ARCHITECTURE
IN PRACTICE
2010-2015
PORTFOLIO SISHE JEFF CHIN
SISHE JEFF CHIN E chinsishe@gmail.com M +86.186.2102.7401
A No.3 Lane 996 Hongqiao Road Apartment 301
Shanghai China 200051
PE DCI
CHIN
KSA
CM
EXPERIENCE
EXPERTISE
Junior Architect & BIM Manager & IT Coordinator 2010/08-Present Perkins Eastman Shanghai | China
Architecture Sustainable Design Programming Diagramming Design Research Interior Design Urban Design
Project Designer 2010/04-2010/07 DCI Designgroup International Shanghai | China Webmaster & Designer 1999/11 Freelance/ [CHiNSiSHE] Graduate Associate 2007/10-2009/06 The Ohio State University Columbus OH | USA Intern Designer 2006/06-2006/08 Cosmos Architects & Interior Design Taipei | Taiwan
CERTIFICATION LEED AP BD+C 2015-2017 Green Building Certification Institute License 10368659 LEED Green Associate 2009-2011 Green Building Certification Institute License 10368659
EDUCATION Master of Architecture 2006-2009 The Ohio State University Columbus OH | USA Master of Science in Industrial & Systems Engineering 2004-2006 The Ohio State University Columbus OH | USA Certificate | ESL 2003 The University of Iowa Iowa City IA | USA Bachelor of Science in Industrial Engineering & Enterprise Information 1998-2003 Tunghai University Taichung | Taiwan
Graphics Autodesk Revit Architecture Autodesk AutoCAD Trimble SketchUp Adobe Illustrator/ PhotoShop/ InDesign Language Chinese-Mandarin English Engineering Cost Estimation Model Optimization Market Research Management Project Management BIM Management IT Coordination
IN PRACTICE 7
INTERIOR DESIGN
4
HEALTHCARE
5
8
COMMERCIAL/ RETAIL
6
SENIOR LIVING
TZH
PLC
JNG
CPL LTN
RDS
5
WDA
9
HJA AVE
K-12
SDU
YSP
PLY
NSK CXH
HFI
LNG
HI-ED
1
MDA WTH
CRHG
LARGE SCALE
PES HQ996 HS119 ULT CLR
TQL
GLQP
NUFE
SCOM CISS HS CISS ES
TIS
12
INSTITUTION
7
2 SHANGHAI
JIANGSU
ANHUI
CHINA
SHANDONG
BEIJING
LIAONING
INNER MONGOLIA
TIANJIN
1 1
1
ZHEJIANG
1
2
5
NGB
IN PROGRESS
GTP
LUCY
ZHA
COHL
RYC XYA I XYA II
FSN BMS UNIS CISH
WIEC
1 1
3
2
1
1
1
1 CANADA
USA
CAMBODIA
VIETNAM
TAIWAN
GUANGDONG
HUNAN
HUBEI
SICHUAN
2
NISC
PRIMARY & SECONDARY EDUCATION
HJA HUIJIA INTERNATIONAL SCHOOL AVE AVENUES-RDFZ INTERNATIONAL SCHOOL TIS TIANJIN INTERNATIONAL SCHOOL CISS HS CONCORDIA INTERNATIONAL SCHOOL HS RESTROOM CISS ES CONCORDIA INTERNATIONAL SCHOOL ES LIBRARY WIEC WUHAN INTERNATIONAL EDUCATION CENTER UNIS UNITED NATIONS INTERNATIONAL SCHOOL CISH CONDORDIA INTERNATIONAL SCHOOL HANOI NISC NORTHBRIDGE INTERNATIONAL SCHOOL CAMBODIA
LOCATION WUHAN | CHINA DATE 2010-2014 TYPE K-12 EDUCATION SCALE 30000 M2 PHASE COMPLETE
WUHAN INTERNATIONAL EDUCATION CENTER
CAMPUS VIEW FROM WEST
Within a developing high-tech park and adjacent to a university, this international school campus locating in suburb area of metropolitan city of Wuhan will provide K-12 study environment to 3 international schools: 1 English school and 2 French schools. Schools will have their own teaching building and share a small size theatre and a sports facility, as well as a academic size of soccer field acting as a buffer to isolate campus from outside. To accomodate 3 schools inside a tiny site with only one side adjacent to public road bring us first challenge of campus circulation.
PE
PHOTO OF VIEW TO GYM
SITE PLAN FINAL PHASE DIAGRAMS OF CAMPUS DESIGN
GREEN SPACE DIAGRAM
CIRCULATION DIAGRAM
FUNCTIONAL ZONING DIAGRAM
LAND USE DIAGRAM
PHOTO OF METAL PANEL & TERRACOTTA PANEL PHOTO OF COURTYARD ELEVATION DESIGN
AVENUES-RDFZ INTERNATIONAL SCHOOL
LOCATION BEIJING | CHINA DATE 2013 TYPE K-12 EDUCATION SCALE 143390 M2 PHASE CONSTRUCTION
CAMPUS AERIAL VIEW
Avenues the World School is a notable private school in New York providing high quality of education from kindergarten to high school. Taking the opportunity of joint venture with RDFZ, Renmin University affiliated high school, also notable in China, to establish a new campus in Haidian district in Beijing, where top universities of China located: Peking University and Tsinghua University.
PE
SOUTH FACADE
NORTHWEST FACADE WALL SECTION
WEST FACADE Campus with site area of 160 mu is housing complete education program from kindergarten to 12th grade, as well as accommodation for faculty and students, a 1000-seat performing art center, one full size soccer filed and one practice field. Therefore, planning has campus divide to four major areas: main academic building with performing art center on the north, kindergarten which positioned as early learning center, dormitories for faculty and students, and outdoor sports area. Each bar attached to academic building from south to north has housed 4 grades of primary school, 4 grades of middle school, and 4 grades of high school. Indoor stadiums is sitting in between bars along main corridor linking teaching area, sports area, and performing arts area.
CAMPUS SOUTH VIEW
CAMPUS MAIN ENTRY
ILLUSTRATIVE SITE PLAN SITE SECTIONS
LOCATION TIANJIN | CHINA DATE 2011 TYPE K-12 EDUCATION SCALE 21611 M2 PHASE COMPLETE
TIANJIN INTERNATIONAL SCHOOL
Tianjin International School os a renovation project that school took over a existing building to turn into a full-functional international school standard campus, with space for kindergarten to 12th grade, as well as gym, music, auditorium, library, lab for teaching support and activity. main spine identified as main street connecting two wings of lower grades and upper grades, as well as the host accomodating support program.
PE
GROUND LEVEL FLOOR PLAN
“MAIN STREET” EXPLODE DIAGRAM INTERIOR CORRIDOR DIAGRAMS
MAIN STREET
“Main Street”, or the main spine of the campus, is a major building portion that link north wing, which host high school and cafeteria, and south wing, containing elementary school and kindergarten, as well as lower grade library. Main spine itself is consisted of key functional program of the school: main library, gym, music suite, auditorium, laboratories, and administration offices. Been the central hub of the campus, main spine has been identified as most busy and traffic zone, just like a main street in a city, while this is the main street of a campus. Social interaction and group activity happen here.
FINISH OF ES/ ECC LOBBY
FINISH OF 2F “MAIN STREET”
RENDERING OF ES/ ECC LOBBY
RENDERING OF 2F “MAIN STREET”
ORIGINAL SWIMMING POOL FLOOR PLAN OF MUSIC SUITE
MUSIC SUITE
Although most of the existing teaching space have been preserved as its original function, one major athletic space of swimming pool has been converted as new teaching function: music. one recital hall, one concert hall, few music classrooms, along with multiple practice rooms has been layout over filled-in pool area. Openess of pool area provide a excellent non-structure interference space for music hall which required large open space as well for better visual and audial performance.
LOCATION BEIJING | CHINA DATE 2010 TYPE K-12 EDUCATION SCALE 53000 M2 PHASE DESIGN DEVELOPMENT
HUIJIA INTERNATIONAL SCHOOL
CAMPUS AERIAL VIEW
Huijia International School is a comprehensive campus with complete program from academic teaching, performance, sports and exercise, food service, to accommodation, as a boarding school campus. Campus facilities are surrounding with a main court that connect student center on the north and performing art center on the south, while performing art center has been sculptured as a egg shape building that host one main theatre and one small theater with black box adjacent to them.
PE
VIEW OF ACADEMIC BUILDING FROM COURTYARD
ROOF PLAN
VIEW OF PERFORMING CENTER SECTION DETAIL OF PERFORMING CENTER ELEVATION
VIEW OF COURTYARD FROM FITNESS
UNITED NATIONS INTERNATIONAL SCHOOL HANOI
LOCATION HANOI | VIET NAM DATE 2012 TYPE K-12 EDUCATION SCALE 17098 M2 PHASE MASTERPLAN
VIEW OF UN PLAZA & LIBRARY
Been built and put in operation as the second campus of United Nations International School, the Hanoi campus is looking for renovation with new campus planning and expansion of existing buildings. Redesign of library and the open plaza in front of it become the center of this renovation. Library complex consisted of three building blocks that accomodate school canteen as well, to provide source of knowledge and source of energy. Circular shape of UN plaza, corresponding to square shape of library, provides a place of calm and serenity.
PE
ADMINISTRATION HIGH SCHOOL MIDDLE SCHOOL GYM & SWIMMING POOL
UN PLAZA
LIBRARY & CANTEEN ELEMENTARY SCHOOL THEATER EARLY CHILDHOOD CENTER
UNIS Hanoi Visioning Study
page 21
History of Campus Development In many respects, the UNIS Hanoi campus in Tay Ho District is young compared to many of their international school counterparts of similar caliber and reputation. While other well-regarded international schools have steadily grown for several decades and developed reactively in short bursts of unplanned growth and decline, UNIS Hanoi’s current campus was planned just 5 years after its founding as a purpose-built campus
2000
2004
2009
2002
2008
2010
to support 1152 students – the same capacity regarded as the school’s target to this day twelve years later. Although the construction was phased, the majority of the physical campus was constructed for opening day. Significant additions
CAMPUS thereafter included extensions to the Swimming Pool, the Middle School – High School Science DEVELOPMENT and Technology Complex, and finally the Arts
Building and Sports Centre. ILLUSTRATIVE SITE PLAN
TIMELINE OF UNIS HANOI DEVELOPMENT
1988:
1999:
1988:
1988
1988 1990
1999:
2004:
1990 1992
1994 1992
1994 1996
1996 1998
2000 1998
2004:
2008:
2009: 2008: 2010: 2009:
2010:2012:
2012:
MS/HSSwimming MS/HSAdded TennisCampus Tennis Courts Courts Added Vision UNIS moves to custom-built UNIS movesSwimming to custom-built Science Pool Pool completed by campus in Ciputra Hanoi campus in Ciputra Hanoi Science and Tech and Tech andNew Arts Completed Completed New Arts Center Center and Perkins Eastman International City International City Complex Complex Sports Complex Sports Complex Expands Expands
UNIS Hanoi adds 12th UNIS grade Hanoi adds 12th grade Moves to UN buildings Moves in Van to Phuc UN buildings in Van Phuc
UNIS Hanoi foundedUNIS Hanoi founded
2002 2000
2002 2004
2006 2004
2008 2006
2010 2008
2010 2012
2014 2012
Campus Vision completed by Perkins Eastman
2014
ELEMENTARY SCHOOL COURTYARD ECC PAVILION & COURTYARD MULTIPLE USE OF MIDDLE SCHOOL COURTYARD
COMMON GATHERING
PERFORMING
LECTURING
DINING Along with the redesign of campus master plan, individual building complex for school level has been further redesigned as well. School courtyards provide more than just a activity space, but also to host multiple types of event, such as banquet, lecture, performance, and so on. Pavilion and sculpture type of shade have also been introduced along with courtyard design. Lotus-like shade indicate the feature of nature, while gable-roof pavilion is responding to traditional vietnamese architecture.
LOCATION HANOI | VIET NAM DATE 2012 TYPE K-12 EDUCATION SCALE 28382 M2 PHASE MASTERPLAN
CONCORDIA INTERNATIONAL SCHOOL HANOI MASTERPLAN
CAMPUS AERIAL MODEL SHOT
Following the success of concordia international school in Shanghai, a new Hanoi campus is expected to open to bring academic model to southeastAsia, New campus is fairly small to accommodate three major programs: primary school, secondary school and a performing art center, as well as to have one academic size of soccer field for physical education.
Three phase of camps development has been designed and school can gradually fill up the capacity and still keep their flexibility. L shape academic bar wrapping common programs such as gym, dining, and large performing space provide a consistant language to keep whole campus together.
PE
N
PHASE II
N
N
0
10m
20m
50m
0
10m
20m
50m
0
10m
20m
50m
ILLUSTRATIVE SITE PLAN
PROGRAM BAR-CHART
FACILITIES
ARTS
ATHLETICS
COMMUNITY
ADMINISTRATION
MS+HS LEARNING
ES LEARNING PHASE I
LOCATION SHANGHAI | CHINA DATE 2011 TYPE K-12 EDUCATION SCALE - M2 PHASE COMPLETE
CISS ELEMENTARY SCHOOL LIBRARY
ING AD E E R AC SP
OK BO ACE SP
ISOMETRIC DIAGRAM OF INTERIOR
N MO R M E CO RN CO
Y TR EN
VIEW OF LIBRARY BOOK SPACE VIEW OF LIBRARY READING SPACE
IN MA TRY EN N IO AT L CU CIR SK DE
Concordia International School Shanghai is renovating their elementary school library and seek new idea to store over 1500 books with lecture and reading space. The scheme has been set with multiple concentric circles while book shafts pointing toward the center of circles that can host study activity for a group of students. Little corner spaces have also been created in between radial layout of book shafts and bigger corner of common space has been defined. Circulation desk occupying one corner along circles can overlook the whole library to provide service and security.
PE
LOCATION SHANGHAI | CHINA DATE 2013 TYPE K-12 EDUCATION SCALE - M2 PHASE COMPLETE
CISS HIGH SCHOOL RESTROOM RENOVATION PERSPECTIVE OF BOY’S ROOM PERSPECTIVE OF GIRL’S ROOM
CISS is renovating restrooms in high school building with high-end 5-star hotel level of finish that aim to welcome student parents and guests. Maple wood pattern tile and finish with cove lighting create high-end experience while ADA design consideration that make it accessible to any users, including disability. Easy maintenance is also a major consideration to ensure quality sustain after high frequency of usage.
PE
COMPLETE FINISH OF RESTROOM RENOVATION
COMPLETE FINISH OF RESTROOM RENOVATION
COMPLETE FINISH OF RESTROOM RENOVATION
COMPLETE FINISH OF RESTROOM RENOVATION
ILLUSTRATIVE SITE PLAN PHASE I
PHASE II
LOCATION PHNOM PENH, CAMBODIA DATE 2011 TYPE K-12 EDUCATION SCALE - M2 PHASE MASTERPLAN
NORTHBRIDGE INTERNATIONAL SCHOOL CAMBODIA
Northbridge International School Cambodia (NISC) is a renovation project of existing K-12 school in the capital of Cambodia, Phnom Penh. To Maintain the operation of existing school the whole masterplan has been phasing to 5 phases, gradually renovate each building according to new masterplan from elementary school to high school, from gymnasium to library. Additional performing art center will be constructed on northwest corner of campus not only to provide teaching space for school, but also to provide a event gathering space for the surrounding community. Building style will still follow the existing style which is more suitable for Cambodia climate, with better refined detail to meet the requirement of teaching and learning that suitable for an international school.
PE
PHASE III
CAMPUS AERIAL VIEW NORTHEAST
PHASE IV
PHASE V
CAMPUS AERIAL VIEW SOUTHWEST
HIGHER EDUCATION
SCOM SHANGHAI CONSERVATORY OF MUSIC SDU SHANDONG UNIVERSITY QINGDAO CAMPUS BSM BROOKLYN SCHOOL OF MUSIC NUFE NANJING UNIVERSITY OF FINANCE & ECOMONICS WDA WANDA COLLEGE
SHANGHAI CONSERVATORY OF MUSIC
FENYANG CAMPUS SITE PLAN
LOCATION SHANGHAI | CHINA DATE 2012 TYPE HIGHER EDUCATION SCALE 32900 M2 & 75700 M2 PHASE COMPETITION
PERFORMING CENTER CAMPUS ENTRANCE
In 2012, Shanghai Conservatory of Music hold an international design competition and inviting 6 notable design firms in the world, for two projects on existing site and future campus: Fenyang campus performance center and new Lingling campus. The design concept is derived from the combinations of traditional Chinese music instrument and symbol for music note, which provide variety of spatial arrangement to accommodate the functional needs for either an extension of main campus heart or a brand new higher education campus.
PE
LINGLING CAMPUS SITE PLAN
OPEN & GREEN SPACE DIAGRAM
SITE DISTANCE DIAGRAM
URBAN ROOM DIAGRAM
VIEW DIAGRAM
It is a challenge to simoutaniously design two separate sites with complete different conditions in terms of functions, scales, and contexts. Diagrammatic approach help to differentiate and filter the characters of sites and to seek consistant language to associate two separate design.
AERIAL PERSPECTIVE OF LINGLING CAMPUS
TRANSIT DIAGRAM
SITEAXIAL DIAGRAM
LAND USE DIAGRAM
URBAN ROOM DIAGRAM
FENYANG CAMPUS EXPLODE DIAGRAM INTERIOR VIEW OF PERFORMING CENTER FENYANG CAMPUS FLOOR PLANS
10M PLAN
17M PLAN
4M PLAN
13M PLAN
EVENING VIEW OF PERFORMING CENTER
LINGLING CAMPUS EXPLODE DIAGRAM LINGLING CAMPUS BUILDING ELEVATIONS
SOUTH ELEVATION
NORTH ELEVATION
BUILDING SECTION OF LINGLING CAMPUS
SHANDONG UNIVERSITY QINGDAO CAMPUS
PERSPECTIVE AERIAL VIEW
LOCATION QINGDAO | CHINA DATE 2010-2011 TYPE HIGHER EDUCATION SCALE 2000000 M2 PHASE MASTERPLAN
Shandong University Qingdao campus is a design competition hold in 2010 with 4 international notable firms in the finalist and Perkins Eastman won the competition in two rounds. Carrying the project into the constructible master plan phase, master plan clearly divide to 4 major areas linked by major axis running north-south through the whole site. With main academic area located at the heart of campus, living area flank on north and south end of campus with convention center and sports area adjacent to them. At the north and south end of main axis, there is performing arts center on the north and museum on the south; while at the end of cross axis cutting twhrough the center of campus, there is library and administration center. Taking advantage of sea shore location, campus own a long coverage of beach and marina, which bring this campus very unique character stand on top of other higher education universities in China.
PE
SITE DIMENSION
WALKING RADIUS
CAMPUS FUNCTIONAL ZONING
SITE ORIENTATION
SITE GRADING
SITE AREA COUNT SITE ANALYSIS DIAGRAM ILLUSTRATIVE SITE PLAN
PERFORMING ARTS CENTER PERSPECTIVE MUSEUM PERSPECTIVE
PERSPECTIVE AERIAL VIEW
NANJING UNIVERSITY OF FINANCE & ECONOMICS
LOCATION NANJING | CHINA DATE 2010-2012 TYPE HIGHER EDUCATION SCALE 50000 M2 PHASE DESIGN DEVELOPMENT
NUFE STREET VIEW PERSPECTIVE ILLUSTRATIVE SITE PLAN
Locating near the west gate of NUFE Fujian Road Campus, twin-tower scheme Incubator building has been given a strong concept as a traditional Chinese gate to the campus and framed the entrance plaza. 2 buildings layout perpendicular to indicate one leaf of door open to welcome people coming into campus. The open space inbetween align with campus axis to set a landmark on campus west end.
PE
SITE LOCATION ANALYSIS
SITE ORIENTATION ANALYSIS
SITE CONTEXT GRID ANALYSIS
NUFE SEMI-AERIAL PERSPECTIVE
LOCATION BROOKLYN NY USA DATE 2013 TYPE HIGHER EDUCATION SCALE 30000 SF PHASE CONCEPTUAL
BROOKLYN SCHOOL OF MUSIC DIAGRAMMATIC APPROACH
to comply with city regulation and to initialize the basic building mass
to test critical massing of performing art space into tight and restricted site to study the feasibility of program layout optimization
BUILDING SETBACK
CRITICAL FIT-TRIAL
while performing program has initial setup at better location, a potential possibility of mass cut in half and shift half floor downward to test the area increase for better layout for rest of programs
CUT & SHIFT
as typical building vertical circulation, a central core with one stair and elevater has been provided for programs other than performing arts space
CENTRAL & VERTICAL
PERFORMING ARTS WITH MAIN HOUSE & BALCONY & FLYLOFT THAT REQUIRE THE MOST OF VERTICAL SPACE
+30%
TAECHING 2350 SF SPECIALIZED 1750 SF
PRIVATE
DANCE 1750 SF MUSIC 2800 SF
PERFORMANCE 6250 SF
LOUNGE +COMMUNITY
850 SF
LOBBY +CAFE 1980 SF ADMINISTRATION 1830 SF SUPPORT +MEP 500+ SF
PUBLIC
PROGRAMMING to quickly layout all rest of program into new massing with classrooms requiring more daylight on the upper level and space requiring less day light on the lower level, as well as the public/ private relationship that determines the program distance to the main access
Brooklyn School of Music is seeking ideas to renovate their existing facility that need to accomodate more programs while historical building shall be preserved as much possible. Considering multiple design constraints, such as municiple code for building setback, facade preservation, program requirements, as well as their preferred operation model for multiple type of users: students, performers, and public.
all requirements has been suggested. A series of transformation gradually shape the functional program from number to 3D space. By setting back volume, cut and divide space to accomodate different functions of program, shift to separate circulation, building has been stack as a jenga puzzle. It is a fine practice to seek fully functional space with only diagrammatic approach to test solution.
Design starts with diagrammatic approach and aim to resolve every issue with diagrammatic approach. With this quite experimental way, solution of spatial arrangment to accomodate
Project will be brought to further level with floor plan and building section testing. More elements will be inserted for further refinement.
pre-k spaces on the forth level and grade classrooms on the top. to optmize the daylight receving.
PE
anchored space to fit all performing program vertically and to minimize the mass impact to other programs
three major programs have been clustered together located in the center of the building mass to have better integration with adjacent performing program
PROGRAM: PERFORMING
PROGRAM: BMS
PROGRAM: SCHOOL
roof area has been split to two parts: outdoor playground above school program and roof garden above performing program. skylight has been introduced to enhence daylighting effect down inside the area that has no exterior windows
OUTDOOR GREEN ROOF
SKYLIGHT GRADE
STAGE
PRE-K/K
BALCONY
TECH LAB
PARENT-CHILD
PIT HOUSE SUPPORT AUDITORIUM
RECORDING LIBRARY DANCE: MED DANCE: SML
MUSIC: SML MUSIC: MED MUSIC: LRG
FLOOR 4-6 SCHOOL
FLOOR 2+ STAGE FLOOR 2 HOUSE
FLOOR 3 SPECIALIZED FLOOR 2-3 MUSIC
FLOOR 2 DANCE
FLOOR 3 BALCONY
FLOOR 1 THEATRE SUPPORT FLOOR B1 AUDITORIUM
FLOOR 1 COMMUNITY
THEATRE SUPPORT ACCESS
THEATRE LOBBY & CAFE
FLOOR B1 SUPPORT+MEP
THEATRE ACCESS FLOOR B1 ADMINISTRATION
SCHOOL ACCESS
CIRCULATION: FRONT
CIRCULATION: BACK
vertical circulation provides centralized access to all the programs other than performing arts program. the purpose is to separate the school access and public access to the building for the security issue
separated accesses to theatre and theatre support. lobby area has cafe to connect to school lobby.
PLAYGROUND
SENIOR LIVING
GLQP GREENLAND QINGPU SENIOR LIVING XYA I XIANGYA HEALTH VALLEY I XYA II XIANGYA HEALTH VALLEY II TQL TIAN QUAN LAKE WELLNESS SENIOR LIVING COMMUNITY FSN SHUION FOSHAN SENIOR LIVING LNG LIAONING ENERGY SENIOR LIVING
LOCATION SHANGHAI | CHINA DATE 2015 TYPE SENIOR LIVING SCALE 80000 M2 PHASE SCHEMATIC DESIGN
GREENLAND QINGPU SENIOR LIVING
Originally planned as a high-end private villa residential neighborhood in the rural area of Shanghai city, Greenland Group, one of top chinese developer, completedly convert them to senior living complex with active adult on 2/3 of site on the west and 1/3 of CCRC on the east. By utilizing existing site condition, canal has been introduced to connect river and creek on two side of site. 4 gardens have been further developed as urban garden, green garde, water garden. and CCRC living garden. To create warm and cozy living environment, as well as coordinate with the existing building style and color tones, beige stone, orange terra-cotta, and grey tile have been further applied, along with approaches that reducing building massiveness by re-scaling proportion and applying frame over building envelope.
PE
概念生成 Concept
组团表现 征、界定 花园、水 文娱花园
口袋公园
POCKET PARKS
The neigh scale, cre and defin experienc Garden, W Garden a
4大花园组团
4 NEIGHBORHOODS 4 GARDENS
城市花园 URBAN GARDEN
绿地花园 GREEN GARDEN
文娱花园 CCRC GARDEN
水景花园 WATER GARDEN
文化娱乐中心概念生成 CCRC Concept
2015 01.28
绿地青浦金秋园
GREENLAND QINGPU GOLDEN AUTUMN GARDEN
文化娱乐中心概念生成 CCRC Concept 文化娱乐中心概念生成 CCRC Concept
场所空间
SITE PLANNING CONCEPT WITH FOUR DISTINCT 文化娱乐中心概念生成 文化娱乐中心概念生成 CCRC Concept GARDENS CCRC Concept WATER AS MAIN FEATURE IN DESIGN CONCEPT
PLACES
关怀中心占据了场地关键节点,强调了场 地入口。 Care Center Anchors The Most Prominent Corner And Marks Arrival To Property
水景是本场地的精神纽带和活动中心。 The River Is The Spiritual Heart Of The Site And The Center Of Activity.
会所是文化娱乐中心的功能中心。 The Club Center Is The Programmatic Heart Of The CCRC.
所有居住单元均与会所紧密相连。 Residential Buildings All Connect Around The Club Center.
标志性的 的核心及 团及多样 的社区节 空间
The symb spiritual h center of the neigh various g paths. C the water energetic events.
PERSPECTIVE VIEW OF CARE CENTER NORTH ENTRANCE
PERSPECTIVE VIEW OF EAST MAIN ENTRANCE TO CCRC SITE PERSPECTIVE VIEW OF INDEPENDENT LIVING SOUTH TOWERS
PERSPECTIVE VIEW OF NORTH RETAIL STREET
PERSPECTIVE VIEW OF COURTYARD AROUND ILU AND CLUB HOUSE PERSPECTIVE VIEW TOWARD SOUTHEAST CORNER OF CARE CENTER
独立式生活 单元平面
Independent Living
9600 2287
1855
Unit Floor Plans
2300
C
2400
3158
YYR T1A 3 2U A-IK L AO TL4S C IE RVR P F
4691.5
K-T14419-4 FAUCETS PURIST BRASS
2BR 二室户 HSL任务套内面积 90.00 SM 套内面积 NET 82.29 SM 建筑面积 GROSS 107.4 SM
11591.5
LIVING ROOM 起居室 BED ROOM 卧室/书房 KITCHEN 厨房
4500
RESTROOM 洗手间
2400
3600
INDEPENDENT LIVING UNIT STUDY: STUDIO UNIT A AND 2 BEDROOM UNIT C
3600
9600
2015 01.28
绿地青浦金秋园
GREENLAND QINGPU GOLDEN AUTUMN GARDEN
独立式生活
建筑平面
72
PERSPECTIVE VIEW OF Independent Living Unit Floor Plans INDEPENDENT LIVING TOWER 单元平面
ARCHITECTURAL PLANS
5000 2710
2290
4890
A LAVATORY K-2314 FIRECLAY PURIST
8800
4-S9T 1TS 4S4 R U K P E S CI1 A UTR A-B F
STUDIO 单间 HSL任务套内面积 59.00 SM 套内面积NET 45.90 SM 建筑面积GROSS 59.8 SM LIVING ROOM 起居室 BED ROOM 卧室/书房
3910
门的开启操作所需空间 Maneuvering Clearances
KITCHEN 厨房 RESTROOM 洗手间
5000
轮椅转弯半径 Turning Radius 2015 01.28
绿地青浦金秋园
GREENLAND QINGPU GOLDEN AUTUMN GARDEN
建筑平面
ARCHITECTURAL PLANS
70
PHASE 1 DEVELOPMENT 第一阶段发展区 12 ONLY NATURAL WATER POND ON SITE 基地上唯一自然水源
1 1
3
12
1 2
1
12
13
13 1
1
13 13 6
1
11 9
7
8
1 4
10 5
HIGH VOLTAGE LINE 高压电线
19
19
19 14
15 19
19
16 19 19
17
19
18
19
19 19
19
19
19
19
19 19 19
LOCAL ROAD EASEMENT 地方道路退缩 地方道路
LOCATION CHANGSHA | CHINA DATE 2013 TYPE SENIOR LIVING & LARGE SCALE SCALE 506000 M2 PHASE MASTERPLAN
12
12
XIANGYA HEALTH VALLEY I
12 12
13
ILLUSTRATIVE SITE PLAN
research & development center 1 commons 2 central plant 3 conference center 4 HSM center 5 immunology hospital 6 imaging center 7 checkup center 8 cmmunity hospital 9 commercial/ retail 10 TCM cultural national sanatorium VIP health club CCRC commercial/ retail club house kindergarten staff dormitory active adult
11 12 13 14 15 16 17 18 19
研发中心 公共区 中心机房 会议中心 健康管理中心 免疫学 影像中心 体检中心 社区医院 商业/零售 中医研究 国家级疗养院 VIP健康俱乐部 持续护理退休社区 商业/零售 会所 幼儿园 员工宿舍 活力老年
Changsha notable healthcare provider Xiangya would like to develop a large campus with general hospital, senior living/ CCRC, commercial complex, club center, convention center, and research center near the downtown of Changsha. Hilly site condition with power line easement separate the site to two part while north site contain hotel, retail, club center, hospital, and research center, and south site accomodate CCRC and residential program. Commercial program has been placed as the center of site development and rest of programs sitting along the main road connecting north and south parcel.
PE
R&D CAMPUS FUTURE EXPANSION 研发区 未来扩张区 LAB BUILDINGS ORGANIZED AROUND GREEN QUADRANGLE 实验室建筑群围绕 于绿色四边型绿地
CONVENTION CENTER 会展中心 MULTIPLE LONG SPAN CONVENTION CENTERS PROVIDE SIMPLE AND EFFICIENT COVERAGE FOR LARGE INTERIOR EXHIBITON SPACES 大跨度的会展中心 提供了简单而且有效的 大型覆盖室内展会空间
HIGH VOLTAGE LINE SETBACK REQUIREMENT 高压电线退缩 30 METER REQUIRED BUILDING SETBACK FROM HIGH VOLTAGE POWER LINES RUNNING THROUGH SITE TO BE OCCUPIED BY VEGETATION 由于30米的退缩线里建设限制 所有退缩地块里 种植植栽以及景观
HOTEL 酒店 TALLEST BUILDING ON SITE SERVING AS ICONIC LANDMARK, 38 STOREY TOWER ADJACENT TO TOWN CENTER 基地上最高的建筑 R&D CAMPUS 作为标志性建筑 研发中心学区 38层的高楼 和城镇中心相邻 SIX LAB BUILDINGS ORGANIZED AROUND CENTRAL GREEN CORE FOLLOWING ROAD BOUNDARY 六栋建筑物 随着计划道路延伸 建筑中间围绕着中央绿地
VIP & VVIP 健康俱乐部 & 国家级疗养院
TOWN CENTER CENTRAL PLAZA 城镇中心 中央广场
CCRC CLUB HOUSE 持续护理退休社区 会所
VILLA LAYOUT ORGANIZED AROUND EXISTING CENTRAL POND, INTEGRATED WITH PROPOSED WETLANDS LANDSCAPE 建筑以别墅型的布局为主 整合现有的中央水池 周围建设成湿地景观
INTERIOR PLAZA SPACE SURROUNDED BY RETAIL & SHOPPING 零售和购物空间 包围着中央广场
AVERAGE 6 FLOOR CCRC RESIDENCE BLOCKS CONNECTED TO CENTRAL CLUBHOUSE AND COMMON AREAS INTEGRATED WITH RESORT LANDSCAPE 平均6层楼的 持续护理退休社区住宅大楼连接会所 中央共享区域大楼 与别墅景观相互结合
TCM CULTURAL CENTER & SPA 中医文化中心 & 水疗中心 CLINICAL BUILDING FOR TRADITIONAL CHINESE MEDICINE AND CULTURAL EXCHANGE ALSO INCLUDES SPA FACILITY 传统中医药文化中心 同时还包括水疗设施 以提供疗养和休憩功能
ACTIVE ADULT APARTMENT TOWERS 活力养老区 公寓大楼 RESIDENTIAL TOWERS RANGING FROM 12 TO 30 STOREYS FOR SENIOR LIVING, TALLER TOWERS ARE LOCATED TOWARDS SITE FRINGES AND LOWER TOWERS NEAR CENTRAL ROAD 12至30层的高级住宅公寓大楼 比较高的楼层集中于基地边缘以及养老区北面 越接近基地计划道路公寓高度越低
LAND USE DIAGRAM IN AERIAL PERSPECTIVERGB
R&D CENTER 研发中心
HOTEL 酒店
47,000M2
20,000M2
PROGRAM BUBBLE DIAGRAM
CONVENTION CENTER 会展中心 COMMUNITY HOSPITAL 社区医院 5,000M2
IMMUNOLOGY 免疫学中心 10,000M2
VIP 健康俱乐部 25,000M2
5,000M2
IMAGING CENTER 影像中心 2,000M2
CHECK-UP CENTER 体检中心 12,000M2
TCM CULTURAL 中医研究 5,000M2
HSM CENTER 健康体检中心 10,000M2
VVIP 国家级疗养院 17,000M2
130 151 160
RGB 118 180 207
RGB 0 151 114
RGB RGB AERIAL PERSPECTIVE 57 84 105 162 OF OVERALL SITE 95 117 RGB
CCRC 持续护理 退休社区 55,000M2
109 131 110
ACTIVE ADULT 活力养老 215,000M2
RGB 189 177 103
RGB 149 164 105
RGB 82 115 85
RGB 152 165 212
RGB 63 81 71
RGB 200 111 152
Research & Development total site area: 86,667 m2 total built area: 70,630 m2 FAR: 0.94
connections corridor 连廊
Located at the northern edge of the site and serving as the first point of focus for visitors, the research and development zone consists of three major portions: research labs and offices, conference center / health services management, and the multinational corporation future expansion zone. Organized around the slightly curvilinear form of the adjacent municipal road, the research labs and offices form a rhythmic procession which directs visitors towards the locus of the site delineated by an iconic structure which is the convention center/HSM combination. Parking and future expansion are masked by this screen of buildings, providing visitors with a seamless introduction to the entire zone.
connections corridor 连廊
commons lobby
公共区
office space
green belt
办公区
绿化带
lab space
实验室
technical training 技术培训
entrance 入口
entrance 入口
canopy overhang
悬挑檐棚
AERIAL VIEWS OF SITE DEVELOPMENT
focal point 聚焦点
研发中心
DIAGRAMS OF RESEARCH AND SENIOR LIVING SPATIAL LAYOUT
总基地面积: 86,667平方米 总建筑面积: 70,630平方米 容积率: 0.94
connection to health management zone 连接到健康管理区
研发中心区位于基地的北边界,是访客进入基地的第一印象, 它包含了三个主要的部分: 研究实验室和办公室,会议中心/健康管理中心,和跨国公司的未来发展区。 研发实验室和 办公室顺应着曲线的市政道路分布,形成有节奏的序列,引导访客聚焦于标志性建筑-会展 中心/健康管理中心综合体。这一系列的建筑群屏蔽了停车和未来发展区,令访客更加感受 到整个区域的连续性。
Senior Living
total site area: 136,667m2 total built area: 272,167m2 FAR: 1.99 Forming the southern portion of the Xiangya Health Valley site, the senior living area consists of active adult apartments, a continuing care retirement community (CCRC), and communal facilities. Active adult apartments range in height from 12 storeys to 26 storeys, gradually increasing in height the further away they are from the main municipal road. These apartments all share common facilities such as a kindergarten, satellite retail, and clubhouse, located centrally to apartment clusters and adjacent to the main access road. The CCRC facility services individuals with more intensive care needs and is separated into three zones (independent living, assisted living, skill nursing), all of which have access to enclosed exterior courtyards.
gradual height increase for apartments 住宅高度 逐渐爬升
active adult apartments 活力老年住宅
active adult apartments
活力老年住宅
common facilities 公共配套设施
staff dormitory 员工宿舍
active adult apartments 活力老年住宅
connection to town center 连接到城镇中心
enclosed courtyard CCRC
持续护理退休社区
围合的庭院
老年人住宅 总基地面积: 136,667平方米 总建筑面积: 272,167平方米 容积率: 1.99 老年人住宅区位于湘雅医疗健康谷基地南部,包括活力老年住宅,持续护理退休社区,和公 共配套设施。 活力老年住宅从12到26层不等,从远离市政道路高度逐渐增加。这些住宅共 用位于住宅区中心紧邻主要道路的公共配套设施,如幼儿园, 分散式零售和会所。持续护 理退休社区包含三个紧邻围合庭院的区域(自理区,半自理区和护理区),为需要加强护理 的个人提供服务。
LOCATION CHANGSHA | CHINA DATE 2014 TYPE SENIOR LIVING SCALE 32000 M2 & 91593 M2 PHASE MASTERPLAN
XIANGYA HEALTH VALLEY II DUSK VIEW OF CCRC COMMUNITY
Following the previous masterplan of Xiangya Health Valley, project scope has been revised and programs have been split to two parcels; one site has 126 mu with town center, research center, senior living, hospital, and school, while the other site has 39 mu with CCRC program. 39 mu site is a highly restricted site that only one small corner of site adjacent to public road and at the center of site there is a unconstructible water area occupying over 50% of the site area. Preserving the water and plan program along the lake shore will be feasible and access better view and orientation. Vehicular circulation will surround the buildings and lake to avoid traffic crossing.
PE
INSTITUTION INDEPENDENT LIVING
ASSISTED LIVING
Three curved buildings accomodate three major programs on the site: institution, independent living, and assisted living: three major components of CCRC community. LAND USE DIAGRAM SITE PLAN
CCRC Zoning and Stacking Diagram 功能分区示意图
floors C 33层+地下室
7 floors+Basement
6 floors+Basement
INDEPENDENT LIVING
INDEPENDENT LIVING
INDEPENDENT LIVING
INDEPENDENT LIVING
27
49
30
42 35
+Basement
独立式住宅
1-Bedroom 一室一厅
7层+地下室 独立式住宅
Studio 单套间
6层+地下室 独立式住宅
Studio 单套间
7 floors 7层
独立式住宅
Studio 单套间
1-Bedroom 一室一厅
floors A 44层+地下室
+Basement
FITNESS/CLUB 健身会所 CENTRAL ADMINISTRATION ELDERLY CLINIC 老年诊所 TRAINNING CENTER 培训中心 INFO CENTER 信息中心
行政办公
CENTRAL SERVICES (B1)
PARKING (B1)
中央服务(地下层)
地下停车
CENTRAL SERVICES (B1) 中央服务(地下层)
STAFF DORMITORY ASSISTED LIVING
生活协助
SKILLED NURSING DEMENTIA
员工宿舍
专业护理
老年痴呆
12 24 48 24
Private 单人间
Private 单人间
Private 单人间
Private 单人间
5 floors+Basement
B 5层+地下室
AXONOMETRIC DIAGRAM INDICATING SPECIFIC FUNCTIONAL ZONING AND ITS CORRESPONDING FACT SHEET FIGURES AERIAL PERSPECTIVE OF CCRC COMMUNITY
CENTRAL SERVICES 中央服务 CENTRAL SERVICES (B1) 中央服务(地下层)
LAND USE DIAGRAM PHASING PLAN PHASING ONE: RESEARCH & HEALTH MANGEMENT
126 mu is relatively flat site to accomodate more programs for research, health management/ hospital, and senior living. Three major program components can be identified and generate three phases of construction accordingly. Research and health management will be in the first phase prior to senior living in order to have service in place to serve residents later. Town center and school come after phase 1 to complete the daily and urgent service needed by senior. The rest of 4 towers of senior housing will complete the whole planning on this site.
PHASING TWO: TOWN CENTER, SCHOOL, AND HOUSING
PHASING THREE: REST OF SENIOR HOUSING
HMS Center 健康管理中心
Checking & Imaging 体检中心及影像中心
Community Hospital 社区医院
Research & Development 研发中心
Town Center 城镇中心
Kindergarten 幼儿园
Club House 会所
Active Adult Apartments 活力老年公寓
AXONOMETRIC DIAGRAM INDICATING SPECIFIC FUNCTIONAL ZONING AERIAL PERSPECTIVE OF SENIOR COMMUNITY WITH RESERACH, HEALTH MANAGEMENT, AND SENOR COMMUNITY
COMMERCIAL RETAIL MIXED-USE
RDS ORDOS DIAMOND WATERFRONT CPL BEIJING CAPLAND SHOPPING MALL LTN BEIJING LOTTE INTIME DEPARTMENT STORE HFI HEFEI TONGSHAN SHOPPING MALL NSK NU SKIN CHINA HEADQUARTER CXH HUADI CHANGXING DEPARTMENT STORE COHL CHINA OVERSEAS HIGHRISE DEVELOPMENT RYC RAYCOM DONGPAILOU COMPLEX DEVELOPMENT
LOCATION BEIJING | CHINA DATE 2010 TYPE RETAIL SCALE 60000 M2 PHASE SCHEMATIC DESIGN
CAPLAND CARECITY SHOPPING CENTER 于窗户玻璃外侧贴覆 淡灰色贴膜仿横向灯盒 于窗户玻璃内侧贴覆 彩色贴膜仿彩色背板
TP8mm厚彩釉玻璃 TP8(LOW-E)+12A+TP6 中空玻璃(带背板) 于窗户玻璃内侧贴覆 彩色贴膜仿彩色背板 于非逃生窗玻璃外侧中间贴覆 淡灰色贴膜仿横向灯盒 于窗户玻璃外侧贴覆 淡灰色贴膜仿横向灯盒 TP8mm厚彩釉玻璃
CURTAIN WALL DETAILS
ELEVATION STRATEGY COLOR-CODING PROGRAM
Capland Care City Shopping Center is a project of facade renovation with colorful scheme to revitalize the original monotone skin in order to bring in energetic and happy tone into the mall. Color as a coding to indicate programs creates a lively and cozy elevation by mixing different color of programs and multiple rainbow ribbon wrapping all the way around building. Layering of color further emphasize the horizontal appearance of facade to extend reading of spreading outward. DCI
STREET VIEW PERSPECTIVE
LOTTE INTIME DEPARTMENT STORE
FACADE STUDY WAVING RIBBON
LOCATION BEIJING | CHINA DATE 2010 TYPE RETAIL SCALE 42500 M2 PHASE SCHEMATIC DESIGN
FACADE STUDY WRAPPING TEXTILE
FACADE STUDY WAVING RIBBON
Lotte Intime Department Store is a facade renovation of existing department store in Wangfujing district in downtown Beijing. New facade study soon establish a floating mass strategy to create a more transparent base for anchor store front. As shown in facade study below, major entrances to the
department store has recognizable height of transparency to emphasize and differentiate from boutique store front. To revert the original heavy feeling of old facade, a more welcoming layer of space flow has been created by floating mass strategy. DCI
LOCATION CHANGSHA | CHINA DATE 2010 TYPE RETAIL/ MIXED-USE SCALE 580000 M2 PHASE MASTERPLAN
RAYCOM CHANGSHA DONGPAILOU COMPLEX DEVELOPMENT AERIAL VIEW OF OVERALL SITE
Locating in the downtown of Changsha, along with huge diverse programs of retail, hotel, office, residential, and culture facility, Dongpailou project meant to be a new center of people’s life. Aim to be built as a city landmark, a mix of highrise surrounding open outdoor terracing walkways with low rise anchor retails creates a stepping down plaza toward center of culture zone, all mix of programs gathering together around central plaza that identified as a living room for city of Changsha. DCI
OUTDOOR RETAIL & WALKWAYS DIAGRAMMATIC ANALYSIS
SPATIAL ARRANGEMENT
PEDESTRIAN CIRCULATION
FUNCTIONAL ZONING
VEHICULAR CIRCULATION
LARGE SCALE PLY PLC YSP JNG TZH
YUYAO POLY PLAZA CHANGZHOU POLY PLAZA YANGSHUPU POWERPLANT RENOVATION JINING MASTERPLAN TONGZHOU NEWTOWN
LOCATION CHANGZHOU | CHINA DATE 2010 TYPE LARGE SCALE SCALE 1583 MU PHASE MASTERPLAN
CHANGZHOU POLY PLAZA
SEMI-AERIAL VIEW HOTEL BUILDING
Changzhou Poly Plaza is a large scale urban planning project that accomodate residential, retail, hotel, office towers, and landscape. In masterplan, programs are layout along main axis of 8-lane boulevard, with one circular shape of sculpture as landmark anchoring at the end of boulevard. One significant spot in masterplan is the Xintiandi style low-rise retail surrounding a lake with church and open plaza to accomodate resident’s life and special moments.
PE
SEMI-AERIAL VIEW POLY THEATRE
SEMI-AERIAL VIEW XINTIANDI TYPE RETAIL TO HOTEL & OFFICE BUILDING
SEMI-AERIAL VIEW XINTIANDI TYPE RETAIL TO MEMORIAL PARK
STREET VIEW POLY THEATRE
HEALTHCARE MDA MEDEA OBSTETRICS-GYNECOLOGY HOSPITAL CRHG CRHG BEIJING REHABILITATION HOSPITAL WTH WUXI TAIHU NEWTOWN WOMEN & CHILDREN HOSPITAL ZHA ZHUHAI HENGQIN INTERNATIONAL LIFE SCIENCE CENTER
LOCATION BEIJING | CHINA DATE 2014 TYPE HEALTHCARE SCALE 99000 M2 PHASE SCHEMATIC DESIGN
CRHG BEIJING REHABILITATION HOSPITAL
STREET VIEW OF NEW REHAB HOSPITAL EXISTING BUILDING STRUCTURE
China Resource Beijing Rehabilitation Hospital is a renovation project of CR’s existing hotel which is closed for business and seek for new life with brand new function of rehab hospital. This project is consisted of 1 existing hotel structure to be remodeled as the patient tower and 3 smaller new structures to accomodate outpatient department and administration office. The biggest challenge is to convert existing shear wall structure without enough space and height in order to fit fully functional rehab tower inside.
PE
STACKING SECTION BUILDING A SECTION 1
STACKING DIAGRAM INDICATING THE PROCHINA RESOURCES HEALTH GROUP GRAM STACKING HUAIN RUN REHABILITATION HOSPITAL December, 2013 BOTH REMODEL AND NEW BUILDINGS
DIAGRAMS TO INDICATE THE IN-PATIENT & OUTPATIENT FLOWS Reception/ Sub Waiting
Stretcher
Decentralized Therapy at Unit
1 Inpatient
IP Nursing Unit
5 Wheel Chair Patient Holding
4
Center Concourse
Reception
Main Waiting
3
Decentralized Therapy at Unit
Holding
Central Therapy on 2F & 3F
Outpatient Discharge
4
oncourse
Reception
1.Inpatients are brought to Patient Holding Areas at floors 2 and 3 in Building A, using the main elevators, with privacy for holding patients in wheelchairs. Stretcher patients are not generally brought to the central therapy areas but receive therapy at the Inpatient Nursing Floors.
2. Outpatients use the two new Outpatient ElevaAdult Therapy tors from theServices Central Concourse to reach floors 2 or 3, where they go to a central Reception/ Main Waiting area. All visits are scheduled appointments to minimize waiting time.
Reception/ Sub Waiting
Clinic Module
4
4.Most patients will receive treatment in several modalities on each therapy visit.
Reception/ Sub Waiting
Clinic Module
Registration Center
Reception/ Sub Waiting
5 Outpatient Pharmacy
Outpatient Services
Clinic Module
4
2. First-time outpatients register at the outpatient Registration Center at Building B Ground Floor. After registration, on subsequent visits outpatients have scheduled appointments and go directly to their point of care. 3. Using the Building B elevators, patients go to floors 2-8 as needed for services. Each service area has a Reception and Sub Waiting area for short term waiting. 4.After receiving services, patients make payment arrangements at the Reception/ Collections desk in that service.
4
2 First Time Outpatient
Outpatient Pharmacy, located in Buildings B and C. 1.Outpatients enter Building B either from the Ground Floor lobby and the Central Concourse or by using the bridge at floor 3 from Building A. Patients who have arrived by private car can enter the Building B elevators from the parking levels.
3
5.After therapy, outpatients return to the Main Lobby to leave the hospital, while Inpatients are returned to their Inpatient Nursing Unit floors.
Services
Outpatient Services include Registration, PreOutpatient Services Admission Testing, Lab, Imaging, Clinics, and
Clinic Module
4
Kiosk
Sub- Waiting
Reception/ Sub Waiting
Outpatient Pharmacy
Reception/ Sub Waiting
3. Family 1 members or patient aides transport patients from the reception and waiting point to each therapy modality area, where there is Scheduled Outpatient sub-waiting for short term waiting.
Main Waiting
First Time Outpatient
Sub- Waiting
Clinic Module
5.Patients with prescriptions take them to be filled at the Outpatient Pharmacy on the Ground Floor of Building B. 6. Outpatients leave the hospital by private car (from parking levels) or from the Main Lobby.
Clinic Module
4
2. First-time outpatients r Registration Center at Bu After registration, on sub have scheduled appointm their point of care.
3. Using the Building B e floors 2-8 as needed for area has a Reception an short term waiting.
4.After receiving services arrangements at the Rec desk in that service.
4
2 4.Most patients will receive treatment in several modalities on each therapy visit. Registration
5
IP Nursing Unit
5
Reception/ Sub Waiting
Center 5.After therapy, outpatients return to the Main Lobby to leave the hospital, while Inpatients are returned to their Inpatient Nursing Unit floors.
Family Member
Clinic Module
4
2. Outpatients use the two new Outpatient ElevaScheduled tors from the Outpatient Central Concourse to reach floors 2 or 3, where they go to a central Reception/ Main Waiting area. All visits are scheduled appointments to minimize waiting time. 3. Family members or patient aides transport patients from the reception and waiting point to each therapy modality area, where there is sub-waiting for short term waiting.
2 Outpatient
3 Reception/ Sub Waiting
Outpatient Services inclu Admission Testing, Lab, Outpatient Pharmacy, loc
1.Outpatients enter Build Ground Floor lobby and by using the bridge at flo Patients who have arrive the Building B elevators
4
1
Outpatient Discharge
Central Therapy on 2F & 3F
1.Inpatients are brought to Patient Holding Areas at floors 2 and 3 in Building A, using the main elevators, with privacy for holding patients in wheelchairs. Stretcher patients are not generally brought to the central therapy areas but receive therapy at the Inpatient Nursing Floors. Kiosk
Clinic Module
5.Patients with prescripti the Outpatient Pharmacy Floor of Building B.
6. Outpatients leave the (from parking levels) or f
Building D
Building C
Building A
Building B
NEW STRUCTURE OUTPATIENT BUILDING
EXISTING STRUCTURE INPATIENT TOWER
site plan/ veHicle circUlation Daigram
CHINA RESOURC HUA RUN REHABIL
SITE PLAN WITH GROUND FLOOR OF IN-PATIENT & OUT-PATIENT OVERLAPPING
CES HEALTH GROUP LITATION HOSPITAL December, 2013
TYPICAL REHAB FLOOR RENOVATED FROM HOTEL
TYPICAL REHAB ROOM UNIT TYPES
LOCATION WUXI | CHINA DATE 2014 TYPE HEALTHCARE SCALE 72661 M2 PHASE MASTERPLAN
WUXI TAIHU NEWTOWN WOMEN & CHILDREN HOSPITAL HOSPITAL CAMPUS AERIAL VIEW
Concept as a pair of hand holding a baby with care, Wuxi Newtown Women & Children Hospital aim to top high-end market of healthcare service provided to women and children. Inpatient and diagnose & treatment have been planned as main service of program, while outpatient will have strong support from main D&T service.
PE
SITE DEVELOPMENT PROGRESS DIAGRAM HOSPITAL CAMPUS AERIAL VIEW
RESIDENTIAL & CORPORATE INTERIORS PES PERKINS EASTMAN SHANGHAI OFFICE RENOVATION HQ996 HONGQIAO RESIDENCE HS119 QIU RESIDENCE LUCY LUCY GAO RESIDENCE CLR CLARE XU RESIDENCE ULT UELITE OFFICE INTERIOR GTP GUANGXI TAIPEI ASSOCIATION RESTROOM INTERIOR
LOCATION SHANGHAI | CHINA DATE 2015 TYPE CORPORATE INTERIOR SCALE - M2 PHASE DESIGN
PERKINS EASTMAN SHANGHAI OFFICE RENOVATION
AXONOMETRIC DIAGRAM OF RENOVATION Perkins Eastman Shanghai office has been operating for over decade and along with the growth of staff office is facing need of expansion. Current phase of renovation is focusing on IT room expansion and 10% seat addition. Relocating server room in order to gain larger space for servers, as well as opening the corner that linking front and back office space with new pantry and open meeting space. New design will also designate a exclusive printing area to avoid traffic conflict in old layout. Once the renovation complete, office will be able to satisfy another 5 years of operation.
PE
VIEW FROM FRONT OFFICE TO RENOVATED AREA
VIEW FROM BACK OFFICE TO RENOVATED AREA
LOCATION SHANGHAI | CHINA DATE 2012 TYPE RESIDENTIAL INTERIOR SCALE 50 M2 PHASE COMPLETE
HONGQIAO RESIDENCE BEDROOM
BATHROOM
KITCHEN DINING SPACE STUDY
LIVING SPACE
This is a residential interior remodeling project for a single person, and potentially can accomodate a couple as a small family. Originally built in 1980’s, this is a two bedroom unit with only kitchen and bathroom. To convert old unit type to accomodate modern household space such as formal living and dining space, south facing master bedroom has its partition wall in between it and kitchen removed and to create a large open space with functions of kitchen, dining, living, and study. Introducing small bedroom concept from Frank Lloyd Wright, space has been traded from preserved bedroom to bathroom to create confortable size for basin area, while shirnked bedroom only keep function for sleeping. CHIN
HOUSEHOLD
ORIGINAL CONDITION FLOOR PLAN BEFORE & AFTER VIEW FROM DINING TO LIVING SPACE
FLOOR & FURNITURE PLAN
PHOTO OF COMPLETION FROM LIVING SPACE TO DINING SPACE.
STUDY
LIVING SPACE
DINING SPACE KITCHEN
BEDROOM
BATHROOM
HOUSEHOLD
ORIGINAL CONDITION
FLOOR & FURNITURE PLAN FLOOR PLAN BEFORE & AFTER
LOCATION TORONTO | CANADA DATE 2013 TYPE RESIDENTIAL INTERIOR SCALE 500 SF PHASE SCHEMATIC DESIGN
LUCY GAO RESIDENCE
PERSPECTIVE: LIVING ROOM TO STUDY CORNER PERSPECTIVE: LIVING ROOM TO KITCHEN/DINING
PERSPECTIVE: STUDY CORNER TO LIVING ROOM PERSPECTIVE: KITCHEN/ DINING 500 square foot of one-bedroom apartment in downtown Toronto, the original plan is fairly functional for single life. However, to better utilize space for young person with modern life style, open kitchen to form a one large multifunctional space is preferred. Main space will accommodate living space, dining, kitchen, and a study, and this main space is wrapping around bedroom, while bedroom will totally open toward study in order to introduce natural light into bedroom through study. CHIN
ACTIVITY MODE
OFFICE & PUBLIC
WORK MODE
TEACHING/ CONSULTING
LOCATION SHANGHAI | CHINA DATE 2014 TYPE OFFICE INTERIOR SCALE 50 M2 PHASE CONSTRUCTION DOCUMENT
UELITE OFFICE INTERIOR
OFFICE MODE PERSPECTIVE
SPATIAL ARRANGEMENT STUDY
Uelite is an entrepreneur firm that providing academic exam training and study abroad service, who is looking for a newly remodelled office. New office with only 50 sm will require to accommodate function of office space for 8 staff, 5 small conference/ classroom stall for maximum 3 people, a lounge area, and a small pantry. On top of that, for constant social event to host over 50 people, space is expected to be able to convert and become a single large space.Aconvertible space is needed. CHIN
ACTIVITY MODE PERSPECTIVE
IN PRACTICE IN PROGRESS 2010-2015