term monopoly of the Evonik Degussa which takes the leading position in material engineering chemistry in the world. Ⅱ. Preliminary Work Public service platform in the park has beenconstructed. Ⅲ. Project Content The project will focus on 3 function modules of AM including the research and development system, application system and platform service system. It aims to construct it into a supply base, which will be highly ranked in the world, of 3D-printing hi-tech equipment and new and high technology and material. It will drive the development of the down-stream industry of 3D printing and derivations of emerging industries such as 3D scanner, B2C and 3D-pringting bar. By doing so, it can form a whole industrial chain cluster of 3D printing. Ⅳ. Project Investment Project investment totals about RMB 5 billion yuan. Ⅴ. Cooperation Way Sole proprietorship or joint venture. Ⅵ. Benefit Analysis After the implementation of the project, the park will gather over 50 corporations with 10 thousand employees and the gross output will be over RMB 5 billion yuan. Ⅶ. Project Initiator Project Initiator: Management Committee of Changsha Hi-Tech Industrial Zone
Investment Promotion of New Material Industrial Park in Changsha Hi-tech Industrial Zone Ⅰ. Project Background Founded in 1988 and approved as one of the first batch of nation-level Hi-tech Industrial Zone in 1991, the comprehensive economic strength and the economicaggregate of Changsha Hi-tech Industrial Zone ranksthe 15thin National Industrial Zones. It has shaped a new material industrial cluster covering power battery, carbon-carbon composites and 3D printing. Gathering a group of battery material and battery productionindustries including CORUN, MELSEN, Kingray New Materials and Shanshan New Materials, it has formed industrial cluster of advanced battery materials which account for 80% of domestic battery material market. The outputandsalesof lithium cobalt oxiderankthe 3rdintheworldand thefirstin China, which shows that it possesses sound industrial strength and supporting infrastructure. Ⅱ. Preliminary Work At present, land acquisition and housing demolition have been finished. The basic road network and other infrastructure are complete. Ⅲ. Project Content Land for construction use amounts to 600 Chinesemu. About 8 to 10 R&D and production corporations of new material are to be introduced. A group of enterprises whose output value willsurpass RMB 1 billion yuan are to be established. Complete associated industries and supports are come into being. Ⅳ. Project Investment Planned project investment in new material amounts to RMB 15 billion yuan, among which RMB 12 billion yuan will be fixed asset investment and RMB 3 billion yuan will be working capital. The construction phase will last 3 years. Ⅴ. Cooperation Way 133
Joint venture, contractual joint venture, holding and sole proprietorship. Ⅵ. Benefit Analysis The construction period will last 3 years. Designedproductioncapabilitywillbeachievedtwo yearsafter the project goes into operation. It is expected to achievethegoal that the annualsalesrevenue reachesRMB 10 billionyuan, the annual netprofitreaches RMB 3 billion yuan and theROI (return on investment) reaches 20%. From the starting year oftheconstruction, the paybackperiodafterincometaxis 5 years. Ⅶ. Project Initiator Project Initiator: Management Committee of Changsha Hi-Tech Industrial Zone
Production of 4000t/a Targeted-bonding Absorbing Environmental Protection New Materials Ⅰ. Project Background Relying on Dr. Feng Xiangdong’s patented technology known as SAMMNS®, Hunan SAMMNS Environmental Protection Co., Ltd is an innovative hi-tech and environmental protectionenterprise bycooperatingwithYoungyInvestmentHoldingGroupCo., Ltd. The company owns comprehensive R&D platform, applies for 70 national inventionpatentsand utility modelpatents and undertakes various nationalandprovincialandministeriallevelscientificresearches and projects. It dedicates to develop a well-known environmental protection enterprise of a whole industrial chain integratedwithR&D, producing, equipment manufacturing, engineering design and EPC (Engineering Procurement Construction). ⅡPreliminary Work The first phaseoftheprojecthasfinishedconstructionof 4 R&Dcentersand a 2000-squre-meter workshop. The construction of second phase of the project and the investment and financing is inprocess. ⅢProject Content The project is planned to build a manufacturingshopofmaterial, molecular and an equipment and an experiment building. ⅣProject Investment The total investmentof the phase 2 amountsto RMB 100 millionyuan. Ⅴ. Cooperation Way Equity financing, venture investment, bank or financial institution loans and credit or other investment and cooperation of specific environment projects (such as PPP or BOT). Ⅵ. Benefit Analysis This mode can quickly gain revenue with an annual return rate between 22% to 28%. Ⅶ. Project Initiator Project Initiator: Hunan SAMMNS Environmental Protection Co., Ltd
New Material of Nonferrous Metals Deep Processing Industrial Park IProject Background New material industry of nonferrous metals inHunanProvince has prominent advantages, and it is the pillar industry that Hunan Province focuses on. Wangcheng EconomicDevelopment Zone has formed a solid foundation. It istheonly NationalNonferrous MetalMaterials Deep Processingof Hi-Tech Industrialized Base, but also the only industrial park takes nonferrous metal industry as the leading industry in Changsha, Zhuzhou 134
and Xiangtan. The park has 40-plus famous material enterprises above a designated scale including Snto, Golden Dragon, Bichamp, China Minmetals Nonferrous Metals Co., Ltd and Hunan MT New Material with anoutput value of RMB 68 billion yuan. To promote the nonferrous metals new material industry becomemorespecial, professional and ecological, Wangcheng Economic Development Zone plans to build a nonferrous metals new material industrial park, works hard to develop nonferrous metals new materialdeepprocessingindustrywithhigh-technologyandhigh value-added and connectsmiddlelinks of theindustrialchainsoastoform a new material industrial cluster with deep processing of copperindustry, aluminum industry and theirproductsasitsdriving force. II. Project Content Land for construction use of nonferrous metals new material industrial park amounts to 320 Chinese mu with a total investment of RMB 25 billion yuan. The project will be divided into two phases and it will focus on introduction of domestic and foreign high-end environmental protection new material, deep processing and manufacturing enterprises of nonferrous metals and other advanced upstream and downstream manufacturing enterprises. III. Project investment Project investment totals at RMB 25 billion yuan, mainly used for plants construction, production equipment purchase, research and development, testing and examination of new products, technological transformation and personnel training. Funding for the project is mainly self-raised. IV. Cooperation Way Sole proprietorship and contractual joint venture. Joint venture or cooperation can be adopted depending on circumstances. V. Benefit Analysis The project is expected to achieve output value of RMB 100 billion yuan within five years with RMB 2-billion-yuantaxrevenue. VIProject Initiator Project Initiator: Management Committee of Changsha Wangcheng Economic Development Zone
Industrialization of the 3G HCPV in Zhuzhou High-tech Zone IProject Background The existingsolar photovoltaic technologiesaremainly polysilicon flat platecellandhullcell (which are 1G and 2Gtechnology), which have problems such as low photoelectric conversion efficiency, high generating cost and environment pollution. High concentrating photovoltaic (HCPV) is the third generation of new technology, using advanced and efficient III-V gallium arsenide solar cells, and its conversion efficiency can reach 40%. By using this technology, the useamountofbatterycanbe dramatically reducedand the cost of power generation will reduce less than $2 per watt, which close to the cost of coal power generation. HCPV isthemostadvanced solar powertechnologywiththelowestcostallovertheworld. II. Preliminary Work The project undertaker already has maturetechnology. It has completed the project feasibility demonstration andtheprojectisinitsstageofpreliminaryapproval. III. Project Content Equipment for production, examination and experiment has been added and the project forms a solar power generation system with an annual output of 120MW so as to achieve industrialization of high efficient solar photovoltaic power system. IV. Project Investment Project investment totals at RMB 250 millionyuanand the project will be divided into 3 phases. The initialinvestmenttotalsatRMB 50 millionyuan, mainly used to develop, manufacture and sell the 3GHCPV. V. Cooperation Way Contractual joint venture. Shareholdingproportion: investor 70% andtechniquesupplier 30%. VI. Benefit Analysis The project can achieve sales revenue about RMB 1.24 billionyuanbythe year ofreaching design 135
capacityand taxation andprofitabout RMB 434 millionyuan. VII. Project Initiator Project Initiator: Merchants Bureau of Zhuzhou High-Tech Zone
Aluminum-air Cell,Hawkins Cell/Titanium Lithium Fuel Cell Production I. Project Background Aluminum-air cell,Hawkins cell/titanium lithium fuel cell has broad market forapplication. The aluminum-air cell with themarketsizeoveronetrillionyuan has incomparable advantages in backup powersupply, island power, island defense, emergency relief and power field because of high energy density, no-grid charging, long shelf-life and wide range of raw materials. As electric vehicle energy, new Hawkins cell has made great breakthrough in green and environment protection and energy saving and emission reduction. Titanium lithium cell has excellent performance in rate, high temperature, low temperature, cycle lift and safety and can be applied in electric vehicles and energy storage. Through cooperation with Qinghua University, the project introduces key technology of Aluminum-air cell,Hawkins cell / titanium lithium fuel cell and achieves industrialization. Industrial transformation in Qingshuitang old industrial area can be effectively promoted. II. Preliminary Work Located in the Qingshuitang technological innovation park in Zhuzhou, the project has complete supportinginfrastructureandreliabletechnological resource. It is in the stage of related preliminarywork. III. Project Content The project focuses on constructing 100 Hawkinscell production lines covering an areaof 150 to 200 Chinese mu and 20 titanium lithium cell production lines covering anareaof 20 to 70 Chinesemu. IV. Project Investment The project investment totals at RMB 4 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the completion of the project, it is estimated that annual output value can amount to RMB 15 billion yuan and increase 700-plus jobs. VII. Project Initiator Project Initiator: Zhuzhou Bureauof Commerce and Food
Zhuzhou Medical Neutral Glass Production I. Project Background International medicalneutralglass is known as Class I Glass, also known as 5.0 glass or Class Aglass. It iswidelyusedinthefieldof drug packagingforits goodmaterial, performance, chemical and thermal stability, and it has huge market demand. As China still being immature in the technologyof manufacturing ofinternational-levelneutralglass, many products packaging including high-grade biological agents, blood, vaccines basically depends on importing neutral glass. Through cooperation with German Eglass Group, the project introduces patented technology and use the industrial foundation of Qingshuitang old industrial base in Zhuzhou to develop high-end glass production in Zhuzhou and achieve the transformation of manufacturing. II. Preliminary Work Located in the Qingshuitang technological innovation park in Zhuzhou, the project has complete supporting infrastructureandreliabletechnological resource. Related preliminarywork is underway. III. Project Content The project covers an area of 150 to 300 Chinese mu. It utilizes mature foreign Dannerprocess to construct a medical neutral glass production line whose annual production can reach 40 thousand 136
tons. IV. Project Investment The project investment totals at RMB 1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture or other ways. VI. Benefit Analysis After the completion of the project, it is estimated that annual output value can amount to RMB 600 million yuan and RMB110-million-yuan taxation andprofit. VII. Project Initiator Project Initiator: Commerce and Food Bureau of Zhuzhou City
Industrialization of High Temperature Corrosion Resistant Components of Silicon Carbide Ceramics in Liling City I. Project Background High temperature corrosion resistant components of silicon carbide ceramics has various advantages including high strength, hardness, insulativity, thermal conductivity, high temperatureresistance, oxidative resistance, corrosion resistance, abrasionresistance, high-temperature strength. Products with such components are widely used in automotive, rail transportation, aviation, smelting and chemical engineering. Liling City, known as “Ceramic Capital of China�, has one national and seven provincial-level enterprise technologicalcenters and six technologicalinnovativeplatforms. The city now has 665 ceramicenterprises, among which 219 scaled enterprises and 23 enterprises hasestablishedproduct R&Dcenters. Ithasfiveseriesofproductsincludinghousehold porcelain, electroceramics, art porcelain, industrial ceramics andnewceramics. The output of electroceramics accounts for 98% of theprovince, 43.4% of the country and 28% of the world. In 2015, the ceramic industry achieved grossoutputvalueofRMB 55.6 billionyuanand sales volumeof RMB 46.4 billionyuan. Inrecentthreeyears, Liling City has successfully developed functional ceramics, structuralceramics, new ceramicmaterialandothernewproductsandtheyarewidelyusedin energy, electronics, aerospace, automotive and other fields. Ceramic patent applications have amounted to 1,500 among which 80% has achieved industrialization. II. Preliminary Work Liling City and Hunan University of Technology have reacheda cooperationagreementtoshareitsstate-level projects research. It further improves research and development and innovative strength of abrasion resistance and high temperature resistance of structuralceramics. III. Project Content Land for construction use amounts to 280 Chinese mu. The project plans to finish construction of production workshop, forming workshop, office buildings, warehouses, roads, dormitories and other necessary auxiliary facilities, to finish building production lines and laboratory andtopurchasenecessaryproductionequipment. IV. Project Investment The project investment totals at RMB 100 million yuan. V. Cooperation Way Sole proprietorship, contractual joint venture and joint venture. VI. Benefit Analysis After the project reachesdesigncapacity, it can achieve the output value of RMB 110 million yuan. VII. Project Initiator Project Initiator: BusinessTravelandFoodBureauof Liling City
New Material Industrial Park Construction in Yanling County 137
I. Project Background Cultivating and developing new material industry is the strategic focus of industrial and economic transformation and upgrade in Yanling County. In 2015, Yanling County has 32 new material industries (among which are 21 enterprises abovedesignatedsizeand 17 enterprises in YanlingCountylistedin provincial levelnewmaterialindustry inventory) with an annual industrial output value of RMB 3.55 billion yuan. The annualsales revenueofnew material industry accounts formorethan 50% of the designed industryin the whole county. There are more than 40 varieties including rare metal powder, special glass, hard surface materials and graphite battery materials. Yanling County locates in the contiguous destitutearea in Luo Xiaoshan mountain andenjoy the preferentialpoliciesinlightof CentralSovietArea. The county has abundant power resources and the price is relatively cheap, RMB 0.25 yuan per kilowatt hour lower than stategrid. II. Preliminary Work The project has got land approval and ‘threeconnectionsandoneleveling’assuringthata construction site is connected to water and electric power supplies and roads, and that the ground is leveled before a project is begun. III. Project Content Land forconstructionuseamountsto 300 Chinesemu. Newly built standard workshop covers anareaof 100 thousand square meters. The new material industry R&D and testing center building covers an area of 5,000 square meters. The project will introduce more than 10 major enterprises of new materials. IV. Project Investment The project investment totals at RMB 350 million yuan. V. Benefit Analysis After the project reachesdesigncapacity, it is expected to increase RMB 1 billion yuan sales revenueandthe profit will reach RMB 150 millionyuan. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Economy & Technology, Informationization and Business &FoodBureau of Yanling County
Construction of Xiangtan Tianyi New Material Industrial Base I. Project Background In 2016, the outputvalueofnewmaterialindustryinTianyi Industrial Parkreached RMB 5.005 billionyuan. At present, the park has nearly 40 manufacturing enterprisesoftraditionalmetal material, architectural electrical materials andnewmetalfunctionalmaterials. Meanwhile, it has strengthened cooperation with National UniversityofDefenseTechnology, Hunan University and Xiangtan University. It has excellent cooperation environmentof production, research and learning. During the “13th Five-Year”, the park will devote to promote the development of basic manufacturing enterprises including semiconductorandhigh-performance integrated circuitandfocusonthedevelopmentofadvanced hard material, high-performance metal material and new building material. II. ProjectContent Land forconstructionuseamountsto 2,500 Chinese mu. Relying on Haipaoshi Industrial Park and Ruitai Industrial Park, the project focuses on the development of high-performance metal material, advanced hard material, new building material and new energy material manufacturing. It plans to introduce 3 to 5 leading enterprises of new material and build one cooperation platform of production, learning and research. More than 100 supporting SMEs and industrial clusters of new material in the park are to be graduallybuilt. III. Project Investment The project investment totals at RMB 5 billion yuan. IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. 138
V. Project Initiator Project Initiator: Investment Attraction and Cooperation Bureau of Xiangtan Tianyi Demonstration Zone
Polymer Lithium Battery Production in Changde Economic and Technological Development Zone I. Project Background In recentyears, supported and promoted by encouraging policies such as Decisions of the State Council on Accelerating the Cultivating and Development of Strategic Emerging Industries, the polymer lithium battery industry has witnessed a rapid development. Investors have paid closer attention to the polymer lithium battery industry. The outputofproductscontinuestoexpandandnewinvestmentprojectsofdomesticenterprises are graduallyincreasing. During the “13th Five-Year”, the polymer lithium battery industry will usher in a new round of investment boom. The electronicandnewmaterialindustriesaretheleading and keyindustries for Changde Economic and Technological Development Zone. Relying on upstream supporting enterprisesofrawmaterialoflithiumbatteryincludingnickelfoamofLyrun, lithium batteryseparatorofChinalyand lithium anodeandcathodematerialsof Jinfuli, it focuses on introducing downstream finished productmanufacturers including finishedlithiumbattery, large-scale power sourcepackage so astoformacompletelithiumbattery industry industrial chain. II. Preliminary Work The project is attracting investment. Changde Economic and Technological Development Zone will provides good area for project siteselection with “nine connections” (connecting municipal roads, rain, sewage, tap water, natural gas, electricity, telecommunications, heat and cable TV). The most favorable policy will be offered to the project construction. A special project leading group will besetupto promise a coordinated promotion in thewholeprocessoftheproject. By doing so, it will provide the best service and create the best environment for the project construction. III. Project Content Planned land for construction use amounts to 200 Chinese mu. Production lines of polymer lithium battery with large capacity will be constructed. The project focuses on building modernized workshop, administrative office building, logistics and storage workshop, technological R&D building, dormitories for employees and other supporting infrastructure. IV. Project Investment The project investment totals at RMB 650 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis It is expected that the annual output of the project will reach RMB 500 million yuan. Annual taxation willbe RMB 50 millionyuan. The project can create 1000 new jobs. VII. Project Initiator Project Initiator: Bureau of Merchants and Cooperation of Changde Economic and Technological Development Zone
Construction of Eco-Industrial Park of Graphene in Changde Economic and Technological Development Zone I. Project Background Graphene is a magical nano-grade new material with good light transmission, high thermal conductivity, low electrical resistivity, high electronic mobility and high mechanical strength. Asit can replace original materialandplayits high performance inmany application fields, it becomes the “king of the new material in the 21st century”. In 2015, China published some favorable papers 139
suchasMade inChina 2025 Key AreaTechnologyRoadmapandOpinions ConcerningAcceleratingthe InnovativeDevelopmentoftheGrapheneIndustry. Relying on new material enterprisesincluding KingfuliLithium, Chinaly New Material, Lyrun New Material and Hanenergy, Changde Economic and Technological Development Zone will attach highimportanceto product development andresearchofgrapheneinpowerbatteryandsolarpowergeneration so as to build an innovative and industrialized base of graphene new material, featuring high level and combination of research and production and to enlarge the industrial scale of new material industry in Changde Economic and Technological Development Zone. II. Preliminary Work The most favorable policy will be offered to the project constructionbyChangdeEconomic and Technological Development Zone. A special project leading group will beset upto promise a coordinated promotion in thewholeprocessoftheproject. By doing so, it will provide the best service for the project construction. III. Project Content Planned land for construction use of thefirstphase amounts to 300 Chinese mu. Annual productionofgrapheneanddeepprocessingproducts of graphene willbeover 1,000 tons. The project will focus on introduction of graphene manufacturingenterprisesin fields of automotive, plastics, coatings, construction, metal, battery, aviation, energy and energy storage. It will focus on construction of R&D center, testing center, production workshop and other supporting production and living facilities. IV. Project Investment The project investment totals at RMB 1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the completion of the project, it is expected that the annual output value will be reached over RMB 1 billion yuan and annual tax payment about RMB 10 million yuan. VII. Project Initiator Project Initiator: Bureau of Merchants and Cooperation of Changde Economic and Technological Development Zone
Construction of New Material Industrial Park in Changde Economic and Technological Development Zone I. Project Background New materialindustryisthemajordevelopmentindustryforChangde Economicand Technological DevelopmentZone inthefuture. At present, there are11 production andresearchanddevelopmententerprises of new material in thezone. It has formed a new materialindustrialcluster which focuseson titanium andtitaniumalloynickel, power lithium battery, nickel-hydrogen battery, major framework material, high-capacity power battery, voltage-sensitive nanomaterial, microwave ovens, induction cooker ceramic plates, polymer wear-resistant pipe. The annual output value surpasses RMB 2 billion yuan, accounting for 10% of the total output value of Changde Economic and Technological Development Zone. To further improve industrial chain and enlarge the cluster of new material, it is imperative for the zone to introduce upstream and downstream supporting enterprises on thebasisoftheexistingindustrial base. II. Preliminary Work The project is attracting investment. The most favorable policy will be offered to the project constructionbyChangdeEconomic and Technological Development Zoneto promise a coordinated promotion in thewholeprocessoftheproject. By doing so, it will provide the best service for the project construction. III. Project Content Planned landfor specialized parkconstructionamountsto 500 Chinesemu. The project focuses on building newmaterialindustries including deep processing of titanium, foam nickel energy storage, new nano-powder material, lithium-ion battery separator material, new chemical engineering material and UHMWPE fiber. 140
IV. Project Investment The project investment totals at RMB 1.2 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the full operation oftheproject, it is expected to achieve the annual output value of RMB 3 billion yuan and annualtaxationof more than RMB 100 millionyuan。 VII. Project Initiator Project Initiator: Bureau of Merchants and Cooperation of Changde Economic and Technological Development Zone
Construction of New Material Industrial Park in Yiyang High-tech Zone I. Project Background Yiyang High-tech Zone is a state-level high-tech zone, covering a planning area of about 67.07 square kilometers, of which Chaoyang Industrial Park covering a planning area of 42.68 square kilometers and eastern industrial park 24.39 square kilometers. With favorable location and convenient transportation, the zone is both the key joint of the economic development corridor of Changsha, Yiyang and Changde and the bridge towerlinkingYiyang andChangsha. It has introduced many new material enterprises including Jinbocc, Huitong New Material,Xiangtou Goldsky andCorun. It ranks frontrow in carbon-carboncompositematerial, titanium material, metallic shieldmaterial, battery material, powder metallurgymaterial in thecountry. New material industry has become one of the leading industries in the high-tech zone. II. Preliminary Work Supporting infrastructure in the park is well-equipped. Project content: The planned address of the project is in Eastern industrial park in Yiyang High-tech Zone. The planned land for construction use amounts to 1,500 Chinese mu. It will continue to introduce various production and R&D enterprises of advanced battery material, hard material, composite material, 3D printing metal, nano material, graphene material, biobased materials and intelligent material. Project investment: The project investment totals at RMB 3 billion yuan.It is required that the investment on land acquisition project should not be less than RMB 100 million yuan and the investment on workshop rental project should not be less than RMB 20 million yuan. V. Cooperation Way 1. The construction project of sole proprietorship of investors can be given preferential treatment in land price, tax and report of project. 2. Plants and supporting facilities can be built for investors and they can be rented in preferential prices if the project is in line with the planning requirements. 3.Projects of scientific and technological incubation enterprises can be provided with a certain amount of financial support according to the scientific and technological content of the project. Free incubation plants and supporting services can also be provided. VI. Project Initiator Project Initiator: Economic Cooperation Bureau of Yiyang High-tech Zone
Construction of Non-Mineral New Material Industrial Park in Huishangang Town in Taojiang County I. Project Background Huishangang industrial concentration zone in Taojiang County in Yiyang City belongs to the provincial industrial concentration zone. It is 30 kilometers away from the Taojiang County and 45 kilometers away from Yiyang City. The planning area is 236.02 hectares. The major development industries of the zone are non-metal mineral products, nonferrous metal smelting and rolling. Surrounded by S217,Luoyang-Zhanjiang Railway, Yiyang-Loudi-Hengyang Expressway, it has 141
convenient cargo transportation. According to the Report of Mineral Resources Reserves of Calcium Carbonate Industry in Huishangang Town of Taojiang County in Hunan Province, Huishangang Town is abundant in limestone resource reserve with recoverable reserve of 7.6 billion tons and high Ca content. It has the best limestone resource in the middle and lower reaches of Yangtze River region. At present, the supply gap of light calcium carbonate, calcium oxide and nano-calcium carbonate is very large in the province, which means that the market prospect is very broad. II. Preliminary Work The investment on infrastructure in the park has totaled to RMB 680 million yuan. The main road networkconstructedandbeingreconstructed is 12.8 kilometers. It now has 3 waterlines with a daily water supply capacity of up to 30,000 tons. Three 110KV transformer substations have been constructed. A sewage treatment plant with a daily sewage treatment of 20,000 tons has been constructed and put into operation. III. Project Content Planning land for construction use amounts to 300 Chinese mu. The project plans to build workshop, office occupancy, canteen and dormitories and purchase production equipment so as to achieve the goal of annual output of 200 thousand tons of light calcium carbonate and nano-calcium carbonate, 1 million tons of calcium oxide and 500 thousand tons of medium-and-high-quality calcium hydroxide and to build a supporting production chain. IV. Project Investment The project investment totals at RMB 500 million yuan with fixed asset investment of RMB 450 million yuan and circulating fundsof RMB 50 million yuan. V. Cooperation Way Joint venture, sole proprietorship and contractual joint venture. VI. Benefit Analysis After the completion of the project, the annual sales volume is expected to reach RMB 1 billion yuan and the annual tax payment is expected to be RMB 10 million yuan. VII. Project Initiator Project Initiator: Huishangang Industrial Concentration Zone in Taojiang County, Yiyang City
Investment AttractionforSettlement in Chenzhou Graphene Industrial Park I. Project Background According to the12th Five-Year Plan for New Material Industry released by MIIT(Ministry of Industry and Information Technology) in 2012, graphene has been listed as one of the frontier new material. After that, the 13th Five-Year Plan clearly put forward that high-end new material including graphene should be developed vigorously. Graphene has many superior material performance including good electrical conductivity and resistance to pressure. It will bring revolutionary progress in both traditional and emerging fields including semiconductor, photovoltaic industry, lithium-ion battery, aerospace, military and a new generation of display. Once it can achieve mass production, it will definitely become the next hi-tech industry of trillion-yuan level. II. Preliminary Work China is blessed with graphene resource, and amorphous graphite resource in Chenzhou, which has a good reputation of “Home to Amorphous Graphite�,accounts for 70% of the world reserves. At present, there are more than 70 enterprises engaging in graphite and graphite products in Chenzhou City, which possesses favorable conditions to develop amorphous graphite. Meanwhile, it has the first National Quality Supervision and Inspection Center of Graphite Products in China. III. Project Content Land for construction use amounts to 1800 Chinese mu with the building area of about 1 million square meters. The construction period of the project is planned to be 5 years. The project will cover an area of 1800 Chinese mu. The project will be divided into 3 phases. Phase I: Land for construction use amounts to 300 Chinese mu with building area of 200 thousand square meters. It focuses on building a collaborative innovation platform of graphene and allow 142
innovative collaboration to play its core leading role in innovative development of graphene industry. It will also build supporting constructions including high (middle) level experimental area, headquarters of enterprises and health center for senior intellectuals, living area for academician and senior intellectuals, data center, remote technical support center, incubation pool for scientific innovation and platforms for investment and financing. Phase II: Land for construction use amounts to 500 Chinese mu with floor area of 300 thousand square meters. In line with national industrial policies and environment protection requirements, it focuses on building primary raw material base and raw material purification base of graphite and graphene inYizhangFluorineChemicalIndustrialPark. Phase III: Land for construction use amounts to 1000 Chinese mu with floor area of 500 thousand square meters, mainly used for application enterprises’ settlement and production of graphite and graphene products. IV. Project Investment The project investment totals at RMB 3 billion yuan, with RMB 300 million yuan to RMB 500-million-yuan self-raised fund by Hunan Gonsion Graphite. The rest of the investment will be introduced by government industry-guided fund, merchants and attracting investment and graphite and graphene industry fund. V. Cooperation Way Sole proprietorship and joint venture. VI. Benefit Analysis After the official operation of the project and reaching its design capacity, it can achieve an annual sales revenue of about RMB 1.4 billion yuan, pretax profits of RMB 320 million yuan, income tax of RMB 80 million yuan and after-tax profits of RMB 240 million yuan. It can offer jobs to 5,000 people. VII. Project Initiator Project Initiators: Management Committee of Chenzhou High-Tech Development Zone(Chenzhou Export Processing Zone), Chenzhou Gonsion New Material Technology Co., Ltd
Investment Attraction for Settlement in Amer Rare and Precious Metals Industrial Park in Chenzhou City I. Project Background Chenzhou is known as the “Home to Nonferrous Metals in China”, “World Nonferrous Metal Museum “and “Silver Capital in China”. China International Mineral Gems Expo has permanently settled in Chenzhou. In recent years, relying on resource advantages, Chenzhou has seen a rapid development of nonferrous metal industry. The comprehensive strength of nonferrous metal industry has also seen a significant improvement. The status of Chenzhou has been enhanced in the province, even in the country. Shenzhen Amer (Group) Co., Ltd is a globalized group which has complete industrial chain of nonferrous metals. In 2016, it achieved turnover of RMB 477.9 billion yuan, ranking the 190th in the Fortune 500, the 5th in China’s top 500 private enterprises, the 40th in top 500 enterprises of China and the 15th in top 500 manufacturers in China. The leading industry of Amer Group has many integrating point with the development of nonferrous metal industry in Chenzhou. The both parties have signed a strategic cooperation frame agreement and plan to construct the project of industrial park of Amer rare and precious metal in Chenzhou City. II. Preliminary Work The project of industrial supply chain of Chenzhou Amer rare and precious metal has completed company registration. It has already reached sales volume of about RMB 60 million yuan. It is expected that the annual turnover can achievemorethan RMB 6 billion yuan. III. Project Content Land for construction use amounts to 300 Chinese mu. It will construct an Amer industrial park of rare and precious metals, integrating with deep processing of rare and precious metals, financial service, communication, logistics and distribution and international trade. IV. Project Investment The project investment totals at RMB 5 billion yuan. 143
V. Cooperation Way Joint venture, sole proprietorship and contractual joint venture. VI. Benefit Analysis After the official operation of the project, it can achieve an annual turnover of morethan RMB 50 billion yuan VII. Project Initiator Project Initiator: Management Committee of Chenzhou High-Tech Development Zone(Chenzhou Export Processing Zone)
Yongzhou Lithium Battery Series Material Production I. Project Background Located in Yongzhou Lingling Industrial Park in Hunan Province, the project covers an area of about 134,000 square meters with total floor area of 140,000 square meters. The project plans to introduce production lines of anode and cathode materials and cells of lithium battery and finished lithium battery with an annual output of 150,000 tons. Lingling District is a famous “Home to Manganese Ore “in China.It has the largest reserve of manganese resource in Hunan, of which 68 million tons of manganese oxide reserve have been verified, accounting for more than a quarter of reserve in Hunan Province. The reserve of manganese carbonate reaches over 100 million tons with annual mining capacity of 1.5 million tons. Lithium manganite is one of the major raw materials for lithium battery production. In order to maximize the added value of resource and transform resource advantages into industrial ones, the project will focus on accelerating the development and application of manganese resource. II. Preliminary Work Preliminary works including planning and design,land approval and land levelling have been finished. Supporting facilities of road network, telecommunication, water and electricity supply in the park are complete. III. Project Content The project covers an area of 134,000 square meters. Four standard workshops and a comprehensive office building will be newly built, covering an area of 140,000 square meters. It focuses on the research and development, production and sell of lithium battery series material whose annual output is about 15,000 tons. IV. Project Investment The project investment totals at RMB 500 millionyuan (of which equipment investmentofRMB 220 millionyuan, infrastructure investmentof RMB 170millionyuan, land investment of RMB 32 million yuan and RMB 78 million yuan invested on others). The sourceoffundingisself-funded. V. Cooperation Way Joint venture or contractual joint venture. VI. Benefit Analysis After the project reaching the design capacity, the estimated annual output can achieve over RMB 800 million yuan and the annual profit can reach RMB 100 million yuan. The investment recovery period will be about 5 years. VII. Project Initiator Project Initiator: Management Committee of Lingling Industrial Park in Hunan Province
Investment Attraction on Industrial Chain of Deep Processing of Steel Sheet in Loudi City I. Project Background In order to accelerate industrial transformation, deep processing of products and improve market competitiveness, Ly Steel Group in Loudi Citylaunches a project of Valin-Arcelor-Mittal automobile sheets through cooperation with Mittal Steel, the international steel giant. The products develop from rebars, hot-rolled plates to 2250 hot-rolled plates, cold-rolled plates, coated 144
plates, silicon steel sheets and riveting screw steels. It achieves the production capacity of an annual output of 1.2 million tons of automotive sheet. In order to promote the rapid development of steel sheet industrial train and focus on creating a industrial cluster, which is worth RMB 100 billion yuan, of fine steel and sheet metal processing, Loudi Municipal Government sets up an industrial park of sheet deep processing in Loudi Economic and Technological Development Zone and introduces a series of preferential policies and measures. It constructs supporting facilities including processing, sheet cutting ingredients, surface management, logistics of finished products to vigorously develop an industrial chain of sheet deep processing. II. Preliminary Work The project feasibility report has been worked out and land is reserved. III. Project Content Relying on Valin Steel sheet and pipe and production enterprises of automobile plate and taking development of steel and sheet deep processing and other supporting industries as direction, the industrial park of sheet deep processing plans to create the largest industrial base and products trading center of sheet deep processing in the central region. IV. Project Investment Land for construction use amounts to about 4,399 Chinese mu. Project investment is estimated to be RMB 900 million yuan. V. Cooperation Way Sole proprietorship and joint venture. Single project canbeinvested on. The project is developed and operated by the Investment and Construction Group of Loudi Economic and Technological Development Zone, Valin Ly Steel and a third-party investor introduced. VI. ProjectProposals of Industrial Chain forInvestment 1.Thermal forming of automobile high-strength steel The production line of thermal forming of 200,000 t/a automobile high-strength steel is planned to be constructed. Land for construction use is estimated to be 150 Chinese mu with workshops of 50,000 square meters. The estimated project investment is RMB 300 million yuan. 2.Electrical steel processing The production line of 90,000 t/a cold-rolled silicon steel and alloy steel for motor use, steel manufacturing, motor accessories (including motor stator and rotor punch and processing transformer core) is planned to be constructed. Land for construction use is estimated to be 100 Chinese mu with workshops of 40,000 square meters. The estimated project investment is RMB 200 million yuan. 3.Sprayingtreatment of steel strip surface Ecological pickling of steel strip surface(EPS) is a treatment process to remove the new oxide layer of strip surface produced in the process of hot rolling. Compared with traditional acid soaking (picking),EPS has many advantages including low investment and operation costs, low energy consumption, advanced technology, scalability of processing equipment, cleaner production, recycled grinding material, no harmful substances and integration of SCS1 brushing technology. At present, Ly Steel has no pickling line. The construction project of EPS technology will further improve the product structure of Ly Steel. Project investment totals at RMB 150 million yuan. New plants will cover an area of 5,000 square meters. Two spraying processing lines will be constructed. 4.Roller coating material production By spraying or electroplating, the surface of roller are adhered by a thin layer of wear-resistant material which is consumable part. The sheet project of Ly Steel needs about 2000 tons of various rollers. Lengshuijiang steelworks, Hengyang Steelworks and other steelworks nearby also have large demand. The project investment totals at RMB 40 million yuan. The planned area of land acquisition is 50 Chinese mu. The plant will cover an area of 10,000 square meters and office building 5,000 square meters. The annual output of roller coating material will achieve 2,000 tons. 5.Ultra-thin steel sheet production Ultra-thin steel sheet refers to the thickness of thin sheet is less than 0.25mm. It is a high-tech project that rolling existing cold-rolled sheet in Ly Steel into a thinner one. The planned area of land acquisition is 80 Chinese mu. The project investment totals at RMB 50 145
million yuan with fixed asset investment of RMB 36 million yuan and working capital of RMB 14 million yuan. The office building covers an area of 7,000 square meters and the plant covers an area of 21,000 square meters. The annual output of ultra-thin steel sheet will achieve 20,000 tons. 6.Color coated board production The color coating uses steel coils of cold-rolled, hot-dip galvanized, electro-galvanized and aluminized as substrate. By coating with polyester resin, silicon reinforced resin, polystyrene-based plastic sol coating, polydifluoroethylene resin, PVC and PVF film paste, it can improve the corrosion resistance of products and make products colorful. The planned area of land acquisition is 80 Chinese mu. Project investment totals at RMB 90 million yuan, among which RMB 60 million yuan will be used in equipment purchase and RMB 30 million yuan will be used in plants,public facilities and working capital. The plant covers an area of 5,000 square meters with four production lines.The annual output of color coated board will achieve 50,000 tons. 7.Cold-formed steel (sheet) The steel of Ly Steel is shaped through special process and it can be made into a variety of building material, machinery manufacturing material and decorative material. The planned area of land acquisition is 80 Chinese mu. Project investment totals at RMB 56 million yuan, among which fixed asset investment of RMB 40 million yuan and working capital of RMB 16 million yuan. The office buildings cover an area of 6,000 square meters and the plant covers an area of 20,000 square meters. Four production lines will be constructed.The annual output of various cold-formed steel will achieve more than 150,000 tons. 8.Manufacturing of burglarproof door There is no scale-forming manufacturing plant of burglarproof door in Loudi City. With an annual output of galvanized sheet of about 300,000 tons, Ly Steel can provide raw material of burglarproof door manufacturing nearby at low cost. Project investment totals at RMB 30 million yuan. The land acquisition covers an area of 20 Chinese mu. The office building covers an area of 1,000 square meters and the plant covers an area of 3,000 square meters. It is designed to achieve an annual output of various set of burglarproof doors of 25,000. 9.Production of structural components of light steel Sheet and other material of Ly Steel will be used to produce light steel building structural materials. The planned land acquisition covers an area of 100 Chinese mu. Project investment totals at RMB 70 million yuan, among which fixed assets investment of RMB 50 million yuan and working capital of RMB 20 million yuan. 10.Production of hot-dip galvanized plate Using the hot-rolled steel plate of Ly Steel as a substrate and processing, the hot-dip galvanized plate is produced by the processing of galvanization equipment. Project investment totals at RMB 580 million yuan, among which fixed asset investment of RMB 400 million yuan and working capital of RMB 185 million yuan. The planned land acquisition covers an area of 200 Chinese mu. The plant will cover an area of 50,000 square meters and the office building will cover an area of 2,000 square meters. Six production lines will be introduced. It is expected to reach an annual output of hot-dip galvanized plate of 1 million tons. VII. Project Initiator Project Initiator: Bureau of Commerce of Loudi Economic and Technological Development Zone
Special Ceramics and New Material Industrial Park (Phase I) Construction I. Project Background Special ceramic industry in Xinhua County,with more than 40-year production history, is one of the major base of early development of special ceramics industry. Thermostat porcelain piece accounts for 80% of the national market share, metallized porcelain pipe for discharge-tube use and protective porcelain tube accounts for 70% and products of water valve accounts for 90%. Some enterprises have established business relations with the Fortune 500. Their products exports to the United States, France, Japan, Korea, German, Malaysia and regions including Taiwan, Hong 146
Kong and Macao. At present, the special ceramics industry in Xinhua County owns more than 200 enterprises. They have applied for 360 national patents and 280 of them are authorized. Ten projects have passed provincial-level scientific and technological achievement appraisals. Products have developed into three major series including middle-and-high grade of electronic ceramics, structural ceramics and magnetic materials. It basically form a special ceramic industrial cluster integrating with production,machinery manufacturing, technology development and product marketing. This cluster has been classified as one of the top ten industrial clusters with priority to develop in the 13th Five-Year Plan by Loudi County. Xinhua has also been known as “Demonstration Base of Special Ceramics in Hunan Province” , “Home to National Electronic Ceramics” and other great reputation. In order to achieve the transformation and upgrade of the industry, special ceramic and new material industrial park is badly in need of construction so as to form a complete industrial chain, create industrial cluster and promote cluster development. II. Preliminary Work Reports about feasibility, project approval, environmental impact assessment review, Financial Capacity Report and PPP Project Implementation Plan have been completed. The project has been declared to PPP project library of Provincial Development and Reform Commission and demonstration project of provincial Department of Finance. III. Project Content Land for construction use amounts to 600 Chinese mu. The project will be divided into two phases: Land for construction use of Phase I will cover an area of 260 Chinese mu with total floor area of 206,600 square meters among which standard plant of 158,182 square meters, administrative office and staff quarters, canteen and other buildings of 48,444 square meters. The planning road in the park will cover an area of 46,985 square meters. Other supporting facilities including plants, lightening, electricity and water supply and drainage. IV. Project Investment Estimated project investment totals at RMB 600 million yuan. After the completion of the project, industrial plants, supporting plants and office, dormitories and other living quarters can be rented. The project will drum up the policy rewards and supplement funds of “135 Project” and “623 Project” of the province and the city in one shot. It will also drum up policy fund of commerce and economic information department. The annual output of the industrial park can achieve more than RMB 10 billion yuan. More than 50,000 jobs will offer to people in Xinhua County, which will play an important role in development of regional economy of Xinhua County and the realization of targeted poverty alleviation. V. Cooperation Way PPP (BOT). VI. Project Initiator Project Initiator: Investment and Development Co., Ltd of Xinhua Economic Development Zone
Investment Promotion of Hunan Bafang Mining Trading Center in Chenzhou High-Tech Development Zone I. Project Background In recent years, with the standardized and orderly mining exploration and rapid development of mining enterprises,regional mineral products, transactions of mining right and property rights of mine enterprises are getting more active, mine environmental production market, mine comprehensive recycling market, mine land reclamation and ecological restoration market, as well as the mine disaster prevention and control market, are also in their initial development. However, objects of transactions are mostly limited in respective administrative regions.The means of transactions are backward with nonstandard transaction behaviors. It is difficult for them to participate in international competition of staple strategic mineral resources. They are relatively weak in defending market risks and lack discourse right of list price in international mineral product transactions. Therefore, the project is to build a comprehensive mineral product trade and 147
exhibition center, trading center,storage and logistics center with rare and precious metals and nonferrous metals as main features. By doing so, it can provide collaborative platforms of displays and sales, financing and commodity, technological exchanges, mining investments for domestic and foreign mineral enterprises and provide direct channels of goods purchase for import and export of both domestic and foreign mineral products. II. Preliminary Work The interprovincial border region of Hunan, Guangdong, Jiangxi and Guilin Provinces is blessed with mineral resources including tungsten, tin, lead, zinc, bismuth, silver, tantalum and niobium, rare earth, fluorite, graphite, rock salt and limestone, which are dominant mineral resources and take an important position in the country and the world. The region has become the production, processing and export base of nonferrous metal ore, precious metal ore and non-metal ore. It has distinct regional advantages in building trans regional mining exchange market platform.Hunan Bafang Mining Trading Center Co., Ltd cooperates with Shanghai Nonferrous Metals Trading Center and Shanghai Free Trade Zone to provide a convenient and safe green passage for import and export of domestic and foreign mineral products. III. Project Content The project site is located in Chenzhou Hi-Tech Industrial Development Zone and Chenzhou Xiangnan International Logistics Park. The planned total area of the project will cover more than 1,000 Chinese mu of both parks, among which more than 600 Chinese mu of Xiangnan International Logistics Park and more than 400 Chinese mu of Chenzhou Nonferrous Industrial Park. Twenty-seven office villas have been constructed and a 28-storey mining building have finished base. IV. Project Investment Project investment totals at more than RMB 1.2 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis As the project is completed and after 3 to 4 years of efforts, a modern mining trading market complex of annual turnover of more than RMB 100 billion yuan will be constructed. Market mechanism of mining ecological environmental protection will be established to change the distribution of mining logistics and warehousing facilities so as to extend industrial chains which takes related mining, smelting, transportation, storage and transportation and technical services as main line in Chenzhou and to strengthen competitive advantages of Chenzhou economy in the interprovincial border region of Hunan, Guangdong, Jiangxi and Guilin Provinces and to promote transformation and upgrade of mining industry in Chenzhou. VII. Project Initiator Project Initiator: Hunan Bafang Mining Trading Market Co., Ltd
2-5 Light Textile, Chemical Engineering and Medicine (38) Investment Promotion of Chenzhou Mineral Gem Industrial Park I. Project Background Chenzhou City, the “City of Ornamental Stone ¡ Capital of Mineral Crystal in Chinaâ€? , ranks the first in mineral gem resources, especially its various mineral symbiosis crystal which can be called as world wonders. In recent years, Chenzhou has vigorously developed mineral-crystal-based ornamental stone cultural industry. It now has more than 500 ornamental stone sites, museums, parks and stores, with more than 80,000 direct employed workers. Located in Chenzhou high-tech industrial park, the Hunan Chenzhou mineral gem industrial park is planned to cover an area of 2 square kilometers. It plans to introduce over 400 enterprises (merchants) and achieve annual sales revenue of more than RMB 30 million yuan in 5 years. It plans to become the most influential gem industrial park featuring international, professional and integration of whole industry chain in South China. II. Preliminary Work In 2014, Hunan provincial government released a paper to focus on supporting the construction of 148
gem industrial park in Chenzhou high-tech industrial park, which is one of the two planned gem industrial parks in the province by Hunan provincial government. III. Project Content Project investment totals at RMB 20 billion yuan. The gem industrial park will cover an area of 2 square kilometers. The project will be divided into two phases and the construction period is 8 years. Phase I is the production and processing of mineral gems, including mineral resource trading center square, deep processing of mineral crystal and rare and precious metals and intelligent manufacturing of gems. Phase II is the associated industries of mineral gems, including international creative design park, Chenzhou gem folk culture creative town, gem schools, master park of intangible cultural heritage, financial center and business center. By doing so, Chenzhou will become the international base of whole industry chain of mineral gem. IV. Project Investment Project investment totals at RMB 20 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis In the period of the 13th Five-Year Plan, the annual sales revenue will achieve over RMB 30 billion yuan and the tax revenue will achieve over RMB 2 billion yuan. VII. Project Initiator Project Initiator: Management Committee of Chenzhou High-Tech Industrial Development Zone
Settlement and Investment Promotion of Gem-cutting Base in Chenzhou Economic Development Zone I. Project Background Chenzhou is the “Home to Nonferrous Metals in the World” and “Capital of Silver in China”. In 2013, the output of nonferrous metal industry in Chenzhou reached RMB 101.6 billion yuan and the output of silver accounted for a quarter of the country. Precious metal including gold and silver is one of the major raw material of artwork. If it can be combined well with design and carving, the added-value of precious metal will be dramatically increased. Chenzhou Economic Development Zone has constructed many projects including highway ports, railway ports, railway freight stations, international express delivery centers, agricultural product concentrated release field of Hunan for Hong Kong and Macao and export and public bonded warehouse. It can form a one-stop platform of declaration and inspection of import and export goods, supervision, sea-railway combined transportation and direct connection between Hong Kong and Macao. It will become a multi-functional international logistics park docking Pearl River Delta and Changsha-Zhouzhou-Xiangtan region. II. Preliminary Work Five standard plants covering 60,000 square meters and a single plant covering 10,000 square meters are planned to be constructed in the project base. Each story of these four-story plants will cover an area of 3,000 square meters. Dormitories, canteens, exhibition center and other supporting facilities are constructed. III. Project Content The project plans to focus on introducing the import and export enterprises of processing and foreign trade of gems. IV. Project Investment Project investment totals at RMB 400 million yuan. V. Cooperation Way Sole proprietorship and joint venture. VI. Benefit Analysis After the industrial cluster in the base is formed, it is expected to achieve an annual import and export revenue of more than US $2 billion and increase more than 300 jobs of relevant industries. VII. Project Initiator Project Initiator: Bureau of Commerce of Management Committee of Chenzhou economic 149
development zone
Comprehensive Development of Tongtian Jade in Linwu County I. Project Background Tongtian jade is named for its abundant in Tongtian Mountain region in Linwu County in Hunan Province because of its large reserves, wide distribution, high mining value and broad development prospect. According to preliminary investigation of Hunan Colored Geological expiration and Academy of Land Sciences, the possible ore of jade resources in Linwu County amounts over 8 million tons and the preliminary estimated value is RMB 240 billion yuan. II. Preliminary Work Jade Resources Survey and Evaluation Report in Linwu Region, Hunan Province has been completed in 2016. Gem Industry Development Plan in Linwu County and Gem Cultural Industrial Park Construction Plan in Linwu County are being formulated. The settings of exploration and mining rights and follow-up work of Tongtian jade are being accelerated. The construction project of Linwu gem cultural industrial park is launched. We strive to build Linwu into a well-known jade and gem distribution center in 3-5 years. III. Project Content The project will carry out exploration and protective mining of Tongtian jade resource, replan and construct the Linwu gem cultural industrial park and build a new test station of gem and jade. IV. Project Investment Project investment totals at RMB 1 billion yuan. V. Cooperation Way Joint venture and contractual joint venture. VI. Benefit Analysis The project will lengthen the industrial chain, increase product value, give full play to the product market advantages of region and jade resource and enhance economic vitality. After the completion of the project, revenue, tax and employment will increase. VII. Project Initiator Project Initiator: Tongtian jade development and management office in Linwu County, Chenzhou City
Investment Promotion of Shaping·Embroidery Street in Changsha County I. Project Background Changsha Shaping town, known as the "Home to Hunan Embroidery in China", is the national intangible cultural heritage heritage and protection base, the cultural industrial demonstration base in Hunan Province and tourism shopping demonstration sites in Hunan Province. Shaping • Embroidery Street project will make full use of the profile of Hunan Embroidery at home and abroad and its distinctive characteristics. It plans to build master studios, embroidered workshops, Hunan Embroidery cultural theme hotels, the specialty food center, the non-heritage center and the Hunan tourism commodity exhibition center so as to create a one-stop comprehensive block integrating culture, tourism and business. II. Preliminary Work Procedures for project approval, filing, land and planning have been prepared. Infrastructure construction has been completed. It is now carrying out investment promotion work. III. Project Content The Shaping • embroidered Street is 1.3 km long, with a total land area of 120,000 square meters. It plans to build commercial facilities of 61,000 square meters, office facilities of 35,000 square meters, hotels of 20,000 square meters, post houses of 1,300 square meters and an underground garage of 15,000 square meters. It will introduce enterprises of Hunan Embroidery, stitchworks and derivative industries, arts and crafts and non-heritages, hotels, food and beverage, leisure and entertainment and life facilities. IV. Project Investment 150
Project investment totals at RMB 112 million yuan. V. Cooperation Way Sole proprietorship, purchase or lease. VI. Project Initiator Project Initiator: Shaping New Countryside Construction and Investment Co., Ltd in Hunan Province Project undertaker: Bureau of Commerce and Tourism in Kaifu District
Construction of Green Building Materials Industrial Base in Ningxiang Economic and Technological Development Zone I. Project Background Ningxiang Economic and Technological Development Zone has various kinds of building materials and more than 20 related enterprises. It has introduced piles of enterprises of housing materials, home building materials and environmental protection materials, including Lesso Building Materials, Zhongcai Chemical Building Materials, Broad Homes Industrial International Co., Ltd, Haida Aluminum Materials, Wenxiang Environment Protection Technology Co., Ltd and Macalline. In addition, as a national demonstration base of residential industrialization, Ningxiang Economic and Technological Development Zone has initially achieved the R&D of residence, manufacturing, construction, decoration, sales, property and other one-stop production and operation. The residential industrialization and green building materials industry has become important industries for the park development. II. Preliminary Work Preliminary work of the project includes the completion of the planning, design, land approval. III. Project Content Land for construction use amounts to 500 Chinese mu. It plans to focus on building a national technology center of construction industrialization and building industrialization and intelligent households bases. IV. Project Investment Project investment totals at RMB 1 billion yuan. Funding for the project will come from enterprises and government investment and subsidies. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. It will introduce many first-class brand building material industry enterprises of chemical pipe materials, new building materials, environmental protection coatings, thermal insulation materials, plumbing bathrooms, integrated cabinets, doors and windows and LED lamps. VI. Project Initiator Project Initiator: Management Committee of Ningxiang Economic and Technological Development Zone
Investment Attraction of Industrial Park of NursingProductsfor Women, Pregnant and Baby in Ningxiang Economic and Technological Development Zone I. Project Background In recent years, the Changsha municipal government has proposed to construct a national industrial park for pregnant, baby and child and to create a complete industrial chain including R & D, production, exhibition, TV shopping and e-commerce. According to the statistics of the 6th national wide census, the total population of the six provinces in the central six provinces and Yunnan, Guizhou and Chongqing is 570 million, accounting for 42% of the total population of China. The population aged 0-12 is 75.6 million with about 8 million new-born live babies. The consumption of products for pregnant, baby and child in the region will reach RMB 400 billion yuan with an annual growth rate of 15%. A strong market support is very conducive to building a Ningxiang demonstration industrial park for pregnant, baby and child. 151
II. Preliminary Work The project of industrial park covers an area of 1,200 Chinese mu which has been fully brought into planning land usage. III. Project Content Land for construction use amounts to 1200 Chinese mu (including the supporting industrial park covering an area of 80-100 Chinese mu). It focuses on the introduction of diapers, nappies, nursing products for pregnant, baby and child, strollers&cribs, complementary foods, toys, early education products, feminine hygienic products and upstream and downstream supporting production enterprises and headquarters of retail enterprises for pregnant, baby and child. IV. Project Investment Project investment totals at RMB 10 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Investment Promotion Way Media promotion, exhibition promotion and door-to-door investment promotion. VII. Project Initiator Project Initiator: Management Committee of Ningxiang Economic and Technological Development Zone
Construction of “New Town of Lusong Clothing” in Zhuzhou I. Project Background Zhuzhou Lusong Clothing came into being in the 1980s and it now becomes the biggest clothing market cluster and logistics center in southeast China. The existing Lusong clothing market cluster covers an area of 1.5 square kilometers and the business area of 1.2 million square meters. It has 43 professional markets of petty commodities of various clothes, shoes and hats,bringing together 28,000 clothing household across the country and over 100,000 employees. Its products radiate to more than 20 provinces and more than 230 counties(cities,districts)across the country with about 150,000 sales networks. It has also established trade in Southeast Asia, Africa, West Europe and other regions with an annual volume of transaction of more than RMB 30 billion yuan. Relying on the strong industrial base of Lusong Clothing, the project plans to build a new Zhuzhou “Lusong Clothing City” integrating cloth accessories, clothing display, trade, R&D of new technology and training. II. Preliminary Work Top designs including The Development Plan of Lusong Clothing City, Plan of Zhuzhou Aviation City and Clothing City Construction and Overall Plan of Lusong Clothing Industry in Zhuzhou City have been completed. III. Project Content The project is located in Longquan and Baiguan Town in Lusong District, Zhuzhou City, covering an total area of 19 square kilometers. The first phase of the project covers an area of 10,000 Chinese mu, among which 4,000 Chinese mu of Longquan for the construction of headquarters of economic building and 6,000 Chinese mu of Baiguan for the construction of industrial park. The second phase covers an area of 12,000 Chinese mu and the third phase 8,000 Chinese mu. IV. Project Investment Project investment totals at RMB 33 billion yuan. V. Cooperation Way The project will be operated by contractual joint venture (joint venture) between investors and New Lusong Group. They will develop, construct and market the planned land and introduce related enterprises of cloth processing, textile accessories, design and R&D of brand, storage and logistics and e-commerce. VI. Benefit Analysis It is estimated that the annual output value can reach RMB 30 billion yuan after the normal operation of the New Town. VII. Project Initiator 152
Project Initiator: Zhuzhou New Lusong Industrial Development Group Co., Ltd in Hunan Province
Construction of Production Base of Five-Color Underglazed Ceramics in Liling City I. Project Background In order to display five-color underglazed ceramic culture in Liling CityďźŒ the project promotes the regional brand of Liling ceramics, plays agglomeration effect of ceramic industry, introduces a number of outstanding production and sales enterprises of five-colored underglazed ceramics so as to create a centralized production and demonstration zone. II. Preliminary Work The project is located in Liling Economic Development Zone in Zhuzhou City with complete infrastructure. Zhenmei Ceramic, Jingtao Ceramic and Liquan Yaoyi Ceramic have been put into operation in the zone. Hongyuhong Ceramic, Tianxin Ceramic and Cibaozhai Ceramic is designing and decorating internal finish. Enterprises including Guoci Zhenghuaci Yiyuan, Shangfang Yaoci Ceramic, Ciyitang Ceramic, Jingtao Ceramic and Hongci Ceramic in Liling will also start construction. III. Project Content The project covers an area of 21.97 hectares and it is designed and constructed according to the antique architectural style. It focuses on introducing brand production enterprises of five-color underglazed ceramics, concentrating on the heritage and creation the brand of five-color underglazed ceramics which is intangible cultural heritage. By doing so, it will form an art ceramic industrial cluster. IV. Project Investment Project investment totals at RMB 400 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the completion of the project, it will have a considerable investment return rate and the production capacity of five-color underglazed ceramics will be greatly enhanced. VII. Project Initiator Project Initiator: Bureau of Industrial Development in Liling Economic Development Zone in Hunan Province
Construction of Energy Saving, Environmental Protection, Intelligent Biomass Boiler Production Base in Hengyang City I. Project Background According to China's biomass resources conditions, using agricultural and forestry residues as a boiler fuel, studying industrial boiler biomass combustion technology, and developing biomass fuel boilers have characteristics of environmentally friendly and renewability. It has a positive meaning in saving conventional energy, optimizing China's energy structure and reduce environmental pollution. The project is mainly focused on the R&D, manufacturing and service of new biomass fuel boilers, a variety of fuel organic heat carrier boilers, vacuum hot water boilers, heat recovery boilers, efficient coal boilers, efficient and environmentally friendly series of fuel (gas) boilers and circulating fluidized bed boilers. The main products are 7 series of more than 100 varieties including DZL1 ~ 20t / chain grate biomass boiler, DZW1 ~ 20t / h reciprocating grate biomass boiler, DZG1 ~ 10t / h fixed furnace effluent biomass boiler; YLW (YWW) biomass organic heat carrier boiler; WNS series of fuel (gas); CWNS series of fuel (gas) hot water boiler, ZKWNS series of vacuum fuel (gas) hot water boiler and circulating fluidized bed boiler (SAWW). The Devotion Group is currently the only supplier of biomass boiler equipment. The local 153
standard of technical conditions of biomass molding fuel industry boiler DB43 / T1177-2016 in Hunan Province and DB44 / T1510-2014 in Guangdong Province are respectively one of the drafting unit. II. Preliminary Work The project has completed feasibility study, planning and design and project approval. III. Project Content Total land for construction use covers an area of 75,455 square meters, among which 60,480 square meters of workshops, 4,607 square meters of comprehensive buildings, 252 square meters of canteen, 252 square meters of bathhouse, 504 square meters of equipment room, 3,600 square meters of dormitory building and 5,760 square meters of science and technology building. IV. Project Investment Project investment totals at RMB 400 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the project put into operation, it is expected to achieve an annual income of RMB 100 million yuan and annual profits and taxes of RMB 20 million yuan. VII. Project Initiator Project Initiator: Bureau of Commerce, Development and Reform of Baishazhou Industrial Park in Hengyang City
600,000t/a LBP Full-Biodegradable Film Production in Leiyang City I. Project Background LBP full-biodegradable packaging film is a non-toxic, colorless, tasteless, fully biodegradable green packaging film made of high molecular polymer polyvinyl alcohol (PVA). It can be completely degraded into carbon dioxide and water. Replacing the traditional plastic film, it offers an effective solution to the problem of white pollution. The transformation of scientific research has entered the industrial chain stage and it has broad market prospects. II. Preliminary Work Kelaibao Bio-Energy Technology Co., Ltd in Hunan Province has independent intellectual property rights of invention patent “two-way stretch polyvinyl alcohol roller method�, and the patent number is ZL200810089692.6. The first phase of the project has rented 6 Chinese mu to build a 3,000-square-meter plants and supporting facilities in Leiyang Haitong Logistics Park. III. Project Content The project plans to build LBP full-biodegradable film production line, plant and supporting facilities featuring an annual output of 600,000 tons. IV. Project Investment Project investment totals about RMB 6 billion yuan and it can be invested in stages. V. Cooperation Way Contractual joint venture, joint venture and investment. VI. Benefit Analysis After the project put into operation, the annual output value can reach RMB 30 billion-60 billion yuan and profits and taxes can be more than RMB 10 billion yuan. More than 50,000 employees can be offered jobs. VII. Project Initiator Project Initiator: Kelaibao Bio-Energy Technology Co., Ltd
Tianyi Digital Printing Industry Base Construction in Xiangtan City I. Project Background With the improvement of people's living standards, while meeting the needs of general public, 154
packaging and printing products present a quality, personalized, customization trend. In recent years, as a new three-dimensional, economical and environment-friendly printing technology, digital printing and 3D printing mark an important direction for transformation of packaging and printing industry. Many large-scale color printing and packaging enterprises including New Xiangwei, Caida, Hongda and Shanghai Digital Manu 3D-Print have settled in the zone. Relying on the solid foundation of intelligent equipment manufacturing of food and medicine, the construction of the base has been well-prepared. II. Project Content Land for construction use amounts to 1,000 Chinese mu. The project plans to introduce enterprises of packaging and equipment manufacturing of food and medicine, combination printing, green printing, digital printing and equipment manufacturing, cloud printing and internet packaging, laser printing and equipment manufacturing, and 3D printing and equipment manufacturing. By doing so, it will create the most powerful packaging and printing equipment manufacturing base in the Central Region. III. Project Investment Project investment totals at RMB 2 billion yuan. IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. V. Project Initiator Project Initiator: Bureau of Commerce and Cooperation of Tianyi Demonstration Zone in Xiangtan City
Packaging and Printing Cultural Industry Park in Heitianpu Town, Shaodong County I. Project Background The packaging and printing cultural industry park is the major project for Shaodong County Party Committee and Shaodong County Government. It is arrangements of building a culturally strong county in response to the Hunan Provincial Government’s building a culturally strong province. Organized by New Bureau of Culture, Broadcasting, Television and Sports in the county and led by printing industry association in the county, relevant member enterprises sets up companies, settles in the industrial park and achieves collaborative development, creating a upgrade milestone for packaging and printing cultural industry in Shaodong County. The project of packaging and printing cultural industry park in Shaodong County started in 2015.The first phase covers an area of 280 Chinese mu and introduced 24 packaging and printing enterprises. It has constructed standard plants of 230,000 square meters. It began construction in 2016 and all enterprises settled and the project put into operation in 2017. The coordination of works of the whole industrial chain in the packaging and printing cultural industry park in Shaodong County is highly integrated, forming a collective competitive advantages. It focuses on producing plastic bags, non-woven bags, woven bags, boxes, handbags, pictures, notebooks, couplets, red envelopes, poker and injection packaging. It also relates to publishing, coal, culture, creative planning, Website marketing and other related industries. After the completion of the project, it will become the first-class domestic packaging and printing industry park. II. Project Content The overall planning land of packaging and printing cultural industry park covers an area of 1500 Chinese mu. The project construction is divided into three phases. The first phase of the project construction has been completed. The second phase of the project construction covers an area of 314 Chinese mu and the third phase 900 Chinese mu. It has constructed six functional areas including standardized production areas, storage and logistics area, business area, product R&D area, residential living area and industrial service area, forming business agglomeration of the upper and lower industrial chain of relevant enterprises. It will play a joint effect of common development and create a brand effect of packaging and printing cultural industry park. III. Project Investment Project investment totals at RMB 1 billion yuan. 155
IV. Benefit Analysis Project investment totals at RMB 1 billion yuan. Covering an area of 1,500 Chinese mu, the project will hire 1,000 staffs for services and administration. The output value will reach RMB 300 million to 500 million yuan and the investment will be recouped in 5-7 years. V. Cooperation Way Contractual joint venture. VI. Project Initiator Project Initiator: People’s Government in Heitianpu Town, Shaodong County
Investment Promotion for Supporting Facilities of Industrial Chain of Hair Products in Shaoyang Economic Development Zone I. Project Background At present, the production capacity of hair products industry in Shaoyang City ranks the 3rd in the country and international market share reaches 26%. It is one of the largest and the best-quality raw material of hair product distribution center and export base in the country. II. Preliminary Work Preliminary research and the initial plan have been completed. III. Project Content The project is located in Baoqing Science and Technology Park. The planning area of the park amounts to 2,000 Chinese mu. The project is divided into two phases. The first phase will expropriate land of 1,200 Chinese mu and will be invested RMB 2.8 billion yuan, focusing on the construction of public infrastructure and leading enterprises in the park. The second phase will expropriate land of 800 Chinese mu and will introduce investors from other places and gather local ordinary enterprises by investment promotion and attract investment. IV. Project Investment Project investment totals at RMB 2.8 billion yuan. V. Cooperation Way A large company or a number of companies invest to found a Hair Products Industry Park Investment and Development Co., Ltd. VI. Benefit Analysis It is expected to achieve sales revenue of RMB 38 billion yuan with an average annual increase of 16% and the export volume of RMB 2.3 billion yuan with an average annual increase of 15% from 2017 to 2020. VII. Project Initiator Project Initiators: Shaoyang Tangrenfa Hair Products Co., Ltd Shaoyang Wanmei Hair Products Co., Ltd
Brand Clothing Production in Shaoyang Economic Development Zone I. Project Background With the increase of the labor cost in coastal cities, the impact of the transfer of industry to the inland cities and the improvement of traffic in Shaoyang City, the number of small and medium-sized clothing and bags processing enterprises is dramatically increasing. The construction of the project is conducive to enhancing the competitiveness of small and medium-sized clothing and bag industries in Shaoyang City and to promoting upgrading and adjustment of industries so as to create the largest brand clothing and bags production and sales base in southwest region of Hunan. II. Preliminary Work The first phase of the project has completed the land acquisition and demolition, environmental impact assessment, project approval and reported construction. Ten standardized plants will be constructed in early June, 2017 and total 48 plants will be constructed in early 2018. III. Project Content The project of brand clothing production will cover an area about 3,000 Chinese mu. The first 156
phase will develop land of 340 Chinese mu with a total floor area of 420,000 square meters. It will construct 48 standardized plants and supporting roads, water supply and drainage and power supply network. IV. Project Investment The total investment of the first phase of the project is about RMB 1 billion yuan. The development of the project will be financed by self-financing, bank loans and other channels by investors. V. Cooperation Way After developers acquire the land by bid, auction and listing, the cooperation way will be sole proprietorship and joint venture. Plant sales revenue, rental income and appreciation report. VI. Benefit Analysis The first phase of the project plans to introduce 100 brand clothing (bags) enterprises into the park. After the project puts into operation, the annual output value will reach RMB 4 billion yuan and the profits and taxes will be RMB 800 million yuan. VII. Project Initiator Project Initiators: Management Committee of Shaoyang Economic Development Zone Huifengyuan Real Estate Development Co., Ltd in Shaoyang City
(Phase I)Construction of Metal Doors and Windows Industry in Shaoyang City I. Project Background In 2015, the total output value of metal doors and windows industry in Shaoyang City has reached RMB 1 billion yuan and relevant employees of 2,000. However, the health and sustainable development of metal doors and windows industry in Shaoyang City has been seriously restricted by the small size of enterprises, majority of which product and operate by rental houses or waste factories, the lack of unified management, confused purchase channels for business households and mixed quality of products. In order to further plan the development of enterprises, introduce new processing technology and improve product quality, the project will make the metal doors and windows industry bigger and stronger by the mode of collaborative development in the park. After the construction of it, the project will greatly change the scattered, chaotic and small condition of metal product industry and lead it develop in regularized, specialized and agglomerated directions. By doing so, it can promote employment and increase income for enterprises and their employees. II. Preliminary Work Project has completed preliminary work including project approval as well as planning and site selection. The land has been approved, and land acquisition and housing demolition has been started. III. Project Content Land for construction use amounts to 300 Chinese mu. Standardized plants covering an area of 300,000 square meters will be constructed and more than 100 metal doors and windows production enterprises will be introduced. The project will be divided into three phases: The first phase of the project construction will cover an area of 90.7 Chinese mu. Standardized plant covering an area of 100,000 square meters will be constructed. Fifty enterprises which urge to settle in the park will be given priority. The planning area is industrial land with plot ratio of 1.5%-3.5%, building density of 30%-45% and green rate of 10%-20%. The investment intensity will not be less than RMB 1.5 million yuan/Chinese mu. IV. Project Investment Land for construction use amounts to 300 Chinese mu. The project investment totals at RMB 500 million yuan. V. Cooperation Way Investment or joint venture by single enterprise. The industry park can also be overall developed by single enterprise (which may include primary land development). Sales revenue, rental income and appreciation returns. 157
VI. Benefit Analysis It is estimated that the annual output value will reach RMB 1 billion yuan, the profit rate will be about 15%, the return period will be 5-8 years, and the employed person will be over 2,000. VII. Project Initiator Project Initiator: Management Committee of Shaoyang Economic Development Zone
The Expansion Project of Ammonium Nitrate Products of Shaoyang Baoxing Kefei Co., Ltd I. Project Background Ammonium nitrate, the main raw material for producing civil explosives, fireworks and crackers and nitro-compound fertilizer, is civil explosive management products under strict national control, and only can be expanded and developed in existing enterprises. To ensure the safe production and transportation of ammonium nitrate products, China is vigorously promoting the utilization of liquid ammonium nitrate. It only can be transported within a short distance of a radius of 600 kilometers because it crystallizes easily. The total demand of ammonium nitrate products in Hunan Province and surrounding Guangdong Province, Jiangxi Province and other provinces amounts to over 800,000 tons. Shaoyang Baoxing Kefei Co., Ltd in Hunan Province is the only comprehensive chemical enterprise which produces ammonium nitrate products in Guangdong, Jiangxi and Hunan Provinces. It has favorable advantages in terms of production qualification, transportation and management of explosive dangerous goods and marketing. II. Preliminary Work The project of expansion of series ammonium nitrate products has been recorded by Development and Reform Commission of Hunan Province (X.F.G.G [2009] 1307). The project has newly acquired more than 400 Chinese mu land and the accumulative investment has reached RMB 280 million yuan. A new set of desulfurization device of 100,000 tons of synthetic ammonia/year, a liquid ammonia storage station of 500 cubic meters and a raw coal storage of 80,000 tons have newly been constructed. III. Project Content The project will make full use of existing equipment for technological transformation, introduce advanced technology of the industry and eliminate high-energy-consumption and backward technology and equipment. By doing so, it can achieve an annual output of 150,000 tons of nitric acid which support an annual output of 180,000 tons of ammonium nitrate (200,000 tons of liquid ammonium nitrate). IV. Project Investment Project investment totals at RMB 410 million yuan, of which RMB 122 million yuan will be raised by enterprises, RMB 288 million yuan will be bank loans. RMB 178 million yuan has been paid-in and RMB 145 million yuan will be required. V. Cooperation Way New investors will be introduced in the form of equity transfer and RMB 145 million yuan needs to be financed. Investors can share and hold equities according to their intentions. As controlling shareholders or one of the shareholders, investors can share profits of production and operation of the company according to the ownership ratio. VI. Benefit Analysis After the project is constructed and put into operation, the annual sales income can reach RMB 360 million yuan, tax RMB 40 million yuan, profits RMB 50 million yuan. It will have good economic and social benefits. VII. Project Initiator Project Initiator: Baoxing Kefei Co., Ltd in Shaoyang City, Hunan Province
Energy-Efficient Burner Production in Yueyang Economic and Technological Development Zone 158
I. Project Background In recent years, problems including low energy utilization rate and irrational consumption structure have intensified conflicts between deterioration of the ecological environment and economic development. Compared with the world’s advanced level, improving energy efficiency and unit output energy consumption in China still has a long way to go. The products of the project use advanced technology of premixing, semi-premixing and blended reflow combustion of air and gas. The technology is cutting-edge in burner research in China. II. Preliminary Work The project is selecting location. The feasibility report and planning design is carried out simultaneously. Next, it plans to introduce funds, sign region-entering agreements and record the project. Then it will carry out land demolition and leveling. The project is expected to begin construction by the end of this year. III. Project Content The project is estimated to cover an area of 100 Chinese mu. The total floor area will cover an area of about 41,2000 square meters. The main constructions include production workshop, test workshop, warehouse, machine repairing room, logistics dispatch center, office building and shift building. IV. Project Investment Project investment totals at RMB 420 million yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture and equity investment. VI. Benefit Analysis After the completion of the project, it is expected to achieve an annual output value of RMB 510 million yuan and annual total net profit of RMB 150 million yuan. VII. Project Initiator Project Initiator: Development and Reform Bureau of Yueyang Economic and Technological Development Zone
Project of 60,000 tons/year Special Materials for Nylon 6 Film and Engineering Plastic in Yunxi District I. Project Background Yueyang City is an important petrochemical production base in China. The Sinopec Baling Branch is the currently largest domestic caprolactam production enterprise in the country. Constructing production device of Nylon 6 here allows that main production raw material can access locally, which saves freight and promises quality. The Technological Center of Sinopec Baling Branch is the scientific research base of Nylon 6. It has strong technological reserves and R&D strength, providing various technological cooperation and supports for the project. II. Preliminary Work The proposal of project construction has been worked out. Industrial land has been reserved. III. Project Content The project will construct a set of production device of 30,000 tons/year Nylon 6 film special material and production device of 30,000 tons/year Nylon 6 engineering plastic. IV. Project Investment Project investment totals at RMB 300 million yuan. V. Cooperation Way Sole proprietorship and joint venture. VI. Benefit Analysis After the completion of the project, it is expected to achieve an annual sales income of RMB 1.2 billion yuan and annual profit of RMB 80 million yuan. VII. Project Initiator Project Initiator: Yueyang Green Chemical Industry Park in Hunan Province
159
Construction of Family Property Industry Park in Xintian County I. Project Background Planning area for family property industry park in Xintian County amounts to 2 square kilometers. The project introduces capital to construct standard plant and supporting comprehensive facilities. It introduces 50 enterprises of family property and relevant industries. The project investment totals at RMB 2 billion yuan. Xintian County is the famous “Town of Sofa” in the country. In 1970s, production and operation of family property industry such as sofa has been on the rise. At present, there are more than 3,000 Xintian enterprises and more than 30,000 Xintian people engaging in production of family property outside the county. These enterprises and people distribute in 30 provinces and more than 200 counties and districts in the country. They have a strong production and sales team of family property. A complete industrial chain of family property industry has formed. To construct Xintian County as a “Capital of Family Property in Central and Southern China”, the family property industry park has introduced 7 projects with annual output value of more than RMB 100 million yuan, including Hunan Huatai Home, Linfeng Wood, Juntong Furniture and Minxin Artificial Board. In 2015, the furniture industry made an output value of RMB 800 million yuan in the county, driving relevant industries to make an output value of RMB 150 million yuan. II. Preliminary Work Planning and land acquisition of the project have been completed. Standard plants have been constructed. The Implementation Opinions on Development of Family Property Industry in Xintian County has been released. III. Project Content Planning area for family property industry park amounts to 2 square kilometers. The park will be divided into four areas including production district, business district, logistics district and supporting service district. It plans to introduce more than 30 middle-and-high-end scale enterprises of furniture manufacturing and projects of lighting production projects. IV. Project Investment Project investment totals at RMB 2 billion yuan. The fund come from self-financing and investment promotion by enterprises themselves. V. Cooperation Way Cooperation way: Sole proprietorship and joint venture. Return Way: PPP mode will be adopted in infrastructure, marketing mode will be adopted in family property production. VI. Benefit Analysis After the completion of the project, the annual output value can achieve RMB 1 billion yuan and annual profit of RMB 200 million yuan. The investment pay-off period will be five years. VII. Project Initiator Project Initiator: Committee of Scientific Business, Food and Economic Information in Xintian County
Annual Output of 60,000 tons of High-Precision Air-Condition and Refrigeration Copper Tube in Changning City I. Project Background Shuikoushan Economic Development Zone in Changning City is the national demonstration park of circular transformation. It boasts abundant mineral resources, long industrial heritages, stable talent teams and independent intellectual property technology. It has important status of nonferrous metals in Hunan Province and even in the country. To promote development of copper industry, copper processing industry park is established in Shuikoushan Economic Development Zone by Changning Municipal Government. The project plans to cover an area of 2.2 square kilometers. The government entrusts China Nerin Engineering Co., Ltd. to work out Development Plan (2015-2020) on Copper Processing Industry of Shuikoushan Economic Development Zone in Changning City and space planning and detailed control regulations of a 2.2-kilometer copper processing industry park. 160
II. Preliminary Work Shuikoushan Economic Development Zone has the comprehensive production capacity of excavating volume of 600,000 tons of copper-lead-zinc ore and 150ďźŒ000 tons of copper, lead and zinc. The total investment of the project of gold-copper comprehensive recovery is RMB 6.906 billion yuan. After the transformation and upgrade of technology, the annual output volume can reach 300,000 tons of cathode copper and 150,000 tons of composition brass, which provides strong resource advantages. III. Project Content The project covers an area of 250 Chinese mu. It plans to construct production line of special high-precision corrosion-resistant copper alloy condenser with an annual output of 60,000 tons. IV. Project Investment Project investment totals at RMB 930 million yuan. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship. The project enjoys preferential policies of both national nonferrous metal circular industry park and investment promotion and attraction of Changning City. VI. Benefit Analysis After the project is put into operation, the annual sales income can achieve about RMB 3.27 billion yuan and annual profit and tax of RMB 120 million yuan. VII. Project Initiator Project Initiator: Shuikoushan Economic Development Zone in Changning City
Investment Promotion of Stainless Steel Pipes Deep Processing in Lengshuijiang City I. Project Background Stainless steel products are widely used in construction, transportation, energy, petrochemical, machinery, metal products, home appliances, urban construction, medical, catering and other fields. Daily life of ordinary people has more accesses to the stainless products. Lengshuijiang City formulates and implements stainless steel industrial base which is worth more than RMB 100 billion yuan and replaces plain steel with stainless steel. Many deep processing projects of stainless steel are constructed. It extends the industrial chain of stainless steel and gives full play to the steel raw material advantage of Lengshuijiang Steel and Ly Steel. Added-value of products will be improved so as to realize high-efficient utilization of energy and resources and city development in Lengshuijiang City. II. Preliminary Work Lengshuijiang Steel Group which is Top 500 in China is in Lengshuijiang City. It is near the Ly Steel. The steel required for the project can be fully supplied. III. Project Content The project is construction of industry park of stainless steel pipes deep processing. The project covers an area of 66,667 square meters (about 100 Chinese mu). The total floor area is 80,000 square meters of which 45,000 square meters of standard steel structure plant, 25,000 square meters of warehouse, 7,000 square meters of comprehensive buildings, 3,000 square meters of guard room, power distribution room, canteen and other buildings. It also has supporting buildings of hardening, green and parking lot. IV. Project Investment Project investment totals at RMB 200 million yuan, of which self-raised fund by enterprises of RMB 20 million yuan and bank loans of RMB 150 million yuan. It will achieve the production capacity of an annual output of 450,000 tons of deep processing of stainless steel pipes. V. Cooperation Way Land development and leasing will be adopted. Enterprises can settle in the park by renting standard workshops or purchasing industrial land to construct workshop by themselves. VI. Benefit Analysis It is expected that the construction and operation will achieve an annual output of RMB 200 million yuan and tax of various kinds of RMB 30 million yuan. 161
VII. Project Initiator Project Initiator: Lengshuijiang Economic Development Zone
Construction of Industrial Base of Fine (Electronic) Ceramics in Loudi Economic and Technological Development Zone I. Project Background Fine (electronic) ceramics in Loudi City is a traditional industry of regional characteristics with 45-year production history. It has 218 production enterprises and great industrial foundation, creating ten major series of more than 1,000 varieties of fine ceramics. Among these, metal porcelain tube for discharge tube use, thermostat ceramics, ceramic water valve film products and ceramic ring of ceramic power battery products account for 70%-100% shares of the domestic market. It is estimated that the market demand of relevant industries in the world will be more than US $200 billion in 2020. It has obvious market advantages and broad market prospect. To this end, Loudi Municipal Government plans to construct a national fine ceramic industrial base in Loudi Economic and Technological Development Zone. II. Preliminary Work Special park district for fine ceramic industry has been planned. The standard workshop of the first phase of the construction has been finished and targeted investment promotion has begun. III. Project Content The project focuses on building industrial base of electronic ceramics, public technological service platform for fine ceramic industry and technological study research institute of fine ceramic industry. IV. Project Investment Land for construction use amounts to 1,400 Chinese mu. Project investment totals at about RMB 6 billion yuan. The project is divided into 3 phases: Phase I is the construction of Jingu High-Tech Industry Park of China Science Group which covers an area of 500 Chinese mu. Public technological service platform for fine ceramic industry and technological research institute of fine ceramic industry in Hunan Province will support the project. Phase II is the construction of the second industry park which covers an area of 600 Chinese mu. Phase III is the construction of entrepreneurship base which covers an area of 300 Chinese mu. V. Cooperation Way Sole proprietorship or joint venture. According to the investment scale, output value and profit and tax, enterprises settled in the park can enjoy a certain degree of rent relief or price concessions and major projects can enjoy the “case-by-case approval” policy. VI. Benefit Analysis In the coming five years, it is expected that 100 enterprises of innovative science and technology will be introduced, the output value will be RMB 45 billion yuan and the profits and taxes will exceed RMB 1 billion yuan. VII. Project Initiator Project Initiator: Loudi Economic and Technological Development Zone
Plant, Processing and Production Base of Traditional Chinese Herbal Medicine in Changning City I. Project Background Southwest to Hengyang City, Changning City is on the south bank of the middle reaches of the Xiangjiang River. The terrain is high in the south and low in the north and Tashan Mountain, the extension of Nanling Mountain, and the Dayi Mountain are in the south part of the city. Being blessed with favorable natural and ecological environment, Changning City is a natural production base for Chinese herbal medicine. According to the provincial general investigation of Chinese 162
herbal medicine, Changning City has more than 1,100 varieties of Chinese herbal medicine and more than 150 species of medical plants among which more than 80 species medical plants have high practical value and abundant drug-resource. Changning City plans to develop Chinese herbal medicine industry into a pillar industry and construct a pollution-free cultivation and processing base of Chinese herbal medicine. II. Preliminary Work The plan of the project has been completed. III. Project Content It plans to construct a plant base of Chineseherbalmedicine which covers an area of 2,000 Chinese mu. It focuses on planting honeysuckle, red-rooted salvia, radix paeonianalba, eucommia ulmoides, platycodon grandifloras and folium mori. Meanwhile, it constructs processing workshop and production line of prepared pieces of Chinese herbal medicine, testing center of Chinese herbal medicine and a logistics and distribution center covering an area of 10,000 square meters. IV. Project Investment Project investment amounts to about RMB 50 million yuan of which investment promotion of RMB 50 million yuan. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship. The specific way will be determined after the negotiation and contract signing. Investors can enjoy preferential policies of investment promotion of Changning City. VI. Benefit Analysis After the project is put into operation, it is estimated that an annual sales income can reach RMB 100 million yuan and annual profit of RMB 10 million yuan. VII. Project Initiator Project Initiator: Food and Drug Administration of Changning City
Medical Equipment and Instruments Manufacturing in Wangcheng Economic and Technological Development Zone I. Project Background Medical equipment and instruments are the most important basic equipment in modern clinical diagnosis, treatment, disease prevention and control, public health and health protection system. The medical device industry is a high-tech industry featuring knowledge-intensive, capital-intensive, multidisciplinary and competitive. It marks the level of the manufacturing industry and cutting-edge technology of a country. In line with realistic development demand of domestic market for medical equipment and industrial foundation in the park, Wangcheng Economic and Technological Development Zone plans to construct a intelligent city for medical equipment to promote the development of big health industry and strengthen the industrial cluster. II. Project Content Land for construction use amounts to 850 Chinese mu and the project investment totals at about RMB 10 billion yuan. Relying on the biomedical industrial foundation which is supported by Xinhui Pharmacy, Kangshou Pharmacy, Lituo Biotechnology Co., Ltd., Xinhang Ruikang, the project plans to create a industrial cluster which focuses on the R&D of the biomedicine, medical equipment and instruments and medical services and integrates medical research and development, pharmaceutical production, logistics and transportation, innovation and incubation, headquarters operations and relevant supporting equipment. At present, the first phase of the project has introduced the project of implanted material for spine and R&D and production of medical robot of Xinhang Ruikang. It sincerely invites enterprises including biomedicine, medical equipment and instruments, cloud platform of health data, wearable device for health and medical service to settle in. III. Project Investment Project investment totals at about RMB 10 billion yuan. It will be mainly used in construction of workshop, purchase of production equipment, R&D of new products and inspection and detention. The fund will mainly come from enterprises. 163
IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. V. Benefit Analysis After the project is fully put into operation, it is expected to achieve the output value of RMB 2 billion yuan and the tax revenue of RMB 500 million yuan in five years. VI. Project Initiator Project Initiator: Management Committee of Wangcheng Economic and Technological Development Zone
Construction of Tianyi Food and Drug Industry Base in Xiangtan City I. Project Background In the project area, enterprises have settled in, including ADM which is one of the Fortune 500ďźŒ Zhujiang Beer, Kamp Medicine, Wuzhoutong Medicine and Hongmao Xianglian. It also gathers leading enterprises including Pangge, Xiaolongwang, Wuzizui and Huangye. At present, it is the largest processing base of areca-nut in the country and the food and medicine industry becomes the leading industry. Making full use of resource advantages of biology and food and medicine, the project accelerates the construction of the food and medicine industry park and create a industry base of food and medicine in Xiangtan. II. Preliminary Work At present, more than 20 enterprises have settled in the base. Meanwhile, the quality supervision and test center of local specialty of Hunan Province has been constructed. III. Project Content Land for construction use amounts to 12.03 square kilometers. It actively introduces food with local characteristics, snack food enterprises, enterprises of pharmaceutical and health care products, and logistics and distribution enterprises. IV. Project Investment Project investment totals at RMB 30 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Project Initiator Project Initiator: Bureau of Commerce and Cooperation of Tianyi Demonstration Zone in Xiangtan City
Construction of Medical Industry Science and Technology Park in Lianqiao Town, Hunan Province I. Project Background The number of business households of herb medicine in Lianqiao Town is more than 5,000. The herbal medical market operates more than 1,000 species of herb medicine with the daily trading volume of about 100 tons and the annual turnover exceeding RMB 6 billion yuan. Original shops and deep processing workshop of Chinese herbal medicine will no longer meet the demand of the market. It is imperative to build a large-scale medical industry science and technology park which has functions including production, sales, storage and logistics, e-commerce, R&D and testing. II. Construction Foundation Preliminary feasibility demonstration has been completed and the land approval is being applied. III. Project Content and Scale Land for construction use amounts to 2.83 square kilometers. The project takes biomedicine, medical device and medical logistics as its core, and focuses on functional food, deep processing of Chinese herbal medicine and medical equipment and instrument so as to create a modern Chinese herbal medicine industry park integrating R&D, production, packaging, logistics and marketing. IV. Project Investment 164
Project investment totals at RMB 6.887 billion yuan. V. Benefit Analysis The project has broad market and promising development prospects. The production of the project has easy access to raw material, mature technology and broad market. VI. Cooperation and Return Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Management Committee of Shaodong Economic Development Zone
Production and Processing of Borneol in West Dongting Management District in Changde City I. Project Background Natural borneol is a valuable spice and precious Chinese herbal medicine with extremely high medicinal value. According to the World Pharmaceutical Material and Drug Organization, the domestic demand for natural borneol is 5,000 tons and the international demand is 100,000 tons at present. It is estimated that both domestic and international demand for the product will increase by 15% in next 15 years. Imbalance between supply and demand is prominent in both domestic and international market, which brings promising market for developing natural borneol. The leading industry in West industrial concentration district is transforming and upgrading from primary agricultural and sideline food processing to biomedicine. The biomedical project will be the main direction of the investment promotion of the park in next few years. The park can provide not only the vast plant field for borne raw materials but also plants integrating production and processing. Production and processing project in West Dongting is in line with the urgent need which suits the advantages of the park. II. Preliminary Work Project proposal has been completed. III. Project Content Land for construction use amounts to 100 Chinese mu. The planning floor area is about 28,930 square meters, including production workshop of 14,850 square meters, office buildings of 3,600 square meters, storage and logistics of 6,600 square meters, shift rooms of 3,880 square meters and a 50-Chinese-mu species cultural demonstration park of cinnamomum camphora. IV. Project Investment Project investment totals at RMB 100 million yuan. V. Benefit Analysis After the calculation, the normal annual sales income of the project is RMB 115.6 million yuan and the tax revenue of RMB 18 million yuan. The profitability of the project is sound. VI. Cooperation Way Sole proprietorship. VII. Project Initiator Project Initiator: Bureau of Commerce in West Dongting Management District in Changde City
Investment Promotion of Fine Chemicals (Chemical Raw Medicine) Industry Park in Changde City I. Project Background Land for pharmaceutical intermediates production industry must meet the need of the third type land for industrial usage. Changde Economic and Technological Development Zone has required approval of the third type land for industrial usage from Department of Environmental Protection of Hunan Province (see X.H.P[2010] No.336). The land can provide project land for chemical industry, paper industry, textile printing and dyeing and new material industry. It has also constructed a power plant with the total installed capacity of 3.32 million kilowatt fire-powered, which can guarantee the supply of electric power and steam. The kiloton Wharf of Changde Deshan harbor district is located 3 kilometers away form the lower reached of highway-railway combined bridge on the right bank of Yuanshui River (which is close 165
to the third industry park). The wharf began construction in September, 2004 and plans to be finish and put into use in 2017. The berths of the wharf is 4 break-bulk berth and the designed annual throughput is 1.12 million tons. Inland waterway transportation has side adaptability with low freight. It has irreplaceable advantages in coal, mining materials, oil, pharmaceutical and other goods transportation. II. Project Content The project operates in market mode. It introduces industrial enterprises of pharmaceutical and chemical intermediates, fine chemicals and chemical raw materials in the park. Investing enterprises can construct independently according to their requirements. III. Project Investment Land for construction use amounts to 200-300 Chinese mu. The project investment totals at about RMB 1 billion yuan. The project focuses on introducing production enterprises of chemical raw medicine and fine chemicals. IV. Preliminary Work Feasibility report and initial site selection have been completed. It is seeking for cooperative partner now. V. Benefit Analysis After the project is constructed and reach design capacity, it will have the production capacity of an annual output of over RMB 1.5 billion yuan and the annual profit and tax of RMB 200 million yuan. It can create 2,000 new jobs. VI. Investment Promotion Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Bureau of Commerce and Cooperation of Changde Economic and Technological Development Zone
Artemisinin Extraction Project in West Dongting Management District in Changde City I. Project Background Located in Dongting Lake plain, the West Dongting management district is the main producing area of Artemisia annua, with prolific yield of wild Artemisia annua. However, treatments of all raw materials of Artemisia annua is basically dried and grinded for livestock feed or burnt as straw at presents. All these treatments lead to a waste of Artemisia annua as the raw material. Dried Artemisia annua occupied roads in the park and burning also affects the air quality. To change this, the park has provided a reserved land for Artemisinin extraction processing project. The land has achieved seven accesses and site leveling with sound infrastructure. II. Preliminary Work The project proposal has been completed. III. Project Content Land for construction use amounts to 50 Chinese mu. It focuses on building 1 office building for quality inspection, 2 production plants and auxiliary building, 1 warehouse and 2 production lines. IV. Project Investment Project investment totals at RMB 100 million yuan. V. Benefit Analysis After the calculation, the annual extraction amount of artemisinin after the completion of the project can reach 20 tons, paid taxed nearly RMB 10 million yuan and create 200 new jobs. VI. Cooperation Way Sole proprietorship. VII. Project Initiator Project Initiator: Bureau of Commerce in West Dongting Management District in Changde City
Industrialization of Special Chinese Herbal Medicine in Zhuzhou County 166
I. Project Background With the altitude of 300 to 600 meters, the mountain area in southern Zhuzhou County whose forest coverage is more than 90%, has more than 200 varieties of Chinese herbal medicine. As its natural ecological conditions including soil, climate and environment are suitable for growing Chinese herbal medicine and its long history of planting, this area has advantages in developing special Chinese medicine of Linxia. Shennong Linxia TCM Development Co., Ltd. in Hunan Province has reached cooperative agreement with Hunan University of Chinese Medicine and Hunan Agricultural University and has signed industrial connecting and cooperation agreements with pharmaceutical enterprises including Huayuan Rongkang Pharmaceutical CO., Ltd and Qianjin Pharmaceutical Co., Ltd, which has established a sound development platform in technological research and development and market development. II. Preliminary Work At present, land transfer agreement of 9,000 Chinese mu has been signed, with the lease period of 40 years. RMB 40 million yuan has been invested. About 4,000 Chinese mu of barren hills have been transformed in a standardized way. The industrial planning and layout has been completed. III. Project Content 1. Transforming the mountain and forest land of 26,000 Chinese mu in a standardized way; 2.Constructing a seedling production base of sealwort, Paris polyphylla and other seeds of 500 Chinese mu and a popular science park of 500 Chinese mu; 3. Expanding the sealwort base to 15,000 Chinese mu; constructing a new base for Paris polyphylla of 5,000 Chinese mu; constructing bases for Gardenia jasminoides, Kuh-seng and scrophulariae of 5,000 Chinese mu; 4. Constructing supporting facilities of medical processing and storage for sealwort and other herbal medicines. Constructing a 20,000-square-meter workshop, 2 production lines of deep processing. Designing the annual production scale of 200,000 boxes. 5. Constructing a refrigeration house of 2,000 square meters. IV. Project Investment The budget of the investment totals at RMB 200 million yuan. V. Cooperation Way Joint venture shares or equity transfer. The minimum financing amounts to RMB 50 million yuan. VI. BenefitAnalysis After the completion of the project, the annual output value will about RMB 400 million yuan. VII. Project Initiator Project Initiators: Bureau of Commerce and Food in Zhuzhou County Shennong Linxia TCM Development Co., Ltd. in Hunan Province
Construction of a Planting Base for 10-Chinese-mu GPM Chinese herbal medicine in Sangzhi County I. Project Background As one of the core areas in the country’s three major traditional Chinese medicine libraries, the Sangzhi County has unique natural, geographical and climate conditions, which enable it to have more than 1,700 varieties of verifiable herbal medicine and 588 varieties have been listed in to Chinese Pharmacopeia. The woody medicinal plant in the county covers an area of 246,000 Chinese mu and the forestry medicinal plant covers an area of nearly 190,000 Chinese mu. It currently cultivates 15 varieties of bulk Chinese herbal medicines, including papaya, Polygonum cuspidatum, golden cypress, Eucommia ulmoides, Mangnolia officinalis, Polygonatum odoratum, scrophulariae, Bletilla striata, red-rooted salvia, Paris polyphylla, root of Chinese elder, Ophiopogon japonicas, gallnut, atractylodes and goldenseal. The Sangzhi County is the largest papaya base in the south China. The production yield of golden seal and gallnut ranks the first in the province. The county is named “Home to Cork” by the National General Administration of Forestry. There are 7 economic organizations of Chinese herbal medicine industry, 23 bases, 1,141 member households in the county, with a area of planting base of 18,050 Chinese mu. II. Project Content The project plans to construct a national planting industry demonstration base of GPM Chinese 167
herbal medicine. The construction includes a base which covers an area of 100,000 Chinese mu, a core ecological “Herbal Medicine Expo Park” which covers an area of 10,000 Chinese mu and a production line of life cultivation, health preservation and tourism products of over 50 Chinese herbal medicine. III. Project Investment Project investment totals at RMB 1 billion yuan. IV. Benefit Analysis After the completion of the project, the annual income can reach RMB 1.15 billion yuan and after-tax profit will be RMB 250 million yuan. The playback period will be 3-4 years. V. Cooperation Way Joint venture or sole proprietorship. VI. Project Initiator Project Initiators: Xiangyuan Chinese Medicine Development Co., Ltd. in Zhangjiajie City Wanxiang Farmer’s Specialized Coopertatives of Chinese Medicine in Sangzhi County Bureau of Investment Promotion in Sangzhi County
Construction of Standardized Planting Base of Chinese Herbal Medicine in Cili County I. Project Background Cili County is located in Wuling Mountain area. The vast basin surrounded by mountains can defend north cold wave and south hot wind. The annual average temperature is 16.8℃. The water, hot and light resource are conducive to the growth of the biological medicine, which makes it a treasured place for developing Chinese medicine planting. The county is abundant with Chinese herbal medicine resources. According to the 4th national Chinese herbal medicine resource survey, the county collected 1,055 samples and 835 among them has been listed in the category of Chinese Herbal Medicine Resource in Cili County. It is calculated that wild and domesticated medical reserves will amount to 200,000 tons. The main varieties of planted medicine include Eucommia ulmoides, golden cypress, Mangnolia officinalis, Taxus chinensis, walnut, gingko, dried orange peel, pine needles, Polygonatum odoratum, sealwort, lily, Paris polyphylla and bletilla striata. The total cultivated area has reached 578,900 Chinese mu. Among them, there are more than 60 varieties of herbal medicine which covers an area of more than 50,000 Chinese mu. II. Preliminary Work Project development plans have been worked out. Industrial concentration area has been opened, which can carry modern processing and manufacturing enterprises of Chinese herbal medicine. At present, many large-scale enterprises and groups have contacted with the area, including the China National Traditional Medicine Corporation, Tasly Holding Group, DEEJ,Guangzhou Pharmaceutical Holdings, Guangdong Yijian, Hong Kong Kaitai and Yunnan Wenshan Furun. III. Project Investment Project investment totals at RMB 1 billion yuan. IV. Cooperation Way Contractual joint venture, joint venture and sole proprietorship. V. Project Initiator Project Initiator: Agricultural and Rural Affair Bureau in Cili County
Extraction Techniques and Applications of Polygonum Cuspidatum of High-Purity Resveratrol in Zhangjiajie Economic Development Zone I. Project Background Resveratrol is a natural antioxidant that reduces blood viscosity, inhibits platelet clotting and vasodilatation, maintains blood flowing, prevents cancer from occurring and developing. It has a preventive effect on atherosclerosis and coronary heart disease, ischemic heart disease and 168
hyperlipidemia. Raw materials of resveratrol are mainly polygonaceae plants such as polygonum cuspidatum, citaceae plantssuchasgrapesand leguminous plantssuchaspeanuts. At present, the market demand for resveratrol is 200 tons/year and it is expected to reach more than 800 tons in the future. But the existing production capacity is only 100 tons/year. Located in the central regionof Wuling Mountain, Zhangjiajie City is abundant with biological reserves including polygonum cuspidatum, eucommia ulmoides, golden cypress, houttuynia cordata and the root of kudzu vine, providing rich raw materials. II. Preliminary Work Xianghui Biology Co., Ltd. in Zhangjiajie has advanced production manufacturing techniques and technology in domestic industries. It has acquired 2 authorized innovation patents. III. Project Content The project is located in the C area in the Zhangjiajie Economic Development Zone. The project plans to acquire 70 to 150Chinese-mu land. Based on newly developed techniques, it will transform the original equipment of production lines and achieve an annual output of 20 tons of high-purity resveratrol. IV. Project Investment Project investment totals over RMB 120 million yuan with fixed capital of RMB 20 million yuan, among which RMB 4 million yuan has been invested and additional RMB 16 million yuan is planned to be invested. V. Cooperation Way Equity participation. VI. Cooperation Way It is expected to achieve an annual sales income of RMB 48 million yuan and an annual net profit of RMB 5.33 million yuan. VII. Project Initiator Project Initiator: Xianghui Biology Co., Ltd.
Deep Processing of an Annual Output of 10,000 tons of Polygonati Officinalis in Anhua County I. Project Background Polygonatum mucopolysaccharide is an effective pure ingredient extracted from Polygonatum odoratum. It has a significant function in nourishing yin and moistening lungs, and it can be made into both a single preparation and raw material for other compound preparations. The national annual demand of Polygonatum mucopolysaccharide is more than 10,000 tons, the annual taking demand is more than 1.5 billion bottles of Polygonatum Chinese patent medicine. The project can achieve an annual output of 300 million bottles of Polygonatum Chinese patent medicine. It has large market space. Anhua County has long been known as “Drug Storage in Middle Hunan Province�. It has abundant wild medicinal resource and a long history of family planting. There are 263 families and 1,277 varieties of Chinese medicine. 27 of them belongs to major national and provincial protected varieties, 248 have been listed into national pharmacopoeia and the reserves of Chinese herbal medicine is more than 30 million tons. At present, the area of planting bases of Chinese herbal medicine in the county is more than 600,000 Chinese mu with more than 100 varieties and 10 varieties covering more than 10,000 Chinese mu. Among these, eucommia ulmoides covers an area of 220,000 Chinese mu, mangnolia officinalis of 127,000 Chinese mu and polygonati officinalis of 80,000 Chinese mu. II. Preliminary Work Preliminary demonstration has been completed. It is working out the feasibility research report. III. Project Content Land for construction use amounts to 150 Chinese mu. It will construct new deep processing and production lines of an annual output of 10,000 tons of polygonati officinalis. It plans to achieve an annual output of 5,000 tons of polysaccharide, the extraction of polygonati officinalis. It plans to produce 100 million bottles of polygonati officinalis paste, 100 million bottles of polygonati officinalis granules, 100 million bags of Wuzha 169
electuary, 100 million bottles of polygonati officinalis pills and other Chinese patent medicine containing polygonati officinalis ingredients. IV. Project Investment Project investment totals at RMB 250 million yuan. V. Benefit Analysis After the project is finished and put into production, it is expected to achieve the annual sales income of RMB 60 million yuan, the annual paid tax of RMB 8 million yuan and the annual profit of RMB 15 million yuan. The payback period is 3 years (including 1-year construction period). VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Bureau of Commerce in Anhua County
Development of Chinese Herbal Medicine Industry in Guidong County I. Project Background The climate and soil in Guidong County is suitable for growth of Chinese herbal medicine. In the county, there are numerous varieties of Chinese herbal medicine, with 1,246 has listed in The Dictionary of Medicinal Plant. The unique natural conditions in Guidong bring the high-quality of its Chinese herbal medicine. The ingredients of the herbal medicine grown in Guidong County are generally one to three times higher than national average. Paris polyphylla, sealwort, eucommia ulmoides, golden cypress, mangnolia officinalis, dendrobe and other herbal medicine have been sold more than 10 provinces in the country. The project integrates planting of Chinese herbal medicine, Chinese herbal medicine industry park and healthy tourism of Chinese medicine. Land for construction use amounts to 1,000 Chinese mu. Using a new approach of corporation (project undertaker) + demonstration base (practical implementation) + government (coordination and guidance)+ R&D institutions (technical backstopping)+ leading enterprises (market orientation), the project develop and plant more than 100,000-Chinese-mu Chinese medicine, which forms a integration of agriculture, industry and business taking base and leading enterprises as its core, a business model of one-stop production, research and sales. By doing these, the project will promote the standardized, large-scale and industrialized development of Chinese medicine. II. Preliminary Work The project belongs to the 13th Five-Year plan of Guidong County. It has completed the planning demonstration. III. Project Content The project plans to construct standard demonstration planting base, seed and seedling breeding garden, brand construction project of medicine with local characteristics, processing demonstration park of Chinese herbal medicine, standard processing plant of Chinese herbal medicine, medicated diet and health care manor, cultural and business streets of medicated diet, medicine specimens museum, scientific and technological innovation operation platform, trade market, primary processing area of Chinese medicine and storage and logistics facilities. IV. Project Investment Project investment totals at RMB 1.05 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After the construction the project, the estimated annual profit can reach RMB 120 million yuan. The payback period is 8.75 years. VII. Project Initiator Project Initiator: Puliang Runhe Industrial Co., Ltd.
Processing of Annual Output of Chinese Medicine Decoction Pieces and Herbal Medicine in Hongjiang City 170
I. Project Background Hongjiang City has obvious advantages in traffic. It is close to Huaihua Zhijiang Airport, Zhicheng-Liuzhou Railway, National Highway 320, National Highway 209, Shanghai-Kunming Expressway and Baotou-Maoming Expressway the Huaihua-Shaoyang-Hengyang Railway which is under construction passes through the city. Hongjiang City has mild climate, distinct seasons. It has adequate sunshine and abundant rainfall, which provide unique climate advantage for growing Chinese medicine. More than 1,000 varieties of herbal medicine in the city, with 78 families of 384 varieties of commonly used medicinal herbs, including taxus chinensis, Paris polyphylla smith, Huperzia serrata, pseudo-ginseng, gastrodia elata, immature bitter orange, honeysuckle, atractylodes, eucommia ulmoides and lycopodium serrata. It has 100,000-Chinese-mu herbal medicine planting base, more than 4,000 key and affiliated households, more than 10,000 employees. It has founded 13 farmers’ specialized cooperatives corporation and 4 intermediate extraction enterprises of Chinese herbal medicine, which is the planting base demonstration county of Chinese herbal medicine. Relying on abundant herbal medicine in the city, the new deep processing project of Chinese herbal medicine has a broad prospect. II. Preliminary Work Feasibility research has been completed. III. Project Content The project plans to locate in Zhushan Mountain in Qiancheng Town in Hongjiang City, covering an area of 130 Chinese mu. It plans to construct modern Chinese medicine processing factory with an annual output of 10,000 tons of Chinese medicine decoction pieces and herbal medicine. It plans to realize drug ingredients extraction and deep processing step by step. IV. Project Investment Project investment totals at RMB 200 million yuan among which fixed capital accounts for RMB 155 million yuan and working capital accounts for RMB 45 million yuan. V. Cooperation Way Sole proprietorship and joint venture. VI. Benefit Analysis After the project is out into production, it is expected that the total output value can reach RMB 350 million yuan and the tax revenue RMB 16 million yuan. 350 new jobs will be crated and 60,000 people in the city will see their income increase. VII. Project Initiator Project Initiator: Management Committee of Industrial Concentration Area in Hongjiang City, Huaihua City
Construction of Yiyang Biotechnology Industry Park I. Project Background The national Yiyang High-Tech Zone has introduced more than 20 biotechnological enterprises including Genomics and Changsha Vtrue Biotechnology Co., Ltd. It has initially formed a modern bio-industrial system taking life and economic innovative industry, precision hospital, gene data center, modern agricultural innovation center, future town and deep processing of food as main body. The project is especially established to further consolidate the basis of the bio-industrial innovation and promote modern biotechnology and industry development. II. Preliminary Work The project has constructed standard plants of about 598,000 square meters, incubation buildings of 43,000 square meters and supporting houses of 140ďźŒ000 square meters. III. Project Content The project plans to locate in the east industry park in Yiyang High-Tech Zone. The planning area of the project is about 2,000 Chinese mu. It plans to create 6 platforms including bio-industrial technology innovation service, public service, business incubation, information and source sharing, 171
investment and financing and talent introduction. IV. Project Investment Project investment totals at RMB 4 billion yuan. The investment on single land acquisition and construction project should not be lower than RMB 100 million yuan and the investment on plant leasing should not be lower than RMB 20 million yuan. V. Benefit Analysis The rate of return on investment of the project is about 25%-30%. The payback period is about 4 years. VI. Cooperation Way 1. Investors who construct the project in sole proprietorship can be given preferential treatment in land price, tax and project report. 2. The plant rental projects can be rented at a preferential price. 3. Scientific and technological incubation projects can be provided incubation plant and supporting services for free. VII. Project Initiator Project Initiator: Bureau of Economy and Cooperation in Yiyang High-Tech Zone
Construction of Yiyang Bamboo Industry Park I. Project Background Hunan Province is home to bamboo resource with more than 1,200-Chinese-mu bamboo forest, ranking the 4th in the country. Yiyang City is the major bamboo production area in Hunan Province. It is the famous “Home to Phyllostachys Pubescens”. The city has more than 100 varieties of bamboo with more than 230-Chinese-mu bamboo forest which accounts for 19% in the provinces. The number of reserve of the phyllostachys pubescens is 320 million which accounts for 19% of the provinces, ranking the 1st in the province and the 3rd in the country. The annual felling yield of phyllostachys pubescens is 700,000 tons, mainly distributed in Yiyang High-Tech Zone, Taojiang County, Anhua County and Heshan Area. In addition to the neighboring Taoyuan in Changde, Huarong in Yueyang and the boundaries between Jiangxi and Hunan, the area of bamboo forest in neighboring 200 km is up to 5 million Chinese mu. Calculated according to the yield of original bamboo 1 ton/year per Chinese mu, the total output will reach 5 million tons. Yiyang City has nearly 1,000 enterprises of bamboo processing and operation. Among them, more than 20 enterprises are leading enterprises of provincial forestry industry with an annual output value of about RMB 5 billion yuan. In addition to the production and transportation of other supporting products, the annual output value can exceed RMB 10 billion yuan. The Yiyang High-Tech Zone has introduced many leading enterprises including bamboo technology of Hunan JINI Intelligent Co., Ltd. Txbond, Tianyuan Tech and Xingxiangyu. The carbonized bamboo mat technology is the nation’s first and the multifunctional air-dry disinfection and carbonization combinational machine has obtained national patent. II. Preliminary Work The infrastructure in the park is well-prepared. About 200-Chinese-mu of land has been approved. III. Project Content The project plans to locate in Yiyang High-Tech Zone. Land for construction use amounts to 500 Chinese mu. The project plans to construct bamboo industry park and introduce manufacturing of bamboo intelligent machine, bamboo flooring, bamboo carriage body, bamboo furniture, carbonized mat and bamboo handicrafts to settle in. IV. Project Investment Project investment totals at about RMB 1 billion yuan. Investment on single project should not be lower than RMB 50 million yuan. V. Cooperation Way 1. Investors who construct the project in sole proprietorship can be given preferential treatment in land price, tax and project report. 2. The satisfactory project can be provided constructed plants and supporting facilities for investors and rented in preferential price. 3. Scientific and technological incubation project will be provided a certain amount of financial support according to its technology content and can be provided incubation plant and supporting 172
services for free. VI. Benefit Analysis After the first phase of the project is constructed and put into operation, the total output value is estimated to exceed RMB 5 billion yuan and the annual ratal will exceed RMB 100 million yuan in three years. VII. Project Initiator Project Initiator: Bureau of Economy and Cooperation in Yiyang High-Tech Zone
2-6 Agricultural Development and Agricultural Products Processing (34) Construction of Agricultural Innovation Park in Ningxiang National Agricultural Science and Technology Park I. Project Background Ningxiang County is under the jurisdiction of Changsha City and is about 44 kilometers from Changsha in west. It plays an important role in getting official approval of the construction of Xiangjiang River New District and Chang-Zhu-Tan Independent Innovation Demonstration Zone. To construct an Agricultural Innovation Park in Ningxiang National Agricultural Science and Technology Park is of great significance and with typical demonstrative effect to accelerate the leapfrog development from traditional agriculture to modern agriculture in Hunan and promote the rational exploitation and effective utilization of regional preponderant agriculture resources and play a guiding and demonstrative role in agricultural science and technology innovation and development of modern agriculture and guide farmers to earn more and to be rich. As National Large Food Production County, National Farming County, Hunan First Food Production County, Ningxiang County has its rich land resources, water resources and biological resources. With years of efforts, 1+3 agricultural industry pattern with main content of deep-processing of agricultural product , effective plantation, special farming and leisure sightseeing has taken shape. Moreover, deep-processing of agricultural product already develops to a certain scale with over 60 enterprises. Over 10 famous brands both in national and provincial level like JiaJia, Panzhongcan, Shengxiang Cereals Industry, Liangzhixing, Wanjiachun, Wald have been cultivated. In 2014, Hunan Grain Group Ningxiang Industrial Park has settled down with total investment of RMB 5 billion yuan. This industrial park lays a solid foundation for the development of the largest grain and oil deep-processing demonstration base in central area. II. Preliminary Work There are one National High-tech Business Incubator, two Provincial Incubators, One National Industrial Design Center, seven Provincial Engineering and Technological Research Centers, twenty Municipal-level Engineering and Technological Research Centers, three Academician Expert Workstations, two Post-doctor Scientific Research Workstations in the park. At present, Ningxiang County is under construction, together with Hunan Agricultural University, 2011 Collaborative Innovation Modern Agriculture Comprehensive Research Zone and Innovation Science Demonstration Park of Hunan Agricultural University. It also has some strategic Cooperation with some R&D institutions including Jiangnan University and Longping High-Tech Seed Industry Academy of Science in science research, talent cultivation and transformation of scientific research achievement. III. Project Content This project covers an area of 15.1 square kilometers for the construction of three functional areas. The first one is Blue Moon Valley-Peach Blossom Forest Industrial Zone. The leading enterprises in this area are JiaJia Food, QiaQia Food, China Resources Cestbon, JueWei Food, Royal Milk, Xiangliang Food Industrial Park. The key point of this area is to develop agricultural product processing and upgrade industrial reconstruction and develop emerging industry. The second one is Yuping Mountain Agricultural Science Comprehensive Service Platform Zone which is an integration of industry incubating, technical research and development, e-commerce, educational training, financial consultation, convention and exhibition and headquarters economy. It already 173
covers an area of 100 thousand square meters. This area focus on the construction of some public service platforms including Top-ranking Agricultural Technique Research and Development Center in central area, Agricultural Scientific and Technological Funding Commercialization and Incubation Center, Agricultural Products Testing Center. The third one is Jinghua LakeUrban Agriculture Science and Technology Demonstration Zone. For the purpose of lengthening industrial chain of core area with supporting industries, this area mainly develops raw materials of high-quality plantation demonstration, introduction and promotion of agricultural new techniques and products, modern farm sightseeing and relaxation, Teenager Food Safety Education Base,Modern Farmer Training Base and Technical Talent Training Base. IV. Project Investment Project investment totals RMB 12 billion yuan, among which RMB 2 billion yuan is from government and RMB 10 billion yuan from the social investment. V. Cooperation Way Listed companies with related experiences, leading enterprises of agricultural industrialization, scientific research institutions, strategic investor, advisory organ are sincerely invited to participate in development in the way of lease, sole supply of land, contractual joint venture and merger and acquisition. VI. Benefit Analysis This project will adopt operational mechanisms of garden guidance, business operation, participants of academics. It is expected that the total output of reach-full-capacity will reach about RMB 10 billion yuan and profits and taxes will reach RMB 2 billion yuan. Investment return period will be five years. VII. Project Initiator Project Initiator: Management Committee of Hunan Ningxiang National Agricultural Science and Technology Park
Investment Attraction of Jinghua Lake Urban Sightseeing Agricultural Park in Changsha I. Project Background In order to promote the coordinated and sustainable development of agriculture, Ningxiang Economic Development Zone combines the regional advantages with industrial advantages to mainly establish urban sightseeing agricultural park, promoting standardized and orderly development of sightseeing agriculture. This project sites in Ningxiang National Agricultural Science and Technology Park and is close to the Ningxiang County. It is between the Yiyang City and Changsha City. Now, Ningxiang-Yiyang Intercity Railway, Jingzhou West Line, has completed, realizing the direct connection between two sides. II. Preliminary Work This project has been listed into land-use planning of the park. The supporting facilities including road, water, electricity have completed. Conceptual planning has been completed. III. Project Content This project will cover an area of 3.66 square kilometers for the construction of eight functional zones including High-Tech Exhibition Zone, High-efficiency Agriculture Demonstration Zone, Comprehensive Service Zone, Small Town with Charming Style Zone, DIY Experience Zone, Wetland Amusement Park, Agritainment Zone, Ecological Fruit Tree Planting Belt. It works on developing an National Agricultural Sightseeing Park which is an integration of ecology, science and technology and circulation . IV. Project Investment Project investment totals RMB 1 billion yuan. V.Cooperation Way Sole proprietorship, joint venture and contractual joint venture. The modes of investment attraction: Media promotion, Exhibition promotion, Direct visit to attracting investment. Ways of return:subsidy from higher authorities, preferential policies. This project plans to bring in some typical demonstration items and some strategic investors including modern farm, construction of agriculture industrialization base, urban agriculture, 174
sightseeing agriculture, leisure agriculture, headquarters economy. VI.Project Initiator Project Initiator: Management Committee of Ningxiang Economic Development Zone
Construction of Specialty Food Industrial Park in Ningxiang Economic Development Zone I. Project Background Food and drink is the first leading industry in Ningxiang Economic Development Zone. With years of development, famous food industries rapidly gathered here. Industrial hosting platform is increasingly promoted and the foundation of industrial development is increasingly developed. Ningxiang Economic Development Zone has become a professional food park in central area with great influence and clustering force and is National Food Industry Demonstration Park and Hunan Specialty Food Processing Industrial Park . This project, relying on the industrial advantages of food and drink, combines agricultural and sideline products resources in northwest region, advanced manufacturing process in the park with huge consumer market in central and south of China. It builds strategic cooperation with Qinghai halal food, Tibetan Autonomous Prefecture of Gannan in Gansu and Shanshan Industrial Park in Xinjiang, promoting the development of specialty halal food. II. Preliminary Work Project overall planning, planning approval and examination, brand planning, orderly construction of sub-projects have been completed. III. Project Content This project is located in Ningxiang National Economic Development Zone with planning area of 5 square kilometers. The functional orientation of being a specialty food distributing center between East and West has taken shape. Processing trade income reaches RMB 100 billion yuan. Profits and taxes reach RMB 5 billion yuan. This project plans to bring over 30 third-party intermediary service institutions in the park, aiming to extend the market and promote the development of over 100 small and medium agricultural products deep-processing enterprises and supporting enterprises of the industrial chain. IV. Project Investment Project investment totals RMB 10 billion yuan, among which RMB 4 billion yuan is for the first phase, RMB 3 billion yuan for the second phase and RMB 3 billion yuan for the third phase. The construction period is three years. Funding for the project comes from enterprises themselves. V.Cooperation Way Sole proprietorship, joint venture and contractual joint venture. This project focus on bringing third-party intermediary service institutions in the park, aiming to promote the development of small and medium agricultural products deep-processing enterprises and supporting enterprises of the industrial chain. VI.Benefit Analysis It is expected that processing trade income will reach RMB 100 billion yuan. Profits and taxes will reach RMB 5 billion yuan after completion. VIIProject Initiator Project Initiator: Management Committee of Ningxiang Economic Development Zone
Investment Attraction of Zhongma International Specialty Food Industrial Park in Ningxiang Economic Development Zone I Project Background Ningxiang Economic Development Zone is successively approved to be National Food Industry Demonstration Park (the only one) and Hunan New Industrialization Food Industry Demonstration Base and has become a Professional Food Manufacturing Park with variety of food and drink industrial resources and high-end brands gathering here. The park makes an agreement with 175
Malaysia to establish a Zhongma International Specialty Food Industrial Park. Two sides plan to conduct wide-ranging cooperation on food trade, authentication, training, research and development and investment attraction to create a National Specialty Food Processing and Trade Distributing Center and then make it to be a Specialty Food Industrial Park with great international influence. II. Preliminary Work Project overall planning has been completed. Construction of related supporting facilities has been completed. III. Project Content This project plans to cover an area of 3000 Chinese mu for the construction of the only International Specialty Food Industrial Park in Hunan. It will be implemented on the principle of high-end planning, international orientation, overall planning and pushing forward by stages. IV. Project Investment Project investment totals RMB 10 billion yuan. V.Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI.Project Initiator Project Initiator: Management Committee of Ningxiang Economic Development Zone
Construction of Green Food Industrial Park in Wangcheng Economic Development Zone I. Project Background Wangcheng Economic Development Zone is the first batch of Special Food Industrial Park that strongly supported by county economy in Hunan Province. It is the first one to put forward the strategy that is differentiation development of high-end food processing industry. With over 20 years of persistent development, 31 food industries above designated size have been gathered here. In 2016, the total output of food industry reached RMB 10.4 billion yuan. This park has become a Professional Food Industry Park with the largest scale of food industry, best operation environment, brand food enterprises being the most centralized and supporting facilities being the most complete. 85% dairy products produced in Hunan are from Wangcheng Economic Development Zone. II. Preliminary Work At present, infrastructure construction including road, water, electricity and gas,etc has been completed, realizing the land standard of seven accesses and one leveling. The construction of centralized heating greatly reduces the steam cost of food industry. III. Project Content The planning area of the park is 7000 Chinese mu. Total investment is RMB 21 billion yuan. Relying on its existed food industry enterprises and supporting facilities with high quality, this project aims to develop a Green Food Industrial Park which is an integration of research, development and production. IV. Project Investment Project investment totals RMB 21 billion yuan mainly for the construction of factories for enterprises, purchase of production equipment, research and development of new products, examination, measurement, and talent training. Funding for the project mainly comes from enterprises themselves.
V.Cooperation Way Sole proprietorship, contractual joint venture. Other ways like joint venture or contractual joint venture, as appropriate. High-tech environmental protection enterprises both at home and abroad, special brand enterprises with local characteristics and other related enterprises are sincerely invited to participate in the development of High-end Green Food Industrial Park. VI.Benefit Analysis It is expected that production value will break RMB 30 billion yuan and taxes RMB 1.5 billion yuan within five years. VII.Project Initiator Project Initiator: Management Committee of Wangcheng Economic and Technological 176
Development Zone
Development of Changsha Jinxia Food Industrial Park (Second Phase) I. Project Background Food processing is a leading industry of Jinxia Economic Development Zone in Changsha City. At present, some food processing industries like Uni-President Food, Rosa Food have been successfully brought in. There are now 67 enterprises above designated size in the park. In 2016, total industrial output reached RMB 11.4 billion yuan. In 2017, some key strategic industries including food processing, fabricated building military and civilian integration will be brought in to expand and develop new urban industries with characteristics of high-end, precise and clear. And strive to achieve the goal that more than 50 urban industrial enterprises will be brought in to achieve the park's total output value of 22 billion yuan, among which will be more than five food processing enterprises and achieve industrial output value of 10 billion yuan in 2020. II. Preliminary Work Land expropriations, 205 Chinese mu area of house demolition, construction of supporting facilities including water, electricity, gas and road has been completed. III. Project Content Construction of Modern Food Industrial Park which is an integration of enterprises headquarters, factories, research and development and design, logistical support. Forming industry agglomeration with surrounding food industries. IV. Project Investment Project investment totals RMB 1 billion yuan including land cost, tax excluded in price, fees on construction of factories and facilities. V.Cooperation Way Land grant and sole proprietorship. VI.Benefit Analysis After the project is put into production, it is estimated that the output value will be about RMB 5 billion yuan, and the project will form a joint force with the first phase of the food industry project, and strive to achieve the annual output value of over RMB 10 billion yuan, annual tax of RMB 800 million yuan. VII.Project Initiator Project Initiator: Merchants and Cooperation Bureau of Jinxia Economic Development Zone, Changsha City
Deep-processing of Agricultural and Sideline Products in Anxiang County I. Project Background Anxiang County has 795,000 Chinese mu of arable land and is the National Production Base County of commodity grain, cotton, oil and fish. Agricultural and sideline products resources is quite rich here. In 2015, there are more than 550,000 slaughter pigs, and about 6 million poultry above slaughter weight, aquaculture area of 260,000 Chinese mu with annual output of 70,000 tons of aquatic products, vegetable planting area of 100,000 Chinese mu with annual output of about 160,000 tons of vegetables, oil planted area of 610,000 Chinese mu with annual output of 90,000 tons of oil, rice 600,000 Chinese mu with an annual output of 450,000 tons of rice, 400,000 Chinese mu of cotton with an annual output of 100,000 tons of seed cotton. So it can meet the needs of deep-processing of various types of agricultural and sideline products. In order to turning the agricultural resources advantages in Anxiang County into commodity and economic advantages, an Agricultural and Sideline Products Refined Industrial Park with annual processing of 500,000 tons of food and the annual output value of over RMB 2 billion yuan is planned to be built. II. Preliminary Work Feasibility study and argumentation of the project have been completed. III. Project Content The planning area of the project is 1000 Chinese mu. This project plans to construct 200,000 177
square meters of standard factory and variety of comprehensive supporting houses and a high-standard multi-functional compound industrial Park which is an integration of processing, refrigeration, exhibition, transaction of agricultural and sideline products. IV. Project Investment Project investment totals RMB 1 billion yuan. V.Cooperation Way Joint venture and contractual joint venture. VI.Benefit Analysis After the project reaching full capacity, it is estimated that the annual output value will reach RMB 2 billion yuan. VII. Project Initiator Project Initiator:Management Committee of Industrial Concentration Area of Anxiang County
Investment Attraction of Food Processing Industrial Park in Yuanjiang City I. Project Background Yuanjiang City is famous all over the country as the base of commodity grain, commercial pig and commercial fish. The existing area of rice, oil seed rape, cotton, citrus planting is 1,925,000 Chinese mu, and aquatic products aquaculture area is 155,000 Chinese mu. The fishing area of Dongting Lake and its water system is nearly 1 million Chinese mu with annual output of 400,000 tons of high-quality rice, other crops yield 130,000 tons, slaughter pigs 600,000, fresh fish and other aquatic products 150,000 tons. Yuanjiang is one of the first batch of rural land circulation demonstration counties with city circulation land of 350,000 Chinese mu. Especially the construction of agricultural and sideline products warehousing and logistics center and the trading market, as well as the promotion of a large area of special vegetable cultivation and animal husbandry, aquatic products provide reliable protection of supply and logistics transportation of raw materials to food production enterprises. II. Preliminary Work In 2015, the industrial output value of Food Processing Industrial Park in Yuanjiang City reached RMB 5 billion yuan. Some enterprises have been admitted to the park including Spicy Girls Co., Ltd., Dongting Fisherman, Jin Yan Food, Yizhiyuan Technology Co., Ltd., Luqingnian Rice Processing Limited, Haiqing Noodles and other food processing enterprises. In addition, Hengchang Packaging Containers and Asia's largest daily glass production enterprises Huaxing Glass and other food packaging outsourcing enterprises have settled in Yuanjiang High-tech Zone and have formed a certain scale of industrial clusters. III. Project Content Project content includes the construction of a professional food processing park through making use of rich agricultural and sideline products resources in Dongting Lake area and introduction of many food processing enterprises, production of various types of biscuits, puffed food with raw materials of grain and various types of snack food projects with raw materials of sweet potatoes, pumpkin and other fruits and vegetables and aquatic products and the introduction of various types of aquatic products, Jupianshuang, fruit juice drinks, chili sauce, candied fruit, dried fruit Processing projects, and the segmentation of pigs, cattle, poultry, fish, deep processing and frozen food processing projects. More than 30 food processing enterprises are to be brought in during 13th Five-Year Plan period. IV. Project Investment Project investment totals at RMB 1.5 billion yuan. Focusing on the introduction of projects with investment scale of more than RMB 50 million yuan. V.Cooperation Way PPP model. VI.Project Initiator Project Initiator: Management Committee of Yuanjiang High-Tech Industrial Park
178
Investment and Development of Modern Animal Husbandry in Wugang City I. Project Background Wugang City sites along the upstream of Zishui River and at the foot of Xuefeng Mountain. It is the center of five counties in southwest of Shaoyang City. In Wugang City, aquaculture industry is rapidly developed and in 2011, National Pig Standardization Demonstration was successfully created. With the rapid growth of large-scale animal husbandry and the large transfer of rural labor force, the traditional pattern of thousands of small-shelved animal husbandry will shrink rapidly, vacating market for large-scale, professional development of animal husbandry. II. Preliminary Work Wugang City can use regional advantages of hills and mountains to develop animal husbandry with 536,000 Chinese mu of cultivated land, 634,000 Chinese mu of hills, 423,000 Chinese mu of paddy fields. With more than 10 large-scale poultry, meat, milk animal products processing enterprises, the slaughter capacity is more than 200 tons per day and the annual slaughter capacity is 60,000 tons or more. The livestock and poultry products circulation system is built with Wugang Agricultural Products Trade Wholesale Market, South Xiangxi Livestock and Poultry Products Wholesale Market and so on as leaders and township market to supplement. It has many fine livestock and poultry varieties that listed in local improved varieties records, such as Wugang Tong goose, Qian Shao Pig with many spots, Qinqiao Chicken and space Chicken. Meanwhile, a large number of animal husbandry breeding and processing enterprises are established, such as Huapeng Food, Fuyuan Food, Asia-Pacific Food, etc., creating national, provincial and municipal famous livestock and poultry products and brands. At the same time, a complete Hu test and detection system is equipped with. III. Project Content The establishment of Wugang Wenshi Livestock and Poultry Co., Ltd., with land expropriation of 50-60 Chinese mu for the construction of one integrated service building of office, scientific research, sales, staff quarters and feed mill. In the form of "listed companies + companies + farmers", 400 1000-square-meters poultry cages of the family farms will be added, reaching the scale of 14 million birds out of the cage. 300-500 Chinese mu of seedling field need to be rent. IV. Project Investment Project investment totals RMB 350 million yuan, among which fixed assets investment of RMB 270 million yuan, working capital of RMB 80 million yuan. Investors need to raise RMB 250 million yuan and bank will loan RMB 70 million yuan and other RMB 30 million yuan will be financed through other channels. V.Cooperation Way Conducting cooperation in the development of modern aquaculture industry by taking the "listed companies + poverty alleviation companies + farmers" or "listed companies + family farm" model to achieve sales revenue, rental income and appreciation of the return. VI.Benefit Analysis By the end of 2018, family farms that possess 600 chicken coops, each covering an area of 1000 square meters will be established in the whole city. The number of chicken above slaughter age will be 20 million per year with an annual feed output of 200,000 tons, 30 million poult being cultivated and the output value of RMB 500 million yuan. The scope of cooperation will be expanded to live pigs, goose and other aquaculture in two years. The annual output value will exceed RMB 2 billion yuan within 3 years. VII.Project Initiator Project Initiator: Guangdong Wenshi Food Group Co.,Ltd.
Construction of Black Tea Industrial Park in Linxiang City I. Project Background Linxiang City is one of the main producing areas and the birthplaces of black tea in China, and also one of the starting points of the Tea Horse Ancient Road and Tea-Horse Trade. More than one thousand years ago, Baling formed a tea land pattern that hill tribes make a living with tea and regard tea plantation as their work. Linxiang City is suitable for growing tea with its hilly 179
landforms, high mountains and cloudy weather, rich soil humus, large temperature difference between day and night, appropriate rainfall capacity and temperature and humidity. Especially the tea on high mountain areas is with strong tenderness and its content is very rich with many amino acids and tea polyphenols. The finished tea appears sturdy with bar-type and tastes mellow, and can endure repeated infusion and smell fragrant with its fragrance lasting. II. Preliminary Work At present, in Linxiang City, tea gardens cover an area of 108.000 Chinese mu, among which 15,900 Chinese mu is improved tea garden, accounting for 14.7% of the total area with the total output of 17000 tons and the output value of over RMB 140 million yuan, accounting for 74% of the total value of economic crop. In this city, 268,000 people engage in tea production, accounting for 72.6% of the agricultural population. III. Project Content The planning area of Black Tea Industrial Park is 1000 Chinese mu. The basic content of the construction of the park is to reproduce the Ming and Qing architectural style, and to remodel Nie Town Tea Horse Ancient Road. Moreover, product research and development, tea products exhibition, Tea ceremony, brick tea production experience and sales area will be established with integration of the tea processing and tea culture tourism. IV. Project Investment Project investment totals RMB 1 billion yuan. V.Cooperation Way Joint venture and contractual joint venture and other Cooperation ways. VI.Benefit Analysis It is expected to sell 50,000 tons per year with profits of nearly RMB 30 million yuan. VII.Project Initiator Project Initiator: CPIT of Xianglin City
Construction of 300,000 Chinese Mu of Standardization Ecological Tea Garden in Sangzhi County I. Project Background Sangzhi County is located in core hinterland of Wuling Mountain area. There are road, railway, and air through the area. The traffic will be more convenient after the construction of "Qianjiang-Zhangjiajie-Changde" Railway which is intersected with Zhangjiajie-Badong Expressway and Sangzhi-Longshan Expressway here. Sangzhi County has abundant sunshine and rainfall with annual rainfall of 1,400-2,100mm and frost-free period of 280 days. The average annual temperature is 16 ℃. The forest coverage rate of Sangzhi county is70.69% and groundwater reserves are extremely rich. Stratigraphic development is complete with deep soil that riches in zinc, selenium with zero pollution. In conclusion, it’s suitable for the development of high quality mountain selenium-rich tea. The existing total area of tea planting is 51,000 Chinese mu. "Xilian Cloud", "Emperor Silver Color Tea" and other green tea has been rated as well-known tea in Hunan Province, and won the gold price in 2012 China (Shanghai) International Tea Expo"Chinese Tea"Rating. "Xilian Red" won Gold Medal in 2012 China Central (Hunan) International Agricultural Fair. II. Preliminary Work Project propaganda, application and site selection have been completed. III. Project Content This project plans to construct a tea garden and its supporting infrastructures, meanwhile, purchasing machines and establishing a system that consist of marketing, organization, quality safe, training and tea culture. IV. Project Investment Project investment totals at RMB 162.2 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis The annual net profit of tea garden of 30,000 Chinese mu will be RMB 45.3 million yuan with investment profit margin of 28% that can benefit more than 30 years. 180
VII. Project Initiator Project Initiator: Sangzhi County Agricultural and Rural Work Bureau, Sangzhi County Investment Promotion Bureau.
Construction and Processing of 100,000 Chinese mu of Tea Garden Base in Cili County I. Project Background Cili County is located in latitude 30 °north, world's high-quality tea growth latitude and longitude, and in the core area of Wuling Mountain, and is China's green tea producing gold areas. The county has a number of provincial highways intersected here with Changde-Zhangjiajie Expressway throughout the county. Zhicheng-liuzhou Railway runs through the county and is ten kilometers from Zhangjiajie Lotus Airport and Changde Taohuayuan Airport. The traffic is very convenient. In history, 25 towns of this county produced tea before. And the tea was with excellent quality. So it was one of the three major black tea producing areas. At present, tea planting concentrated area is more than 20,000 Chinese mu. The development of tea industry has a unique advantage. II. Preliminary Work Propaganda of brand culture, planning and site selection has been completed. III. Project Content Project planning and construction: Five belts: Jiangya tea leisure, Yanghe peninsula leisure tea, Zhangjiajie Grand Canyon folk tea, Zhaojiaya reservoir and Chaoyang Difeng tea culture belt and Wuleishan Taoist tea industry belt; Three zones: the North Jiangya Reservoir - Zhuangta reservoir area Alpine organic tea garden, the central Taiping Mountain - Wuleishan ecological tea garden, southern Jiandao Temple Department - Lishui River green and efficient tea garden; Two parks: Sanhekou - Zhuangta tea processing industrial park, Jiangya-Xiangshi tea processing industrial park; Center: Cili Tea Integrated Industry Center. IV. Project Investment Project investment totals at RMB 1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Project Initiator Project Initiator: Agricultural and Rural Work Bureau of Cili County of Zhangjiajie City
Development of Public Brand of “Chenzhou Fortunate Tea” I. Project Background According to the Hunan Tea Association, Hunan Tea Institute, Hunan Tea Research Institute "on the bigger and stronger Chenzhou Tea Industry Recommendations", Chenzhou City in April 2016 applies for registration of collective trademarks of "Chenzhou FortunateTea" .In October, the State Trademark Office issued a "Chenzhou FortunateTea" trademark acceptance notice. At present, Chenzhou Tea Association is organizing scientific and technological personnel to develop five technical standards, collective trademark use and management methods for "Chenzhou FortunateTea" cultivation techniques, green tea, black tea, white tea, green tea processing technical regulations. Chenzhou belongs to subtropical monsoon humid climate zone with the characteristics of "spring early, summer long, autumn clear, winter short", abundant rainfall, warm and humid climate, long frost-free period, much alpine clouds, red soil, yellow acid soil. In conclusion, it ‘s very suitable for tea growth. It’s one of the three high-quality tea areas under the Provincial tea planning and development. Chenzhou City, Guidong County, Rucheng County and Zixing City have been 181
classified as Tea Development Base County. II. Preliminary Work Since ancient times, Chenzhou produced fine tea. There are 10 high-quality teas, being rated as well-known teas in Hunan Province that won Gold Award of "Hunan Tea Cup". Guidong Delicate tea, Rucheng Yinzhen tea, Yongxing Longhua Chunmian tea, Anren Haofeng tea and Zixing Gounaogong tea once won the International Tea Gold Award, being known as the leaders of tea development in Hunan. In 2016, the city's tea garden area has reached 278,300 Chinese mu, of which 20,200 Chinese mu of tea-leaves picking area with total output of 8,800 tons of tea and tea output value of RMB 1059 million yuan. III. Project Content Guidong County, Rucheng County, Zixing City, Yizhang City and Anren County are focus to develop tea industry. 130,000 Chinese mu of new tea garden will be established within 3 to 5 years. By 2020, a tea breeding base of clonal and high-quality tea seedling with annual capacity of more than 100 million will be built. In accordance with the requirements of "ecological, improved, normalized, standardized", 3 to5 national standard tea gardens and 1 to 2 high quality and high yield standard park covering each over ten thousand million Chinese mu, will be created. IV. Project Investment Project investment totals at RMB 990 million yuan, among which: Tea base construction: 130,000 Chinese mu of new tea base, investment of RMB 910 million yuan; Tea processing construction: the construction of 6 tea processing plants, investment of RMB 60 million yuan; RMB 20 million yuan for brand promotion of Chenzhou Fortunate Tea . V. Cooperation Way Joint venture, contractual joint venture and sole proprietorship. VI. Benefit Analysis 1. By 2020, the city's high-quality tea garden area will reach 400,000 Chinese mu, with an annual output of 40,000 tons of tea, of which 15,000 tons of famous tea, achieving comprehensive output value of RMB 10 billion yuan of tea industry. 2. According to the output value of RMB 8,000 yuan per mu, 130,000 Chinese mu of tea garden will add RMB 1,040 million yuan per year to farmers’ income. According to the agricultural industry average profit rate of 10%, RMB 104 million yuan will be added to net income of tea farmers. VII. Project Initiator Project Initiator: Agricultural Committee of Chenzhou City
Comprehensive Development of Ecological Tea in Yanling County I. Project Background There are few pollution sources in Yanling County. Its agricultural ecological environment is good and rich in mountain resources. So it’s suitable for the comprehensive development of tea industry. Compound Farm, Luyuan Town, Xiayang Town and Zhongcun Village and other Mountain Tea Bases have been successively established. To the end of 2015, the county's actual tea-leaves picking area reaches 6,300 Chinese mu, among which pollution-free certification area is 2,000 Chinese mu with total output of 213 tons and the total output value of RMB 40.61 million yuan. Some well-known brands have been gradually formed including alpine oolong, Shennongjian, Shenyanchun whose products won prize for many times in the national and provincial famous tea award. Among these products, alpine oolong tea from Compound farm has repeatedly won first prize and Grand Prize of the "Zhongcha Cup", "Guoyin Cup". These products are sold to Guangzhou, Shanghai, Hong Kong, Taiwan and other places, enjoying a certain reputation in domestic tea market. Yanling County plans to expand the scale of production, develop rural economy and improve farmers’ income through investment attraction. This project is organized by Yanling County Alpine Ecological Tea Cooperative. II. Project Content New tea garden of 3,000 Chinese mu will be established. According to the tea industry 182
development planning in Yanling County, by 2020, county’s tea planting area will reach 35,000 Chinese mu. Tea industry will become a pillar industry of the economy of the whole county. III. Project Investment Project investment totals RMB 36 million yuan, among which RMB 6.15 million yuan will be used for base construction, RMB 6.3 million yuan will be used for seedling and planting, RMB 6.3 million yuan will be used for construction of processing factory, RMB 5.25 million yuan will be used for equipment purchase, RMB 11.1 million yuan will be used for base development and management, and RMB 0.9 million yuan will be used for other expenditure. IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. V. Benefit Analysis After the completion of the project, the annual output value of tea garden is expected to reach RMB 13.5 million yuan. This project will promote the development of county’s famous tea industry, improve the quality of tea and increase farmers’ income effectively. VI. Project Initiator Project Initiator: Agricultural Bureau of Yanling County of Zhuzhou City
Depth Development of Dani (Giant Salamander )in Economic Development Zone in Zhangjiajie City I. Project Background Dani is commonly known as "giant salamander" and listed as state second class key protected wild animal. Muscle protein contains 18 kinds of amino acids with the total amino acid content of 17.10%. It can regulate the human microcirculation and has a high medicinal value. For example, it has a significant effect to anemia, cholera, dysentery, epilepsy and other diseases. Known as "water ginseng", it also can tonify kidney and make you strong, enriching the blood and benefit qi. Zhangjiajie City is known as "Home of giant salamander in China". The city's existing domesticated breeding business (field) are 6. Professional cooperatives are 15. Professional farmers are more than 400.Giant salamander farming scale is more than 400 thousand with annual breeding giant salamander 200 thousand. The city's giant salamander leading enterprises with assets of more than RMB 10 million yuan are 8, of which two are with assets of over hundred million yuan. Zhangjiajie Jinni Biotechnology Co., Ltd. has developed a number of health care products in the giant salamander protein peptide powder, cartilage powder, oil soft capsules, whitening and anti-aging skin care products. II. Preliminary Work Regional detailed planning and land approval have been completed. Environment impact assessment report is now being prepared. III. Project Content This project site in C zone of Economic Development Zone of Zhangjiajie City. It plans to cover an area of 200 Chinese mu for the construction of manufacturing shop, research and development base. This project will also bring in high-tech enterprises with a certain degree of technological base or other enterprises that want to have depth Cooperation with local companies. IV. Project Investment Project investment totals RMB 200 million yuan. V. Cooperation Way Sole proprietorship, contractual joint venture. VI. Benefit Analysis After the completion of the project, it is expected to achieve annual industrial output value of more than RMB 1 billion yuan. VII. Project Initiator Project Initiator: Merchants Bureau of Management Committee of Economic Development Zone of Zhangjiajie City
183
Production of Officinale in Leiyang City I. Project Background According to the records of Compendium of Materia Medica, "there are many officinales on Longshan Mountain in Leiyang City, and the quality is just as gold hairpin."officinale is classified as the head of "Chinese Nine MagicHerbs", known as "Gold in the Medicine", and enjoys the reputation of "Life-saving Herbs" among people. Officinale is a valuable and endangered herb. Because of its significant magical pharmacological effects, yet slow growth, limited production, the market is in short supply. The project is located at 107 National Road, and in Cai Lun Modern Agricultural Science and Technology Park. So the transportation is very convenient. Climate conditions and soil composition in Leiyang adapt to the growth of officinale. Indoor artificial culture test has been successful. II. Preliminary Work Site selection, land approval, environmental impact assessment and project audit have been completed. III. Project Content The project plans to cover an area of about 200 Chinese mu for the construction of 80 steel frame multi-span greenhouses, about 153.6 Chinese mu (102,400 square meters). About 172.8 Chinese mu will be used for planting officinale with 5,000 square meters for processing plant, 1,000 square meters for cold storage warehouse. “Company + Farmer "mode will be used in operation. IV. Project Investment Project investment totals RMB 550 million yuan. V. Cooperation Way Sole proprietorship or Contractual joint venture. VI. Benefit Analysis After the project being put into operation, the annual output value will reach RMB 200 million yuan with profits of RMB 83.26 million yuan, taxes paid of RMB 53.42 million yuan to solve the employment of 1,200 people. VII. Project Initiator Project Initiator: Development and Reform Bureau of Leiyang City
Plantation and Processing of Tea-oil Tree in Leiyang City I. Project Background To rapidly develop the tea industry is a major strategic measure proposed by nation to protect China's edible oil security, and is an important way to increase the income of mountain farmers. At present, tea oil is recognized by more and more consumers, and tea oil market continues to expand with good development prospect. Leiyang City has 1.2 million Chinese mu of oil-tea forest with perennial production of tea oil of 5 million kilograms. The planting area and annual output of oil rank first in Hunan Province, known as "Hunan Oil Sea". Leiyang City has been successively rated as "Provincial Renovation and Advanced City of Tea-oil Tree" by the Provincial Forestry Department, awarded the "National Food Aid Project Tea-oil Tree Project Advanced Unit" by the Ministry of Agriculture, Forestry Department, Ministry of Water Resources, and named "National Famous and Special Economic Forest of Tea-oil Tree" by the State Forestry Administration . II. Preliminary Work Environmental impact assessment and project approval have been completed. III. Project Content This project plans to establish research institution of tea-oil tree, ecological and low carbon processing plant of tea-oil tree, tea-oil tree town, leisure tourism park of tea-oil tree and so on. IV. Project Investment Project investment totals RMB 500 million yuan which can be invested by stages. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis 184
Raw materials production can adopt the model of ‘company + farmer’ which can increase annual income of RMB 4,000 yuan for 400,000 farmers and solve the employment problem of 10,000 people. It can recover costs within 4-5 years with annual profits and taxes of RMB 4 million yuan. VII. Project Initiator Project Initiator: Shennong Tea-oil Tree Scientific and Technological Development Co., Ltd.
Demonstration Park of Tea-oil Industry in Suining County I. Project Background Suining is located in the southwest border of Hunan Province with a total area of 2,927 square kilometers, the forest coverage rate of 76.4%. Tea-oil trees are widely distributed in this territory. The existing tea-oil trees planting area is 154,000 Chinese mu, covering more than 10 villages and towns with tea oil annual total output of about 5,000 tons, thus laying a good basic condition for the development of edible oil. II. Preliminary Work Roads that connect Baotou-Maoming Expressway and Dongkou- Xinning Expressway with Suining County and expansion and reconstruction of Jiangwan Road have been finished. Wugang-Jingzhou Expressway will be completed in October 2017. Suining will be successfully integrated into Shaoyang, Guilin "Two-hour Economic Circle" and Changsha, Nanning, Chongqing, Guangzhou "Four-hour Economic Circle." Suining County has more hills than farmlands and has rich labor force with low cost. So it is conducive to corporate recruitment. III. Project Content Construction of tea oil refining production line, automatic blowing, automatic rotation weighing filling, intermittent refining production line; construction of high standard raw materials and packaging warehouse with a total area of 15,000 square meters; construction of 200,000 Chinese mu of high-standard, green high-quality tea oil base. Construct Hunan Province (Suining) Tea Oil Industry Cultural Corridor to create a Tea Oil Culture Museum with Hunan cultural characteristics and connotation and a Tea Oil Culture Exhibition Experience Museum. IV. Project Investment Project investment totals RMB 600 million yuan, among which RMB 200 million yuan are fixed assets and RMB 400 million yuan are working capital. V. Cooperation Way Sole proprietorship and contractual joint venture. VI. Project Initiator Project Initiator: Shaoyang City Suining Hunan Business Park, Suining County Business and Economic Information Bureau
Construction of Tea-oil Tree Plantation Base and Processing of Refined Tea Oil I. Project Background Cili County, located in the northwest of Hunan Province, is the east gate of the west region of Hunan and also an important place connecting Hubei, Chongqing, Sichuan, and Guizhou. In recent years, railways, highways, shipping and other traffic conditions have been greatly improved. Transportation is very convenient. The natural environment of Cili County is superior with the annual average temperature of 16 ~ 18 ℃ which is suitable for the growth of tea-oil tree. The forest area that suitable for planting tea-oil tree in this county reaches over 500,000 Chinese mu. There are now 42,000 Chinese mu of new tea-oil tree plantation and 65,000 Chinese mu of old tea-oil tree plantation. Cili County lists one of the 100 state-level, 25provincial-level tea oil industry development key counties. Tea oil has the advantages of lowering blood pressure, blood fat and softening blood vessels enjoying the reputation of “East Olive Oil”. It is rich in vitamins A, B, C, E and a variety of beneficial trace elements, which are easily absorbed by human body. Long-term consumption can 185
enhance immunity. II. Project Content This Project plans to plant more than 100,000 Chinese mu of fine tea-oil tree and reconstruct tea-oil low production forest. It also plans to construct a tea-oil industrial park with rich selenium and refined tea oil processing production line. III. Project Investment Project investment totals RMB 300 million yuan. IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. V. Benefit Analysis Tea-oil tree will enter into the fruiting period after 5 years, and rich production period after 8 years. Sustained and stable income will reach 100 years or more. VI. Project Initiator Project Initiator: Forestry Bureau of Cili County Of Zhangjiajie City
Construction of Vegetable Industrial Park in Huaihua City I. Project Background Huaihua City enjoys the reputation of “west gate” of Hunan Province. There exist three dimensional transport network including railways, highways, airlines and shipping . Every county has high-speed that connected to other counties so that the longest journey in huaihua City is within 2 hours, providing a convenient transport for the trade of vegetable products. The existing resident population is more than 500,000 in Huaihua City with urban vegetable consumption population of about 600,000. According to statistics in 2016, the existing vegetable professional base is 16,000 Chinese mu in Huaihua City, with an annual output of 800,000 tons of vegetables. The production is rich in harvest season while the off-season production is low. At present, vegetables capacity basically meets the urban consumers’ demand through transporting from other places. But looking at the existing base of the city and the transfer of vegetable products, there are not many high-end products, few green products, and even no organic products, which cannot meet the needs of the existing consumers. The project based on the reality that Huaihua high-grade vegetable products are in short supply. Plans to develop green and organic products is of great prospects. II. Preliminary Work Site selection of the project has been completed. A project coordination leading group has been set up with person who specially responsible for this project. III. Project Content The project is located in Yantian Village, Shimen Town, Hecheng District, Huaihua City. The overall planning area covers an area of 1,000 Chinese mu. The project mainly develops three major industries including green ecological vegetable cultivation, science and technology demonstration and ecotourism. This project focuses on the construction of five functional areas including High-tech Vegetable Demonstration Zone, Ecological Recreation Zone, Ecological Sightseeing Zone, Intelligent Nursery Zone and Scientific Research Training Zone. IV. Project Investment Project investment totals at RMB 100 million yuan, of which land transfer and fixed assets investment are RMB 60 million yuan and liquidity is RMB 40 million yuan. V. Cooperation Way Joint venture and contractual joint venture. VI Benefit Analysis It is expected that annual sales income will reach RMB 220 million yuan with annual profits of more than RMB 40 million yuan. It can drive 6,000 farmers. VII. Project Initiator Project Initiator: Agricultural Committee of Huaihua City
186
Deep Processing of Special Alpine Fruit in Yanling County I. Project Background Yanling County is located in the west of Jinggang Mountain with the forest coverage rate of 83.51%. There are superior conditions for the development of food industry including pure air, fertile soil, high altitude and high temperature differences between day and night. In recent years, Yanling County rapidly develops ecological special agriculture. The county fruit cultivation rapidly developed with a total area of 50,000 Chinese mu, of which peach cultivation area is 26,000 Chinese mu. In 2016, 9,257 Chinese mu was expanded with 8,900 Chinese mu of fruiting area and the output value of RMB 145 million yuan. In particular, "Ling County White Goose", peach, Nai Li, the new century pear and other fruit varieties enjoy a high reputation in the country. The project will, relying on unique ecological environment and green food resources of Yanling County, use advanced food industry technology to improve the added value of products, forming the food industry that is an integration of plantation, processing, production and sale. II. Preliminary Work Preliminary work is undergoing. III. Project Content 1. The construction of fruit cultivation (Yanling peach, Yanling Nai Li, grapes, pear, etc.) base 10,000 Chinese mu; 2. The construction of special alpine fruit canned deep processing plant 70,000 square meters; 3. The establishment of agricultural products quality and safety inspection and testing system; 4. The construction of food logistics and distribution center, fresh keeping storehouse and food e-commerce information platform. IV. Project Investment Project investment totals RMB 200 million yuan. V. Cooperation Way Sole proprietorship, contractual joint venture and other ways. VI. Benefit Analysis After the completion of the project, it will produce annual economic benefits of RMB 120 million yuan. VII. Project Initiator Project Initiator: Yanling County SME Venture Park
Integrated Construction of Production and Sale of Citrus in Mayang County I. Project Background Mayang County is the most suitable area for citrus cultivation. The existing citrus area is 310,000 Chinese mu with annual output of 450,000 tons, of which 260,000 Chinese mu is sweet citrus. Thus, Mayang County was awarded the "Chinese Sweet CitrusTown" with its product even successively awarded the Gold Award of China (international) Agricultural Fair. Surrounding counties and cities are also with rich resources. The project is mainly about deep processing of citrus: ① the formation of cysts, and then being sold in the form of semi-finished products to food and drink processing enterprises as raw materials; ② processed into citrus juice drinks, as a new type of health drinks. ③ comprehensive utilization of citrus peel. The project intends to integrate Mayang citrus industry enterprises and bases, and build a modern leading enterprise integrating production, processing and R & D, logistics and warehousing and marketing, and strive to make the listed companies for 3-5 years. II. Preliminary Work Project park is approved by the provincial government for the food industry cluster, and is currently doing pre-planning. III. Project Content This project plans to cover an area of more than 300 Chinese mu for the construction of office buildings and plants, citrus logistics park, citrus comprehensive processing center and citrus drinks, canned production lines, citrus cysts production lines, peel comprehensive utilization production lines. 187
IV. Project Investment Project investment totals RMB 500 million yuan. V. Cooperation Way Sole proprietorship or joint venture. VI. Benefit Analysis After the completion of the project, it can achieve an annual output value of RMB 650 million yuan with annual profits of RMB 80 million yuan. VII. Project Initiator Project Initiator: Agricultural Committee of Huaihua City
Deep Processing Base of Livestock, Poultry and Aquatic Products in Hengnan County I Project Background Hengnan County is a big county of husbandry and fishery with the annual production of 2.5 million pigs, 50 million poultry, 40,000 tons of egg products, 80,000 tons of aquatic products, which are all fresh products to supply the market. Industrial chain is short with low product value added. To promote the industrialization of breeding industry, strategic investors are in urgent need to be brought in to develop deep processing of livestock and poultry aquatic products, extend the industrial chain, and promote the sustained and healthy development of breeding industry. II Preliminary Work Project planning has been completed. III Project Content Land acquisition will be 150 Chinese mu for the construction of deep processing base of livestock. Poultry and aquatic products will achieve an annual processing of 300,000 pigs, 10 million poultry and 20,000 tons of aquatic products. IV Project Investment Project investment totals at RMB 300 million yuan, of which 200 million yuan will be used for investment attraction. V Cooperation Way Sole proprietorship, joint venture. Investment is shared in proportion. VI Benefit Analysis After the project reaches design capacity, it can realize the annual sales income of RMB 760 million yuan and profit of RMB 80 million yuan. VII Project Initiator Project Initiator: Husbandry and Fishery Bureau of Hengnan County
Industrialization Development of Shelduck in Youxian County I Project Background Youxian County shelduck is a famous Chinese local duck species only for egg production featuring small size, fast growth, early maturity, large egg production and strong adaptability. In 1988, this duck was listed in the "Chinese Poultry Species Records". In 2006, it was identified as national protective varieties of livestock and poultry genetic resources by the National Ministry of Agriculture and in 2010, it became the national geographical registered trademark. However, no deep processing of shelduck is in the Youxian County currently, which is a serious impediment to the development of the shelduck industry. The implementation of industrialization development of Youxian County shelduck is an important means and carrier to accelerate the development of local industry with traditional advantages —— shelduck industry, and to enhance the level of industrialization. Youxian County duck itself, being processed into duck meet and egg products, will be loved by consumers because of its rich-nutrient and delicious taste. In addition, duck’s down, the by-product of the duck after the processing, has strong warmth retention, and is lightweight, which is a precious materials of variety of styles of clothing and bedding. Therefore, the market potential of Youxian County duck processing products is very large, and the development prospects are very 188
broad. II Preliminary Work The project is located in Youxian County Youzhou Industrial Park. Water circuit, logistics and other supporting facilities in the park are relatively perfect. The project started in 2013, and has completed a total investment of RMB 90 million yuan for the construction of plant office building which is nearly ten thousand square meters and the installation of two production lines. Now the pre-production equipment debugging work is rapidly undergoing. III Project Content Project plans to cover an area of 60 Chinese mu for the construction of a standardized plant of 6,000 square meters, the purchase and installation of two production lines of Youxian county shelduck processing, two production lines of egg products processing, a sewage treatment facilities, a new frozen cold storage of 5,000 square meters, a breed conservation, product change and the seedling hatchery, a product R&D building for shelduck series, 20 scientific breeding bases with annual processing capacity of 10 million shelducks. IV Project Investment Project investment totals at RMB 120 million yuan. V Cooperation Way Joint venture, contractual joint venture. VI Benefit Analysis After the project reaches design capacity, the annual sales income is 315.8 million yuan with the investment profit rate of 16.13%, and the after-tax investment recovery period (including the construction period) is 6.16 years. VII Project Initiator Project Initiator: Honghua Duck Co.,Ltd in Youxian County, Zhuzhou City
Annual Production and Processing of 1000 Meat Duck in Zhijiang County I Project Background Zhijiang County is in hilly mountainous area with mountains over mountains and green forests, featuring abundant rainfall, many animal and plant species, warm in winter and cool in summer. It is the superior industrial belt of chicken, duck, goose breeding industry. The Zhijiang duck, Zhijiang black-bone chicken, cherry duck, ecological geese here enjoy the reputation for good meat, low fat, high linoleic acid content and high lean meat. Developed Zhijiang duck products have won the "Gold Award" and "Best-Selling Product Award" of the third session of Hunan Province Agricultural Fair and Trade Fair, "Silver Award" of Hunan, China (International) Agricultural Fair. In 2012, the project unit was identified as a leading enterprise of agricultural industrialization in Huaihua City. II Preliminary Work Approval report, site selection and planning of the project have been completed. III Project Content The project is located in Daotangwan Village Industrial Park in Yanqiao Town in Zhijiang County. It plans to cover an area of 130.35 Chinese mu for the construction of Zhijiang duck core population of 20,000. This project will use the production mode of company + cooperatives + farmers to form the scale of an annual output of 10 million ducks within 2 years. It will expanding the packinghouse with an annual output of 10 million Zhijiang ducks . 2000 tons of Zhijiang fried duck, 1000 tons of Zhijiang taste duck, 1,000 tons of leisure duck products, 11,000 tons of severed duck and 600 tons of duck feathers will be added annually. IV Project Investment Project investment totals at RMB 62.914 million yuan, of which 55.8259 million yuan will be used for construction and 7.0841 million yuan are initial working capital. V Cooperation Way Joint venture and contractual joint venture. VI Benefit Analysis After the project puts into production, the annual sales income will reach RMB 358.6 million yuan, the annual profit after tax will reach 23.9365 million yuan with the project investment profit rate of 51.37% and investment profit tax rate of 55.96%. During the calculation period, the internal 189
income rate after tax is 31.41%, the net present value is RMB 102.4807 million yuan, and the static investment payback period is 5.65 years (including construction period). VII Project Initiator Project Initiator: Hexiang Duck Co.,Ltd. in Zhijiang County, Hunan Province
Development of Selenium-rich Agricultural Product in Cili County I Project Background Cili County is one of the rare natural selenium-rich areas in Hunan Province. The selenium here is abundant and widely distributed with low pollution of heavy metals in soil excellent quality of crops. According to the preliminary estimate, selenium-rich soil covers an area of 2.6143 million Chinese mu, and seven kinds of selenium-rich products including grain, oil, fruit, tea, livestock and poultry aquatic products, medicine, vegetables have been developed. "Kang Tian" brand of selenium-rich red rice has won the title of "Chinese special selenium products ". Natural selenium resources and a huge amount of agricultural products provide favorable conditions for the development of selenium industry . II Project Content The project plans to construct six contiguous selenium-rich agricultural products bases, each covering ten thousand Chinese mu, to support 10 "agricultural industrialization leading enterprises" mainly engaged in the development of selenium-rich agricultural products and to create 10 "selenium-rich agricultural products brands" with strong competitive. It will achieve an annual output of 12,000 tons of selenium-rich rice, 10,000 tons of selenium-rich tea, 100,000 tons of selenium-rich citrus, 10,000 tons of selenium-rich rapeseed, 10,000 selenium-rich pigs, 1,000 tons of selenium-rich eggs and 2,000 tons of selenium-rich tea oil. III Project Investment Project investment totals at RMB 200 million yuan. IV Cooperation Way Sole proprietorship, joint venture and contractual joint venture. At pilot development stage, submitted products will be inspected by County Selenium-rich Office. If Enterprises inspects individually, the inspection costs will be paid by the Selenium-rich Office. Enterprise which successfully develops selenium-rich products with packaging and being listed, it will be given a certain reward from County Selenium-rich Office. County Selenium-rich Office will actively organize the declaration of pollution-free agricultural products areas and selenium-rich series of green organic food brand certification. V Project Initiator Project Initiator: Agricultural and Rural Work Bureau of Cili County in Zhangjiajie City
Construction and Processing of 300,000 Chinese Mu of Tung Trees Base I Project Background Biodiesel is a new type of renewable energy that is an ideal substitute for oil. The development of biomass energy in China, a major oil consumption and oil import power, is particularly necessary. Among Chinese various kinds of forestry biomass energy, tung trees can adapt to barren hills and wasteland or even saline soil and sand cultivation. Fruit processing technology is simple with high oil rate, which is very suitable for industrial cultivation and processing. Besides being processed to biodiesel, Tung oil is also a good dry vegetable oil featuring rapid drying, light specific gravity, good glossiness, strong adhesion, heat-resistant, acid-resistant, alkali-resistant, corrosion-proof, rust-proof and non-conductive. It can be synthesized into millions of chemical products. So the construction of the project has good economic and social benefits. II Preliminary Work Project planning has been completed. In Hengnan County, more than 50,000 Chinese mu of land is transferred. It has excellent seed breeding and planting techniques. III Project Content It will construct Tung trees planting base covering 300,000 Chinese mu, 6,000 square meters of 190
raw materials storage base and 50 Chinese mu of seed cultivation. It will establish the agricultural technology service system. IV Project Investment Project investment totals at RMB 840 million yuan. V Cooperation Way Joint venture, contractual joint venture. The investment is shared in proportion. VI Benefit Analysis After the completion of the project, the estimated annual output value will be up to RMB 4.2 billion yuan with profits of RMB 400 million yuan. VII Project Initiator Project Initiator: Hunan Bilinyuan Agricultural Development Co., Ltd
Deep-processing Base of Ginkgo (Gingko) in Hengnan County I Project Background Ginkgo is a kind of important economic tree in China, and it is also a valuable planting resource for human. It has high economic, medicinal, edible and health care value. The benefits of ginkgo cultivation are high and its various derivatives are currently sold well in domestic and foreign markets with great potential. Ginkgo cultivation industry has broad and good market prospects. Since 1994, Baogai Town in Hengnan County has begun to cultivate ginkgo trees, including large bergamot, Huakou, Dongting emperor, king of ocean, featuring large species, white fruit, strong waxiness, heavy fragrance, high rate of fruits, high resistance of wet and edible value and high medicinal value. This land is the largest contiguous cultivation area of ginkgo trees in Hunan Province, and the famous ginkgo base in the whole China. II Preliminary Work The existing planting base covers an area of 10,000 Chinese mu with more than 200,000 ginkgo trees. Ginkgo trees have been in the rich fruiting period. The project site selection, feasibility study and planning and design have been completed. III Project Content This project will cover an area of 12,000 Chinese mu for the construction of 10,000 Chinese mu of ginkgo plantation and ecological leisure tourism area, 400 Chinese mu of food industry park with production of 200 tons of ginkgo for cold storage, instant white ginkgo fruits and drink and wine production, 100 Chinese mu of ginkgo preparation R&D center, 1,500 Chinese mu of bio-pharmaceutical industrial park for the production of health care products, medicine and cosmetics. IV Project Investment Project investment totals at RMB 400 million yuan, of which 200 million yuan will be from investment attraction. V Cooperation Way Contractual joint venture. The investment is shared in proportion. VI Benefit Analysis After the project is put into production, it is estimated that the annual output value will be RMB 200 million yuan and the annual profit will be RMB 30 million yuan. VII Project Initiator Project Initiator: Commerce Bureau of Hengnan County of Hengyang City
Planting and Processing Base of Edible Fungi of Hunan Xiangbei Group I Project Background Hunan (Hengnan) Xiangbei Group Co., Ltd. is a national leading enterprise of agricultural industrialization integrating scientific research, production, demonstration and promotion. It has formed a unified production system with edible fungi (mushrooms) production as the core, and multi-species comprehensive processing, factory mushroom dregs use. The company intends to expand the cultivation and processing base to comprehensively enhance the level of edible fungi production and processing and to promote the development of relevant industries. 191
II Preliminary Work The site selection and project approval have been completed. III Project Content 1. Planting base. It will construct mushroom raw materials (auxiliary) production base of 2094.7h ㎡, greenhouse bacteria production greenhouses of 45,000h ㎡, ordinary mushroom greenhouses of 26.67h ㎡, and fungi biological fertilizer production plant of 2,000 square meters and purchase some equipment. 2. Processing base. The total area of it will cover an area of 12,950 square meters with two mushroom processing production lines, 5,000 square meters of plant with the annual output of 1,000 tons of mushrooms; two tea-oil trees processing production lines, 4,950 square meters of plant with the annual output of 4,000 tons of tea oil and 2,000 square meters of Science and Technology Building. IV Project Investment Project investment totals at RMB 200 million yuan, of which 150 million yuan will be from investment attraction. V Cooperation Way Joint venture and contractual joint venture. VI. Benefit Analysis After the project is put into operation, it is expected that the operating income will be RMB 244 million yuan and the profits will be RMB 30 million yuan. The investment will be shared in proportion. VII. Project Initiator Project Initiator: Agricultural Bureau of Hengnan County of Hengyang City
Construction of Processing Base of Non-Residue Ginger in Changning City I Project Background In Changning City, non-residue ginger is the treasure of all kinds of ginger. Non-residue ginger is large with thick ginger petals, tender and crisp ginger flesh, soft taste without residue. If it is planted out of the place, the taste will change. Cultivation of non-residue ginger in Changning City has a long history for more than 2100 years with planting area up to 100 hectares. In 1984, Changning’s non-residue ginger was listed as Hunan famous products, and was listed into the "Chinese Famous Specialties Dictionary." With its processing of five snake ginger, sugar ginger, rose ginger and other products which are sold to the whole country and Hong Kong and Macao markets, it has a promising prospect. II Preliminary Work This project has been incorporated into industrial planning of Changning City. III Project Content It is planned to build an intensive production and deep processing base of non-residue ginger covering an area of about 30 Chinese mu. The total construction area is 5,000 square meters. It mainly includes processing plants, office areas, dormitories and cafeterias. IV Project Investment The total investment is RMB 50 million yuan, of which 30 million yuan is fixed assets investment, working capital is 20 million yuan. Project funds is obtained through the attraction of investment. V Cooperation Way Contractual joint venture, joint venture and sole proprietorship. The specific way is determined after negotiation and signing the contract. VI Benefit Analysis After the completion of the project, the total annual profits will be RMB 5 million yuan. VII Project Initiator Project Initiator: People’s Government of Baisha Town of Changning City, Hengyang City
Deep-processing of “Youxian County Bean Curd” I Project Background 192
Youxian County Bean Curd is a famous traditional soy product in Hunan Province. It pays great attention to the materials selection with traditional processing techniques. The processing water is with rich mineral and trace elements that are beneficial to human health including the natural mineral water of Yuwang Hole in the upper reaches of the You River, the underground river of the Pijia Hole and the hot spring water of Bo city. The protein digestibility is more than 90%, forming a unique food flavor. It becomes a local special dish that suitable for all ages of people with characteristics of fragrant smell, tender taste, elastic, pure taste, etc. In 2010,"Youxian County Bean Curd" is shown in Shanghai World Expo as one of Hunan cuisine, becoming a brand of Hunan cuisine. The project intends to integrate the existing advantage resources of the selection of raw materials, the deep processing of products, the sales and packaging so as to upgrade and transform industry, to form an industrial chain and to make this special food brand be bigger and stronger. II Preliminary Work The project is located in Youzhou Industrial Park with complete supporting infrastructure. The relevant work of the project is ongoing. III Project Content The project plans to cover an area of 500 Chinese mu which is mainly for the construction of You County Bean Curd Industrial Park. It will use advanced production equipment to build a You County bean curd production line with a daily output of 100 tons. IV Project Investment Project investment totals at RMB 200 million yuan. V Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI Benefit Analysis After the implementation of the project, the annual output value will be up to RMB 200 million yuan, and the annual tax will be about RMB 10 million yuan. VII Project Initiator Project Initiator: Management Committee of Youzhou Industrial Park in Zhuzhou City
Deep-Processing Industrial Park of Bamboo Products in Anhua County I Project Background The project is located in Anhua Economic Development Zone Industrial Park. The transportation in the park is convenient with Taojiang County in east that can be accessed to Yiyang and Changsha that can be directly reached through the road. And the park is intersected with G207 national highway and Erenhot-Guangzhou Expressway. It also connects with Hunan-Guizhou Railway in the south and is along Zishui River in north. The products here can reach Yangtze River from Dongting Lake through the water routing. Anhua County is "the hometown of bamboo in China" and "top ten counties of forestry in Hunan Province" with bamboo area covering nearly 800,000 Chinese mu. There are nearly 30 bamboo species, which can be used for producing 300,000 cubic meters of commercial goods and 120 million phyllostachys pubescens. With the development of social economy, human demand for natural green, low-carbon bamboo products is growing. Through integration of bamboo resources within the county, the project plans to enhance the deep processing of bamboo products, to create a well-known brand of Anhua Bamboo industry and to promote the transformation and development of bamboo industry . II preliminary Work The Industrial Park has basically completed the "three links and one leveling", and it has completed the construction of some relevant supporting and auxiliary facilities. III Project Content This project plans to cover an area of 200 Chinese mu. Six processing enterprises are to be introduced including bamboo chemical industry, bamboo fiber, bamboo food, bamboo handicrafts, bamboo packaging, bamboo furniture and office supplies. IV Project Investment The total investment of the project is RMB 200 million yuan, of which RMB10 million yuan will 193
be used for land acquisition, RMB 40 million yuan will be used for plant construction, RMB 120 million yuan will be used for equipment purchase and RMB 30 million yuan is working capital. V Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI Benefit Analysis After the completion of the project, it is expected to achieve annual sales income of RMB 150 million yuan, the annual tax of RMB 15 million yuan, the annual profit of RMB 80 million yuan. Investment recovery period is 5 years (including the construction period of 1 year). VII Project Initiator Project Initiator: Forestry Bureau Office of Anhua County in Yiyang City
Production of 6,000 t/a Golden Potato Thin Pancake I Project Background Xinhua County, located in central Hunan with the population of 1.48 million, is a large agricultural county with a total land area of 535.07 million mu, of which: arable land area of 726,800 Chinese mu, cultivating area of 254,600 Chinese mu. Xinhua county is known as "Hunan’s treasure" because of lots of hills and basins with a mild climate and pleasant environment. So it’s suitable for a variety of crops cultivation including sweet potato cultivation with high yield and good quality. In recent years, xinhua county has introduced a number of fine varieties, such as Xianghuang NO.1 which is early-maturing, yellow surface with yolk yellow heart. It is commonly known as "golden potato" containing more than 10% sugar and more than 20%starch. Golden potato is the valuable raw materials of sweet potato processing. After years of research, Hunan Qianjin Food Co., Ltd. makes use of local natural resources advantages to cultivate and grow a variety of "golden potato" species, and then uses a number of techniques and technology with independent intellectual property rights including "quick cooking technology", "sweet potato several times softening and saccharification and nutrition sublimation technology", "low temperature fast drying technology " to improve efficacy and nutritional value of " Golden Potato "to the greatest degree. II Preliminary Work Project feasibility report preparation, filing approval, environmental assessment and plant construction have been completed. III Project Content The project is located in Xinhua Economic Development Zone Food Industry Park, covering an area of 40 Chinese mu, with a total construction area of 12,000m2, of which the main workshop of 6000m2. It will add an automated production line, including fast cooking equipment, French fries softening and saccharifization equipment, low-temperature fast drying equipment, forming the capacity of annual output of 6,000 tons of golden potato thin pancake. IV Project Investment Project investment totals at RMB 104 million yuan, of which the fixed assets investment will be RMB 98.6 million yuan. V Cooperation Way Joint venture and contractual joint venture. VI Benefit Analysis After the project is put into production, the annual sales income will be RMB 288 million yuan and annual profits will be 40 million yuan. VII Project Initiator Project Initiator: Management Committee of Xinhua Economic Development Zone in Loudi City
50,000 t/a Sweet Potato Starch and Modified Starch Procession I Project Background Hengyang County is a large agricultural county and is also a traditional “land of fish and rice”. It has a long history of cultivating the local traditional crop of sweet potato. At present, the county's 194
existing sweet potato planting area is about 800,000 Chinese mu with an annual output of 1.8 million tons. In order to speed up the regional planting industry restructuring and to promote regional economic development, Hunan Zhenfeng Agricultural Development Co., Ltd. has proposed a project of 50,000 t/a sweet potato starch and modified starch procession. This project is in line with industrial projects supported and encouraged by the state, and is also an important measure to expand and ensure that farmers income increasing and to improve the lives of poor farmers. II Preliminary Work This project plans to cover an area of 100 Chinese mu for the construction of two modified starch production lines so as to achieve the capacity of 50000 t/a sweet potato modified starch. It will mainly construct production workshop, finished product warehouse, raw material field, weighbridge room, sedimentation pond, dormitory, canteen and auxiliary facilities. III Project Investment Project investment totals at RMB 267 million yuan. IV. Cooperation Way Joint venture V. Benefit Analysis After the completion of the project, the annual sales income will be RMB 244 million yuan, the average annual profit will be RMB 44 million yuan. The payback period will be 8 years. VI. Project Initiator Project Initiator: Hunan Zhenfeng Agricultural Development Co., Ltd.
3 Modern Service Industry (181) 3-1 Business and Logistics (44) Development and Investment in Changsha Airport Economic Core Area I.Project Background In order to speed up the agglomeration of airport high-tech industry and modern service industry, and promote the coordinated development between airport industry and the airport, city, transportation as well as ecology,inland open highland in central regionsand high-end airport industrial cluster district will be built. By the end of 2016, land of 5047 Chinese mu in the region for various types of construction has been approved, among whichland of 2568 Chinese mu is for public infrastructure project, 2479 Chinese mu for various types of operating projects and reserve land of 1361 Chinese mu for investment attraction. China Unicom Digital reading base, Okay Airway Hunan Branch, Changsha Bailian Outlets shopping plaza, ProLogis Changsha Airport Logistics Center and Hunan Shunfeng Electric Business Industrial Park has been introduced in. II.Preliminary Work Compiling work related to the control plan, industrial planning and strategic planning of Changsha Airport Economic Core Area has been completed at present. III.Project Content The overall planning area of the project is about 130 square kilometers, of which the core area account for 30 square kilometers. Focuses are laid on the development of aviation logistics industry, air manufacturing industry, high-end services and general aviation industry. IV.Project Investment The total investment amounts to RMB 100 billion yuan. V.Cooperation Way 195
Either sole proprietorship or joint venture can be taken. Land development can be achieved through the remising way of land listing. VI.Benefit Analysis Huanghua Comprehensive Bonded Area will achieve acceptance, Customs closure and operation in May 31, 2017. It is estimated thatthe total import-export amount will reach 1 billion US dollars in 2017, and reach 5billion US dollars in 2020, becoming a new window of opening up and rising. VII.Project Initiator Project Initiator: Changsha County Business Bureau
(II Phase) Development of Changsha Jinxia Cross-border Industrial & Trade Town I.Project Background Jinxia cross-border production and trade city project to make full use of Jinxia Bonded Logistics Center, Changsha Xingang, Hunan-Shanghai Expressway and the transmission of the port, the province's bonded display transactions and cross-border electricity regulatory channel and other advantages of resources, from Jinxia by the area, Bonded logistics center, Hunan Jiade Group jointly build Hunan and even the central cross-border trade and industrial base, is a collection of goods, exhibition promotion, foreign trade services, warehousing and distribution and business incubation in a foreign trade industry comprehensive service platform. II.Preliminary Work The project covers an area of 260 Chinese mu and the construction area covers 248,000 square meters, which is divided into two phases for construction. The first phase construction covers 93,000 square meters, including 4 demonstration trade buildings and 2 corporate headquarter office buildings. Global commodity data base, B2C cross-border e-commerce platform, bonded display trade O2O platform and other systems has been initially built up. More than 40 enterprises engaged in foreign trade such as "Australia New Museum" and "Korea Pavilion " have been introduced to settle in. III.Project Content The second phase of the construction covers and area of about 142,000 square meters, mainly composed of boutique national pavilion (67,000 square meters), commodity export museum (21,000 square meters), supporting warehouse (35,000 square meters), comprehensive supporting service center (19,000 square meters). IV.Project Investment Investment budget of the second phase project is about RMB 450 million yuan. V.Cooperation Way Joint venture, contractual joint venture, sole proprietorship and other ways. VI.Benefit Analysis It is expected that Jinxia Bonded Store can achieve sales incomes of 50 million US dollars in 2017. The total import-export trade amount of enterprises of the platform reaches 710 million US dollars during the past three years, which has solved the employment of 600 people, collected taxes of RMB 11.85 million yuan. When the project is fully completed, sound economic and social benefits will be generated. VII.Project Initiator Project Initiator: Bureau of Commerce and Tourism in Kaifu District, Changsha
Construction of Import-export Commodity Display Trading Center at Changsha Huanghua Comprehensive Bonded Area I.Project background The import-export commodity demonstration trading center, through the construction of bonded display transactions, global logistics, trade finance and other functions, providethe one-stop foreign trade industry services of information flow, business flow, logistics and capital flow, formingforeign trade industry comprehensive service system of "buy globally to achievethe seamless docking between national and international. 196
The project will make full use of traffic location and logistics distribution advantages of Changsha Huanghua comprehensive bonded area and the development opportunity of Changsha airport economic area.It is a major project of Changsha County Government to actively participate in foreign cooperation and exchange, but also a major project supporting Changsha Huanghua comprehensive bonded area and Hunan for applying for the free trade area. II. Preliminary Work Project land has been approved, and work related to demolition and site leveling has been completed. Surrounding roads have been completed and put into use. Water, electricity, network, gas and other supporting facilities have been laid with the road. III.Project Content The project covers an area of 67.6 Chinese mu and the totalplanning construction area is 90,000 square meters, of which 50,000 square meters are for product demonstration, 30,000 square meters are for commercial offices, and 10,000 square meters for warehousing. Import-export commodity distribution center and comprehensive international commodity trading complex, which combines export commodity demonstration trade, foreign trade headquarters and direct purchasing and distribution into one, will be built. Facing Hunan and influencing central regions, it is featured by national thematic goods display trade museum and professional market segmentation of import-export commodities. IV.Project Investment The total investment amounts to RMB 900 million yuan. V.Cooperation Way Sole proprietorship or joint venture will be adopted. The project with the design program will attract investment. Land development can be achieved through the remising way of land listing. Famous enterprises both at home and abroad with the experience of building and operating export-import demonstration trade center are heartedly invited. VI.Project Initiator Project Initiator: Management Committee of Changsha Huanghua Comprehensive Bonded Area
Bonded Logistics Investment Attraction of Changsha Huanghua Comprehensive Bonded Area I.Project background Bonded logistics project is not only conducive to reducing the cost of import and export goods and reduce expenses, but also can simplify the import and export links, speed up the flow of goods and improve economic efficiency.So that it is more convenient and fast for enterprises to import and export commodities, boosting the rapid development of import and export businesses. The project, based in Changsha Huanghua Airport, which makes full use of the traffic location and logistics distribution advantages of Changsha Huanghua Comprehensive Bonded Area, will drive the development of import and export and enhance the city grade and strategic competitiveness. II.Preliminary work The project land is located within the fence of Changsha Huanghua Comprehensive Bonded Area.The construction of subgrade and underground pipeline has been completedand it is expected that by the end of March the road construction will be completed. III.Project content The project plans to build 46 bonded warehouses with a construction area of about 447,600 square meters. Its development is divided into two phases: the first phase project, covering an area of about 443 Chinese mu with the volume rate being 1.2-2.0, plans to construct 22 bonded warehouses and the construction area is about 175,300 square meters. Companies that have signed the intention agreement of settling inare: China Post Express Logistics Co., Ltd., Hunan International Express Branch, Hunan Earth International Freight Co., Ltd., Hunan Thousand warehouse Electric Service Co., Ltd., Haotong International Freight Forwarders Limited Wait. The second phase project will be decided in accordance with the development of first phase project. IV.Project investment budget The total investment is expected to be about RMB 580 million yuan. V.Cooperation way 197
Well-known enterprises both at home and abroad with the operational experience of bonded logistics are invited to settle in. VI.Project Initiator Project Initiator: Management Committee of Changsha Huanghua Comprehensive Bonded Area
Biomedical Processing and Warehousing Logistics of Changsha Huanghua Comprehensive Bonded Area I. Project background With the change of people's health concept, the bio-pharmaceutical industry which closely related to the quality of human life in recent years has maintained a sustained growth trend in recent years. In order to conform to this trend, and meet the needs of medical treatment, Changsha Huanghua Comprehensive Bonded Area will rely on policies of Hunan import and export designated ports regarding biomedical industry as well as aviation logistics distribution advantages to buildthe project of biomedical industry production and processing and warehousing logistics at Changsha Huanghua Comprehensive Bonded Area II.Preliminary Work The project land is within Changsha Huanghua Comprehensive Bonded Area fence.The construction of subgrade and underground pipeline in the area has started andthe construction of roads is expected to be completedby the end of March. III.Project Content The project covers an area of about 96 Chinese mu with the volume rate being ≤ 1.2. The construction area is about 27,000 square meters, on which a logistics warehouse combining pharmaceutical port platform and the production and processing of drugs, health products, cosmetics and medical equipment. IV.Project Investment Budget The total investment is expected to be RMB 500 million yuan. V.Cooperation Way Either joint venture or sole proprietorship will be adopted. Land development can be achieved through the remising way of land listing. Well-known enterprises both at home and abroad with the experience of Medicine, health care products, cosmetics and medical equipment are invited to invest for construction and building. VI.Project Initiator Project Initiator:Management Committee of Changsha Huanghua Comprehensive Bonded Area
Cold Chain Logistics Construction of Changsha Huanghua Comprehensive Bonded Area I.Project background Cold chain logistics refers toa systematic project that thefrozen food and food of cold storage should be always stored in stipulated low temperature during all processes of the production, storage, transportation, sales, and consumption in order to ensure the food quality and reduce food losses. Changsha Huanghua Comprehensive Bonded Area with such desiganted port functions as imported meat, imported chilled aquatic products, imported edible aquatic animals, imported fruitand others, which can conduct the import and export trade of meat, frozen aquatic products, chilled aquatic products, edible aquatic animals, red wine, fruits and vegetables and other products. The completion of the project will give impetus to the development of the processing, circulation and tradeof food and agricultural products at Changsha and its surrounding areas. II.Preliminary Work The project land is within Changsha Huanghua Comprehensive Bonded Area fence. The construction of subgrade and underground pipeline in the area has started andthe construction of roads is expected to be completedby the end of March. III.Project Content 198
The project covers an area of about 76 Chinesemu with the volume rate being ≤ 1.5. The construction area is about 23,000 square meters including a freezer and a binded warehouse. The project will rely on the cold chain logistics project combining freezing and refrigeration, information management, logistics distribution, storage transportation, and comprehensive support into one, which is modern, multi-functional, and comprehensive. At present, the Polish Worth Group has signed an intention agreement of settling in. IV.Construction investment of the project The total investment amounts to RMB 350 million yuan. V.Cooperation Way Contractual joint venture will be adopted. Well-known enterprises at home at abroad with the operational experience of cold chain logistics are heartedly invited to settle in. VI.Project Initiator Project Initiator:Management Committee of Changsha Huanghua Comprehensive Bonded Area
Cross - border E - commerce Industrial Park of Changsha Huanghua Comprehensive Bonded Zone I.Project Background With the further development of electronic information technology and economic globalization, the status and role of e-commerce in international trade has become increasingly prominent, cross-border e-commerce has become a"dark horse"of foreign trade industry, introducing the international trade to become the borderless trade and causing great changes in world economic and trade. Cross-border e-commerce industrial park project at Changsha Huanghua Comprehensive Bonded Area will make full use of the traffic location and logistics distribution advantages of Changsha Huanghua Comprehensive Bonded Area to achieve the linked development within and outside Changsha Huanghua Comprehensive Bonded Area, attract small and medium-sized enterprises to gather, promote new business growth and increase employment. So thatthe foreign trade can adapt to the new situation and gain new advantages. II. Preliminary Work The demolition has been started at the project land, and the surrounding roads have been completed and put into use, water.Electricity, network, gas and other supporting facilities have been laid with the road. III.Project Content The project covers an area of about 246 Chinesemu with the volume rate being ≤ 2.0. The project will mainly build the cross-border e-commerce comprehensive service platform, the bonded exhibition center, office buildings, and the warehousing center, etc., by relying on aviation logistics and the advantage of being adjacent to National Changsha Economic and Technological Development Zone to build e-commerce industrial park combining high-end multi-functional cross-border e-commerce comprehensive service platform and bonded exhibition center into one. So that enterprises related to international logistics, cross-border e-commerce and consulting services can be attracted to enter the park to carry out cross-border import and export trade, e-commerce, bonded warehousing logistics, port operations, Customs inspection and other services, and provide the one-stop full-service of customs clearance, warehousing, logistics, tax rebates, foreign exchange, finance, and insurance. IV. Project Investment The total investment amounts to RMB 1 billion yuan. V. Cooperation Way Either joint venture or sole proprietorship will be adopted. Land development can be achieved through the remising way of land listing. Well-known enterprises both at home and abroad with the operational experience of cross-border eletric-commerce are invited to settle in. VI.Project Initiator Project Initiator:Management Committee of Changsha Huanghua Comprehensive Bonded Area
Changsha Modern Service Industry Industrial Park (I Phase) Construction 199
I.Project Background Longping Hi-Tech Park is located in Dongcheng District, Changsha City, where land resources is very scarce and it mainly attaches the development of urban industry. In recent years the "two-wheel drive" ofthe modern service industry and modern manufacturing industry has been achieved. The industrial output value has reached RMB 42.5 billion yuan in 2016, of which modern service industry account for nearly RMB 18 billion yuan. To focus on the development of modern service industry, the modern express logistics, e-commerce, mobile Internet and chain operation headquarters and others should be given priorities to provide enterprises with platforms of industrial upgrading and technological innovation, promote the gathering and integration of similar industries, form overall competitive advantages of the industry, and enhance the regional competitiveness and development potential. II. Preliminary Work The project has been considered and passed by the Changsha City Industrial Real Estate Joint Conference and listed as the Hunan Provincial Innovation and Entrepreneurship "135" project. It is the key construction project of Longping Hi-Tech Park. The first phase project construction and early investment attraction are underway. III.Project Content The project covers an area of 108.29 Chinese mu, with a total built-up area of 318576.21 square meters. It is planned to construct three functional areas: technology incubator area of innovation and entrepreneurship area, production, processing and storage area and comprehensive supporting service area. The project is divided into two phases of development and construction. The first phase construction covers an area of 68.52 Chinese mu with a total built-up area of 192401.04 square meters. One hatching building with 18 layers (including 2 layers of basement), one standard industrial plant with 10 layers(including 2 layers of basement), one comprehensive supporting building with 12 layers (including 2 layers of basement) and 4 standard industrial plant with 8 layers. VI. Project Investment It is an industrial real estate project with a total investment of RMB 1.6 billion yuan. V.Cooperation Way Contractual joint venture and sole proprietorship. VI.Project Initiator and Contact Way Project Initiator: HunanGFLongpingHigh - TechZoneInnovationServiceCo., Ltd. Project Initiator: Investment Attraction and Cooperation Bureau of Management Committee of Longping High-tech Zone
The Construction of Cross-border E-commerce Industrial Park and Public Bonded Warehouse at Changsha High-tech Zone I.Project Background In order to promote the development of an open economy and vigorously develop cross-border e-commerce industry, Changsha High-tech Zone has started to construct the cross-border e-commerce industrial park and public bonded warehouse. It will provide one-stop service with the consultation and of departments related to Customs, commodity inspection, tax, and foreign administration to ensure smooth procedures of the national inspection, Customs clearance, logistics, and tax, achieve customs clearance integration, and form the cross-border e-commerce industry gathering area. By relying on cross-border e-commerce and bonded logistics, the project will build the Cross border E-commerce Industrial Park and Public Bonded Warehouse of Changsha High - tech Zone, combining the cross-border e-commerce base, bonded warehousing, import and export comprehensive trade services, international exhibition, cross-border shopping center, exotic dining and leisure businesses and other business services into one. II.Preliminary Work Changsha High-tech Zone has 580 import and export trade enterprises with total import and export trade amount of 2.94 billion US dollars in 2016; and nearly 500 e-commerce enterprises, only 20 of which are engaged in cross-border e-commerce. Trade amount of e-commerce enterprises reach 200
RMB 14 billion yuan in 2016, of which cross-border e-commerce account for RMB 2.5 billion. yuan. III.Project Content The project plans to build cross - border e-commerce entrepreneurship base, public - type bonded warehouse, cross - border e-commerce business supporting area. Project construction covers about 146 square kilometers, and the total land size is about 100 Chinese mu. The cross-border e-commerce base and public bonded warehouse account for 79 Chinese mu, with the intended volume rate being 1.5 and the construction scalebeing about 120,000 square meters (of which cross-border e-commerce entrepreneurship base account for 40,000 square meters and bonded warehouse account for 80,000 square meters); The cross-border e-commerce business supporting district covers an area of 20 Chinese mu with the intended volume rate being 2.0 and the construction scale being about 26,000 square meters. IV. Project Investment The total investment amounts to RMB 480 million yuan. V. Cooperation Way Joint venture and sole proprietorship. VI.Benefit Analysis The rent of the cross-border e-commerceentrepreneurship base is calculated at 40 yuan / month / m2, the rent of the bonded warehouse is calculated at 20 / month / m2and the rent of the business supporting area is calculated at 80 / month / m2. The part for sales is calculated at 8,000 yuan / m2. According to the initial estimation, the project can achieve sales income of about RMB 130 million yuan and gross annual rental income of about RMB 48 million yuan. VII.Project Initiator Project Initiator: Investment Attraction and Cooperation Bureau of Management Committee of Changsha High-tech Zone
Integrated TransportationHub Business Matching Projects of Changsha South Bus Station I.Project Background Due to the small size of Changsha South Bus Station, it is difficult to meet the growing passenger transportation demand. Changsha City is building Changsha South Bus Station comprehensive transportation hub. It is expected that the construction area of Changsha South Bus Station will reach 500,000 square meters with 45,000 passenger volume.The project is an urban model supportedby multiple business model of commerce, business office, culture and entertainment. II.Preliminary Work At present, cooperation agreements with large cinemas and sports venue operators have signed. III.Project Content The project covers an area of 114,380 square meters, divided into two plots in the north and south.The land in the southcovers 97,270 square meters and the land in the north covers 17,110 square meters. The first phase commercial development: commercial podium, small apartment, a total built-up area of 132,000 square meters. IV. Project Investment The total planned investment of the project is 3.59 billion yuan, with a total area of 503,430 square meters. The area for pure purposescovers 170,000 square meters. There are 4 towers and two pavilions. V.Cooperation Way 1.The overall cooperation: the operation of Changsha South Bus Station traffic hub adopts the overall cooperation, and establishes share-holding cooperative venture. 49% capital of the investors can be accepted for the equity management. 2.Purely commercial cooperation: the share-holding cooperation, the overall leasing operation, joint development and development cooperation, proportionate investment and return will be adopted. 3. Other regional cooperation:real estate development, comprehensive supporting, commercial sales and other aspects of cooperation can be chosen. VI.Benefit Analysis The project will receive a return on investment through commercial property leasing, partial sale and commercial related supporting services such as parking fees, advertising rental, commercial 201
activities, etc. And it is estimated thatthe annual income will reach 67 million / year. VII.Project Initiator Project Initiator: Hunan Long Xiang Transport Development Group Limited Liability Company
The Development of Changsha Jinxia Pharmaceutical Circulation Industrial Park I.Project background Changsha Jinxia Economic Development Zone relies on Jinxia Bonded Logistics Center Customs Special Supervision Zone, with 9 functions of bonded warehousing, export tax rebate, deep processing carry forward, simple processing and value-added services, international logistics and distribution, international trade, merchandise display, port customs clearance and logistics information processing. After nearly a few years of development, four logistics industry cluster of pharmaceutical, grain, steel and energy has formed. In 2016, the zone completed the total industrial output value of 46.547 billion yuan, and trade circulation enterprises achieved operating income of RMB 35.168 billion yuan. At present, the zone has introduceda number of high-quality pharmaceutical distribution companies such as Sinopharm Holdings and LBX Pharmacy, with a good foundation for the development of bio-pharmaceutical industry. Project site is located within Qingzhu Lake group of Jinxia Economic Development Zone, and the planning area covers 311 Chinese mu, aimed at creating the largest pharmaceutical distribution industry base in central and southern China. II.Preliminary Work Supporting facilities are basically complete. Work related to land approval and demolition is underway. III. Project Content Focuses will be laid on the introduction of the world's top 500, top 100 of the industry, listed companies and other leading enterprises of the pharmaceutical distribution industry. And theindustrial agglomeration with the surrounding pharmaceutical manufacturing enterprises will be brought into existence and the modern pharmaceutical distribution industry base combining corporate headquarter office, modern logistics services, product trade demonstration and other functions into one will be built. IV.Project Investment The total investment of the project is about RMB 1 billion yuan, including land cost, price tax, and construction costs of the plant and ancillary facilities. V. Cooperation Way Land transfer and sole proprietorship development. VI.Benefit Analysis After the project is put into production, the estimated output value is about 20 billion yuan. VII.Project Initiator Project Initiator: Changsha Jinxia Economic Development Zone Investment Cooperation Bureau
Construction of Modern Business Logistics Industrial Park in Wangcheng Economic and Technological Zone I.Project Background By combining the zone’s own development needs, and relying on Jinqiao International Trade Town, Gao Xing Logistics Park, Outlets Shopping Park, ProLogis, Baowan International E-commerceLogistics Port, Hong Kong Quan Kang Investment Financial Logistics Industry park, card linee-commerce logistics platform and other high-quality projects, Wangcheng Economic Development Zone has sped up the construction and improvement of modern business logistics service system, and channeled great efforts into creating business logistics market cluster to become the construction hub of the national transport logistics center at Changsha. Changsha-Changde Expressway, around-city expressway, Beijing-Hong Kong and -Macao Expressway, New Changsha-Yiyang Expressway around the project has staggered into a network. 202
And there is a special line of Shimen-Changsha Railway, creating prominent traffic advantages.supporting advantagesof forming commercial logistics industry cluster have been equipped with. II.Project Content The planning land of commercial logistics industrial park coversan area of about Chinese 6,000 Chinese mu, and is expected to be completed in 2017 - 2022. The project of Jinqiao International Trade City and Outlets shopping park introduced in the first phase project has completed 3 million square meters of land area construction, and has built eight apartment-style office buildings, eight 5A-grade office buildings, four professional market big malls, 44 market area layout, as well as a large shopping plaza which can accommodate 3,000 parking spaces.Therefore, the central region's largest commercial logistics market cluster has gradually taken shape.And the high-quality projects engaging in commerce and logistics are invited to settle in. III.Project Investment The total investment is about RMB 26 billion yuan, mainly for the project infrastructure, real estate plant construction and transportation equipment purchase. IV. Cooperation Way Sole proprietorship and contractual joint venture are the main form. Joint venture, cooperation and other means can be taken depending on circumstances. V.Benefit Analysis It is planed to achieve the transaction volume of RMB 50 billion yuan and tax revenue of RMB 1 billion yuan. VI.Project Initiator Project Initiator: Management Committee of Changsha Wangcheng Economic and Technological Development Zone
Investment Attraction of "Wan Tian • Zhongnan" International Building Material Trade Logistics Zone(Phase II) I.Project Background Wan Tian • International Business Logistics Zone, relying on the largest logistics base in Hunan Jinxia logistics park, is positionedas themarketing headquarter of global building material entering into the Chinese market. It is intended to build a modern commerce logistics platform in central and southern regions, and become a center of building material procurement, warehousing logistics distribution base, Brand image display, e-commerce, financial services and information release covering the whole nation. By adopting one-stop supply chain integrated service model, the project will become the top choice of building material home manufacturers and the general agents of "origindirect, transit distribution, centralized distribution"in central and southern regions through the integration of information to achieve the warehousing and distribution of goods. Nearly 2,000 well-known building material home brands have been introduced,bringing together 95% of Hunan wood industry brand, 85% of the ceramic brand, 85% of the overall investment rate, with the monthly trading volume surpassingRMB 300 million yuan and the monthly cargo exceeding 100,000 tons.It has becomeemerging building material professional market of Changsha. II.Preliminary Work At present, a total of RMB 3 billion yuan has been invested, more than 1,500 Chinese mu of land for the first phase project has been developed. In terms of 3,000 Chinese mu of land for the second phase project, it is planed to develop and build 500 Chinese mu per year, and the land approval work is underway. III.Project Content The total planning area of the project is 5000 Chinese mu, and the total construction area is 5 million square meters. It is intended to build large professional wholesale market combining ceramics, bathroom, stone, hardware, plumbing, furniture, lighting, home, chemicals, sheet metal and other formats intoone through investment attraction. IV.Project Investment 203
The total construction investment is about RMB 30 billion yuan. V.Cooperation Way Contractual joint venture. VI.Benefit Analysis After the completion of the project, it will become the national home building materials distribution center, permanent venue of green building material exposition.The introduction of 20,000 business households can be achieved the annual turnover will reach RMB 50 billion yuan and the annual tax will surpassRMB 1 billion yuan. VII.Project Initiator Project Initiator: Changsha Gangwan Property Co., Ltd.
Construction and Investment Attraction ofShuidu River Agricultural Product Market (Phase II) I.Project Background Changsha Wanjia Li Road is the only urban south-north traffic arterywhich combines theviaduct, ground BRT, and underground, and connected the second ring road and the third ring road. Changsha Shuidu River agricultural product market has the direct access to the urban area through the elevated fast track of Wanjiali Road and Metro Line 5. Located in 1,Wanjia Li North Road, Changsha Shuitou River agricultural product marketis the only large-scale agricultural product wholesale market in north Changsha. It is also the only large-scale agricultural product market which is the nearest to the urban areaafter the Changsha City Red Star, Mawangdui and other old markets have been relocated.With superior traffic conditions,agricultural products can be distributed to any corner of the city within 20 minutes. II. Preliminary Work The first phase of the project has investedRMB 320 million yuan, the total planning construction area covers 186,000 square meters, and the completed area covers more than 80,000 square meters.Seafood area is being decorated, preparing for the opening and other areas have been officially opened. The second phase of the project is undergoing planning. III.Project Content The second phase of the project intends to use 50 Chinese mu of land, with focus being laid on planning information business buildings, vegetable and fruit wholesale area, seafood catering, characteristic catering, tourism and other projects. IV.Project Investment The total project construction investment is about RMB 1 billion yuan. V.Cooperation Way Investment quota, cooperative development, participation in business and other ways VI.Benefit Analysis After the opening of the market, the annual turnover of RMB 10 billion yuan, social retail of RMB 2 billion yuan and new tax revenues of more than RMB 60 million yuan will be achieved. Market resident and floating population will be more than 20,000 people, which will effectively drive the economic development of surrounding areas. VII.Project Initiator Project Initiator:Changsha Ruihai Property Co., Ltd.
Business Transformation of International Agricultural Innovation Park in Central China I.Project Background Adhere to the document spirit contained in “Three Year Work Program of the Relocation and Building of Three Markets & the Improving and Transforming of Gaoqiao Market Area� issued by the Changsha municipal committee and government, the wholesale and warehousing logistics relocation work of the above-mentioned area will be completed by the end of December 2015. 204
After the relocation of the original Gaoqiao logistics market, the facade of the first floor is basically vacant.In order to enhance the overall quality of Gaoqiao shopping district and speed up the transformation of the business district, under the auspices of the government, the way of intensive and unified investment attraction has been adopted under the auspices of the government; International Agricultural Innovation Park in Central China has been introduced through multiple argument and screening. II.Preliminary Work Hunan Shuimumu Business Management Co., Ltd. as the main body of constructing theInternational Agricultural InnovationPark project, has accumulated rich experience in agricultural construction and agricultural market operation with 18 years of "Agricultural Fair" operating experience; it has maintained long-term cooperative relations with more than 2,200 companies engaged in the agriculture at home and contacted with more than 83,000 enterprises involved in the agriculture; the online agricultural specialized trading platform of "Cloud Agricultural Bo" (now renamed asAgricultura Innovation Network) developed by the enterprise has more that 10 million of clicks over one year. III.Project Content Project construction content is commercial infrastructure transformation: 1.underground pipe network, electricity and other facility renovation project; 2.replacing the rain sun shed, security network, air conditioning machine and blinds of windows facing the streets; 3.the comprehensive transformation of areas facing the streets including: planting new trees, adding stone, plastic and wood stools, trash bins, signs, sign boards, the number of neighborhoods and buildings, publicity, and so on; 4.main road and inter-building lighting (LED outline lights); 5.the business atmosphere transformation of the outside facade:3402 square meters of agricultural innovation culture street, 23306 square meters of agricultural innovation food street, 22178 square meters of foreign trade agricultural product market, 23512 square meters of the national agricultural product market, and 50427 square meters of Huxiang famous and extinguished agricultural product market; 6.the construction of new agricultural innovation platform and agricultural innovation information platform: the overall transformation of the construction area of 12,462 square meters, vertical facade reconstruction area of 7,576 square meters, the demolition of indoor partition area of 9,274 square meters, the purchase of 19 agricultural innovation information platform equipment, and 27 safety inspection equipment of agricultural products; 7.the urban centralized distribution center: the transformation of a layer of the outside facade, the construction of 2 tons of low-temperature storehouse, the equipment of 14 trucks, forklifts; 8.the construction of agricultural innovation culture, agricultural innovation food, exotic pedestrian street, farming culture square: 18,478 square meters of ground pavement, 20 landscape pieces, and 58 tree pools; 9.beautifying 158,641 square meters of the outside facade, including the cleaning and repair of external walls, window replacement, adding air conditioning machine frame and adding window sheds above windows; 10. 33192.2 square meters of arcade construction project IV.Project Investment The total investment of the project is RMB 220.3 million yuan, of which the project cost is RMB 178.0182 million yuan, the construction cost and other expenses are RMB 12.7363 million yuan, the reserve fee is RMB 19.0755 million yuan, the interest during the construction period isRMB 1.47 million yuan and the initial working capital is RMB 9 million yuan. V.Benefit Analysis After the completion of the project, the average annual profit will beRMB 20.0448 million yuan, the return on investment of the project after the income tax is 14.03%, and theinvestment recovery period is 7.93 years (including the construction period of 1 year). VI.Project Investment Way Two ways: government investment and corporate self-financing. VII.Project Initiator Project Initiator: Hunan Shuimumu Business Management co.,Ltd.
205
The Construction of New Lusong International Apparel Logistics Townat Zhuzhou City and the Public Service Platform I.Project Background Zhuzhou Lusong apparel market cluster is the largest distribution center of clothing in central and southern regions and an important production and processing base, with the annual turnover of 30 billion yuan. Due to historical reasons, many clothing wholesale markets around the Lusong market clusterhave different levels of storage problems. Through the project construction, the problems of warehousing and logistics loading as well as unloading of the Zhuzhou Lusong clothing market will be solved, improving the market operation efficiency. Meanwhile the use of electronic information technology and e-commerce will strengthen the apparel industry chain management to conduct online clothing transactions and logistic distribution and improve as well as enhance the traditional apparel trading way. II. Preliminary Work The project is located in Lusong District, Zhuzhou City. The first phase project has been completed and the second phase project is carrying out land demolition and expropriation. The service platform construction is carrying out the preliminary work. III.Project Content The project plans to build the large-scale warehouse, apparel logistics, aviation logistics, e-commerce logistics, business office, etc. The total construction area of 1,665,000 square meters of which: the large-scale warehouse covers 1,225,800 square meters, office buildings cover 419,400 square meters. The public service platform plans to establish Lusong ApparelE-commerce Center, including 5 major systems of Lusong clothing information dissemination and exchange, apparel electronic transactions, apparel logistics and distribution, apparel enterprise (merchant) business services and apparel R & D training. IV.Project Investment The project is expected to investRMB 7.2 billion yuan, of which the logistics town account for RMB 7 billion yuan, the development of the public service platform account for RMB 200 million yuan. V.Cooperation Way Joint venture, contractual joint venture and sole proprietorship VI.Benefit Analysis The annual output value of the logistics town will reach RMB 5 billion yuan, the public service platform can achieve the annual turnover of RMB10 billion yuan. VII.Project Initiator Project Initiator: Zhuzhou New Lusong Industry Development Group Co., Ltd
The Settlement and Investment Attraction of Zhuzhou Tongtang Bay Bonded Logistics Center (B type) I.Project Background The project is located in Qingshuitang of Zhuzhou City, close to Tongtang Bay, adjacent to Zhuzhou North Station, and opposite to Zhuzhou National Hi-Tech Industrial Development Zone across the river. It is connected with China's largest rail transportation equipment manufacturing industry base through a special railway line, equipped with good location and traffic advantages. Tongtang Bay Bonded Logistics Center covers an area of 239.02 Chinese mu, with the net land area of 160.81 Chinese mu. Bonded warehouses, supervision warehouses, stockyard and inspection sites, integrated buildings and ancillary rooms, checkpoints, isolation fence and other infrastructure have been constructed, with the total construction area being 76,000 square meters. II. Preliminary Work Bonded Logistics Center hasbeen approved for the establishment in January 2016 by the General Administration of Customs and other four ministries and will apply for the acceptance in September 2017. 206
III. Project Content The project will build five core functions such as “bonded warehousing, international logistics and distribution, import and export trade and entrepot trade, simple processing and value-added services, port functions and export tax rebates�, becoming a high-end service platform for catering to surrounding enterprises and the regional economy. The project intends to attract a number of foreign trade (especially cross-border e-commerce)enterprises to settle in. IV.Project Investment The total investment ofBonded Logistics Center is RMB 734.5 million yuan. V.Cooperation Way The leasing of office buildings and bonded warehouses, operating total package,and joint venture. VI.Benefit Analysis The expected earnings of the project will be up to 10%. VII.Project Initiator Project Initiator: Zhuzhou State Capital Investment Bonded Logistics Operation Co.,ltd.
Hengyang City Modern Logistics Park of Agricultural Products I.Project Background To strengthen the rural commercial circulation and market system construction, establish a rural and farmer-oriented modern circulation system, the key lies in establishing a modern logistics park of agricultural products. Since Hengyang City is rich in agricultural resources,the construction ofHengyang City modern logistics park of agricultural products can transfer resource advantagesto market advantages, while driving the development of agricultural product processing, catering industry, financial industry and other related industries. II.Preliminary Work Hengyang City is an important transportation hub in South China and has obvious advantages of location. Within South Wai Huan Road of Hengyang Baishazhou Industrial Park the project is located in the intersection of and ZhengxiangSouth Road, ZhengyangSouth Road and Hengyang South Railway Station,wheretransportation is convenient. Hengyang City is a major grain-production city and agricultural city, abundant in famous and extinguished agricultural and sideline products, with large annual turnover of agricultural products. III.Project Content and Scale The project covers an area of 806 Chinese mu. The total built-up area is 474037m2, of which: the wholesale trade facade of grain and oil agricultural and sideline products accounts for 109,334m2, the commercial facade accounts for 37309m2, office buildings account for 49600m2, business hotels account for 49600 m2, trading warehouses account for 15504m2, warehousing transit storage accounts for 33879m2, grain reserves account for 27240 m2, cold storage accounts for 39084m2, oil silo storage accounts for 1356 m2, food collection and processing library accounts for 3320m2, agricultural product exhibition hall accounts for 5000 m2, center of detection, information, stock and trading accounts for 5631 m2, and underground garage accounts for 7000 m2. Supporting houses account for 12180m2, supporting apartments account for 78000m2. IV.Project Investment The total investment of the project is RMB 1.5 billion yuan, which will be completed in three phases. Source of funds: financial investment, subsidies ofRMB 200 million yuan and investment attraction of RMB 1.3 billion yuan. V.Benefit Analysis After the completion of the project, the annual conversion of grain and oil products will be over 1 million tons, the annual turnover will reach RMB 5 billion yuan, the market management and operating profit will be RMB 17.93 million yuan, and the investment recovery period will be 15 years. VI. Cooperation Way Joint venture, contractual joint venture VII.Project Initiator Project initiator: Agriculture Committee of Hengyang City
207
Huai-Shao-Heng Railway Logistics Park Construction of Hengyang City I.Project Background Relying on the rich salt and halogen resources and Hengyang City's industrial advantages, Songmu Economic Development Zonewill build regionalcomprehensive industrial base of salt brine chemical and fine chemicals, new energy, smelting, pharmaceutical, logistics, printing and dyeing, and clothing and textile. At present, the zone has more than 100 enterprises which have settled in, such asJiantao Chemical, Dianke Power Supply, Ruida Power Supply, Jinshan Cement, Li Ang Biological, XinliChemical, Phoenix Chemical.It is tend to be scattered logistics-based. With the expansion of the sales market and the urgent need to improve circulation efficiency, logistics demand potential is large. At the same time, with the rapid development of e-commerce economy, logistics and warehousing are of great significance to the optimization of the logistics and supply chain system. II.Preliminary Work Shigu section of Huai-Shao-Heng Railway, an important part of the Chinese section of Eurasian Third Continental Bridge, has started construction. It is the most convenient and fastest transport corridor, which is connected to the southwest, northwest and southeast coastal areas as well as the Pearl River Delta region.At present Huai-Shao-Heng Railway has been fully started construction, Hengyang North Railway Station has been started construction, and the surrounding traffic network has a prototype. III. Project Content The project intends to use 2,000 Chinese mu of land at the North Railway Station as the core planning land to construct express logistics area, electrical appliance warehousing and logistics area, integrated service center area, loading and unloading area, administrative office area, and introduce modern logistics service enterprises to settle in. IV. Project Investment The total investment of the project is RMB 2.5 billion yuan. V.Cooperation Way Joint venture, contractual joint venture, sole proprietorship The project can enjoy preferential policies based on "Incentive Measures onMajor Investment Attraction Projects of Modern Service Industry of Hengyang", "Preferential Measures on Hengyang City Construction Project Administrative Fees and Government Fund Relief " . VI.Project Initiator Project initiator: Bureau of Commerce of Shigu District,Hengyang City, Huanan Province
Construction of Modern Logistics Industrial Park in Hengyang High - tech Zone I.Project Background The establishment of modern logistics industry park at the high-tech zonedoes not only facilitate enterprises in the park, but also can become the basic platform and operation base of Hengyang City modern logistics development, actively guide and supportthe development of modern logistics enterprises at Hengyang,and build the systematic framework of operation, organization and information management of modern logistics. II.Preliminary Work Project infrastructure such as networks, communications, power supply, gas supply, water supply and drainage, roads, is complete. There are many hotels, restaurants and high-end communitiesnear the projects site, logistics demand being large. III.Project Content The project is to be located beside Changfeng Road of the high-tech zone. It is planned to cover an area of 53 Chinese mu and the construction area covers 9066.95 square meters. Four major industrial service areas including a modern retail service area, information storage area, modern logistics distribution area and consulting management service area will be built. Therefore, it will become the comprehensive modern logistics industrial park combining sales, warehousing logistics and after-sales service into one. 208
IV.Project Investment The total investment of the project is about RMB 500 million yuan, of which civil engineering and parking supporting facilities account for RMB 250 million yuan, the working capital and other costs account for about RMB 250 million yuan. V.Cooperation Way Joint venture, contractual joint venture VI.Project Initiator Project Initiator: Hengyang Gaoxin Investment Co., Ltd.
Construction of Xinma E-commerce Logistics Park in Zhuzhou High-tech District I.Project Background As the most important railway hub node city in South China, Zhuzhou, with the largest cargo marshalling station in South China, is also one of China's five major super station of passenger and cargo transportation. It is of rapid access to the Pearl River Delta, the Yangtze River Delta, Chengdu, Chongqing, the Bohai-rimEconomic Circle within 3 hours, with a strong capacity of transportation and transshipment. Within the scope of Zhuzhou High-tech Zone, there are more than 10 small non-professional logistics parks of different sizes, which are gathered independently by the merchants in sporadic distribution. Merchants within the park have strong demands for gathering and professional services. II.Preliminary Work The project planning has been completed, and the land approval at the end of the year will be up to 60%, which can guarantee the progress of the scheduled development of the project. III. Project Content The project covers an area of about 1180 Chinese mu, which will be developed into two phases. The first phase accounts for 810 Chinese mu and the second phase accounts for 370 Chinese mu. It is planned to build projects such as the experience center of e-commerce, logistics center, warehousing center, cold chain industry group, auto parts group, home building materials group and supporting business group, with a total construction area of about 1 million square meters. IV. Project Investment The total investment of the project is about 1.5 billion yuan. V.Cooperation Way Joint venture, sole proprietorship VI.Project Initiator Project initiator: Zhuzhou High - tech Zone Investment Promotion Bureau Cooperation Unit: Zhuzhou High-tech Group Co., Ltd
Zhuzhou City Agricultural Product Logistics Center I.Project Background With the rapid development of economic and social undertakings in Zhuzhou City, the contradiction between the rapid increase of urban agricultural product trading vehicles and the lagging construction of urban parking lots has become increasingly prominent. The original urban old agricultural product markets, located in the urban central areas, covers an increasingly small area.Its construction scale has been unable to meet the demand of urban population for the development of agricultural products. II.Preliminary Work Municipal roads around the project are perfect, the land has gained the certificate of the right of usage, the initial design has been reviewed, and commencement conditions are equipped with. III. Project Content The project totally covers an area of 148,000 ㎡, among which the cold storage area is 12314.8 ㎡, the dry land area is 7099.97 ㎡, the comprehensive service area is 1274.15 ㎡, the logistics supporting area is 2111.64 ㎡. 462 large parking spaces for cargoes and 236 small parking spaces 209
for cars are set up. Roads as well as parking areas cover99413.11 m2 and the greening area covers 23994.18 ㎥. The main functional areas of the project are: cold storage area of agricultural products, dry area of agricultural and sideline products, comprehensive service area (logistics information center and logistics office of the station site), logistics supporting area, parking area, and greening area. IV. Project Investment The total investment amounts toRMB 1.016 billion yuan.RMB 566 million yuan has been invested in by 2016 and it is expected to be completed in 2018. V.Cooperation Way The project adopts a joint venture way. VI.Benefit Analysis After the implementation of the project, if the annual trading volume reaches 4 million tons, the annual profit will be up to RMB 100 million yuan. VII.Project Initiator Project Initiator: Zhuzhou Guosheng Market Operating Management Co., Ltd
Port-Surrounding Integrated Logistics Park Construction in Xiangtan New and High Technology Development Zone I. Project Background Xiangtan New and High Technology Development Zone was established in 1992 covering area of 46.79 square kilometers. It is approved to be national level zone by State Council. Leading industries such as new energy equipment, advanced mine equipment, high-quality steel deep processing and modern service industry have been set up. It was rewarded with ten national rewards, including National New Energy and High Technology Industry Base, National Science and Technology Commercial Innovation Base, and National Industrial-Academic-Research Cooperation and Innovation Base. The technical industrial and trade income of the zone reached to RMB 121.31 billion yuan and tax revenue of RMB 2.4 billion yuan in 2016. The second phase wharf of Tieniubu has been built in Xiangtan New and High Technology Development Zone, which can afford 3000-ton ships. It has a wharf storage yard of 200 Chinese mu and its shoreline lasting nearly 3 kilometers. Freight corridor Youth Road in the park has been open to traffic as a whole, which in connected to Xiangtan Train Freight Station in the north. Freight branch lines are close to port, which helps water-land coordinated transport and offers great advantages for developing port-surrounding logistics. II. Preliminary Work Feasibility Study Report is being prepared and site selection is in process. III. Project Content Main project contents are standard warehouse, distribution processing center, distribution center, headquarter (including financial service center and service management center), ancillary works and utilities. It plans to introduce steel alloy logistics, urban fresh foods distribution cold chain, large eletromechanical products and regional warehousing and delivering center for large e-commerce. IV. Project Investment Project planning area is 500 Chinese mu and total investment is RMB 1 billion yuan. Proposed floorage area is 250,000 square meters, including 200,000 square meters standard warehouse and 50,000 square meters supporting service area. Annual average handling capacity will amount to over 4 million tons. V. Benefit Analysis After its completion, annual average handling capacity will reach to over 4 million tons. And annual logistic trade volume will climb up to RMB 15 billion yuan, create tax revenue of RMB 150 million yuan, and enterprises will gain operation income of RMB 180 million to RMB 240 million yuan. VI. Cooperation Way Contractual joint venture and joint venture VII. Project Initiator Project Initiator: Xiangtan New and High Technology Development Zone 210
Standardized Fresh Agricultural Product Supermarket Construction in Urban Area of Xiangtan I. Project Background There are many problems in Xiangtan’s famers’ market, including weak system, high circulation cost, inefficiency of supervision, and poor sanitation. As the acceleration of social and economic development and urbanization, residences have higher demands for basic livelihood, including environment sanitation and food security. Xiangtan Government printed and handed out Plan of Making Farmers’ Market Meet Standards and Realize Supermarket-Style Operation in Urban Area of Xiangtan.(X.Z.B.H [2016] No.96)It plans to adopt PPP cooperative mode to reform 48 famers’ markets and wholesale markets of agricultural products. Also, it plans to make farmers’ markets more unified, regulated, safer, and well-organized by taking supermarket-style operation. II.Preliminary Work Feasibility study report, program examination and approval, national land pre-qualification, and environment impact assess have been prepared. III. Project Content The project plans to adjust, newly construct ad comprehensively improve 48 farmers’ market in urban area of Xiangtan, including 42 for comprehensive improvements and 6 for adjustment and new construction. Reconstruction includes: reconstruction of market roofs, floors and walls, improving drainage, ventilation, lighting and sanitary fittings, adding testing, fire protection, parking lots, stalls, and meat counters. IV. Project Investment Total investment is RMB 1.56 billion yuan, including RMB 460 million yuan raised by Project Initiator, and RMB 1.1 billion yuan raised by bank loans or social financing. V. Project Analysis Average annual income is RMB 336,700,000 yuan, including government subsidies of RMB 223,000,000 yuan. In the third year after its completion, government pays subsidies in 10 year installments. VI. Cooperation Way Preliminary input of the project is great, so payments of users are not enough to cover project inputs and reasonable payback of social capital. Therefore, available gap funding may be adopted, which means payments of users and government subsidies. VII. Project Initiator Project Initiatorr: Xiangtan Industry Invest Group CO., Ltd
Construction of Large-scale commercial Complex in Jiuhua I. Project Background This project is located in Xiangtan Economic Development Zone, which is a “golden area” with the most developed economy, politics, culture and transportation in Hunan. It is only half an hour drive from Huanghua International Airport and 40 minutes’ drive from Zhouzhou high-speed railway station. Tanzhou Boulevard and scenery belt along the Xiangjiang River are seamlessly connected to Changsha basicly. Metro Line 3 in Changsha will extend to Jiuhua. Chongqin-Xiamen high speed railway is in process with great regional advantages. At present, Xiangtan Economic Development Zone has been seamlessly connected to Changsha, which means the two cities will integrate and development together. Comprehensive cooperation in key infrastructure construction, industry development and ecology construction will be conducted between the two cities. The two cities will improve the basic conditions of Hunan for opening up 211
and create a first-class international service area in the world together. II.Preliminary Work At present, developed area in Xiangtan Economic Development Zone is over 40 square kilometers and 386 enterprises settled in this zone. 241 enterprises are put into production. And total population reaches to 200,000. Over 10 universities, including Xiangtan University and Hunan University of Science and Technology surrounds this area with a great consumption potential. III. Project Content The project covers land of about 100 Chinese mu with 200,000 square meters of floorage area. It initiates a composite business mode of “anchor stores+ secondary stores+ interior streets+ outside streets”. It plans to build a large shopping center with shopping, eating, relaxing, and recreation. Also, it will build five-star hotel, office building,anexhibition center, shopping streets and supporting facilities. IV. Project Investment Total investment is aboutRMB 1 billion yuan, mainly including project fees, extra project fees, preliminary costs, and working capital. V. Project Analysis Market prediction.Construction period is 2 years. And after it is put into operation, income will be RMB 500 million yuan. VI. Cooperation Way Contractual joint venture, joint venture, sole proprietorship Detailed way will be decided by contract after negotiation. VII. Project Initiator Project Initiator: Management Commission of Xiangtan Economic Development Zone
Logistic Park Construction in East Yard in Shaoyang
I. Project Background Generally, logistics in urban area is at a low-level and extensive developing stage. There is no logistics park yet. Organization level of logistics is low with logistic companies being scattered, small, disordered and poor and poor function of logistic service. As an industry, logistics has not been developed well yet. The strategy of “two centers and one hub” has been set up in Shaoyang. Shaoyang will be developed into a logistic center at the boarder of Hunan and Guangxi. The project shows this strategy well. II. Construction Basis This project is listed in “13th–Five-Year Plan” of Shaoyang. For the first phase of the project, railway yard will be constructed by Guangzhou Railway Group with land of 1,000 Chinese mu and investment of RMB 2.62 billion yuan. Construction has been started. III. Project Content Project content include: 300,000 square meters stereotype warehouse of lot cargo, 20,000 trading and delivering service center, one building for information processing and e-commerce trading, one logistic parking lot. IV Project Investment Total investment is RMB 1 billion yuan. V. Project Analysis Economic benefit includes: RMB 70 million yuan income from warehousing; 5 million from delivering; RMB 5 million yuan from information service; RMB 25 million yuan from multimodal transport. all these totaled RMB 100 million yuan. VI. Cooperation Way Sole proprietorship or joint venture The person who invests does the construction and manages the work and will get benefits. Logistic park project will be led by enterprises and developed as a whole. And it will be constructed and managed by sole proprietorship and joint venture. VII. Project Initiator 212
Project Initiator: Shaoyang Economic Development Zone Logistics Development Department of Commerce Bureau of Shaoyang
Shaoyang Bonded Logistics Center Project I. Project Background The project is located in Shaoyang East Yard with convenient transportation. It is connected to Xincheng Boulevard in the north, faced with Hengyang-Shaoyang Highway in the east, linked with Donghutong Boulevard in the west. Foreign trade develops fast in Shaoyang. Total foreign trade volume increases from 297 million dollars in 2010 to 1.305 billion dollars in 2016 with average increasing rate of 28.68%. There are 221 foreign trade enterprises with import and export achievements. After its completion, it will have functions including bonded warehousing, cross-border logistics delivering, importing and exporting and processing trades, port services and exporting tax refund, and logistic information processing service. Bonded logistics will emphasize on advantages of multifunction of services, offering one-stop logistic service comprehensively. It has a sound market future. II. Preliminary Work The project has been listed as the key project in 13th Five Year Port Development Plan. Shaoyang Import and Export Customs Clearance Service Center is being built, and will be put into use comprehensively in 2018. III. Project Content Shaoyang Bonded Logistics Center plans to cover land of about 1000 Chinese mu, being used for building four area: bonded processing area, comprehensive service area, bonded warehousing and logistics area and port supervision area. IV. Project Investment Estimated total investment is about RMB 800 million yuan. V. Benefit Analysis Economic benefits are shown in mid-term and long-term. Main economic benefits include warehousing and delivering, value added by manufacture, leasing, and products exhibition and sales. VI. Cooperation Way The project is operated by investors who are responsible for lost and gains. Municipal government will offer preferential prices for land leasing and support on building supervision places of customs. VII. Project Initiator Project Initiator: Bureau of Commerce in Shaoyang
Construction of Longhui County Eastern-City Integrated Market(Bangsheng International Trade City) I. Project Background The number of population of Longhui County is over 1.2 million, which makes Longhui County one of the counties with large population. Gross value of production of this county in 2016 reached to RMB 15.5 billion yuan and fiscal revenue amounted to RMB 1.14 billion yuan. As the development of economy and society, urban residences’ demands for modern service industry keep increasing. In accordance with city construction layout and planning, Longhui County Eastern-city integrated market (Longhui Shengbang International Trade City) will be constructed in the east of the city where there is convenient transportation and beautiful scenery. II. Preliminary Work Demolition Headquarter has been set up and land requisition is finishes. Displacement and resettlement are in process. III. Project Content Developing area of the project is 545 Chinese mu, being divided into 5 parts: 1. PartA-04, A-05 are near Longhui Boulevard. Available development area is 199 Chinese mu. 213
2. PartA-10,A-5 respectively connected to Fulongjiang North Road, covering area of 226 Chinese mu. 3. Available area of A-11 is 120 Chinese mu. Planning area of the project is business land with plot ratio being less than or equal to 1.5, density of building being less than or equal to 30% and greening rate being more than or equal to 40%. The project mainly builds a large trade city integrated with modern composite markets, large shopping malls, office buildings, restaurants and residence, shops, apartments and leisure and culture centers. IV. Project Investment Total investment is RMB 2 billion yuan and covers area of 545 Chinese mu. Planning plot ratio is 1.5, and floorage area is 540,000 square meters. V. Benefit Analysis Land cost of the project temperately measured by RMB 301,620 yuan/ Chinese mu. Funds for project development are raised by investors, investment attraction, bank loans and other financing ways. After its completion, it will be able to create more than RMB 100 million yuan tax, over RMB 3 billion yuan GDP, and more than 5,000 jobs. VI. Cooperation Way After obtaining land by bidding, auction and listing, it will be developed by sole proprietorship of Longhui Bangsheng commerce and Logistics Co., Ltd VII. Project Initiator Project Initiator: Shaoyang Longhui Bangsheng Commerce and Logistics Co., Ltd.
Wugang Central Street Commerce and Trade Synthesis Project I. Project Background The project is located at the south-west of the conjunction of Xindong Road and Dongsheng Road in Wugang where it is close to Baixing Square and Zhanhui International City and Wugang Airport. Surrounding transportation is convenient, with roads at four directions. Conditions for developing and operating land are great and there are complete basic conditions for project construction. Central Street Commerce and Trade Synthesis is an important project in central business area of Baixing Square. In order to promote the construction of central cities of south-west, Wugang municipal party committee and municipal government initiated construction of five areas including central business area of Baixing Square, striking to make the city famous and make new economic growth point. II. Project Basis Planning and approval of land have been finished. House demolition has been started and part of house demolition agreement has been concluded and signed. III. Project Content Planning area of the project is a rectangle spreading from the south to north and mainly divided into northern buildings and southern buildings. They are laid out as a “dumbbell”. Total covering area is 45,360 square meters and floorage area is 41,755 square meters. Floorage area of northern buildings is 28758 square meters, including youth center and a library. The youth center (children recreation center) is of 5,000 square meters floorage area while the library is of 2,621 square meters floorage area. Floorage of southern buildings is 20,023 square meters, including a theater (performance center) whose floorage area is 6,488 square meters. Plot ratio is 0.92 and density of buildings is 44%. IV. Project Investment Estimated investment is RMB 2.5 billion yuan. V. Benefit Analysis The project is located in the core area of the new district. There are many residential quarters around here, including Zhanhui Central New Town, Hengrun Mansion and so on. These residential quarters may offer great consumption potential. In the north, it takes youth center (children recreation center) and library as its core, developing businesses such as children’s shopping, infant and mom shopping, special catering, leisure restaurants, education and training, boutiques. In the south, it takes the theater (performance center) as its core and develops boutiques, manicure and 214
hairdressing with diverse consumers. VI. Cooperation Way It plans to adopt PPP mode for cooperation. Detailed ways may be decided in negotiation. VII. Project Initiator Project Initiator: Shaoyang Duliang Investment and Development Co., Ltd.
Imported Aquatic Products and Meat Processing and Distribution Center in Chenglingji Comprehensive Bonded Area in Yueyang Ⅰ.Project Background On November 3, 2015, Chenglingji Port in Yueyang wasapproved by the General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China as a designated port of imported meat.The port has been officially put into operation. To give full playto the platform advantages, develop port economy, meet the demands for imported aquatic products and meat in surrounding areas,it’s urgent to establish the processing and distribution center project. In 2016, 3,802 tons of meat was imported in the designated port of imported meat . Ⅱ.Preliminary Work Foresun Group has settled in Chenglingji Comprehensive Bonded Area with the relevant industry gradually taking shape. Meanwhile, high-tech enterprises like SETCS are gathering. A 50,000 m2 standardized plant and a 20,000-ton refrigeration house are under construction. Ⅲ.Project Content The project is located in Chenglingjin Comprehensive Bonded Area(the first phase project) with a planned area of about 80 Chinese mu, mainly used to construct bonded, processing and distribution base of imported aquatic products and imported meat. Ⅳ.Project Investment The project investment totals RMB 500 million yuan. Ⅴ.Benefit Analysis After the project is completed and put into operation, the annual import and export value will be about 1 billion US dollars. It’s estimated to achieve annual profit of RMB 80 million yuan, in which the net income from warehouse leasing reaches RMB 50 million yuan. Ⅵ.Cooperation Way Investment way: sole proprietorship, joint venture and contractual joint venture. Return of Investment: operation profits. Ⅶ.Project Initiator Project Initiator: Chenglingji Comprehensive Bonded Area in Yueyang
Cereal&Oil Trade and Logistics Center in Chenglingji New Port Area in Yueyang Ⅰ.Project Background The designated port of imported grain of Yueyang was approved by the General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China in October 2014. There are three imported food inspection points: the new port , the old port, China Grain Wharf with a silo whose capacity is 20,000 tons and a professional damp-proofgrain warehouse whose capacity is 400,000 tons. In 2016,theannual imports of grain was 503,000 tons, making is the largest grain port along the Yangtze River except Shanghai. The project uses the new port area featured by "one district, one harbor and four ports", to provide our clients with water, iron, public transport, cargo agents, financial insurance, market information, commodity trading, goods delivery and other logistics services, gradually developing into the important cereal&oil raw materials trade and logistics center in the central region. Ⅱ.Preliminary Work Cereal&oil processing enterprises including COFCO, Wilmar and Baling Oil have settled down. Ⅲ.Project Content The planned area of this project is 1,000 Chinese mu, utilizing the regional advantages of the new port area which is connected with the river and the ocean to construct an important cereal&oil 215
trade and logistics center in the central region, which integrates financial insurance, market information, commodity transaction and goods delivery service. Ⅳ.Project Investment The project investment totals RMB 2 billion yuan. Ⅴ.Benefit Analysis After the completion of this project, it’s estimated to achieve annual turnover of RMB 10 billion yuan with annual profit of RMB 500 million yuan. Ⅵ.Cooperation Way Sole proprietorship, joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Merchants Liaison Department of Chenglingji New Port Area in Hunan
Warehouse Logistics Base Construction in Chenglingji New Port Area in Yueyang Ⅰ.Project Background Chenglingji Port is planned to realize the same function of pivotal ports along the Yangtze River,the delivery port of Shanghai port and pivotal ports of transshipment of "3 +5 City Cluster" in Hunan.The container handling capacity grew from 80,000 TEU in 2010 to 300,000TEUin 2016, maintaining No.1 in terms of growth rate in seven consecutive years among the inland ports of the Yangtze River. Relying on imported cars, imported food, imported meat, import solid waste designated ports, the project intends to create a production, processing and transit distribution center of imported food and meat and aimport base and trading center of renewable resources in the central region. Ⅱ.Preliminary Work A total of RMB 10 billion yuan has been invested in the new port area, bringing into being a backbone road network with 18 roads and the length of 62 kilometers featured by"Three vertical lines and three horizontal lines", promoting the seamless docking between Chenglingji Newport and Suizhou-Yueyang Expressway, Beijing-Zhuhai Expressway and Hangzhou-Ruiliexpressway so that the traffic can be smooth within 15 minutes. The preliminary work of the branch surrounding the port of Jingzhou-Yueyang section of Mengxi-Huazhong railway has been done basically and the formation of a water-road-railway three-dimensional transport system is speeding up. Ⅲ.Project Content The plannedarea is 400 Chinese mu, mainly used to construct informationized and intelligent modern warehouses and supporting facilities including roads, power supply, water supply, communications, greening, fire-fighting,making it the main warehousing and logistics base of shipping in Hunan Province. Ⅳ.Project Investment The project investment totals RMB 800 million yuan. Ⅴ.Benefit Analysis After the project is completed and put into production, it’s estimated to achieve annual output value of RMB 3 billion yuan with annual profit of more than RMB 300 million yuan. Ⅵ.Cooperation Way Sole proprietorship, joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Merchants Liaison Department of Chenglingji New Port Area in Hunan
Imported Automobile Logistics Park in Chenglingji New Port Area in Yueyang Ⅰ.Project Background Chenglingji AutomobileImport Port in Yueyang was approved for construction by the State Council on July 1, 2014, becoming the third automobile import port along the Yangtze River 216
following Shanghai and Zhangjiagang as well as the first in the central area. In 2016, 267 imported cars were introduced and it is expected that the port can increase import and export volume by nearly 2 billion US dollars for Hunan Province every year after it’s constructed. The project intends to introduce brand vehicle dealers and auto parts dealers and at the same time for the sake of the needs of industrial clustersattract parts logistics dealers, automotive industry associated service providers and automotive after-sales service enterprises. After the completion of the project, it will be a strong impetus to Hunan and even the central region for the development of automobile sales and logistics industry, effectively promoting the development of export-oriented economy in Hunan. Ⅱ.Preliminary Work The site selection for ro-ro terminals has been done. The design of ro-ro terminals,storageyard, detection lines is underway along with the landacquisition and demolition work in the land area. Ⅲ.Project Content The project is located in Aviation Logistics Park in the new port area with a planned area of 500 Chinese mu and a planned total floorage of more than 1 million square meters. It’s a comprehensive, integrated ultra-large automobile logistics park, providing service to the central region,taking advantage of the two platforms of automobile import and export in Chenglingji new port area and the comprehensive bonded area.It’s featured mainly by car display and transactions, auto parts distribution, car storage with automotive international trade, cultural and sports experience, after-sales service, automotive logistics e-commerce, financial and insurance services. Ⅳ.Project Investment The project investment totals RMB 1 billion yuan. Ⅴ.Benefit Analysis After the project is completed and put into production, it’s estimated to achieve annual turnover of RMB 5 billion yuan with annual profit of RMB 400 million yuan. Ⅵ.Cooperation Way Sole proprietorship, joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Merchants Liaison Department of Chenglingji New Port Area in Hunan
Aviation Logistics Park and Port Logistics Park Construction in Changde Ⅰ.Project Background Changde Taohuayuan Airport is located in the southwest of Changde City, only 10 kilometers away from the downtown area, 20 kilometers away from the Taohuayuan scenic area, 5 kilometers away from Deshan Economic Development Zone. The TaohuayuanAirport, connected with Yuanshui PeijiaWharf, Changde-Zhangjiajie expressway and Changde-Jishou expressway, G207 and G319, airport expressway, is Changde’s transportation hub. After the completion of the 4D transformation project of the airport, the passenger and freight volume doubled. 2016 witnessed a total turnover of 1100 tons of goods,3.2 times that of 2015. In order to speed up the development of aviation logistics industry in Changde, the municipal government intends to rely on the advantages of the airport to construct an aviation logistics park, take advantages of the Yuanshui Peijia Wharf to construct a port logistics park so as to build the commerce and trade distribution center in Northwest Hunan. Ⅱ.Preliminary Work The preliminary work has been done. Ⅲ.Project Content The total planned area of this project is 2,550 Chinese mu, in which 1,550 Chinese mu is for aviation logistics park, 1,000 Chinese mu is for port logistics park, 920,000 square meters for construction warehouse, 100,000 square meters for processing workshop and 100,000 square meters for information center and so on. Ⅳ.Project Investment The project investment totals 2.5 billion yuan. Ⅴ.Benefit Analysis After the project is completed, it’s estimated to achieve annual profit and tax of about RMB 250 217
million yuan. The construction pay back period is 10 years. Ⅵ.Cooperation Way Joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Konggang New Town Construction Headquarter in Changde City
Yanguan Port Modern Logistics Center Construction in Changde Ⅰ.Project Background Yanguan Port in Changde is the only water foreign trade logistics platform in Northwest Hunan at present. Since its opening to the outside world, it has mainly cooperated and done business with mainline shipping companies through the internal branch lines of Hunan Ocean Transportation Company. It has already launched “Changde-Yueyang” and “Changde-Shanghai” branch line liners, two liners a week, providing over 250 branch line shipping spaces. 10 mainline ship-owning enterprises are cooperating with each other through branch lines. They are COSCO, CMA CGM Group, APL, HMM, HPL, OOCL, EMC, PIL, SITC and FESCO. In 2015, YanguanPort received a total branch line voyage number of 174, completed the container handling of 7869TEU and provided more than 1,100 deals of import and export logistics business servicefor44 foreign trade enterprises in Northwest Hunan. In 2015, the annual operation income of the port was only RMB 1.6million yuan, while electricity, equipment maintenance costs and labor costs in maintaining the port operation wasup toRMB 2.2 million yuan. In order to give full play to the advantages of the platform of YanguanPort, the municipal government convened the relevant departments to study and planned to build a modern logistics center based on Yanguan Port. Ⅱ.Preliminary Work The preliminary work has been done. Ⅲ.Project Content The total floorage of the project is 35,000 square meters, mainly used to construct comprehensive service building, storage facilities, terminal expansion and parking lots, etc. Ⅳ.Project Investment The project investment totals RMB 850 million yuan. Ⅴ.Benefit Analysis The annual ROI of this project is about 4.85% with a payback period of 18 years. After it’s completed and put into production, it can achieve annual output value ofRMB 1 billion yuan and annual newly-added tax of RMB 50 million yuan, driving the upstream and downstream industry chain by nearly RMB 10 billion yuan, giving impetus to the development of port logistics in Northwest Hunan.The economic benefitsare obvious. Ⅵ.Cooperation Way Contractual joint venture, sole proprietorship Ⅶ.Project Initiator Project Initiator: Changde Modern Industrial Development Investment CO., LTD.
Ganlu Temple Vegetable Wholesale Market Relocation and Reconstruction Project Ⅰ.Project Background Ganlu TempleVegetable Wholesale Market in Changde city, located in Renmin East Road in the urban area, see over 60,000 passersby every day and even up to 80,000 in holidays andthousands of all kinds of vehicles.As can be seen, the existing market isclearly overloaded. Along with the city expansion, human flow will increase so that the problem of a small market capacity will be more prominent. At the same time, the market is in a shed, shabby and insufficient. It fails to meet the modern standard and has no room for upgrading and transformation, affecting the appearance of the city. Therefore, the construction of an intensive, economical, ecological modern vegetable wholesale and trading market is imperative. 218
Ⅱ.Preliminary Work The preliminary work has been done. Ⅲ.Project Content The new market will cover an area of about 482 Chinese mu with a floorage of about 150,000 square meters. It’s developed in two phases. The main construction content is: 1.trading shed(integrating vegetable, fruit, meat and aquatic product transaction, freezing and processing); 2. business building (integrating information monitoring, monitoring of pesticide, electronic settlement, measurement control and administrative offices and other functions); 3.warehousing and distribution facilities; 4.parking lot and other facilities. Ⅳ.Project Investment The project investment totals about RMB 1.5 billion yuan. Ⅴ.Benefit Analysis It can achieve annual output value of RMB 1.5 billion yuan. The annual listed varieties of vegetable exceed 130. The project can benefit enterprises, local farmers and the government. It can both promote the rural economic development and solve the problem caused by a small market capacity. Ⅵ.Cooperation Way Contractual joint venture and sole proprietorship. Ⅶ.Project Initiator Project Initiator: Changde Modern Industrial Development Investment CO.,LTD.
Bonded Logistics Center(Type B) Construction in the Economic Development Zone in Changde City Ⅰ.Project Background The Economic Development Zone in Changde City was approved by the State Council as a national economic development zonein June, 2010. The project is proposed to undertake international industrial transfer and develop export-oriented economy, encourage foreign trade and electronic commerce, promote intelligent logistics, strengthen infrastructure facilities in the zone, optimize the industrial layout of the zone and facilitateits transformation and upgrading. Relying on the water transport, freight, shipping that are being improved day by day and Deshannew port area in Changde Port as well as 4D airport, the project cooperates with the existing integrated logistics park, Wan Lu Da Logistics and Northwest Hunan Building Materials Logistics park to build a modern logistics system in the Economic Development Zone of Changde City. In the “Twelfth Five Year” Plan, Changde City has introduced an accumulative total domestic capital of 215 billion yuan and foreign capital of 2.5 billion US dollars with the total volume of foreign trade of 3 billion US dollars. Ⅱ.Preliminary Work Pre-feasibility study report and site selection of the project have been completed. It’s seeking strategic partners at present. Ⅲ.Project Content It mainly constructs: 1.business center building and supporting living facilities; 2. bonded logistics warehouse and container yard in logistics area. Ⅳ.Project Investment The project investment totals at RMB800 million yuan, planning to construct a bonded logistics park with an area of 300-500 Chinese mu. Ⅴ.Benefit Analysis After the project is completed and put into production, it’s estimated to generate annual operation revenue of RMB 1 billion yuan with annual profit and tax of RMB 200 million yuan. It can create 1,000 jobs. Ⅵ.Cooperation Way Sole proprietorship, joint venture and contractual joint venture. Ⅶ.Project Initiator Project Initiator: Department of Merchants and Cooperation in Economy and Technology 219
Development Zone in Changde
The Development of “Jiangnanhui” Commerce and Trade Complex Ⅰ.Project Background Jiangnan area is Changde's business center, gathering a number of professional business market clusters including Qiaonan market, Jiuguang Shopping Mall, Qiaonan Appliance Market with the annual trade volume of RMB 4 billion yuan. As the existing market cluster is occupied by urban buildings of the last century without neat appearance and modern market management concept, in order to introduce new business forms and improve the level of urban construction, it’s planned that a modern urban commercial complex with high commercial standards will be built in Jiangnan area to construct a landmark building integrating advanced commercial and business facilities, five-star hotels, luxury apartments, gardenswith aerial landscape to boost the urban construction and economic growth in Jiangnan area of Changde. Ⅱ.Preliminary Work The preliminary work has been done. Ⅲ.Project Content The project covers an area of about 109 Chinese mu and is constructed in two phases: the first-phase project constructs a multi-functional business center integrating electronic commerce, parking and unloading, commercial office, cloth market and relevant commercial activities; the second-phase project constructs a high-end commercial complex combining business, leisure, entertainment, shopping and special catering. Ⅳ.Project Investment The project investment totals RMB 1.5 billion yuan. Ⅴ.Cooperation Way Contractual joint venture, sole proprietorship Ⅵ.Benefit Analysis After the project is completed and put into operation, it’s estimated to generate annual operation revenue of nearly RMB 1.5 billion yuan. The self support part and rent-out part can bring annual profit and tax of over RMB 300 million yuan. Ⅶ.Project Initiator Project Initiator: Jiangnanhui Property Company in Changde City
Bulk Commodity Bonded Warehouse Logistics and Spot Trading Center Construction Ⅰ.Project Background Non-ferrous metal industry is Chenzhou's traditional and advantageous industry.In order toeliminate the dependence on imports of mineral raw materials and remove obstacles inenterprise financing in the non-ferrous industry, Guoda Non-ferrous Metal Corporation in Chenzhou City is planned to cooperate with the international third-party logistics warehouse giant -- Steinweg (No.1 in the global industry) to carry out the imported mineral products bonded logistics and financial warehouse business in the comprehensive bonded area of Chenzhou, making full use of overseas resources to serve the city's non-ferrous industry and thus creating a regional bulk commodity spot bonded trading center. Ⅱ.Preliminary Work Pre-feasibility study report and site selection of the project have been completed. It’s seeking strategic partners at present. Guoda Non-ferrous Metal Corporation in Chenzhou City was established in 2005, located in the comprehensive bonded area of Chenzhou, covering a total area of 57 Chinese mu with the existing floorage of 10,090 square meters. Affiliated to Ritar (Nasdaq listed company), it mainly engages in non-ferrous metal processing and sales allowed by national policies. Since 2011, it has been carrying out silver concentrateprocessing and its performance for several years ranked among the top of processing trade enterprises in the province. It has set up offices in South America, Central Asia and Africa with a wide overseas marketing network and has accumulated a large number of foreign high-quality mineral resources. 220
Ⅲ.Project Content 1. Extendtheraw material warehouse by 20,000 square meters. 2. Extend the finished product warehouse by 6,000 square meters. 3. Transform the office buildings. 4. Establish bulk commodity spot electronic trading platform. Ⅳ.Project Investment The project investment is estimated to total RMB 300 million yuan. Ⅴ.Benefit Analysis After the completion of this project, it is expected to achieve import trade of 900 million US dollars and generate import tax of RMB600 million yuan. At the same time, it can address 400,000 tons of imported high-quality raw materials every year and provide guarantee for the production of local enterprises. Ⅵ.Cooperation Way Contractual joint venture, sole proprietorship Ⅶ.Project Initiator Project Initiator: Guoda Non-ferrous Metal Corporation in Chenzhou City
Million Tons of Garden Stuff Cold Chain Logistics Center Construction in Jiangyong County Ⅰ.Project Background Jiangyong County, more than 300 kilometers away from Guangzhou, is within four-hour drive on the expressway.Thus, it’s quite convenient and efficient. The climate there is mild with abundant rainfall and adequate sunshine. The annual average temperature is 18.1 ℃. Frost-free season generally lasts for more than 300 days, known as the"Natural shed"; fertile soil, rich in selenium and other trace elements with strong magnetization contributes to the aroma of the products, thus named as the cradle of fragrant premium agricultural products. "Fragrant pomelo, taro, fragrant ginger, fragrant rice, mushrooms"there are known to all.Jiangyong was awarded the "home to pomelo in China" and "home to taro in China" successively. At present, 198,000 Chinese mu is planted with fruits such as fragrant pomelo, citrus, navel orange and summer orange and so on while 150,000Chinese mu is planted with vegetables including taro, fragrant ginger and honey pumpkin. Ⅱ.Preliminary Work Feasibility demonstration has been done and site selection has been preliminarily accomplished. Ⅲ.Project Content The project is located in the industrial concentration zone of Jiangyong County Yongzhou City. The planned area of itis 100 Chinese mu with a total floorage of about 24,500 square meters,used to builda gas-adjusted and fresh-preserved storehouse with a capacity of 5,000 tons of fruit and vegetable and a air-conditioned cold storehouse with the same capacity. The construction of this project is divided into two phases: The first-phase project will construct a gas-adjusted and fresh-preserved storehouse with a capacity of 5,000 tons of fruit and vegetable, a fruit and vegetable sorting and packing workshop and an integrated office building and so on. The second-phase project will construct a air-conditioned cold storehouse with a capacity of 5,000 tons of fruit and vegetable. The main construction content is:3,000m2logistics warehouse, 10,000-m²cold storage and distribution workshop, 5,000m²processing workshop, 5,000-m²air-conditionedcold storehouse, 1,500m²integrated office building; and the purchase of quality testing equipment. Ⅳ.Project Investment The project investment totals RMB 100 million yuan, in which RMB 60 million yuan is for infrastructure construction and RMB 40 million yuan is for equipment purchase. Ⅴ.Benefit Analysis The project is estimated to achieve total output value of RMB 200 million yuan with an annual profit of RMB 40 million yuan after it’s put into production. The pay back period is about 3 years. Ⅵ.Cooperation Way Sole proprietorship, joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Management Committee of Jiangyong Industrial Park in Yongzhou City 221
Processing Trade and Logistics Center in Lanshan County Ⅰ.Project Background Lanshan County in Yongzhou City, only 310 kilometers away from Guangzhou City, is a key county carrying on industry transfer in Hunan Province. Lanshan Economic Development Zone, established in July, 1992, was upgraded to a provincial economic development zone in 1994. Processing trade has been promoted there, bringing into being leading industries including textile and apparel, leather and its products and shoemaking, electrical and electronic manufacturing, stone processing and so on. In 2016, the zone achieved the total output value of scale industries of RMB 7 billion yuan with industrial added value of RMB 1.5 billion yuan. Over 400 processing enterprises(individually owned enterprises included) have settled in the zone, such as export-oriented apparel, light textile and shoemaking, leather products. Processing import and export and foreign trade import and export volume of 250 million US dollars have been achieved. Products export to Europe and the United States, Japan and other countries and regions. Ⅱ.Preliminary Work The planning, project approval and land acquisition of land of 300 Chinese mu have been done. Ⅲ.Project Content The planned area of this project is 300 Chinese mu with the total floorage of about 30,000 square meters, mainly used to construct product display and trading hall, information release and property management center, distribution center, fresh warehouse, wholesale integrated warehouse, quality inspection, security supervision center and other supporting facilities. Ⅳ.Project Investment The project investment totals RMB 200 million yuan, in which RMB 50 million yuan comes from bank loans, RMB 50 million yuan comes from self-financing and RMB 100 million yuan comes from investment promotion. Ⅴ.Benefit Analysis After the completion of this project, the logistics cost of the enterprises can be significantly reduced. The annual output value can reach RMB 100 million yuan with an annual profit of RMB 50 million yuan. The pay back period is 4 years. Ⅵ.Cooperation Way Joint venture or sole proprietorship; dividends are shared according to investment proportion. Ⅶ.Project Initiator Project Initiator: Economic Development Zone of Lanshan County, Yongzhou City
Comprehensive Modern Logistics Park in Jianghua County Ⅰ.Project Background Jianghua County covers a total area of 3,248 square kilometers with a total population of 510,000, in which the population of the Yao nationality is 340,000, accounting for 66.7% of the total population. Hence the name “Capital of Yao Nationality in China”. In recent years, Jianghua County has seen the rise of industry, mining, agriculture and the great expansion of freight volume. In industry, the annual output of reduced iron is 1million tons and that of the clinker cement is 2.2million tons; 500,000 tons of chemical materials are needed for tombarthite deep-processing. In mining, the annual output of iron mine is 700,000 tons. In agriculture, the annual output of garden stuff is 300,000 tons and the shipments of commercial timber are 200,000 cubic meters. It’s estimated that the volume can exceed 3.5 million tons within 3 years and it can reach over 6 million tons in 5 years. At present, lack of a scale logistics center leads to the scattered logistics activities and single service. Besides, there is only one freight station in the county --Luoyang-Zhanjiang Railway Jianghua Freight Station with a handling capacity of 260,000 tons per year. Thus, the construction of this project is essential. Ⅱ.Preliminary Work The site selection and feasibility study report have been done. 222
Ⅲ.Project Content The planned area of this project is 380 Chinese mu, used to build a railway special line from the Luoyang-Zhanjiang Railway Jianghua Freight Station with the total length of 1.475km. On this basis, a comprehensive modern logistics park integrating storage, loading and unloading, processing, freight, distribution, catering, accommodation, business and many other functions will be established. There will be industrial raw materials and product distribution, agricultural and sideline products trading, storage, cargo distribution operation center. Ⅳ.Project Investment The project investment is estimated to total RMB 200 million yuan, mainly through self-financing by the enterprises. Ⅴ.Benefit Analysis The annual profit is estimated to be about RMB 40 million yuan. Ⅵ.Cooperation Way Sole proprietorship, joint venture, contractual joint venture Ⅶ.Project Initiator Project Initiator: Management Committee of Jianghua Economic Development Zone in Hunan
Poria Cocos Trade and Logistics Center Construction in Jingzhou, China Ⅰ.Project Background Jingzhou, known as “Home to poria cocos in China”, reputed as “Home to Medicine with Long History”, is an important producing area of geo-authentic crude drug across China. It abounds in traditional Chinese medicinal materials such as poria cocos, lucid ganoderma, gastrodia elata, uncaria, eucommia ulmoides; the production and trade volume of poria cocos accounts for 70% of the country and the export volume takes up two thirds, making it the largest poria cocos distributing center in China, selling poria cocos across the country. The poria cocos industry in Jingzhou County has witnessed the establishment of national breeding base of poria cocos cultures and trading base of raw poria cocos products and rough-wrought products as well as national deep-processing base and research center of poria cocos after 50 years of development. After the completion of this project, the traditional Chinese medicinal materials market including poria cocos market will be further regulated through unified management of sales to develop it into the national largest poris cocos specialized market and distributing center of traditional Chinese medicinal materials. Ⅱ.Preliminary Work The overall planning and design of the project, application for land approval have been done. Ⅲ.Project Content The project is located in Medicine and Food Science and Technology Industrial Park in Jingzhou County, covering an area of 100 Chinese mu, used to construct poria cocos trading center, storage center, logistics center, fine production and processing center, R&D center and training center. Ⅳ.Project Investment The project investment totals RMB 1 billion yuan. Ⅴ.Benefit Analysis The project investors make profits through warehouse logistics operation and sales as well as shop selling or leasing. It’s estimated to achieve annual total trade volume of RMB 2 billion yuan. The pay back period is 3-5 years. Ⅵ.Cooperation Way Sole Proprietorship, contractual joint venture Ⅶ.Project Initiator Project Initiator: Economic Information and Science and Technology Bureau of Jingzhou County, Huaihua City
PPP Project of Industrial Logistics Park in Huaihua City Ⅰ.Project Background 223
Huaihua High-tech Industrial Development Zone was established in 2003 and is located in Zhongfang County, Huaihua City. Decades of development and construction are accompanied with more and more demand for modern logistics. Therefore, it’s urgent to establish a modern production service-oriented logistics park. To that end, PPP project leading group and working group have been formed in Huaihua City. The government will offer support in finance, land, financing and power supply and so on to facilitate the implementation of this project. In December, 2016, the project was reported to Department of Finance of Hunan Province as the fourth batch of PPP demonstration project for its review and approval. Through innovating investment and financing methods, it can open up new investment channels for social capital and realize benefit sharing and risk sharing between government and social capital. Ⅱ.Preliminary Work At present, the feasibility study report of this project has been approved; land acquisition, demolition and land-leveling work have been partially done. The first-phase project has finished fund raising and is under construction. The second-phase project is collecting capital. Ⅲ.Project Content The project is carried out in two phases: The first-phase project covers a total area of 115,999 square meters with a total floorage of 129,362 square meters, mainly used to construct urban distribution warehouses, LTL warehouses, general warehouses, cold chain warehouses, administrative offices, car service centers and other ancillary facilities. The second-phase project covers a total floorage of 453,336 square meters, mainly used to construct container operating area, operation area, distribution processing area, renewable resource processing area, standardized storage area, etc. Ⅳ.Project Investment The total investment is about RMB 2,057,690,000 yuan, in which that of the first-phase project is RMB 374,900,000 yuan and that of the second-phase project RMB 1,682,790,000 yuan. Ⅴ.Benefit Analysis The operating income of this project comes from the rental and operating income of the warehouses, areas and parking lots. The park uses a segmented return model. Ⅵ.Cooperation Way The first-phase project adopts O&M method and the second-phase project adopts DBOT+DBOO method. Ⅶ.Project Initiator Project Initiator: Management Committee of Huaihua High-tech Industrial Development Zone
3-2 Tourism (72) PPP Project on Tourism Development of Zhangjiajie Tianmen Mountain Pilot Area I. Project Background This project is located in the southern foothill of the national level 5A scenic spot Tianmen Mountain National Forest Park, and is connected with Tianmen Mountain as a whole. The project is separated from the core urban area of Zhangjiajie only by Tianmen Mountain. The high grade mountain tourism highway under construction is 11.8 km from the core urban area, Zhangjiajie Huanghua International Airport, Zhangjiajie Railway Station and Zhangjiajie Central Bus Station can be arrived within 15 minutes. The project can develop an area about 6,000 Chinese mu, where have a total of 1929 households, the land transfer is permitted so the cost of development and resettlement are relatively low. II. Preliminary Work 224
Has completed the master plan formulation and EIA preliminary examination III. Project Content The project is located in Yongding District, Zhangjiajie City with a total planned area of about 120 square kilometers, and aims at building an open museum featuring with Tujia culture, and a landscape architecture group mainly with stilted style. Build “Square Street” of Zhangjiajie, and urban core culture scenic area, quality tourism resort area and folk-customs leisure resort area integrating sightseeing, leisure, recreation, cultural experience and intangible culture exhibition. IV. Project Investment Investment totals RMB 3 billion yuan for infrastructure, the construction period is 10 years. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Project Initiator Project Initiator: Management Committee of Zhangjiajie Tianmen Mountain Pilot Area
Construction of “Yuanxiang” (Original Hunan Style) Green Road System in the Grand Crayon of Zhangjiajie I. Project Background The planned project site is about 30km away from the urban area of Zhangjiajie, where the S306 runs through and adjacent to Yanghe Exit of Changde-Zhangjiajie Expressway. Surrounded by Wulingyuan, Baofeng Lake, Huanglong Cave, Jiangya Hot Springs, Grand Canyon and many other tourist resources, this project has beautiful sceneries decorated with mountains, water, isles, fields, forests, orchards, the former residence and characteristic residential houses. II. Preliminary Work Has been included in the overall planning of Zhangjiajie Grand Canyon Economic Zone III. Project Content Taking into consideration of the main wetland landscape, it plans to build up the bike lane and water-loving plank road, water affinity platform, resting landscape and other facilities along the water. Mainly include: Wanhe waterfront leisure area: construction of continuous spaces for activities such as walking, cycling, water-loving plank road, viewing platform, leisure square, etc. Country Orchard experience area: divide the green road relying on the village roads which are connected to provincial road; special dwellings, nursery garden, waxberry garden, peach garden, tile kiln and village halls will be built. Outdoor sports entertainment area: construction of water affinity spaces for fishing, camping, barbecue and outdoor sports. IV. Project Investment Investment totals RMB 230 million yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Project Initiator Project Initiator: Management Committee of Zhangjiajie Grand Canyon International Tourism Economic Zone
Rail Transit Construction from Urban Area of Zhangjiajie to the Core Scenic Area I. Project Background This project has a number of features such as economical, technical, security, environmental protection and value-added services. Straddle monorail technology is mature and the localization rate of all equipment is more than 95%. Calculated in accordance with the standard of RMB 180 million yuan per km and the whole length of 48 km, although the one-off construction cost is RMB 8.64 billion yuan, it will put into use with low cost, low energy consumption. With the use of power system traction, no waste gas pollution will occur. II. Preliminary work 225
The project proposal is being prepared for project planning and demonstration. III. Project Content The project starts at the starting point of the new site of the Tianmen Mountain Ropeway, followed by high-speed railway station, forest park, Wulingyuan, Baofeng Lake, Huanglong Cave and the Grand Canyon, 5 core scenic sites in Zhangjiajie will be included. It plans to build seven stations and one base station with total length of 59.3km. The construction cost includes the expenses for full set of operational facilities such as bridge structure, track structure, vehicles, stations, electrical systems, signal systems and so on. Technical-economic indicator is RMB 260 million yuan per a kilometer of main track. IV. Project Investment Investment totals RMB 15.418 billion yuan. V. Cooperation Way PPP or other cooperation ways, using a joint operating model. Land for commercial development purpose with area of no less than 200 Chinese shall be provided for each station, so as to serve as the repurchase guarantee for build-transfer. VI. Project Initiator Project Initiator: Zhangjiajie Traffic Construction and Investment Group Co., Ltd.
Construction of Badagong Mountain International Eco-tourism Resort I. Project Background Badagong Mountain is located in the intersection of Hunan and Hubei provinces, it’s 70 kilometers away from Sangzhi County, 34 kilometers away from Hefeng County in Hubei Province. Sangzhi-Heqing Expressway under planning will connect the tourism resort to Zhangjiajie, Hubei, Sichuan and Chongqing. Badagong Mountain Virgin Forest Park, the first national forest park in Hunan Province, is the birthplace of "Sangzhi high-pitched tune"—the national intangible cultural heritage as well as the ancient seat of Sangzhi Tusi. There are many cultural landscapes, such as the former site of “He Long killing in the salt tax bureau by knives”, Red Army Village in Yuntou Mountain, Zhuang’erping, Jiangxi battle sites, Sangzhi-Heqing Tusi alliance site, Chajiaoxi natural hot springs valley. To attract more domestic and foreign tourists, the construction of tourist resort is necessary. II. Preliminary Work State Forestry Administration has approved the "Eco-tourism Planning for Hunan Badagong Mountain National Nature Reserve", and has accomplished the “Conceptual Planning for National Mountainous Park of Badagong Mountain ". Ⅲ. Project Content Tianpingshan Service Center, Eco-resort Hotel, Self-driving Travel Service Base, Bamaoxi Folk Pastoral Landscape Corridor, Dove Flower (Davidia Involucrate) Landscape Avenue, Red Culture and Inspirational Education Base for Parent and Child, Lishui River Rafting, Wudaoshui Hot Spring Valley, Tusi Alliance Cultural City, Simenyan Mountain Forest Tourism Area and other projects are going to be constructed. IV. Project Investment Investment totals RMB 1.65 billion yuan. V. Cooperation Way Joint venture or contractual joint venture; Investments for sub-projects are acceptable as well. VI. Benefit Analysis After the completion of the project, the annual comprehensive income of the tourist area will reach RMB 120 million yuan in 2 years and RMB 250 million yuan in 3-5 years. VII. Project Initiator Project Initiators: Badagong Mountain Virgin Forest Eco-Tourism Development Co., Ltd.; Investment Promotion Bureau of Sangzhi County
226
Development of Huanglong Ancient Village in Zhangjiajie I. Project Background "Huanglong Ancient Village" development project is one of the key projects for upgrading and transformation of Huanglong Cave Scenic Spot in Zhangjiajie. The subject of the project implementation is Zhangjiajie Huanglong Ancient Village Tourism Investment Co., Ltd., which was established in November 2015 with the shareholder being the wholly-owned subsidiary of Hunan Daily Newspaper Group--- Zhangjiajie Shengdi Culture Tourism Development Co., Ltd. (holding and controlling shares of 42%), Huanglong Cave Investment Co., Ltd. (holding shares of 41%), Changsha Xinrun Culture Tourism Investment Co., Ltd. (holding shares of 17%). Guided by the principle “to create an upgraded version of Zhangjiajie", and through the “source seeking, restoration, transplantation, activation, innovation and transculturation” of rich folk cultures in Wuling Mountain Area, the development program aims at building the largest and highest quality intangible cultural heritage base and a complex of folk-customs and commerce. II. Project Content The total planning area is 302 Chinese mu, and the project is divided into two phases: Phase 1: 136 Chinese mu for reconstruction of Huanglong Ancient Village and optimization of the ecological scenes of Huanglong Cave Square and the landscape belt of Suoxi River. Based on the settlement and performance of traditional skills, songs, dances and other intangible cultural heritage projects, the intangible cultural heritage exhibition area takes craft masters as the core to do a better job in silver ornaments and tea industries. Phase 2: About 166 Chinese mu of land is used to develop the upper reaches, river channels and valley areas that are adjacent to Huanglong Cave Scenic Area, to build folk-customs theme inns and business street with cultural characteristics. IV. Project Investment Investment totals RMB 520 million yuan, among which RMB 90 million yuan for Phase 1,RMB 430 million yuan for Phase 2. It will take 4 years to complete the construction. IV. Cooperation Way Joint venture or contractual joint venture; V. Benefit Analysis After the completion of the project, the income would come from “tickets, inns, operational items, property, policy subsidies" and other items. After the phase 1 and 2 being put into operation, the annual income is predicted to be no less than RMB 80 million yuan. VI. Project Initiator Project Initiator: Zhangjiajie Huanglong Ancient Village Tourism Investment Co., Ltd.
Construction of Zhangjiajie Betel Valley Outdoor Sports Base I. Project Background Binglangping is located at Luotaping Village, Yongding District, Zhangjiajie, the scenic spot covers an area of 30 km2. The landform of its northern part is Karst with many marvellous spectacles, such as Binglang Hole, Binglang Valley, Qin Hou Stove, Jia’ergou, Can’eryan, etc; the landform of its southern part is sandstone with tourist sites such as Twin-peak Rock, Zhuma Creek, Cold Ditch and so on. Taking advantage of unique natural wonders in Binglangping, more than 10 differentiated outdoor lines will be developed to cover “Quartet, HuangTujie, Zhuma Creek, Twin-peak Rock, Cold Ditch, Mi Hole – Qin Hou Stove, Damijie, Fengluan Creek, Xuemengou, Zhushitou, Seven-year Village” and other places. II. Project Content It plans to construct hotels, cars and tent camps, outdoor equipment rental shops, national stadiums, bonfire plaza, bar street, picnic valley, off-road vehicle and mountain bike tracks, riding track, 10 outdoor walking routes and so on. III. Project Investment Investment totals RMB 600 million yuan. IV. Cooperation Way 227
Sole proprietorship, contractual joint venture or operational right transfer, etc V. Benefit Analysis Daily reception capacity of 2,000 people, including 1000 people stays overnight. VI. Project Initiator Project Initiator: Zhangjiajie Economic Development and Investment Group Co., Ltd.
Tourism Development of Jiangya Forest Park in Cili County I. Project Background Jiangya Forest Park is located in Jiangya Town, Cili County, with a total area of 39781 Chinese mu. It is far away from Cili County about 60 kilometers and about 35 kilometers away from Wulingyuan Scenic Area. Jiangya Forest Park is adjacent to the national key water conservancy project – Jiangya Reservoir, and separated from the urban area by Loushui River. There climate is mild in winter and rather cool in summer. The park contains great species diversity and glorious scenery. The main attractions include Purple Hump, Xiangjiaxi Grand Canyon, Xianlv Cave , Wind Cave, Hundred-year Ancient Pine Forest, Nine-stump Camphor Tree, God Tree, Giant Eucommia Ulmoides, Loushui River, Xiangjiaxi, Jiangya Reservoir; Jiuxi Ancient City Walls, He Long Ancestral Grave, Qili Bridge and so on. II. Preliminary Work The master plan has been completed. III. Project Content The project is intended to protect and develop the characteristics of Chinese herbal medicines on the basis of natural landscape, and to provide all kinds of tourist reception facilities for the scientific research, practice, tourism and leisure. IV. Project Investment Investment totals RMB 100 million yuan V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture; VI. Benefit Analysis Annual net profit after tax will exceed RMB 5 million yuan. VII. Project Initiator Project Initiator: Forestry Bureau of Cili County, Zhangjiajie City
Construction of Folk Customs Ancient Town in Tianzi Mountain Ⅰ.Project Background Tianzishan Town is located in the southwest of Wulingyuan District in Zhangjiajie City. The total area is 56 square kilometers, among which the core area is 36 square kilometers. There have 4 premium attractions including the Imperial Brush Peak, Xihai Stone Forest, Assembly of Heavenly Troops and Immortal’s Pond Gulf; 7 first-class scenic spots such as the General-like Rock, etc., and 23 second-class scenic spots represented by the Yellow Dragon Spring. With the rapid growth of tourists in recent years, Tianzishan Town becomes an important gateway for tourists to go to Wulingyuan Scenic Spot, especially those on self-driving or self-service travel, most of them choose to enter the core area through Tianzishan Town. II. Project Content The project is located in Tianzishan Town. Land for construction use is about 900 Chinese mu. The main construction items include: 1. Tujia culture square in ancient town: construct Tujia ancient stage, brook-side culture corridor, landscape water system, sculpture of Tujia life scenes, Xilankapu ground relief, Chinese noria group, etc. 2. Entrance archway, wind and rain bridge: set up three-span stone archway in the west entrance of the town, and build the wind and rain bridge along Huanglong Brook; 3. National customs inns: construct multiple folk-custom on the north side of the Xiangjiaping 228
Neighborhood Committee of Tianzishan Town. 4. Multi-purpose parking lots: use planned land area of 30 Chinese mu to build parking spaces and commercial shop fronts. 5. Construct other facilities for cultural tourism, leisure & resort and ecological recuperation. III. Project Investment Project investment totals RMB 600 million yuan. IV. Cooperation Way Contractual joint venture, joint venture or sole proprietorship V. Benefit Analysis It is estimated to receive 100,000 people per year. According to per capita consumption of RMB 2,000 yuan, the annual income will achieve RMB 200 million yuan. VI. Project Initiator Project Initiator: Wulingyuan District Investment Promotion Bureau of Zhangjiajie City
Development and Construction of Loushui River Scenic Spot Ⅰ. Project Background Loushui River Scenic Spot, located in the northeast of Sangzhi County, covers a total area of 203 square kilometers, and is 40 kilometers away from Sangzhi County. Loushui River Scenic Spot is rich in natural landscapes and full of national features. It boasts not only the ecological beauty based on natural landscapes and vegetation, but also the beauty of folk culture themed by Tujia and Bai cultures. Loushui River Scenic Spot has picturesque scenery of High Gorges Low Lake, magnificent Jinji Grand Canyon, Zhongli Stone Forest with jagged rocks of grotesque shapes and a boundless stretch of Nantan Grassland. The tourism resources of this area are featured by distinctive characteristics and high grade and thus have relatively high cultural and scientific value, which enable the Spot to become an unique scenery resources gathering place in northwest of Hunan Province. Ⅱ. Preliminary Work At present, the overall planning and EIA report have been completed. Phased construction plan is starting. Ⅲ. Project Content Land for construction use amounts to 198 square kilometers. The external protection area is 550 square kilometers. And 4 sub-projects are going to be built: 1. Principal part of Loushui High Gorges Low Lake Area: Guandiping abovewater stage, Changtanping Happy Valley, Linxi River rafting area, Renchaoxi ethnic cultural experience area and Liaocheng Castle Culture Park; 2. Zhongli Grand Canyon, Stone Forest Scenic Area: Sports Adventure Base, Luoxiangtan Ancient Plank Road and Stone Forest Park; 3. Nantan Grassland Area: Happy Pasture, Tianchi Fishing Base, Mountain Park, Wind Power Observation Platform; 4. Liuyangxi Scenic Area: Natural sightseeing, extreme sports experience such as water plane, glider, hot-air balloon, high bungee jumping, cliff diving and so on. IV. Project Investment Project investment totals RMB 1.16 billion yuan. V. Cooperation Way Contractual joint venture or sole proprietorship; VI. Benefit Analysis It is estimated that annual income of the project will reach RMB 150 million yuan in 2018, in 2020 will reach RMB 300 million yuan, Construction investment can be recovered in 2023. VII. Project Initiator Project Initiators: Tourism and Foreign & Overseas Chinese Affairs Bureau of Sangzhi Country, Zhangjiajie City; Investment Promotion Bureau of Sangzhi County
229
Comprehensive Development of Yingzhu Mountain Provincial Forest Park in Changsha County I. Project Background The Project of Yingzhu Mountain Provincial Forest Park is located in the Fulin Town, northeast of Changsha County. Yingzhu Mountain is the highest peak of Changsha County and the strategic place in Changsha Battle. It is endowed with rich natural and cultural landscapes, and complete scenery elements such as peculiar stone landscape and pastoral scenery. There are more than 70 large or small peaks with the greening rate and forest coverage rate of 86.86% and 85.45%, respectively. Guided by the principle of “developing business in the south while tourism in the north” of Changsha country, it plans to carry out comprehensive tourism development of Yingzhu Mountain Forest Park. II. Preliminary Work At present, the scenic area road to the mountain from east has been built; designation for the road from north has been completed. The construction of the second phase of the core scenic spot has been finished, and we have started to repair and protect cultural landscape such as Yangjing Temple and others. III. Project Content The Management Service Area, Core Landscape Area, Patriotic Education Base for the Third Anti-Japanese Battle in Changsha, East Yingzhu Mountain Religious Culture Area, Science Popularization and Education Area, Original Agricultural Experience Area, Ecological Conservation Area and other related facilities are proposed to be constructed. IV. Project Investment Project construction is divided into two phases, and a rolling development mode “simultaneous implementation of construction and operation” will be adopted. RMB 180 million yuan will be invested for the first phase project, mainly for infrastructure construction; and RMB 120 million yuan will be invested for the second phase project, mainly for construction of all scenic spots. V. Cooperation Way Sole proprietorship, contractual joint venture, joint venture or other ways VI. Benefit Analysis Return of investment: tickets income. The payback period is estimated to be 7 years. VII. Project Initiator Project Initiator: People’s Government of Fulin Town, Changsha County
Qingshan Mountain International Eco-Tourism Resort Project I. Project Background "Qingshan Mountain International Eco-Tourism Resort" project is located in Jinjing Town of Changsha County. It is a compound eco-leisure tourism area based on the primeval forest and original biosphere, which covers an area of 40,000 Chinese mu. II. Preliminary Work It has completed the reply and approval of the project, concept renderings design and ecological immigration of 750 households with more than 3,200 villagers. It has been approved to construct “Changsha Qingshan (International) Hunting Ground”. III. Project Content The total planning area is about 40,000 Chinese mu, among which the core planning area covers an area of about 31,000 Chinese mu, the conceptual planning area covers an area of 9,000 Chinese mu. It plans to build 9 major topics of “the original landscape recreation, forest tour and health keeping, ecological leisure vacation, Zen bowing and praying, extreme sports entertainment, high-end jungle hunting, popular science of forest hunting, biological food shopping and native environment conservation" and so on. IV. Project Investment Project investment totals about RMB 3.6 billion yuan. The investment of the first phase is RMB 820 million yuan. The construction period is 10 years. V. Cooperation Way 230
Contractual joint venture, joint venture, sole proprietorship VI. Benefit Analysis After the completion of the project, the number of the average annual tourists will reach 3 million in the first three years with per capita consumption of RMB 500 yuan. The average annual revenue is expected to reach RMB 1.5 billion yuan. VII. Project Initiator Project Initiator: Changsha Sanzhen Forestry Science and Technology Development Co., Ltd.
Quality-Improvement Development of Scenic Spot in Dawei Mountain National Forest Park in Liuyang City I. Project Background Located in the northeast of Liuyang City, Dawei Mountain National Forest Park is the birthplace of Liuyang River and the highest peak in east Hunan, which is 1,607.9 meters above the sea level. In recent years, tourism development of Dawei Mountain has been included in the “251 provincial projects” and it has been one of the Liuyang City's seven key economic development sectors. Liuyang government has set up an investment and financing platform--- Dawei Mountain Tourism Investment Development Co., Ltd. and established "a garden boost four town’s development", "three united and four separated” management systems and development models. It plans the industry development and tourism layout of Sixiang Town which is surrounding Dawei Mountain, and accelerates the forest park industry convergence and docking with surrounding villages and towns. The developing atmosphere there has gradually increased and the development of Dawei Mountain National Forest Park rises in response to the proper time and conditions II. Preliminary work Dawei Mountain Tourism Investment Development Co., Ltd. has been established as the investment and financing platform. III. Project Content 1.Qixingling Scenic Spot: Concentrating on “The First Peak in Changsha”, “Sunrise in Xiaoxiang”, “Birthplace of Liuyang River”, it will develop special tourism activities including seeing the sunrise in Xiaoxiang, mountain tourism, ecological camping, outdoor photography, mountain climbing and wedding festival. 2. Walinping Holiday Base of Zhongtang: Relying on the ecological landscape pattern of Waling Ping, it will develop holiday accommodation products of multi-type and multi-level and form the tourist resort cluster corresponding with the South Gate tourism town. 3. South Gate Tourism Town: Following the overall strategy of "Provincial Tourism Industry Park" and "International Eco-Tourism Demonstration City", it plans to construct Dawei Mountain tourism portal and the tourism town with unique features. 4. Dawei Mountain Forest Park Resort: It plans to create the most prestigious high-end resort in central China with major four experiences like “leisurely living, leisurely eating, leisurely entertainment and leisurely tour”. 5. Lakeside Terraced Area: Relying on the magnificent terraced landscape and original rural villages, it plans to develop terraced fields, rural vacation, farm experience, rural food and other special tourism projects and to construct a rural leisure base with the most original rural feelings in Changsha City. 6. Elephant Mountain Scenic Area: With water as the axis, it will integrate the Danxia landform and the original villages to develop water sightseeing project and hydrophilic entertainment products and to build "Ten-mile Gallery above water" leisure tourism zone. IV. Project Investment Investment totals about RMB 10 billion yuan. Dawei Mountain is rich in tourism resources.It is the largest and closest ecological oasis from Changsha, Zhuzhou and Xiangtan Cities with the best ecological environment V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture Sincerely invite companies with large-scale tourism development experience to participate in the development. VI. Benefit Analysis 231
The main economic benefits from projects including scenic spots tickets, accommodation, catering, shopping, entertainment, equipment rental, transportation and other projects. It is estimated to receive an annual average of 1.5 million tourists with per capita consumption of RMB 800 yuan and the annual income of RMB 1.2 billion yuan. VII. Project Initiator Project Initiator: Dawei Mountain Tourism Investment and Development Co., Ltd in Liuyang City
Construction of Outdoor Sports Base in Dongwu Mountain of Ningxiang County I. Project Background The project belongs to the national key town – Huitang Town of Ningxiang Country, where the Huitang Hotspring is one of the China's three high temperature compound hot springs with more than two thousand years of history. The maximum temperature can reach 98℃. Huitang Hotspring is rich in 29 kinds of trace elements like potassium, calcium, magnesium, etc., as well as bicarbonate, metasilicic acid, fluoride and other compounds, therefore, is has many effects such as abirritation, antiinflammation, desensitization, physique intensification, beauty maintaining and anti-aging. Huitang Hotspring enjoys the “natural medicine spring, magic water, country soup "and other reputations, it is one of the first batch of national tourism resorts, health preserving tourism demonstration base. The project relies on the unique natural landscapes and rich hot spring resources of Dongwu Mountain Scenic Area (AAA), plans to build an outdoor sports base integrated fitness and adventure, sports and leisure, sightseeing, hot spring resort and other functions. Ⅱ. Preliminary Work The scenic area has 10 km asphalt pavement tour road, 5 km log trails; With acres of red maple forest, million-peach valley and other attractions, there has become the permanent base both of the national youth orientation cross-country race and the international mountain bike race. The spot has successfully held two sessions of the cycling race around Hunan Province and six sessions of the Peach Blossom Festival. Ⅲ. Project Content 1. The Eagle’s Beak Stone sightseeing platform and bungee jumping site: sightseeing platform and bungee jumping site are going to be built at the eagle’s beak stone for tourists to experience the thrills of high altitude extreme sports. 2. Leizi Stone natural climbing zone: the existing natural linear climbing zone with the total length of 200 meters and a fall of more than 100 meters can bring enjoyment and challenge to climbing. 3. Peach Blossom Valley Scenic Area: It is intended to add water elements to upgrade the Peach Blossom Valley as a whole, creating a dream paradise. 4. RV Camping Base: build RV Camping Base on the natural lawn around the Dongwu Reservoir. Set up barbecue buffet with full range of barbecue equipment as well as raw and ecological ingredients to make visitors feel closer to the nature and enjoy the natural delicacies. IV. Project Investment Investment totals RMB 1 billion yuan. V. Cooperation Way Sole proprietorship VI. Project Initiator Project Initiators: People's Government of Huitang Town in Ningxiang County, Investment Promotion Service Center of Ningxiang County
Comprehensive Development of Qingshuitang Industrial Culture Park in Zhuzhou City I. Project Background The project is located in the old industrial area of Qingshuitang in Zhuzhou City, one of the industrial layout areas in the national “First Five-year Plan" and "Second Five-year Plan". With a 232
60-year history of industrial development, a profound industrial culture foundation has come into being. At present there are a lot of valuable old factories and facilities can be developed. The project focuses on protecting and utilizing the buildings of former enterprises, and conducting reconstruction and reuse based on the industry sites. II. Preliminary Work The project has been included in the key construction projects of provincial government and the municipal government; it is expected to relocate all the internal polluting enterprises in 2018. III. Project Content Qingshuitang Industrial Culture Park covers an area of 3000 Chinese mu, among which 1400 Chinese mu for industrial sites park in the core area, and the remaining 1600 Chinese mu for theme-oriented commercial district. The main constructions items include: industrial sites park, Museum of Science & Technology of Hunan Province, theme-oriented characteristic town (street), experiencing type business, supporting services and others. IV. Project Investment Investment totals RMB 8 billion yuan. V. Cooperation Way As for the whole project: cooperative development As for infrastructure construction: PPP; VI. Benefit Analysis Government will give investors the corresponding returns. VII. Project Initiator Project Initiator: Zhuzhou Qingshuitang Investment Group Co., Ltd.
Construction of Camphor Hot Spring Tourism Resort in Yanling County I. Project Background Yanling County, located in the southeast border of Hunan Province, has the national key cultural relic protection site, the first mausoleum of China - Emperor Yan Mausoleum. “Sacrificial Ceremony for Emperor Yan” was included in the first national “Intangible Cultural Heritage List” in 2006. Yanling also has a national nature reserve - Shennong Valley National Forest Park. The project is located around Emperor Yan Mausoleum Palace, where about 3 km along the upstream and downstream of Mishui River. A number of large and small hot springs are distributed here without being effectively utilized. Relying on local tourism resources, the project aims to build a leisure and tourism complex with the Emperor Yan culture as the soul and good ecological environment as the background and the original living environment as a selling point. II. Preliminary Work Preliminary planning, topographic mapping and project planning have been completed. III. Project Content The project is located in the area of Tianxing Village and Xiatang Village in Luyuan Town, Yanling County. The project covers an area of about 1500 Chinese mu, which is mainly used for the construction of hot spring area, ancient town area, leisure area, agricultural culture area and other infrastructures. IV. Project Investment It is estimated that the investment totals about RMB 1.2 billion yuan. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship VI. Benefit Analysis After completion, the project can receive 400,000 tourists per year, according to per capita consumption of RMB 200 yuan; tourism income will reach RMB 80 million yuan. VII. Project Initiator Project Initiator: Economy, Science & Technology, Informatization and Commerce & Food Bureau of Yanling County
Tribe of the Northern Liling Tourism Development 233
I. Project Background Beixiang (Northern) Area of Liling has a wide range of landforms and is rich in water and tourism resources, for instance, special natural landscapes such as Taoist Seventy-two Blessed Places, Zhangxian Ridge, large-scale Guanzhuang Reservoir. In recent years, tourism industry in the north of Linling has developed quickly. Liguan Road, northern circular highway connected Guanzhuang Landscape, Fenglin Impression, Huangtazui Civilian Houses and Weishan Ancient Kiln as a whole. Fenglin Avenue, the road around Guanzhuang Lake improved the tourism traffic network and formed an efficient traffic patterns with the urban expressway of Liling City. II. Preliminary Work "Guanzhuang Landscape" tourism development has begun to take shape; full-length of 32 km ring road around reservoir has been completed. Fence, touch mirror and other ancillary facilities are perfect; the core scenic spot of “Fenglin Impression”—Fengxi Valley is currently open to business, Yongsheng Villa and fruit picking base - Danfeng Fruit Industry has been established and put into operation; Huangtazui Civilian Houses and Geng’s Ancestral Hall have been restored. Ⅲ. Project Content The total planning area is 174.4 square kilometers, including Weishan Town, Fenglin Town, Guanzhuang Town and so on. It plans to build an ecological leisure resort integrating leisure, entertainment, food, shopping, folk customs, culture and arts as a whole. And the main construction items include 4 tourism brands: Guanzhuang Landscape, Fenglin Impression, Huangtazui Civilian Houses and Weishan Ancient Kiln. 1. Guanzhuang Landscape: focus on water experience, wetland tourism, mountain sports and other tourism products. Cultural landscapes like tourism town, Lufo Ridge Forest Park, restoration of Dafo Temple have been included in the planning. 2. Fenglin Impression: the main scenic area is ten-mile contour of Fenglin Town, covering an area of 7 square kilometers. The mainly recommended tourism products are health maintenance, colorful flowers landscape and organic agriculture experience. 3. Huangtazui Civilian Houses: the Zhanglong Mountain Forest Park is planned to be the main scenic spot covering an area of 6.5 square kilometers. To create a 4A level scenic spot integrating folk experience, Taoism health maintenance and tea-horse cultural experience. 4. Weishan Ancient Kiln: the planned area is about 7.1 square kilometers. Plans to build ancient kiln site cultural park, Wangxianqiao Reservoir and other projects. The primarily recommended tourism products are ceramic culture experience and folk tourism. IV. Project Investment The planned investment totals RMB 2.5 billion yuan, presently, about RMB 710 million yuan has been invested. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VI. Benefit Analysis After the comprehensive development, the project can receive 2 million guests from Changsha, Zhuzhou, Xiangtan as well as tourists at home and abroad. The annual rate of profit will be more than 20%. VII. Project Initiator Project Initiator: Business Travel and Grain Bureau of Liling City in Zhuzhou
Comprehensive Development of Dajing Scenic Area in Zhuzhou I. Project Background Dajing Scenic Area is located in the suburb of Zhuzhou City with total planned area of 29.67 square kilometers. The forest area is 16.6 square kilometers, accounting for 56% of the total area. Surrounded by mountains, the water area of Jingshui Lake is 3600 Chinese mu, and dozens of streams meet here. The highest temperature in summer is still 10.8℃ lower than the urban area. And there are 20 kinds of 34 landscapes categorized as physiographic landscape, water area scenery, biological landscape, historic sites & buildings and leisure & knowledge seeking & fitness. The preliminary development focuses on the construction of core scenic area -Poxian Mountain, Jingshui Lake and the surrounding area. However, a vast peripheral area has huge 234
potential for development. II. Preliminary Work The initial conceptual planning and investment attraction program have been completed. III. Project Content The project includes two parts: construction and operation, which will be carried out in three phases: The first phase includes Jingshui Lake recreation area, passionate outdoor sports area, high-end ecological residential area, meditation experience area, peninsula business hotel area, leisure agriculture experience area, forest oxygen bar, sports park and school (vocational and technical school). The second phase includes the lakeside theme hotel area, theme-oriented recreation area, film and television base for all people (continued development of Jingshui Lake recreation area, passionate outdoor sports area, high-end ecological residential area, meditation experience area) and school (primary school). The third phase includes folk culture village and other supporting facilities (continued development of meditation experience area, theme-oriented recreation area, high-end ecological residential area, secondary school). Operation projects include the Jingshui Lake recreation area, passionate outdoor sports area, theme-oriented recreation area, leisure agricultural experience area, meditation experience area, lakeside hotel area, peninsula hotel area, high-end health residential area, and the film and television base for all people, folk culture village, and ecological region, etc. IV. Project Investment Project investment totals about RMB 11.1 billion yuan. V. Cooperation Way During the franchise period, the BOOT will be used. VI. Benefit Analysis Project income includes operating income and repayable transfer of fixed asset. VII. Project Initiator Project Initiator: Lusong State-owned Assets Investment and Development Group Co., Ltd of Zhuzhou
Tourism Development of Zhuting Ancient Town in Zhuzhou County I. Project Background Zhuting Town, with nearly millennium history, is located at the south of Zhuzhou County, east bank of Xiangjiang River, known as Puwan in the past. Beijing-Guangzhou Railway runs through the town from west to east of 7 km and Zhuting Railway Station was established accordingly; Beijing-Hong Kong-Macao Expressway stretches across Zhuting Xiangjiang Bridge at the south of the town, and Zhuting Interchange was hereby set up. The town is rich in tourism resources, including Granite Street, The Hall of Patriarch relics, Zhuzi Pavilion relics, Longtan Academy site, Lu Ban Hall, Hitching Camphor, Longtan Bay and other landscapes. There are nearly 10 terminals along the 9 km waterway area. Hundred miles of artificial forests Tianzi Hill is one of the 72 ranges of Mount Heng; Provincial forest park-Phoenix Hill, Zhuting New Town also get beautiful sceneries. Benefit from its rich tourism resources, profound histories and cultures, the project has great potential for development. II. Project Content 1. The overall scene of the town is going to be transformed, including the restoration of some badly damaged but valuable buildings, and the landscape renovation of main streets. 2. Systematically repair the ancient buildings with the historical and cultural value, such as Longtan College, Granite Street, the Old Pier, the Millennium Ancient Well and Lu Ban Hall. Restore the Zhuzi Pavilion, and construct landscape pavilion, landscape trail around Longtan Bay; 3. Construction of tourist service centers, tourist restaurants and other service facilities; 4. Take Zhuting Ancient Town, Tangshi Soil City, Wanzhou Island as the carrier to carry out tourism projects such as famous town tourism, agricultural sightseeing, water amusement, 235
religious pilgrimage, leisure fishing, etc. III. Project Investment Investment totals RMB 600 million yuan. Construction period will last 6 years. IV. Project Initiator Project Initiators: The Department of Culture, Sports, Radio, Film, TV, Press, Publication and Tourism of Zhuzhou Country; People’s Government of Longchuan Town, and People’s Government of Zhuting Town
National Mine Park of Xiangtan Manganese Ore I. Project Background In order to promote the successful transformation of resource-depleted mines, effectively remediate geological disasters, restore the ecological environment and develop tourism and other alternative industries, Xiangtan municipal government put forward the concept to build national mine park in efforts to solve the sustainable development problem of Xiangtan manganese region. Centered at the unique manganese ore remains, National Mine Park of Xiangtan Manganese Ore displays the glorious history of “China’s Capital of Manganese” through reproducing the exploration, mining, selecting, smelting, machining processes of manganese ore, the development history of China's manganese industry, as well as the restoration of mine environment. The project is to be built as “manganese-focused” scientific education base and demonstration base of national mine environmental restoration integrating industry tourism, historical and cultural review, and leisure and entertainment as a whole. II. Preliminary Work The Ministry of Land and Resources approved the project on January 17, 2013 as the third batch of national mine parks. The Ministry of Land and Resources reviewed the master plan and construction details of the project on October 12, 2014. Detailed plan is under designing. III. Project Content The planned land use area is 9.92 square kilometers, the core scenic area takes up 1060.68 Chinese mu. Five areas demonstration area of mine environmental restoration, eco-agriculture sightseeing area, down-the-pit exploration area, modern industry sightseeing area, mine integrated service area and science education area are going to be built. And the main construction items are: the park theme tablet, mine museum, cultural square, tourist reception center, ecological agriculture village, down-the-pit exploration, mine style street and so on. IV. Project Investment It is estimated to invest RMB 420 million yuan. Through the geological environment management, waste residue treatment and other projects to get some supports from state financial funds, the rest will be raised by investment attraction. V. Cooperation Way Contractual joint venture, PPP or other ways Grant franchise rights of operation, development and charge according to the specific nature of the project so as to ensure the gains of investors. VI. Project Initiator Project Initiator: Xiangtan Manganese Mine Park Company
Development of Dongting Lake Exposition Park in Yueyang I. Project Background The project is located in Junshan District of Yueyang City with a total area of 18 square kilometers, shaped a tourism Golden Triangle with Junshan Island and Yueyang Tower. This park has rich Dongting Lake ecological environment and profound humanistic connotations, and it shows the China's freshwater lake culture based on the Dongting ecological culture. The project aims to build a national AAAAA level scenic spot by taking the Dongting Lake Museum as the core, the wetland park as the environment, the leisure vacation as the type of operation. It plans to set up a comprehensive demonstration project integrating ecological protection, farmland protection, lake culture display and recreation function as a whole. 236
II. Preliminary Work The construction of Dongting Lake Museum and Dongting Lake Happy World has been launched. Investment totals RMB 1.55 billion yuan. RMB 85 million yuan has been invested on Dongting Lake Museum project. III. Project Content Dongting Lake Expo Park covers an area of 18 square kilometers, plans to build seven functional areas: entrance business district, the core cultural display area, Dongting cultural experience area, aquatic recreation area, happy holiday resort, ecological recreation area and ecological household area. There are Dongting Lake Museum, five-star hotel, wedding garden, reed marshes wandering, amusement park, Dongting food street, self-driving camp, wetland birds forest, Dongting angling, cruise ship sightseeing, aquatic plant viewing, farming experience, fishing culture experience, tourist service center, tourism real estate development, nostalgia culture experience area, wetland golf course and other special tourism projects. IV. Project Investment Investment totals RMB 5 to 11 billion yuan. V. Cooperation Way Governmental investment or PPP investment; integrated or separated investment, development and management of the project; VI. Project Initiator Project Initiator: The Department of Culture, Sports, Radio, Film, TV, Press, Publication and Tourism of Junshan District, Yueyang City
Construction of Yumu Ecological Scenic Spot in Hengyang I. Project Background Crowned as the Back Garden of Hengyang and the city’s "green lung", Yumu Ecological Scenic Spot is 15km from the southwest of Hengyang City. The total planned area is about 39 square kilometers, and the core area covers 10 square kilometers. This spot has been identified as one of the three demonstration sites for the construction of beautiful village in the urban area. After the completion of the project, the Nanyue-Yumu tourism economic circle will come into being, which may meet the urgent demand of Hengyang people for cultural leisure, tourism and ecological health maintenance. II. Preliminary Work Hunan Yumu Tourism Investment and Development Co., Ltd. was unveiled on July 5, 2016. At present, the scenic spot has improved the signs and logo, tourism safety, environment and health protection system and tourism services. There are three projects under construction, the construction of small towns is underway. Planning and Design Institute of Hengyang City is designing the master plan for Yunmu Scenic Spot. III. Project Content The land use are is planned to be 3000 Chinese mu and the construction area is 80,000 square meters, including Bull-like Stone Peak Scenic Area, Xiaoquan Lake Scenic Area and Saddle-like Peak Scenic Area. The construction items include cultural creativity and leisure area, recreation area, tourist reception area, ecological food area, flora and fauna park area, landscape pavilion, artist tribe, etc. A comprehensive ecological scenic spot integrating cultural learning, playing, accommodation and catering service will be built. IV. Project Investment Project investment totals RMB 1 billion yuan, among which 400 million yuan will be used for civil engineering, RMB 300 million will be used for land expropriation and housing demolition, RMB 300 million will be used for garden ecological construction. V. Cooperation Way Sole proprietorship or joint venture VI. Project Initiator Project Initiator: Hengyang High-tech Investment Co., Ltd
237
Overall Development of Nanyue Shuilian Cave Scenic Area in Hengyang City I. Project Background Nanyue Shuilian Cave Scenic Area is located in the east side of the core scenic spot of Hengshan Mountain. It is one of the "Four Unique Scenic Features" of Nanyue. There are "the Third Cave Heavens" and "the Twenty-Sixth Blessed Places" mainly consisting of Shuilian Cave, Fushou Lake, Zhuling Palace with total areas of about 2.7km2. The main landscapes include cliffs and waterfalls, green mountain and clear lake and inscriptions on precipices. The overall development of Shuilian Cave Scenic Spot positioning to create the right wing of "one body and two wings” layout of Nanyue tourism. Industry cluster integrating landscape scenery, ecological leisure, pilgrimage enlightenment, rural exploration, cultural innovation and pension health maintenance is going to be constructed. II. Preliminary Work The overall planning program has been compiled and the water, electricity, roads and other infrastructures are perfect. III. Project Content The core scenic area of Shuilian Cave is intended to be upgraded and transformed, the Amitabha Temple, "Huandanfu" Stone Inscription Museum, Hengshan Academy will be repaired, and the Wuji Palace, Shuilian Ecological Agriculture Park, International Health Resort Hotel, etc. are going to be constructed. IV. Project Investment Project investment totals about RMB 2 billion yuan. V. Benefit Analysis The reception capacity of Nanyue Mountain is 8 million tourists per year, if calculated by 2 million tourists per year, the annual tourism income of Shuilian Cave Scenic Area is approximately RMB 90 million yuan. VI. Cooperation Way Contractual joint venture, sole proprietorship VII. Project Initiator Project Initiator: Management Office of Shuilian Cave Scenic Area in Nanyue District, Hengyang City
Construction of Mount Paradise National Forest Park in Changning City I. Project Background Mount Paradise belongs to the Yangming Mountain Range of Nanling Mountain system, it is the first peak in Changning City with 1265 meters above sea level, a total area of 5933.4 hectares. The average altitude is more than 1000 meters above sea level, there are 1379 species of plants and 143 species of animals. The main peak is known as “Dragon’s Head”, which has beautiful topography and good ecological environment. The spot includes karst cave, stone forest, waterfalls, springs, ancestral hall, temples and mountain villages. The area has Yangquan medium-sized reservoir - "Paradise Lake", which surrounded by mountains on three sides. Paradise Hill National Forest Park is located in the southwest of Changning City, 25 kilometers away from the urban area. Stretching across Miquan, Miaoqian and Tashan towns and villages of Changning City, the spot enjoys convenient transportation. It is rich in negative oxygen ions with the year-round temperature of about 15℃. II. Preliminary Work The project has been incorporated into the Thirteenth Five-year Plan of Changning City. It has been initially built as an integrated tourist area with tourism, leisure and overwater amusement. III. Project Content Tourist attractions, such as Miquan resort, Jiulong Tower tour area, bamboo garden, water amusement park, forestland-grassland scenery, etc. with a total planned area of 96,300 Chinese mu are going to be constructed. The main construction contents: 1. 11.5 km of walking trail, 4 parking lots with total area of 6400 square meters, being equipped with protective facilities; 2. Ten environmental-protection public toilets with a total area of 400 square meters; 3. Science 238
education and tourism service facilities; 4. 500 square meters of multi-function tourist center, and 120 square meters of guide center; 5. Self-service system of travel service information and green wisdom tourism facilities; 6. Forest museum; 7. 500 square meters of multi-purpose tourist center and education center; 8.Three viewing platforms with total area of 500 square meters. IV. Project Investment Project investment totals at RMB 300 million yuan. V. Benefit Analysis Calculated by annual reception capacity of 50,000 tourists, the estimated annual profit will reach RMB 18 million yuan. VI. Cooperation Way Contractual joint venture, joint venture, sole proprietorship The project can enjoy preferential policies related to investment attraction in Changning. VII. Project Initiator Project Initiator: Changning Traffic and Tourism Investment Co., Ltd., Hengyang City
Infrastructure Construction of Dayi Mountain Tourist Area in Changning City I. Project Background In order to meet the needs of the tourism market, to promote regional economic development and industrial structure optimization and protect the historical and cultural monuments, Changning municipal government decides to speed up the infrastructure construction of Dayi Mountain Tourist Area. Plans to integrating those tourism resources such as Jinlong Rock, Yishan Mountain, Dayi Mountain Reservoir, Sacrosanctity Temple, Lion-like Ridge, the bamboo sea exploration, Wangsi Ridge, Hequn Waterfall, the Jiulongtan Waterfall and Miaoshan Village Cherry Garden, etc. as a whole. II. Preliminary Work The feasibility study report has been compiled, the investment and financing amount of 2017 is estimated to be RMB 40 million yuan. III. Project Content The land for construction use amounts to 230 Chinese mu. And three scenic areas will be constructed: 1.Yishan Mountain Scenic Area: Build 1 tourism reception center, 2 ecological parking lots and 1 classic garden-style door; Construct new tourist roads (12000m), the walking trail (7500m) and boundary markers, boundary pillars, etc. Build water supply and drainage system, electricity and telecommunication system, scenic area mark system, environment sanitation facilities, security facilities, etc.; 2. Sacrosanctity Temple Area: Build ten thousand steps, the recreation corridor and viewing pavilion; 3. Hequn Scenic Area and Jiulongtan Waterfall Scenic Area: Build the entrance roads (3500m), characteristic walking trail (3000m), ecological sanitation, parking lot signs, scenic area mark system, safety system and other infrastructure projects. IV. Project Investment Project investment totals RMB 1.5 billion yuan, among which RMB 430 million yuan is self-raised capital and the remaining RMB 1.07 billion yuan comes from bank loan. V. Cooperation Way Joint venture, PPP financing. VI. Project Initiator Project Initiator: Administration Bureau of Dayi Mountain Nature Reserve in Changning City, Hengyang City
Development of Cai Lun Bamboo Sea Scenic Area in Leiyang City I. Project Background Cai Lun Bamboo Sea Scenic Area has jurisdiction over 18 towns and villages such as Huangshi 239
Town, Nanyang Town and Dayi Village. With planned area of 106.6 square kilometers (the water area is 2.7 square kilometers) and the core area of 66 square kilometers, Cai Lun Bamboo Sea Scenic Area is the elaborate tourism product and leading project of Leiyang City. The scenic area is endowed with beautiful landscape and quiet environment, the forest of luxuriantly green bamboos with total area of 160,000 Chinese mu is the largest contiguous bamboo forest of China, known as “Asian bamboo sea”, “natural big oxygen bar”. Leishui River flows through the bamboo forest and the bamboos are reflected in the water. And there are “Three Spectacles”: First is the natural beach fountain which can be sprayed 25.06 meters, certificated by Shanghai Guinness World Record; Second is the fish fossils of the bamboo sea, after identified by the Chinese Academy of Sciences, it was formed about 250 million years ago and has very high scientific value. And third is the Shangbao crystal mine, where over 20 mineral samples in National Geological Museum come, and the symbiotic vug here enjoys a world reputation, II. Preliminary Work Since starting the construction in 2008, Cai Lun Bamboo Sea Scenic Area has been successfully constructed as a national AAAA tourist attraction, national water conservancy scenic spot, the hometown of bamboo forest, scenic area of Hunan province, Hunan forest park and civilized scenic spot in Hunan province. III. Project Content The project planning includes the construction and transformation of roads (32km), walking trails (35km), tourist reception center (6000m2), three parking lots, ecological embankment, RV camp, upgrading of water supply and fire-fighting facilities, sewage waste disposal, ancient building repair and other infrastructures. IV. Project Investment Project investment totals RMB 580 million yuan, among which 520 million yuan will be used for land expropriation and project construction, RMB 10 million yuan will be used for surveying and designing and RMB 20 million yuan will be used for others. V. Benefit Analysis After the completion of the project, it will realize an annual rate of return of about 8%, an annual profit of about RMB 40 million yuan and the local tax revenue of about RMB 8 million yuan. VI. Cooperation Way Joint venture VII. Project Initiator Project Initiator: Hunan Cai Lun Bamboo Sea Tourism Development Co., Ltd.
Construction of Qi Baishi Cultural Tourism Zone in Xiangtan County I. Project Background Baishi Town, Xiangtan County, endowed with profound cultural deposits and many celebrities, is very abundant in tourism resources including a national key cultural relics protection unit - Qi Baishi’s Former Residence, the provincial cultural relics protection units -Ancestral Temple of Yin, Simenqian Charitable Ferry and Former Residence of Eight Outstanding Men of Li, provincial forest park - Qi Baishi Forest Park, national AAA scenic spot – Mount Wulong Dajie Temple, and the legendary Zhoujia Cave, Mount Jigong and so on. The project will centre on the Qi Baishi cultural industries and eco-tourism resources, to create the most representative brand of the Chinese Qi Baishi culture, and form a cultural resort integrating artistic appreciation, sightseeing, leisure and tourism. II. Preliminary Work The “Regulatory Plan of Baishi Culture Eco-tourism Area” is being compiled. III. Project Content Project construction includes 6 items: 1. Ink painting village: take Xiangtan ancient residential buildings as the theme, build a temple fair street of Celestial Queen Temple; restore the Mei Gongci to display the carving techniques and reading, painting and writing, poetry and other scenes of Qi Baishi; 2.Ancient workshops: centre on the ancient workshops and creative workshops to gather a variety of workshops in the county, such as rice wine workshop, manual work mill, tofu workshop, lotus workshop, ceramic workshop and cloth shoes workshop and so on; 240
3. Baishi Painting and Calligraphy Academy: construct Baishi seal cutting museum, painting hall, calligraphy hall, poetry hall, Xingdoutang painting base, and the buildings are folk houses; 4. The Mainland, Taiwan and Hong Kong traditional Chinese painting base: construct Chinese painting art street, landscape painting square, academic exchange center of the Mainland, Taiwan and Hong Kong experts, artist villages; 5. The world’s painting and calligraphy art town: build painting street, poetry street, seal cutting street, calligraphy street and Qi Baishi Cultural Square around Zijing Lake; 6. Zijing Lake Resort: take Qi Baishi art culture and health culture as the core, and the religious meditation culture as the feature to build health center, art island, villa chamber, mountain cabin, and meditation center. IV. Project Investment Project investment totals RMB 1 billion yuan. V. Benefit Analysis Ticket income will reach RMB 80 million yuan if calculated by 400,000 tourists per year; if per capita consumption is RMB 450 yuan, the annual income of catering and service industry will up to RMB 180 million yuan. The operating cost will be RMB 90 million yuan and real estate development gains RMB 400 million yuan, the payback period will be 4 years. VI. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VII. Project Initiator Project Initiator: Baishi Town People’s Government in Xiangtan Country Project Initiator: Culture, Tourism and Sports Bureau of Xiangtan Country
Construction of Zhaoshan Aviation Theme Park I. Project Background Xiangtan Zhaoshan Demonstration Area is located in the center of Changsha-Zhuzhou-Xiangtan City Cluster. As the core area of this metropolitan area, its distance from the three city centers are not more than 15 km. Huanghua International Airport, Changsha South Railway Station of Beijing - Guangzhou High-speed Rail, Zhuzhou West Station can be arrived within 20 minutes. Shanghai-Kunming high-speed railway Xiangtan station can be arrived within only 10 minutes. Effected by the Huxiang culture, Zhaoshan has “Shan Shi Qing Lan”—one of the eight famous “Xiaoxiang Landscapes”. Zhaoshan Ancient Temple was built in the Tang Dynasty, Buddhist culture has a long history of precipitation. In 2014, Zhaoshan Scenic Area was awarded the national 4A level scenic spot, in 2015 won the first batch of “national tourism demonstration areas”. II. Project Content The total regulatory area is 3595 Chinese mu, among which land for construction use is about 2736 Chinese mu. Plans to build 4 industry pillars: aviation technology experience area (theme park), traffic complex, markers space and e-commerce industrial park: 1. Aviation technology experience area includes aviation science and technology cultural experience center, aviation theme world, geek-flying Park; 2. Traffic complex: Build the urban subway, public transportation, tourism bus terminus, taxi, tourist sightseeing rail car, P + R park lots, air-rail direct vehicles and other transport center themed of aviation culture 3. Makers space includes makers ’base and creativity district; 4. E-commerce industrial park includes e-commerce mall, exhibition center and accounting center, etc. III. Project Investment Project investment totals RMB 7 billion yuan. IV. Benefit Analysis After completion, the first three years of reception is expected to reach 5 million people so the ticket sales of about RMB 750 million yuan. Each year after that will be stable at more than 3 million people so the annual ticket sales of about 450 million yuan. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship. The specific way will be confirmed 241
after negotiating and signing the contract. VI. Project Initiator Project Initiator: Investment Attraction, Tourism and Cooperation Department of Xiangtan Zhaoshan Demonstration Area
Construction of Shuifu National Tourist Resort in Xiangtan City I. Project Background The project is located in Qizi Town, Xiangxiang City. Covering a water area of 45km2, the bank shoreline is 431km long with more than 100 reservoir bays and 34 islands. The area is rich in tourism resources. According to the classification of tourism resources, there are 7 forth level objects of tourism resources, 17 three level objects of tourism resources, 40 second level objects of tourism resources and 12 first level objects of tourism resources. Its combination of mountains, water and forests is perfect to build an ideal place for tourism, exercise, adventure, avoiding summer heat, leisure and health maintenance, which shows a great development value. II. Preliminary Work At present, the number of tourists there has achieved 400 thousand per year. It has successfully won the National AAAA level tourist attraction, National Water Scenic Area and National Wetland Park. â…˘. Project Content The project consists of nine sub-projects including water culture theme park, art creation and exchange culture park, wedding photography base, sightseeing of boutique agriculture and Shuifu fishing village, comprehensive development of non-standard boutique accommodation on island, Song kiln culture theme park, outdoor sports base in Tianmen Mountain, Xiangjun Shuizhai film and television base and heath keeping community. IV. Project Investment Project investment totals at RMB 6 billion yuan. â…¤. Cooperation Way Contractual joint venture, joint venture, sole proprietorship; Investors can develop and construct the overall project and they can also separately invest on relevant items. VI. Benefit Analysis 1. Operation and management income; 2. Specific concessions for specific tourism projects; 3. Government purchase of services and support policies. VII. Project Initiator Project Initiator: Tourism Construction Department of Xiangtan Shuifu Demonstration Zone
Cultural Tourism Construction in Wanlou Area in Xiangtan City I. Project Background The profound Xiangtan culture is always known as the red holy land, the origins of Hunan academics, ancestral land of Hunan merchants. There rich humanity resources and beautiful natural resources provide unique conditions for Xiangtan culture development. Transportation in Wanlou Area is very convenient, with just northward 3 miles to get to Shanghai-Kunming Expressway, Changsha-Xiangtan West Expressway, Changsha-Hengyang Expressway and Shanghai-Kunming High-speed Rail Station. To the southwest, the Xiangtan Railway Station and the Intercity Railway Station is within 3 km. Making full use of the existing historical and cultural resources, combining Hunan culture, Xianglian culture and celebrity culture, the construction of the Xiangjiang River and the restoration of historical and cultural relics, the project will vigorously develop the tourism industry and life service industry. II. Project Content 242
Located in Xiangtan Wanlou New Town, this project covers an area of about 240 Chinese mu and develops in "tourism + real estate" mode. The project plans to create tourist attractions of “Wanlou scenic area + a museum, five centers + Wanlou culture and leisure area”, making it as a new tourism boutique in Xiangtan. III. Project Investment Investment totals RMB 1.5 billion yuan. The construction period will last 2 years. IV. Cooperation Way Contractual joint venture, joint venture, sole proprietorship or PPP; the specific way will be determined after negotiating and signing the contract V. Project Initiator Project Initiator: Xiangtan Real Estate Group Co., Ltd
Protection and Development of Yaowan Historical and Cultural Blocks in Xiangtan City I. Project Background Yaowan Ancient Street is located in the urban area of Xiangtan City and it has a profound history and ancient architectures. Now it is undergoing the tourism depth exploitation, and in the future it will form a historical, cultural and commercial district with the theme of “ancient building, city memory, Hunan characteristics, Shanjiang fishing sandbar". The project plans to build regional tourism, hotel accommodation, food and beverage products aiming to mass tourists, to produce cultural experiential products for intellectuals and students and to provide business and leisure products for businessmen and politicians. II. Preliminary Work The construction of Tangbao Bus Station and square, the restoration of Jiangshan sights, Tangxin Bridge cultural relics and the transformation of Tangxin Bridge exit section have been finished; The first phase of municipal road and pipe network project and the infrastructure construction of Jiangshan scenic landscape wall have been completed; The River street, bar street pile foundation construction is in progress. Ⅲ. Project Content Project construction includes the core-protected area, construction control area and the landscape coordination area. Among them: 1. The core-protected area of 5 Chinese mu is the historical district, the project will repair a construction area of 51,263 square meters while the original capacity will not change; 2. The construction control area covers an area of 20.45 hectares, among which capacity building area of 106,737 square meters including the construction of Tangxing Temple, courtyard, hotel and repair of commercial district; Non-capacity flooring area is 33,770 square meters, including empty space, basement, waste transfer station, substation, etc. 3. The landscape coordination area is 16 hectares including cruise terminal and wetland park. IV. Project Investment Project investment totals RMB 1.3 billion yuan. V. Cooperation Way Joint stock, contractual joint venture; the specific way will be determined after negotiating and signing a contract. VI. Project Initiator Project Initiator: Xiangtan Urban and Rural History and Culture Investment Development Co., Ltd
Development of Fahua Mountain Forest Park in Xiangtan High- Tech Zone I. Project Background Fahua Mountain Forest Park is located in Shuangma Sub-district in Xiangtan High-Tech Zone, Xiangtan City, 9 km away from the urban area. It is the highest place in Xiangtan urban area, which is 299 meters above sea level. The total area of forest in the project area is 3,048 Chinese mu. Therefore, it has been considered as the green center of Changsha-Zhuzhou-Xiangtan City 243
Cluster. Possessing superior natural conditions and abundant tourism resources, Fahua Forest Park is the best place to relax and avoid the heat. II. Project Content Without changing the planning of green center, the project will mainly construct the following items through the land transfer mode: 1. Leisure villas: Using the original ecological conditions to build 20-30 small villas and to attract urban family tourists, forming the reception capacity of 200 people a day. 2. Special dining area: Taking Majia River mutton, river fish and green ecological vegetables as the specialty, building special dining restaurants in scenic area. The project will construct the Fahua Temple covering an area of 60 Chinese mu and create the cultural tourism area to satisfy the mass pursuit of religions. â…˘. Project Investment Project investment totals RMB 200 million yuan, among which 50 million yuan will be used for land expropriation and housing demolition; RMB 70 million yuan will be used for infrastructure construction, RMB 30 million yuan and 22 million yuan will be used for land transfer rent and facilities respectively. Other expenses total RMB 28 million yuan. IV. Benefit Analysis 1. Income of land development (the land price of surrounding roads is temporarily calculated at RMB 1.5 million yuan per Chinese mu). 2. Income of property management. 3. Operating income in scenic area (bicycle rental, supporting leisure business, sports and entertainment, boat rental, religious income, etc.). 4. Government support policies. Tourism revenue is estimated to achieve RMB 49 million yuan by the end of 2020. V. Cooperation Way Contractual joint venture, joint venture, sole proprietorship; VI. Project Initiator Project Initiator: Xiangtan High-Tech Industrial Development Zone
Construction of Large - scale Integrated Amusement Park in Xiangtan Economic and Technological Development Zone I. Project Background At present, the business and service industry in Xiangtan Economic Development Zone is mainly concentrated within 2 km of the management committee. Consumption resources are relatively scarce and the scale and effective supply and disposable living resources per capita are not adequate, which is difficult to meet the growing demand of people's need, especially the recreational facilities need. There is no large amusement tourist attraction in Xiangtan City. Taking consideration of the development needs and overall layout of Xiangtan Economic Development Zone, government is urgent to enhance the public service capability of Binjiang New Zone. II. Preliminary Work At present, Xiangtan Economic Development Zone is increasingly stronger with the population has reached 200,000, and industrial workers in the park has reached 60,000. In 2016, the region's industrial output value reached RMB 10.12 million yuan and the number of industrial workers increased at the rate of 8000-10000 people per year. It is expected that by 2020, urban population will be 35 million; industrial workers will reach 200,000 with larger consumption demand. The project has completed the site selection and it is undergoing planning and design. III. Project Content The project is located in Xiangtan Economic Development Zone and around the Jiuhua Lake project. The land for construction use amounts to 150 Chinese mu. This park is mainly positioned as a large park which integrates sightseeing, leisure and entertainment, cultural exchanges and catering. The project includes roller coaster, big pendulum, double-deck merry-go-round, jumping machine, Ferris wheel, spacewalk, Wild Water, bumper car, water park and other recreation. IV. Project Investment Project investment totals at RMB 500 million yuan, including engineering costs, other costs of the project, preparation costs and working capital. 244
V. Benefit Analysis The construction period of the project is 2 years, and the estimated operating income is RMB 300 million yuan after the completion of the project. VI. Cooperation Way Contractual joint venture, joint venture or sole proprietorship; the specific way will be determined after negotiating and signing a contract. VII. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
Construction of Tourism Industrial Park of Hunan Merchant Culture in Shaoyang City I. Project Background Abundant in its tourism resources, Shaoyang City is the third largest city with rich tourism resource which is next to Zhangjiajie City and Changsha City. It is located in the “big Xiangxi tourism circle” composed of Zhangjiajie and Xiangxi Autonomous Prefecture and the overlapping area of "big Guilin circle" taking Lijiang in Guiling, Guangxi Province as its core, which compensates the blank space of tourist gap between Zhangjiajie tourism area and Guilin tourism area. With the opening of the Shanghai-Kunming High-speed Rail, the Wugang Airport, the Huaihua-Shaoyang-Hengyang Railway, the Wu Jing Expressway and the Dongxing Expressway, Shaoyang is expected to become a new growth pole of tourism in Hunan province. In order to speed up the construction of the “Beautiful Riverside New City Featuring Habitable, Work-able and Tour-able" of Beita District, the Shaoyang municipal government attaches great importance to building the "Tourism Industry Park of Hunan Merchant Cultural " and strives to build the Beita District in 2-3 years. The project aims to create a cultural tourism and leisure scenic area to fill gaps of the southwestern Hunan tourism market. Vegetation coverage of the Liaojia Mountain, the Nianyu Mountain, the Zishu Mountain and other major mountains is well. The vision at the peaks of the Liaojia Mountain and Nianyu Mountain along the river is broad, which can be described as “See from the north for seeking snow mountain and see from the south for the cassia tree, and the Zishui River flows to the east all the times”. II. Preliminary Work The land use planning, site selection, relocation thoroughly investigate, conceptual design have been completed. III. Project Content The project is located in the Beita District of Shaoyang City. It will mainly construct the large-scale amusement park, folk cultural heritage park, cultural and creative industrial park, and business supporting services. The land for construction use amounts to 2,466 Chinese mu. It will mainly construct Space Travel Polar Museum, VR Virtual Reality Experience Hall, Maya Water World, Internet Experience Museum, Film and Television Complex (IMAX theater), Makers’ Center (advertising, animation, film and television), folk customs street, folk treasures park and non-material cultural heritage display area. IV. Project Investment Project investment totals at RMB 10 billion yuan, of which investment on modern amusement park should not be less than RMB 1 billion yuan. V. Benefit Analysis In 2015, the tourism income of Shaoyang City was RMB 20 billion yuan and handled 27 million tourists. Calculated by 8%, there will be 2.16 million tourists per year; Shaoyang has permanent resident population of 721.94 million, which will be 1.08 million tourists in the city per year if calculated by 15%; the annual reception capacity can reach 3.24 million people. The direct income will be about 648 million yuan and the net profit will be 450 million yuan. VI. Cooperation Way PPP VII. Project Initiator 245
Project Initiator: Business Travel and Food Bureau of Beita District, Shaoyang City
Construction of Luoxi National Forest Park in Dongkou County I. Project Background With a total area of 298 square kilometers, the Luoxi National Forest Park is the largest national forest park in Hunan Province. The party committee and county government of Dongkou county clearly put forward the general requirement of the "eco-tourism development" construction so as to build the park taking six major characteristic and boutique tourist attractions of "a waterfall, a lake, a mountain, a valley and a district" as the core. It plans to build the Luoxi National Forest Park into a real "tourism leader of Dongkou, scenic brand of Hunan and tourism boutique of China ", turning the tourism industry into a strategic pillar industry and enriching industry in Dongkou County. II. Preliminary Work Luoxi Forest Park construction has been listed in the "Development and Poverty Alleviation Planning in Hunan Wuling Mountain Area" and "251" key projects of the Provincial Tourism Bureau. The project has been completed the "the overall plan of tourism development" and "detailed planning of scenic construction ". Visitor Center, Wanzhang Rock and other projects have been approved. The county will appropriate RMB 10 million yuan from its financial budget every year for the park development, and the capital for integrating poverty alleviation, transportation and other funds should not less than RMB 30 million yuan so as to build the park and basic service facilities. â…˘. Project Content Construction projects: the development of scenic region of Hunan-Guizhou Ancient Road; the construction of Luoxi Forest Hotel; repair of Puzhao Temple architectural complex; the construction of Gongxi Lake Water Park; the development of Lofty Rock Scenic Area; the construction of Luoxi Tourist Service Center; the construction of high mountain cableway and so on. IV. Project Investment Project investment totals RMB 2.6 billion yuan. Luoxi Forest Park project is divided into three phases (9 years) and plans to be constructed and operated at the same time. It will achieve rolling development according to annual investment. V. Benefit Analysis Luoxi Forest Park is a social welfare construction project. It can also boost the market and promote the development of the tertiary industry. VI. Cooperation Way Sole proprietorship, joint venture, contractual joint venture, PPP; VII. Project Initiator Project Initiator: Dongkou County Tourism Bureau Management Office of Luoxi National Forest Park in Shaoyang City,
Modern Amusement Park in Shaoyang City I. Project Background Approved by the Shaoyang municipal party committee and municipal government, the Beita District plans to build the Tourism Industrial Park of Hunan Merchant Cultural of a total area of about 2 square kilometers. It faces the Xuefeng North Road on the east, the Shaoxi Road to the west, the Baoqing West Road to the south and the Weiyuan Road to the north. It plans to construct "one district with four gardens". The project enjoys relevant preferential policies on the Xiang Shang Industrial Park and be given the priority to strive for superior funding support. II. Preliminary Work The site selection has been completed and the land approval is in progress. â…˘. Project Content Modern amusement park will cover an area of 1300 Chinese mu, with a total investment of about RMB 1.5 billion yuan. It will manly construct amusement park, extreme experience, children's 246
playground, competitive square, performing world, green ecological park, and integrated service area, tourism shopping and other projects. It will build a amusement center integrating leisure, entertainment and resort, form the environmental landscape which can travel, view and participate in and build a “city - suburb - rural – field” space leisure system. IV. Project Investment Project investment totals at RMB 1.5 billion yuan. V. Benefit Analysis The project covers more than 15 million people, including the Shaoyang City and the neighboring Huaihua, Loudi, Yongzhou and other places. In accordance with the average annual reception of 1.6 million people, calculated by consumption of 300 yuan each person each time, the annual sales income will reach RMB 480 million yuan, the annual profit is expected to reach RMB 168 million yuan and the annual investment profit rate will be about 14%. VI. Cooperation Way Sole proprietorship or contractual joint venture; VII. Project Initiator Project Initiator: Business Travel and Food Bureau in Beita District of Shaoyang City
Huayuange National Wetland Park Tourist Facilities Construction in Suining County I. Project Background Huayuange Miao nationality-style island is located in the Huayuange Village, Guanxia Miao Nationality Town of Suining County, Hunan Province. This island is surrounded by water on three sides and by mountain on one side, being the core scenic area in Huayuange National Wetland Park. The island covers a land area of over 5000 Chinese mu, an area of 4000 Chinese mu in the waters. There are 6 natural courtyards of 240 families with 900 people, most of whom are indigenous Miao people with Yang as their family name, speaking “Pin Language” which is not understandable to visitors, thus shaping a unique language-isolated island. The island boasts splendid scenery and enjoys abundant tourist resources, ranging from remarkable pastoral landscape to forest ecological landscape, as well as the Wushui Lake and Gorge Pinhu Lake surrounding the whole land. Besides, due to primitive and plain courtyards remained, unique folk customs, salient ethnic characteristics and profound Miao nationality culture have taken shape and been kept here. II. Preliminary Work There are some scenic spots in Huayuange Miao-nationality-style island: Miao Folk Houses, Miao Theatrical Stage, Gallery, Wind-brain Bridge, Forest Park, Yanmen Gorge, Hunan-Guizhou Ancient Path, Ten-miles Landscape Gallery of Wushui River and the best preserved“ Meikou Anti-Japanese War Trench Site”, etc. The road network on the island has taken shape, basically opening a 10-mile beltway, of which road hardening has not finished yet. By now, Huayuange Village has won honors of ”Huayuange National Wetland Park”, ”the most beautiful minority characteristic town in Hunan” and “the most beautiful minority characteristic town in China”. Meanwhile it is also a provincial level poverty village and a key village in China which entails poverty alleviation through tourism. III. Project Content The project construction items include” one belt”, ”two roads”, ” three areas”, and “ four parks”. One belt: Wushui River Landscape Gallery Belt. Two roads: ten-miles island mountain bike racing track and 3000-meters forest skyways. Three areas: travel reception area, cultural performance area, wooden house hot-spring resort area. Four parks: sea of flowers exposition park, forest recreational park, Miao style experience park and water amusement park. IV. Project Investment The construction period for Huayuange scenic area is 4 years, with investment of RMB 0.21 billion in the 1st phase, 0.18 billion in the 2nd phase, 0.17 in the 3rd phase. Hence estimated total investment for the project is RMB 0.56 billion yuan. V. Cooperation Way Sole investment and proprietorship VI. Project Initiator 247
Project Initiator: Suining County Tourist Administration of Shaoyang.
Yueyang Bajiao Lake Five-star Hotel Construction I. Project Background Bajiao Lake is located in Chenglingji New Port Area of Yueyang, covering a total area of 33 square kilometers, of which 11 square kilometers is water area with a lake shoreline of 33.5 kilometers. Boasting splendid scenery and abundant water resources, Bajiao Lake is one of the best preserved ecological lakes in terms of water area and ecology. Hence it has been incorporated into Yueyang Tower, Dongting Lake and other National Scenic Areas. With water and mountains around, pleasant environment, flourishing plants and convenient transportation, this area is an idea place to develop five-star hotel and modern service industry. II. Preliminary Work At present, land banking and project outline have been completed with a total planned area of 3000 Chinese mu. Some renowned enterprises such as Country Garden Holdings Group and China Chengtong Holdings Group have been introduced here so as to create a high-end ecological residential district. III. Project Content The project locates in the south bank of Bajiao Lake. Within the site area, hotel covers an area of 100 Chinese mu, and supporting high-end residence development land covers 100 Chinese mu. Five-star hotel’s total planning includes 400 rooms and more than 500 parking spaces. The hotel supporting plan includes contents of large-scale multifunctional conference hall, large-scale banquet hall, catering, conference, entertainment, business and commerce, SPA, etc. IV. Project Investment The total investment for the project is RMB 1 billion yuan. V. Benefit Analysis After the construction, the estimated annual sales volume would reach RMB 0.8 billion yuan, with annual profit of RMB 80 million yuan. VI.. Cooperation Way Sole proprietorship, joint venture, etc VII. Project Initiator Project Initiator: Investment Attraction and Liaison Department of Hunan Chenglingji New Port Area
Changde Huashan Wetland Comprehensive Improvement and Development I. Project Background Changde Huashan Wetland, situated in Changde Liuye Lake Tourist Resort, is where the legend Woodcutter Liu Hai originates and covers a total area of 5 kilometers. The comprehensive improvement and development area refer to the returning-farmland-to-lake area in Huashan Village and swamp land in the east of railway. The project aims to create a compound type wetland integrates functions of ecological purification, wetland sightseeing, farming culture, countryside trend, scientific research and science popularization, so as to provide a unique sightseeing and leisure place for residents around. II. Preliminary Work The evaluation and review of the overall plan has been completed, now the plan design is underway. III. Project Content The project total area is 14067 Chinese mu, which falls into three parts for construction. 1. Core Purification Area combined with industrial zone: 2 ecological purification water systems are designed to purify the reclaimed water discharged from the west of Guanxi Town Water Disposal Plant; Lutang Maze, Water Fowl Habitat, Aquatic Plant Purification Demonstration Base, Science and Research Park and other landscape spots would be built. 2. Wetland Promoter Region: this region is mainly for wetland sightseeing with various aquatic 248
ornamental plants. One Dongting Lake Aquarian is planned to be built, demonstrating aquatic ecological environment and biological species in Dongting lake. And supporting traditional villages, folk culture villages and bird observatory would be built as well. 3. Pastoral Experience Zone: this area is for plantation of organic rice and aquatic vegetables. One rice pavilion is planned to be built, supported with grain-sunning ground, open air theater and other landscape nodes. A popular science base of aquatic vegetable cultivation greenhouse would be set, supporting with marina, underwater sightseeing walkway, relaxation corridor, etc. IV. Project Investment The total investment for the wetland construction is RMB 3.7 billion yuan. V. Project Analysis After the construction, the estimated annual sales volume would reach RMB 140 million yuan, with annual profit of RMB 22 million yuan. VI. Cooperation Way Contractual joint venture, sole proprietorship VII. Project Initiator Project Initiator: Changde Chuanzi River Construction and Development Co,. Ltd.
Changde West Dongting Lake Wetland Tourist Resort Development I. Project Background 2005, West Dongting Lake Wetland has been named as “West Dongting Lake National Urban Wetland Park” by National Ministry of Construction. Hence, under the aegis of “wetland landscape” of West Dongting Lake, this project would take the advantage of local scenery to create a wetland tourist resort of an inland lake. The natural scenery, human landscape, folk and custom in West Dongting Lake Wetland Tourist Resort all blend into one harmonious whole, with unique style. Meanwhile, this area boasts unique market prospect and development value, which are premium resources to develop and promote the tourism and vacation in West Dongting Lake. So it possesses high potential for tourism development. II. Preliminary Work The feasibility study report has been completed. III. Project Content The total planned area is 720247 square meters, mainly for construction of “two centers, two water, three parking lots, four wharfs and tourism line” as well as supporting facilities. 1. “Two Centers” project. It include 2 visitor centers, with a total planned area of 2000 square meters, building area of 1500 square meters and overall floorage of 9000 square meters. 2. “Two Water” project: It includes 2 water systems dredging, ecological revetment, hydrophilic plank road and other projects in wetland park, with a total area of 486000 square meters (equal to 729 Chinese mu). 3. “Three Parking Lots” project. It includes the construction for 3 parking lots, with a total area of 27000 square meters (equal to 40.5 Chinese mu) and 920 parking spaces in all. 4. “Four Wharfs” project. It plans to build four revetment-type wharfs, with a total area of 11677 square meters (equal to 17.5 Chinese mu) and overall floorage of 2000 square meters. 5. “Tourism Line” project. It is mainly about improvement and restoration of tourism line, with a total length of 23890 meters and a total area of 193580 square meters (equal to 290.4 Chinese mu). IV. Project Investment The total investment for the project is RMB 0.6 billion yuan. V. Project Analysis It is estimated that 250000 tourists can be received annually. Calculating by the average consumption of RMB 218 yuan per capital, the business income could reach RMB 54.5 million yuan. VI. Cooperation Way Contractual joint venture, sole proprietorship VII. Project Initiator Project Initiator: Jincheng Urban Construction Investment and Management Co,. Ltd., Hanshou County, Changde 249
Shanjuan Hometown Tourist Attraction Construction of Changde I. Project Background The “Poem Wall Park”, along the bank of Yuan River of Jiangbei urban area of Changde, presents harmonious integration between natural landscape and cultural ones, which enjoys enviable reputation across the board. De Mountain, where the Shande culture originated, is famous for Mr.Shanjuan. So it is hailed as “the De Mountain in Changde is virtuous”. In early Tang Dynasty, an eminent monk Xuanjian has been the head monk in Qianming Temple of De Mountain, promoting the Zen conduct and disseminating ”Deshan Bang” Buddhism culture so as to exert a national influence of Deshan Zen. Until today, remaining historical relics are Gufeng Tower, Qianming Temple and so on. 4000 years ago, Mr Shanjuan had refused to inherit the throne of Shun Emperor, instead he focused on enlightening the public wisdom and disseminating virtue culture, thus the former residents living in this uncivilized region had adopted the Central Plains civilization. In honor of the virtue of Mr.Shanjuan, the Emperor Huizong of the Northern Song Dynasty named the living place of Shanjuan Changde. Chinese civilization honors self-discipline and social commitment, and disseminates virtue via blessing, thus profound virtue has been accumulated in thousand years of inheritance. To establish a multifunctional and dynamic new urban center, Changde Municipal Government has decided to combine Chinese Shande culture with business, relaxation, sightseeing and tourism so as to build a urban new district in De Mountain covering an area of 4 square kilometers, which integrates business, residence, relaxation, culture and entertainment. II. Preliminary Work The project feasibility study report and site selection have been completed, and now strategic investors are needed. III. Project Content The project construction land covers an area of 2861 Chinese mu, which bears three major functions of disseminating Shande culture, providing leisure and entertainment and developing riverside business and commerce, thus forming six projects. 1. Expand Qianming Temple, restore Gufeng Tower (and change its name to former Wenfeng Tower ), and move back or reproduce Tiejingzhuang. 2. Shande Cultural Square. Build the Shande Cultural Square on the 160-Chinese-mu riverside land down to the Wenfeng Tower. 3. Restore Taoist Fifty-three Blessed Places. Build a statue of Mr. Shanjuan and relaxation and fitness place for Taoism. 4. Build five-star hotels. 5. Characteristic tourism and entertainment facilities. Build entertainment facilities in Deshan Park, surrounding areas, and the east bank of Wangshui River in consideration of current river system, mountain shape and water flow. 6. Riverside Tour and Sightseeing Center. Along the bank of Yuan River from Gufeng Tower to Hengli Wharf, a new wharf is planned to be built with water entertainment facilities so as to form a water entertainment and sightseeing center. IV. Project Investment The total investment for the project is RMB 1.6 billion yuan. V. Project Analysis Main economic income sources: 1. Ticket sales from theaters or other cultural performing venues. 2. Tuition from students in various art subjects. 3. Rental got in all kinds of business places. 4. Income from business projects such as Shanshui Concert Hall. 5. Operating income from catering industries and entertaining facilities. 6. Operational income in property hotels. Altogether the project is estimated to receive 2.5 million people, and calculating by average consumption of RMB 180 yuan per capital the annual income would reach RMB 450 million yuan. VI. Cooperation Way PPP model is adopted with government finance and social capital. 250
VII. Project Initiator Project Initiator: Investment Attraction and Cooperation Bureau of Changde Economic and Technological Development Zone.
48 Stockaded Villages Science Spot in Guangfuqiao of Cili County I. Project Background The project located in Guangfuqiao Town of Cili County, 41 kilometers away from Cili County. It covers an area of 20 square kilometers of Sanwangyu Village, Laopeng Village, Shuangyun Village, Taiping Village and Jinggang Village, among which Sangwangyu covers over 40 stockaded villages. 48 Stockaded Villages boasts long-aged cultural history, thus with various and splendid cottage culture. Abundant forest resources are also found here, with over 90% of forest coverage rate. The highest altitude is 976 meters and the average temperature is 12.57 degrees Celsius in this area. Meanwhile, a host of temples have been built here, including a majority of 36 palaces and 72 halls in Wulei Mountain. As for cultural relics and stone carvings found in Sanyuangong historic site, they are with extremely high value. All in all, this area forms a tourist resort that integrates mountains, rivers, stones, stockaded villages, bridges, forests, farmlands, temples, flowers, birds, animals and other landscape elements. II. Project content 1. Restoration of some ancient architectures such as 36 palaces, 72 halls, 48 stockaded villages and old shed bamboo village, etc. 2. Construction of 2 tunnels through the mountain, with a total length of 790 meters. 3. Construction of Li Zicheng Memorial Hall and cultural and recreational center. 4. Building of high-end hotels and conference and exhibition center. 5. Construction of Zhubao Bay and Qiwanxi Artificial Lake. 6. Building of leisure resorts with national features along 5 natural streams. III. Project Investment The total investment for the project is RMB 3 billion yuan. IV. Benefit Analysis It is estimated that more than 1 million tourists would be received annually. V. Cooperation Way Joint venture, sole proprietorship and contractual joint venture. Preferential policy of development of Hunan western regions has covered this project. And projects with over 2 billion yuan investment would adopt preferential policy of ”One Project One Discussion”. VI. Project Initiator Project Initiator: Cili County Tourist Administration of Zhangjiajie
Ancient Tea-Horse Road (Chamagudao) Resort Construction in Anhua County I. Project Background The only 4A level thematic cultural scenic spot named by the Ancient Tea Horse Road (Chamagudao) in China is situated in Anhua County, Hunan Province. Chamagudao embraces rich tea culture, leading to the formation of three types of cultural attractions there, including the production, the transport and the vendition of tea. It possesses the unique and unrepeatable culture of Hunan regional features and favorable resources for developing Chamagudao tourist spots in the middle areas of China. II. Preliminary Work Leading by “Bike Company”, a number of scenic spots have been constructed including Guanshan Canyon, Siyou Valley, Tribe on Horses, ChuanjiangRiver Driftage, Dongshi Old Street and Yongxi Bridge, covering an area of about 4 square kilometers. III. Project Content 1. The Comprehensive Service Center of Jiangnan (south region of the Yangtze River) Town: it is planned to build a passenger transportation center, a tourist information service center, and a network information service center. 251
2. The Ancient Tea-Horse Road Core Resort: it is planned to build a dark tea appreciation museum, tea mountain folkways-displaying zone, distinctive water streets and other sites for exhibition or transaction. 3. Folk-custom Displaying Zone of Meishan Ancient Village: it is planned to construct Shiniushan sports and entertainment base,Meishan cultural event square and Meishan-style homestay. 4. Tea-Horse Water Park of Yongxi Bridge: it is planned to construct rafting gangs on Maxi River, Yongxi Bridge and a water park. 5. Dongshi Old Street Traditional Business Area. 6. Huxiang Culture Experiencing Zone: it is planned to build a village of well-known artists, Tangjiaguan ancient blocks, palace of governor Tao Shu, etc. 7. Ecological Tea Park Leisure Zone of Malu New Village: it is planned to construct a SUV base and a summer cave for cooling. IV. Project Investment Investment totals RMB 1 billion yuan. V. Cooperation Way Joint venture, contractual joint venture or sole proprietorship VI. Benefit Analysis The expected payback period is 10 to 12 years (containing 5 years’ construction time). VII. Project Initiator Project Initiator: Tourism Development Office of Anhua County, Yiyang City.
Comprehensive Development of Taohuajiang Forest Park (4A Tourist Attraction) I. Project Background Taojiang County plays an important role in Hunan’s tourism development. It boasts a long history and profound cultural heritages, has vivid and distinctive folk customs preserved, and is endowed with favorable natural resources. Hence, it has been designated as a pioneering demonstrative county in regional tourism by National Tourism Administration. And now it has incorporated into the planning and development for quality tour routes of central Hunan Great Meishan Culture and the northern Hunan pan-Dongting Lake eco-culture resort. This project, based on natural resources of mountains and rivers, will turn the Taohuajiang Forest Park into a tourist destination characterized by the combination of entertainment, sightseeing, forest health industry, religious pilgrimage, cultural study, distinctive food culture and homestay and so on. II. Preliminary Work The general planning of Taohuajiang Forest Park has been compiled. The feasibility study report is now being drafted. PPP consultative agency has begun the relevant work. III. Project Content The project will be carried out by the construction and operation standard of 4A above scenic spots. Three major tourist spots, Fuqiu Mt., Taohua Lake and Luoxi Creek, will be built up. Fuqiu Mt. embodies a mixed religious culture of both Buddhism and Taoism. There are three heritage sites including archaic temples, old streets, and ancient trees. It is aimed to provide culture experiencing products including cultural creation, meditation and pedestrianism. Luoxi Creek is endowed with great natural scenery such as majestic waterfalls and ten thousand mu of cherry blossom. Ecological resort products including experiencing folk customs, going camping and making explorations in valleys can be developed there. Taohua Lake has its charm in its picturesque landscape of the lake and hills. It can provide waterfront leisure products such as lake sightseeing, water recreation and performances. IV. Project Investment RMB 1.3 to 1.6 billion yuan is expected to be invested, with RMB 300-400 million yuan for Fuqiu Mt., 500-600 million yuan for Taohua Lake, and RMB 500-600 million yuan for Luoxi Creek. V. Cooperation Way Adopt the way of PPP (Public-Private Partnership) 1. Investment attraction for the whole project: strategic investment partners implement investment, development and operation for the whole project. 2. Investment attraction for sub-projects: carry out investment attraction for different scenic spots, 252
there will be multiple investors that implement separate investment, development and operation according to the overall planning. VI. Project Initiator Project Initiator: Management Office of Taohuajiang National Forest Park, Taojiang County.
Tourism Development of Chishan Island, Yuanjiang City I. Project Background Chishan Island lies in the northwest part of Yuanjiang Cityand in the west of Dongting Lake, stretching 30 kilometers in north-south direction and 4 kilometers from east to west, covering an area of 140 square kilometers. It was formed 1.2 million years ago, and is the largest island in Dongting Lake as well as the largest island of an inland lake in China. Chishan Island is defined as an eco-tourism island, and is involved in the ten major projects of Dongting Lake Ecological Economic Zone. Chishan Island enjoys profound cultural history and beautiful scenery. There are scenic spots such as Memorial Temple to Fan Li, the tomb of Yang Sichang, Zhangbaola (an ancient tree formed by camphor and privet), nine-trunk camphor tree, Longhu Mt., Xianglu Mt., and so on. Even sites of Paleolithic age a hundred thousand years ago were once found in this island. As development of pan-Dongting Lake eco-economy zone continues to be intensified, Chishan Island will have larger potential for tourism development and become one of the important brands for tourism development in Yuanjiang County, Yiyang City. II. Project Content According to Development Planning of Dongting Lake International Wetland Eco-tourism Area (2012-2025) and the tourism development orientation of Chishan Island, projects including Fan Li Lake yacht resort, Xi Shi Lake resort, Longhu Mt. religious meditation resort, and highways around the lake will be in the process of construction. III. Project Investment Investment totals RMB 2 billion yuan. IV. Benefit Analysis Economic benefits: driving extra consumption of RMB 500 million yuan in the tertiary industry and producing an annual tax revenue of RMB 30 million yuan. Social benefits: creating 3000 new jobs V. Cooperation Way The project runs according to DBOT (Design, Build, Operate, and Transfer) way. Term of the contract lasts 20 years (5 years’ construction and 15 years’ operation). VI. Project Initiator Project Initiator: Bureau of Culture, Sports, Broadcasting, Television, Press and Publication of Yuanjiang County.
YiyangZhaizilunScenic Spot Development I. Project Background Zhaizilun Scenic Spot is located in the place 6 kilometers from the central urban area ofYiyang. With the Zhaizilun Mountain range as its main body, it consists of three groups of hills, the Shenlong Peak, the Phoenix-shaped Hill, and the Skyscraping Ridge, and the highest peak reaches 500 meters above sea level. The old roads in Zhaizilun were once an important part of the Ancient Tea Horse Road for the transport of dark tea. Over 40 scenic spots there can be developed. The key spots are: Guanlong Pavilion, Shenlong Peak, Wanglang Cliff, Haiyin Pagoda, Motian Ridge, Zizhulin Buddhist Temple, Guchatingfeng (an ancient temple), Tianxiayijue (the bamboo sea),etc. There are many ancient battlefield sites in Zhaizilun, such as the beacon towers, ancient batteries, horse-blocking towers, stonefall platforms, bunkers, blindages, drum stages, fodder dykes, horseponds and watchhouses, from the Three Kingdoms time to Anti-Japanese War period. Zhaizilun is also a holy land for Buddhism. It is said that there were temples built up on the main peak during the Sui and Tang dynasties, and that an eminent monk who had roamed across the 253
country then being cultivated in Zhaizilun, leaving the joss stick burning constantly for over 300 years. Now the temples have been renovated, and plenty of people have come here to burn incense and pray to Buddha. Hu Linyi, the prominent chief of Hunan Army in late Qing dynasty, was quite fond of Zhaizilun, and had selected the tomb place here personally before he passed away so Hu and his spouse were buried here afterwards. In February 2010, Hu’s epitaph, the bricks used for the tomb, coffins, osseous remains, funerary objects and other precious cultural relics were found by archaeologists. II. Project Content Based on the existing scenic spots in Zhanzilun, it is planned to construct an all-round service center, a waterfront leisure zone, kid’s entertainment region, Zizhulin Temple Scenic Spot and Peak Core Scenic Area, etc. III. Project Investment Investment totals RMB 2 billion yuan. IV. Project Analysis Once running the business, the total profit rate will be around 25% under a preliminary calculation, FIRR will reach 19%, and the static payback period (including construction period) lasts 5.26 years. V. Cooperation Way Contractual joint venture, sole proprietorship, or BOT. VI. Project Initiator Project Initiator: Bureau of Economic Cooperation of Yiyang High-tech Industrial Development Zone
Tourism Development of the “Jingui Silver City” in Chenzhou I. Project Background As the national economy grows, the need for tourist products diversifies, and the simple sightseeing cannot meet customers’ demands. Therefore, industrial tourism is gradually getting on the fast track of development in both tourism and industry. Chenzhou city is a model in nationwide circular economy pilots and the biggest recycling and production base for rare and precious metal in China. The brand image as “Silver City of China” has been deeply rooted in people’s minds. Furthermore, the company “JinguiYinye” has advanced techniques in the production of high purity silver and in the design and processing of high-end silver craftworks. All of these set a favorable foundation for the development of industrial tourism. II. Preliminary Work Chenzhou Jingui Silver Industry Co., Ltd plays a leading role in deep processing techniques and the production of silver in China. It has created a complete industry chain, from the mine exploitation to the manufacture of silver goods, and has established its brand image in silver industry. III. Project Content Two productive comprehensive buildings and relevant supporting facilities will be constructed, which include silver craftworks processing workshops(which can be visited by tourists)and the silver deep processing products, and embody the process of silver craftworks designing, manufacturing and packing It is planned to cooperate with businesses who work on silver processing and industrial tourism, so as to jointly set up a provincial industrial tourism demonstration site which integrates modern silver craftworks visiting, silver history and culture exhibition, silver-theme special experiencing and silver goods consumption. IV. Project Investment Total investment exceeds RMB 200 million yuan. V. Project Analysis Once the project is finished, sales income is expected to exceed RMB 230 million yuan, and tax will outnumber RMB 53 million yuan. VI. Cooperation Way Joint venture, contractual joint venture VII. Project Initiator 254
Project Initiator: Chenzhou Jingui Silver Industry Co., Ltd.
AishangSanhe Eco-Agricultural Leisure Tourism Development in Beihu District, Chenzhou I. Project Background The Sanhe Village, Huatang Town, Beihu District, where the project will be constructed, is situated at the foot of a hill and beside a river with flat terrain. The region embraces favorable agriculture foundation. And the transportation and communication are convenient here, as it is adjacent to the new Chenzhou Airport that will be built up soon, and it takes no more than half an hour to drive to high-speed railway station or to expressway exit via Chenzhou Avenue. Besides, the nationwide project of leisure agriculture service information “coming into cities and households” and the Twelfth Five-year Plan of China’s Leisure Agriculture Development have contributed to a favorable environment for project construction. II. Preliminary Work All infrastructures (roads, parking lots, visitor reception center, water and electricity facilities, lightening facilities, etc.) have already been constructed. The 1st phase has been operated in good condition since 2013. III. Project Content It is planned to build a comprehensive industrial park of modern agriculture, three theme squares, a visitor service center of rural tourism, the Rose Avenue, a fishing park, a rose manor, a water park, the flower sea, rare birds park, a homestay center, covering an area of 1720 Chinese mu in total. Besides, one e-commercial platform for agricultural business and another for agricultural tourism, an intelligent scenic spot management system and other projects are going to be established. IV. Project Investment Investment is preliminarily estimated to be RMB 420 million yuan, among which 260 million yuan is for the 1stphaseand 160 million yuan for the 2ndphase. The project will be put into operation soon. V. Project Analysis Once the project is finished, through the tickets selling, produce selling and second consumption, the annual revenue can register RMB 300 million yuan from the primary, secondary, and tertiary industries in aggregate. VI. Cooperation Way Joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Chenzhou Shanhe Qiaolong Eco-Agriculture Co., Ltd
Hot Spring Leisure Resort Construction in Yichongqiao Town, Zhangjiajie I. Project Background The Shadao bight, where the project will be constructed, lies in YanboduTown, Cili County. The transportation there is quite convenient. It is in close proximity to Changsha-Zhangjiajie Highway and Zhicheng-Liuzhou Railway, and is 40 km from Zhangjiajie downtown area and Hehua International Airport. It only takes 40 minutes to drive to Zhangjiajie core scenic spot. The hot spring in Yichongqiao town is called “the divine water”. The geological survey shows that, the runoff cycle of subterranean hot-water aquifer flows well and the water supply from the origin is abundant, and that dynamic water level and temperature maintain generally stable. The surface temperature of hot spring is 49℃,and the PH value is 7.32. It contains an opulent source of minerals: the concentrations of fluorine, lithium, metaboric acid, metasilicic acid and radon which 255
is the radioelement, reach the level of medical value; the concentrations of fluorine, lithium, metasilicic acid and radon reach the level of mineral water. Besides, there are multiple trace elements including bromine, iodine, arsenic, molybdenum, zinc, ferrum and copper. In particular, the contents of metasilicic acid and strontium are nearly equal to those in human blood, which have a superb value for health. II. Preliminary Work The project plan has been drafted, and water resource study report has been accomplished. III. Project Content It is planned to build up a modern eco-town of countryside style, with hot-spring leisure-taking as its signature, where people can enjoy hot-springs, diet therapy (giant salamander therapy—caring for your health and slowing the aging process) and other healthy leisure-taking activities. IV. Project Investment Investment totals around RMB 500 million yuan. V. Cooperation Way Joint venture, contractual joint venture, or sole proprietorship VI. Project Initiator Project Initiator: Zhangjiajie Cili Business and Grain Bureau
Construction of Longnv Hot-Spring Health &Leisure Industrial Park I. Project Background Chenzhou is located in the “One-hour Economic Circle” of both the Changsha-Zhuzhou-Xiangtan city group and the Pearl River Delta urban agglomeration. There are multiple traffic lines crisscrossing the city, including the Beijing-Guangzhou Railway, Wuhan-Guangzhou High-speed Passenger-only Railway, Beijing-Hong Kong-Macao (G4) Expressway, Xiamen-Chengdu Expressway and 107 National Highway. The Longnv Hot-spring Health& Leisure Industrial Park lies to the north of Chenzhou downtown area, and contains national 4A level scenic spot, the Longnv Scenic Spot. It embraces favorable geographical position and convenient transportation, with Beihu Airport 35km to its west, Chenzhouxi Railway Station 18km to its south, and the intersection of G4 Expressway and Chenzhou Zaoxiang Highway about 7km to its east. II. Preliminary Work The plan of Longnv Hot-spring Health& Leisure Town project has been drawn up and the Longnv rehabilitation hospital project has begun to construct. RMB 600 million yuan has been invested so far. The project has been involved in the key projects of Beihu District. III. Project Content 1. Land scale. The project consists of two parts, a health& leisure tourist town and a community for old people. The tourist town covers an area of 7200 Chinese mu, of which 2700 mu is for construction and 4500 mu covers the ecological forests; the community for old people covers 600 Chinese mu. 2. Functions. With the focus on health caring, it aims to provide recovery and convalescence services, health management and other related services to form an industry chain. Meanwhile, leisure resort, health-caring products designing and manufacturing, healthy food, cultural exchanges, talent training, and financial services are available as derivatives from the main health-caring industry chain. 3. Sectorization. The Longnv Hot-spring Health& Leisure Industrial Park is divided into three sectors, and they are the health& leisure resort, the elderly caring community, and the ecological forests. IV. Project Investment Investment totals around RMB 5 billion yuan, among which about3 billion yuan is for the tourist town and 2 billion yuan is for the elderly’s community. The government vigorously promotes the PPP pattern and actively attracts businesses and capitals to together push ahead with the development of the region. V. Benefit Analysis 256
After the whole construction, once it is put into operation, the annual economic profits are considerable via ticket selling and other tourist sources. VI. Cooperation Way Sole proprietorship, joint venture or PPP (Public-Private-Partnership) VII. Project Initiator Project Initiator: Beihu District Bureau of Commerce, Chenzhou.
Construction of Xianling Hot-Spring Cultural Park in Beihu District I. Project Background Chenzhou is China’s excellent tourism city. In 2003, it is assessed as Hometown of China’s Hot-springs by CMA (China Mining Association). Xianling hotsprings, situated in Tangwei Village, Shijiao Township in Beihu District, Chenzhou, is one of the two hot-spring spots in Beihu District that can be exploited. It is about 3km away from downtown area, and 500m from the 107 National Highway. Xianling Hot-spring embraces an advantageous position and convenient transportation, as it is very close to the downtown and Chenzhouxi Railway Station of Wuhan-Guangzhou High-speed Railway. In recent years, the tourism industry in Beihu District has been developing at a rapid pace and the supply cannot meet the demand for hot-spring resorts, leading to a hard situation that some visitors cannot get access to tickets in holidays. To relieve the demand pressure, further develop hot-spring tourism and construct a Hot-spring City of China, the project aims to exploit and develop the Xianling Hot-spring Cultural Park. II. Preliminary Work The detailed project construction plan has been drawn up, the well drilling technical report has been worked out, and the water quality certification has been issued by Chenzhou Products Quality Supervision and Inspection Institute. In 2015, RMB 220 million yuan has been invested, and infrastructure construction including Fuquan Avenue and Wuxing Avenue has been started up and is expected to be finished in 2006. III. Project Content The total planning area is 29.33 hectares. The project focuses on the exploitation of large hot springs, and aims to build a large-scale hot-spring cultural park with both natural beauty and exotic charms, which can provide services of health care, leisure vacations, recreational sightseeing and business meeting. The main construction items include: the gate house, tourists service center, kid’s park, opera& dance drama theater, spa, reception center, swimming pool, family villas, hot-spring villas, star hotel, etc. IV. Project Investment Investment totals about RMB 1 billion yuan. V.Benefit Analysis The future of hot-spring resort market is promising. The tourists from the secondary tourist market are abundant, thanks to an increasing number of visitors from Pearl River Delta to come to Chenzhou City. On the basis of a large tourist volume, the economic benefit will be remarkable and the annual revenue of over RMB 80 million yuan is expected. VI. Cooperation Way Sole proprietorship or joint venture VII. Project Initiator Project Initiator: Tourism Administration of Beihu District, Chenzhou
The Development of International Hot-spring Resort Center in Rucheng County I. Project Background Rucheng hot-spring is characterized by high water temperature, ample flow, good quality and high radon content. The temperature is ordinarily 91.5℃, with 98℃ being the peak. There are over 30 kinds of trace elements beneficial to the health in the hot spring, particularly radon, the content of which reaches 142 eman, causing the springs to be radon springs rare in the world. Radon spring, 257
as a type of natural hot spring, is valuable in its function of recuperation and health-caring. It can regulate the endocrine system and boost metabolism of reproductive glands, allay the tiredness, strengthen the constitution thus improve your health. II. Preliminary Work So far the project plan, the project demonstration and other preliminary work have been done. III. Project Content The land use is around 595 Chinese mu. The project includes the construction of a five-star hot-spring hotel, a hot-spring meeting center, hot-spring museum, a service center, a health-caring center, hot-spring villas, shopping streets, hot-spring recuperation zone, a golf gymnasium and others. IV. Project Investment Investment totals RMB 1.8 billion yuan. V. Benefit Analysis The annual operation revenue is expected to be nearly RMB 200 million yuan, and the annual profits will register around RMB 100 million yuan. VI. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VII. Project Initiator Project Initiator: Hot-spring Administrative Committee of Rucheng County, Chenzhou
Tourism Development in Yangtian Lake Scenic Spot I. Project Background Yangtian Lake scenic spot is situated in the southwest of Beihu District, Chenzhou, at an elevation of 1356 meters above sea level. It is the only well-preserved alpine (wetland) meadow in the China’s south region. It embraces particularly favorable tourism resources as the rare alpine meadow in southern China, and enjoys high popularity among Pearl River Delta area. To that end, the Beihu government has proposed a strategic development plan of Beihu tourist areas, setting focus on the tourist development of Yangtian Lake alpine meadows. II. Preliminary Work We have carried out the prophase investigation, formulated the development plan of Yangtian Lake scenic spot, finished land survey and demarcation, and identified the land ownership. We have also put up public signs, replanted the destroyed grassland, set fences for 4600 mu core meadowland and prohibited herding practices. The highway between Chenzhou City and Yangtian Lake scenic spot has been constructed; water and electricity have been supplied; roads and communications facilities have been unlocked. In addition, 22 large wind-driven generators have newly been built, becoming an infrequent landscape of wind power generation in southern China. III. Project Content 1. Meadow Resort. Area: It is located in Anle Cave, northern part of the scenic spot, covering 396 Chinese mu. Orientation: Countryside vacation village resort Content: Country villa, outdoor playground, campfire evening performance space 2. Grassland Recreational Area. Area: in the central part of scenic spot, around Yangtian Lake, covering 1500 Chinese mu. Orientation: sports leisure, meadow-themed entertainment Content: 1) the construction of a health-caring base on alpine meadow, with leisure sports field, sun-watching platform, self-driving trailer park and an environmental-friendly parking lot; 2) The construction of a natural grass-skiing field on alpine meadow, with kite-flying area, ice-skating runways and an environmental-friendly parking lot. 3. Alpine Meadow Preservation and Tourism Development. Area: in the central part of scenic spot, around Yangtian Lake, covering 1000 mu. Orientation: grassland preservation, ecological sightseeing Content: close hillsides and facilitate afforestation, return the grazing land to grassland; recover the vegetative cover of 10000 Chinese mu, and relocate or demolish the buildings within the 258
meadowland for a new 12 thousand square meters of grassland; construct and reinforce the dyke, recover the wetland ecosystems, and improve water conservancy facilities. IV. Project Investment Investment totals about RMB 1.3 billion yuan. V. Benefit Analysis Economic benefits: the annual tourist revenue is predicted to be RMB 70 million yuan. VI. Cooperation Way Sole proprietorship, or joint venture VII. Project Initiator Project Initiator: Tourism Administration of Beihu District, Chenzhou
Wangxian Ridges Tourist Resort Development I. Project Background Wangxian Ridges tourist resort is located near the Chenzhou Avenue of Chengdong District, Chenzhou City in Hunan province. It is the core project in developing a nationwide model tourist spot of Suxian District. The resort is only 0.5km from Beijing-Hong Kong-Macao Expressway Chenzhou Exit, and 14km from Chenzhouxi Railway Station. It includes the main peaks of large and small Wangxian Ridges and the extending massifs, covering an area of about 26 square kilometers. The resort embraces profound cultural deposits with the widespread legend of Wang Xiang and Wang Xi. Besides, the water resource is ample here; the fraction of vegetation coverage amounts to 90%, and the original ecological environment is well preserved along with many astronomical spots, rare and precious plants and diversified trees. The Xiangshan Waterfall among ancient Chenzhou eight spots is also located here. All of these provide favorable conditions for the development of leisure-taking and health-caring industry. II. Preliminary Work The general planning of Wangxian Ridges Resort, the regulatory plan, environmental impact assessment, and feasibility study report have been worked out. Meanwhile, the infrastructure construction has been accomplished, which is invested RMB 400 million yuan, including the eastern gate (main entrance) landscape, tourists information service center, waterfront eco-landscape, ecological parking lot, the decorated archway, mountain roads, etc. III. Project Content 1. Jewelry Town Project in Guanshandong Village: it covers around 600 Chinese mu, and it is planned to construct jewelry shopping streets, resort hotels, a mountain happy village for kids, etc. 2. Tian’e Lake Forests Health-caring Tourism Development Project: the land use is about 180.2 hectares; it is planned to develop the Yao nationality tribe, Chinese herb garden, the fairy town, rare herb and flower exhibition garden, a SPA in forests, health-maintenance club, Tian’e lake, WangXianju, performance& art center, cloud restaurant, YaochiXianju (the abode of immortals), etc. IV. Project Investment Investment totals RMB 3.2 billion yuan. V. Benefit Analysis Jewelry town project: according to financial analysis, the project’s pre-tax IRR is 23.37%, and dynamic payback period lasts 6-8 years; once the project is finished, it can create about 2000 job posts. Tian’e lake forest health-caring tourism project: assuming 300 thousand tourists annually and consumption per capita of RMB 400 yuan, plus other earnings, the annual revenue is expected to be around RMB 180 million yuan; the ROI (return on investment) is 5% to 10%. VI. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VII. Project Initiator Project Initiator: Bureau of Tourism and Foreign Affairs of Suxian District, Chenzhou City
Culture Tourism Development of Ancient Folk Residence in Suxian District 259
I. Project Background Suxian District of Chenzhou City boasts a long history of over 2200 years and possesses profound cultural deposits. It came into existence as Chen County in the Qin Dynasty. In the area widely distributed are the ancient folk houses, among which the Aoshang Village in Aoshang Town and Gangjiao Village in Qifengdu Town are representatives. In Kangxi period of Qing dynasty, a living community was formed in AoshangVillage, Aoshang Town by the folks, most of which were surnamed Li. Now there remain over 100 ancient folk houses, all with architectural style of Qing dynasty and traditional brick-wood structure. Located at the foot of mountains, the houses are built one following another with the ends touching and well-proportioned. Between courtyards twists the green slabstone path and meanders a brook. The architecture complex is an organic unified whole in an orderly and reasonable layout with a compact structure, and it is one of the well-preserved ancient architectural complexes in Chenzhou. The three types of carvings (brick carving, stone carving and wood carving) of the buildings are numerous and exquisite, fully reflecting the architectural style of folk houses in Qing dynasty. In 2011, it was listed in provincial key cultural relics protection units. The site also enjoys flat terrain and convenient transportation, situated 17km from downtown areas, 5km from Xiamen-Chengdu Expressway Chenzhou Wanshouqiao Exit and 2km from Mid Chenjiang Road. In the middle of northern Suxian District lies the ancient folk residence of Gangjiao Village, Qifengdu Town, which is 30km from Chenzhou downtown areas. It is a rare well-preserved architectural complex, built at the turning of Yuan and Ming dynasty. The ancient folk houses are widely distributed in the area, with 70 more houses well preserved. The complex is in an enclosed type of overall composition, and within the courtyard home displayed a vase on the east part and a mirror on the west part of the long table, a traditional way wishing for the safety and stability. The wood carving, brick carving, stone carving and clay sculpture are delicate; the colored drawings and wall paintings have an antique flavor, and the eave, beam, archway, ceiling and the plinths of pillars are artistically modeled. The figures, animals and plants are carved or painted vividly. As a whole, it leads to a style of primitive simplicity and elegance, mixed with slight luxury. The Gangjiao ancient folk residence, echoed with the Gangjiao wetland park, combining sightseeing and entertainment, is an unique featured part of the Xiheshui River ecological scenery and will be a highlight of the scenery belt. II. Preliminary Work Both Chenzhou Municipal Government and Suxian District Government attach great importance to the ancient folk residence, who have taken the cultural tourism development of ancient folk residence as key project in Chenzhou Urban and Rural Integrative Development, and will provide preferential policy in terms of land-use right transference, financial support, administrative services, reduction and exemption of obligatory charges, encouragement and assistance and other fields. III. Project Content It is planned to turn the southern Hunan ancient folk-custom village into a noted scenic spot of village traveling, which combines the ancient folk residence cultural experience and agricultural leisure travel, prioritizing the countryside entertainment. Aoshang ancient folk residence is planned to cover an area of 2000 Chinese mu, and the investment totals RMB 36 million yuan. It contains: construction of the ancient folk residence sightseeing area as the core area, including the rebuilding of several important courtyards, constructing a Zizhi Tower and a couple of new tourist items; construction of entrance comprehensive service region, mountain sports and leisure zone, and village sightseeing zone as three major tourist zones; construction of a sightseeing passage way, formed along a river which connects the core area and three major tourist zones. Gangjiao ancient folk residence project contains: the controlling of the environment of ancient village; the construction of landscape and scenic spots outside the core tourist region. The aggregate area is 106 thousand square kilometers. IV. Project Investment Investment totals RMBxxx yuan. V. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VI. Project Initiator 260
Project Initiators: Suxian District Bureau of Tourism; Aoshang Town People’s Government; Qifengdu Town People’s Government.
Construction of Huishan Mountain Valley Tourist Area in Guishan County I. Project Background The tourist area of Huishan Valley, covering over 130 thousand Chinese mu (83 square kilometers), embodies rich tourist resources and favorable ecological environment, with around 40 thousand Chinese mu of bamboo (Phyllostachyspubescens) forests and 30 thousand mu of secondary forests. The spring water in the valley is plentiful, murmuring all year long. The air is fresh, and the weather there is always pleasant and comfortable. The project is located in Huishan village, Qiaoshi Township of Guiyang County, where it is 50 km from the county town, and there are secondary roads connecting it with the country town and the neighboring county. It takes only 30 minutes to drive to the interchange exit of Jing-Zhu Expressway’s dual line in Hunan (Hengyang to Linwu Highway). Therefore, it is an ideal place for leisure vacations, and the first choice for investing and financing. The project is generally positioned for ecological leisure vacations, with the sightseeing and valley driftage as main tourist products, aiming to create a high quality tourist area. II. Preliminary Work The feasibility study report has been drawn up, and the preliminary work of construction has been done. III. Project Content It mainly contains: ten thousand Chinese mu of bamboo sea, Huishan Mountain Valley Shengxian driftage, statues of giant, ten thousand mu of mountain meadowland, two thousand mu of high quality ecological organic tea plantation of “Huishanwu” (the local tea), raw upstream sport area, natural karst caves, forging site of ancient coin, etc. It is planned to develop a tourist area with functions of leisure-taking, vacation-taking and convalescence. IV. Project Investment Investment totals RMB 150 million yuan. The project is divided into 2 phases: RMB 50 million yuan is invested in phase 1 for the construction of main functional area; RMB 100 million yuan is invested in phase 2 for the improvement of infrastructures, construction and development plan of supporting tourist items. V. Benefit Analysis The development of Huishan Mountain Valley tourist area can bring more publicity to the region, intensify the environment protection, prosper the local tourism economy and contribute to the development of side lines such as agriculture and husbandry. VI. Cooperation Way Joint venture, contractual joint venture, sole proprietorship or assignment of property VII. Project Initiator Project Initiator: Bureau of Culture, Sport, Broadcasting, Press and Publication of Guiyang County, Chenzhou City
National Tourist Resort Development in Mangshan, Yizhang County I. Project Background Mangshan national 4A level tourist spot, situated in Yizhang County, Chenzhou, covering an area of 198.33 square kilometers, is the national forest park, national nature reserve as well as the provincial geopark. To further strengthen the leading role of Mangshan Mt. tourist spot and make full use of its resources and position edges, it is planned to build a national tourist resort in the 261
Mangshan area (including Mangshan scenic spot, Yao Township, Tiantang Town, Liba Town, Huangsha Town, Yiliu Town, Rongjiadong forest farm) and create a Mangshan tourist economic circle. The vast Mangshan area possesses the magnificent mountain landscape of Mangshan Mountain, golden hot spring bathing, health-caring culture of Yao nationality, the attractive native villages in southern Hunan, multiple cultures of Confucianism, Taoism as well as the cultures of ancient Hunan and Guangdong and other core tourist resources, all of which laid the foundation for developing a national tourist resort. II. Preliminary Work The overall planning of Mangshan National Tourist Resort and the detailed planning of Mangshan key areas are being drafted. III. Project Content The planned construction area is 6.1 square kilometers: 1.8 square kilometers for the construction of Tiantang tourist town and 4.3 square kilometers for the tourist resort. It is mainly planned to construct the Mangshan national 5A tourist spot, Mangshan lakes tourist resort, Tiantang tourist town, Rongjiadong scenic spot, Layuan ancient folk residence tourist spot, Huangsha Fortress film and television base, Yiliu outdoor luxurious hot-spring bathing site and other tourist products. IV. Project Investment Investment totals RMB 10.78 billion yuan: RMB 3 billion yuan for constructing Mangshan national 5A tourist spot, RMB 3 billion yuan for Mangshan lakes tourist resort, RMB 2 billion yuan for Tiantang tourist town, RMB 1 billion yuan for Huangsha Fortress film and television base, RMB 780 million yuan for Yiliu outdoor luxurious hot-spring bathing site, RMB 500 million yuan for Rongjiadong scenic spot and RMB 500 million yuan for Layuan ancient folk residence tourist spot. V. Benefit Analysis Once the construction is finished, the number of visitors annually will reach 3.5 million and total tourism income will register RMB 3 billion yuan; in 2023 when the mid-term project is finished, the number of visitors annually will be 4.8 million and total tourism income will register RMB 5 billion yuan; in 2030 when the long-term project is completed, the visitor number will reach 12 million and the total income will be RMB14 billion yuan. VI. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VII. Project Initiator Project Initiator: Mangshan State-owned Forestry Administration of Chenzhou City
Jiahe National Forest Park Construction in Jiahe County I. Project Background Jiahe National Forest Park is situated in the Nanling (Jinping) mountain area, a distance of 3 km to the west of Jiahe county town. It borders on Yongzhou Lanshan County, and forms a major part of Qitian Ridge. It is a natural oxygen bar, where there are lush green trees, scenic environment, fine ecology and pleasant climate. The whole scenic spot covers an area of 3927 hectares, with total forest volume of 240 thousand cubic meters and the forest cover percentage of 90.6%, making it to be one of the most well preserved natural spots in Jiahe county. In the mountain live a large number of national protected animals and plants, stand the old towering trees and murmur the clear streams. There are 18 natural attractions in the scenic spot, including the evergreen forests in Jinping Mountain (Jinping Wancui), overlooking platform on mountain peak (JianfengLansheng), Mausoleum of the king of Jin, and Mati Ridge. As for the human landscape, there are Tian’e Dyke, the gathering site of forest outlaws, and red revolutionary tourist attractions such as Red Army Ravine and Red Army Tress. Besides, 36 Buddhist convents and 72 temples stand there, showing the preserved Buddhist culture. Jiahe National Forest Park is an integrated tourist spot with mountains and rivers, folk customs and religious culture for leisure taking and vacations. II. Preliminary Work It was approved as National Forest Park in December, 2015. The feasibility study report and general planning have been worked out. As a key project in Jiahe Tourism Development Planning (2016-2025), it is now under construction. III. Project Content 262
The park covers an area of 29 square kilometers, including the construction of a top grade hotel integrated with accommodation, catering and entertainment, leisure entertainment center, folk culture village, zoo, steles carved with poems, sightseeing pathways and artificial spots, etc. IV. Project Investment Investment totals RMB 1.3 billion yuan. V. Cooperation Way Sole proprietorship or contractual joint venture; Development for the whole project or for sub-projects. VI. Project Initiator Project Initiator: Forestry Administration of Jiahe County, Chenzhou
Bamian Mountain Ecological Tourism Development in Guidong County I. Project Background Bamian Mountain National Nature Reserve is located in the west of Guidongcounty in the southeast of Hunan province. It lies in the central and southern part of Luoxiao mountain ranges as well as the northern part of Nanling mountain range, covering totally 10974 hectares with 3137 hectares of core reserve area, 2141 hectares of buffer area and 5696 hectares of experimental area. In the reserve, there is a variety of natural attractions. The four sides of the main peak of Bamian Mt. named Shiniuxian are cliffs, on which stand dangerous stones and crisscross the gullies, thus forming multiple natural attractions of great value for appreciation, such as the heart-shaped rocks, a stone like a rooster crowing to the sky, an attraction resembling a cattle lying on clouds, a stone forest, etc. Besides, there are plenty of rare animals and plants, including 21 first and second class national protected plants such as cathayaargyrophylla, ginkgo, Chinese yew, Bretschneiderasinensis, Fokieniahodginsii, and Toonaciliata var. pubescens; 43 first and second class national protected animals such as leopard, clouded leopard, Elliot's Pheasant and yellows bellied pheasant. In addition, the climate in the reserve is comfortable as there is no frigid cold in winter and no intense heat in summer, and the concentration of negative oxygen ion is high with over 100 thousand negative oxygen ions per cubic centimeters, so it is the first choice for tourists to enjoy leisure vacations with forests health-caring and other activities. II. Preliminary Work The overall planning of Bamian Mt. ecological tourism project, detailed planning of key spots construction and other plans of key projects of the Guidong County Thirtieth Five-year Plan have been worked out. The feasibility study report and the environmental impact assessment report of BamianMt. ecological tourism project are being drafted now. III. Project Content The project is located in the reserve area, experimental area and the peripheral areas. It will focus on the construction of: a military camp-style ecological vocational village, a forest health industry base, 3 ecological tourist hotels, 5 sightseeing pathways, 3 secondary forest highways around the scenic spot, 2 gates, 2 tourist reception and service centers, a folkway garden, a science-education center, a botanic garden, an ecology-education base, 2 campsites, 1 RV campground, ecological tourist toilets and infrastructures. IV. Project Investment Investment totals RMB 1.287 billion yuan. V. Benefit Analysis According to the prediction of economic goal of Bamian Mt. tourism development (2016-2025), the average annual tourism income can reach RMB 377 million yuan; providing that 60% of the income pays for the operation costs, the average annual profits can register RMB 150 million yuan, and ROI is 11.66%. VI. Cooperation Way PPP (Public-Private Partnership) or sole proprietorship VII. Project Initiator Project Initiator: Hunan Bamian Mountain National Nature Reserve Authority
263
Comprehensive Tourism Development in YongzhouJiuyi Mountain I. Project Background Jiuyi Mountain is situated in Ningyuan County, Yongzhou City, 60 li(one li equals to 500 meters) to the south of Ningyuan county town, and belongs to the Nanling Mountain Ranges. It enjoys a high reputation around the world for its plentiful cultural relics and historic sites, unique natural scenery, bizarre karst caves and featured folk customs, and it is also among the Hunan’s first batch of major national scenic parks, national forest parks, state-level cultural relics protection units as well as national 4A class tourist spots. A dozen of tourist attractions in the area which have been developed includes Tomb of Emperor Shun, Zixia Cave, Shunyuan Peak, Yuguan Hill, site of Ancient Shun Temple, Confucius’ Temple, Fenghuang Cave, Taohua Cave, Yongfu Temple and so on. At present, the tourism development of Jiuyi Mountain is still at the early stage. It is in urgent need to integrate resources and build two famous brands, Jiuyi Mountain and Culture of Emperor Shun, to develop the national tourist destination. II. Preliminary Work RMB 420 million yuan has been invested to build the Shunde Square and a tourist service center, repair the Tomb of Emperor Shun, construct the highways which connect the tourist areas, transform the Zixia Cave scenic spot, and complete the prophase development of Xiangyuan hot springs, etc. III. Project Content It is planned to mainly develop and construct the Tomb of Emperor Shun tourist spot, Three Peak Mountain tourist spot, Mujiang River natural park, Qingshanwei Valley scenic spot, the home village of Mahjong, Taohua Cave scenic spot, Ancestor Peng Health-caring scenic spot, Cuiwei Lake scenic spot, Lazi Mt. scenic spot, Xiaoshuiyuan National Forest Park and Xiangyuan hot springs. IV. Project Investment Investment totals RMB 8.6 billion yuan, with RMB 2 billion yuan for recent investment. V. Cooperation Way By sole proprietorship, joint venture or contractual joint venture, the investors can get reasonable return. VI. Benefit Analysis In 2016, the number of tourists registered 8 million, and total tourism income of RMB 4.8 billion yuan was obtained. By 2020, the number of tourists is expected to reach 12 million, and total tourism income of RMB 8 billion yuan is expected to earn. VII. Project Initiator Project Initiator: Jiuyi Mountain National Forest Park Administration of Ningyuan County, Yongzhou City
Yangming Mountain Tourist Resources Full Transferring I. Project Background Yangming Mt., located in the outskirts of Yongzhou City and in the northeast of Shuangpai County, covering an area of 114.2 square kilometers, is the second largest National Forest Park in Hunan Province. It contains large-scale primitive/original ecological forests of high altitude rare in southern Hunan, and the percentage of forest coverage reaches 95%, providing rich natural resources, a pleasant climate as well as unique and picturesque scenery. In the region tower the majestic high mountains and blanket the secondary forests, which help purify the air and offer a content of negative oxygen ions 3 to 6 times more than that in Lushan Mountain or Emperor Kangxi’s Summer Mountain Resort in Chengde. It also embraces profound “Buddhism” culture background and deep Chinese “harmony” culture deposits. There are always tens of thousands of pilgrims coming to Wanshou Temple to worship the Buddha (Xiufeng Chan master). The tourist spots that have been developed include Wanshou Temple, Flower Sea of Rhododendron, Wanhe Lake, and Headstream of Small Huangjiang River the four major scenic spots. Yangming 264
Mountain tourist spot is an ideal place for visitors to worship the Buddha, go sightseeing, enjoy their leisure time and do scientific research. In 1992, it was approved as the National Forest Park; in 2006, it was entitled as Green China’s Environmental and Cultural Demonstration Base and one of the hundred Hunan scenic spots that citizens like; in 2012, it was selected as national 4A level scenic spot, possessing large potential for tourism development. II. Preliminary Work The project has begun to take shape: the main road into the park and roads inside the spot have hardened and been open to traffic; the communications network has covered all area; Wanshou Temple, Headstream of Small Huangjiang River, Flower Sea of Rhododendron, Wanhe Lake and other scenic spots have been open to tourists. Daily reception capacity of 1000 people can be achieved by Yangming mountain villa, Yangming Mountain hotel and other sites. III. Project Content In light of the overall tour plan of Yangming Mt. area, all tourist resources in the park are planned to be transferred, in order to further improve and perfect the four major scenic spots (Wanshou Temple, Flower Sea of Rhododendron, Wanhe Lake, and Headstream of Small Huangjiang River) as well as the supporting facilities, and to develop the Headstream of Great Huangjiang River scenic spot. IV. Project Investment Investment totals RMB 1 billion yuan. V. Benefit Analysis On the basis of the average 1.2 million tourists per year and consumption per capita of RMB 300 yuan in recent three years, the annual revenue is RMB 360 million yuan, with the overall rate of profit of 50% and the annual net profit of RMB 180 million yuan. Once the project is completed, the number of tourists per year will skyrocket. VI. Cooperation Way Sole proprietorship or joint venture VII. Project Initiator Project Initiator: Yangming Mountain National Forest Park Administration
Centian River Reservoir Tourist Resort Development I. Project Background Centian River reservoir tourist resort, where the residents are aborigines of Yao nationality, covers 7 townships such as Wujiang Township and Huajiang Township. There are rich ethnic feelings and miraculous peaks and streams. After the expansion of Centian River reservoir which enjoys a reputation of Headstream of Hunan Province, the normal impounded water level will rise to 313 m from 254.26 m, and 86 km of deep-water channel will be formed at an average elevation of over 300 m in upstream of reservoir. The total water surface covers around 320 square kilometers, on which there exists a picturesque landscape of the bay and lake, with more than 210 forest islands and bylands adding radiance to each other. It is an ideal place for leisure vacation and health caring. Centian River tourist resort development in Jianghua County is among the planned projects of Great Xiangxi Eco-cultural Tourism Circle, which also include the Charming Yao Nationality self-driving tour base, Tuojiang River Ancient Residence of Yao nationality, Great Longshan Mt. Forest Tourist Resort and Gupo Mt. Folk Customs Eco-tourist Resort. II. Preliminary Work The overall project planning and regulatory plan of service area have been worked out. The construction of the tourist town where live the migrants from Dongtian Township and the estuary area of Centian River and the roads inside the resort has been started. III. Project Content It is planned to construct an aquatic sports center, a water recreation center, Yao customs experiencing zone, resort hotels, Millennium Village of Yao Nationality, alpine driftage, large-scale hunting ground, Tianhe-Yaochi tourist zone, HuazhenShuixiang tourist zone, etc. IV. Project Investment Investment totals RMB 6 billion yuan, among which RMB 1 billion yuan is the loan from the bank, 265
and RMB 5 billion yuan is from investment attraction. V. Benefit Analysis The number of tourists per year is 1.5 million, business income is around RMB 1.7 billion yuan, and profit and tax is RMB 700 million yuan. VI. Cooperation Way Joint venture, contractual joint venture or sole proprietorship; the return of investment is project’s operation income. VII. Project Initiator Project Initiator: Bureau of Ethnic and Religious Affairs and Culture, Sports, Broadcasting, Television, Press and Publication of Jianghua Yao Autonomous County, Yongzhou City
Overall Tourism Development of Siming Mountain Forest Park in Lengshuitan District I. Project Background Hunan LengshuitanSiming Mountain Forest Park is located in Yangchundian Township in the north of Lengshuitan District, Yongzhou City, 39 km from Yongzhou downtown area, 10 km from G55 Expressway. Covering a total area of 2547 hectares, with 1043.2 meters being the highest altitude, the forest park is endowed with rich resources of A class forest landscape, beautiful hydrological landscape, and peculiar physiographic landscape. In addition, the Buddhist culture, folk customs and cooking culture are of unique characteristics. II. Preliminary Work In 2015, Hunan Provincial People’s Government approved of the construction of Hunan Lengshuitan Siming Mountain Provincial Forest Park (Hunan Document [2015] No.66), and in the same year Document on Overall Planning of Hunan Lengshuitan Siming Mountain Provincial Forest Park (2015-2025) was reviewed and passed. At present, the declaration work is in process in line with procedures. Inside the park, 33.9 km of roads between villages have been constructed and hardened, 23.5 km of new gravel roads have been built, and 9.6 km of road fence has been installed. III. Project Content According to Document on Overall Planning of Hunan Lengshuitan Siming Mountain Provincial Forest Park, it is planned to mainly construct: 1) 5items of infrastructures (roads, water and electricity facilities, toilets, communications facilities); 2) 4items of regulatory service area (regulatory subarea, the park gate, tourist center, hotels); 3) 7 items of core scenic spot (the repair work of Tengyun Patriarch Hall, sightseeing stands, waterfall stage, Yanying Pavilion, Guanhou Pavilion, outdoor bivouac, sightseeing pathways); 4) 10 items of general leisure area (pan-lake cycle way, water park, outdoor swimming pool, ecological parking lot, Monument of Lv Shen, Yixin Pavilion, Yixuan Pavilion, flower sea of rhododendron, Xizhu leisure village, aboriginal tribe). IV. Project Investment Investment totals RMB 175.9 million yuan: RMB 136.4 million yuan for engineering and RMB 39.5 million yuan for other costs. V. Cooperation Way Joint venture, sole proprietorship or joint stock partnership VI. Benefit Analysis Calculated from the 16 years’ total business income of RMB 2.67623 billion yuan, a total cost of RMB 103.32 million yuan and a total profit of RMB 873.63 million yuan, the average annual business income is RMB 167.26 million yuan, average annual cost is RMB 103.32 million yuan and average annual profit is RMB 54.6 million yuan. ROI is 31%. VII. Project Initiator Project Supervisor: People’s Government of Lengshuitan District, Yongzhou City Project Constructor: Siming Mountain Forest Park Authority of Lengshuitan District, Yongzhou City 266
Jiemuxi National Nature Reserve Eco-tourism Development I. Project Background Jiemuxi National Nature Reserve, adjacent to Zhangjiajie National Nature Reserve and Xiaoxi National Nature Reserve, enjoys a reputation of “Jiuzhai Valley in Hunan”. It covers an area of about 32 square kilometers, touching upon the Jiemuxi Township, Mingxikou Town and Yuanling Town. The reserve has picturesque scenery with flowers in blossom all year long, and embodies valley secondary forests rare in China with the coverage proportion of 89.6%. The highest peak Guoguonao (Shengmu Mountain) is at an elevation of 1294 meters. In the reserve, there is a variety of species of ancient origin, including over 460 types of ornamental plants with more than 60 types of new plants, and 108 sorts of rare animals, of which 10 are the national A Class key protected animals and 9 are B Class protected animals. II. Preliminary Work 14 km of tour trail in the reserve has been preliminarily constructed. And infrastructures including sightseeing stands, pavilions, stone benches, wooden chairs and latrines along the roads have been constructed. III. Project Content It is planned to construct a comprehensive sports ground, combing the forest sightseeing, valley trek, scientific research, health-caring, camping and hiking, and leisure vacation as a whole. IV. Project Investment Investment totals RMB 800 million yuan. V. Benefit Analysis With the number of tourists per year of 1 million and consumption per capita of RMB 400 yuan, the overall revenue is RMB 400 million yuan; calculated with the tax rate of 3%, the annual tax revenue is RMB 12 million yuan; calculated with profit rate of 25%, the annual profit is RMB 100 million yuan. The payback period spans 8 to 10 years. VI. Cooperation Way Joint venture, contractual joint venture or sole proprietorship VII. Project Initiator Project Initiator: HuaihuaYuanlingCultural Tourism Construction and Investment Co., Ltd.
ZhijiangKaixuan International Peaceful Tourism and Cultural Creativity Industrial Park I. Project Background Zhijiang Dong Autonomous County is located in western Hunan, covering 2099 square kilometers, with a population of 379.4 thousand. In the region pass the Shanghai-Kunming Railway, 302 National Highway, Shanghai-Kunming Expressway, Baotou-Maoming Expressway, and Changsha-Kunming High-Speed Railway, and the Huaizhi Highway is going to be constructed. Huaihua Zhijiang Airport has opened several airlines to Beijing, Shanghai, Guangzhou, Shenzhen and other destinations. Hence, there forms a “three-in-one” transportation network of railways, highways and airlines all over the county. The tourist resources are rich, including the Japan’s surrender site of Chinese people’s Anti-Japanese War, Memorial Hall to the Flying Tiger, International Peace Village, Longjin Fengyu Bridge, Tianhou Palace, Wanhe Building, Confucius’ Temple, Mingshan Taoist Temple, Sandaokeng Nature Reserve, Maocong River driftage, etc. The project, relying on the unique peace culture of Zhijiang, rich tourist resources and profound cultural history, is aimed to set up a demonstration region of world peaceful cultural tourism, national defense education and training as well as military culture experience. II. Preliminary Work The preliminary planning of the project has been drawn up. The detailed planning, site selection, environment impact assessment, beforehand land assessment and other prophase work are now in process. III. Project Content 267
The project include: 1. Zhijiang International Tourism Comprehensive Service Center; 2.Wushui Riverside Landscape Belt and Peace New Town Sightseeing Belt; 3. Anti-Japanese War Happy Valley Expanded Group, Health-caring Resort Group, International Peace Forum Cultural Group, Peace Lake Vacation Town Recreational Group, and Self-driving RV Campground Experiencing Group. IV. Project Investment Investment totals about RMB 2 billion yuan. V. Benefit Analysis When the construction is finished, calculated from annual 10 million of visitors and average service fee of RMB 60 yuan per capita, the annual profit can register RMB 600 million yuan. VI. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VII. Project Initiator Project Initiator: Huaihua Zhijiang Dong Autonomous County Cultural Tourism Development Co,. Ltd.
Overall Development of Bamboo Sea Eco-tourism in Hongjiang Ancient Business City I. Project Background The project is located along the Hongjiang-Qiancheng Highway, 2 km from Hongjiang downtown area. Northwards it is adjacent to Furong Pavilion which is famous for a poem written by an ancient Chinese poet Wang Changling, and in the south it neighbors the national key cultural relics protection unit, the Hongjiang Ancient Business City, which is the only intact business society system of Ming and Qing Dynasties. The region enjoys multiple traffic advantages: 209 National Highway, 320 National Highway, Shanghai-Kunming Expressway and Baotou-Maoming Expressway run through the area, and it only takes 60 minutes to drive northwards to Huaihua Railway Station and 70 minutes to drive westwards to HuaihuaZhijiang Airport. Inside the tourist spot, the famous scenic spot of Taoism, Miyanjian, is like a fairyland which is always wreathed in mists; ten thousand Chinese mu of bamboo forests expand and mantle the land, forming a magnificent landscape; the water areas stretch for 9 kilometers with a width of 300 meters and can be developed for water recreation and leisure tourism. II. Preliminary Work The feasibility study report and regulatory detailed planning have been drawn up. III. Project Content It is planned to construct a high-end leisure holiday village, farmhouse bamboo stockade complex, fishing and sightseeing stands, hot-spring villa, bamboo forest sightseeing pathway, the expanded training center, a water park, cruise ships and boat studios, Hongjiang stilted building residential area, good quality local specialty shopping mall, etc. IV. Project Investment Investment totals RMB 200 million yuan. V. Cooperation Way Sole proprietorship, joint venture or contractual joint venture VI. Project Initiator Project Initiator: Huaihua Hongjia District Bureau of Tourism
Tourism Development in Gaoyi Ancient Village, Huitong County I. Project Background The project is located in Gaoyi Village, Gaoyi Township of Huitong County, Huaihua City, 35 km from Huitong county town, covering an area of 15 square kilometers with 2.5 square kilometers being the core area. The core tourist resource is the Gaoyi Residential Group, which is the national key cultural relics protection unit. At present the Gaoyi ancient village is the national 3A level 268
tourist spot, China’s historic and cultural village and one of China’s top ten ancient villages. II. Project Content The project, highlighting the topic of the Millennium Ancient Village, the Dream Homeland, will focus on the construction and development of: 1. The 104 antique buildings and the folk culture leisure tourist area in Gaoyi ancient village; 2. A Fancy Water World theme park located in Wushui River area and reservoir region of Ruo hydroelectric power station; 3. The Dream Forest leisure resort and Miraculous Cloud Sea Landscape in Mengying Mt. 4. Traditional farming culture and farming work experiencing activities in Gaoyi Village; 5. The Farming Culture Museum, Gaoyi Village History Museum and intangible cultural heritage museum of root carving handcraft, paper-cutting art, Nuo culture and others; 6.The improvement and promotion of supporting facilities and infrastructures. III. Project Investment Investment totals RMB 1 billion yuan. IV. Cooperation Way Joint venture, sole proprietorship, contractual joint venture or BT (Build-Transfer) model V. Project Initiator Project Initiator: Bureau of Culture, Sports, Tourism, Broadcasting, Television, Press and Publication of Huitong County, Huaihua City
TongdaoWanfoshanShenxian Valley Ecological Tourism Construction I. Project Background Wanfoshan Dong minority scenic area of Tongdao Dong Autonomous County is located in the juncture area of Hunan, Guangxi and Guizhou and also under the radiation area of Guilin and Zhangjiajie scenic circles. With a total area of 166 square kilometers, Wanfoshan Dong minority scenic area has been examined and promulgated by the State Council as National Natural Heritage, National Geological Park and National 4A Level Scenic Area among the seventh approved national scenic area list. It is also listed incorporated into World Natural Heritage Nomination Sites and China World Cultural Heritage Tentative List. With annual average temperature of 16.3℃, frost-free period of 298 days and annual average rainfall of 1480.7 mm, Wanfoshan Dong minority scenic area is an ideal spot for relaxation, tourism and healthcare. II. Preliminary Work The specialized planning of Wanfoshan Dong minority scenic area has been completed. Preliminary work such as feasibility study report, land use application and land requisition is currently underway. III. Project Content This project covers a total area of 1,000 Chinese mu and the main focuses will be laid on the construction of sports recreational area, ecological scenic area, folk cultural area and agriculture experimental area. This healthcare and vacation project will integrate functions such as ecological tourism, healthcare resort, recreation and relaxation. IV. Project Investment Investment totals RMB 1.5 billion yuan. V. Benefit Analysis The payback period totals about 6-8 years. VI. Cooperation Way Joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Administrative Office of Wanfoshan Dong Minority Scenic Area, Hunan Province.
Xiyou Cultural Park of Boyue Cavity in Lengshuijiang City Development Project I. Project Background Boyue Cavity of Loudi is one of the famous scenic areas in Hunan. It is breathtaking to appreciate 269
the amazing length and width of this cavity and the wonderful and eccentric lava. The inner space of Boyue Cavity is a dazzling exhibition with a manifestation of the uncanny craftsmanship of the Mother Nature. A visit to Boyue Cavity will be a wonderful feast to eyes when clustering stalactites, upright stalagmites, gathering stone pillars and pending stone curtains come into sight, all incredibly and fantastically shaped. Boyue Cavity has enjoyed an enviable reputation nationwide as a filming spot of TV series Journey to the Westin the 1980s’ version. In 2016, Loudi municipal government decided to start up the Boyue Cavity Xiyou Cultural Park project and conducted superior planning and propaganda with a full utilization of factors in TV serials Journey to the West. This project aimed to establish a well-reputed image of Loudi cultural tourism and the highlights were laid on the construction of core scenic spots like Mount Huaguo, Water Shade Cavern and Monkey King Area. II. Preliminary Work Approval procedures including feasibility study report, environment evaluation, regulatory location, project initiation have been completed. This project has been included into PPP project library of Hunan Department of Finance. III. Project Content This project is located in Lengshuijiang City with a total area of 64 hectares (about 970 Chinese mu). The further construction of this scenic area will be expanded eastward, southward and northward with a total area of 3.43 square meters (about 5,012 Chinese mu). The main construction project includes Mount Huaguo, Xiyou cultural Block, Boyue Cavity Xiyou story line, Heifeng Cavern, Long palace, Xiyou thematic tour exhibition and aquarium. IV. Project Investment Investment totals RMB 1,087,500,000 yuan (including interests incurred during construction period). Engineering costs are RMB 876,440,000 yuan; other costs are RMB 82,390,000 yuan; the estimated basic reserve funds amount to RMB 47,940,000 yuan and the debt financing accounts of this project are RMB 789,270,000 yuan. The construction period spans four years with the loan rate of 4.9%. The interests incurred during construction period amount to RMB 80,740,000 yuan. V. Cooperation Way This project will adopt PPP model. When this project is completed, it will be operated by Project Company or the entrusted third party and will be transferred to government or designated authorities after the expiring date. The term of cooperation is 24 years (including four years of construction period). VI. Benefit Analysis The major business income comes from tickets, catering, recreation, accommodation, tourism commodities and parking lots. VII. Project Initiator Project Initiator: Administrative Bureau of Culture, Sports, Radio and Press (Travel Bureau), Lengshuijiang of Loudi.
LianyuanDalongshan (The 1stPhase) Tourism Development I. Project Background The project area boasts abundant ecological resources with profound historical bases. Of particular note, Chinese traditional medicine culture represented by Medicine Master Sun Simiao, dragon culture, and Xiang culture are quite mysterious and unique. Wetland landscape here are unique, hence it has won the honor of the national Chinese traditional medicine healthy tourism demonstration base, the best health maintenance and relaxation base, top 10 most popular heath maintenance base in Hunan province consecutively. Therefore, in the near future, this area can be built into a renowned travel destination scenic spot integrating traditional medicine health maintenance, tourism and sightseeing, wetland experience, and summer resort, with promising developing prospect. II. Preliminary Work The planning compilation and preliminary site selection have been completed, and the land pre-trail approval is underway. Now it has been published on the website as the fourth group PPP demonstrative projects of Hunan Provincial Department of Finance. III. Project Content 270
The project locates in Longshan National Forest Park and Yangshi Town, covering a total area of 710,000 square meters and a floor area of 560,000 square meters. Main construction items include Medicine Master Shengshan Area, Health-maintenance Area, Xiang Culture Demonstration Area, Ecological Holiday Area, Dragon Culture Expo Area, Yangshi Old Town of Tourism Style Town and other tourism construction projects, as well as restoration and supporting facilities construction for former scenic spots, IV. Project Investment The total investment for the project is RMB 2.9 billion yuan. Among that, 2.05 billion yuan is for engineering costs, 0.42 billion yuan for other costs, 0.25 billion yuan for budget reserve, 12 million yuan for working capital, and 0.16 billion yuan for interests incurred during construction period. The project would be initiated in the beginning of 2017 and be completed at the end of 2019. V. Cooperation Way Longshan area (the 1stphase) tourism development PPP project would adopt PPP model, taking enforcement body of Lianyuan Long Mountain National Forest Park Management Administration authorized by Lianyuan Municipal People’s Government. Lianyuan Liyuan Tourism Investment and Construction Co,. Ltd is appointed to represent the government and then to sign a contract with the social capital wining the bidding, thus to found a SPV project company. The company would be in charge of the whole process of project design, financing, construction, operation, and transfer, etc. VI. Project Analysis The total investment for the project is RMB 2.9 billion yuan, with a franchise period of 30 years. 750,000 tourists are expected to visit here per year. And the annual income would reach RMB 0.36 billion yuan in various fields such as Chinese traditional medicine, health-care tourism, relaxation and entertainment, tourism products, and tourist real estate income. Internal rate of return of the project investment is 6.37% deducted from the personal income tax. Investment financial net present value is RMB 634795300 yuan deducted from the personal income tax, the financial net present value is more than zero. VII. Project Initiator Project Initiator: Lianyuan Longshan National Forest Park Management Administration
Xinhua County Meishan Old Town Protection and Development I. Project Background ral ecological and cultural resources. In 2013, it has been listed into a characteristic economic key county of Hunan, enjoying promising opportunities in tourism industry development. With the long-lasting Meshan culture and as the core of a provincial historical and cultural city, Meshan old town has long-aged history and cultures, being a significant cultural origin of Huxiang culture. The unique and plain construction culture, profound folk culture, shipping culture and food culture here all reflect the construction features in Ming and Qing Dynasties as well as lives of ancient residents in Meshan old town. Hence the protection construction of Meshan old town is beneficial to inherit historical culture, enhance the expressive force and emotional appeal of Meishan culture, so as to bring rewarding economic, political and social benefits. II. Preliminary Work The overall plan and design of the old town protection and development has been compiled, and some project items have won state fund support. III. Project Content The project is located in Shangmei Town of Xinhua County, with a construction area of 79.85 hectares. Main items are: 1. Infrastructure construction, which includes road and parking lot engineering in old town district and Huashan district. 2. Old town protection, including renovation and restoration of residential buildings, business stores, water system landscape, and some old architectures. 3. Huashan district development, which includes projects as evacuation square, food street, hotel, market, homestay, club and park. IV. Project Investment The total investment for the project is RMB 2.7 billion yuan. V. Cooperation Way 271
Joint venture, contractual joint venture, PPP, etc. VI. Project Analysis After the completion of the project, 2 million visitors are to be received here. Each year, quality hotel, Meishan delicious food, characteristic business and commerce, relaxation and entertainment, water amusement park can earn profits of RMB 40 million yuan. The income from scenic spots ticket would reach RMB 60 million yuan, and other income would reach RMB 60 million yuan. In this way, the annual net profit is over RMB 0.3 billion yuan. VII. Project Initiator Project Initiator: Loudi Xinhua County Old Town Development Co,. Ltd.
Zhuzhou Hi-tech Industrial Development Zone Style Business Water Street Construction I. Project Background The project is in the Wanfeng Lake tourist attraction, which is a center area of Xinma Innovation City in Zhuzhou Hi-tech Industrial Development Zone. This attraction covers an area of 2000 Chinese mu, among which 1000 Chinese mu is water surface, 146 Chinese mu is mountainous area, with a total south-to-north length of 5 kilometers. With catering industry and hotel industry as core industries, the project plans to introduce theme catering and style inn as primary sector, and special snacks and business front stores as secondary, so as to build a style street surrounded by water and mountain with graceful scenery. Thus it would provide complete supporting services for permanent residents and tourists around. II. Preliminary Work The project covers a land of 300 Chinese mu, which is for construction of a 150,000-square-meters regionally characteristic cultural and tourism style street. The total length is over 2 kilometers, including urban cultural tourism public facilities, style water street, characteristic hotels, style inns, etc. III. Project Content The total investment for the project is RMB 1.25 billion yuan. IV. Cooperation Way Sole proprietorship or joint venture. V. Project Initiator Project Initiator: Zhuzhou Hi-tech Industrial Development Zone Investment Attraction and Cooperation Bureau.
Huxiang Characteristic Style Street Development I. Project Background Xiangtan has been long hailed as �the golden Xiangtan over the past thousand years�. In order to promote regional business and commerce atmosphere, attract visitors, explore traditional local cultures, spread Xiangtan cuisines and snacks, shape Xiangtan culture and create aimage of Xiangtan with assorted delicious delicacies, the Hi-tech Zone Huxiang Characteristic Style Street is planned to be built on the basis of regional reality. II. Preliminary Work Being close to urban business circle that takes Wanda Plaza, Wanda King Street and Evergrande business-residence complex as main bodies, the project can fully leverage on unique Huxiang characteristic culture to develop local business and introduce nationwide famous brands as well as regional specialties. The focus is to build a multifunctional style street that integrates tourism, relaxation, shopping, food and so on, with Xiangtan old street culture as its theme. III. Project Content The project is to be located in Xiangtan King Street and along the Yuehua Road. Xiangtan King Street is 900 meters long, covering an area of 77000 square meters. The stores in King street fall into the first floor ones and the second floor ones. These stores have various house 272
types, ranging from 30m2 to 400m2, but the most are from 50m2 to 90m2. The first floor is 5.1to5.6 meters high, and the second is 4.5 meters high. The Yuehua Road is 800 meters long, which is near Wanda Plaza, Evergrande business district and Nongmin Street catering area. A host of domestically-renowned catering brand stores and local characteristic catering units are to be introduced, thus to found 10 to 20 Xiangtan characteristic and traditional specialty restaurants. IV. Project Investment The total investment for the project is RMB 0.5 billion yuan. V. Cooperation Way Contractual joint venture, joint venture or sole proprietorship for development; Details would be confirmed by discussion in form of contract. VI. Project Initiator Project Initiator: Xiangtan Hi-tech Industrial Development Zone
3-3 Culture, Sanitation, Education (59) Construction of Changsha Cultural and Creative Industry Cluster (Phase 1) I. Project Background To boost the integration and innovation between cultural industry and information technologies, such as IOT (Internet of Things), Mobile Internet, cloud computing, big data, etc., a cultural and creative cluster has been planned to be established at Malanshan, Kaifu District in Changsha on the basis of the cultural advantages in creative film and television production, planning and producing, animation and cartoon of Hunan province. A national innovation and creativity center and a city of video are expected to be established under the totally fresh developing mode for cultural and creative industry cluster featuring “Internet + high technology + culture maker�. Through this effort, the cultural and creative industry will be strengthened. II. Preliminary Work A special project research team has been organized; the Research Report for the Development of Malanshan Cultural and Creative Cluster has taken initial shape. The demolition work has been finished and the establishment of road network and other infrastructure is in progress. III. Project Content The total land area for the project is planned to be 4,000 Chinese mu, 1,200 Chinese mu for Phase 1 (2017-2019), which includes the establishment of part of Riverside Complex, the Scenic Belt along Liuyang River and aims at forging a whole industrial chain for digital video leaded by software research and development and the creative production of digital video. IV. Project Investment Investment for Phase 1 totals RMB 30 billion yuan. V. Cooperation Way Joint venture, contractual joint venture and technology import etc.. VI. Benefit Analysis The output value is expected to reach RMB 100 billion yuan in 2020. VII. Project Initiator Project Initiator: Changsha Urban Construction, Investment and Development Group Co., Ltd.
Construction of Changsha (National) Advertising Industrial Park
273
I. Project Background Changsha (National) Advertising Industrial Park represents one of the first nine national advertising industrial parks approved by SAIC (the State Administration of Industry and Commerce) and major industrial projects jointly constructed by province, city and district and supported by the state. This industrial park has been honored as “Changsha Demonstration Base for Promoting Employment Through Innovation and Entrepreneurship”, “the Demonstration Base for Promoting Employment Through Innovation and Entrepreneurship of Hunan Province”, “the Demonstration Base for Maker Space of Hunan Province”, and has become a rotating presidency unit of the Third National Advertising Industry Development Conference. Under the guiding principle of “creativity, innovation, entrepreneurship and venture”, the establishment of the park puts emphasis on promoting advertising culture and creativity, new media and Internet plus related industry. Hunan Satellite TV Advertising Center, Hunan EE Advertising Co., Ltd, New Media Center of Xinhua News Agency, Tus Holdings, Shanghai Pegasus Brigade, CCTV Mall, HKSTV Hunan Branch Company and other major industrial projects and leading enterprises have been attracted and settled in this park. Now, the business cooperation between this park and some major enterprises and platforms including iSoftStone, Tus Holdings, Alibaba Business College, iSoftStone International and Motion Magic is in negotiation. To provide better service to settled enterprises, with the joint efforts of Changsha (National) Advertising Industrial Park and Fortune Securities, dedicated channel for the listing of enterprises in the park has been built as a way to expanding space for financing. By the end of 2016, 495 enterprises had registered in this park in which advertising cultural and creative companies take up 72% while 28% of them belong to mobile Internet and e-commerce. The registered capital reached RMB 2.14 billion yuan and the total output value was RMB 4.17 billion yuan. II. Preliminary Work Phase 1 project has been finished and come into service. III. Project Content The programmed land for this project is 450 Chinese mu and is divided into three phases. The total floorage is 800,000 square meters with 640,000 square meters ground floor area. Under the guidance of the strategy featuring planning comprehensively and carrying out separately, the phase 1 construction has been finished with the total area of 104 Chinese mu and construction area of 210,000 square meters. IV. Project Investment Investment totals RMB 3.5 billion yuan and RMB 1.6 billion yuan for phase 1 project. V. Cooperation Way Joint venture. VI. Project Initiator Project Initiator: Administration Committee of Changsha (National) Advertising Industrial Park
Construction of Xiangjiang River International Cultural Creativity Industry Park I. Project Background Since the founding of Hunan & Taiwan Cultural Creativity Industry Park, several projects including Changsha Macrolink Tongguanyao International Cultural Tourism Resort, Changsha Tongguanyao Museum, Kiln Temple, Tongguan Huxiang Cultural Art Gallery, Tongguan International Pottery Village and Metro Manufacture and Produce Base have been signed and begun construction. In order to improve worldwide popularity and influence, mayors from 26 representative cities, ambassadors, foreign friends, experts, scholars from 46 countries and media from home and abroad have been invited to collect in various cultural events including “Xiangjiang Forum”, “Changsha (Tongguan) Tour of Cultural and Creative Celebrities and Enterprises Across the Strait” and the “Ouyang Xun Cup Chinese Calligraphy Contest”. II. Project Preparation The construction of Xiangjiang River International Cultural Creativity Industry Park has been started in 2015. Changsha Xiangjiang River International Cultural Creativity Industry Park Co., Ltd has been set up to take charge of investment promotion, investing and financing. 274
III. Project Content This project includes the construction of Riverside Landscape Belt, Hongjiazhou Island, Caijiazhou Island, Tongguan Ancient Town Cluster, Caitaoyuan Cluster, Navigation-power Junction Cluster and Book Hall Cluster. This project aims at making a base that collecting cultural enterprises and cultural creativity industry in the form of culture and exhibition art, delicate agriculture, design and sale of cultural creativity, culture-and-creativity-related life house, hotel, office and residence and vocational training of creativity. IV. Project Investment The investment amount is RMB 2 billion yuan and this project is divided into 3 phases. One or two excellent items will be given top priority and the construction of infrastructure in core zone will be the key point. The main works going into operation means the park is shaped basically. V. Cooperation Way Sole proprietorship, joint venture; VI. Benefit Analysis This project is expected to bring about economic benefit of more than RMB 5 billion yuan and produce jobs for 100,000 persons in an indirect way. VII. Project Initiator Project Initiator: Hunan & Taiwan Cultural Creativity Industry Park
Construction of Hunan Cultural Creativity Center I. Project Background In recent years, Hunan has implemented the strategy of building Hunan into a culture-rich province and ranked cultural creativity industry as a strategic emerging industry. Hunan Cultural Creativity Center has planned to introduce premium enterprises and talents through Hunan Cultural Creative Design Competition. This will help to transform cultural and creative work into goods in a short time, open up the manufacture and sales market and shape a integrated industrial chain. This effort will help to promote the integration and collaboration of government, talents, finance, enterprise and other key elements of resource, forge a culture and creativity base driven jointly by government and market. As a result, the industrial upgrading will be accelerated and the international influence of Xiangjiang culture will be improved. The first Hunan Cultural Creative Design Competition has finished its collection and first review of works. 4,023 works has been received and 100 finalists will be elected from the entries. II. Preliminary Work Hunan Cultural Creativity Center has set up the project in the Ministry of Culture. Through reviewing, the civil engineering section has been finished and interior decoration will be started according to the core construction plan. Hunan Cultural Creativity Center Co.,Ltd. is planned to be set up. III. Project Content The construction cycle of this project is 3 years. This project mainly includes the construction of Cultural Creative Design Pavilion, Exchange Center, Copyright Management Center, Incubation Center, Investment Center, marketing platform and think tank platform. According to the project plan, 50 enterprises and 1,000 creative talents will settle in this Center and the commercialized operation of 5,000 creative goods will be realized with output value reaching RMB 2 billion yuan. IV. Project Investment Investment totals RMB 383 million yuan. The civil engineering costs RMB 345 million yuan. RMB 13 million yuan will be spent in the decoration of Cultural Creative Design Pavilion, Exchange Center, Copyright Management Center and Transforming Center, RMB 6 million in the construction of IT platform, which includes marketing platform and think tank platform, and RMB 1,900 yuan will go to other expenditure. V. Cooperation Way Joint venture, contractual joint venture and some other uncertain ways. VI. Benefit Analysis 275
The gross revenue during the construction period is expected to be RMB 350 million yuan. It is expected to reach target output in the third year with annual revenue coming to RMB 200 million yuan and total profit RMB 55,367,300 yuan. In this connection, this project has strong profitability amid its rate of Return on Investment (ROI) coming to 18.5%. VII. Project Initiator Project Initiator: Huasheng VOC Co.,Ltd., Huasheng VOC Kaiyue International City
Construction of Changsha International Art Zone of Houhu I. Project Background Changsha International Art Zone of Houhu, with its planned coverage of 2,110 Chinese mu (including water area of 600 Chinese mu), is located in central area of the Higher Education Mega Center and the core area of the National 5A tourist attraction, Yuelu Mountain. Located at the foot of Yuelu Mountain and the down-town area, neighboring Xiangjiang River and elite universities, Changsha International Art Zone of Houhu is endowed with splendid geographical position. This project enjoys the unique advantage coming from its neighboring famous mountains and rivers, well-known lands, prestigious universities as well as the eminences. This project highlights the development of cultural and creative industry and is planned to build Houhu as a cultural and creative industrial park gathering the transaction of original art design, the exhibition of Huxiang Culture, and leisure and recreation service. II. Preliminary Work The work includes the clearing up of demolition waste, the building of landscape node, the leasing of land and fishpond and the design of comprehensive plan. About RMB 2 billion yuan has been invested in the construction of infrastructure and the project is expected to be finished in 2017. III. Project Content 1. Road building project. Seven main roads including Houhu Road, Tianma Road, Huda Road, Huda Bypass 1, Huda Bypass 2, Huda Bypass 3 will be built and supporting facilities for water, electricity, gas and telecom will be added. 2. Pollution cut and control project. The diversion of rain and sewage water will be carried out on the basis of the network of main roads so as to clean the Houhu Lake in a thorough way. 3. Demolishing and upgrading project. Illegal constructions and dilapidated buildings will be demolished while the remaining houses will receive facade retrofit and be improved comprehensively in line with the phased plan. 4. Ecological management project. The water body of Houhu will be exposed to advanced treatment so as to promote landscaping and beautifying. IV. Project Investment Investment totals RMB 2 billion yuan. 500 buildings (about 300 square meters for each) will be constructed for developing cultural industry and approximately 600 Chinese mu water areas and 300 Chinese mu lands can be employed for business development of related industry. V. Cooperation Way Contractual joint venture, joint venture and equity participation. VI. Benefit Analysis The modes of return include land value-added revenue, project operation profit and rent and sale earning. It is expected that the annual output value will reach about RMB 80 million yuan with net earning coming to RMB 30 million yuan. VII. Project Initiator Project Initiator: Propaganda Department of Yuelu District, Changsha.
Investment of Mango TV Self-produced Program
276
I. Project Background The Self-produced Program is a project aiming at making network homemade program and its derivative contents and this program is played and operated mainly by Mango TV. This project has established partnership with Hunan Satellite TV( HNTV) and the channel crowd of Hunan Broadcasting System. The year of 2015 represents the first year when Mango TV scored brilliant achievements in self-produced programs as the peak play amount of its programs including Perfect Holiday, The Million Second Quiz, I am a Singer 2016 and Mango LiveShow reached more than 1 billion. The year of 2016 witnessed the homemade program of Mango TV reached its peak with its variety shows such as Perfect Holiday 2, Dad, Where Are We Going? Season IV and Super Girl 2016. The number of applicants for Super Girl 2016 swelled to 610,000, four times of the previous program. As a result, the user volume of Mango TV has increased by 100 time, the advertisement premium grown by 13 times and the capital consideration more than 10 times. The number of all-terminal users has reached 47 million UV per day and the videos received more than 220 million hits each day. The downloads and installs of Mango TV APP has registered more than 438 million and the activated users of NTV (including both the public network and private network) has been more than 48 million. The annual revenue of the whole platform has reached RMB 1.9 billion yuan. II. Preliminary Work The programming team has been set up, the copyright bought and the programming scheme laid down. The financing work has been finished and the programming is ready to be started. III. Project Content The plan for 2017 is as follows: 1. Upgrading and strengthening the original homemade programs including Super Boy 2017, Dad, Where Are We Going? Season V, Super Mom II, and Who's the murderer II. 2. Initiating more creative programs like the gender-swapping reality show named Transformed Men and Women, the survival-test reality show called The Successor of Life Game and horrifying game-and-task-based reality show known as Out of Silent Hill. 3. Raising awareness of Mango drama: elaborate homemade dramas including Master, The Phantom Rider, Enjoyable Golden Words, The Romance of Dragon and Snake and Demon Girl II are planned to be pushed out after the Chinese cartoon culmination, Fire of Lord. Co-presented drama Fighter of the Destiny, exclusive drama Tribes and Empires: Storm of Prophecy, Love Actually, SWAT and If love like This. 4. Developing Mango Live APP in a creative way: planning to broadcast the award ceremony of Academy Awards, Grammy Awards, Golden Globe Awards and Billboard and Spring Festival Gala for Chinese and Overseas Chinese, The Lantern Festival, Mid-Autumn Night, Hunan TV New Year Concert. IV. Project Investment Investment totals RMB 1 billion yuan, including fixed assets of RMB 0.2 billion yuan, intangible assets of RMB 0.5 billion yuan and circulating fund of RMB 0.3 billion yuan. V. Cooperation Way Joint venture and contractual joint venture. Overall investment or single investment. Coordinating the programming and popularizing work. Introducing capital mainly for purchasing or renting equipment, programming, researching, developing and purchasing copyright. VI. Benefit Analysis Investment in early period totals RMB 0.3 billion yuan. The business model featuring advertisement on Mango TV platform plus interactive-added value plus copyright selling plus derivative expansion has been adopted. It is expected to realize annual revenue of RMB 1 billion yuan with over RMB 0.5 billion yuan going to annual net profit in the third year. The payback period is 2 years. VII. Project Initiator Project Initiator: Hunan Happy Sunshine Interactive Entertainment Media Co., Ltd
Construction of Xunlong River Film Town I. Project Background 277
To comply with the situation that China is highlighting the development of cultural tourism industry and grasp new opportunities, Hunan Xiaoying Cultural Industry Investment Co., Ltd selected Shuanghe Village, Guoyuan Town, Changsha County to establish Xunlong River Film Town, and developing and designing a construction project specially. The project location is endowed with abundant natural resources, picturesque scenery, vast bamboo forest and grove. With Xunlong River, Jinjing River and Malin River interweaving and surrounding, setting off with the typical Jiangnan foothill landscape, the river system here is rather thriving. In the mean time, this area is rich in historical and cultural resources with time-honored legendary story and historic sites spreading. The traffic is very convenient as it takes 10 minutes driving from this village to Changsha County and 25 minutes to downtown Changsha and Huanghua International Airport. II. Preliminary Work In 2016, the strategic cooperation agreement on the project named Xunlong River Xiaoying Cultural Tourism Town, which identifies that Xiaoying Group is entitled to develop and operate the 3000-Chinese-mu land in Xunlong River Ecological Art Town, was signed between Hunan Xiaoying Cultural Industry Investment Co.Ltd and Hunan Zonglv Xunlong River Authority. The two parts has conducted further negotiation on cooperation details and the overall planning scheme is being carried out. III. Project Content The planning land for this project amounts to 3,000 Chinese mu, among which 1,000 Chinese mu will be used for construction and total floorage is about 660,000 square meters. Xiaoying Film DreamWorks, hotel, Homestay Culture and Entertainment, Culture and Art Street and Artist Resort are planned to be constructed. This project aims at making a top-ranking new brand of film-theme culture and tourism town, setting up a new model featuring integrating film IP into tourist industry at the same time reaching a highland of building film-and-culture-theme special town. IV. Project Investment Investment totals RMB 1.5 billion yuan with initial investment of about RMB 0.5 billion yuan. The period from 2017 to 2018 is mainly for construction and the in the year of 2019, part of the project will come into service. It is estimated that this project will be completed around 2021 and put into operation. V. Cooperation Way Joint venture, contractual joint venture and sole proprietorship. VI. Benefit Analysis The earning comes from the selling, renting and management of property, selling tickets of amusement facility and the twice-consuming of tourists. It is expected that the earning from property selling will reach RMB 0.4 to RMB 0.5 billion yuan during the period from 2019 to 2021. The investment is expected to be recovered in 2015. VII. Project Initiator Project Initiator: Hunan Xiaoxiang Film Cultural Industry Investment Co., Ltd
Capital Increase and Share Expansion of Xiaoxiang Cinema Line I. Project Background Hunan Xiaoxiang Movie & TV Transmission Co., Ltd. ( Xiaoxiang Cinema Line ), founded in April 2000, was a professional cinema company funded and set up jointly by Xiaoxiang Film Group and Changsha Film Distribution Center. Till now, cinemas under Xiaoxiang Cinema Line have spread in 26 provinces, cities and autonomous regions. Xiaoxiang Cinema Line owns over 180 cinemas and 730 projection screens. In 2016, the box office of Xiaoxiang Cinema Line reached RMB 360 million yuan, which in 2017 is expected to be more than RMB 0.5 billion yuan. Facing with booming film market, Xiaoxiang Cinema Line hopes to strengthen itself through adding more self-establish cinemas and franchisers by increasing capital and expanding share. Due to no more business certificate for cinema operation will be issued by State Administration of Radio, Film, and Television, the license has become a rare resource and entitled with huge business value. II. Preliminary Work 278
At present, Xiaoxiang Cinema Line ranks 23 among 48 commercial cinema lines nationwide and is second to none compared with other 19 commercial cinema lines in Hunan province. III. Project Content As a way to strengthen itself, Xiaoxiang Cinema Line is planned to sell 30% of its share after value assessment to increase capital and expand share. The capital from share expanding will go to the construction of new cinema and cinema acquisition. According to the plan, 50 to 80 chain cinemas will be added and Xiaoxiang Cinema Line is expected to be ranking at the national top 10 in the coming 3 to 5 years. IV. Project Investment Existing capital and brand business value of Xiaoxiang Cinema Line is assessed to be RMB 0.5 billion yuan. RMB 150 million yuan will be attracted through this capital increasing and share expansion endeavor. V. Cooperation Way Investment raising is oriented to social legal person while natural person is not accepted. Priority will be given to counterparts or other enterprises owning resources in culture, film and TV, entertainment, advertisement and publishing sectors. VI. Benefit Analysis 1. Xiaoxiang Cinema Line has long enjoys stable income and sound benefit. Investment units will become the third party shareholders of Xiaoxiang Cinema Line and participated in annual profit sharing. 2. RMB 150 million yuan will be used to build or take over 15 cinemas valued at RMB 10 million yuan each. The annual earnings from box office is expected to reach RMB 0.2 billion yuan. 3. Shareholders will gain huge economic return given that the Xiaoxiang Cinema Line being listed. VII. Project Initiator Project Initiator: Hunan Xiaoxiang Movie & TV Transmission Co., Ltd
The Website Development of “Sports Ape APP” I. Project Background With healthy life gaining more and more attention, sports industry market has emerged to thrive. It is expected that the output value of sports industry will reach RMB 5 trillion yuan in the coming ten years with 400% growth space. As a way to optimize social public resource of sports, promote the equalization of public service, break the barrier between state-owned venue and social venue as well as upgrade sports service, “ Sports Ape” is designed. Started in 2016, this project has gone through initial team recruiting, technological development, business training for the staff, VI design for the enterprise, venue information collecting, investigating and surveying, signing, background data and information typing in, commercial tenants training, formal issuing, publicizing and operating. In September 2016, Sports Ape is identified as Hunan public sports information service platform. Sports Ape serves as an all-media service platform mainly for venue online reservation, competition and events organization, coach training, city-wide competition arranging and sports information spreading. It aims to realize the operation of sports venue under O2O mode via promoting sports venue open to the public for free or with low-charge. II. Preliminary Work Up to January 31, 2017, more than 812 venues of various type has sign a contract with Sports Ape with user number coming to 140,000, 352 advertorials being published, 254,650 orders received. By and large, Sports Ape is accessible to 77 venues in 14 cities in Hunan. III. Project Content According to the scheme, this project plans to make a nationwide public sports service platform by uniting Guangdong, Guangxi, Guizhou and other neighboring provinces under the guidance of Hunan model. It is planned to add 200 large sports venues into this platform and open them to public for free or with low charge. At the same time, the number of venues signing with Sports Ape is set to reach over 3,000 with 800,000 users and annual sum of business transactions of more than RMB 60 million yuan. Meanwhile, this project is planned to building Sports Ape the greatest public sports service platform with widest coverage. 279
IV. Project Investment Investment totals RMB 250 million yuan, with RMB 200 million yuan going to phase 1 and RMB 50 million yuan to phase 2. Technology building, staff cost, venue maintenance, publicizing and consumption subsidy for clients take up the major expenditure. V. Cooperation Way Strategic cooperation, platform allying and capital attracting through share. VI. Benefit Analysis Benefits mainly come from: 1.Venue reservation: charging proportional administrative fee for platform using. 2.Platform purchasing: improving platform-purchasing earnings through offering better service. 3.Module derivation: earning through developing Sports Circle, E Coach, Sports Competition, Sports Mall and other modules. 4.Advertisement implanting: customizing and developing various advertisements. 5.Product extension: improving added-value benefit by developing augmented products. 6.Capital premium: listing in capital market through strategic cooperation and platform allying. VII. Project Initiator Project Initiator: Hunan Huameng Sports Co,.Ltd
Construction of Zhuzhou International Circuit I. Project Background Racing is a live laboratory of automobile industry. Car racing can be used to test the performance of newly developed car and help to learn existed advanced automobile technology worldwide. At the same time, spectacular racing is able to encourage more professionals entering automobile industry and creating cars with better performance. Shanghai Lisheng Racing Culture Co., Ltd, leader of Chinese motor racing and car-racing culture industry, owns the exclusive aptitude of operating the top-class competition, well-known and professional motorcade, specialized autodromes spreading Beijing, Shanghai and Guangzhou, the largest nationwide training center, planning and executive team for automobile-related public relation activities. In this connection, Shanghai Lisheng Racing Culture Co,.Ltd enjoys high reputation in motor racing field at home and abroad. II. Preliminary Work Intentional cooperation agreements between Zhuzhou and Shanghai Lisheng Racing Culture Co,.Ltd has been signed and the data preparation work for land approval has been started. III. Project Content Project site is in Zhuzhou Auto Expo Park. The floor area totals 1,170 Chinese mu with 663 Chinese mu going to autodrome land and 507 Chinese mu for supporting service. The project mainly includes the construction of autodrome, international karting track, driving test square, auto-camping base, automobile R&D base, training center, motorcade base and high-end supercar flagship store. IV. Project Investment It is estimated that the investment totals RMB 3164.99 million yuan. V. Benefit Analysis After the preliminary estimation, more than 300,000 viewers at home and abroad per year are expected to be attracted with the reference of domestic and overseas business data of autodrome and on the basis of Chinese reality and the location of Zhuzhou——central region of China. VI. Cooperation Way Cooperative development. Return from the earnings of project operation. VII. Project Initiator Project Initiator: Investment Attraction and Cooperation Bureau of Zhuzhou Hi-tech Industrial Development Zone
Supplementary Development of Liling Pottery Pavilion 280
I. Project Background In 2015, the first Hunan (Liling) Ceramics Expo was held successfully, showing the world the industrial features and styles of Liling——the porcelain city of China. In order to better publicize the developing history, cultural deposits and artistic characteristics of ceramic industry in Liling, a multifunctional venue integrating exhibiting, showcasing, meeting, competing and performing is in dire need. This endeavor aims at promoting ceramic industry in Liling as well as meeting the demand of all walks of life for holding ceramics expo, ceramic trade fair and other events. II. Preliminary Work Roof-topping works for the main building of the Pavilion has been conducted. The construction of all supplementary projects is expected to be completed in 2017. III. Project Content The land for construction use amounts to 307 Chinese mu. The floor area totals 128,000 square meters including functional areas such as exhibition halls, conference halls of various size, banquet halls that can hold 700 persons and parking lots. The construction of main pavilion, hotel and other supporting facilities is the major work, which will shape a comprehensive district for convention and exhibition. IV. Project Investment Investment totals about RMB 840 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis The ROI of this project id sound as the annual business volume is expected to reach RMB 90 million yuan through renting exhibition hall and conference hall and holding ceramics expo. VII. Project Initiator Project Initiator: Liling Gain Sea Group.
Construction of Zhaoshan Cultural and Creative Industry Park I. Project Background Zhaoshan is blessed with time-honored historical culture with Zhaoyang Ancient Temple built in Tang Dynasty on the main peak of Zhaoshan Mountain having stood there for more than 1400 years. The painting Sunshine After Rain in Maintain Town drawn by Mi Fu in Song Dynasty, one of the well-known Eight Views of Hsiao and Hsiang, describes exactly the beautiful landscape of Zhaoshan. The Zhaoshan national AAAA level scenic spot was established in 2014 with the Jinping-Yuping District being listed as provincial forest park. In 2015, Zhaoshan was approved as the first batch of the state of global tourism demonstration area, whose construction is estimated to be finished in 2018. This project is about to gather a host of cultural and creative enterprises of different kinds and shape an area integrating multi-industrial elements through collaborating with Zhaoshan national AAAA level scenic spot and the high-tech industry in the North. II. Preliminary Work The infrastructure in Zhaoshan Demonstrate Area is taking shape and the construction of the "three vertical and four horizontal" road network has been finished by and large. In addition, Zhanshan Two-oriented Industry Development Center and Zhaoshan Heping Primary School have been built up and put into operation. III. Project Content The land use for construction amounts to about 4000 Chinese mu. With cultural creativity as industrial characteristic and derivative cultural products, this project promises to build a multifunctional park integrated creativity, science and technology, exhibition, performance, Olympic Sports, office, and residency. IV. Project Investment Investment totals RMB 6.5 billion yuan, mainly spending in land cost, engineering cost, other cost for engineering construction, basic budget reserve and interest incurring during construction. V. Benefit Analysis 281
The net present value totals RMB 0.3 billion yuan, the average annual output value about RMB 1 billion yuan, average annual revenue about RMB 0.1 billion yuan, internal rate of return about 10% and the dynamic payback period around 12 years. VI. Cooperation Way Joint venture and contractual joint venture. Return on investment comes from renting property, cultural and artistic performance, acting as artwork auction transaction intermediary, publishing news, broadcast, TV program and film, offering e-commerce platform, Internet, and 3D printing service, convention and exhibition, designing, tourism, catering, leisure and recreation. VII. Project Initiator Project Initiator: Department of Party-Mass and Human Resource and Social Society of Xiangtan Zhaoshan Demonstrate Area.
Construction of Conference and Exhibition Center of Hengyang High-tech Zone I. Project Background The development of conference and exhibition industry is of great importance to restructure industry, exploit market, promote consumption, boost cooperation and exchange, expand export, and facilitate the sound development of economy. In view of the absence of a professional and quality conference and exhibition center in Hengyang, a high quality and multifunctional conference and exhibition hall is planned to be established as a way to build corporate image, and help enterprises go global and attract relevant enterprises worldwide into this area so as to boost economy. II. Preliminary Work Hengyang High-tech Zone possesses impeccable infrastructure, graceful surrounding and well-equipped supporting facilities. According to the plan, the project site is in Lujia-Yumu New District, which enjoys convenient transportation and the overall planning has been confirmed. III. Project Content This project consists of exhibition area, convention area, public service area (including catering and amusement facility), outdoor square and underground parking. The floorage amounts to 100,000 square meters with 80,000 square meters going to the above-ground building and 20,000 square meters to the underground one. It is planned to construct a modern and multifunctional convention center that integrates product display, comprehensive convention, large and medium-sized training and cultural events. IV. Project Investment Investment totals RMB 0.5 billion yuan, including the cost for land, engineering construction and decoration, ancillary works and equipment for security and firefighting. V. Cooperation Way Sole proprietorship or joint venture; VI. Project Initiator Project Initiator: Hengyang National High-tech Industries Development Zone
Construction of Baishi Art City I. Project Background As the cradle of Xiang Merchants and Xiang Culture, hometown of celebrities and new city of cultural tourism, Xiangtan City is blessed with long history, unique cultural tradition as well as abundant talents and natural tourism resources, which laid solid foundation for the long-term development of Xiangtan. According to the plan, Xiangtan old town with Baishi Park as its center is selected as the project site. Dotted with quite a few time-honored cultural buildings, this area enjoys profound historic culture atmosphere, represents the epitome of the city memory and developing history of Xiangtan and serves as a core area in terms of cultural tourism development. With large population density around, this area represents a core commercial district with largest scale, multiple function and highest radiating capacity. 282
II. Preliminary Work Report on project planning and project design has been finished. III. Project Content The floorage area is planned to be 800,000 square meters. The engineering construction consists of Baishi Antique Street, Baishi Art Gallery, Qi Baishi Art Center, Qi Baishi Art Training Center, Qi Baishi Art World, Qi Baishi Art and Business Street and the Artist Hotel. IV. Project Investment Investment is estimated to be RMB 4.2 billion yuan. V. Benefit Analysis This project promises to promote and develop Baishi art culture and bring about higher reputation and more prosperous cultural industry to Xiangtan. VI. Cooperation Way Participation and holding; More details will be identified after signing contract. VII. Project Initiator Project Initiator: Chenhui Construction Engineering Group Real Estate Development Co., Ltd
The “Most Memorable Is Shaoshanchong” Cultural Tourism Synthesis I. Project Background With the strategic target of building a worldwide well-known travel destination, Shaoshan City, on December 12, 2016, together with Impression Wonders Arts Development Co., Ltd, began to develop the tourist project around Qingnian Reservoir, Shaoshan Village in a deep and cooperative way so as to better develop and utilize the unique political resources, human and historical resources as well as scenery resources that Shaoshan has to offer. To that end, the two parties promise to join hands to facilitate the integration of tourism, culture and performance and spare no efforts in advancing the “Most Memorable Is Shaoshanchong” Cultural Tourism Synthesis project. II. Preliminary Work The headquarter has been set up in Shaoshan to carry out land acquisition and other preliminary work. III. Project Content The total area of the “Most Memorable Is Shaoshanchong” Cultural Tourism Synthesis comes to about 3000 Chinese mu with about 800 Chinese mu going to construction land. Taking the opportunity of the making of the large-scale real-scene/indoor situational performance by Impression Wonders and Zhang Yimou Director Team Investment Management (Beijing) Co., Ltd, this project is about building and operating an international-level Shaoshan Cultural Tourism Synthesis, which integrates education training, conference and exhibition, collection display and transaction, red nostalgic cinema, red culture street, water leisure sports, health care and elder nursing. IV. Project Investment The investment is expected to reach RMB 5 billion yuan with about RMB 1 billion yuan going to “Most Memorable Is Shaoshanchong” performance and RMB 4 billion yuan to other ancillary subitems of the Cultural Tourism Synthesis. V. Cooperation Way Unlimited. VI. Benefit Analysis This project consists of an international-level Shaoshan Cultural Tourism Synthesis, which integrates education training, conference and exhibition, collection display and transaction, red nostalgic cinema, red culture street, water leisure sports, health care and elder nursing. VII. Project Initiator Cooperator: Impression Wonders Arts Development Co., Ltd
Construction of Miluo Quzi Cultural Park I. Project Background Preparations were started in 2009 for the construction of Miluo Quzi Cultural Park, which aims at building a national-level cultural park themed with Qu Yuan’s patriotic thoughts and pursuing spirit, and relying on a world well-known cultural celebrity (Qu Yuan), an ancient temple with 283
thousand-year history (Qyzi Memorial Temple, a famous river (Miluo River) and a worldwide sport (dragon boat racing). This park is located along Miluo River, from Xinshi Town in the East to Quzi Memorial Temple Town in the west. With the purpose of building the Park as a world-renowned quality cultural tourism product that integrates tourism, sightseeing, leisure and expo, this area embraces the top-level tourist resources in Miluo and has emerged as a leading scenic spot driving the development of tourist industry in Miluo. II. Preliminary Work The preliminary work has been finished and the project is under construction. III. Project Content Planning area for this park totals 16 square kilometers with investment amounting to over RMB 1 billion yuan. At present, the protection and construction of 2.2-sqrare-kilometer core scenic area of Quzi Memorial Temple is planned to start in early period. With the investment of RMB 380 million yuan, the core scenic area, consisting of heritage site, exhibition area, nature reserve and supporting service area, will deal with the reconstruction of Quzi Academy, the construction of Qu Yuan Memorial Hall and some sub-items including environment improvement and the establishment of ancillary facility. IV. Project Investment Investment totals RMB 1 billion yuan. V. Benefit Analysis The average annual number of tourist reception up to 1,500,000 with average consumption of RMB 150 yuan per capita. Annual revenue totals RMB 220 million yuan with gross profit of RMB130 million yuan and payback period of 8 years. VI. Cooperation Way Sole proprietorship, joint venture, contractual joint venture and other ways Returning way: gaining from tourism development. VII. Project Initiator Project Initiator: Trade Promotion Council of Miluo City, Yueyang City.
Construction of Changde Folklore Museum I. Project Background Located in the important node of the Great Tourism Circle of Xiangxi, which represents one of the four great tourism circles, Changde enjoys the radiation and driving of the Great Tourism Circle of the Three Gorges (GCTG) and Wuhan City Tourist Area. In order to build Changde Peach Blossom Spring tourist area and the Liuyehu Lake National 5A Tourist Attraction, Chuanzihe comprehensive treatment, Liuyuan Jinjiang River Hotel, Overseas Chinese Town Happy Water World, Germany Flavor Street, Changde River Street and other large projects has been carried out through bringing in Hannover Water Resources Association, Overseas Chinese Town (OCT) in Shenzhen, Shanghai Jinjiang Group and other well-known enterprises. As a result, the scenery spots, exotic charm and folk custom in Liuyehu Lake National 5A Tourist Attraction has been enriched, so do citizens’ leisurely life for amusement and shopping as well as gourmet food appreciation. It is planned to build the Folklore Museum a Channgde-edition Along the River During the Qingming Festival as a way to fully display the characteristic and profound history of Changde as a famous historic and cultural city and combining the Huxiang Culture of its business district and tourist district. This project is bound to become a highlight in the field of business and tourism in Changde Urban area once it finished. Next, it promises to promote the integration of tourism and culture and the combination of tourism and economy so as to further improve the city grade and popularity of Changde. II. Preliminary Work Feasibility research has been finished. III. Project Content The planned area is 239 Chinese mu and the total floorage area is 45,130 square meters which includes the construction of combined-type museum, cultural artwork street and independent-type 284
museum. Combined-type museum takes up 5,190 square meters, cultural artwork street 22,450 square meters and independent-type museum17,490 square meters. IV. Project Investment Investment totals RMB 0.5 billion yuan. V. Benefit Analysis All houses for business purpose will be rented after completion. The leasable area comes to 45,130 square meters, renting at RMB 2,000 yuan per square meter per year. The annual revenue totals RMB 90,260,000 yuan. The operation revenue will come to RMB 902,600,000 yuan during the calculation period. VI. Cooperation Way Contractual joint venture and sole proprietorship. VII. Project Initiator Project Initiator: Changde Chuanzihe River Development and Construction Co., Ltd
Changde Sun Valley Industrial Park for Regimen and the Aged Service I. Project Background At present, with the acceleration of urbanization, the number of nest-empty families and elders in both urban and rural areas is on the increase and the aging-population problem has become daunting. The traditional mode featuring raring child for old age is out of style and not capable of adapting to the development of modern society. More and more people turn to a new old-age supporting system that is featured by centralized service. According to the statistic, the number of people over 60 years old has reached 1,150,000, accounting for 18.5% of the total population. At present, Changde City is equipped with 264 nursing institution for the aged with 19,000 beds. The 13th Five Year Plan has identified the target of making sure 35 to 45 beds are accessible to every 1000 old people in 2020. According to that target, about 27,000 beds should be added in Changde. The aged nursing service is not only a cause concerning the livelihood and well-being of the masses, but also a promising industry with huge potential. In this connection, enormous economic and social benefit will be produced by setting up high-end base for regimen and the aged service. II. Preliminary Work The overall plan and conceptual design is in progress. III. Project Content Sun Valley Industrial Park for Regimen and the Aged Service promises to make an industrial chain that integrates leisurely regimen, vocation tour and treatment in line with the structural layout of one core plus one district plus two clusters. The floorage area totals 150,000 square meters, including: 1Medicare Core: the construction of convalescent hospital, recuperation and resort hotel, healthy regimen training center, community-based commercial center, and exhibition center for aged service industry. 2Enjoyable Forest District consists of the Forest Healthy-Regimen and Medical Cluster and the Leisure Amusement Cluster. The Forest Healthy-Regimen and Medical Cluster are equipped with home-based care community for the aged, recovery apartment, continuing care community, community service center, and university for the aged and central kitchen. The major constructions for Leisure Amusement Cluster are ecology movement park and the aged sharing center. IV. Project Investment Investment totals RMB 1.5 billion yuan. V. Benefit Analysis About 123,000-square-meter property-right real estate is available to selling and can bring RMB 950 million yuan, which can balance part of the investment. The self-control property is worth about RMB 140 million yuan with annual stable net profit of RMB 14 million yuan (calculated by 10% of the annual revenue). VI. Cooperation Way Contractual joint venture and joint venture. This project will introduce excellent enterprises that specialize in elder service and hotel 285
management and operation and allow them to run by themselves. This project adopts separated construction and progressive development. VII. Project Initiator Project Initiator: Changde Education and Culture Investment and Management Co,. Ltd
Construction of Li County Lanjiang Cultural City I. Project Background Located in Northern Changde County, Li County is blessed with time-honored history and quite a few scenic spots and historic sites such as Chengtoushan Ancient Culture Site and other 13 Major National Historical and Cultural Sites, collecting 2069 pieces of cultural relics including 24 first-class one. The public cultural undertakings are thriving as it owns 1 county-level culture centers, 32 township culture centers, holding over 50 large-scale mass cultural activities and showing more than 7,500 sessions of film per year. In addition, 60,000 readers have been the visitor of county-level library. Having said that, the demand for cultural life is ever-growing and far to meet due to that the existed cultural facility is defective with the problem of disrepair, unreasonable layout, flawed function and safety loophole. As a result, the government of Li County has planned to renovate the old town in urban area and carry out the Lanjiang River Cultural City project so as to optimize the living environment of Li County and enrich the building landscape. II. Preliminary Work Project is under planning. III. Project Content This project is mainly about the construction of tourism resort, landscape architecture, culture-sharing area, shopping area, high-grade residential area and other supporting infrastructure for water supply and drainage, street lighting, pipe installment and landscaping. IV. Project Investment Investment totals RMB 1.2 billion yuan. V. Benefit Analysis Gaining through house sale, conference reception, leisure and vocation and catering service. VI. Cooperation Way Sole proprietorship, joint venture, contractual joint venture VII. Project Initiator Project Initiator: Project Office and Merchants Bureau of Li County, Changde
Infrastructure Construction of Anxiang County Shuyuanzhou National Wetland Park I. Project Background Located in Anxiang County, Changde City, Shuyuanzhou National Wetland Park serves as an important ecological corridor of the river network consisting of three outfalls (Ouchi Outfall, Taiping Outfall and Songzi Outfall), through which the Yangtze River flows into Dongting Lake. A series of wetland protection work has been carried out by the government of Anxiang County so as to guarantee the ecological safety of Dongting Lake after the post era of Three Gorges. As a result, the ecological safety and biological diversity in Dongting Lake has been protected effectively. The project is launched now as a way to meet citizens’ ever-increasing demand for material culture and tourism, boost the sustainable development of economy and society in Anxiang County as well as reinforce wetland protection and tourism development. II. Preliminary Work The overall planning for wetland park has been completed. III. Project Content 1Wetland protection: carrying out bottomland waterfront renovation, comprehensive treatment of pollution, fire protection, pest control, alien harmful species control, wild animal 286
epidemic sources and disease monitoring, safety protection during tourism and upgrading infrastructure for the management of wetland protection. 2.Establishing Wetland Culture Square, Fan Zhongyan Poetry Gallery, Showroom of the Battle against Flood in 1998 and Shenliu Academy. 3.Renovating 468.63 hectares of wetland, restoring and reestablishing 10.6 hectares of wetland. 4.Establishing a 1200-square-meter Park Administrative Office, and a 200-square-meter wetland protection and management station, purchasing facilities and equipment for protection and management. 5.Establishing a 2-hactare wetland base for field activity, a 3-hactare regimen retreat, a 5-hactare farming experience park, a 5-hactare picking park and a 4-hactare ecological fishing park. 6.Establishing 19.5-kilometer road, 23-kilometer traveling pavement, building a 5500-square-meter parking lot, 5 wharves, renovating 2 wharves, constructing 10 environmental public lavatories, 8 refuse transfer stations and other facilities for sewage treatment and electric power supply. IV. Project Investment Investment totals RMB 0.4 billion yuan. V. Cooperation Way Joint venture VI. Project Initiator Project Initiator: Administrative Office of Hunan Anxiang Shuyuanzhou National Wetland Park
Construction of Sangzhi International Film and Television Cultural Tourism City I. Project Background With large minority group and home to 28 nationalities, Sangzhi County is known as town of folk song and has been listed in China Intangible Cultural Heritage. There are quite a few distinctive ethnic villages with two village among them are provincial-level tourist town. Sangzhi County is also known as Red Land and Hometown of Marshal, and has been listed in the 100 National Classical Scenic Spots for Red Tourism and the 30 Exquisite Routes for Red Tourism. The planning area is close to the No. 305 Provincial Road, 3 kilometers apart from Sangzhi County town, 30 kilometers apart from core scenic area of Zhangjiajie and 2 kilometers distant from the Exit of Zhangjiajie-Sangzhi Expressway. It takes 30 minutes driving to Zhangjiajie Hehua International Airport and 10 minutes to Qianzhangchang High-speed Railway Station. II. Project Content Fenglian Stream-Jiutian Cave-Kuzhu Stockaded Village scenic area has been selected as the project site. The planning area amounts to 5,000 Chinese mu mainly for the construction of film and television shooting area, industrial service area, sightseeing and theme hotel area, culture showing and ethnic culture displaying area, theme park, tourist real estate, convention and training base. This project promises to build a 5A-level film and television industry city that integrates film and television production, tourism and leisure, film and television experiencing, convention and training as well as tourist real estate. III. Project Investment Investment totals RMB 3 billion yuan. IV. Cooperation Way Contractual joint venture, joint venture and sole proprietorship or confirming after negotiation and signing contract. V. Project Initiator Project Initiator: Investment Promotion Bureau of Sangzhi County, Zhangjiajie county
Construction of Yiyang Ming-Qing-Dynasty Ancient Alley I. Project Background Ziyang District of Yiyang City is blessed with quite a few premium tourism resources such as the 287
Ming-Qing-Dynasty Ancient Alley, founded during Xianfeng period in Qing Dynasty and having a history of more than 150 years. The Ming-Qing-Dynasty Ancient Alley consists of three east-west parallel lanes known as Weigong Temple Lane, Yulingpo Lane and Lantern Pavilion Lane, which connects 200 wood-and-brick-structure two-tier Courtyard Dwellings built in Qing Dynasty. This historic site is in good keep and has been praised as the Prettiest Lane in South China by Zhao Congcang, a professor of Southwest University and an expert in cultural relics research. He also praised it as precious historic and cultural tourism resource worthy of developing. II. Preliminary Work House demolition in Ming-Qing-Dynasty Ancient Alley and the surrounding area has been completed by and large. III. Project Content 1. The Phase 1 development embraces “Three Kingdoms Culture" and the Guan Yu Spirit (loyalty and filial piety). Town's God Temple: Guan Gong reincarnation, offersacrifice before going for a battle, sacrific protecting the town by the Town's God; Ancient City Wall: Ancient battlefield in Three Kingdom Period, beating gong on land and water to resist Lv Meng and fight against Lu Su; Ming-Qing-Dynasty Ancient Alley: ambitious person in Three Kingdoms period, Wei-Shu-Wu Culture rebirth; Qinglongzhou: Guan Yu starting a solo run (Tongxi Garden); Three Kingdoms Water City: Reappear the ancient battlefield in Three Kingdom Period (ancient warship in Three Kingdom Period) . 2. Upgrade the tourism-supporting facility around Ming-Qing-Dynasty Ancient Alley to improve tourist experience. This project is planned to build a resort of leisure, regimen, tourism and vacation, which integrates the functions of showing archaic rhyme, displaying holy religious land and accessible to sports, exercise and fitness. IV. Project Investment Investment totals RMB 0.5 billion yuan. V. Cooperation Way Sole proprietorship, contractual joint venture and joint venture VI. Project Initiator Project Initiator: Administration of Radio, Film, Television, Press and Publication of Ziyang District, Yiyang City.
Construction of Lianyuan Culture and Art Center I. Project Background At present, Municipal Cultural Center of Lianyuan is still equipped with shabby facility. The Municipal Cultural Center was retrofitted on previous memorial hall and the precious cultural relics are always locked in narrow office rooms. The Municipal Art School is still a sojourner in previous Office Building of the Administration of Culture, Sports, Radio, Film, Television, Press and Publication of Lianyuan, and the current situation is too bad to meet the need of the development of times. To address the short slab of Lianyuan in cultural facility, accelerate the establishment of public culture service system, meet the spiritual and cultural needs of citizens, comprehensively raise the city image of Lianyuan, boost the economic and social development in a coordinated way and promote the establishment and development of now urban area, the construction of Lianyuan Culture and Art Center is imperative. At the same time, the construction of Lianyuan Culture and Art Center represents a major project in the 13th Five Year Plan of Lianyuan. II. Preliminary Work The site selection, land acquisition, environment inpact assessment and financial evaluation have been finished and the project has been registered in the PPP project library of Hunan Provincial Department of Finance. Outline of the 13th Five Year Plan for Culture Development of Hunan has pointed that the provincial government will remit RMB 4 million yuan to each project as subsidy. Except that, 288
RMB 4 million yuan will be invested as a reward for the counties and cities listed as provincial-level public culture demonstrate zone. III. Project Content This project is located in the Chengdong New District of Xinzhong Village, Shinahan Town. The project area totals 71,745 square meters and the total floorage area amounts to 1,550,000,000 square meters. Project content includes the construction of “Six-Pavilion and One Center”, which consists of museum, house of culture ( intangible heritage display pavilion ), library, art gallery, urban construction planning pavilion, archive, art training center, grand theater (Lianyuan conference center and film and television center ). In addition, 3 large comprehensive pavilions, a performance center, culture square, underground parking lot and supporting facility room are also in the construction plan. IV. Project Investment Investment totals RMB 699.65 million yuan with RMB 514.83 million yuan going to engineering cost, RMB 41.22 million yuan going to other expenses in construction and the budget reserve is RMB 55.6 million yuan, the interest during construction is RMB 36 million yuan, and the expense for land acquisition and demolition is RMB 52 million yuan. V. Cooperation Way This project adopts PPP Mode and is carried out by the Administration of Culture, Sports, Radio, Film, Television, Press and Publication with the authorization of People’s Government of Lianyuan. The Administration is in charge of organizing and implementing the preparation of the Municipal Cultural Center PPP project, social capital procurement, supervision and handover as well as signing PPP contract with project undertaker. The BOT Mode is adoptable. The term of cooperation is 20 years consisting of 3 years of construction and the 17 years of running. VI. Project Initiator Project Initiator: Administration of Culture, Sports, Radio, Film, Television, Press and Publication of Lianyuan, Hunan Province.
Female-Script Culture and Creativity Industry Park of Jiangyong County I. Project Background Female-script has been listed in the first batch of National Intangible Heritage. This project will help to rescue and protect female-script culture, raise the popularity and influence of Jiangyong County, boost the growth of tourism and other relevant industry as well as drive the development of regional economy. It will lay solid foundation for applying for World Intangible Cultural Heritage by publicizing female-script culture, building female-script-culture brand as well as developing and utilizing tourism products. II. Preliminary Work The project is ready to be started as the environmental protection examination and the feasibility study report approval have been finished. III. Project Content The construction mainly includes: 1. Female-script Culture Experience Zone, Female-spirit Sculpture and Culture Island, Resort for Female Regimen, Farming and Fishing Culture Experience Zone, Art Plant Leisure zone; 2. Female-script Impression real-scene program; 3. Female-script-culture-style Town construction, female-script craft work development and agricultural and sideline products production and packaging. IV. Project Investment Investment totals RMB 0.3 billion yuan. This project is divided into 2 phases and half of the investment goes to Phase 1. V. Cooperation Way Managing, designing and running in the form of sole proprietorship, equity participation and cooperative development. The project returns come from selling and providing service to government. 289
Preliminary estimation indicates that the rate of return is 3% and the recovery period is 15 years. VI. Project Initiator Project Initiator: Administration of Nationality, Religion, Culture, Sports, Radio, Film, Television, Press and Publication of Jiangyong County.
Construction of Hunan Science Building for Chinese Medicine Inheritance and Innovation I. Project Background Founded in 1957, Hunan Academy of Chinese Medicine is the one and only comprehensive scientific research institution of Chinese medicine in Hunan that integrates scientific research, medical treatment, teaching, developing, production and information service. As most of the research facilities are established in 1980s and part of the infrastructure and experimental facilities are old as well as the building for scientific research is insufficient, a Science Building for Chinese Medicine Inheritance and Innovation is in dire need to address the problem of the insufficient building for scientific research and upgrade scientific research condition. This endeavor is beneficial for improving scientific and technical innovation ability and the overall capacity of the Academy, elevating the capacity of technological achievements transformation, advancing and enriching Chinese-medicine culture, promoting the growth of Chinese-medicine industry and health industry. II. Preliminary Work Hunan Academy of Chinese Medicine is carried with its own characteristic and superiority. Since the Twelfth Five-year Plan, Academy has undertaken 180 scientific research subjects at national, ministerial and provincial level, won a Second Prize of the National Award for Science and Technology Progress and 44 awards at ministerial and provincial level. It has been awarded 5 new drug certificates, 10 patents for invention 3 and achievement transformations. Except that, 90 SCI theses, 97 compositions and teaching materials have been published. The Academy owns the key technology for Chinese-medicine powder and is equipped with 2 national-level key laboratories, which including a National-Regional Joint Engineering Laboratory, key research departments for Chinese-medicine-powder technology of State Administration of Traditional Chinese Medicine, 4 Third Grade Laboratories of State Administration of Traditional Chinese Medicine, 4 provincial-level technical centers, 5 provincial-level key laboratories such as the Key Laboratory for New TCM Drugs Research and Development of Hunan Province, Oncology and other 3 national key disciplines, Encephalopathy and other 2 TCM clinical specialties of National Health and Family Planning Commission, 5 key specialties of State Administration of Traditional Chinese Medicine,9 National Famous TCM Experts Inheritance Studios, and one National Academic School Heritage Studio. In addition, the Academy also represents the drug clinical research base of (SFDA) State Food and Drug Administration and Chinese medicine culture popularization, propaganda and education base of State Administration of Traditional Chinese Medicine. New drugs of TCM researched and transferred by the Academy including Ancient Han Health-Keeping Essence, Yiganning Granules, Ganfule Tablet, Lvjiaobuxue Granule, Gynecologic QianjinTablets, Simo Decoction have become the competitive products or famous brands in TCM manufacturing factor inside and outside the province. These achievements have brought about tremendous social and economic benefit as well as the cumulative output of more than RMB 30 billion yuan. The Academy owns TCM Master Liu Zuyi and Sun Guangrong, National Talents Zhang Shuihan and Peng Qinghua, young and middle-aged experts Liu Zuyi, Pan Minqiu and Cai Guangxian who has made outstanding contributions to the state, 29 experts who enjoy the special allowance of the State Council and 10 guiding teachers for the academic experience inheritance work of Chinese medicine experts. There are 873 staffs at work, including 176 experts with senior professional title, 66 doctor’s master’s tutors. III. Project Content The project will be constructed on the existing venues in the northern yard of Hunan Academy of Chinese Medicine. The Science Building is composed of 13 floors on the floor and 2 floors 290
underground. The overground Floor 1-4 is podium building and the Floor 5-13 is tower. The building area is 2,700 square meters and the gross floor area of the new building is 31,032 square meters, including overground floor area of 25,632 square meters, and underground floor area of 5,400 square meters. In addition, scientific research instruments and equipment and corresponding public supporting facilities for water supply and drainage, power supply and distribution, heating and ventilation will be equipped. IV. Project Investment Investment totals RMB 0.3 billion yuan, including the central investment of RMB 0.1 billion yuan and the regional investment of RMB 0.2 billion yuan. V. Benefit Analysis This project will carry out the work of technological achievements transformation and investment industrialization. 2 new drugs and 10 functional foods are expected to be transformed. After industrialization, the output value is expected to reach about RMB 3 billion yuan, the profit and tax will be RMB 0.9 billion yuan and the average payback period will be about 10 years. VI. Cooperation Way Listed companies with relevant experience, leading enterprises in TCM industrialization, scientific research institutions, strategic investors and advisory agents are sincerely welcomed to participate in products development in diversified way. VII. Project Initiator Project Initiator: Hunan Academy of Chinese Medicine
Investment in International Capacity Cooperation and Technology Research and Development of Sinocare Inc I. Project Background As a leading enterprise in researching, manufacturing and selling blood glucose monitoring system in China, Sinocare Inc is planned to introduce advanced technology, improve its product mix and overseas selling network through merger and acquisition so as to realize the expansion of international business at fast speed. In 2016, Sinocare Inc took over Trividia, the world's sixth largest supplier of blood glucose monitoring system in America with $273 million. It also pushed out a new generation of product, which is oriented to international high-end market and is cost-effective with international competitiveness. As a result, technical strength of both sides will be enhanced and advantage complementation will be realized. II. Preliminary Work New products of this project have successfully passed the United States FDA certification and won 7 domestic registration certificates, 1 FDA registration certificate and 2 CE registration certificates. III. Project Content 1Automatic production line and fully automated biosensor production building will be established so that the annual production capacity will raise to 12 million glucose meters and 5 billion blood glucose test strips including 4 billion carbon test strips and 1 billion gold test strips. At last, the largest production base for biosensors in Asia will be established. 2Carry out automated, informationalized, and intellectualized upgrading. Establish supporting MES system and ERP system. IV. Project Investment Investment totals RMB 350 million yuan mainly for carrying out cooperation in research, development and production as well as upgrading and establishing automatic production line. V. Cooperation Way Collaborative project committee has been set up between Sinocare Inc and Trividia to seek for collaboration in procurement, production, research and development so that the advantage complementation will be realized. VI. Benefit Analysis After completion, the annual production capacity is expected to be raised to 12 million glucose meters and 5 billion blood glucose test strips and the sales avenue will be more than RMB 3 billion yuan in 2020. Net profit in 2020 will be more than RMB 336 million yuan, tax in the same 291
year amounts to more than RMB 0.5 billion yuan and over RMB 10 million yuan will be saved per year. VII. Project Initiator Project Initiator: Sinocare Inc Biosensor Co,.Ltd.
Construction of the Fifth Xiangya Hospital of Hunan Light Industry & Salt Industry Group I. Project Background Hunan Light Industry & Salt Industry Group has taken a positive attitude to salt monopoly system reform and the new round of reform of state-owned enterprises, striven to promote the combination of traditional industries and emerging industries, positioning and transforming into Hunan Medical and Health Industry Investment Operation Platform to promote sustainable development of the Group. With the Fifth Xiangya Hospital as a core and combining the capital, staff and network of the Group, Hunan Light Industry & Salt Industry Group aims at realizing medical conjoined format and effectively promoting the Healthy Hunan planning target. Project area is in south of Tianxin District, intersection of metro Line two and Line five and the traffic location advantage is very obvious. It is also boasts enjoyable environment as it is adjacent to the 680-Chinese-mu Green Park of Xianguling Park and You’a Outlet Shopping Park. II. Preliminary Work Project is divided into 2 Phases: Phase 1: 1000 hospital beds will be established in 2019. A hospital reaching the standard level of class III comprehensive hospitals with regional emergency center and life emergency center and equipped with perfect medical function and part of featured medical treatments will be constructed. Phase 2: it is planned to add to 2500 beds in 2014 and establish the hospital into a distinctive hospital with professional advantage based on the market demand and hospital developing requirement. III. Project Investment Investment totals RMB 4.3 billion yuan with RMB 1.8 billion raised by the investor, Hunan New Sun Health Care, and RMB 2.5 billion yuan from loan and financing. IV. Cooperation Way The mode called Government Leading, Market Operation, Mixed Ownership and Professional Management will be adopted in construction and operation. V. Benefit Analysis The time limit is 10 to 20 years with part of due interest and part of interest repaying from operation period; combination of due repayment and repaying from operation period. VI. Project Initiator Project Initiator: New Sunshine Medical Industry Development Co., Ltd of Hunan Light Industry & Salt Industry Group
Hospital Construction in Changsha Economic and Technical Development zone I. Project Background With the completion of the Renmin East Road in Changsha, Shanghai Volkswagen, Fiat and other projects have been put into production and the population along the road is increasing at fast speed. However, the medical facility is still in absence in this region. Medical treatment has become a main livelihood demand of enterprises, institutions and residents around. This project represents a significant measure to meet the demand of local residents for seeking treatment nearby as well as a large hospital radiating Changsha County, Liuyang and Pingjiang. II. Preliminary Work Project land has been planned. III. Project Content This project is located in the west of Dongba Road and west of Renmin Road. Net land area is planned to be 173,333 square meters, the overall floorage area 200,000 square meters and 1,600 292
beds are planned to be added. A large comprehensive is planned to be established after attracting investment. IV. Project Investment About RMB 2 billion yuan V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Project Initiator Project Initiator: Business Department of Changsha Economic and Technical Development Group
Construction of Comprehensive Hospital (Class 3A) in Changsha Airport Economic Zone I. Project Background With the improvement of the local economy and people’s livelihood in Changsha County, more and more diversified requirements on medical and health resources have been raised by local people. Planning and construction of medical institutions are in dire need to improve disease prevention and cure competence, elevate medical quality so as to offer better medical service in Changsha Airport Economic Zone and around. A Medical Service Center with a 3A-class hospital will be established through the integration of modern service industry and medical industry system. This endeavor promises to realize the integration of medical resources, advantage complementation, as well as boosting common development. II. Preliminary Work Planning for project land has been finished. Preliminary work such as land approval, land acquisition and demolition has been started and the demolition work is expected to be finished by the end of 2017. Peripheral supporting facilities are basically perfect and the infrastructures for water, electricity and gas supply are able to meet construction demand. Construction of surrounding roads has been started with the establishment of infrastructures for water, electricity, Internet and gas supply at the same time. III. Project Content Project site is located in a medical land, North to Siyuan Road, South to Zhiliu Road, West to Xiaokang Road and East to Shengxiang Road in Changsha Airport Economic Zone. The land area totals about 240 Chinese mu and the plot ratio is 1.8. This project promises to build an international-leading 3A-class hospital, which provides medical service to the whole country. The project requirements include reasonable layout, complete function, top-class equipment and enjoyable environment. IV. Project Investment Investments totals about RMB 2 billion yuan. V. Cooperation Way Sole proprietorship or joint venture. Developing in the form of land use right listing-for-sale. Brand medical institutions with the experience of running 3A-class comprehensive hospital and strategic investors with medical and scientific research resources are sincerely welcomed. VI. Project Initiator Project Initiator: Management Committee of Airport City, Changsha County
Construction of 3A-class Hospital in Core Area of Liuyang Economic and Technological Development Zone I. Project Background Liuyang Economic and Technological Development Zone’s predecessor is Liuyang Industrial Park and was founded in 1997. In 2001, it was renamed as Liuyang Biomedical Park. In 2006, this park was approved as the first national biological industry base in the mid-western region of China by National Development and Reform Commission; in 2012, it was upgraded as National Economic and Technological Development Zone. 293
Great changes have taken place in this Economic and Technological Development Zone after 20 years of development. In 2016, the industrial output value amounts to RMB 100.3 billion yuan and the total revenue RMB 3.53 billion yuan. Economic aggregate was ranked the second among all parks in Changsha. This park represents a cluster integrating biomedicine, electronic information and health food. With the economic development of the park, the population is also in rapid growth. The population has reached 120,000 up to the end of 2016 and the around population within 10 km amounts to 240,000. The population is expected to reach 350,000 in the coming 3 to 5 years. At present, the park is equipped with 2 small hospitals with 226 beds. The medical service level is low and is not able to meet the demand of local people. With consideration of the increasing population in the future, the number of hospital bed is supposed to be more than 1,500 according to relevant standards of resource allocation of WHO. Thus, market feasibility shows that the establishment of a 3A-class hospital is necessary. This project area is located in the center of planned future city, which is equipped with square, scenic zone, Changjun High School, the light rail station, five-star hotel and business street and the service radius radiates around 30 km township. II. Preliminary Work Feasibility study report has been completed. III. Project Content Project covers an area of 150 Chinese mu and lies in Laodao River District of the CBD in the park. The floorage area totals 100,000 square meters and 500 to 1000 beds are planned to be added. 4 functional areas including clinical diagnosis, medical diagnosis and treatment, inpatient treatment and ancillary facilities are planned to be established. IV. Project Investment Investment totals RMB 0.5 billion yuan with RMB 0.3 billion yuan going to Phase 1 construction. V. Cooperation Way Joint venture or sole proprietorship. Investors with investment strength and medical qualification are welcomed. Phase 1 is required to be completed and put into operation in 2 years after land delivery and all investment should be finished in five years. VI. Benefit Analysis 1The Park will invest 100 Chinese mu to support the establishment of 3A-class hospital as well as return investors. 2The Park will return all tax paid by the hospital in five years after the completion and operation of this project. At the same time, the Park will reward RMB 10 million yuan. VII. Project Initiator Project Initiator: Liuyang Economic and Technological Development Zone
Relocation and Reconstruction Project of Hengyang TCM Bonesetting Hospital I. Project Background Located in No.90, Zhongshan North Road, Hengyang TCM Bonesetting Hospital was founded in 1958, covering an area of 2,923 square meters. As the one and only specialized hospital in TCM orthopedics in Hengyang, this hospital has shaped a rounded system in the treatment of bone fracture and bone disease through TCM or combination of TCM and Western Medicine. As the most authoritative hospital in orthopedics, it boasts unique approach in treatment of limbs fracture, lumbar fracture, all kinds of tendon injury and bone fracture and enjoys high reputation in Hunan province. At present, the hospital owns only 110 beds, and buildings are old and narrow. With the development of social economy, the hospital has been unable to meet the needs of patients for medical treatment and relocation and reconstruction is imperative. II. Preliminary Work Planning and design and land reserve have been finished. III. Project Content Laiyanxincheng has been selected as the new site for the relocation and the planned area totals about 120 Chinese mu. It is planned to establish a well-equipped modern hospital specialized in 294
orthopedics that integrates Outpatient Building, Inpatient Department, Comprehensive Building and Academic Building. IV. Project Investment Investment totals RMB 0.5 billion yuan. V. Cooperation Way Sole proprietorship, joint venture, contractual joint venture and PPP. This project can enjoy related policy preferences stipulated in Opinions on Supporting Hengyang to Speed Up the Comprehensive Reform of the Service Sector NO.[2013]79 issued by General Office of Hunan Provincial People's Government. VI. Project Initiator Project Initiator: Bureau of Commerce of Shigu District, Hengyang City
Relocation and Aged-service Construction of Xiangtan Traditional Chinese Medicine Hospital I. Project Background As the one and only 3A-level comprehensive TCM hospital in Xiangtan, Xiangtan Traditional Chinese Medicine Hospital covers an area of only 12.72 Chinese mu and the area of medical service room is 27736.4 square meters with 460 beds. With narrow area, the traffic and vehicle access are inconvenient. In order to meet the people's demand for medical treatment of traditional Chinese medicine, Carry forward traditional Chinese medicine as well as promote the growth of TCM and health industry, relocation of the hospital is in urgent need. Xiangtan Railway Station area has been selected as the project site as this place enjoys superior location, convenient transportation and beautiful ecological landscape, which is conducive to the development of traditional Chinese medicine, regimen and elderly-maintenance industry. II. Preliminary Work Hospital relocation and site selection scheme has been passed in November 2016; the project approval has been finished at the end of January 2017; the construction will be started in June 2017. III. Project Content Project construction is divided into 2 parts: 1Relocation of Xiangtan Traditional Chinese Medicine Hospital: covers an area of 100 Chinese mu, building area is 90,000 square meters. Construction includes Emergency Outpatient Building, Infectious Outpatient Building, Inpatient Building, Research Building for TCM Industry-University-Research Cooperation, Medical Technology Building, Logistics Building, Single Staff Apartment, Canteen, Administrative Research Building, Boiler Room, Guard Room and Underground Garage. 2Combined base containing the function of health-care, aged-maintenance and rehabilitation: Covers an area of 204-224 Chinese mu. Construction includes a center of medical treatment, health-care, aged-maintenance and rehabilitation. IV. Project Investment Investment totals about RMB 1.4 billion yuan with RMB 550 million yuan going to hospital relocation and RMB 850 million yuan going to combined base. V. Cooperation Way Adopt PPP mode and cooperate with social-capital side with brand strength and the third-party operator in medical treatment and health-maintenance area. VI. Benefit Analysis The project is part of public-welfare nature and part of operating nature. This project is featured with stable income source, little risk and considerable expected benefit. VII. Project Initiator Project Initiator: Kaiyuan Development (Xiangtan) Investment Co., Ltd
Construction of Xiangtan Jiuhua Comprehensive 3A-Level Hospital 295
I. Project Background Located in core area of Chang-Zhu-Tan, Xiangtan Economic and Technological Development Zone is home to 190,000 residents and the total planning area is 138 square kilometers. In 2016, the total revenue of technology, industry and trade in this area reached RMB 171.5 billion yuan and the gross industrial output value came to RMB 101.2 billion yuan and fiscal revenue RMB 3.76 billion yuan, showing an increase of 21.2%, 20.6%, and 17.4% respectively on year-on-year basis. With the rapid development of industry and the construction of "Two-oriented Society", the existing small hospitals in the park have been unable to meet the needs of investors and industrial workers, therefore, construction of Jiuhua comprehensive hospital is imperative. II. Project Content Xiangtan Economic and Technological Development Zone has been selected as the project area and the planning land is about 500 Chinese mu. A comprehensive 3A-level hospital integrating medical care, health care, prevention, scientific research and aged-maintenance is planned to be constructed. III. Project Investment Investment totals about RMB 2 billion yuan. IV. Benefit Analysis Annual revenue is expected to reach RMB 0.6 billion yuan after completion. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship. Specific way will be confirmed after negotiation and signing contract. VI. Project Initiator Project Initiator: Management Committee of Xiangtan Economic and Technological Development Zone
Construction of Comprehensive 3A-Level Hospital in Xiangtan National Hi-tech Industrial Development Zone I. Project Background With the transfer of urban center, Hedong District has become the political, economic and cultural center of Xiangtan while hospitals and aged-maintenance centers are still gathered in Hexi District, the old town. Hedong District boasts only one comprehensive hospital, the First People's Hospital of Xiangtan. Especially, there is no standardized comprehensive medical institution but a Bantang Township Hospital in Xiangtan National Hi-tech Industrial Development Zone. With the rapid development of economy and society and the significant improvement in people’s material and cultural well-beings, people put forward higher requirements for the health care and the hospital environment. Xiangtan National Hi-tech Industrial Development Zone covers an area of 46.79 square kilometers and it is planned to be expanded to 200 square kilometers. At present, the number of residents in the Zone and the surrounding area is about 500,000. Recently, talents are attracted and the number of migrant workers and residents has increased at fast speed with the integrated development of this hi-tech zone and the accelerated growth of business service. Most of the existing large hospitals are concentrated in the city center, where is in trouble of traffic congestion and bed tension and there are little hospital combined medical treatment and aged-maintenance in Chang-Zhu-Tan area. This project can rely on the natural ecological advantages of Huashan and build a healthy industrial park through the cooperation of hospitals and enterprises, building a cluster of health care industry which containing medical treatment, health management, health care, aged-maintenance as well as industry-university-research cooperation. II. Project Content Planning project land covers an area of 240 Chinese mu for the establishment of a 3A-level comprehensive hospital with more than 1000 beds. Medical building, outpatient building, inpatient building, medical R&D center, first aid center, rehabilitation training center, high-end convalescent service center and supporting staff quarters, staff canteen, underground parking lot 296
and expert apartment are in the construction plan. III. Project Investment Investment totals RMB 1 billion yuan. Investment areas include: construction, construction costs, costs of infrastructure for power supply, water supply, environmental protection, roads and afforesting. IV. Benefit Analysis After completion, annual outpatient income is expected to be 3000*362*300=RMB 325,800,000 yuan assuming that the outpatient to inpatient ratio is 3:1 and the number of beds is 1000. There are 3,000 outpatients per day, 362 days for outpatient per year and the average daily expenditure of outpatients is RMB 300 yuan per capita. Given that the bed utilization rate is 90%, 12 days of hospitalization per capita, 362 days for inpatient per year, 30 times turnover per year, RMB 6,000 yuan hospitalization fee per capita, then the annual inpatient income is expected to be RMB 162 million yuan and the annual revenue of the hospital will be RMB 487.48 million yuan. The annual profit of this project is expected to reach RMB 80 million yuan after taking off the relevant expenses. V. Cooperation Way Sole proprietorship, contractual joint venture and joint venture. Specific way will be confirmed after negotiation and signing contract. VI. Project Initiator Project Initiator: Xiangtan National Hi-tech Industrial Development Zone
Relocation and Expansion of Affiliated Hospital of Changde Vocational Technical College I. Project Background According to the forecast, urban population in Changde will increase from the existing over 700,000 to more than 1,550,000. In order to implement the developing strategy of Building Healthy Changde, improve public health service system, meet the needs of urban expansion and population growth, 6 level-3 comprehensive hospitals will be established in "13th Five-Year" period so as to provide better medical and health services for the people of Changde and the northwestern region of Hunan. But there are only 2 level-3 hospitals in this area and especially, the health resources in the western region are poor. Based on the special resources of medical care, Changde Vocational Technical College proposed this project. II. Preliminary Work Preliminary Work has been carried out. III. Project Content This project covers an area of 150 Chinese mu and building area totals 120,014 square meters with 109,014 square meters going to ground buildings and 11,000 square meters to the basement. Construction mainly includes outpatient department, inpatient department, health management center, fever / infection clinic, and cancer center with 32 elevators. 1,080 beds will be added, including 960 ordinary beds and 120 infectious bed. IV. Project Investment Investment totals RMB 0.6 billion yuan. V. Benefit Analysis Financial internal rate of return (FIRR) after tax is 6.08%, static payback period is 13.53 years, and the investment financial net present value (FNPV) is RMB 59,223,900 yuan. VI. Cooperation Way Contractual joint venture and sole proprietorship. VII. Project Initiator Project Initiator: Health and Family Planning Bureau of Wuling District, Changde City
Construction of 3A-Level Hospital in Loudi I. Project Background 297
Lying in the geometric center of Hunan, Loudi represents the strategic reserve base for energy and raw materials of Hunan and is praised as Pearl of Hunan. Loudi covers an area of 8,117 square kilometers with Louxing District, Lengshuijiang City, Lianyuan City, Shuangfeng County, Xinhua county and Loudi Economic Development Zone and Wanbao New District in subjection to it. There are 4.2 million people in the jurisdiction of Loudi with 440,000 people living in central urban area. With the rapid development and expansion of the city, the population will continue to increase and the one and only 3A-level hospital will fail to meet the needs of population development in Loudi. Therefore, it is planned to introduce well-known hospitals in Beijing or Hunan and build a 3A-level hospital with better environment and more advanced technology in the southwest region of the city. II. Preliminary Work Preliminary work is in planning. III. Project Content The planned land use is about 300 Chinese mu and 2,000 beds will be equipped. A comprehensive building, an outpatient building, a surgical building, a medical building will be constructed and other related facilities will be established. IV. Project Investment Investment totals RMB 3 billion yuan. V. Cooperation Way Authorized by Loudi Municipal People's Government, Loudi Urban Construction Investment Group will act as the implementation unit. Joint venture and contractual joint venture will be adopted through introducing qualified large medical enterprises. VI. Benefit Analysis The income source of the project comes from the income of the hospital and the development and utilization of the surrounding land. VII. Project Initiator Project Initiator: Loudi Urban Construction Investment Group Co.,Ltd
Construction of Comprehensive Hospital in Loudi Economic and Technical Development Zone I. Project Background With planned area of 72.8 square kilometers, Loudi National Economic and Technical Development Zone is home to more than 120,000 people and has Lianbin subdistrict office and Dabuqiao subdistrict office in subjection. The population is expected to reach 180,000 people in the coming 3 to 5 years. There is 1 specialized hospital in the park without comprehensive hospital, which fails to meet the needs of medical services in the district. In accordance with the relevant standards of resource allocation set by WHO, 800 beds should be added. Therefore, it is necessary to build a comprehensive hospital in line with the 3A-level standard according to the market feasibility. II. Preliminary Work Preliminary planning has been finished III. Project Content Located in Loudi Economic and Technical Development Zone, this project is planned to cover an area of 80 Chinese mu and will be equipped with 500 to 800 beds. After completion, a modern and comprehensive private hospital with perfect function and advanced technology will come into being in this area. IV. Project Investment Investment is estimated to be RMB 380 million yuan. V. Cooperation Way Joint venture, contractual joint venture or sole proprietorship. VI. Project Initiator Project Initiator: Merchants Bureau of Loudi Economic and Technical Development Zone
298
Expansion of Changning People’s Hospital I. Project Background As a 2A-level comprehensive hospital at the service of 1 million people, Changning People’s Hospital is not able to meet the urgent needs of the masses of health care with its existing condition. With the development of social economy, the urban area of Changning has expanded by nearly 5 times and the new district has become a political and cultural center. But most hospitals are gathered in old urban area while large-scale comprehensive hospital is still in absence in new urban area. Poor medical facilities directly affect the medical condition of local people. In order to improve the imbalanced hospital layout, expansion of Changning People's hospital is imperative. II. Preliminary Work Project has been planned and the land acquisition is in process. III. Project Content Land acquisition area is planned to be 288.8 Chinese mu and the floor area will be 100,000 square meters. According to the national standard for the construction of 3A-level hospital, 900 beds should be equipped and it must serve as a comprehensive hospital that integrates the function of medical treatment, scientific research, teaching, health care, rehabilitation and aged-maintenance. IV. Project Investment Investment is estimated to be RMB 0.5 billion yuan. V. Benefit Analysis Annual business revenue increases by 5%-8% according to the current situation of the hospital. After the completion and operation of the project, the internal rate of return is expected to be 19% calculated on the basis of total investment (10% higher than the industry benchmark rate of return), the investment recovery period (excluding construction period) is 10 years. VI. Cooperation Way Contractual joint venture and joint venture. Specific way will be confirmed after negotiation and signing contract. Investors can enjoy preferential policies in investment, logistics and other related sectors. VII. Project Initiator Project Initiator: the People’s Hospital of Changning ,Hengyang City.
Business Attracting of Hunan Medical Center (Lugu Park) I. Project Background Hunan boasts nationwide top-class Chinese and Western medicine, Chinese herbal medicine resources and owns industrial resource advantages such as technology and talents in pharmaceutical industry and medical service sector. In recent years, biopharmaceutical industry in Changsha High-tech Industrial Development Zone has registered an increase of more than 20%. In 2015, the annual revenue came to RMB 18 billion yuan and over 200 diversified enterprises are collected here, among which, 25 are above designated size, 8 are listed one and 7 are planned to be listed. Moreover, 43 innovative platforms including key laboratory, engineering center, engineering technology center and enterprise technology center are located here. Based on the solid foundation of the High-tech Zone in medical industry, biomedicine, medical equipment and other related sector, this project puts emphasis on a new type of health industry with high technology content in cross realm, strives to introduce leading enterprises in advanced medical devices, bio medicine, high-end hospitals, genetic testing, cell therapy, cloud platform for health data, wearable health devices and high-end health services so as to promote the collective growth of health industry. II. Preliminary Work World top 500 enterprise Fresenius and a batch of enterprises in health sector including Jiuzhitang, Sinocare Inc, Fangsheng Pharmaceutical, Sansure Biotech and Carefx have been gathered here so that sound industrial development basis and supporting condition have been prepared. III. Project Content This project is located in Hunan Medical Center (Lugu Park). Investment totals RMB 20 billion 299
yuan and the planned land area is 6000 Chinese mu. This project plans to introduce leading enterprises in advanced medical devices, bio medicine, high-end hospitals, genetic testing, cell therapy, cloud platform for health data, wearable health devices and high-end health services and cultivate a batch of enterprises with annual output of RMB 1 billion yuan. IV. Project Investment Investment totals RMB 20 billion yuan with RMB 4 billion yuan going to initial working capital, RMB 14 billion yuan to fixed assets investment and RMB 6 billion yuan to working capital. V. Benefit Analysis Project construction period is 3 years. Target output is expected to be reached two years after operation. It is expected that the annual sales income will reach RMB 30 billion yuan, annual net profit RMB 3 billion yuan, and investment profit rate 30%. Payback period of after tax items will be 8 years. VI. Cooperation Way Joint venture, holding, sole proprietorship. VII. Project Initiator Project Initiator: Management Council of Changsha High-tech Industrial Development Zone
Construction of Hengyang International Leisure Resort I. Project Background By the end of 2015, the number of old people of over 60 years old in Hengyang has been more than 1.2 million and the population aging rate reached more than 16%. According to Aged People Development Plan of Hunan, more than 30 beds should be prepared for every 1,000 old people. Thus 36,000 beds should be prepared in Hengyang, while only 19,000 beds are accessible in fact and about 17,000 beds should be added. With consideration of the comprehensive aged-maintenance mode featuring making the aged accessible to proper care, to leisure, to medical treatment and to learning, Hengyang International Leisure Resort proposed this project. II. Preliminary Work Construction area lies in sub center of the city with good construction condition and no obstacle. Building materials such as sand, brick and steel can be purchased in Binjiang New District and the surrounding area and the transportation is very convenient. III. Project Content This project is located in Binjiang New District of Zhuhui District, Hengyang with a total planning area of 575,766 square meters and the building area is 30,339 square meters with 50,725 square meters going to elderly apartment, 81,320 square meters to semi-detached middle-end aged-maintenance villa, 54,600 square meters to courtyard-type high-end aged-maintenance villa, 35,000 square meters to national comprehensive 2A-level hospital, 16,500 square meters to rehabilitation center, 2,000 square meters to medical research center, 32,500 square meters to the Nursing School of National Open University School, 2,500 square meters to the old people’s university, 3,096 square meters to the art center for the aged and 7,260 square meters to comprehensive service room. Moreover, the land for agricultural picking, fishing and leisure agriculture covers an area of 20,000 square meters, physical training venue 35,041 square meters; landscape 259,094 square meters and road 26842 square meters outside the door. IV. Project Investment Investment is estimated to be RMB 2.3 billion yuan. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship. VI. Project Initiator Project Initiator: Hengyang Riverside New District Investment Co., Ltd
Construction of Xinma International Medical and Health City in Zhuzhou Hi-tech Industrial Development Zone
300
I. Project Background As an important industrial city in Hunan Province, Zhuzhou has reached a new level in urban planning, construction and management in recent years. Zhuzhou has been praised as national civilized city, health city and garden city and emerged as a green, healthy, comfortable, livable city. At present, Zhuzhou is home to 4 million people, including about 1.3 million urban residents, among which about 680,000 are old people of more than 60 years old, accounting for more than 15% of the total residents, showing that this area has stepped into an aging society. The existing facilities and buildings for old people are generally damaged and old, which are not able to meet the actual needs of society, so the construction of Xinma International Medical and Health City is imperative. Based on Shennong culture, this project has positioned Xinma International Medical and Health City as Zhuzhou Shennong Healthy Ecological Town. This project promises to build a cross-border integrated health-theme town integrating Chinese medicine, regimen, education, cultural creativity and tourism. As a result, the effective linkage of medical treatment, health care, education, cultural creativity and land and the perfect combination between healthy life and leisure tourism will be realized. II. Project Content This project covers an area of about 2,000 Chinese mu, including 400 Chinese mu mountain and 1,600 Chinese mu construction land and 2,000 Chinese mu expanded land in later period. Project area is located in north shore of Wanfeng Lake Ecological Landscape Park, a nice project location with clean water and beautiful scenery. The construction of comprehensive hospital, rehabilitation hospital, maintenance residential area, high-end ecological residential area and mountain park is included in the plan. III. Project Investment Investment totals about RMB 8 billion yuan with about RMB 2 billion yuan going to primary land development and about RMB 6 billion yuan going to Phase 2 construction. IV. Cooperation Way Sole proprietorship or joint venture. The return comes from operating income and feasibility gap subsidy from government. V. Project Initiator Project Initiator: Bureau of Business Cooperation of Zhuzhou Hi-tech Industrial Development Zone. Cooperation unit: Zhuzhou Geckor Group.
Construction of Shennong Health-Cultivation City in Zhuzhou Hi-tech Industrial Development Zone I. Project Background Zhuzhou is blessed with profound culture including the culture of Emperor Yan and supreme Shennong altar. Furthermore, Zhuzhou has also won the honorary title of National Green City, National Health City, National Civilized City and National Garden City. As Zhuzhou has entered the aging society, the demand for rehabilitation services is increased. In 2016, the number of old people over 60 came to about 686,000, and will still increase with an annual growth rate of 2.5%-3%. The need for aged service is strong and the development space of health and aged service industry is huge. II. Project Content Shennong City is located in Tianyuan District of Zhuzhou, representing a demonstration project of two-type society and a key project of Zhuzhou municipal government. This project is planned o build a national 4A-level cultural tourism resort that integrates tourism, culture, health, regimen, shopping, entertainment and leisure. The floor area totals 224,000 square meters and consists of 3 parts: 1.Shennong Cultural Leisure Street, Shennong Sun City and 2#, 3#, 4# towers, building area totals 154,000 square meters. 2.Shennong Building, Springs Hotel, building area totals 70,000 square meters. 3.Wuyunfeng Ecological Health City, building area totals 25 square kilometers. III. Project Investment 301
Investment totals RMB 2.8 billion yuan. IV. Cooperation Way Contractual joint venture and joint venture. Returns is reflected in cash and equity. V. Project Initiator Project Initiator: Bureau of Business Cooperation of Zhuzhou Hi-tech Industrial Development Zone. Cooperation unit: Hunan Tanyes Group
Construction of Shennong Health Rehabilitation Center in Yanling County I. Project Background At present, China has gradually entered the aging society. Up to 2015, the number of old people over 60 in Zhuzhou came to 686,000, taking up 17.15% of the total residents, much higher than 10%, the international standard of population aging. The annual growth rate of old people in Zhuzhou is 2.5%—3.5%, and the degree of population aging is in the forefront of the province. Thus, it is promising to develop health recuperation and rehabilitation sector. This project is close to Shennong Valley National Forest Park, embraces dense forests, clear water, pleasant climate, and high content of negative oxygen ions in the air. This project site is suitable for the construction of rehabilitation center. Consisting with the 13th Five-year Plan of Zhuzhou, this project is a key aged service project of Yanling County. II. Preliminary Work Relevant preliminary work is in process. III. Project Content This project covers an area of about 100 Chinese mu and the floor area totals 26,640 square meters. It is planned to build a well-equipped modern health rehabilitation center that integrates clinic building, acupuncture treatment area, fumigation treatment area, Chinese medicine health care area, massage area, regimen lecture, medicated diet, foot area and outdoor activity area. IV. Project Investment Investment totals RMB 0.1 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Benefit Analysis After completion, annual turnover is expected to be RMB 30 million yuan and net profit will be RMB 18 million yuan. VII. Project Initiator Project Initiator: Economy Informatization Bureau and Business and Grain Bureau of Yanling County.
Construction of Shaoshan Aged Service Industrial Park I. Project Background Shaoshan is located in the hilly area of east central Hunan Province, 100 kilometers apart from Changsha. Shaoshan is well equipped with highway and railway, and Wuhan-Guangzhou high-speed railway and Shanghai-Kunming high-speed rail have established stations in Zhuzhou. Shaoshan Heliport is planned to be established so as to form an air traffic network with the airports of Changsha, Changde, Zhangjiajie and Hengyang. Shaoshan is the hometown of the great leader Mao Zedong and the place where he carried out early revolutionary activities, representing a national patriotism education base and revolutionary tradition education base. Shaoshan is blessed with beautiful scenery and rich tourism resources, is China first batch outstanding tourist city, national ecological demonstration zone and soil and water conservation demonstration area. II. Preliminary Work Conceptual planning and design have been completed. III. Project Content The planning area for this project totals about 135652.33 square meters and the building area is 302
162,581 square meters. It is planned to establish apartment, university, hospital and nutrition catering center for old people and the elderly nursing training center. Moreover, business and management room, road, square, parking lot, green land and other infrastructures for power distribution, water supply and drainage will be established as well. IV. Project Investment Investment totals about RMB 1 billion yuan. V. Benefit Analysis Revenue source: 1. Shaoshan municipal government repurchase; 2. operating income of the park. After calculation, the financial internal rate of return is 5.98%; total investment recovery period is 14 years. VI. Cooperation Way Contractual joint venture or running totally by investment enterprises. VII. Project Initiator Project Initiator: Shaoshan Municipal Civil Affairs Bureau of Xiangtan.
Shaoyang Kanghua Medical Treatment and Aged Service Synthesis I. Project Background There is a serious shortage in the quantity of aged-service institution in Shaoyang. Many public aged-maintenance institutions are inefficient and poorly managed. The counterpart, nursing service enterprises are also desperately insufficient while the vast majority of them are with poor professional skills and low professional quality. In order to improve the supporting function of Beita District of Shaoyang, solve the problems about medical treatment, rehabilitation and aged service of the old people, a rehabilitation center of international advanced level that integrates medical treatment, rehabilitation and aged service is planned to be established through uniting enterprises intending to invest in medical treatment industry and other private capital. II. Preliminary Work Project planning, site selection, demolition situation investigation have been finished. III. Project Content This project covers an area of 300 Chinese mu and the investment totals RMB 3 billion yuan. The floor area is 160,000 square meters with 15,000 square meters going to outpatient and emergency building, 50,000 square meters to inpatient building, 10,000 square meters to scientific research building, 5,000 square meters to administration center, and 80,000 square meters to rehabilitation and aged service center according to the design of garden-style hospital. IV. Cooperation Way Sole proprietorship and contractual joint venture. Investors and cooperators should have the qualification of running 3A or higher level comprehensive hospitals. V. Project Initiator Project Initiator: Business Travel and Brain Bureau of Beita District, Shaoyang City.
Construction of Dongjiang Lake Rehabilitation City in Zixing I. Project Background In order to implement the spirit of Opinions on Further Encouraging and Guiding Social Capital to Set up Medical Institutions ( General Office of the State Council Issued [2010] No. 58 ), Opinions on Speeding up the Set up of Hospitals (Restructuring Department of National Health and Family Planning Commission Issued [2013] No. 54 ), Notice on Issuing <Opinions on Promoting Comprehensive Reform of County-level Public Hospitals> (Restructuring Department of National Health and Family Planning Commission Issued [2014] No. 12 ) issued by national five ministries, introduce social capital, explore new running method of hospital, address the problem of insufficient capital, enhance the development potential of public hospitals, this project was proposed. II. Preliminary Work Conceptual planning and design have been completed III. Project Content 303
1) Zixing Dongjiang Lake Rehabilitation Hospital This hospital is planned to cover an area of 80 Chinese mu with the investment of RMB 1 billion yuan and 900 beds. Floor area totals 98,980 square meters including the construction of emergency and outpatient building, medical technology building, inpatient building, rehabilitation center and villa area. This project promises to build a modern hospital orienting to middle-and-high-end demand and integrating medical treatment, rehabilitation and convalescence. This project will draw lesson from the management mode of high-end hospital in Hongkong and Taiwan, put emphasis on special medical service such as Traditional Chinese medicine treatment, rehabilitation, health care and unit nursing. 2) Zixing Dongjiang Lake Aged Service and Regimen Park This park covers an area of 348 Chinese mu and the investment is planned to be RMB 1.8 billion yuan. Health club, villa for the aged, apartment for the aged, the elderly care building as well as facilities and venues for cultural amusement and sports are in the construction plan. This park will emerge as a quality ecological base for aged service and regimen that integrates the function of living, foster care, leisure, vacation, recuperation, entertainment and health care. 3) Zixing Dongjiang Lake Chinese Herbal Medicine Expo Park It is planned to invest RMB 0.2 billion yuan in Chinese Herbal Medicine Expo Park to establish facilities and venues for planting, processing, production, research and development of Chinese herbal medicine. This park will emerge as a comprehensive and new-type medicinal plants expo garden integrating Chinese medicine culture, tourism and leisure. IV. Project Investment Investment totals RMB 3 billion yuan. V. Benefit Analysis After completion, this park will largely meet the growing needs of the masses for diversified and multi-level medical service in the aspect of traditional Chinese medicine treatment, health care and rehabilitation, driving the growth of modern health service industry. VI. Cooperation Way Sole proprietorship and joint venture. VII. Project Initiator Project Initiatorďź&#x161;Zixing Health and Family Planning Bureau, Zixing Economy Informatization and Business Bureau
Construction of Yngzhou Jindong Forest Rehabilitation Base I. Project Background Located in the south of Qiyang County, Jindong Management Zone covers an area of 635 square kilometers, expanding 54 kilometers from south to north and 12 kilometers from east to west. This project is located in Shaibeitan Village, Jindong Town of Jindong Management Zone, covers an area of 510 Chinese mu. This place is blessed with beautiful environment, fresh air, convenient transportation and pleasant climate, and the negative oxygen ion content here is as high as 74300 / cmÂł, very suitable for living and rehabilitation. At present, projects such as Niutoushan Rafting, Shaibeitan Wetland Park and Dazhailing Park have been developed, put into operation, and have produced good economic benefits. Relying on Rich forest resources and water resources, this project is planned to build a one-stop rehabilitation service base that integrates living, tourism, health care, medical treatment and leisure. II. Preliminary Work Conceptual planning, site selection and project approval have been completed. III. Project Content The ecological parking lot, five-star hospital for the aged, Jindong Longevity Culture Park, Nostalgia Museum, Immortal Legend Fresh Oxygen Bar, Negative Ion Breathing Cabin, Rehabilitation Spring Hotel, Silver Hair Club, apartments and villa for the elderly are in the construction plan. IV. Project Investment Investment is estimated to be RMB 558 million yuan. Construction cost is RMB 391 million yuan, 304
other expenses in construction is RMB 40 million yuan, budget reserve is RMB 20 million yuan, interest during construction is RMB 52 million yuan and the land acquisition fee is RMB 55 million yuan. V. Benefit Analysis After completion, operating venue is expected to be RMB 0.3 billion yuan, profit will be RMB 80 million yuan and the payback period will be 7 years given that 10,000 people are received per year. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Development and Reform Commission of Jindong Management Zone, Yongzhou City
PPP Project of Huaihua Integrated Health Services Facility I. Project Background There are 2 project sites: Site 1: Qingziping Area, lies in Huaihua Economic Development Zone and is blessed with convenient transportation, beautiful environment, quiet landscape, suitable for convalescence; Site 2: previous campus of Hunan University of Medicine, crowded with residential quarters. Large apartment projects such as Shengshihuadu (designed to accommodate 40,000 people) and Hongyuxincheng (designed to accommodate 55,000 people) are planned to be established in this area, which is close to the First People's Hospital of Huaihua, whose medical resources advantage can be utilized for medical service. In October 2016, this project has been approved as the third batch of PPP demonstration projects of Treasury Department. Huaihua municipal government specially formulated the PPP project management approach, identified the division of labor, responsibilities and PPP project undertaker. The government will provide appropriate support in terms of finance, land, financing and power supply to promote the implementation of the project. II. Preliminary Work This project has been reviewed and construction land planning, environmental impact assessment (EIA) approval and energy saving approval have been completed. This project can be carried out through dividing into 2 phases: Phase 1, the part in Qingziping Area, and Phase 2, the part in previous campus of Hunan University of Medicine III. Project Content Land use for this project totals 699,916 square meters (1049 Chinese mu), and the floor area amounts to 886,060 square meters. Including: Qingziping Area covers an area of 535,874 square meters. Floor area is 661,480 square meters and the rate of green land is 42.8%. This area is divided into 6 parts: old peopleâ&#x20AC;&#x2122;s residential apartments area, rehabilitation area, medical care area, beadhouse and nursing homes area, school for the aged and activity area and Chinese medicine health care area. Floor area of the part in previous campus of Hunan University of Medicine totals 224,580 square meters and is divided into new-built part and rebuilt part. Floor area of the new-built part is 90,590 square meters, including apartment for the aged, cantee and medical center; floor area of rebuilt part is 90,430 square meters, the work mainly includes decoration, elevator installation and corridor adding. IV. Project Investment Investment totals RMB 1763 million yuan with RMB 1698.08 million yuan going to construction investment and RMB 64.92 million yuan going to interest in construction period. Project capital is RMB 528.9 million yuan, accounting for 30% of the total investment. Project debt financing is about RMB 1188.65 million yuan, taking up 70% of total construction investment, pledge financing from financial institution by project company with the franchise right of the project. Project capital is RMB 528.9 million yuan. Investor composition: RMB 0.1 billion yuan from investment representative authorized by government, taking up 18.9% ( 20% of investment in the form of land and other 80% in the form of project-use land as physical carrier of feasibility gap subsidy ); RMB 158.67 million yuan from China PPP Fund, accounting for 30%; RMB 270,23 million yuan from social capital, taking up 51.10%. 305
V. Benefit Analysis Return mechanism is composed of payment of users and feasibility gap subsidy. Project revenue comes from renting of facilities and venues in two parts. It is calculated that internal rate of return after tax will be 6% given that the feasibility gap subsidy is RMB 36 million yuan. VI. Cooperation Way The set period of this project is 30 years (including construction period). The BOT ( building, operating, transferring) plus ROT ( rebuilding, operating, transferring) Mode will be adopted, social capital side with the capability of investing, constructing, operating and managing will be selected as cooperator through market competition selection, project company will be set up with the joint efforts of government side and social capital side, both of the two parties will be responsible for the whole management process including design, financing, construction, operation and transfer. VII. Project Initiator Project Initiator: Wuyang Economic Development Co., Ltd of Huaihua Economic Development Zone
Development of Leisure, Tourism and the Aged Service in Zhijiang County I. Project Background Located in western Hunan Province, Zhijiang Dong Autonomous County serves as an essential part of the“One Pole, Two Belts” strategic target of Huaihua. It has won the honored titles of "National Cultural Advanced County", "China's Best Leisure Tourism County", "China's Famous Cultural Tourism County", "Chinese Large Cultural Tourism County" and has been praised as one of the 20 supported national tourism counties in the province. Population is this area has come to more than 0.4 million with 62,500 people over 60 years old, the population aging rate reaching 16.5%. With the rapid development of population aging, it is imperative to speed up the development of the aged-service industry. II. Preliminary Work Feasibility research has been completed and other related work is in process. III. Project Content Zhijiang Town has been selected as the project site and the project covers an area of 1,000-2,000 Chinese mu with about 3,000 families living here. This project will become a comprehensive social aged-service base at the service of local communities and families, radiating 1,000 km around. IV. Project Investment Investment totals RMB 3 billion yuan. V. Benefit Analysis Investment will be paid back in 7 years given that 2,000 people were received per year, RMB 30,000 yuan for each. VI. Cooperation Way Sole proprietorship. VII. Project Initiator Project Initiator: Economy Informatization and Science and Technology Bureau and Business and Grain Bureau of Zhijiang Dong Autonomous County
Construction of Fukang Aged People’s Apartment I. Project Background Approved by Provincial People's Government, Fukang Aged People’s Apartment is the largest apartment for the aged in Loudi with the most beds (2,000) and represents the one and only one with its own hospital for the aged. Fukang Aged People’s Apartment is located in the core area of Wanbao District, a good location. The apartment covers an area of 100 Chinese mu and the floor 306
area is 150,000 square meters. It is well equipped with perfect facilities and functions as well as convenient transportation. After completion, Fukang Aged People’s Apartment will become a large-scale comprehensive service center for the aged that integrates regimen, aged service, rehabilitation, medical treatment, health care, leisure and entertainment. II. Preliminary Work Land acquisition and demolition have been finished. III. Project Content Land use for the project totals 65,679 square meters and the floor area amounts to 151,850 square meters including 17 apartments with 17 floors totaling 145,656 square meters, the hospital for the aged totaling 2,672 square meters, the elderly activity center building of 2,366 square meters, canteen of 1,154 square meters and the underground parking lot of 13,000 square meters. IV. Project Investment Investment totals RMB 550 million yuan. V. Cooperation Way Joint venture and contractual joint venture. VI. Project Initiator Project Initiator: Loudi Fukang Aged People’s Apartment Co.,Ltd
Investment of Comprehensive College of Higher Education in Liuyang National Economic & Technical Development Zone I. Project Background Liuyang National Economic & Technical Development Zone grew out of Liuyang Industrial Park, founded in 1997 and renamed as Liuyang Biomedical Park in September 2001. In October 2006, it was approved by National Development and Reform Commission as the first national biological industry base in the central and western regions; in October 2010, approved by the State Ministry of Science and Technology as the only national innovative medicine incubator base in the central and western region. In March 2012, approved by the State Council, it was upgraded to national economic and technological development zone, becoming one of the important parks for the development of hi-tech industry in Hunan and in 2015, emerging as the top 4 among 109 development zones in Hunan. Biomedicine, electronic information, and health food are leading industries of this park. The collection of emerging industry and knowledge-intensive industry has brought about higher demand for High-end technical personnel. It is necessary to establish a professional comprehensive school of higher education in order to support the economic development of the park. II. Project Content This project covers an area of 500-1,000 Chinese mu. According to the standard of higher education set by Ministry of Education, the building area of Phase 1 construction will be more than 100,000 square meters, teaching building, laboratory building, apartment building, student canteen and other necessary facilities will be included. Building area of Phase 2 construction will be more than 200,000 square meters and teaching building, administrative building and library will be constructed.according to the reality, in the Phase 3 construction, the teaching, administrative and ancillary facilities will be improved and standardized basketball court and football field be built, the total floor area will be more than 300,000 square meters. It is planned to build a large comprehensive education industry base integrating education, science and technology research and development as well as technical application training. III. Project Investment Investment totals RMB 0.3 billion yuan. IV. Cooperation Way 1.Cooperation model: attracting investors with investing capability, modern concept of running a school and advanced management experience. Joint venture or sole proprietorship. 2.Construction period: Phase 1 will be finished and put into operation 2 years after land delivery and finish all investment in 3-5 years. 307
V. Benefit Analysis 1ďź&#x17D;With the park as the center, more than 0.3 billion people lived in 500 km radius, huge space for absorbing students. 2ďź&#x17D;Annual venue is expected to reach RMB 150 million yuan, payback period of investment will be 10 years and profit rate will be 50% given that the number of students at school is 12,000. VI. Project Initiator Project Initiator: Liuyang National Economic & Technical Development Zone
Construction of Production and Education Integration Demonstration Base of Vocational Education in Hengyang I. Project Background A positively interactive win-win scenario between the park and vocational education base will be shaped through intensifying the cooperation between school and park. That is to say, enterprises in the park provide practice and training bases, guiding teachers, employment trends and information on the one side; the school provides technical services, training and human resources support on the other side. II. Preliminary Work According to Hengyang Modern Vocational Education System Construction Plan (2015-2020), Municipal Standing Committee approved to allocate 2,000-Chinese-mu land in Baishazhou Industrial Park for the construction of production and education integration demonstration base of secondary vocational education and reserve 1,000-Chinese-mu land around Zhuhui District Higher Education Mega Center for the development of higher vocational school. III. Project Content In Phase 1, 2 secondary vocational schools are planned to be established. The land for construction is 600 Chinese mu with 200 Chinese mu going to Hengyang Secondary Vocational School and another 200 Chinese mu going to Hengyang Construction Secondary Vocational School. Public training center covers an area of 200 Chinese mu, including the construction of employment and entrepreneurship incubator center for graduates from junior college and technical secondary school in Hengyang, practicing and training industrial zone and industrial service area. Furthermore, a batch of enterprises which participate in cooperation between school and enterprise will be introduced and set up plants in the base. Land use for the Phase 2 construction totals 1,400 Chinese mu. A private higher vocational college will be introduced and cover an area of 800 Chinese mu and 2-3 private secondary vocational schools will be introduced. Each covers an area of 200-300 Chinese mu. IV. Project Investment Investment totals about RMB 1.2 billion yuan. VI. Cooperation Way Joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Hengyang Baishazhou Development Construction Investment Co.Ltd.
Construction of Cold Chain Storage and Logistics Base in Chang-Zhu-Tan Universities I. Project Background In recent years, material in student canteen has been required to be procured on the basis of linking agricultural products and schools according to relevant documents issued by Ministry of education and Provincial Education Department. Related document shows that there are 101 universities with about 950,000 students at school in Changsha, Zhuzhou and Xiangtan (Chang-Zhu-Tan area), which means a huge consumer group and market. This project aims to build a cold chain storage and logistics base covering the colleges in Chang-Zhu-Tan area and undertake the business of associated procurement in the form of integration of agricultural products and schools through introducing social capital. II. Preliminary Work 308
Admittance management system has been adopted in the material procurement of universities in Hunan and pilot areas of associated procurement have been set up in some regions. Phase 1 construction of the procurement supervision platform has been finished and a multidisciplinary method has been adopted to the associated procurement scheme. III. Project Content 4 functional zones respectively for integrated services, information, warehousing and scheduling and distribution will be established. The construction mainly includes cold storage, air conditioning warehouse, distribution building, comprehensive building, vehicle maintenance center, parking lot, testing center and supervision platform. 1 million tons of cold chain agricultural products are expected to be distributed per year and the annual trading volume is expected to reach RMB 1.25 billion yuan. IV. Project Investment Investment totals RMB 240 million yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VI. Project Initiator Project Initiator: Hunan Association for Campus Management
Construction of Hunan Domestic Business School I. Project Background At present, the consumer service industry is thriving. According to the prediction of experts, the number of new born child will increased by 250,000 in Hunan province after full liberalization of the two-child policy; by the end of 13th Five-Year period, the total population in the province will be more than 75 million and the number of people over 60 years old will grow to 13.4 million, accounting for 17.8% of the total and among them, the number of disabled and semi-disabled old people will reach 2.3 million and will increase with the annual growth rate of 6%. About 3 million families have rigid service demand given that 20% of urban families and 10% of rural families need service. Hunan is a province with prosperous service industry, and family service industry in this province faces unprecedented opportunities. The main bottleneck restricting the development of the family service industry is the insufficient supply of talent while the existing talent market is far from meeting the needs of customers. In 2016, there was a gap of 200,000 staff in family service industry in China and the gap in Hunan is over 20,000 staffs. In this connection, it is of far-reaching significance for improving family service and increasing employment to establish Hunan Domestic Business School and strengthen the professional training of family service industry. II. Preliminary Work Hunan Female University represents the director unit of Teaching Guiding Committee for Domestic Service and Management Major and the first batch of provincial demonstration units of family service vocational training, boasts the nationwide largest domestic teaching research team and domestic vocational training system. Moreover, Hunan Womwn’s University has a stable cooperative relationship with Japan, Taiwan, Philippines, Switzerland and other countries and regions advanced in family service industry. III. Project Content 500 Chinese mu lands will be expropriated in Ningxiang Weidong New Area for the construction of Hunan Domestic Business School and the floor area will be 50,000 square meters. In this school, the training of domestic workers, senior skilled personnel training and postgraduate degree education will be carried out and it will strive to become an innovation and entrepreneurship base of family service industry and a modern family service enterprises incubator center. IV. Project Investment Investment totals RMB 0.6 billion yuan. V. Benefit Analysis 1.Broaden the existing enrollment channels for home economics major undergraduates and expand the enrollment number of ordinary high school graduates and vocational school graduates. 2.Enhance the training of high-skilled personnel. 12,000—25,000 ordinary domestic service personnel will be trained in one year; “Philippine maid” mode will be adopted to train 2,000-2,500 309
senior housekeeping staff and 100-200 senior management staff per year. 3ďź&#x17D;Cooperate with colleges and universities in Hunan to carry out MBA and EMBA degree education for domestic senior professional managers and the average annual trainees are 80. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Office of Hunan Women's University
Construction of Minor Social Practice Base in Zhuzhou County I. Project Background According to Outline of National Basic Educational Curriculum Reform ( proposed) and Outline of Reform and Development Plan of National Medium-and-Long-Term Education (2010-2020) issued by National Ministry of Education, comprehensive practice activity should be added to primary and secondary school curriculum as compulsory course and taking up 16%-20% of the total courses. And the social practice base of minors is the main position of teaching comprehensive practice activity curriculum. The number of minors in school now is about 25,000 in Zhuzhou County. Due to the backward facilities, equipment and ideas, it is difficult for all primary and secondary schools to set up such courses, and it is urgent to build a social practice base for minors. Songxizi Community in Zhuzhou County has been selected as the project site. A dozen of bases of vegetables, fruits, flowers and breeding have been established in Songxizi Community, which is also surrounded with patriotic education bases such as the Former Residence of Yang Dezhi and Xianjing Revolutionary Martyrs Cemetery, which can help to realize resource sharing. II. Preliminary Work Planning, site selection and design have been completed. III. Project Content This project covers an area of 471.5 Chinese mu and the floor area totals 40,000 square meters. Exhibition area, practice area, military training area and living area of teachers and students are planned to be established. After completion, 1,500 minors can be accommodated for the implementation of social practice activities in each term. IV. Project Investment Investment is estimated to be RMB 160 million yuan. VI. Cooperation Way Sole proprietorship and contractual joint venture. VI. Benefit Analysis The rate of return on investment can be 12%. VII. Project Initiator Project Initiator: Zhuzhou County Education Bureau
Construction of International Bilingual Middle School in Chenglingji Xingang District of Yueyang I. Project Background As a prefecture level city of Hunan Province and provincial sub-central city, Yueyang covers an area of 15,019 square kilometers and has population of 5,483,400. With Jiangxi province in the east and Hubei province in the north, Yueyang is not only a traffic hub of north-south and east-west traffic arteries, the first batch of open place along the Yangtze River, but also an important regional central city in the middle reach of the Yangtze River. The planning area of Yueyang Chenglingji Xingang District is 100 Square kilometers. This district represents an ideal investment place and gathering place of hi-tech enterprises, the central enterprises and the top 500 enterprises. With the opening development of Yueyang and Xingang District, the problem of insufficient educational resources has shown up in Xingang District and the need of rapid development cannot be met. 310
II. Preliminary Work Planning for secondary school construction has been incorporated into the overall planning of Xingang District, and land reserve and other preliminary work have been started. III. Project Content The area with beautiful scenery in south coast of the Bajiao Lake has been selected as the project site. This project covers an area of about 100 Chinese mu and the floor area is 50,000 square meters. Quality educational resources in the province even in the country will be introduced to take charge of overall management, introducing advanced educational conception and curriculum model. This school will equipped with 40 classrooms including 15 junior high school classes and 13 high school classes with the enrollment scale of 2,200 students. IV. Project Investment Investment totals RMB 180 million yuan. V. Benefit Analysis After completion, the annual revenue is expected to be RMB 21 million yuan through government subsidies and other preferential policies and operation. VI. Cooperation Way Sole proprietorship and joint venture. VII. Project Initiator Project Initiator: Hunan Chenglingji Xingang District Business Liaison Office
Construction of Chenzhou General Navigation College of China Southern Airlines I. Project Background Low altitude economy will be China's next economic growth point and the open of low altitude area provides development opportunities for general aviation industry. According to statistics, output of China's general aviation industry in 2013 was only RMB 6 billion, accounting for about 0.1% of the total GDP, while the annual output in the USA is more than USD 150 billion dollars, taking up about 1% of the total GDP. Thus, there is huge potential in China's general aviation industry. According to the target of China's general aviation industry set by the nation, more than 500 general airports should be established and the number of general aircraft should be more than 5,000 to drive the GDP growth of trillion-level. With the trend of the development of general aviation industry, a regional general aviation institute is planned to be established in Chenzhou High-tech Industries Development Zone, striving for the cultivation of navigation talents in Central-South China. II. Preliminary Work The construction of 30-square-kilometer road network and other supporting facilities have been completed in Chenzhou High-tech Industries Development Zone which is also equipped with 3A-level hospital, the urban commercial complex, Sports Center, the Convention and Exhibition Center and College Students Entrepreneurship Park as well as 3 ecological parks. With fresh air and beautiful environment, this place is suitable for the establishment of a general aviation institute. III. Project Content The land use for construction of this general aviation institute totals about 800 Chinese mu and the building area will be about 300,000 square meters. This project will be divided into 2 phases. Land use for Phase 1 is about 500 Chinese mu and the building area is about 200,000 square meters; Land use for Phase 2 is about 300 Chinese mu and the building area is about 100,000 square meters. IV. Project Investment Investment totals RMB 1.5 billion yuan. V. Benefit Analysis In the initial stage, the junior-college-form higher vocational education will be the main form of Chenzhou General Navigation College and continuing education and navigation-related vocational training will be the auxiliary form. Building inspection is expected to be completed by the end of 311
June 2018 and the enrollment will be started in the autumn of 2018. After completion, more than 2,000 students are expected to be recruited per year. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture. VII. Project Initiator Project Initiator: Management Committee of Chenzhou High-tech Industries Development Zone (Chenzhou Export Processing Zone)
Construction of Chenya International School I. Project Background It is estimated that the population in Chenzhou High-tech Industrial Park will reach 400,000 in 2030 and the area of the park will come to 100 square kilometers. In order to solve the education problem of the children of investors and staffs in this Park, Chenya International School, a international quality private school of junior high school level and high school level is planned to be established in the Park. The project has been listed as the key project of Chenzhou High-tech Industrial Park in 2017. II. Preliminary Work Chenya International School is established through exploring the cooperation with social capital and is co-founded by Changsha Yali School, Canada Ottawa, St. Mark School, Chenzhou Hi-tech Industrial Park and Chenzhou Shicun Middle School. III. Project Content Located in Chenzhou Hi-tech Industrial Park, Chenya International School covers an area of about 200 Chinese mu with Western River scenery belt in the east, Fenghuang Avenue in the north, and backing on Xiangshanping Road. Floor area of Chenya International School totals 100,000 square meters with teaching facilities such as library, teaching building, dormitory, student canteen, gymnasium and ground track field. After completion, 5,000 students can be accommodated. It is planned to introduce project cooperation unit for common development. IV. Project Investment Investment is estimated to be RMB 0.5 billion yuan with about RMB 0.2 billion yuan going to Phase 1 construction. Phase 1 construction covers an area of 200 Chinese mu for the construction of teaching facilities, floor area of which is 100,000 square meters. Land for construction of living service facilities in later period covers an area of 280 Chinese mu. V. Benefit Analysis Initially, the enrollment will orient to the site of Chenya International School and downtown Chenzhou and gradually expand to surrounding area, emerging as modern international premium education resource in Southern Hunan. VI. Cooperation Way Joint venture, contractual joint venture. VII. Project Initiator Project Initiator: Chenzhou Shicun Middle School
Construction of Full-time School in Eastern New District of Loudi I. Project Background As a "Two-oriented Society" demonstration area planned by Loudi Economic and Technical Development Zone, Eastern New District of Loudi is planning to build a sub-center of the city that integrates regional passenger transport, logistics centers, business services, high-end business residence, headquarters economy and financial services. In recent years, commercial plaza, logistics center, financial services area and residential quarters have been established and the population in this area has come to 100,000. The number of school-age students is estimated to be 15,000 given that the proportion of school-age children is 15%. According to the statistics, the average number of students in primary school class in downtown Loudi is more than 65, the most even up to 90 people, greatly exceeding the national standard of 45 students in each class, 4,200 students are overloaded in primary schools. 312
In accordance with the relevant provisions of the Ministry of Construction and the Ministry of Education, one middle school should be established in each residential area (with 30,000-50,000 people). This project is designed to accommodate 3,420 people, which is able to meet the need of school-age students in this region to go to the nearest school within 5 years by and large, and will help to alleviate the phenomenon of overloaded class in downtown Loudi. II. Preliminary Work Project proposal has been finished and land been reserved. This project consists with the â&#x20AC;&#x153;13th Five-Year" Plan for Education Development of Loudi and Five Year Action Plan for Education Development of Downtown Loudi (2015-2020). III. Project Content This project covers an area of 99,000 square meters (148 Chinese mu), and floor area totals 79,763 square meters. Teaching building, art building, library, comprehensive building, canteen, dormitory, a 400-metre runway, basketball field and other ancillary facilities will be constructed. The Full-time School in Eastern New District of Loudi is planned to be equipped with 72 classes, accommodating 3,420 students. IV. Project Investment Investment totals RMB 249.5 million yuan with RMB 165.2 million yuan going to construction and installation costs, RMB 72.5 million yuan going to other costs for construction and RMB 11.9 million yuan to reserve fund of project. V. Cooperation Way Joint venture and contractual joint venture. Donations to students are accepted. VI. Project Initiator Project Initiator: Merchants Bureau of Loudi Economic and Technical Development Zone
3-4 Finance (6) Investment Attraction of The Belt and Road Strategic Investment Fund of Hunan High-tech Venture Capital Investment Group Co., Ltd. I. Project Background In order to further integrate the action of The Belt and Road in Hunan into the national strategy of The Belt and Road, promote the innovative development of enterprises in Hunan, Hunan High-tech Venture Capital Investment Group Co., Ltd. (HTVC) is planning to take the lead in setting up The Belt and Road Strategic Investment Fund (hereinafter referred to as the fund) in Hunan Province. Through the market operation of the fund, taking capital as a link, integrating resource advantages such as funds, talents, technology, culture and other resources, so that financial and physical enterprises can be closely connected and achieve a win-win situation. II. Project Content The strategic investment fund of One Belt One Road in Hunan Province will be established. The fund is a special fund, focusing on projects or enterprises in the list of items in the plan of integrating One Belt One Road (2015-2017) in Hunan Province. The enterprises can also be those ones that was brought in, in order to attracting qualified resources to Hunan. III. Project Investment The total amount of the investment is RMB 30 billion yuan, and the introduced capital will be RMB 20 billion yuan. IV. Cooperative Way A fund will be established, adopting a limited partnership form, taking the capital commitment. Investment period: 10 (8 + 2) years Fixed income: 5%. V. Project Initiator Project Initiator: Hunan High-tech Venture Capital Investment Group Co., Ltd.
313
Capital Raising for Black and Odorous Water Disposal of Xiandai Investment Co., Ltd. I. Project Background With the promotion of sewage governance and sponge city construction in Hunan, energy conservation and environmental protection industry will undoubtedly enter a new round of rapid growth. Innovating investment and financing mode and enhancing the efficiency of capital operation are effective ways to promote the upgrade of environmental protection industry structure and the sustainable development of the economy. As a large listed state-owned enterprise, Xiandai Investment Co., Ltd. establishes "Xiandai Investment environmental protection industry fund", taking industrial projects and non-listed companies equity in environmental protection industry as investment objects, adding values to the fund assets through capital operation, and ultimately attracting funds of different investors who are interested in the governance of black and odorous water disposal and sponge city construction to promote the development of the project and achieve the purpose of promoting the development of environmental protection industry in Hunan province. II. Project Content The project mainly includes urban and rural water supply, integration projects of sewage and waste disposal; comprehensive river management, environmental dredging, flood control, urban pipe network, and black and odorous water disposal projects; buildings concerning livelihood, culture, tourism and other welfare-oriented uses along the rivers. III. Project Investment The target overall amount of the fund is expected to reach RMB 1 billion yuan, raised by stages according to the process of the project. Xiandai Investment will compose guidance capital with venture capital fund and other social capital, and attract financial capital to form priority capital through the guidance capital. After the establishment of the project company, RMB 7-7.5 billion of funds will be obtained in the form of debt from policy banks (the debt ratio of 70% -75% is in line with the provisions of bank loans), the final total investment can reach over RMB 10 billion yuan. IV. Cooperation Way The environmental protection industry fund will be set up by private placement in contract form, and there are preferred shares and common shares. The return will be paid according to the order of principal and income of the preferred shares, and then principal and income of the common shares. V. Project Initiator Project Initiator: Xiandai Investment Co., Ltd.
Hanpu Project Financing of Hunan Construction Engineering Group (HNCEG) I. Project Background Located in Xueshi Sub-district Office, Yuelu District, Changsha, the project belongs to the Yanghuwan area (Hanpu). The total area is 406.7 Chinese mu, and planning plot ratio is 2.8-3.0. The largest planned construction area can be converted into 813,000 square meters. The land parcel is an irregular quadrilateral in a hilly landform; the middle of it is the mass if (altitude of highest point if 80 meters); height difference is about 40 meters. The landscape vision is very wide. The location is good, near the Yanghuwan Wetland Park. The transportation is convenient: adjacent to entrances of three expressways in the northwest, and closely connected with core urban area in the south of Changsha. It already has superior conditions of building high-end residential areas. The surrounding land has basically entered the ending period of the development: the format has been formed and the amount of residents has grown rapidly. The residential areas such as Tingxiangshili, Jiangshandijing have been formed; good cultural and educational atmosphere has been created by schools such as Hunan Traditional Chinese Medicine University, Hunan Normal University Attached Middle School and Bocai Experimental School; and the headquarters base of China Railway Urban Construction Group Co., Ltd. is under construction there. 314
II. Project Content It is planned to develop a building area of 700,000 square meters. The designing idea of One Room Two Views(internal landscape, external city scenery / Yanghu wetland / Xiangjiang overlooking) should be strengthened. The plot ratio is planned to reach 2.84%, and the greening rate is planned to exceeds 40%. At the same time, a supporting nine-year school will be built. Therefore, there will be a community specialized as a destination integrated with leisure, party, catering and retail with an area of 10,000 m2. III. Project Investment The overall amount of the investment is RMB 3.45 billion yuan, the attracted capital will be RMB 500 million yuan. IV. Cooperation Way Set up the fund for cooperative development. HNCEG sets up industry fund and serves as the fund manager, the investment institutions subscribe for the fund preferred shares by creditors rights, stock rights and other assets management plan, HNCEG subscribes for the fund common shares; the purposes of the fund include but not limited to meeting the projects demand for capital funds, loan and working capital. Period is five years, repay the introduced capital by sales outstanding and interest payment per year. V. Project Initiator Project Initiator: Hunan Construction Engineering Group
Investment Attraction of Hunan Financial Center XiangJiang New Area I. Project Background In recent years, the development strategy, "One River and Two Sides" is vigorously promoted in Changsha. The policy of "construction along the river, development cross the river " has been put out, and the idea of building the riverside new area a high-end new area and constructing a dynamic, distinctive, national first-class regional financial center has been proposed. Hunan financial center is located in the core area of riverside financial business area, standing beside Xiangjiang River with a planning area of 2.8 square kilometers. The vision of the river is wide, and the surrounding scenery is very pleasant. At present, it has gathered Changsha Bank, Sanxiang Bank, the national headquarters of Jixiang Life, China Minsheng Bank, Shanghai Pudong Development Bank, Guangdong Provincial Bank branch and other financial institutions. In order to accelerate the development of financial industry in XiangJiang New Are of Hunan Province and promote the integration of XiangJiang New Area, Binjiang New Town Construction and Development Co., Ltd. is planning, constructing and operating in accordance with the requirements of "all-industry gathering", striving to build a regional financial center based on Hunan, affecting the middle-west of China. II. Preliminary Work XiangJiang New Are issued a Opinions of the Speeding Up Construction of Hunan Financial Center (XXGF2016No.25); In 2016 September, a global bid of Hunan financial center concept planning program has been started, inviting international planning and design team to participate in. III. Project Content The main project is to develop and construct of Hunan financial center, and to improve the infrastructure construction and related ancillary works. Actively carry out investment attraction to introduce the headquarters of large financial enterprises. IV. Project Investment The total investment is about RMB 40 million yuan. V. Cooperation Way Cooperative development, purchasing, leasing VI. Benefit Analysis Return of investment comes from land transfer or cooperative development. VII. Project Initiator 315
Project Initiator: Changsha Bingjiang New Town Construction and Development Co., Ltd.
HNAC Technology Co,. Ltd Strategic Cooperation Investment Attraction I. Project Background HNAC Technology Co,. Ltd (stock code: 300490) was founded in 1994. Its major businesses cover automation of hydraulic power plant, substationprotectionand monitoring, smart distribution automation, water treatment automation, industrial process control system software development, engineering design and construction, etc. Now there are 746 employees in the company, and 33.91% of them are R&D technicians. Every year, the R&D investment accounts for over 4% of companyâ&#x20AC;&#x2122;s total sales income, which has reached RMB 25.0447 million yuan in 2014. The company is equipped with platforms of normal inspection, EMC and environment, high temperature aging, automatic system experiment, communication consistency testing and advanced laboratories. Owing to long-time independent R&D on its own, the company has possessed 111 patents, 46 software copyrights and a variety of non-patented technologies by the end of 2015. HNAC Technology Co,. Ltd has reached its business arms to 33 countries, and already finished over 6000 plant-station software control system development and installation projects. Among them, hydraulic power plant automatic control system has accounted for 30% of market share, ranking the first in China. Now its has established sub-companies and service centers in Pakistan, Sri Lanka, Chile, and Zambia, and its service center is Russia is in construction too. Meanwhile, the company has established strategic partnership with GE, Siemens, ABB, Schneider, HABIB and other enterprises, becoming the appointed productive cooperation partner in China of ABB, Schneider and some renown enterprises. By the end of 2015, the total assets has reached RMB 988.3805 million yuan, an increase of 42.58% than the previous year. The main business income of company has amounted to RMB 415.2681 million yuan, a year-on-year increase of 16.97%. And the net profits have reached RMB 45.217 million yuan, a year-on-year increase of 2.57%. II. Project Partnership In order to promote enterprise development and proactively participate in the One Belt and One Road national development strategy, HNAC is seeking for survey controlling enterprises in Europe and America, so as to jointly compete for market of equipments of electric and water treatment. The enterprise is hoped to possess the following comparative advantages: 1.With certain capability and experience in measurement or control device R&D and manufacturing fields. Major items are: first, mature products and technology in water quality analyzer of water treatment industry. Second , relay protection, measurement and control devices, mature products and technology in power sector. 2.With a certain popularity of brand. 3.With proper size and certain enterprises competitiveness, and strong willingness to expand its market in China. III. Cooperation Ways 1.Equity cooperation: cooperation in forms of equity participation, holdings, and acquisition, and to expand world market with the help of respective market advantages. 2. Joint venture: both sides would invest to found a joint venture in Europe, and then establish a high-end brand in high-end measurement and control, automatic device(water conservancy and hydropower, water treatment, etc) so as to expand Chinese market. 3.OEM cooperation: entrusting cooperative enterprise to manufacture HNAC high-end brand measurement and control device in OEM form. 4.Other cooperation ways: both sides can conduct investigation to enhance mutual understanding and trust and seek for more cooperation ways . IV. Project Initiator Project Initiator: HNAC Technology Co,. Ltd.
316
Zhuzhou China Power Valley Innovation Venture Capital Guidance Fund I. Project Background China Power Valley Innovation and Entrepreneurship Capital Guidance Fund refers to a non-profit-oriented policy fund established by Zhuzhou High-tech Industrial Development Zone Government. Zhuzhou Power Valley Innovation Venture Capital Management Co,. Ltd is in charge of equity investment, management, exit and other daily operations regarding investment funds. II. Preliminary Work Social capital would be guided to set up different investment phases of Angel, VC, M&A, etc, and sub-funds in different industries such as transit traffic, general aviation, new-energy automobile. And high-end innovation and entrepreneurship groups or enterprises in start-up stage or medium term would be given full support. III. Project Investment The total Venture Capital Fund is RMB 0.5 billion yuan. IV. Cooperation Way Cooperative investment and direct investment. V. Project Initiator Project Initiator: Investment Attraction and Cooperation Bureau of Zhuzhou High-tech Industrial Development Zone. Cooperation Undertaker: Zhuzhou Power Valley Innovation and Entrepreneurship Capital Management Co,. Ltd
4-1 Industrial Park Infrastructure (31) Construction of Changsha Airport Economic Zone I. Project Background This project aims to fully utilize the advantage of the comprehensive transportation system and the airport foundation of Changsha, Hunan Province; to promote the agglomeration of airport high-tech industry and service sector; to foster the harmonious development of airport industry and airports, cities, transportation and ecosystem; to build the air-rail multimodal hub of Yangtze River Economic Zone, the inland opening-up height of central China and the clustering of high-end airport industrial area. II. Preliminary Work Changsha Airport Economic Zone has a favorable condition to develop the airport economy for its superior comprehensive transportation, rich cultural resources and good ecological environment. 1. At present the preparation work of regulatory detailed plan, industrial and strategic planning for airport economic core area has been laid down. The Changsha comprehensive bonded zone inside was approved to be established on May 31, 2016 and was expected to operate on May 31, 2017. 2. Gradually construct and improve the traffic lines and supporting infrastructure facilities. The renovation project of Renmin East Road, Huangjing Avenue (S207) and Airport Road has already been completed. The other nine roads are now under construction. 3. By the end of 2016, the airport economic zone has been approved of 5,047 Chinese mu of various kinds of construction land, among them 2,568 Chinese mu for public infrastructure construction, 2,479 Chinese mu for profit-oriented projects. At present area of 1,007 Chinese mu has been constructed and area of 1,361 Chinese mu is reserved for investment promotion. 4. Total requisition land for this project is 6,550 Chinese mu, with 701 houses demolished and 2,303 households relocated, the payment amounting to RMB 1.4 billion yuan. 5. The projects settled and under construction include China Unicom Digital Reading Base, Okay Airways Hunan Branch Company, Changsha Bailian Outlets, GLP Changsha Airport Logistics 317
Center, Hunan Shunfeng E-commerce Industrial Park. III. Project Content This project covers a planned area about 130 square kilometers, with the core area being 30 square kilometers. The layout will be “one axis two cores and three groups”. The focuses will be laid on the introduction and development of the following leading industries: 1. Airport hub group: conceptualized as the driven force of airport economic zone to introduce and develop the core airport industry, comprehensive bonded logistics and aviation services. 2. New areas around railways group: conceptualized as airport economic agglomeration zone to introduce and develop headquarter exhibitions, commercial services, cultural innovation, e-commerce logistics, cross-border e-commerce and financial services. 3. Xingma innovation group: conceptualized as the carrier of high-tech industry and service sector to introduce and develop information technology, precision manufacturing, intelligence equipment, entertainment, cultural tourism and commerce and modern agricultural technology. IV. Project Investment Estimated investment totals about RMB 100 billion yuan V. Cooperation Way Sole proprietorship and joint venture are welcomed. The system of land use right listing-for-sale shall be adopted. Enterprises with strong potentiality, credit and reputation from home and abroad and meanwhile conducive to this area’s industry development are sincerely welcomed. VI. Project Initiator Project Initiator: Administration Committee of Airport City, Changsha County
Construction of Changsha Airport Business District I. Project Background Changsha Airport Business District will be constructed to a high standard district embodying the strategic deployment of “innovation leadership and opening up” proposed by Hunan Provincial Committee and “construct the central city of nation” “establish the national transportation and logistics center” proposed by Changsha Municipal Party Committee. This district will be the engine and high end of east Changsha, integrating financial, commercial, cultural and service facilities. II. Preliminary Work Periphery infrastructure facilities like water and gas supply, electricity internet usage and road construction have nearly accomplished. Land acquisition project has been finished in the south of Renmin Road and started the preliminary phase in the north of Renmin Road. III. Project Content The construction land is around 2,000 Chinese mu with the plot ratio being 2.0-3.0. The land is mainly used to construct buildings for office work, scientific research, products displaying and selling and star hotels. The industries relating to finance, international trading, high-tech, cultural innovation and commercial service will be introduced and developed to build a comprehensive intelligence industry park centralized on financial trade. IV. Project Investment Investment totals about RMB 20 billion yuan. V. Cooperation Way Sole proprietorship and joint venture are acceptable. The system of land use right listing-for-sale shall be adopted. Investors experienced in developing large property and business complex are sincerely welcomed. VI. Project Initiator Project Initiator: Administration Committee of Airport City, Changsha County
Investment Attraction Project of Changsha Huanghua Comprehensive Bonded Zone 318
I. Project Background Comprehensive bonded zone is established in inland with the function of bonded port area under special customs supervision. It is a special area open at the highest level, enjoying the most preferential policies, completed functions and simplified formalities. It is a requisite to declare the free trade area. Changsha Huanghua Comprehensive Bonded Zone was officially approved by National People’s Congress on May 31, 2016. It covers five state-level industrial parks and nine province-level industrial parks of Hunan Province within 20 square kilometers and meanwhile gathers thousands of enterprises represented by 32 Fortune 500 companies, being the most powerful industrial zone and the most dynamic business area. Thus, it is reputed as the bright pearl beset in the crown of Hunan opening economy. Being the important platform of export-oriented economy in Hunan, Changsha Huanghua Comprehensive Bonded Zone will be dedicated to constructing Hunan as a new engine for open development, a new base for foreign trade service, a new platform for airport economy and a new frontline for optimum structure. II. Preliminary Work 1.The compilation work of regulatory detailed plan, industrial and strategic planning for comprehensive bonded area has been accomplished. 2. The construction mode of this project adopted PPP model and is jointly funded by China State Construction International Holdings Limited and Changsha Comprehensive Bonded Zone Investment Co., Ltd. This project will be constructed by The Third Construction Company of China Construction 5th Engineering Bureau. 3. The 1st phase construction will cover 0.77 square meters. Infrastructure construction like ground leveling has been completed currently. III. Project Content Changsha Huanghua Comprehensive Bonded Area will be established as a multi-functional area including bonded processing, logistics, trading and service. The construction of its 1.99 square kilometers will be divided into two phases. The 1st-phase project will cover 1.2 square kilometers. The key projects will be the construction of fresh commodities bonded warehouse, bonded research port, high-end equipment manufacturing area, medical equipment distribution center, bonded boutique, infrastructure facilities exhibition center, art works exhibition and auction center, cultural trade bonded park, intelligence equipment industrial park, e-business headquarter, central south international conference center and aviation training base. The three core functions will be laid to construct bonded storage, logistics processing and trade and business communication. Meanwhile, it will improve the four supporting systems of industrial park, business office, cultural exhibition and comprehensive service. IV. Project Investment Investment totals about RMB 5 billion yuan. V. Cooperation Way Sole proprietorship, joint venture and contractual joint venture are welcomed. Enterprises from home and abroad dedicated to bonded processing, logistics, commerce and service which are conformed to this area’s industrial orientation are sincerely welcomed. VI. Project Initiator Project Initiator: Administration Committee of Changsha Huanghua Comprehensive Bonded Zone.
Construction of Innovative Achievement Transformation Core Area in Yuelushan National University Science City I. Project Background According to Changsha’s Overall Plan for Construction of National Innovation-minded City and National Independent Innovation Demonstration Area Plan in Chang-Zhu-Tan Urban Agglomerations, Innovative Achievement Transformation Core Area in Yuelushan National University Science City is planned to promote the deep integration of technology, industry, culture, education and finance. Changsha not only has the national level Xiangjiang River New Area but also three national level 319
parks including Changsha High-tech Area and two provincial level parks, with the total industrial output value being RMB 420 billion yuan. Changsha owns more than 1000 research and service platforms of various types, over 40 ministerial (provincial) scientific research institutions, over 100 national level innovation platforms, over 300 provincial innovation platforms. Among them, Changsha High-tech Area gathers many scientific research institutions like Changsha Intelligent Manufacturing, Space Research Institute of Chinese Academy of Science, Hunan New Materials Technology Research for Aerospace, Changsha Technology Research Institute of Beidou Industry Safety and 3D Printing Technology Research, having nearly 60 national level innovation platforms and more than 200 provincial innovation platforms. Changsha has four universities under 985 and 211 projects and more than 30 other colleges, 25 scientific research institutes and over 100,000 scientific talents to support her. The effective invention patents of enterprises in Changsha mount to over 4,000 pieces. More than 1,000 national level programs under 863 and 973 project are carried out in Changsha. II. Preliminary Work This project concentrates on the construction of national intelligent manufacturing center, national innovation and creation center and national transportation and logistics center. The core area is planned to be 32.2 square kilometers, Yuelu District 2.6 square kilometers and High-tech Zone 29.6 square kilometers. III. Project Content This project will be completed by the means of “three parks four towns and one center”: 1. Three parks: Haichuang Park will be established as the base for overseas high-level talents innovation and starting a business; Kechuang Park for national laboratories, national major science and technology infrastructure, high-end research platforms, academician studios and industrial technology research academy; Chuangyi Park for cultural innovation, design innovation, internet new cities, test and certification service platforms. 2.Four towns: Civil-Military Town will be established for civil-military integration technology research institute and technology transferring center and the like; Financial(Fund) Town for the clustering of financial institutes like funds, securities companies, angel investment, warrant and technology banks, to build an financial ecosystem; Garden Town for Headquarter for enterprises’ scientific research headquarters and centers; Maker Town for innovation streets and innovation creating platforms and innovation communities. 3. One center: Technology Service Platform will be established for industry innovation public platforms, and platforms of professional services like intellectual property rights, technology transferring, science pavilions, big data transaction, design, scientific communication and comprehensive service. IV. Project Investment This project is planned to invest RMB 50 billion yuan totally, strat-up capital RMB 10 billion yuan, fixed asset RMB 35 billion yuan, circulation capital RMB 15 billion yuan. The 1st phase is expected to be three years and reach design output after two years. It is expected to achieve annual sales RMB 80 billion yuan, annual net profit RMB 8 billion yuan, with profit ratio of investment being 15%. The payback period after tax is 10 years. V. Cooperation Way Joint venture, contractual joint venture, shareholding and sole proprietorship are sincerely invited. (1)Enjoy the preferential policies of national high-tech area, Hexi Pilot Area and also the Administration committee of High-tech Area of Changsha. (2) Assist strategic investors with seeking partners, project financing and other items. VI. Project Initiator Project Initiator: Administration Committee of Changsha High-tech Industrial Development
Construction of Innovation and Creativity City in Wangcheng Economic and Technological Development Zone I. Project Background Changsha is the comprehensive reform pilot area of Chang-Zhu-Tan urban agglomeration area under the Two-oriented Society program and the National Independent Innovative 320
Demonstration Zone. It is also the first batch of Demonstration City of Small and Medium-sized Business Innovation Base. In recent years Changsha has constantly improved the new innovation and creativity policies, its carrier construction, public service and financial environment, presenting a good momentum of development for this industry. Wangcheng Economic and Technological Development Zone shows a high emphasis on the innovation and Entrepreneurship of small and medium-sized business and strives to present a much improved envision of innovation and creativity. Innovation and Creativity City in Wangcheng Economic and Technological Development Zone will be constructed based on the established five innovation and creativity bases. II. Project Content This project aims at both sides of Purui Avenue in Wangcheng Economic and Technological Development Zone. Investment totals RMB 8 billion yuan and it will be divided into two phases. Five business incubation centers have been established—Golden Entrepreneurship Park, Jinqiao Innovation and Creativity Base, Jinrongyachuang Base, Liandong U-shaped Valley, Yongwang Standard Workshop. They can provide services like basic training, legal aid, financial service and technology communication for free. At present Golden Innovation Park has already built the innovation incubation building and its supporting warehouse for 70,000 cubic meters, multi-floor, single-floor and special workshop 70,000 cubic meters, public service facilities and comprehensive service building 100,000 cubic meters. It has already introduced 50 enterprises like Tianjin Kalee Star Vehicle and Maliang Digital Science. Jinqiao Innovation and Creativity Base have built eight 5A first-level class office buildings about 400,000 square meters. It has also completed public service buildings like Maker Road Show Room, Maker Academy Community Center, staff canteen, Maker Coffee, Maker Health Club, setting up RMB 250 million yuan Jinqiao Low Carbon Fund. This project has already introduced some profound e-business enterprises represented by Ali Cloud Cross-border Commerce, Oracle, Hunan Wancon and Hunan Liushi E-business. Jinrongyachuang Base has an extensive docking and cooperation with Germany Mecklenburg-Vorpommern government in nonferrous metals, new energy, new materials and environment protection. It has already introduced five renowned German companies represented by Vascat, German Mailer Energy, Caint Luo and over 10 domestic companies represented by Hunan Yitong Wire and Cable, Changsha Qianhong Electricity and Changsha Sumei Electricity. Enterprises focusing on digital information, intelligent manufacturing, industrial internet, new energy vehicle and e-business and high quality projects are sincerely invited. III. Project Investment Investment totals RMB 8 billion yuan and will be concentrated on the construction of infrastructure, innovation and creativity building, landscape design and supporting hardware of the apartment. Self-financing will be the major approach. IV. Cooperation Way Sole proprietorship and contractual joint venture in enterprises entered this park will be the most welcomed. Joint venture and contractual joint venture shall be adopted according to circumstances. V. Benefit Analysis The construction of Innovation and Creativity Area in Wangcheng Economic and Technological Development Zone will promote the local employment, with a huge market potential and economic benefit. The mass entrepreneurship and innovation policy will further invigorate the market. The construction of “Maker Space” will effectively integrate resources; implement policies; improve service modal and nurture innovation culture, thus docking the conceits of business starters and market demand in an all-round way. Therefore, this project will develop the giants from dwarfs of all the massive entrepreneurship. It is estimated that more than 1,000 companies will enter into this area and achieve yield value RMB 10 billion yuan and tax RMB 300 million yuan. VI. Project Initiator Project Initiator: Administration Committee of Wangcheng Economic and Technological Development Zone.
321
Construction of Hunan Geomatics Industry Park I. Project Background Geomatics industry is an emerging strategic industry engaging in geospatial information acquisition, processing and development application with the assistance of high-tech technologies like modern surveying and mapping, GIS and remote sensing, GPS and earth observation. Muyun Economic and Technological Develop Zone has a wonderful industry foundation and gathers more than 10 geomatics industry companies including the Second Surveying and Mapping Institute of Hunan Province, Hunan Institute of Hydraulic and Geological Engineering Survey, Hunan Institute of Geophysics and Geochemical Exploration, Changsha University of Science and Technology, 303 Brigade of Hunan Nuclear Geology. Hunan Geomatics Industry Park was set up in 2014 and undertook China Geomatics Industry Conference in 2016 with nine major programs signed and attracting investment over RMB 10 billion yuan. More than 50 enterprises have already entered into this park and they covers a wide range of industry like surveying and mapping, investigation, unmanned aerial vehicle, map publication and associations, laying a quite solid foundation for the development of Muyun as a geomatics town. II. Preliminary work In 2014, the State Council General Office Document No.2, â&#x20AC;&#x153;the Suggestion on Promotion of the Development of Geomatics Industryâ&#x20AC;? has been promulgated. The project site has been completed and the construction planning and bidding are undergoing. III. Project Content The major programs will be the construction of national geological park, national geological museum, geomatics information industrial innovation park, intellectual industry park, technology and business exhibition center and commercial logistics park. This final target is to establish the Innovation Demonstration Zone of Hunan Geomatics Application Industry and Hunan Special Pilot Town. IV. Project Investment Investment of the 1st phase is planned to be RMB 5 billion yuan. The Current project land is 1,672 Chinese mu and development reserve land about 5,000 Chinese mu. The construction will be jointly accomplished by Muyun Economic and Technological Development Zone and other social financing sources. V. Cooperation Way PPP model shall be adopted and potential partners are sincerely welcomed currently. VI. Project Initiator Project Initiator: Hunan Geomatics Industry Park.
Changsha Xingsha Doctor Innovation and Entrepreneurship Park Construction I. Project Background In recent years demobilized technical cadres of key military academies inside and outside Hunan Province are important personnel introduced to key enterprises. Most of them are technical experts with doctorate, senior title and overseas experience. They are featured with high-tech knowledge, experience of team management and enthusiasm of serving the country by industry. II. Preliminary Work The leading group of this project has already established. The construction of 4,400 square meters computer center and 2,200 square meters area of scientific research and office work have been completed. The first programs settled in this park have started operation. III. Project Content This project is divided into three subprojects. 1. 20,000 square meters standard plants are planned to be the project incubation to hatch scientific research achievements of high-end talents like new demobilized military technical cadres and doctors. 2. It is planned to construct the Doctor Innovation and Entrepreneurship Building with total area of about 90 Chinese mu and construction area about 300,000 square meters. Scientific research office building, laboratory building, pilot plant and supporting facilities for high-end talents like 322
doctors will be included. 3. It is planned to construct the Transformation of Innovation and Entrepreneurship Achievements Industry Park with the total area about 2,000 Chinese mu. Its main function is to foster the localization and industrialization of the introduced high-tech achievements. The construction period is four years. It is planned to introduce more than 40 high-level talents like doctors, 50 innovation and entrepreneurship projects and meanwhile incubate 40 industrial enterprises in the coming five years. IV. Project Investment Investment totals RMB 5 billion yuan. V. Cooperation Way Contractual joint venture, joint venture and sole proprietorship are sincerely welcomed. VI. Project Initiator Project Initiator: Administration Office of Xingsha Industry Base, Changsha County.
Construction of Changsha High-tech Civilian-military Integration Industry Park I. Project Background Hunan Provincial Government regards the deep development of civilian-military integration as an important part of the construction of Independent Innovative Demonstration Area in Chang-Zhu-Tan urban agglomeration. Changsha high-tech area is equipped with a large number of scientific research institutions, high-level talents and fully furnished supporting facilities. It gathers a full range of enterprises closely related to civilian-military integration such as China Electronics Cooperation, China Aerospace Times Electronics, Gaodi Optoelectronic Enterprise, Galaxy Electric Technology, Aerospace Universal Communication Technology. It also develops a close cooperation with universities like National University of Defense Technology, forming a good foundation and supporting services for civilian-military integration industry. In 2015, the output value of civilian-military integration industry in this park amounted to more than RMB 20 billion yuan, increased by 48%. Over 300 enterprises which are dedicated to civilian-military dual-use technologies and meanwhile penetrated into the industrial market are directly transformed. The development of BeiDou Navigation Satellite System industry plays a leading role, gathering more than 80% enterprises concentrating on it in Hunan such as Great Wall Information Industry, Hunan Aerospace Times Electronics, Zhongsen Communication and Guoxin Junchuang. The civilian-military integration industry park achieves many top one titles on chip development, military application, construction machinery positioning, post logistics navigation and intelligent city. The only one national authorized testing center among central region is located here. II. Project Content This project is located in Changsha High-tech Information Industry Park, with planned area of 1,000 Chinese mu (500 Chinese mu for one phase). Under the support of the co-established Hunan Industrial Technology Cooperative Innovation Research Institute by National University of Defense Technology and Hunan Science and Technology Department, it is expected to introduce about 30 civilian-military integration projects; to construct the specialized industrial Park; to carry out the related projects with the emphasis laid on key area such as the development of super-computer, BeiDou Navigation Satellite System, laser gyro and aerospace industry. III. Project Investment Investment totals RMB 5 billion yuan, with fixed assets investment RMB 4 billion yuan and circulating capital RMB 1 billion yuan. The construction period will be three years. IV. Benefit Analysis This project can reach designed production capacity after going into operation for three years. It is estimated to achieve the annual sales RMB 10 billion yuan, annual net profit RMB 2 billion yuan, with investment profit rate being 40%. The recovery period after income tax will be 7 years if counted from the starting year of project construction. V. Cooperation Way Joint venture, contractual joint venture, shareholding and sole proprietorship shall be adopted. This project enjoys the preferential policies in national, provincial and municipal level and the 323
investment incentive policies of Hunan Xiangjiang River New Area. More detailed preferential policies will be provided by Changsha High-tech Area according to project investment, project prospect and tax. VI. Project Initiator Project Initiator: Administration Committee of Changsha High-tech Industry Development
Changsha Jinxia Modern Architecture Demonstration Industrial Park the Phase One Construction I. Project Background Building industrialization is a new building style featured with intensive integration, green low carbon and industrial efficiency. Compared with traditional approach, building industrialization can save 70% of energy, 80% of water, 20% of materials and 20% of land without any pollution in construction process. It is characterized by water impermeability, sound insulation and seismic resistance. It also has distinct advantages of good quality, controllable costs and construction, showing the significant economic and social benefits with huge potential. The building industrialization has been a trend currently. Changsha Jinxia Economic Development Area, with the planned area of 80 square meters, is the only comprehensive development park in Hunan integrating the multi-transportation advantages of water transport, highway, air transport, railway and pipeline. It gained approved titles such as National New Industrialization Industrial Logistics Demonstration Base and Hunan Top 10 Industrial Parks with the Most Investment Value. At present building industrialization projects from China Minsheng Drawin Technology Group, Sanxin Housing Manufacturing of Hongde Group, Mingxiang Technology and Hunan Hengsheng Ruitong New Building Materials have already been introduced. The building industrialization industry is expected to be the fifth industrial clustering over 10 billion enterprises. II. Preliminary Work This project covers a total area of 508.82 Chinese mu, effective area about 411.34 Chinese mu and five plots of land (effective areas being 103 Chinese mu, 70 Chinese mu double times, 73 Chinese mu and 95 Chinese mu respectively). The land requisition has all been completed but the demolition is not started yet. III. Project Content This project is planned to construct the national base of technology development under the building industrialization program and the production base of its demanding component parts, including the construction of major plant, specialized plants, design and research center, products experiencing center, office building and residential supporting area. IV. Project Investment Investment totals above RMB 1 billion yuan, including cost of land, price excluding tax, construction cost of plants and other buildings. V. Cooperation Way The land use right is listed for sale and sole proprietorship shall be adopted. VI. Benefit Analysis The estimated output value is above RMB 5 billion yuan after this project goes into operation. VII. Project Initiator Project Initiator: Investment Cooperation Bureau of Changsha Jinxia Economic Development Area.
Investment of Ethiopia & Hunan Province Equipment Manufacturing Cooperation Park I. Project Background To positively explore the new model of Going Out in our countryâ&#x20AC;&#x2122;s industrial parks and achieve political, economic and social benefits at the same time, Hunan Provincial Government proposed global cooperation and communication on production capacity with The Ethiopian government. One of the achievements is to co-construct the Ethiopia & Hunan Province Equipment Manufacturing Cooperation Park. This is the concrete action implementing the â&#x20AC;&#x153;One Road, One 324
Beltâ&#x20AC;? strategy and the deployment of global cooperation on production capacity; it is also the first pilot development area of promoting African construction in provincial level. II. Preliminary Work Work has been completed on leading group and project team establishment, personnel selecting, project operation and management plan, investment plan and Hunan project company organization. III. Project Content The operation company of this park will be co-established by Ethiopia Industrial Park Development, CGCOC Ethiopia Company and Changsha Economic and Technological Development Area. It is authorized by the Ethiopia government to operate this park. The companyâ&#x20AC;&#x2122;s responsibilities are as follows: construct and maintain the inside infrastructure; implement the projects of attracting investment; assist the enterprises entered to complete administrative examination and approval procedures of all sorts (one-stop service) and direct them to operate and pay tax according to law; provide enterprises entered with services like investment suggestion, human resources, production and operation, policy legal consultation, life supporting facilities and foreign affairs in an all-round way. With the focus laid on seven industries and four leading industries , the administrative of this park will highlight industries like engineering machinery, energy and electricity, automobile and its parts and general equipment. Meanwhile the supplementary industries will include new materials, food and beverage and light package. IV. Project Investment Investment totals USD 360 million dollars, with construction capital of USD 350 million dollars and circulating capital of USD 10 million dollars. This project is divided into two phases and will be completed in three to five years. V. Cooperation Way Sole proprietorship and joint venture shall be accepted. The major industries will be oriented towards engineering machinery, energy and power, automobiles and its parts and general equipment, with new materials, food and beverage, light printing package as the supplementary industries. VI. Project Initiator Project Initiator: Administration Committee of Changsha Economic and Technological Development Area.
Construction of Liuyang Innovation and Entrepreneurship Park in High-tech Zone I. Project Background Liuyang High-tech Area grew out of the Hunan Liuyang Manufacturing Industry Base. It was founded in 2003. 25 kilometers away from Changsha urban area and about eight-minute drive to Huanghua International Airport, Liuyang High-tech Area is the core area of the eastern parts of Changsha airport economy and the important component of Liuyang Jinyang New Area as well. It has been considered into the overall plan of Changsha urban area. The construction of Innovation and Entrepreneurship Park will effectively enhance this areaâ&#x20AC;&#x2122;s competence of attracting investment and improve the ecological environment to meet the demand of conservation-minded economic society. II. Preliminary Work At present more than 200 industrial enterprises, 112 enterprises above designated size and 35 high-tech companies have entered into this park. With advanced equipment manufacturing, automobile and its parts and remanufacturing as the leading industries and other industries including new energy and new materials, fast moving consumer goods and furniture and building materials as the supplementary industries, the park has formed a multi-point supporting development pattern. III. Project Content This project covers a total area of about 149 Chinese mu, with land for construction use about 190,000 square meters. The project content includes: 1. Innovation and Entrepreneurship Service Center. It will serve the leading industries like advanced equipment, automobile and its parts and remanufacturing. By accumulation of innovative factors and core technologies of all sorts, this 325
project will establish a distinct, well-furnished and well-performed innovation and entrepreneurship carrier integrating scientific research, design, production and service; 2.Remanufacturing Industry Development Center. Consist of inspection and testing center, information tracking service center, industry supporting center, additive manufacturing processing center and exhibition and transaction center, it will establish an eco-industry chain integrating production, dismantlement, inspection, transaction and after-sales service; 3.Intelligent Manufacturing Industry Supporting Center. It shelters mainly the introduction of high-end automatic machinery, advanced CNC machine, complete set of medical and pharmaceutical devices, advanced rail transit equipment and industrial robots with the dedication to build the Hunan Demonstration Area of Intelligent Manufacturing. IV. Project Investment Investment of this project totals RMB 1.2 billion yuan. V. Benefit Analysis According to financial evaluation, the after-tax financial internal rate of return of 6.13% is greater than the benchmark yields of 6%; the financial net present value of RMB 6,542,800 yuan is greater than zero; the static investment recycling time is 10.98 years; the total rate of return 5.44%; net capital rate 8.0%. This project has profitability and is solvent. The financial evaluation is feasible. VI. Project Initiator Project Initiator: Administration committee of Liuyang High-tech Industry Development.
Investment of Enterprise Headquarter City in Wangcheng Economic and Technological Development Zone I. Project Background Supported by the profound regional transportation and favorable policies superposition, Wangcheng Economic and Technological Development Zone will fully exert the advantages of riverside location and the enthusiasm of waters-minded entrepreneurship to establish the headquarter center and innovation center of Chang-Zhu-Tan urban agglomeration. It will be dedicated to create a national-level business supporting environment and gather international famous centers of scientific research development, operation and purchase. The highlight will be laid on the development of financial, commercial, high-end manufacturing and technical achievements transaction headquarters and scientific exhibition to establish a regional CBD with the radiation range of Hunan Province and the nation. This project is completed in all respects. 27 high-quality enterprises including Shanghai MJ Intelligence System, Jinke Caizhi Management Consultant Group, Oracle and WinChance has entered this area. II. Project Content This project is located in Jinqiao Commercial and Trade Market of Wangcheng Economic and Technological Development Zone, with a total area of 400 Chinese mu and land for construction use 400,000 square meters. Investment totals RMB 10 billion yuan. It is planned to construct a clustering base of headquarters integrating office work, scientific research, pilot-scale tests and industries. The Enterprise Headquarter City has seven standard office buildings of 5A level, one hotel, three exhibition halls and 20,000 parking lots. With 470,000 square meters construction land, this project can introduce about 500 large enterprises and about 2,000 headquarters of small and medium-sized enterprises with a direct creation of around 5,000 high-level jobs. III. Project Investment Investment totals about RMB 10 billion yuan. It will be concentrated on the construction of infrastructure, headquarter buildings, landscape and supporting facilities like headquarter apartment. Self-funding will be the major financial source. IV. Cooperation Way Sole proprietorship, joint venture and contractual joint venture shall be adopted. Headquarters of finance, electronic information, high-end commerce, biotech, media, film and television are sincerely welcomed. V. Benefit Analysis The estimated revenue of this project mounts to RMB 500 million yuan after the overall operation. 326
It can provide job for 1,000 people. VI. Project Initiator Project Initiator: Administration Committee of Wangcheng Economic and Technological Development Zone
Construction of Power Valley Independent Innovation Park of Zhuzhou High-tech Zone I. Project Background China Power Valley Independent Innovation Park is located in Zhuzhou High-tech Zone Xinma Innovative city, with an area of 5,382 Chinese mu. It is mainly positioned as the core carrier to introduce and develop research institutes of enterprises, including a whole chain of innovation and entrepreneurship such as pioneer park, incubator, accelerator, scientific research center and public technology center. From the operation in September 2015, enterprises entered have achieved business income of RMB 360 million yuan with revenue towering over RMB 10 million yuan and research and development investment nearly RMB 35 million yuan. At present, the park has signed agreements with 72 enterprises and 15 scientific research projects. More than 50 projects have been negotiated. II. Project Content This project has D, E, F, G types of land, with a total area of 489 Chinese mu and construction area of 468,916.84 square meters. The main construction will be multi-floor plants, detached headquarter, scientific research center and supporting facilities including central landscape garden, supporting houses and sports stadium. III. Project Investment Investment totals RMB 3,062.25 million yuan, RMB 1,600.85 million yuan for southern parts and RMB 1,461.4 million yuan for northern parts. IV. Cooperation Way Purchase, lease and directional development shall be adopted. V. Project Initiator Project Initiator: Investment and Cooperation Bureau of Zhuzhou High-tech Zone Cooperation unit: ZhuZhou Geckor Development Co., Ltd
PPP Project of Independent Entrepreneurship Park Construction in Tianyi Technology City I. Project Background Zhuzhou Independent Entrepreneurship Park of Tianyi Technology City is planned to develop new information technology industry. The 1st phase covers 1,160 Chinese mu and 670,000 square meters land for construction use (including 320,000 square meters standard plants, 350,000 square meters headquarter base and its supporting facilities). Investment of RMB 3 billion yuan has been completed. 16 enterprises have been successfully introduced including Great Wall Computers, Li-Fun Technology Corporation, Aimei New Materials, Nanfang Electromechanical Corporation, Shenzhen Xindi New Materials, Shenzhen Bellsent Technology Corporation and Shenzhen Megmeet Electric. High-end manufacturing industry and electronic information technology industry will be developed and introduced with high attention. The supporting service sector will be developed at the same time to establish a modern ecological industrial park integrating intelligent manufacturing, scientific research, entrepreneurship incubation, commercial office work and entertainment. II. Project Content Independent Entrepreneurship Park of Tianyi Technology City has completed regulatory planning, feasible study report and PPP implementation plan. At present it is waiting for research and ratified reply. This PPP project is a continuation project, among which the 2nd phase covers an area of 1392431.92 square meters (2088.65 Chinese mu); the 3rd phase 1348269.76 square meters 327
(2,022.40 Chinese mu). III. Project Investment Investment of this project totals RMB 3031.59 million yuan, with construction investment about RMB 2877.74 million yuan and interest of construction period of RMB 153.85 million yuan. IV. Cooperation Way This project will adopt PPP model, that is, the government authorizes the investor Hunan Tianyi Group co., Ltd to co-organize project company to implement the project content with social capital. This project will go into operation by the means of investment and construction—operation and maintenance—transfer. It will be paid off by government subsidy. The project facilities will be transferred to the authority designated by the government for free when it is expired. V. Project Initiator Project Initiator: Investment and Cooperation Bureau of Zhuzhou High-tech Area Cooperation unit: Hunan Tianyi Cooperation Group Co., Ltd
PPP Project of Zhuzhou Qingshui Lake Technological and Innovative Park I. Project Background Qingshui Lake Technological and Innovative Park is located in Zhuzhou Qingshuitang old industrial district which was listed among the first pilot areas nationwide of the relocation and revamp of 21 old urban industrial districts in 2014. This project is an important part of provincial and municipal governments’ project planning with the project area counted as a part of the 2017-2018 Shantytown Renovation Project. To upgrade and renovate this district, this project will strengthen the construction of municipal infrastructure and commerce with emphasize laid on the construction of Qingshui Lake Wetland Park, commercial and residential block and Qingjiang Scenery Belt. II. Preliminary Work The preliminary work of this project is under construction. III. Project Content This project covers a total area of 3,335 Chinese mu with industrial land of 372 Chinese mu. Land use of supporting facilities, commercial and residential construction is 980 Chinese mu. The highlight of this project will be the construction of municipal infrastructure like traffic line system, Qingshui Wetland Park and public parking lot. The industrial park around the lake is planned to be 73 Chinese mu, an area of 150,000 square meters; the 2nd phase industrial park is planned to be 299 Chinese mu, an area of 340,000 square meters. This project also undertakes the construction of supporting commercial and residential block, Xiangjiang River scenery belt, supporting education and medical facilities, public infrastructure land development and industrial platforms. IV. Project Investment Investment totals RMB 5.1 billion yuan, among which about RMB 1.2 billion yuan for construction of municipal infrastructures including traffic lines, pipe lines, landscape, scenery, wetland and parking lots; about RMB 1.7 billion yuan for construction of technological and innovative park industrial facilities (construction land about 490,000 square meters); about RMB 2.2 billion yuan for regional land requisition . V. Cooperation Way PPP model shall be adopted. VI. Benefit Analysis The financial resources will be the government subsidies and operation business income. VII. Project Initiator Project Initiator: Zhuzhou Qingshuitang Investment Group Co., Ltd
Construction of New Materials Industrial Park in Shaoshan High-tech Zone I. Project Background Shaoshan High-tech Industry Development Area was upgraded into provincial high-tech area in 2012. It has been successively awarded titles like Hunan Biological Medicine Base, Shaoshan 328
Innovative Achievements Transformation Base of Hunan Production Promotion Center, Two-Oriented Society Pilot Area and Hunan Industrialized Base of New Industry. In view of the industrial development realities in this park, Shaoshan High-tech Development Area targets potential markets of energy-saving and eco-friendly industry and recycling economy. With the supporting of equipment manufacturing industrial park and Yintian Industrial Base, it will dedicated to the development of industries like high-efficiency energy saving lighting, energy-saving materials and equipment manufacturing, urban environment protection equipment manufacturing. At the same time it will introduce the research and production of new photoelectric, light, heating and composite materials to develop the supporting upstream and downstream products and the clustering of new materials industry. II. Preliminary Work At present, with complete supporting infrastructures, this park can provide serial platforms like financial platform companies, SME subsidiary loan application center, skill training and supporting logistics service. More than 20 new material enterprises have entered and basically form the industrial clustering with Shaoshan characteristics. III. Project Content This project covers a total area of 933,338 square meters with 150,000 square meters of standard plants; 203334.35 square meters of roads and land use of its supporting infrastructure; 730,000 square meters of land for enterprises entered. It is also planned to construct five roads which totals 5,280 meters long. IV. Project Investment Investment totals RMB 1002.61 million yuan. V. Cooperation Way Sole proprietorship and PPP model shall be accepted. Investment will be recovered by the business income from land use right transfer, standard plant lease and property management. VI. Project Initiator Project Initiator: Xiangtan Shaoshan High-tech Construction and Investment Co., Ltd
Infrastructure Construction of Xiangtan Xianfeng Modern Industrial Park I. Project Background Xiangtan Xianfeng Modern Industrial Park is an important part of â&#x20AC;&#x153;one zone and two parksâ&#x20AC;? of Xiangtan Yuhu industry clustering zone. With a radiation range of 5.03 square kilometers, the industries in this park will focus on the development of service sector and high-tech industry. However, the further development of this park is restricted due to short time of construction and backward infrastructures. II. Preliminary Work This project has been listed into the 13th Five-Year Plan; the compilation of feasibility study report is ongoing. III. Project Content The 1st phase of this project is planned to construct two raods: 1. Gaolin North Road: it totals about five kilometers long and 60 meters wide. It is an important bi-directional and four-lane highway which runs north and south, connecting the old urban area. 2. Kejiao 3rd Branch Road: it totals about four kilometers and 60 meters wide. It is a bi-directional and four-lane highway and the supporting facility of the headquarter base in this park. IV. Project Investment Investment totals RMB 1.5 billion yuan with RMB 1 billion yuan for Gaolin North Road and RMB 500 million yuan for Kejiao 3rd Branch Road. V. Cooperation Way Sole proprietorship and cooperation with platform companies shall be adopted. VI. Project Initiator Project Initiator: Xianfeng Modern Industrial Park financed by Xiangtan Yuhu Economic and Technological Development Zone 329
Xiangtan High-tech Green Construction Industrial Park Project I. Project Background Residency Industrialization is the mainstream of current development of international residency construction and becomes the main development mode in America, Japan, Europe and Hong Kong, China. It forms a complete residency industrialization system. With a rapid development of urbanization, residency demand is sill the pivot of economic growth in our nation. The transformation of traditional construction mode has been an urgent demand of sustainable development of residency industry. II. Preliminary Work Xiangtan high-tech area has large state-owned enterprises such as Xiangtan Electric Manufacturing Group and Xiangtan Iron & Steel Co., Ltd of Hunan Valin; it also introduced projects from Home-Broad Homes Industrial International Co., Ltd and Utility Tunnel Production Base. Xiangtan high-tech area has possessed industrial base for conducting projects. At present, this area is cooperating with Hunan Construction Group in promoting the construction of green building industrialization park. It mainly shelters the construction of prefabricated components of Sponge City, utility tunnels, production base of decorating agencies and residency supporting facilities. III. Project Content This project covers an area of around 400 Chinese mu with total investment of RMB 1.5 billion yuan. It mainly shelters the construction of prefabricated components of Sponge City, utility tunnels, production base of decorating agencies and residency supporting facilities. IV. Project Investment The investment totals RMB 1.5 billion yuan. Investment includes: building construction costs, construction and erection engineering costs, infrastructure construction costs of electricity and water supply, environment protection, traffic lines and landscaping, survey and design costs, preparation costs of this project. V. Benefit Analysis The construction period of this project is 18 months. It is estimated to achieve gross income of RMB 2 billion yuan and gross profits of RMB 20 million yuan. VI. Cooperation Way Contractual joint venture and joint venture shall be adopted. VII. Project Initiator Project Initiator: Xiangtan High-tech Industry Development Area
Construction of Headquarter Building in Xiangtan High-tech Industry Development Area I. Project Background Xiangtan is a municipality directly under the Hunan government and among the national first class open cities. With a total area of 5,006 square kilometers, it has one county, two cities and two districts in subjection to it. Its total population is 3 million with urban population of about 900,000. Xiangtan High-tech Industry Development Area is located in the central urban area. The registered industrial and commercial enterprises amount about 1,200 with more than 430 industrial enterprises and over 140 industrial enterprises above designated size. Its leading industries consist of new energy and equipment manufacturing, quality steel deep processing, mechanical and electronic integration, modern service sector. In 2016, the total revenue from technology, industry and trade amounts to RMB 121.33 billion yuan; from industry output is RMB 88.98 billion yuan. The financial revenue reached RMB 2403 million yuan. The headquarter building construction is aimed to attract high-end production factors like talents and investment and show strong clustering and radiation effects. Thus, promote the development of the central city. 330
II. Project Content This project covers an area of 150 Chinese mu. It will construct a headquarter building integrating office headquarters, industrial associations, financial service agencies and e-business enterprises. It is planned to construct commercial and office buildings of 180,000 square meters which can serve more than 200 enterprises. III. Project Investment The estimated investment totals RMB 2 billion yuan with direct investment RMB 1.58 billion yuan; financial and other investment RMB 420 million yuan. Sequence Value(RMB Costs Items Proportion Number 10,000,000 yuan) 1 Land costs 6.2 31% 2 Project costs 8.6 43% Construction costs and 3 1 5% other costs 4 Basic reserve funds 2 10% 5 Financial costs 2.2 11% Aggregate amount 20 100% IV. Benefit Analysis The estimated construction period of this project totals five years (including three years of construction). It is expected to achieve business income of RMB 5 billion yuan when this project goes to operation. V. Cooperation Way Contractual joint venture and joint venture shall be adopted. VI. Project Initiator Project Initiator: Xiangtan High-tech Industry Development Area
Construction of Academician Innovation Industrial Park of Xiangtan High-tech Industry Development Area I. Project Background Xiangtan High-tech Industry Development Area was founded in 1992 and was upgraded into national level in 2009. At present, enterprises entered has reached more than 430 with over 150 enterprises above designated size. In 2016, the gross industrial output value amounted to RMB 88.98 billion yuan with output value of high-tech industry RMB 45.96 billion yuan. The registered innovation patents amounted to 103 pieces. Xiangtan High-tech Industry Development Area has been awarded titles like National Base of New Energy and High-tech Industries, National Base of New Materials Achievements Industrialization and Transformation, National Base of University-Industry-Research Cooperative Innovation. Academician Innovation Industrial Park is constructed for following aims: to implement the Development and Raise policy advocated by Hunan Provincial Committee; to fully utilize the advantage of intelligence intensity in national high-tech area; to speed up the integration of high-end talents, advanced technologies and industrial capital; to step up the construction of National Independent Innovation Demonstration Area in Chang-Zhu-Tan urban agglomeration. The core will be laid in the improvement of independent innovation capability and the transformation of university-industry-research achievements. II. Preliminary Work High-end talents like the Academicians of Chinese Academy of Engineering Ouyang Xiaoping, Deng Zhonghan, Professor of Xiangtan University Li Zheng, and Professor of American Tulane University Sun Lichun have entered into this park. They are experts in industries of special robot, hyper-pure high-resistivity silicon probes, polypeptide drugs research center and quantum energy powder materials. III. Project Content This industrial park is a part of Torch Innovation and Entrepreneurship Park of Xiangtan High-tech Industry Development Park. It mainly shelters the renovation of scientific research 331
buildings like current technology center of standard plant construction and laboratory; the establishment of public service platforms of scientific research innovative achievements transformation such as technology transformation industry funds, venture social capital, patent technology and achievements application. It is aimed to reach output value of RMB 10 billion yuan in 10 years. IV. Project Investment Investment totals about RMB 1 billion yuan and mainly by attracting merchants and outside investments. V. Benefit Analysis The construction of this project can raise the capacity of independent innovation and promote mass entrepreneurship and innovation. At the same time, it benefits social employment, tax income and regional image with creation of more jobs and maintenance of social stability. VI. Cooperation Way Contractual joint venture, joint venture, shareholding and venture capital shall be accepted. VII. Project Initiator Project Initiator: Xiangtan High-tech Industry Development Area
Construction of Xingang Area Civilian-military Integrated Application Industry Park in Chenglingji of Yueyang I. Project Background According to Policies on Promotion of the development of Civilian-military Integrated Industry by Hunan government and Specifications on Specialized Capital Management of Hunan Civilian-military Integrated Industry Development by Hunan Administration of Science, Technology and Industry for Defense, this park is greatly supported in resources of all sorts. Xingang area has made favorable policies for civilian-military industry and meanwhile positively introduced many experts of this industry from Chinese Academy of Science and National University of Defense Technology to speed up this industryâ&#x20AC;&#x2122;s development. Central Region Innovation Program on Development and Manufacturing of unmanned intelligent equipment and China Unicom (Yueyang) Cloud Data Central Program have entered into Hunan Civilian-military Integrated Satellite Application Industry Park. It also introduced projects like 6906 Beidou Navigation, 360°panoramic camera, unmanned aerial vehicle and robots. Therefore, the industrial foundation is established. II. Preliminary Work The land requisition procedures have been completed and the infrastructures are gradually constructed. The special favorable policies for the development of civilian-military integrated industry have been issued. III. Project Content This project covers a total area of 2,000 Chinese mu with the construction area of 400,000 square meters. The area will be classified according to functions and products. IV. Project Investment Investment totals RMB 4 billion yuan. V. Benefit Analysis This project is divided into three phases. It is estimated to achieve business income of RMB 10 billion yuan when it goes to operation with a creation of about 2,000 jobs. VI. Cooperation Way Contractual joint venture and sole proprietorship shall be adopted. VII. Project Initiator Project Initiator: Hunan Chenglingji Xingang Area Investment Liaison Department
Investment of Zhuzhou High-tech Area Innovation and Entrepreneurship Park I. Project Background This project is located in high-tech industry development area. College students are the most creative and dynamic crowds. They are the main force to construct an innovation-minded nation. 332
Therefore, it is necessary to construct and develop college studentsâ&#x20AC;&#x2122; entrepreneurship parks. With a favorable environment for their entrepreneurship, the employment rate will be much improved and it will also speed up the process of transforming intelligence achievements into actual productivity. As a result, the integrated image and competence of colleges will be enhanced and it can help Chenzhou city develop, attract and stay talents. Meanwhile, it will guide and serve investors form Hong Kong, Macao, Taiwan and abroad with the establishment of a platform to promote innovation and entrepreneurship of college students from home and abroad. II. Preliminary Work The major construction of this project has been completed with whole auxiliary facilities like electricity and water supply, communication and traffic lines. The inner decoration is currently on-going. The investment has been started in an all-round way. III. Project Content This project covers an area about 250 Chinese mu with total construction area about 300,000 square meters. The floor area ratio is 1.63; building density is 37.2% and green land is 14.95%. It is planned to construct 12 standard plants (frame structure, four floors, monolayer area about 2,500-3,500 square meters), one office building (12 floors, 50 meters high), two service centers (six floors, 24 meters high) and two research laboratory buildings (six floors, 24 meters high). IV. Project Investment Investment totals above RMB 0.5 billion yuan. V. Benefit Analysis When this project is completed, 100 enterprises can be introduced. It has significance to promote carrying on industrial transfer of coastal areas and widening domestic and international markets. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture shall be adopted. VII. Project Initiator Project Initiator: Administration Committee of Chenzhou High-tech Industry Development Area (Chenzhou Export and Processing Area)
Investment of Shanghai Zhongkun Headquarter Economic Park I. Project Background Shanghai Zhongkun Headquarter Economic Park project is an important part of investment planning of Chenzhou Municipal Party Committee and the City Government. This economic park is a clustering park of headquarters which is featured with low-density, intelligence and ecological development. It integrates services including office work, exhibition, scientific research, commercial trade, financial settlement, financial services, skill training, entertainment, shopping, tourism, hotels and conferences. With the complete supporting facilities for high-quality commercial office work, financial service and life, this project creates a more mature, high-end and convenient environment for work and life. II. Preliminary Work This project was located in Chengzhou High-tech Industry Development Area. It was planned to cover an area of 3,000 Chinese mu with Donghe Jintian Lake of 650 Chinese mu, Donghe Ecological Park of 850 Chinese mu and estimated municipal roads of 200 Chinese mu. This project would be finished in 2014. III. Project Content This project was divided into four parts including Start-up Area, Headquarters Park, Innovative Economic Park and Innovative life Park. The engineering construction included: 1. water golf range and clubhouse investment projects. The water golf range was planned to build 40 hitting bays with 60 meters long and four meters wide. It would cover an area of 240 square meters with two floors and a sunshade in upper floor. As for clubhouse investment projects, it would share the already constructed commercial villa building, goods section, resting area, food and beverage area of Shanghai Zhongkun Headquarter Economic Park. It covered an area of 300 square meters. The water area of 650 Chinese mu had been completed; 2. five-star hotel project. It was planned to cover an area of 100 Chinese mu and to construct five-star hotels integrating commerce, finance, catering and entertainment and star hotels. 333
IV. Project Investment Investment totals RMB 3 billion yuan. V. Benefit Analysis When this project was completed, it would attract a lot of enterprises from home and abroad and would also be the tie to carry on industry transfer of Pearl River Delta and Yangtze River Delta. It would present a new growth point in regional economy development. VI. Cooperation Way Sole proprietorship, joint venture and contractual joint venture shall be adopted. VII. Project Initiator Project Initiator: Hunan Bafang Mining Rights Trade Market Co., Ltd
Construction of China South Agriculture Machinery Equipment Manufacturing Industry Park I. Project Background Shuangfeng County is a traditional and famous county of agriculture machinery equipment manufacturing. It is reputed with the title of Hunan Agriculture Machinery Industry Base and enjoys the fame nationwide. By the end of 2016, enterprises of agriculture machinery equipment manufacturing amount to over 70 with total output value of more than RMB 12 billion yuan and foreign exchange earning amounting to USD 10 million dollars each year. The direct workers in this line are more than 10,000 people. The products are exported to more than 20 provinces and cities all over the country, Southeast Asia and Africa. Shuangfeng County owns a China well-known trademark the Nongyou Haoyunlai; six Hunan famous products and provincial well-known trademarks such as Guofan, Yinshan, Dingyuan and Fengcai; more than 30 gold prize products of Expo Central China; nearly 200 patents and six participated specification of national and industrial standard for agriculture machinery manufacturing. In recent years, Shuangfeng County actively promotes attracting investment and takes great efforts to construct China South Agriculture Machinery Equipment Manufacturing Industry Park of Shuangfeng County II. Preliminary Work Land requisition of this project has been completed and standard plants of 100,000 square meters have been constructed. III. Project Content The estimated area of this project totals about 1,500 Chinese mu with a total construction area of 1,200,000 square meters. It is planned to construct the Agriculture Machinery Equipment Manufacturing Industry Park of 1,000 Chinese mu and China South Agriculture Machinery Equipment Trade Market of 500 Chinese mu. IV. Project Investment The estimated investment totals RMB 2 billion yuan with RMB 1 billion yuan for infrastructure facilities and Agriculture Machinery Equipment Trade Market respectively. V. Cooperation Way This project shall adopt PPP model. The project company will be co-organized by social capital units and designated authorities of Shuangfeng government. It will manage the project investment, construction, operation and maintenance. VI. Benefit Analysis The non-operational projects in this project will be financed by government. It is estimated that the investment profits of party A is RMB 0.5 billion yuan and party B RMB 0.2 billion yuan when the Agriculture Machinery Equipment Trade Market is constructed for three years. VII. Project Initiator Project Initiator: Administration Committee of Hunan Shuangfeng Economic Development Area.
Construction of Innovation and Entrepreneurship Scientific Industry Park in 334
Loudi Economic and Technological Development Area I. Project Background Loudi Economic and Technological Development Area was founded in 2002. With 10 years of development, it formed five leading industries including sheet deep processing, automobile and its parts, engineering machinery manufacturing, electronic information and commercial logistics. In the end of 2012, Loudi Economic and Technological Development Area was upgraded into national economic and technological development area with approval of the State Council. It had been successively reputed as National Base for High-tech Industry, National Demonstration Base for New Industrialization Industry, Hunan Demonstration Base for Carrying on Industry Transfer, Hunan Base for Automobile Accessory Industry, Hunan Electronic Information Industry Park and Hunan Top Industrial Influence Industry Park. In 2016, it achieves the revenue of RMB 117.2 billion yuan from technology, industry and trade with output value of industry above designated size RMB 43 billion yuan and financial income of RMB 1.4 billion yuan. To implement the spirit embodied in the document of Hunan government Suggestion on Promoting the Development of Innovation and Entrepreneurship Park and Stepping up the Construction of 135 Project, the Innovation and Entrepreneurship Scientific Industry Park is now set up with consideration of the development demand of current industries and future. II. Preliminary Work The detailed regulatory planning has been completed. The approval of land use, environment evaluation and project setting-up are underway. III. Project Content This project occupies a total area of 112.30 hectares and the detailed project content is as follows: 1. Land requisition. The land requisition area is planned to be 112.30 hectares. 2. Land leveling. Five lots amounts to 83.25 hectares. 3. Municipal roads. It is planned to construct six roads. The total area is 28.86 hectares with a total length of 7,902 meters and width of 24-42 meters each. 4. Standard plants which cover an area of 23.22 hectares with construction area of 200,000 square meters. IV. Project Investment Estimated investment of this project totals RMB 1.85 billion yuan with land requisition costs and other costs of RMB 840 million yuan; the construction and erection project costs of RMB 1.01 billion yuan. V. Benefit Analysis The business income totals about RMB 36 million yuan per year when this project goes to operation and the number will increase by 5% every three years. VI. Cooperation Way PPP model shall be adopted. VII. Project Initiator Project Initiator: Loudi Economic and Technological Development Area
Construction of Lodi Electric Power Science and Technology Industry Incubation Park I. Project Background Loudi Economic and Technological Development Area have 23 electric power construction enterprises with 19 electric power transmission and transformation equipment installation companies and four transformer set manufactures. Taking into consideration of the realities of this park, Lodi Electric Power Science and Technology Industry Incubation Park project is planned to integrate electric power equipment sources, expand the industry chain and form electric power technology industry. The leading industries will be industries like electric power transmission and transformation remote control system, electric power project design, new energy and electricity equipment, electric new materials, intelligent set equipment, electric power e-commerce and intelligent electronics manufacturing. II. Preliminary Work The project location and regulatory design have been completed. 335
III. Project Content This project will establish Electric Power Scientific Research Center, Electric Equipment Testing Center, office section of Electric Power Transmission and Transformation Equipment Installation Company Headquarter, incubation service platform center, power electronics and commercial logistics platform, upstream and downstream products of electrical installation and high-end products manufacturing industrial park. IV. Project Investment The 1st phase of this project is planned to occupy an area of more than 400 Chinese mu. The estimated investment totals RMB 0.2 billion yuan with engineering costs of RMB 148 million yuan, other costs of RMB 22 million yuan (including costs of land requisition, house removal and approval procedures),budget reserve of RMB 16 million yuan, interests of construction period of RMB 13.7 million yuan and circulating capital of RMB 300,000 yuan. V. Cooperation Way PPP model shall be adopted. VI. Project Initiator Project Initiator: Administration Committee of Loudi Economic and Technological Development Area
Investment Attraction of SMEs (Innovative) Incubator in Loudi Economic and Technological Development Park I. Project Background Loudi Economic and Technological Development Area was upgraded into national level in 2012 and was one of the innovation and entrepreneurship incubation parks under Hunan 135 project. The standard plants had been constructed for 800,000 square meters. The current construction focuses are six specialized parks, namely, Qianyuan International Enterprise Center, Wangda Entrepreneurship Park, Shuangxin Small and Medium-sized Enterprises City, Xingtai Emerging Industry Park, Sany Heavy Machinery Accessory Industry Park (two phases) and Zhongke Jingu International Enterprise Park. The standard plants are mainly steel structure and steel frame structure (multi-floor). Other structures requested by enterprises will be specifically satisfied. At present, more than 150 enterprises entered have went to operation in plants of 800,000 square meters. The other standard plants of 50,000 square meters are going to be sold or rented. In this year, standard plants of 300,000 square meters will be constructed to meet the development demand of innovation and entrepreneurship of small and medium-sized enterprises. II. Preliminary Work More than 150 enterprises have been introduced into this park with constructed area of 800,000 square meters and area of 50,000 square meters yet to be completed. III. Project Content This project covers a total area of 3,500 Chinese mu and the other 300,000 square meters standard plants will be constructed in the 2nd phase. More than 200 small and medium-sized enterprises have been introduced. With the focus laid on the development of industries like machinery manufacturing, automobile and its parts and electronic information, the incubation park will be dedicated to construct a park for the clustering development of small and medium-sized enterprises innovation. IV. Project Investment Investment totals RMB 4.5 billion yuan. V. Cooperation Way Every plant has absolute property right and would be sold and rented on demand by the means of separate floor and building. It enjoys the supporting favorable policies and is fully furnished. VI. Project Initiator Project Initiator: Incubator Office of Loudi Economic and Technological Development Park
Investment of Xiangzhong International Logistics Park in Loudi Economic and 336
Technological Development Area I. Project Background Loudi Xiangzhong International Logistics Park is located in the east new area of Loudi Economic and Technological Development Area. It is constructed by Hunan New Cooperation Xiangzhong International Logistics Park Investment and Development Co., Ltd which is the subsidiary company of China Co-Op Group directly under government management. The constructed area is planned to be 2,500 Chinese mu with building area about 3 million square meters. At present, four areas have been basically constructed in the 1st phase. A area: information building (already in operation); B area: Ceramics exhibition and transaction center; C area: multi-modal transportation hub; D area: China Red Star Macalline. II. Preliminary Work It has successfully introduced groups including Guangzhou Railway (Group) corporation, China National Cotton Group Corporation, China National Agriculture Means of Production Group Corporation, China Merchants Group and China Red Star Macalline Group. III. Project Content This project is planned to construct engineering information service center, multi-transportation hub, exhibition and transaction center of ceramics, industrial raw materials and its products, hardware and electromechinary and furnishings, thematic shopping center (conference and exhibition center), life supporting community, agriculture means of production logistics, customs, commodity inspection and railway port station. IV. Project Content Investment totals RMB 8 billion yuan. V. Cooperation Way According to the aims of Xiangzhong International Logistics Park, the investment customers can be divided into four types: 1. Logistics service supplier: logistics enterprises focus on monopoly service like transportation, freight forwarding, storage and processing, package, loading and unloading, distribution. The third party logistics enterprises from home and abroad which provide comprehensive logistics services are also included. 2. Industrial and commercial enterprises tightly-related to Logistics services: large merchants and production enterprises such as five traditional industries in central Hunan including metallurgy, energy, building materials, chemicals and machinery; three special industries like special ceramics, mining and agriculture electromechanical equipment and enterprises in high-tech industries like new materials, new energy, advanced manufacturing, electronic information and bio-tech medicines. 3. Information service supplier: the supply of high-tech information services like information web, e-business and software development. 4. Other service sector: service sectors like finance, insurance, legal consultation agency, commercial services, advertisement, breakdown services, food and beverage, gas fueling, hotel, cultural entertainment, property management and living services. Cooperation way is various and please consult project initiator about the detailed items . VI. Project Initiator Project Initiator: Loudi Xiangzhong International Logistics Park
Construction of Enterprise Headquarter Base in Loudi Economic and Technological Development Area I. Project Background With 10 years development, Loudi Economic and Technological Development Area has introduced a lot of professional and renowned enterprises including hyper-large transnational enterprises like ArcelorMittal and China National Petroleum Corporation, China Huadian Corporation, China Co-Op Group, Valin Group, China Resources, Shany Heavy Machinery Group, Hunan Wujio Light industry and Chemicals Group Co., Ltd and Ch-gemstone capital. The registered enterprises currently amount to more than 600. With further acceleration of development of Loudi Economic and Technological Development 337
Area, the regional advantages have been much clearer. Numerous local merchants aimed at outside business opportunities are returning to invest this development area currently. This project has been endowed with a favorable foundation and obvious advantages. II. Preliminary Work The project location has been primarily determined and preparation work like land application and requisition has been started. III. Project Content This project is located in north bank of Lianshui River with an area of about 200 Chinese mu. It is planned to construct headquarter commercial square, single or row independent office space, commercial office buildings and high-rise apartments with supporting construction like Yingbin Park, urban veranda and special commercial pedestrian street along riverside. This project will provide enterprises entered with independent and individualized commercial communication space and office work atmosphere with complete and convenient supporting facilities. It is planned to introduce 200 small and medium-sized enterprise headquarters. IV. Project Investment Investment totals RMB 1.5 billion yuan. It is planned to construct headquarter commercial square, single or row independent office space, commercial office buildings and high-rise apartments with supporting construction like Yingbin Park and urban veranda. V. Cooperation Way Joint venture, contractual joint venture and sole proprietorship shall be adopted. VI. Project Initiator Project Initiator: Investment Bureau of Loudi Economic and Technological Development Area
Investment of Standard Plants of 80,000 Square Meters of Hunan Merchants Industry Park in Shaoyang County I. Project Background Numerous labor-intensive processing and manufacturing industries are currently being transferred into central and western regions which have comparatively richer labor resources, lower costs, factory rent and ground rent. Shaoyang County enjoys serial nationâ&#x20AC;&#x2122;s favorable policies as a famous Revolution District, National Key County of Poverty-relief and Development, Development and Poverty Alleviation District in Mount Wuling Area. II. Preliminary Work This project has been completed and can be transferred. III. Project Content The construction area totals 170 Chinese mu with total building area of 100,000 square meters. The supporting facilities include plants, office building, warehouse, logistics and staff residency area. IV. Project Investment According to the condition of lease projects, the least lease area is 1,200 square meters. V. Benefit Analysis The lease project enjoys rent reduction and tax incentive policies (the first year without rent) according to No.19 document issued by Shangyang government. VI. Project Initiator Project Initiator: Administration Committee of Industry Center, Shaoyang County
PPP Project of Standard Plants and Road in Nan County Engineering Economic Development Area I. Project Background Nan County Economic Development Area was a provincial industry park. It was founded in 2006 and consisted of Nanzhou Industry Park and Maocaojie Industry Park with management mode of One District and Two Parks. At present 51 enterprises have entered this park among which 38 338
enterprises are in operation; 11 in construction and the rest two enterprises under preparation. The original area of Nan County Economic Development Area was planned to be 11.92 square kilometers with Nanzhou Industry Park of 5.92 square kilometers. The leading industries of this park included food processing, light and textile, high and new technology and modern logistics. In 2015 the detailed regulatory planning of the area of Nanzhou Industry Park had been changed into 20 square kilometers. II. Project Content 1. Construct standard plants about 300,000 square meters (including auxiliary projects like district integrated pipe network, heavy and weak current combination, landscaping and lightening) among which 70,000 square meters standard plants is used for stock conversion project. The plot ratio is 1.65; building density is 41.1% and green ratio is 19%. 2. Road infrastructure and supporting pipe network construction Six roads will be constructed in this park including Xinqiao Road 1.94km long, Hexiang Road 2.31km long, Shanqing Road 3.26km long, Yaozigang Road 1.41km long, Xiashan Road 1.81km long and Qingminghu Road 3.82km long. The total length is 14.55 kilometers. III. Project Investment Investment totals RMB 1,024,431,000 yuan with construction investment of RMB 957,130,400 yuan (including engineering costs of RMB 538,831,400 yuan, project construction costs and other costs of 319,256,100 yuan, preparation costs of RMB 99,042,900 yuan). The interest of construction period is RMB 67,300,600 yuan. The engineering costs are calculated according to quota and practical fees. The final accounts for completed project will adopt financial evaluation audit report as the financial statement presentation. IV. Benefit Analysis When this project is completed, project company will be responsible for the operation, management and maintenance of properties like standard plants, municipal roads, supporting pipe network and other infrastructures and supporting facilities. Investment will be recovered by business income such as plant operating income. V. Cooperation Way PPP model shall be adopted. VI. Project Initiator Project Initiator: Administration Committee of Nan County Economic Development Area, Yiyang City
339