![](https://assets.isu.pub/document-structure/250106212414-acbc0c3ed815f7a2b1612c636bdb7853/v1/1c3a95fe14e5dd08c00c45ef7d14dd0a.jpeg)
2025–2034
![](https://assets.isu.pub/document-structure/250106212414-acbc0c3ed815f7a2b1612c636bdb7853/v1/ac7d10b343b8b7da7df88d42152fb2c9.jpeg)
![](https://assets.isu.pub/document-structure/250106212414-acbc0c3ed815f7a2b1612c636bdb7853/v1/f9e8feee9d0db7306167cf5a7ab3ef9c.jpeg)
2025–2034
City of Eden Prairie Capital Improvement Plan 2025 to 2034
The City plans for capital maintenance and improvements by preparing a ten year capital improvement plan (CIP). The CIP represents a framework for planning the preservation and expansion of capital including equipment, facilities, and infrastructure. It sets forth the estimated schedule, timing, and details of specific improvements by year, together with the estimated cost, the need for the improvement, and sources of revenue to pay for the improvement.
The plan provides for consistent investment in City equipment, facilities, and infrastructure It also preserves and expands capital in a way that is sustainable and affordable for Eden Prairie citizens.
The plan supports the City’s goals as identified by the City Council and discussed during the 2024/2025 budget process. These goals include enhancing and preserving service levels, continual review for service efficiencies and innovations, preservation of Eden Prairie’s exceptional image internally and externally, maintain a strong financial position, and enhance the sense of community identity.
The City has implemented the following policies to provide guidance to meet our goals.
• The City will maintain a ten-year Capital Improvement Plan for all projects over $25,000 and will update the plan every two years.
• A strong pay-as-you-go program is maintained. The City uses current resources to pay for projects whenever feasible.
• One-time revenues are used for one-time expenses. This helps to ensure the City does not have long term commitments without an outgoing funding source.
• The City will confine long-term borrowing to capital improvements or projects that cannot be financed from current revenues. Where the issuance of long-term debt is required, it will pay back the bonds within a period not to exceed the expected useful life of the project.
• The City will maintain a sound relationship with all bond rating agencies and will keep them informed about current capital projects. The City has the highest rating possible of Aaa from Moody’s investor services and AAA from Standard and Poor’s.
• Liquor profits are a dedicated funding source of the Capital Improvement Program
The City updates the Capital Improvement plan (CIP) every two years. Each department documents and prioritizes requested projects. The City Manager makes the final recommendation to the City Council on which projects to include and fund in the CIP.
The City Council receives input from various sources when making final decisions on the CIP including citizen input through a biannual citizen survey and other public and private meetings and contacts. The Council receives input on projects from the City’s various commissions including the Planning Commission, Heritage Preservation Commission, Human Rights & Diversity Commission, Parks, Recreation & Natural Resources Commission, Sustainability Commission, and the Flying Cloud Airport Advisory Commission.
The City Council considered the following when preparing the CIP for each project and for the overall plan
• the condition of the City’s infrastructure including the projected need for repair or replacement
• the likely demand for the improvement
• the estimated cost of the improvement
• the available public resources
• the level of overlapping debt in the City
• the relative benefits and costs of alternative uses of the funds
• operating cost of the proposed improvement
• alternatives for providing services most efficiently through shared facilities with other cities or local government units
Capital Improvements Definition
A Capital improvement is a major expenditure of City funds. For the CIP, the City defines a capital improvement where the cost of a single project or piece of equipment is over $25,000.
Below summarizes total project amounts by department
Conclusion
The CIP is an important tool to maintain and provide consistent investment in City equipment, facilities, and infrastructure. Assets are not allowed to deteriorate beyond repair and appropriate repair and replacement are scheduled. Summary and detail information on the cost and funding source for each project is provided in the Capital Improvement Plan document.
City of Eden Prairie, Minnesota
City of Eden Prairie, Minnesota
of Eden Prairie, Minnesota
of Eden Prairie, Minnesota
Project # 13801
Project Name Entry Monument/Signs Category Economic Development
Description
Install City entry monument signs or other branding/signage near major entrances into Eden Prairie. Three monuments have been constructed or approved at Hwy 169/Anderson Lakes Parkway; I-494 westbound; and Hwy 5 eastbound near Dell Rd. A bridge branding for Hwy 212 eastbound at Dell Rd is a separate CIP project worksheet. This worksheet includes a monument sign for I494 southbound that will be similar to I-494 westbound and enhanced bridge branding for 212 westbound. The latter could include adding “Eden Prairie” on the Shady Oak Rd bridge. Design work for these elements is in process with construction in 2024 or 2025.
Justification
The signs will help with wayfinding and economic development by expanding Eden Prairie branding along major highways. This will help provide better awareness and recognition of our City while contributing to a strong sense of community.
Budget Impact/Other
Additional maintenance costs are expected. Useful Life 50 years
of Eden Prairie, Minnesota
Project # 13804
Description
City entry graphics are planned for the retaining wall across the tracks from the station area and plaza at the City West LRT station to create a sense of community and wayfinding as LRT enters/exits Eden Prairie.
Justification
The City entry graphics will assist with wayfinding as they help visitors and residents identify when they have entered Eden Prairie. Another goal of the project is to extend the City's brand experience and be impactful on both an individual and collective basis with other City entry monument signs and bridge branding.
be
Description
The Southwest LRT Project will leave a remnant of undeveloped land at the northwest corner of Town Center Place and Flying Cloud Drive. The Southwest LRT project office has indicated a willingness to allow the City to improve and maintain the area either through fee title transfer or an easement/agreement. No cost for the property rights is anticipated. The budget is for paving, plantings, pedestrian-scale wayfinding and a bench with entry signage. The Flying Red Horse (FRH) is planned for installation at this site. The City has received a grant to cover costs for interpretive panels to convey the historic context of the FRH. Costs for restoration/preservation of the FRH are planned from other sources. Project # 13805
Justification
This plaza is at the vehicular entrance to the Town Center Station which warrants some identification from Flying Cloud Drive to provide wayfinding to the LRT station. This plaza will also serve hotel residents to the north who use the trail along Flying Cloud Drive to the station or to cross to the mall. Therefore, pedestrian-level wayfinding and a bench are also warranted.
Budget Impact/Other
Some annual maintenance will likely be required.
City of Eden Prairie, Minnesota
Project # 24801
Name Station Area Bike Racks & Plantings
Description
The LRT Station Area improvements at City West, Golden Triangle, Town Center and Southwest Stations are largely completed. The exceptions are the installation of bike racks at Golden Triangle and Town Center stations. Bike rack loops are already installed at City West and Southwest Transit will be installing bike racks at Southwest Station. Plantings on the west leg of Town Center Place also need to be installed and could occur in 2024 with an estimated cost of $125,000 - $150,000.
Justification
Improvements will facilitate public gathering, way finding, and access to the station areas. Budget Impact/Other
There will be minimal budget impact for ongoing maintenance.
City of Eden Prairie, Minnesota
Project # 27000
Name Bridge Railing Replacement
Description
Replacement of bridge railings at Prairie Center Drive and Mitchell Road over Highway 5/212. Prairie Center Drive replacement should take priority over Mitchell Road due to its proximity to Southwest Station and LRT expected to be operational in 2027. The MnDOT maintenance agreement specifies the City of Eden Prairie is responsible for bridge railing maintenance.
Justification
Bridge railing maintenance is Eden Prairie's responsibility per the maintenance agreement with MnDOT. These railings are moving toward disrepair.
Budget Impact/Other
There should be minimal maintenance costs.
of Eden Prairie, Minnesota
Project # 17-5990
Project Name Dell Road [Crestwood Terrace to FCD (CSAH 61)]
Description
Upgrade existing rural un-improved roadway section to a two-lane urban collector street with curb and gutter, storm sewer, bituminous trail to Flying Cloud Drive and creek crossing. The project will also review extending utilities (watermain from Crestwood Terrace to Turnbull). It's assumed a gravity system in the ROW connected to private low pressure sanitary sewer systems in houses to serve the westerly Turnbull Road properties. Gravity sanitary sewer can be extended from Reeder Ridge to serve the easterly Turnbull Road properties. The completed Hennepin County CSAH 61 (Flying Cloud Drive) project raised the profile of CSAH 61 and constructed a section of Dell Road (about 0.11 miles) up the hill from the intersection. The construction cost estimate is based on a preliminary design level estimate for 0.45 miles of Dell Road plus a portion of Turnbull Road. Other significant cost items include major grading, retaining walls, creek crossing, and utilities. The construction estimate was completed by the consultant during the feasibility study and includes contingency and engineering. A portion of the roadway improvements will be assessed to adjacent and benefitting property owners, determined by the Feasibility Report. The project's timing is anticipated to be concurrent with the development of the Marshall property located north of the corridor.
Justification
A major portion of this street is one of the last remaining gravel road sections in the community. The horizontal and vertical alignments and surface width are deficient and need to be upgraded to City and Municipal State Aid standards. These improvements will provide a safer corridor and develop a viable collector street for motorists and residents in the area.
Budget Impact/Other
New pavement and stormwater facilities will reduce or eliminate the need for frequent gravel, erosion, and grading repairs. The new roadway and utilities will be added to our standard preventative maintenance programs.
Project # 20820
Department Engineering
Contact Adam Gadbois
Useful Life 40 yrs
Category Transportation Type Improvement
Description
Reconstruct existing 2-lane rural roadway to a 2-lane urban collector roadway (32' wide) including intersection improvements at School Road (likely a mini-roundabout assessed to school per agreement). The project may include reconstruction of the trail on the south side of Scenic Heights Road. Estimated roadway construction cost is based on 0.5 mile @ $7.2M per mile or $3.6M plus a mini-roundabout estimated at $0.8M There are minimal sanitary sewer or watermain improvements needed in the corridor, but there will be stormwater infrastructure and treatment required in a challenging environment which is estimated to add $0.6M. Grading, retaining walls and landscaping may be needed, which could add $0.5M. Engineering is estimated at 25% of the construction cost of $5.5M which results in the total estimated project costs of $6.8M.
The existing roadway is an unimproved segment with no curb & gutter or stormwater management. Issues needed to be addressed include grading, wetland impacts, soils, retaining walls, etc. With the Central Middle School's expansion project and the addition of another grade level at the school, traffic issues at the intersection of Scenic Heights Road and School Road will further deteriorate. As part of the school project approval process, physical and operational improvements were identified on the school property to reduce anticipated increased congestion. In addition, the School District has agreed to contribute $0.8M to the improvements at the intersection. The project is in the City's Transportation Plan and the intersection improvements are proposed to be accelerated to accommodate the school improvements, as well as upgrade a portion of the roadway to current City and MSA standards.
Budget Impact/Other
With additional roadway width, a minimal amount of additional roadway maintenance is expected.
Project # 22824
Name Willow Creek Rd. Street and Utility Improvements
Description
The Willow Creek neighborhood has reached out to the city inquiring about city utilities. The city has received a petition from the neighborhood to study the feasibility of providing city utilities. It is assumed that a new street would be constructed with the utility improvements. The public street within the neighborhood is about 0.56 miles long and estimated cost for a new street is $4.4M/mile plus storm water facilities (20%) plus engineering (30%) for a total of $3.7M.
If new utilities were installed within only public right-of-way, it is estimated that the length of sanitary sewer and watermain would be about 3300 feet. At an estimated cost of $350/foot for sewer and water infrastructure, the estimated utility costs would be $1.5M. The total project costs are estimated at $5.2M. The street grades may limit an effective utility layout for the neighborhood, so a sanitary sewer lift station or a low pressure system may be necessary - an additional $700k is added for the lift station. A feasibility study will identify various options to serve the neighborhood. It is also assumed to include assessments for area utilities.
Justification
This neighborhood is one of the last areas of the city without city utilities. Due to the age of the neighborhood and the condition of their septic systems and possibly their wells, there would be an environmental justification for these improvements. The residents have expressed interest in pursuing city utilities.
utility improvements would add to the city's maintenance responsibilities.
City of Eden Prairie, Minnesota
Project # 24822
Project Name Washington Ave Sewer Lining (Phase 2)
Description
Approximately 3049 LF of 9" vitreous clay pipe sanitary sewer main on Washington Ave is in need of replacement to prevent future failure and to eliminate infiltration of ground water, which is a typical problem of this type of sewer main pipe. The pipe will be rehabilitated with a structural liner which will seal the leaks and provide a continuous, strong alternative to the existing system This is the only known remaining clay pipe in the City's public system. Trenchless lining is less intrusive than replacement by open cut.
Justification
Reconditioning pipe that is likely to fail in the near term will avoid system interruptions and possible sewer backups on private property. Lining the pipe also eliminates the opportunity for ground water intrusion into the sanitary sewer, which results in unnecessary treatment costs and negatively impacts the City's I&I ratios.
I&I grants are also available through Met Council that will be pursued as well as shared cost with Edina.
Budget Impact/Other
Providing a structural liner to existing pipe creates a new pipe inside of a pipe that is structurally sound even if the host pipe fails over time. The life span of lined pipe is equal to that of a new plastic pipe or 50-80 years.
Project # 24830
Project Name Shady Oak Rd. (Flying Cloud Dr. to Valley View Rd)
Pavement Management
Description
The Aspire 2040 Comp Plan identified the existing 2-lane industrial street to be widened to a 3-lane section with trail/pedestrian improvements and streetscape features. However, the existing 2lane street has a volume capacity of 11,050 vehicles per day (VPD). The most recent volume counts from 2020 were 3,550 VPD. New counts will be completed in 2024 and will help understand the future needs of this corridor. The updated proposed scope includes maintaining the existing street width, with the exception of the Valley View Intersection turn lane widening, completing a rehabilitation of the road surface, adding a new bituminous trail along the west side of the road using grant funds obtained by the City along with trail funds, leaving room for potential widening in the future. The rehab cost for the street is estimated at $22.75/SY for this 0.8 mile section ($400k), the trail is estimated at $0.4-$0.6M with the streetscape elements adding $100k. It's anticipated that the streetscape features of lighting and benches will be paid by the Economic Development Fund. Street lighting is anticipated to provide better pedestrian safety at an additional estimated cost of $100k. Engineering is estimated at 25% for a total project cost of $1.625M.
Justification
The Golden Triangle Area is an expected redevelopment area that will result in higher densities and traffic volumes associated with the Golden Triangle LRT Station. The LRT project converted the roadway to a 3-lane section at the intersection with W 70th which will provide necessary capacity, while adding trail, streetscape, and lighting improvements will provide a more pedestrian friendly environment along Shady Oak Road.
Budget Impact/Other
The addition of trails, pedestrian facilities, and streetscape features will add additional maintenance responsibilities. Maintaining the street width will not add any additional pavement maintenance.
Project # 25800
Department Engineering
Schulze
Project Name ADA Ramp Improvement Program Category Transportation
Description
As a component of our ADA Transition Plan for the Right-of-Way, we program and fund annual ADA improvements throughout the city on a priority basis. ADA improvements include sidewalk, trail, and curb ramps. Several priority areas were determined based on a half-mile radius from transit stations, community facilities, high and medium-high density housing, and Southwest Transit bus stops. These priority areas are combined to determine the overall highest priority areas to which ADA improvement projects should be evaluated and implemented on an annual basis.
Justification
The primary objectives of the ADA Transition Plan for the Right-of-Way are to ensure accessibility for all users and to remove pedestrian barriers within the public right-of-way.
Budget Impact/Other
These ADA improvements will add minimal maintenance needs within the right-of-way. Useful Life 20 years
Project # 25801
Project Name Annual Pavement Management
Description
Ongoing maintenance of approximately 234 miles of City streets. Annual Maintenance includes our yearly program for overlays, crack sealing, reclamation, underseals, fog seals, and other supporting pavement maintenance strategies. (Approximately $4M/year)
Significant pavement replacement work will also occur as certain streets no longer benefit from typical maintenance strategies and will require funding beyond our annual maintenance program (around $1-2M/year). This type of work includes reconstruction, pavement and curb replacement, and full-depth pavement reclamation and stabilization of larger segments of roadway. These projects will also be funded by the pavement management fund where appropriate. Projects are identified and prioritized through regular pavement management evaluations completed every three years as well as select pavement area testing. Projects involving multiple funding sources including pavement management will be identified in separate CIP sheets but tracked through the pavement management fund budget.
Utilizing a City-wide pavement management software program, the current Pavement Condition Index (PCI) is approximately 86 out of 100 or Excellent. The two City-wide Pavement Management Program goals are: to maintain an average citywide pavement condition index rating of “Very Good” or better (greater than 70) and to have 90% of streets categorized “Fair” or better (greater than 40). These goals require steadily or intermittently increasing revenue sources such as franchise fees ($5.3M in 2025) and State Aid maintenance revenue ($0.6M).
Preserve a major infrastructure investment and provide an expected level of service to the community. As the City street system continues to age certain roadways are requiring more extensive maintenance including complete pavement replacement or reconstruction. This program will help provide the expected level of service to the community by working to achieve the City's Pavement Condition Index (PCI) goals.
Budget Impact/Other
This item is an operational and maintenance cost that is expected to optimize the life of our street system. In the case of reconstructions, it will restart the life cycle of a street. The level of spending will be adjusted for inflation in the future and to reflect changes in the PCI as determined in Citywide evaluations of the streets on a three year cycle.
of Eden Prairie, Minnesota
Project # 25802
Description
Ongoing surface seal of approximately 234 miles of City streets.
Justification
Preserve a major infrastructure investment and provide an expected level of service to the community.
Budget Impact/Other
This item is an operational and maintenance cost that is expected to optimize the life of our street system. The level of spending will be adjusted for inflation in the future and to reflect changes in the PCI as determined in Citywide evaluations of the streets on a three year cycle.
Project # 25803
Project Name Annual ROW Maintenance and Repairs
Description
This funding source is for miscellaneous public works maintenance, repair, and replacement projects. Projects likely to be funded include minor fence repairs and replacements, guard rail repairs and replacement, sound wall staining, retaining wall repairs and replacements, and other city responsible maintenance improvements without a designated funding source or part of a larger project. There are currently 6 Public Works retaining walls identified to be in poor condition. This funding will prioritize those walls with goal to eliminate all walls in poor condition while continuing to maintain the additional projects listed above.
Justification
This funding source will allow the Public Works Department to prioritize and finance repairs and improvements that arise and provide an ability to react to yearly issues and priorities.
Budget Impact/Other
This provides a schedule and priority of maintenance, repair, and replacement issues rather than being reactive to failed infrastructure.
Project # 25804
Description
This CIP item will be used for repair or replacement of streetlights throughout town that have expired 25-year contracts with Xcel Energy. There are approximately 475 streetlights with rate code A30-Q5, meaning that Xcel Energy maintains and repairs them for 25 years from the installation date. 110 of those streetlight contracts have already expired, and Xcel Energy only performs basic maintenance of the photo controls and ballasts. If the pole is damaged or in disrepair, or there are any underground faults, the City is responsible for the cost. These lights will be systematically replaced with new lights at a capital cost of about $1,800 per light and a monthly service cost of about $22 per month per light. They will then no longer be on 25-year contracts and Xcel Energy will own and maintain them.
Justification
This will allow the Public Works Department to finance replacement of streetlights that are aging and on expired contracts with Xcel Energy.
Budget Impact/Other
After the capital cost of these streetlight improvements there will be an ongoing service cost at Xcel Energy's standard rates.
Project # 25805
Description
The Transportation Fund 5165 funding source can be used for minor signal systems improvements such as signal re-timing efforts, RRFB or LED pedestrian crossings, etc. Funds will also be used for a phased replacement of aging traffic signal cabinets (likely two per year), conversion of signal cabinets from cellular connectivity to fiber, and conversion to flashing yellow arrow where appropriate. PTZ cameras will also be added to specific intersections similar to signals at Singletree Ln, Preserve Blvd, and Technology Dr.
Eden Prairie currently is an active partner in the following 2 coordinated signal systems: The Major Center Area system is 30+ signals that are split between MnDOT, Hennepin County, and the City. The Mitchell Road system is a 6 signal system that is split between MnDOT, Hennepin County, and the City. Maintaining effective and up to date signal timing plans is a key component of managing and operating the roadway system. The MCA system will cost approximately $50,000 every 3 to 5 years. The Mitchell Road system will cost approximately $20,000 every 3 to 5 years.
Justification
This funding source will allow the Public Works Department to finance minor signal timing and improvements that arise and provide an ability to react to yearly issues and priorities.
Budget Impact/Other
These signal related improvements will provide operational and safety enhancements for various vehicular and pedestrian situations.
City of Eden Prairie, Minnesota
Project # 25813
Project Name Plaza Dr (PCD to Valley View Rd)
Description
Due to the complexity of this pavement rehabilitation project, it is being pulled out of the recurring Annual Pavement Management plan. This project may entail additional design and construction efforts beyond the typical rehab project specifically around the culvert crossing that has settlement around it.
Costs are based on Full Depth Reclamation plus 6-inches of bituminous and traffic control = $37/SY 20,000 SY = $740,000 and $100,000 for stormwater improvements, and 25% for engineering = $1,050,000.
Justification
The road is settling at an existing culvert, new roadway design over the existing storm sewer will be needed. The pavement condition has declined and a combination of a mill & overlay, full depth reclamation and possibly stabilizing will be needed.
Budget Impact/Other
This rehabilitation will restart the life cycle of the pavement. Additional maintenance costs for sealing (8-10 year cycle) and overlays (20 year cycle) are modest.
of Eden Prairie, Minnesota
Description
This project would connect two dead-end segments of Magnolia Trail. A City standard 28-foot wide urban street section with a five-foot wide concrete sidewalk would be extended, along with a connection of the watermain. New storm sewer would be added to accommodate the new impervious surface. The new street, sidewalk, and storm sewer are estimated at $4M per mile (0.05 mile) or $0.2M. Storm sewer is estimated at $0.04M and watermain is estimated at $0.06M. Engineering is estimated at 15% of the construction cost, since most of the design will be done in-house, bringing the project cost estimate to $0.345M. Project # 25814
Justification
The connection would allow for improved traffic circulation and easier emergency response for both Arrive and Fountain Place townhome associations. Additionally, connecting the watermain would eliminate two existing long dead ends, resulting in better flows and more flexibility during watermain breaks or fire response.
Budget Impact/Other
This
Project # 25815
Project Name CSAH 1 (Pioneer Trail) Bridge #27542 over HCRRA
Description
Hennepin County approached the City about replacing the CSAH 1 bridge over the HCRRA LRT Regional Trail near the county line with Carver County and the City of Chanhassen. The County is soliciting federal funds for a 2026 program year. They have requested cost participation from the City based on an 80/20 cost split after the federal funds are applied, although the City has indicated that we have concerns about the level of City participation based on the value received from the bridge replacement. Hennepin County is considering cost participation from Carver County in addition to the City since the bridge is located on the county border. The bridge is planned to have pedestrian facilities, but there is still a gap in trails between this bridge and Riley Lake Rd, which would require CSAH 1 to be reconstructed to fill.
Justification
This is a County directed project which likely requires City cost participation based on the County's cost participation policy.
Budget Impact/Other
It's anticipated that very little City maintenance responsibility will be needed unless pedestrian facilities are included with the bridge replacement. With pedestrian facilities, the City would likely be responsible for trail/sidewalk maintenance.
Project # 25816
Project Name CSAH 4 (Eden Prairie Rd.) Bridge #27502
Description
Hennepin County approached the City about replacing the CSAH 4 bridge over the TC & W Railroad Corridor. The County is soliciting federal funds for a 2027 program year. They have requested cost participation from the City based on an 80/20 cost split after the federal funds are applied, although the City has indicated that we have concerns about the level of City participation based on the value received from the bridge replacement. The City is willing to participate at some level in the bridge costs with the ability to add new and improved pedestrian facilities on the bridge. Currently, the only pedestrian facility at this location is on a separate City-owned pedestrian bridge on the west side of the existing bridge. With a new bridge, the City can have new trail facilities on both sides of the new roadway bridge, but with additional trail gaps to fill.
Justification
This is a county directed project which likely requires city cost participation based on the county's cost participation policy.
Budget Impact/Other
It's anticipated that city will be responsible for maintenance for the new trail/sidewalk maintenance on the bridge.
City of Eden Prairie, Minnesota
Project # 26800
Project Name Riverview Road (Homeward Hills Rd. to Parker Dr.)
Department Engineering
Contact Megan Larson
Useful Life 40 yrs
Category Transportation Type Improvement
Description
This project will re-construct the existing two-lane rural un-improved section to an urban two-lane with a trail. The schedule for this project is extended due to the decision to reclaim and repave the roadway in 2009 rather than reconstruct the roadway. The project length is about 0.3 miles with the construction cost estimated at $4.41M/mile. Stormwater management is assumed to be an additional 20%. Engineering is assumed at 25%. Assessment amount is based on remaining 26 properties that have not paid the $3800 special assessment.
Justification
This reconstruction project will upgrade the roadway to an urban section and provide stormwater facilities and a new trail.
Budget Impact/Other
This project will increase trail and stormwater maintenance.
City of Eden Prairie, Minnesota
Project # 26801
Project Name Creek Knoll Road Bridge
Description
This project would replace the bridge over Purgatory Creek, which is over 100 years old. The cost estimate assumes a 52' x 25' bridge @ $250/sf ($0.325M) with about 0.18 mile of street reconstruction to the north at $4.95M/mile ($0.9M) and engineering at 25%. This project will need a creek bypass and a possible roadway bypass (estimated at $0.2M). There may be an opportunity to obtain state bridge funds. City Historic Site.
Justification
The project will replace an old deteriorating bridge that has deficient railings and abutments. A reconstructed urban street section is included in this project to extend the urban section to the south side of the bridge.
Budget Impact/Other
A new bridge will reduce the maintenance needs of the current bridge but will add long-term maintenance needs for the new bridge. The new street section will have minimal maintenance impacts.
Project # 27800
Project Name Beach Road Rehabilitation and Water Main
Department Engineering
Contact Megan Larson
Type Improvement
Useful Life 40 yrs
Category Engineering
Description
This project will provide access to city water and fire protection for the residents along Beach Road. This project was previously only a watermain project, but due to the condition of the street, this project now includes major rehabilitation or reconstruction of the entire street section with the watermain installation. The estimated cost per mile for the full-depth reclamation with cement stabilization would be about $700K/mile. Total reconstruction is estimated at $4.06M per mile. This cost for total reconstruction assumes constructing a standard 28' urban street with concrete curb and gutter. With this street having mostly one sided frontages and a rural section, the reconstruction could be less expensive if replaced with a rural section and the existing width. It's assumed that the best solution for the street reconstruction is a full-depth reclamation with cement stabilization at an estimated cost of $700K/mile. With about 1.2 miles of street without curb and gutter, the estimated cost of the pavement rehabilitation would be $840K.
The cost of the watermain is estimated at $1.17M (5200' x $225/ft) with 20% engineering. This neighborhood has sanitary sewer provided along the lake. Assessments for the watermain will likely be in the form of a connection fee at the time of connection. The water portion of the service connection fee is 40% of the city's utility connection fee.
Justification
The Beach Road residents have asked about the availability of city water for domestic use and fire protection. A portion of the road is currently in MnDOT right-of-way. Connection fees would be used if a property owner chooses to connect to city water service. However, the Water Access Fund will be needed to finance a significant portion of water main costs for the project.
Budget Impact/Other
This project will add additional water main to the system with the associated maintenance and operational responsibilities.
Project # 28800
Life 40 yrs Project Name W. 78th Street / Den Rd. Intersection
Description
Install a traffic signal and turn lanes at the W. 78th Street / Den Road intersection. Project would also include geometric revisions to the intersection. A roundabout or mini-roundabout may be a feasible alternative option. Project could be combined with W. 78th Street / Singletree Lane realignment project or a redevelopment project involving the mall and this access point.
Justification
Recommended project in MCA Study. Former Project Number PE-MCA 8052 With anticipated traffic growth, intersection is expected to require capacity improvements. Mall redevelopment may be the catalyst.
Budget Impact/Other
The City will be responsible for the operation, maintenance, and energy costs for the signal. Overall impacts are minimal. Roundabout would be less maintenance than a signal.
of Eden Prairie, Minnesota
Project # 29800
Engineering
Improvement Contact Megan Larson
Life 40 yrs
Project Name Duck Lake Trail (Duck Lake Rd to CSAH 4) Category Transportation
Description
Upgrade the existing rural roadway to a 2-lane urban street with a trail replacement on the north side, a new sidewalk on the south side (about 350 feet of sidewalk exists) and stormwater improvements. Intersection improvements at CSAH 4 are included in this project. It's assumed that the existing right-of-way will be sufficient to accommodate the new roadway, trail, and sidewalk improvements. However, there will be additional right-of-way needs (estimated at $0.472M) for intersection and stormwater improvements. Stormwater is estimated at $0.6M. The sidewalk extension is estimated at $.37M per mile. The estimated construction cost is based on 0.6 miles @$5.04M per mile. Engineering is estimated at 25%. Street and stormwater assessments are presumed for curb and gutter and stormwater improvements for the properties that take direct access to Duck Lake Trail including the church near CSAH 4.
The existing roadway is an unimproved segment of roadway with no curb and gutter, flat grades, and drainage issues. Testing will determine if a pavement reclamation (with or without stabilizers) can be used to reduce project costs and avoid a full reconstruction of the corridor. The project estimate is based on a full reconstruction of the segment and will bring the roadway up to current City and Municipal State Aid standards.
Budget Impact/Other
With a new street, trail, sidewalk, and stormwater facilities, additional pavement, trail/sidewalk, and utility maintenance is expected.
City of Eden Prairie, Minnesota
Project # 30800
Department Engineering
Contact Carter Schulze
Project Name CSAH 4 (Spring Road) Water main Category Water Distribution
Useful Life 50 years
Description
This project closes a gap and completes a loop in the water main system. The project will connect an 8" water main from the existing stub on CSAH 4 (Spring Road) south of Prospect Road to the 8" stub constructed with Hennepin County's CSAH 61 (Flying Cloud Drive) project near the Lion's Tap site. The estimated length is 2000 feet at a cost of $315 per foot ($635K) including road restoration plus engineering ($125K). Schedule is pushed back due to Hennepin Co rehabbing pavement on CSAH 4 in 2024 and there is a 5 year moratorium on pavement.
Justification
This project will complete a loop in the water system. Having a water system with continuity/loops provides better water quality and fire protection for the customers.
Budget Impact/Other
The water main will increase the overall water distribution infrastructure and require additional maintenance responsibilities.
City of Eden Prairie, Minnesota
Project # 30801
Project Name Roberts Drive (Baker Rd. to Topview) Category Transportation Type Improvement Contact Megan Larson
Description
Upgrade existing rural roadway to a 2 lane urban roadway with trail replacement and new sidewalk. Construction cost is based on 0.7 miles @ $5.5M per mile or $3.9M. There is no existing stormwater infrastructure, so stormwater would add 20% or $0.77M. A 500' sanitary extension is included to capture two properties without services at additional $250/LF or $0.125M. Engineering is estimated at additional 25%.
Justification
The existing roadway is an unimproved segment of roadway with no curb & gutter. The project will bring the roadway up to current City standards.
Budget Impact/Other
With additional roadway width, a minimal amount of additional roadway maintenance is expected. Useful Life 40 yrs
Project # 31800
Name
Department Engineering
Contact Megan Larson
Useful Life 40 yrs
Category Transportation Type Improvement
Description
This project proposes to upgrade the existing 2-lane rural roadway to a 2-lane urban section. The estimate is based on upgrading the roadway from the westerly end of the TH 169/I-494 improvements to the improved section near Prairie Center Drive. A new trail will also be included in the project to extend the trail from the east end of the project toward Prairie Center Drive. The construction cost estimate is based on 0.75 miles @ $5.0M per mile plus an additional $390k per mile for the new trail. Sanitary sewer and watermain exists within or outside the corridor. However, there is no stormwater infrastructure in the corridor so it's estimated that $0.75M will be needed for storm sewer. Engineering is estimated at 25%. The total project costs are estimated at $6M.
Justification
MnDOT re-constructed the interchange of TH169 and I-494 in 2011-2012, which includes a new Washington Avenue bridge connecting Viking Drive with West 78th Street. With the MnDOT project, the West 78th Street corridor was designed to accommodate an extra west-bound lane adjacent to the north side retaining wall, if needed. With these improvements, there is still a gap in roadway and trail improvements along this segment from the Golden Triangle Area to the Major Center Area.
Budget Impact/Other
Upgrading the rural section to an urban section will add a minimal amount of pavement maintenance. The new trail along the south side of the road will increase trail maintenance.
City of Eden Prairie, Minnesota
Project # 33800
Project Name CSAH 4 and TH 5 Intersection
Description
Construct new upgraded TH 5/ CSAH 4 Intersection or Interchange. Based on the selected design, this project may require widening, reconstruction or an interchange. Partnering with MnDOT and Hennepin County, a comprehensive analysis needs to be completed to determine the appropriate scope of the project. In addition, consideration should be given to alternative interchange designs. May also include the Fuller Dr intersection as well as Terrey Pine and Wagner Way. Appendix F interchange approval process needed from Met Council to proceed.
Justification
This area has been identified in the comprehensive plan as an area of concern relative to traffic and access. An area study is underway with SRF, MnDOT and Hennepin County to study components of the area. Recommendations considered range from minor intersection improvements to full interchanges redesign.
Budget Impact/Other
The majority of the interchange area is under the jurisdiction of the State and Hennepin County. As a result, additional maintenance / operation costs are negligible. Useful Life 60 yrs
City of Eden Prairie, Minnesota
Project # 33801
Project Name Valley View Rd / Shady Oak Rd Traffic Signal
Department Engineering
Contact Adam Gadbois
Useful Life 20 years
Category Transportation Type Improvement
Description
Construct new traffic signal at Valley View Rd. / Shady Oak Rd intersection. In addition, provide additional approach lane on Shady Oak Rd and potentially left turn lanes on Valley View Road. Assume $350,000 for traffic signal and $650,000 for turn lanes and other improvements. Add $250,000 for Engineering the prior year to construction. A roundabout may be a feasible alternative at this location. However, it is noted that with this option project costs may be higher. LRT revising driveway on 4th leg to align for signal.
Justification
Additional development / redevelopment in the Golden Triangle Area will require improvements at this intersection including the addition of the LRT station.
Budget Impact/Other
The City will be responsible for the operation, maintenance, and energy costs for the signal. Overall impacts are minimal.
City of Eden Prairie, Minnesota
Project # 34800
Project Name Bryant Lake Drive (212 Ramp to Shady Oak Rd)
Description
Upgrade existing rural roadway to a 2-lane urban collector roadway with trail improvements. Cost is based on 0.9 miles @ 6.5M per mile, 20% for stormwater. Total includes 25% for engineering.
Justification
The existing roadway is an unimproved segment of roadway with no curb & gutter. The project will bring the roadway up to current City standards.
Budget Impact/Other
With additional roadway width, a minimal amount of additional roadway maintenance is expected.
Project # 34801
Project Name Valley View / TH 169 Interchange
Department Engineering
Contact Carter Schulze
Useful Life 60 yrs
Category Transportation Type Improvement
Description
Construct new upgraded TH 169 / Valley View Road interchange. Based on the selected interchange design, this project may require widening or reconstruction of the bridge over TH 169. Partnering with MnDOT and the City of Edina, a comprehensive analysis needs to be completed to determine the appropriate scope of the project. In addition, consideration should be given to alternative interchange designs.
The TH 169 / I-494 project originally included substantial improvements to this interchange. These improvements were ultimately eliminated from that project. MnDOT, Edina, and Eden Prairie agreed to re-evaluate the scope of the proposed improvements of the TH 169 / Valley View Road interchange after the TH 169 / I-494 project is complete and traffic patterns have adjusted to the completed interchange improvements.
The TH 169 / I-494 Cooperative Agreement includes language in which MnDOT agrees to use the reduced project scope identified in the agreement as the baseline for their participation in a future project. The City anticipates a greater need than the reduced scope of the latest project layout. This interchange is one of only five planned access points to the Golden Triangle area. The existing design experiences regular congestion and is inadequate to serve the future needs of the area.
Budget Impact/Other
The majority of the interchange area is under the jurisdiction of the State or the City of Edina. As a result, additional maintenance / operation costs are negligible.
City of Eden Prairie, Minnesota
Project # 34802
Project Name Prairie Center Drive Commonwealth 3/4 Access
Description
Reconstruct the PCD and Commonwealth intersection to a 3/4 access.
Justification
As part of the Castle Ridge Development, the traffic study shows a 3/4 access would be necessary when the intersection level of service drops below a level F causing backups into the development and unsafe exiting conditions onto Prairie Center Drive.
Budget Impact/Other
The City will be responsible for the maintenance of the intersection improvements. Overall impacts are minimal. Useful Life 40 yrs
City of Eden Prairie, Minnesota
Project # 21200
Project Name City Wide Building Restoration
Description
Replace failed caulk, tuck-point failed mortar joints, failed brick and concrete block, window glazing repair, door replacement, expansion joint and concrete repair, paint steel and wood components.
Justification
Annual maintenance of City buildings.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 21201
Project Name City Center, Heat Pump Replacement
Department Facilities
Contact Rick Clark
Type Facilities/Buildings/Environmental Cont
Useful Life 10 to 15 years
Category City Center
Description
10% replacement of older and faulty heat pumps per year (260 total). Also used as a funding source when other major mechanical equipment fails. Examples include boiler tube replacement, replacement of a 25 horsepower compressor in the chiller, replacement of a cooling tower pump or core water loop pump and replacement of a cracked heat exchanger in the Police Dispatch air handling unit. This equipment always starts in the $5,000-$10,000 range, and some of the equipment can easily exceed $25,000.
Justification
Much of the original heating, ventilation, and air conditioning (HVAC) equipment within the facility is 25 years old. The typical life of heat pumps is about 15 years. The typical life of most of the other equipment within the building is 20 years, at which time it needs to be rebuilt or replaced. When equipment reaches the end of its useful life, we maintain it until the maintenance costs exceed the cost of new equipment. For example, a heat pump that is 10 years old, has been well maintained, but the compressor fails. A new heat pump costs $6,000-$7,000 and a compressor costs $3,000. In this case we would replace the compressor because it is likely that the heat pump will remain serviceable for at least 5 more years, probably more. However, if the heat pump is 16 or 17 years old, we would replace the entire heat pump. At that age, the likelihood of the fan motor, the evaporator or condenser coils (a type of heat exchanger) or other costly components failing soon is very high. It would not be economically prudent to put a new compressor in a heat pump that old. A different type of example is when our (approx) 20 year old hot water boilers failed because the hot water tubes (another type of heat exchanger) cracked and leaked. The "shell" of the boiler is likely to be good for 40 years or more, so even though the replacement of the tubes was in the $25,000 range, the likelihood that the boiler will be serviceable for another 20 or 30 years is very high. However, if the boiler was 45 years old, we would evaluate the replacement of the tubes very differently.
Budget Impact/Other
City of Eden Prairie, Minnesota 2025 2034 thru
Project # 22204
Project Name Fire 1, Seal Apparatus Bay Floors
Description
Seal Apparatus Bay Floor in Fire Station 1 and re-do striping/coloring.
Justification
Maintenance item to preserve concrete floor from damage.
Budget Impact/Other
City of Eden Prairie, Minnesota 2025 2034 thru
Project # 25202
Project Name Fire Station 4, Seal Apparatus Bay Floor
Description
Seal Apparatus Bay Floor in Fire 4 and re-do striping/coloring.
Justification
Maintenance item to preserve concrete floor from damage.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25206
Project Name Community Center PA and Emergency Button
Description
The Community Center currently only has a PA notification system in the 2008 addition side of the building. Staff desires to have a PA system at the front desk that can notify the entire building for notices or safety concerns. We will also tie in an emergency/panic button at the front desk as part of the project similar to what is done at the City Center.
Justification
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25209
Description
Complete Facility Condition Assessments at all City buildings. This process will redevelop the current deferred maintenance needs for City facilities, develop a new long-term facility maintenance plan and provide prioritization of the current needs for City facilities. The assessment will be provided on a digital platform and will help staff understand the current status of the facilities, prioritize immediate needs, and provide long-term facility maintenance plans for budgeting.
Justification
A similar process was done in 2004 by EPI. Our buildings capital needs are growing as they age. This will help identify and prioritize timing of maintenance items for budget purposes.
City of Eden Prairie, Minnesota
Project # 26202
Project Name City Center Partial & Fire 1 Asphalt
Description
Mill and Overlay part of City Center and Fire Station 1 parking lot, entries, and drives.
Justification
The asphalt parking lot and drives are deteriorating and over 20 years old with spidering and large cracks.
Budget Impact/Other
This will decrease operating expenses by limiting annual repairs after the freeze/thaw cycle.
City of Eden Prairie, Minnesota
Project # 27204
Project Name Fire 2 and 3 Kitchen Remodels
Description
Remodel and update kitchens at Fire 2 and 3.
Justification
The kitchen cabinets and countertops are 20 plus years old and showing signs of wear.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 27205
Project Name Park Shelter Roofs
Description
Miller Softball, Miller Baseball, Miller Ice, Prairie View, Homeward Hills Barn (roof and siding), Outdoor Center and Animal Junction shingle roof replacements
Justification
All park shelters and buildings listed in the above description have 25+ year old single tab shingle roofs with a life expectancy of 15 years. Shingles have been coming loose and chipping over the years.
Budget Impact/Other
Project # 27206
Project Name Genetec Synergis Access Control System
Department Facilities
Contact Rick Clark
Type Software and Hardware
Useful Life 20-25 years
Category City-wide
Description
Moving from the obsolete Amag system to the Genetec Synergis access control system platform allows for a single unified platform for access control, IP video, intercom audio and intrusion/burglar alarm systems. Genetec Security Center manages all of these systems. Moving to Synergis will allow for integration of card reader door alarms such as forced open door or propped open doors with the video system. Video clips of door alarm incidents will be available for those doors or areas that have a camera. The new software will give the multiple users who utilize the card access system for door scheduling a more user friendly front end to operate.
Justification
Card Reader technology security enhancement
The low frequency proximity technology in use at the City has been hacked. This card technology is no longer secure. Low frequency proximity cards can be cloned and used by bad actors to gain access to buildings after they have been terminated or leave city employment. Communication between the card reader and Amag panel has also been hacked. A bad actor with knowledge of a card reader door could potentially remove the reader short out cables and open the card reader door. Upgrading from Amag to Genetec Synergis will allow the City to increase security of the access control system. Genetec Mercury hardware panels can be configured for OSDP communication between the card reader and the panel. OSDP communication provides secure encrypted communication between the card reader and panel preventing tampering. The current Amag system in place does not support OSDP communication.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28202
Project Name Community Center Front Entry and Office Carpet
Description
This is a placeholder in the event a lobby update does not happen. Replacing the worn carpet in the main entrance and offices of the Community Center.
Justification
The carpet at the Community Center is worn and past its useful life for a high traffic area.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28204
Name Maintenance Facility, Replace Roof
Description
The Maintenance Facility roof has reached its theoretical useful life. We will continue to maintain it until economically unfeasible to repair. An additional cost of $200k for removing and reinstalling the solar panels is factored into this budget.
Justification
The roof is over 30 years old and past life expectancy.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28205
Project Name Art Center Front Desk and Entry Renovation
Description
Art Center programming and staffing levels have increased over the years. This project would remove the curved front desk and ceiling drop tray squaring off the area to provide two workstations. One for greeting and check in and another for a full time staff to work as well as fill in for greeting/check in. It would also provide an area for programming display.
Justification
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28206
Project Name Maintenance Facility Carpet
Description
Replace existing carpet at the Maintenance Facility.
Justification
Carpet is showing signs of wear and in need of replacement.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 29202
Project Name Maintenance Facility Concrete Drive Lanes
Description
The large bay main drive concrete is failing. This is likely due to the soil underneath or the possibility of moisture. This project will remove the concrete, repair any soil issues and re-pour concrete drive lanes.
Justification
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 29203
Description
Update the Community Center's 2008 front entry and front desk area improving traffic flow and guest entry. This would also include remodeling and updating the original locker rooms, showers and bathrooms.
Potential for naming rights.
Justification
With the carpet due for replacement, locker rooms needing updating and Cambria's contract from 2008 expiring, this is a good time to look at updating our community's most public facing building. Staff have also expressed interest in reconfiguring the flow of traffic for multi sport programming, particularly during large events.
City of Eden Prairie, Minnesota
Project # 29204
Description
This project would reconfigure a break room and a meeting room creating 2 additional offices for supervisory staff and 2 additional cubes for part time staff.
Potential for naming rights.
Justification
The break room is not utilized beyond a simple kitchenette. The aquatics supervisor is currently in a meeting room reconfigured as 2 cubes. Park and Rec would like to reconfigure the space as it is desired for all supervisory staff to be located at the front of the building.
City of Eden Prairie, Minnesota
Project # 29205
Project Name Community Center Water Heaters
Description
Replacing water heaters (3) and water holding tank for the locker room showers and restrooms.
Justification
These water heaters were installed in 2008 and are past life expectancy. The water holding tank is original to the building.
Budget Impact/Other
Higher efficiency water heaters will be used
City of Eden Prairie, Minnesota
Project # 30202
Project Name Community Center HVAC
Description
Replacement of past useful life HVAC equipment at the Community Center. This equipment was installed during the 2008 addition/remodel.
Justification
Past service life. High efficiency units will be installed.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 30203
Project Name City Center East MUA Replacements
Description
Replacement of the 2 make up air units that serve the east side of the building. These units are over 40 years old and beyond life expectancy. These are critical to the air quality and comfort of the building.
Justification
These units are original to the building (1979) and over 45 years old.
Budget Impact/Other
Higher efficiency units will be installed.
City of Eden Prairie, Minnesota
Project # 31201
20-25 years Project Name Liquor #1 RTU #2
Description
Replacement of rooftop unit serving liquor store 1.
Justification
Beyond life expectancy at 25 years old.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 31202
Project Name Fire 3 Roof
Description
Replace roof.
Justification
Roof is 30 years old and past its useful life.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 31203
Name Fire 3 Truck Bay MUA
Description
Replacement of the MUA in the truck bay of Fire 3. This unit serves as make up air in the event of high CO or NO2 readings measured in the truck bay as well as emergency heat in the event the radiant heat fails.
Justification
Unit will be 42 years old by this replacement time and has multiple parts needing replacement. These do have longer life expectancy than most HVAC as they are not often used.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 31204
Project Name Fire 4 Furnaces and AC
Description
Replacement of 4 furnaces with AC
Justification
Past life expectancy of 20 years
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 31205
Project Name Senior Center Lower Level Remodel
Description
Remodel the kitchen and update the lower level at the senior center creating a greeting space for programming. This will also include adding onto the lower level creating a vestibule entrance.
Justification
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 32201
Project Name Liquor 3 RTU's #1 and #2
Life 20-25 years
Liquor store 3 (Prairie View)
Description
Replacement of the 2 rooftops serving liquor store 3.
Justification
Beyond life expectancy at 25 years old.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 32202
Project Name Senior Center, Replace Roof
Description
Replace roof at Senior Center
Justification
End of theoretical useful life
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 33203
Project Name Fire 2 Truck Bay MUA
Description
Replacement of the MUA in the truck bay of Fire 2. This unit serves as make up air in the event of high CO or NO2 readings measured in the truck bay as well as emergency heat in the event the radiant heat fails.
Justification
Critical unit and over 40 years old
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 33204
Project Name Maintenance Facility MUA's
Description
Replacement of 5 make up air units on the roof serving the smaller shop bays and replacement of the 2 larger make up air units serving the large truck bay. These units provide emergency heat in the event the radiant fails and are critical to bringing in fresh air if CO or NO2 sensors are triggered.
Justification
Beyond life expectancy. By 2033 they will 36 years old.
Budget Impact/Other
City of Eden Prairie, Minnesota 2025 2034 thru
Project # 34202
Project Name Fire Station 2, Seal Apparatus Bay Floor
Description
Seal Apparatus Bay Floor in Fire 2 and re-do striping/coloring.
Justification
Maintenance item to preserve concrete floor from damage.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 34205
Project Name Fire 1 Truck Bay MUA
Description
Replacement of the MUA in the truck bay of Fire 1. This unit serves as make up air in the event high CO or NO2 readings are measured in the truck bay as well as emergency heat if the radiant heat fails.
Justification
Critical unit and past life expectancy at 36 years old by 2034
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 34206
Project Name City Offices Carpet
Description
Replacement of carpet in main entrance, public areas, council chambers and City office areas. This is upper level only.
Justification
Useful life and wear. Current carpet was installed in 2017-2018.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 07603
Project Name Station Alerting
Description
This is our station alerting system for all four fire stations and the dispatch center. This system includes an interface to our CAD system, speakers, lighting, and digital display devices.
$75,000 in 2022 - complete the install of the station alerting system at each fire station. Original install 2019.
$75,000 in 2029 to provide updates/enhancements to the system.
$150,000 - Replacement for end of life of the 2019 station alerting system.
Justification
$75,000 in 2029 to maintain and upgrade station alerting project.
Reduce 2029 expenditure as part of additional funds for new Ladder Truck
$150,000 in 2039 - Replace the 2019 station alerting system that will be at end of life.
Budget Impact/Other
Avoid costly unbudgeted repairs. Sustain and improve system reliability to ensure timely response to emergency incidents.
of Eden Prairie, Minnesota
Project # 10600
Project Name SCBA Equipment
Description
SCBA stands for self contained breathing apparatus. SCBA is one of the single most important pieces of gear worn by firefighters. It allows firefighters to enter hostile environments without fear of compromised breathing.
There are no alternatives to SCBA to supply oxygen to firefighters involved in a fire event. Every firefighter needs a personal mask and regulator. It is not feasible for firefighters to share these pieces of equipment. Federal and state safety laws require the use of this equipment for firefighters to perform their duties.
Justification
JPA (Joint Power Agreement) pricing is established. Includes cost of: Airpack frame
Mask
Regulators
Bottles (45 min and 60 min).
Maintenance fee
Set up fee
Rapid Intervention Teams packs
Budget Impact/Other
Implemented current SCBA in 2021.
Adjusted years to reflect current practice.
Adjusted pricing to reflect current costs.
Project # 14600
Description
Camera systems are in City facilities for security and risk management. This project is for upgrades of equipment and servers at the end of useful life. The project does not include cameras and servers for the LRT to provide coverage in areas where the Metropolitan Council and Metro Transit will not have coverage.
Justification
First generation of Analog cameras from 2006 are at end of life. We have 280 cameras throughout the City with 487 views.
Ongoing replacement for end of life cameras and servers. Servers include all city buildings except water treatment plant and liquor stores.
2027 includes water tower camera from the vantage point atop the water tower, the two PTZ cameras would be able to see, zoom into a large portion of the retail areas within the city to provide live video. Having a large coverage area, dispatch/officers/fire would be able to maintain visual on mobile incidents much better. With the addition of the light rail, this would also provide a way to view many of the elevated sections. Live video would feed into security desk, and thus, would require minimal additional funds to operate.
City of Eden Prairie, Minnesota
Project # 14605
Project Name UPS Replacement for Dispatch and Radio Tower
Description
UPS is the uninterruptable power supply used to ensure power is not lost to key communication infrastructure components such as the dispatch area and the radio tower. This project is the replacement UPS for dispatch and radio tower at the end of useful life.
Justification
Replacement UPS for dispatch and radio tower - UPS is critical for uninterrupted service delivery.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 17602
Project Name Radio Loggers
Description
Radio Loggers are used to record public safety radio communications.
This project is for the replacement and upgrade to dispatch radio logging. Motorola currently pays for the ARMER maintenance agreement - we pay fees for this. (Washington County). Motorola could pay for the new maintenance agreement.
Justification
Ensure proper logging of communications.
End of life equipment.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 17603
Project Name Phone Loggers
Description
Phone logger is used to record phone communications in the dispatch center.
This project is to replace the recorders for 911 which are at end of life.
Justification
To ensure recording of all dispatch phone calls. Equipment is at end of life.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 20601
Description
800 MHz radios are used by police, fire, public works, parks, and facilities for critical day to day communications. Radios are mobile and portable.
This project is to replace mobile and portable radios that were last replaced in 2016 to 2018. Radios are given a 10 year life cycle by the manufacturer.
Justification
Ongoing replacement cycle.
Costs have gone up, but we are reducing inventory to ensure we get what we need and utilize the correct number of radios. This will help us to stay with the current dollar amounts.
Impact/Other
City of Eden Prairie, Minnesota
Project # 21601
10 years Project Name SCBA and PPE Washer
Description
The machine was purchased in 2021. This machine allows our firefighters to clean SCBA and PPE to a new level. This equipment is to specifically wash SCBA and PPE to remove carcinogens and other contaminants from this equipment.
This project is to replace equipment for our city while striving to provide effective tools to enhance the health and safety of our firefighters.
Equipment is also used by the police department for decontamination.
Justification
Equipment to wash SCBA and PPE to meet current standards and minimize health impacts to our firefighters.
Replacement for end of life equipment.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 22601
Project Name Emergency Operations Center - Station 1
Description
This project is the effective EOC facility at Station 1.
Station 4 is an alternate EOC.
Station 1 -
Operations and Technology -- no major facility upgrades
Video and Audio System for the EOC - Crestron System Monitors
White Boards
Tables/Chairs
Justification
EOC at Station 1 to allow for more effective EOC operations on City Center campus and have redundant fiber connection.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 22602
Description
SCBA fill stations and compressors are needed to fill the SCBA bottles with specific grade breathing air for the SCBA at the fire department. Fill stations and compressors are located at Fire Station #1 and Fire Station #4.
This project is to replace end of life SCBA fill stations and compressors.
Justification
Replace end of life fill stations and compressors for SCBA bottle filling at Station 1 and Station 4
This project is moved back 7 years due to ongoing research and performance of the current system. Coordinate with next SCBA replacement.
City of Eden Prairie, Minnesota
Project # 23600
Name Sprinkler Control Training Room
Description
Life 10 to 20 years
Fire
Training Prop for sprinkler and alarm operations. Specific sprinkler risers wet/dry and fire alarm system training simulators. Adding this training tool to fire station #2 where firefighters could utilize it on shift, would be an effective option. Components needed would be a training FDC with riser, a wet and dry system connected to a proper fire alarm system, notification devices, and initiation devices such as pull station and smoke alarms.
Would like to move this project up 1 year to 2025
Justification
Training Prop will be used for facilitating new and ongoing training for the fire department. This will allow firefighters to understand sprinkler and alarm systems and refresh their knowledge on the systems. This allows us to be more effective with our alarm response and restoration.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24600
Name Engine 21
Description
Fire engines are the backbone of our fleet. They provide response for fire, medical, and special incidents.
This project is to replace one engine. The current engine was purchased in 2005 and will be 21 years old in 2026.
Justification
Replaces one engine purchased in 2005.
Current engine is showing increased maintenance costs.
Replacing engine in 2026 will allow for most effective sale pricing. New Engine replaces Station 4 Engine - Engine 21
City of Eden Prairie, Minnesota
Project # 24602
Project Name Engine 41
Description
Fire engines are the backbone of our fleet. They provide response for fire, medical, and special incidents.
This project is to replace one engine. Engine 41 was purchased in 2006 and will be 19 years old in 2025.
New Engine replaces - Station 4 Engine - Engine 41
Justification
Replaces one engine purchased in 2006.
Current engine is showing increased maintenance costs.
Replacing engine in 2025 will allow for most effective sale pricing.
New Engine replaces - Station 4 Engine - Engine 41
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24603
Project Name Engine 22
Description
Fire engines are the backbone of our fleet. They provide response for fire, medical, and special incidents.
This project is to replace one engine. Engine 22 was purchased in 2005 and will be 20 years old in 2025.
New Engine replaces - Station 2 Engine - Engine 22
Will use one time Public Safety Money of $2,806,797 received in 2023 which was placed in the Capital Maintenance fund
Justification
Replaces one engine purchased in 2005.
Current engine is showing increased maintenance costs.
Replacing engine in 2025 will allow for most effective sale pricing.
New Engine replaces - Station 2 Engine - Engine 22
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24604
Project Name Engine 31
Description
Fire engines are the backbone of our fleet. They provide response for fire, medical, and special incidents.
This project is to replace one engine. Engine 31 was purchased in 2005 and will be 19 years old in 2024.
New Engine replaces Station 3 Engine - Engine 31
Will use one time Public Safety money of $2,806,797 received in 2023 which was placed in the Capital Maintenance fund
Justification
Replaces one engine purchased in 2005.
Current engine is showing increased maintenance costs.
Replacing engine in 2024 will allow for most effective sale pricing.
New Engine replaces Station 3 Engine - Engine 31
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24605
Project Name Tower 41
Description
The tower ladder is an important part of our fleet with a platform to provide elevated suppression, rescue, and special operations.
The project is to replace the tower ladder truck that was purchased in 2007. This truck will be 20 years old when it is replaced in 2027.
New Ladder replaces Tower 41
Justification
Replace apparatus for response mission. Required apparatus to maintain response capability and ISO rating.
Costs increased with changing economic factors.
Replacing tower in 2027 will allow for most effective sale pricing.
New Ladder replaces Tower 41
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24606
Project Name Quint 11
Description
The quint ladder is an important part of our fleet with a straight stick and versatility to provide elevated suppression, rescue, and special operations.
The replacement will be with a tower ladder and not a quint for increased safety and operational effectiveness.
The project is to replace the quint purchased in 2015.
New Ladder Truck replaces - Station 1 Quint - Quint 11
Justification
Replace apparatus for response mission. Required apparatus to maintain response capability and ISO rating.
Costs increased with changing economic factors.
New Ladder Truck replaces - Station 1 Quint - Quint 11
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24607
Project Name Rad 57 replacement
Description
The RAD-57 monitor is used to monitor oxygen levels and carbon monoxide levels in individuals. This is used for fire, carbon monoxide, and other fire/medical related incidents.
This project is to replace current RAD 57 for end of life. Replacement of 10 units.
Justification
EMS equipment for medical and CO calls as well as firefighter rehab.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24608
Description
The LUCAS device is a mechanical CPR device. It is used to provide effective compressions on a person in cardiac arrest. The LUCAS device is critical to our staffing levels.
This project is to replace our eight (8) LUCAS devices.
Four (4) were replaced in 2021 to upgrade the older version Model 2 at its end of life.
Replacement in 2027 will be the remaining four (4) at end of life
Justification
Life safety device, Mechanical CPR.
Pricing increase - inflation
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24609
Name Rescue tool replacement
Description
Rescue tools are used for vehicle and machinery extrication. We have rescue tools on the engines and the quint.
This project replaces 20 year old rescue tools on five new engines, 2 new skeeters and 2 new aerial apparatus in 2023-2027.
Moving to sustainable practice with battery operated tools.
9 total sets.
Justification
New rescue tools on 5 new engines, 2 skeeter trucks, and 2 aerial trucks.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24612
Name Firefighter Pagers
Description
Firefighter pagers are individual pagers for firefighters to wear and be notified of emergency calls when not at a fire station and/or not working a duty crew shift.
This project will replace our current firefighter pagers at end of life -- issued in 2020.
Justification
Replace firefighter pagers that are needed for notifying firefighters of emergency events.
Reduce expenditure as part of additional funds for new Ladder Truck
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24614
Description
Fire hose is a key component in fire suppression. Supply hose is the larger diameter hose used to supply water to a fire truck from a hydrant or to supply larger volumes of water to a fire scene. Attack hose is smaller diameter hose used by a fire crew for fire suppression efforts.
This project is replacing attack hose and supply hose.
Justification
Replacement schedule for fire attack hose and supply hose to stay up to date with the NFPA standard on service life for hose.
City of Eden Prairie, Minnesota
Project # 24615
Project Name Boat 31 Replacement
Fire
Description
The fire boat is a key special operations component in our fleet. It is used for rescue and suppression efforts on our lakes and waterways as well as regionally to support water rescue efforts.
This project is to replace our current large fire boat.
Justification
Our current fire boat was purchased in 2006 and will need to be replaced. Fire boat is used for water rescue, search, and fire attack
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24616
Description
Ballistic Armor is being purchased to provide personal protective equipment for our firefighters. Equipment added will be ballistic vests, helmets and goggles.
This project is to replace equipment in 2028 -- replace ceramic plates and helmets.
Justification
Ballistic vests, helmets and goggles will allow firefighters to go into warm zones to assist PD in active shooter events. Currently, we do this mission without any protection or body armor.
Price reduction for years 2028 and 2035 is because of the components that need to be replaced. Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24630
Description
The Knox Box Key system is the fire and police security controlled key system for buildings and businesses in our city. We currently have 3 different types of boxes and three different keys. This project will provide a uniform 1 box and 1 key for the entire city and enhanced accountability and security.
City to pay for the re-key of the existing boxes on buildings.
Justification
Re-key fire and police emergency key system in the city to minimize risk and maximize resources. Move to one key with better control.
City of Eden Prairie, Minnesota
Project # 24682
Project Name Boat 31 Electronics
Description
Boat 31 electronics upgrade.
We evaluated replacing Boat 31 at an earlier timeframe; however, this was not practical with current costs and operational needs. This is a new project to keep the electronics up to date with no new replacement in the near future.
Justification
Replacing end of life equipment.
Reduce expenditure as part of additional funds for new Ladder Truck
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24683
Project Name AED replacement
Description
Fire Department is responsible for replacing all AED's in the City. Currently there are 56 AED's plus an additional 27 for the Police.
27 AED's for Police - replaced in 2023 with grant funded AED's. 2030 cost is to replace the Police AED's
This is a city-wide asset fire coordinates.
Justification
Replace end of life equipment.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24687
Project Name Mobile Command Post Technology
Description
Technology for Mobile Command post.
Needs to coordinate with PD
Justification
Technology needs for mobile command post to enhance emergency and non-emergency operations.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24688
Project Name ENGINE 32
Description
Fire engines are the backbone of our fleet. They provide response for fire, medical, and special incidents.
Needed if all 4 stations are staffed 24 /7/365.
This project is to replace one engine.
Engine 32 was purchased in 2005 and will be 26 years old in 2031.
Justification
Replace apparatus for response mission. Required apparatus to maintain response capability and ISO rating.
Costs increased with changing economic factors.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 24689
Project Name Vesta 911 Phone system
Description
911 Phone system - end of life
Use of $100,000 of E911 funds
Justification
911 phone system - end of life.
E911 funds could be used for this purchase. Funds will need to be available. Funds are being used for multiple areas.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 26601
Project Name Citywide Security and Fire Alarm Monitoring
Description
Citywide Security and Fire Alarm Monitoring
Replacement of Alarm Panels
Justification
Alarm panel replacement for effective alarm reporting to dispatch
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 26650
Project Name Station 4 Technology Update
Description
The station 4 training room is an important facility for training and emergency operations. The room is used on a regular basis and needs technology updates.
This project is replacing end of life monitors, tvs, projectors, and crestron.
Justification
Monitors, tvs and crestron have all reached end of life with technology.
Current technology is over 10 years old.
Reduce expenditure in 2029 as part of additional funds for new Ladder Truck
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 26660
Project Name Fire Helmet Replacement
Description
The firefighter helmet is an important part of the overall personal protective equipment. The helmets need to be replaced every 10 years to meet current health and safety standards.
This project is to replace end of life firefighter helmets.
Justification
Replace end of life firefighter helmets to meet all current health and safety standards.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 26670
Description
The Class A uniform is the highest level of dress for our firefighters. Our current Class A uniforms are expensive and are vendor specific.
This project is to replace the Class A uniform with a current model that will be more cost effective, allow an easier resource to obtain, and will require all firefighters to be changed out at the same time.
This project will replace end of life Class A uniforms for the Firefighters.
Justification
Replace end of life Class A uniforms with current model that will be more cost effective, an easier resource to obtain, and will require all firefighters to be changed out at the same time.
Impact/Other
City of Eden Prairie, Minnesota
Project # 26681
Project Name Boat 32 Replacement
Life 15 years
Fire
Description
Replacement of Boat 32, trailer, and motor
2015 Purchased
Justification
Replace end of life boat, trailer and motor.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 26682
Life 10 to 15 years Project Name Large Ventilation Fan
Description
Large ventilation fan for Commercial buildings, Apartment garage space, and LRT tunnel.
Justification
To allow for effective ventilation in large occupancy spaces. Current capability does not exist in the City or region today.
Budget Impact/Other
Project # 1
Project Name Vehicles and Equipment
Description
The City of Eden Prairie has over 300 vehicles and large pieces of equipment in its vehicle and equipment fleet. The fleet includes police and fire vehicles, snow plows, dump trucks, pickup trucks and autos. Fleet Services also assists with the maintenance and repair of small equipment such as chain saws, trimmers, and lawn mowers.
Justification
The primary objective of Fleet Services is to provide and maintain a safe, high quality, reliable and efficient fleet of vehicles and equipment to support the service and operational objectives of the City.
Budget Impact/Other
Departments are responsible for securing initial vehicle purchase funds. Once secured Fleet Services will order vehicles and service them over their life. Departments are charged annual depreciation for each vehicle so Fleet Services can replace them at end of useful life. Fleet Services assumes 20% trade-in or auction value to offset depreciation/replacement costs.
City of Eden Prairie, Minnesota 2025 2034 thru
Project # 23-903
Project Name Upgrade oil storage area and install remote fill Category Maintenance Facility
Automotive Contact Scott Riley
Useful Life 10 to 20 years
Description
Upgrade our bulk oil storage area to make it more efficient and easier to track and maintain a safe environment. Helps with safety so personnel do not have to manually move heavy barrels of product and makes storage and inventory more efficient. Install a remote fill system so that the delivery drivers do not have to drag hoses through the shop and up stairwells to fill bulk storage tanks. This will help prevent injuries.
*changed project # from 23-803 to 23-903 to avoid duplicate with Engineering IC#s*
Justification
To help with efficient movement and storage of our bulk oil products used in daily fleet operations. To eliminate possible injuries due to moving heavy oil barrels.
Budget Impact/Other
increase productivity lessen costs
Project # 06300
Description
Replace and expand existing internal and external network equipment which includes switches, VM servers, controllers, SAN storage, backup solution
Justification
The network is our information technology backbone. The City needs to enhance and expand capacity to serve City business needs. We need to upgrade/ replace the following equipment in different years:
2034: Switch replacements, City Hall core replacement, SAN Replacement, DR environment replacement, 9K switches in Primary Data center replacement
2033: Switch replacements, Access Point Upgrades
2032: Switch replacements, Disk Backup upgrade, UCS Blade upgrades, Battery Backup 2031: Switch replacements, Core replacements (Council Chambers, Police)
2030: Switch replacements, 9K Switches at EPCC DR, EPCC Core replacement
2029: Switch replacements, City Hall core replacement, SAN Replacement, DR environment replacement, 9K switches in Primary Data center replacement
2028: Switch replacements, Access Point Upgrades
2027: Switch replacements, Disk Backup upgrade, UCS Blade upgrades
2026: Switch replacements, Core replacements (Council Chambers, Police)
2025: Switch replacements, 9K Switches at EPCC DR, EPCC Core replacement
2024: SAN replacement, City Hall core replacement, PD core replacement 2023: DR servers upgrade Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 06303
Description
Fiber build out and upgrades for various city locations for improving reliability and connectivity, building a redundant fiber network to city locations, planning for future data requirements (e.g. camera upgrades)
Justification
2021: Fiber from school district to city hall to reduce reliance on school district.
2022: Fiber from LRT to city locations (create redundant network), North side fiber loop from EPCC to Art Center.
2024: Fiber updates as required. (Fiber to Staring Lake Building)
2027: Fiber connection to the 511 building via Logis
City of Eden Prairie, Minnesota
Project # 10305
Project Name Police Mobile Computer System Replacement
Description
Squad computers replaced in 2020 are GeTac A140 laptops. Future budget is based on replacement with similar equipment.
TOTAL: 39 units
Squads: 29, 1 new in 2022, 1 new in 2023, potentially 1 new in 2027
Spare in IT: 3
MCC: 1
Bearcat: 1
Negotiations Van: 1
SWAT Truck: 1
Justification
Police mobile computers are a vital part of law enforcement. As the applications and functionality increase, the hardware must be upgraded to accommodate new technologies. These systems were replaced in April-May 2020 and it is recommended for best performance to keep this equipment on a 4 - 5 year replacement life cycle. After this time, the system's integrity and performance will start to exhibit noticeable failures and decreased overall performance.
Budget Impact/Other
Normally, 10% increase in cost over a 5 year cycle is estimated. Useful Life 5 years
City of Eden Prairie, Minnesota
Project # 15305
Project Name GIS Data Collection Project
Description
Engineering Trimble GPS receiver and controller replacement. Last replaced in 2021.
Justification
Engineering GPS receiver to be upgraded on a routine schedule. Planning on 5-7year upgrades/ replacements.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 19301
Project Name Public Safety Application Upgrades
Description
Public Safety (PD and Fire) application needs to be upgraded to keep up with current functionality updates including interfacing with mobile hardware.
Justification
Upgrades will fix current bugs/ issues as well as provide new functionality to move us to Enterprise CAD, LERMS etc.
2025 $100,000 (estimated - no timeline from Tyler) E-LERMS upgrade
Budget Impact/Other
Adding new functionality increases operational budget. That will be adjusted once we have a better timeline for the E-LERMS project.
City of Eden Prairie, Minnesota
Project # 19403
Project Name Counterpoint Hardware Upgrades
Description
Upgrade Counterpoint hardware to keep up with updates, align with PCI compliance, provide required memory and hardware capacity for transactions and improve efficiency of transactions.
Justification
XR5 NCR All-in-One (10 units) $19,950
Ingenico ISC250 USB Securepay $859
XR5 warranty renewal 4 yrs (10 units): $4,800
Budget Impact/Other
Project # 20301
Project Name Police Body and Squad Cameras
Description
BWC's initial implementation was in 2022. When replaced in 2025, these will be on a 5-year maintenance cycle. Along with squad cameras, body cameras will be updated every 5 years.
BWC: 85
Squad cameras: 35
Booking and Interview room cameras are separate line item but hope to pay from this project.
***TASERS ARE IN PD CIP - ***
Justification
Promote officer safety, gather evidence and augment officer transparency.
Budget Impact/Other
Staffing time to process additional video data would increase. It is anticipated that this additional processing time would be absorbed in our existing Records Division.
Project # 20302
Project Name Police License Plate Readers
Description
PD would like portable license plate reader system to aide in investigation and apprehension of criminals.
2022: Replace 2 existing units, install new portable LPR $52,000, portable is a lease
2024: Replace other 2 existing units $36,000
2027: Replace 2 units $40,000
2029: Replace 2 units $42,000
2032: Replace 2 units $44,000
Justification
Portable system aides in ability to identify suspects in a targeted location.
Budget Impact/Other
2021-2022: extend warranty for all 4 existing units ($6,000)
2022-2024:extend warranty for 2 units
Continue to budget for warranty for all units.
City of Eden Prairie, Minnesota
Project # 20401
Project Name AV upgrades in conference rooms
Aditi Salunke
Unassigned
Life
City-wide
Description
Upgrade Audio/ Visual equipment in various conference rooms throughout the city.
Justification
2025: AV upgrades for conference rooms at city hall, Senior Center
2030: AV upgrades for other city conference rooms
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 21501
Description
Fire would like laptops mounted in vehicles for Inspectors and Chiefs. Fire will handle purchase and installation of mounts.
Building Inspectors: 4
Fire Inspectors: 4
Chiefs: 5
Captain: 1
Spare in IT: 1
BI laptops procured in 2022
Fire Inspector laptops procured in 2021
Fire Chief and Captain laptops to be procured in 2022
Approx cost without Trolley docks $5000 per laptop including 5 yr warranty. Add 10% renewal cost per cycle.
Justification
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25300
Project Name Microsoft Office Desktop Licenses
Description
Shared desktops cannot have Office 365. We have 255 F3 licenses primarily for part-time staff. M365 F3 licenses are $85 per year. M365 G3 licenses are $387 per year and assigned to all Full time staff, Part time regular and a handful of part time staff based on job responsibilities. Users with F3 licenses cannot access O365 Office applications. Hence all shared desktops (primarily used by part time staff and/or conference rooms) are still on Office 2016. We need to upgrade these to the newest version of Office. This will be Office Pro with SA on Windows Select plus agreement. After the first year, we will see the cost of SA in the Operational Budget ($110 per workstation)
Justification
Budget Impact/Other
SA cost will be added to the Operational budget after initial purchase. Useful Life
City of Eden Prairie, Minnesota 2025 2034 thru
Project # 25302
Project Name ProjectDox Saas implementation
Description
ProjectDox SaaS licensing for 35 Named Users Integration to PIMS using newAPIs from LOGIS Migration of On Premise Data and workflows to SaaS Upgrade to ProjectDox 9.3/9.4
Per Avolve, support for current Brava viewer will end December 2024.
Justification
Required to upgrade ProjectDox from current version. Next upgrade will be hosted with Avolve.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25303
Project Name Upgrade to ESRI Enterprise License Agreement (ELA)
Useful Life 10 to 15 years
Description
We currently have several variations of ESRI licensing from Single user to Concurrent, from Fieldworker to Admin. We have continued to add licenses as needed. With the increase in number of GIS applications and users, and with a shift in ESRI licensing, we will need to procure additional licenses next year.
Justification
An ELA allows for unlimited licensing, thus allowing all users to access GIS data via applications. It also enables us to procure other required modules at a cheaper cost. We have $28,000 in the IT Operational budget. The increase in cost is one-time for IT CIP. This will be update in the IT Operational Budget from 2026.
Budget Impact/Other
Increase in annual Operational budget from $28,000 to about $58,000 from 2026
City of Eden Prairie, Minnesota
Project # 25304
Project Name PD Booking and Interview cameras
Description
Interview and Booking room cameras
2025 - 5 cameras (Dome cameras)
2026 - 2030 - Add 1 Dome camera and 4 covert cameras for a total of 10 cameras.
2030 - 2024 contract - add 10% for each year from 2025 - 2029.
Justification
Interview and Booking room cameras for recording and live streaming.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25305
Project Name Simulator Training Software
Description
Simulator training. Emergency Services training has become more virtual reality based. This will allow our staff to maintain and enhance various training components.
Justification
Electronic and virtual based training is becoming more effective and used more in the emergency services setting.
Budget Impact/Other
Project # 26300
Name Implement new Permits and Inspections System
Description
Logis is sunsetting PIMS - Permits and Inspection Management System currently used at the city. This will need to be replaced. Logis is implementing Accela for its member cities. This is a placeholder for implementation of Accela, or another application as determined by Building Inspections. High level estimates from Logis for transition to Accela are as follows. Assuming that we will need about 40 users with licenses. This will have a significant impact to the Operational budget as seen below.
Annual Charges by user license count:
60 users: $146k
55 users: $140K
50 users: $133K
45 users: $125k
40 users: $116k
35 users: $105k
30 users: $94k
Onetime cost for Data Conversion and Implementation: $40-45k.
Justification
PIMS will be sunset by Logis. We need to move to a different application for Permits and Inspections.
Budget Impact/Other
There will be some operational maintenance cost for the new application. We anticipate this will be higher than what we currently pay for PIMS. This will add to the IT Operational Budget.
Project # 11188
Description
Scheduled replacement of older play equipment at various parks. The proposed replacement - upgrade schedule is as follows: 2025 - Homeward Hills Park
2026 - Edenvalley and Overlook Parks
2027 - Edenvale, Topview and Sterling Parks
2028 - Edgewood, Rustic Hills and Carmel Parks
2029 - Miller Park
2030 - Smetana, Red Rock Lake and Birch Island Parks
2031 - Round Lake Park
2032 - Pioneer Park and Eden Lake Park (Cost Share with School District)
2033 - Staring Lake Park
Justification
Play equipment is on a replacement schedule based on our annual safety audits. Each year the play equipment is scheduled for replacement based on its age and safety audit point priority ranking. These playground replacement expenses will be on-going as long as there is play equipment within the parks. Play equipment has a normal life expectancy of 15 to 20 years and currently there are 31 playgrounds within the park system.
Budget Impact/Other
There is little or no change in the annual operating budget for the inspection and preventative maintenance for these play areas. There is however a slight repair cost savings when new equipment is installed since the amount of breakage and frequency of damage that occurs on the older style is reduced significantly.
Project # 11199
Project Name Parks Parking Lot Maintenance
Amy Markle Department Parks and Recreation
Improvement
Life 25 years
Park Maintenance
Description
Reconstruction/repair of parking lots within City parks. Annual inspection determines the priority of parking lots that will be repaired to keep the lots safe and in good physical condition. For general maintenance, $41,200 is budgeted annually to cover miscellaneous repairs and upkeep. The additional annual funding request is for the major renovation of parking lots either by installing a 1 ½ inch bituminous overlay or the complete replacement of the parking surface. The current schedule for these large scale park parking lot projects is as follows:
2025 - Round Lake Tennis Lot and Edenbrook CA
2026 - Crestwood Park and Forest Hills Ballfield Lot
2027 - Franlo Park and Milller Park Warming House and Field 12 &13 lot
2028 - Wyndham Knoll and Outdoor Center
2029 - Miller Park Playground Lot
2030 - Smetana Park and Flying Cloud Feilds
2031 - Birch Island Park and Richard T. Anderson
2032 - Birch Island Woods CA and Edenvale Park
2033 - Riley Creek Woods CA and Flying Cloud Expansion
2034 - Eden Valley and Homeward Hills Parks
Justification
Currently the parking lots in the 32 parks within the City are in various stages of age and wear. An annual audit is completed to determine maintenance needs. These range from crack fill and seal coat, to overlay, and the most costly - total replacement. The parking lots have an effective life of 25 years but even with the application of regular chip/sealcoats they will need major renovation as indicated in the description section.
Budget Impact/Other
No additional costs are expected with this item.
City of Eden Prairie, Minnesota
Project # 12104
Project Name Cedar Hills Park Development - Phase II Category Cedar Hills Park
Useful Life 25 years
Description
This phase is for additional development of Cedar Hills neighborhood park. This phase would occur after the initial construction, grading, seeding and construction of the play area, irrigated soccer/football/lacrosse field and parking lot.
Phase II: 2026 - Single track bike trails in "highland" area of property north of Riley Creek and construct a bike skills area in the open field area.
Justification
Development of the last neighborhood park to be developed in Eden Prairie to meet the goal of a park within 1/2 mile of all residents. This park will serve the south central portion of the community as outlined in the Park and Open Space Plan.
This phase of work would complete development of the master plan for this neighborhood park.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 12105
Project Name Lower Purgatory Creek Trail - Phase III
Useful Life 50 years
Category Purgatory Creek Corridor Type
Description
This nature trail project is one of a series of phases to build a nature trail along Purgatory Creek from Creekwood Park to the Minnesota River within the Lower Purgatory Creek Conservation Area.
Phase III: 2031 - Construct the section of nature trail from Creekwood Park south along the creek to the intersection with the bituminous trail between Homeward Hills Road and Wild Heron Point.
Justification
The trail master plan for this project was approved by the City Council in 2005. This soft surface nature trail system will link the residents of Eden Prairie from points along Purgatory Creek in the area of Homeward Hills Road to the Minnesota Wildlife Refuge Area on the Minnesota River.
Budget Impact/Other
General labor to do inspection and minimal trail maintenance to keep vegetation from interfering with trail users. Approximate cost of $500 per year for this maintenance work.
Project # 14102
Description
Starting in 2015 this CIP Fund will be used to provide ongoing maintenance of the existing trail and sidewalk systems throughout the city. The goal of the program is to keep our system at a PCI rating of 80 by performing regular maintenance to prolong the surface life of the trails. Annual maintenance work will include the sealcoating of approximately 5-8 miles of trails, the overlay and or replacement of trail/sidewalk sections identified within the pavement management survey as having a PCI of less than 50, and the repair/reconstruction of degraded trails within city parks.
Justification
Many of the trails within the city and parks have an effective life cycle of 30 years. However, some of the trails have degraded sooner due to heavy traffic loads, poor soils and surface degradation due to roots and vegetation debris. By monitoring our trail surfaces and using sealcoat and overlay applications prior to complete rebuild, the goal is to keep our extensive trail network in a safe and good physical condition.
Budget Impact/Other
Currently annual inspection and repair costs are needed to keep these trails safe. After restoration the need for this maintenance activity will decrease resulting in lower annual costs.
Project # 17104
Project Name Hard Court Maintenance
Description
Reconstruction/repair of tennis and basketball courts within City parks. Annual inspection determines the priority of hard court replacement in order to provide high quality and safe playing surfaces. This funding request is for major renovation or reconstruction of tennis, basketball and pickleball courts. The current schedule for these large scale hard court projects is as follows:
2025 – Carmel and any remaining costs for the pickleball courts
2026 – Homeward Hills and Rustic Hills
2027 – Edenvale and Wyndham Knoll
2028 – Topview
2029 – Prairie East and Willow
2030 – Holasek
2031 – Forest Hills and Hidden Ponds
2032 – Franlo
2033 – Staring Lake Park
2034 – Eden Valley and Sterling Field
Justification
There are currently 55 tennis and basketball courts within City parks that are in various stages of age and wear. The courts generally have an effective life of 20 years and will need major renovation work even with preventative maintenance practices.
Budget Impact/Other
There
City of Eden Prairie, Minnesota
Project # 17105
Description
Build or install many features that were identified in the master plan created for the Outdoor Center in 2015. This project would include building a new nature play area, adding a boardwalk near the lake and installing a new entry monument and signage throughout the property.
Justification
The master plan that was created for the Outdoor Center identified many items that were needed to enhance the experience of the property. This project would build and/or install those that were considered the highest priority of need.
Budget Impact/Other
General labor to clean and inspect the new features would be needed. Approximate cost of $500 per year for this maintenance work.
of Eden Prairie, Minnesota
Project # 18102
Project Name Flying Cloud Fields - Regrading
Flying Cloud Athletic Fields
Description
The youth soccer fields surface at Flying Cloud Athletic Field complex are in need of regrading to improve the turf condition and playing safety. There are currently 15 acres of turf soccer fields at this location that accommodates 25 youth fields.
Justification
Due to heavy use, the fields are subject to considerable wear and tear. The surface has become uneven in multiple locations due to the goal mouth depression caused by the soccer goalies. The plan is to take a portion of the fields out of play every other year to upgrade the irrigation system and regrade and level the fields for better drainage, turf condition and safer play.
Budget Impact/Other
There shouldn't be any additional annual costs since these are existing facilities being renovated. Annual costs for maintaining the fields are expected to be the same as currently expended in the Park Maintenance operating budget. There may be some cost savings with a newer irrigation system and less repairs. Useful Life
City of Eden Prairie, Minnesota
Project # 18104
Project Name Replace Ballfield Fencing
Description
Replace old fencing at various park ballfields with new aluminum fencing.
Justification
The fencing on many of our ballfields is breaking down and needs replacing. The vinyl coating on many of these fences has degraded from UV light and can no longer be secured tightly to the fence supports.
Budget Impact/Other
There will be no additional cost with this item.
City of Eden Prairie, Minnesota
Project # 20102
Project Name Auxiliary Picnic Shelters
Description
Add five 20x20 covered picnic shelters to the community parks to provide additional rental shelters to the park system.
Justification
Currently there are large covered picnic shelters at the community parks; however, there is a need to provide smaller shelters that would be available for rent by smaller groups. Currently the large shelters can accommodate up to 150-200 people, whereas small shelters would provide space for groups between 20-40 people.
Budget Impact/Other
It is expected that new picnic shelters would need trash removal and cleaning activities during the summer. These would result in a slight increase in general maintenance costs at the parks where these shelters would be constructed.
City of Eden Prairie, Minnesota
Project # 20103
Project Name Staring Lake Park Amphitheatre Renovation
Description
Renovate the Staring Lake Amphitheater for set building and increased storage.
Justification
Currently sets for theater productions are built off-site and transported to the park for summer play performances. Additionally the used sets, props and other material are stored in an unsecured 'corn crib' at Riley Lake Park. Renovating the amphitheatre to increase storage and work space would reduce waste, transportation costs and increase efficiency in set production for the theater productions.
Budget Impact/Other
There will be minimal budget impact as it would be renovating an existing building
City of Eden Prairie, Minnesota
Project # 21103
Project Name Park Amenity Upgrades
Description
Purchase and install new amenities within the parks. These may include new or expanded play features near existing playgrounds, new shade structures or additional drinking fountains.
Justification
Staff often receives requests for additional park amenities to be installed at many of our parks. This project would allow staff to fill these needs as they arise.
Budget Impact/Other
These upgrades most likely will have a small increase in costs related to insurance needs or preventative maintenance activities.
of Eden Prairie, Minnesota
Project # 21104
Project Name Park Building Access Upgrades
Description
Upgrade city park buildings from keyed locks to remote and card access.
Justification
There have been many issues with the current key system we have in place to give access to the various park buildings we have in the system and the hundreds of keys that have been issued at some point over the last 8 years. This project would begin to convert these buildings from using a standard key that needs to be duplicated and sent to numerous people to access cards. This would allow us to issue and cancel cards as needed to user groups and schedule doors to be opened remotely, relieving the need to have park staff open doors for rental groups.
Budget Impact/Other
A network connection would need to be maintained at each building but would be offset by the need to have new keys made and locks changed.
City of Eden Prairie, Minnesota
Project # 23101
Project Name Replace Staring Lake Trail Bridges
Description
Replace the two bridges around the Staring Lake loop trail with new 10 ft wide bridges.
Justification
The existing bridges are nearing the end of the useful life and are too narrow making it difficult for maintenance equipment to cross them.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 23102
Lower Purgatory Creek Trail - Phase II
Description
This nature trail project is one of a series of phases to build a nature trail along Purgatory Creek from Creekwood Park to the Minnesota River within the Lower Purgatory Creek Conservation Area.
Phase II: 2030 - Construct the section of nature trail from the end of the current trail south to Wild Duck Pass.
Justification
The trail master plan for this project was approved by the City Council in 2005. This soft surface nature trail system will link the residents of Eden Prairie from points along Purgatory Creek in the area of Homeward Hills Road to the Minnesota Wildlife Refuge Area on the Minnesota River.
Impact/Other
City of Eden Prairie, Minnesota
Project # 23104
Project Name Miller Park Ballfield Drainage Category Miller Park
Description
Add sand and drain tile to the ballfields at Miller Park to improve drainage and playability.
Justification
The baseball fields at Miller Park are often too wet to play on in early spring or after a moderate rain. Adding sand and drain tile to the fields would improve the quality of the fields and allow for better playing conditions.
Budget Impact/Other
There would be no impact to the operating budget. Useful Life 20 years
City of Eden Prairie, Minnesota
Project # 23106
Project Name Replace Park Signage
Description
Replace the monument, informational and directional signs at each park location.
Justification
Many of the park signs were installed 20 years or more ago and are fading and the decals are beginning to peel off. With such a large number of signs located throughout the system, it will take multiple years to work through the different varieties and replace them when needed.
Budget Impact/Other
There would be no impact to the operating budget. Useful Life 15 years
City of Eden Prairie, Minnesota
Project # 24103
Project Name Richard T Anderson Erosion Control
Department Parks and Recreation
Contact Matt Bourne
Useful Life 30 years
Category Richard T. Anderson Conservation Area Type Improvement
Description
Install a new retaining wall along the paved trail at Richard T Anderson Conservation Area and fix other erosion issues throughout the conservation area.
Justification
The north side of the paved trail at Richard T Anderson is starting to experience some severe erosion and the area needs to be reinforced with a retaining wall. If left alone, many trees will be at risk of falling onto the trail. Other trails have been washed out and are becoming hazardous. These areas would either be reconstructed or the erosion issues will be addressed and new trails around the areas will be installed. We will also be applying for multiple grants to help fund these projects.
Budget Impact/Other
There will be minimal impact to the budget once the wall is installed.
City of Eden Prairie, Minnesota
Project # 25101
Project Name Franlo Park Water Service Category Unassigned
Useful Life 30 years
Description
Connect to city water service and cap well at Franlo Park.
Justification
The Franlo Park irrigation system is currently supplied by a well. Capping the well and connecting to City water would give us a more efficient and reliable water source. With City water, it would also allow us to install a public drinking fountain.
Budget Impact/Other
There would be approximately 1 million addition gallons of City water used as irrigation for the park.
City of Eden Prairie, Minnesota
Project # 25102
Description
Replace the existing display board at the Senior Center entrance with a double sided display screen. The display board will have a network connection and allow for expanded marketing and messaging capabilities.
Justification
The existing display board has reached its useful life. Upgrading to a new electronic display board will save time and increase the marketing capabilities needed with the recent upgrades at the Senior Center. Staff will also be able to use the board to provide real time messaging to patrons regarding things like events, closures, and programming updates.
City of Eden Prairie, Minnesota
Project # 25103
Project Name Retaining Wall Replacement
Description
Replace or repair failing retaining walls throughout the park system.
Justification
There are many retaining walls within our parks along trails and parking lots that have exceeded normal life expectancy and are beginning to fail. If these walls are not replaced soon, it may require these trails and parking lots to be closed. Budget Impact/Other Not applicable
of Eden Prairie, Minnesota
Project # 26102
Project Name Lake Aerator Replacement
Department Parks and Recreation
Contact Matt Bourne
Type Unassigned
Useful Life 20-25 years
Category Unassigned
Description
Replace our existing temporary lake aerators that are used on Mitchell Lake and Red Rock Lake with permanent aerators.
Justification
Currently, staff install lake aerators at Mitchell Lake and Red Rock Lake in the winter as soon as conditions allow to help prevent against winter fish kill. These aerators are very labor intensive to install and maintain and conditions can be extremely hazardous to our staff. The new permanent aerators could be turned on by one person from shore and remove the risk of multiple employees on the ice near open water. These aerators are also more effective and could be turned on earlier in the winter if oxygen levels require it.
Budget Impact/Other
This would reduce costs in staff time to install and maintain the systems.
City of Eden Prairie, Minnesota
Project # 26103
Description
Purchase a new track skid steer for work within our parks and conservation areas.
Justification
With the increase in projects and maintenance work specifically within our conservation areas, staff has noted an increasing need for a specialized skid steer that can be used in these areas and cause minimal disruption to the plant material. A skid steer with tracks instead of wheels causes less destruction and can be used much easier in the winter during snowy conditions.
Budget Impact/Other
This equipment will need to be added to the vehicle replacement program and will require routine maintenance.
of Eden Prairie, Minnesota
Project # 26104
Name Purchase Sweeper
Description
Purchase a new ride on sweeper for cleaning debris from trails and sidewalks. Funds for the purchase of a new sweeper had previously been approved (project #18103), but it was decided at that time to try other equipment. This new type of sweeper can be used for a much wider variety of tasks than the one that was previously considered.
Justification
Each spring and before any preventative maintenance practices, we need to clear sand and other debris from the city's trails and sidewalks. Purchasing this sweeper would allow us to do this in a much more efficient manner. This model of sweeper would also be used in many of our turf areas for cleanup and maintenance.
Budget Impact/Other
This vehicle would need to be included in the vehicle replacement schedule and would need routine maintenance.
City of Eden Prairie, Minnesota
Project # 27101
Project Name Miller Park Field #8 Artificial Turf
Description
Convert the Miller Park field 8 from natural turf to artificial turf.
Justification
Department Parks and Recreation
Contact Amy Markle
Category Miller Park Type Unassigned
Useful Life 20-25 years
The baseball field at Miller Park is full size field that is used by many groups throughout the year. Converting this field would allow for a longer season and could withstand more play during that season. The current field conditions are extremely wet and it takes our maintenance crews a lot of effort to make sure that it is playable. Converting it to an artificial turf surface would greatly reduce the amount of time spent preparing the field for play.
Budget Impact/Other
The new artificial turf surface would require routine maintenance but would be greatly reduced from the amount of time and effort needed for the existing field.
Project # 27102
Project Name Riley Creek Trail - Phase II
Department Parks and Recreation
Contact Amy Markle
Type Unassigned
Useful Life 30 years
Category Riley Creek
Description
This trail construction project is the second phase of nature trails along Riley Creek (previous project was #06121). This phase would construct trails through the western portion of Riley Creek Conservation Area and add a creek crossing and connection from Farmstead Circle and Crestwood Terrace.
Justification
Master Nature Trail Plan was approved by the City Council in 2005. The first phase of the Riley Creek Conservation Area trail system was completed in 2006. With the upcoming upgrade to Dell Road and the Marshall Farm property, a connection will not be possible to extend the phase one trails west of Dell Road through the western section of the conservation area. The creek crossing will also give residents in the southwest corner of Eden Prairie access to Crestwood Park.
Budget Impact/Other
There would be minimal impact to the operating budget. Most maintenance activities in these areas are the periodic removal of down trees blocking the trail.
City of Eden Prairie, Minnesota
Project # 28101
Project Name Veteran's Memorial Paver Replacement
Description
Replace the pavers within the Veteran's Memorial at Purgatory Creek Park.
Justification
Due to the poor soils in the park, many of the pavers at the memorial have settled since their installation and have created multiple hazards to anyone walking through. This project would pull all of the pavers out, add to and regrade the base material and install the pavers back on the reinforced base.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28102
Project Name Purchase Small Bucket Truck
Description
Unassigned
Park Maintenance
Purchase a small bucket truck to be used for our forestry maintenance activities. Funds were approved for the purchase of an aerial lift in 2024 (project #24102), but after getting a demo unit for two winters, staff no longer felt that type of lift would meet our needs and this type of equipment would work better.
Justification
EAB and an increase focus on our forestry maintenance practices has shown a need for more specialized equipment to complete these tasks. A smaller bucket truck would allow easier access to areas that cannot be reached with our larger truck and increase our efficiency.
Budget Impact/Other
This vehicle will need to be added to our vehicle replacement program and will require routine maintenance. Useful Life 10 to 15 years
City of Eden Prairie, Minnesota
Project # 29101
Name Nature Trail Erosion Repair
Description
Many of our conservation areas are experiencing serious erosion issues and some of these are starting to impact our nature trail system. This project would help repair or prevent further damage to these areas and limit hazards to park users.
Justification
Due to heavy use and changing weather patterns, many of the nature trails throughout our conservation areas are experiencing erosion issues. Previous projects that have received funds are addressing issues at Richard T. Anderson, but we are also experiencing issues at Prairie Bluff and Riley Creek Conservation Areas.
City of Eden Prairie, Minnesota
Project # 30101
Description
Renovate existing soccer fields that are only used for practice to provide additional space for game fields.
Justification
With the possibility of losing field space to MAC at Flying Cloud Fields, those activities will need to be relocated to other parks. Staff has started to identify field space within our existing system that would need to be renovated in order to provide a full playing surface or upgrade the playing conditions so that these areas could be used for games.
Budget Impact/Other
There should be no impact to budget. The funds spent at the current Flying Cloud Fields would be spent on the new renovated fields.
Project # 5081
Project Name New Trails and Sidewalk Construction
Description
Provides funding for new trails and sidewalks throughout the city. Projects are prioritized on the need to complete missing sections of the trail/sidewalk system as outlined in the Park and Open Space System Plan and the recently completed Pedestrian and Bicycle Plan for the city. Unspent annual allocations are to be carried forward to allow for unanticipated delays or higher costs due to future contractor bids.
Justification
Needed to complete and infill the missing links in the current system of trails and sidewalks. Provides funding for completion of a very visible and highly regarded element of our recreation and transportation system.
Additional trails and sidewalks will need to be constructed as a result of the LRT Project. These trails and sidewalks will provide vital extensions of the trail and sidewalk system beyond the station areas.
Budget Impact/Other
There is a specific trail plan that will take 10 years to fully implement. Useful Life 20 years
City of Eden Prairie, Minnesota
Project # 16500
Description
Replace current mobile command center to better suit current needs. Fire will be contributing to this project as the MCC will now be a shared asset.
Some Federal Funding expected to offset expense
Justification
The police department's existing 2002 Mobile Command Center and its integrated technology has reached its end of life cycle. Will also now be shared Fire resource.
No resale of current MCC due to the fact that it will be repurposed as our new SWAT Tactical truck which is in the Fleet Replacement schedule.
City of Eden Prairie, Minnesota
Project # 19502
Project Name Handgun Replacement
Description
Replace handguns for all sworn officers
Justification
Due to usage levels in training and to ensure reliability, our handguns have an approximate seven year life cycle. This period is also most practical in recovering the best trade in value.
Budget Impact/Other
If handguns aren't replaced as proposed, costs associated with repair and maintenance start to dramatically increase, resale values drop, and most importantly, reliability is reduced.
City of Eden Prairie, Minnesota
Project # 20501
Project Name Gas Masks Replacement
Description
Replace gas masks, filters and bags for all sworn officers.
Justification
Our gas masks, necessary for dealing with potentially disruptive situations, have a 10 year life cycle. Existing gas masks were purchased in January 2020. Gas masks will have no resale value at the time of replacement.
Budget Impact/Other
Filters need to be tested yearly and replaced as needed.
City of Eden Prairie, Minnesota
Project # 20503
Project Name SWAT Rifles Replacement
Description
Replace rifles for SWAT Team.
Justification
Current SWAT rifles were purchased in 2018 and are used for SWAT training and tactical response to incidents. In an effort to ensure reliability at critical times of need and due to the frequency of their use in training, these rifles have an expected 10 year life cycle.
Budget Impact/Other
New rifles will reduce the need for increased repairs and maintenance. They will also assure reliability when they are needed the most.
City of Eden Prairie, Minnesota
Project # 21505
Project Name Ballistic Helmets and Plates Replacement
Description
Replacement of existing ballistic helmets and plates for patrol and investigation squads.
Justification
Ballistic equipment has a 5 year warranty at which time the vendor no longer provides us with liability protection in the event an officer was shot.
Budget Impact/Other
If not replaced, equipment will be out of warranty and liability protection.
City of Eden Prairie, Minnesota
Project # 21508
Project Name Night Vision for SWAT Replacement
Description
Night vision equipment for SWAT Team
Justification
This equipment would allow our SWAT officers to preserve their visibility when conducting high risk tactical entries during the night or in dark rooms. This visibility would provide much better safety for our officers during these highly dangerous incidents. This unique equipment was originally estimated at $60,000. A quote for the equipment obtained in 2020 was $104,000.
It is estimated night vision has a 12 year life cycle. Minimal resale value.
Budget Impact/Other
Minor repairs and maintenance as needed.
City of Eden Prairie, Minnesota
Project # 21509
Description
Purchase an Unmanned Aerial System (UAS) and supporting camera equipment
Justification
This equipment is intended to be used by the police department's Unmanned Aerial System Program to assist in locating missing and endangered people, finding fleeing suspects, and supporting tactical and investigative functions. Due to the ongoing changes in FAA rules in this industry and the rapid improvements in this technology, the life expectancy is 3 to 5 years.
Budget Impact/Other
Minor repairs and maintenance as needed.
City of Eden Prairie, Minnesota
Project # 22500
Patrol Squad Car
Description
Additional squad car for Patrol Division
Justification
The squad car will be a necessary patrol vehicle for our increased number of officers working patrol. The cost includes $95,000 for the car and integrated equipment (lights, cage, push bumpers). It also includes the additionally required installed equipment to include the squad radio, rifle, computer, printer and mount, squad video and radar.
Budget Impact/Other
The vehicle will result in the usual fuel, maintenance and repairs. End of life replacement will be necessary via the Fleet Internal Services Fund
Project # 25210
Description
Remodel existing vacant space on the west side of City building of approximatley 73,000 S.F. for the police station, which would include enclosed parking for police vehicles, and 23,000 S.F. for city office/meeting space
Justification
The Police department has outgrown their current space and needs a facility that will be adaptable to accommodate the departments growth and operational changes for the next 20 years. The new space will:
* Maintain or enhance the level of service that the dpartment provides to the community.
* Be a leading example of the City's sustainable approaches.
* Create a facility where the community feels welcome and encourages interaction with the public.
* Better organize and enhance safety and security within detention and evidence intake/processing/storage.
* Enclose vehicle storage for entire fleet, including training vehicles.
* Allow for better wayfinding throughout the building, to enhance a more welcoming public environment.
City of Eden Prairie, Minnesota
Project # 25500
Name ICOR Robot Replacement
Description
Replacement of the police department's ICOR Mini-Caliber robot
Justification
The police department's existing ICOR robot was purchased in 2014 and has a 10 year life expectancy. This robot is often used by our tactical team and our surrounding agency consortium to conduct safe searches at scenes of violent offenders and/or barricaded suspects. This tool dramatically reduces the need for our tactical officers to be forced to make high risk entries into unknown and highly dangerous scenes.
Budget Impact/Other
Minor repairs and maintenance as needed.
City of Eden Prairie, Minnesota
Project # 25501
Project Name Optics for Handguns
Description
Optics for department handguns
Justification
Improve accuracy and proficiency. Police officer safety and safety of the public is of first most importance. All rounds must be accounted for and research has shown that optics improve accuracy and safety.
Budget Impact/Other
Minimal battery costs
City of Eden Prairie, Minnesota
Project # 28500
Description
Replacement of the optic sights used on many of the police department's weapons (squad rifles, training rifles, 40mm rifles and SWAT rifles)
Justification
The EoTech Holographic weapon sights are part of our current weapon systems. These sights have been evaluated and used successfully for many years. Over time the sights need replacement as the internal components wear out. Past experience has shown replacements are necessary after a 10 - 12 year life cycle. Current equipment was replaced in 2017.
Budget Impact/Other
Replacement of these sights will mitigate high maintenance costs that would otherwise be required for non-replaced equipment.
City of Eden Prairie, Minnesota
Project # 25400
Project Name Fabric Cover Replacement - Salt Storage Bldgs.
Description
Replace the fabric covers on the City's two (2) salt storage structures. MOSS facility is $200,000. Maintenance Facility is $25,000.
Justification
The fabric on the City's salt structures has an estimated life expectancy of 15 years. The larger structure was installed in 2009 and the smaller one in 2010. A 2022 condition evaluation also confirmed that the fabric is deteriorating and the service contractor recommends replacement by 2025.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25401
Name Salt Crusher Dirt Pulverizer Bucket
Description
Purchase a salt crusher dirt pulverizer bucket attachment for a loader to use at the MOSS for winter and summer operations for Streets, Parks and Utilities.
Justification
Minnesota winters are becoming more humid causing salt to freeze in boulders. This is jamming augers during snow removal. In the summer we will be able to pulverize black dirt to make it better for seeding and spreading more uniformly.
Budget Impact/Other
Repurchase every 20 years. Minor savings in labor and response times due to avoided equipment malfunctions.
City of Eden Prairie, Minnesota
Project # 25402
Description
Purchase two medium message boards for traffic control, parks events, emergency management, crowd control. These message boards have more lines for messaging and can move vertically and horizontally for better readability.
Justification
Frequently Streets is asked to deploy message boards to control traffic, or for event notification. They currently have one small message board with limited messaging and viewing options. The current message board is over 10 years old. These new units are bigger and would allow us to place for both directions of traffic. When we do need message boards we rent them for $1,200 per use. Budget Impact/Other
required every 20 years.
City of Eden Prairie, Minnesota
Project # 33400
Project Name Cold Storage Building Addition
Description
Project to construct an addition to the existing unheated storage building and to add heated storage component for parking and servicing of front end loader and forklift stationed at this facility.
Existing storage building constructed in 2016 for total project cost of $750,000.
Projected project cost in 2033 is $1.46M based on 2.5% per year inflation and adding $210,000 for a small heated component. Maximum allowable footprint for new addition is 8,960 sq ft (80 ft x 112 ft). Total project cost is estimated at approximately $1.46 million.
Justification
Project will add heated area for parking and servicing of front end loader and forklift stationed at this facility as well as additional cold storage for other seasonal equipment.
Budget Impact/Other
The project is anticipated to reduce operational costs through efficiencies gained and longer lasting equipment / vehicles.
Project # 19837
Project Name Environmental Learning Center Upgrades
Description
The City’s Environmental Learning Center (ELC), located in the water treatment plant, requires updating to keep it in good shape and refurbish or replace a number of the sections. The ELC is used in tandem with water treatment plant tours as part of the City’s public education and outreach for its NPDES Phase II municipal stormwater permit compliance.
Justification
The City's Municipal Separate Storm Sewer System (MS4) permit requires public outreach and education. The City can continue to meet this requirement through promoting education on water conservation and quality at the Environmental Learning Center.
Budget Impact/Other
By refreshing the content of the ELC, the City can provide cost effective and quality education to meet the requirements of its MS4 permit for many years to come.
of Eden Prairie, Minnesota
Project # 23825
Description
The Preserve Association is experiencing flooding in the vicinity of their tennis courts. The flooding is due to runoff from Anderson Lake Parkway overtopping the curb and flowing down a slope toward the courts as well as surcharging water from a City storm sewer system next to the courts. Means of diverting and/or storing excess runoff from the right-of-way must be explored to prevent damage to the roadway and private property. The project assumes approximately 1,000 linear feet of additional storm sewer is needed. Additional costs include stormwater management/storage and procurement of easements.
The runoff overtopping the curb on Anderson Lakes Parkway could lead to erosion of the slope. This could pose a risk to the roadway and result in sedimentation in Neill Lake. The surcharging storm water may cause damage to the courts and other private property. The City is evaluating means of mitigating the flooding and also implementing water quality improvements.
Budget Impact/Other
Mitigation of the flooding along Anderson Lakes Parkway protects public and private infrastructure from damage during large rainfall events and promotes resilient stormwater practices.
City of Eden Prairie, Minnesota
Project # 23826
Project Name Neill Lake Berm Improvements
Description
The two earthen berms along Neill Lake and the Neill Lake Marsh are structurally maintained by the City. The berms have experienced settling, erosion, and intrusion from muskrats which have been repaired on an as-needed basis. In light of these deficiencies, the City is in the process of conducting inspections of the berms. However, some repairs are anticipated to keep the berms in sound condition.
Justification
Failure of the berms could result in flooding of public and private property. A breach of the Neill Lake Berm could also result in damages to the Neill Lake marsh wetland complex.
Budget Impact/Other
Routine and major repairs of the berms prevent costly flooding of private and public property and associated emergency repairs.
Project # 25806
Project Name Wetland Restoration Projects
Category Water Quality Improvements Type Conservation Projects Contact Lori Haak
Description
The City owns several prominent wetlands that could help further public education goals, increase City biodiversity, improve water quality, and provide greater aesthetic benefits. These wetlands have an abundance of non-native and invasive plants and require an initial investment in revegetation to improve water quality, aesthetics, and public education. The City assumes the restoration work will cost approximately $20,000 per acre with 30% contingency for maintenance. Maintenance will continue for approximately 3 years following a project to allow for successful long-term establishment of native vegetation.
The water treatment plant site will be used in combination with water treatment plant tours and the Environmental Learning Center as part of the City’s public education and outreach for its NPDES Phase II municipal stormwater permit compliance. Additionally, improving the biodiversity, aesthetics, and educational opportunities of the Glenshire site and the City Center wetland (1614-B) furthers the goals of the City's NPDES Phase II municipal stormwater permit compliance and promotes a beautiful natural environment for the City's residents.
Budget Impact/Other
This project promotes the City's goal of a preserved and beautiful environment. Additionally, by investing in intensive short-term restoration projects, the City hopes to achieve long-term native flora biodiversity and stormwater quality benefits rather than using frequent small projects to address recurring problems. Useful Life
Project # 25807
Description
The City conducts storm water system analyses annually which result in projects to help improve water quality in lake and creek sub watersheds. Projects will include constructing or retrofitting bioretention basins; expanding storm water treatment capacity; constructing sump manholes and other in-line treatment devices; retrofitting stormwater ponds with infiltration or sand filters; or inlake and in-pond alum treatments. Improvements within the lower Riley Creek, Staring Lake, and other impaired sub watersheds will be prioritized as the City has waste load allocations for these waterbodies.
Making measurable improvements to water quality and waste load reduction within the drainage area of impaired waterbodies is a Phase II NPDES Permit requirement. In addition, most of our lakes are impaired for nutrients and Riley Creek is impaired for turbidity. Upgrading the drainage system and lake and creek ecology will help improve the water quality with a goal of delisting the lakes and creek as well as increasing the recreational values of these surface water resources.
Budget Impact/Other
The inventory program will result in a need for storm water system improvements. Depending on the number and types of problems identified in the inspection program, additional improvements beyond the amount budgeted may be required.
Project # 25808
Project Name Creek and River Corridor Restoration Projects
Description
Design, development and implementation of plans to repair, stabilize, or improve water quality within the creek and river corridors. Projects will be identified in the Local Water Management Plan, stormwater system inventory, or derived from future TMDL requirements.
Justification
The Minnesota River is impaired for sediment load. These improvements to the river and creek corridors will help meet our requirements to reduce sediment loads to the river by reducing upstream erosion and sediment transport. In addition to the water quality benefits, eroded stream channels and slope failures also pose threats to private property and public infrastructure adjacent to the failures. Areas of high risk and high vulnerability will be identified and prioritized.
Budget Impact/Other
Recently completed creek assessments and annual creek bank monitoring have resulted in a need for ongoing creek bank and river stabilization projects. Depending on the number and types of problems identified, additional improvements beyond the amount budgeted may be required. The assessments have helped to define and prioritize projects within the creek and river corridors to help stabilize severely eroded and unstable sections.
Project # 25809
Name General Storm Water Repairs and Maintenance
Description
Design, development and implementation of plans for miscellaneous repairs and improvements not currently identified as a specific project. Repairs will include potential projects as a result of the televising of high risk storm sewer alignments adjacent to the creek corridors and corroding corrugated metal pipes. This project will also include storm sewer capacity upgrades, pipe lining, and additions to address localized flooding issues. Projects will include work done by City's utilities staff or consultants depending on scope and availability of staff.
Repairs and improvements to storm sewer and storm water best management practices are critical to maintaining the integrity of the City's infrastructure and adjacent properties. Maintenance and improvements are required to be both reactive and proactive to ever changing climates and land uses. Inspection, repairs and maintenance are also required as part of the City's Municipal Separate Storm Sewer System (MS4) with the Minnesota Pollution Control Agency (MPCA).
Budget Impact/Other
The inspection program and regular monitoring of the City's infrastructure will result in a need for storm water system improvements. Depending on the number and types of problems identified in the inspection program, additional improvements beyond the amount budgeted may be required.
Project # 25810
Project Name General Road Drainage Improvements
Road Drainage
Description
Stormwater system and curb and gutter improvements for roadway projects to meet NPDES and Watershed District requirements. This could include culvert replacements, roadway drainage improvements or other projects not currently related to a specific road project. This item will also include funding for drainage improvements to be completed along with the Pavement Management Program.
Maintaining proper drainage of the right of way creates a safer driving experience and prolong the lifespan of the bituminous pavement. Additionally, nuisance drainage conditions often manifest as ice in winter and require the application of extra road salt. Thus, fixing drainage issues may reduce chloride pollution.
Budget Impact/Other
This budget item provides the flexibility needed to maintain and repair our storm water system on an ongoing basis to help prevent major projects in the future. Depending on the number and types of problems identified during the engineering analysis, additional improvements beyond the amount budgeted may be required. Useful Life 25 years
Project # 25811
Project Name Sweeping
Description
The City currently conducts annual street sweeping in the spring and fall. Additional street sweeping within the sub watersheds of impaired water bodies can prevent pollutants from reaching the waterbodies.
Making measurable improvements to water quality and waste load reduction within the drainage area of impaired waterbodies is a Phase II NPDES Permit requirement. In addition, most of our lakes are impaired for nutrients and Riley Creek is impaired for turbidity. Prioritized additional sweepings within the sub watersheds of impaired waterbodies improves water quality with the ultimate goal of delisting these waterbodies.
Budget Impact/Other
Enhanced street sweeping is widely recognized as one of the most cost effective means of reducing pollutant loading to impaired water bodies. More frequent sweeping may also result in less sedimentation into City-maintained stormwater ponds, which should reduce the need for costly dredging projects. Useful Life
Project # 25812
Description
The City maintains over 800 stormwater ponds as part of its Municipal Separate Storm Sewer System (MS4). These ponds provide pollutant reduction for runoff from the right of way prior to it discharging to lakes, streams, and rivers. However, over time, the ponds become less effective at pollutant removal as sediment accumulates. The City evaluates bathymetric data from the ponds to determine which ponds have excessive sedimentation and provide the most water quality benefit. The City also inspects all of its ponds at least once every five years. Ponds with excessive sedimentation that inhibits their pollutant removal or impedes the flow of water through the pond need to be dredged to maintain their design functionality and protect downstream resources.
Justification
Pond dredging can lower pollutant loading to impaired waterbodies as well as improve the utility of the pond at conveying stormwater runoff. Making measurable improvements to water quality and waste load reduction within the drainage area of impaired waterbodies is a Phase II NPDES Permit requirement. In addition, most of our lakes are impaired for nutrients and Riley Creek is impaired for turbidity. Pond dredging within these sub watersheds is prioritized to continue waste load reductions to these waterbodies. Additionally, the City's ongoing pond inventory program evaluates which ponds as most beneficial and cost-effective form a pollutant removal standpoint.
Due to the number and the age of many of the ponds in the City, pond dredging is an ongoing maintenance program needed to ensure the proper functionality of the City's storm system. The City's ongoing pond inventory program evaluates which ponds are most beneficial and cost-effective from a pollutant removal standpoint. This allows the City to be judicious in its prioritization of ponds and avoid unneeded dredging. Finally, the City inspects all pond inlets and outlets at least once every five years, which allows us to evaluate if excessive sedimentation could obstruct inlets and outlets and inhibit flow.
Project # 25817
Project Name City Center Stormwater Quality Improvements Category Water Quality Improvements
Description
Runoff from City Center is currently not treated prior to discharge. Pollutants from the building and parking area then discharge into downstream wetlands, lakes, and rivers. Additionally, there are some drainage and snow storage deficiencies within the parking lot which can be improved.
The implementation of stormwater best management practices at City Center that exceed the requirements of the City and Watershed District will result in additional reductions of nutrients and sediment within the Staring Lake sub watershed. Staring Lake is currently impaired for nutrients. Additionally, low-salt design improvements to the City Center parking lot will reduce chloride loading to downstream waterbodies. Finally, the stormwater and chloride-reduction BMPs implemented at City Center can serve as a public educational tool.
Budget Impact/Other
By coordinating the project with improvements to the City Center associated with the Police Station remodel project, the City hopes that these improvements can be implemented in a cost effective manner and minimize disruptions. Useful Life 25 years
City of Eden Prairie, Minnesota
Project # 26802
Project Name Fire Station 4 Rain Garden Improvements
Description
The raingardens at Fire Station 4 are overrun by non-native and invasive plants and require an initial investment in revegetation to improve water quality, aesthetics, and public education.
Justification
The location of the gardens (between the Fire Station and Dell Road) is highly visible. The rehabilitation of the raingardens will make them an asset to water quality and aesthetics. The adjacent child care center will be invited to participate in the process as part of the City’s public education and outreach for its NPDES Phase II municipal stormwater permit compliance.
Budget Impact/Other
By investing in the aesthetics and water quality benefits of the rain gardens at Fire Station 4, the City can minimize future ongoing maintenance costs for the basins.
Project # 27801
Project Name Welters Way Culvert Lining
Department Storm Water Utility
Contact Patrick Sejkora
Useful Life 40 years
Category Public Works Type Improvement
Description
The Welters Way culvert is the outlet of pond 23-43-C that discharges to Purgatory Creek. 23-43-C receives drainage from a considerable and highly developed drainage area that includes Neill Lake, Eden Prairie Center, and Eden Lake. The existing culvert is a 65" x 40" corrugated metal arch pipe that has upwards of 14 feet of fill over it and is in close proximity to existing homes.
Given the age of the pipe (1987), it is nearing the end of its functional lifespan. Many other corrugated metal pipes in the City of similar age, including an identical culvert that was an inlet to the pond, have been lined or replaced due to corrosion or separation. Based on a limited visual inspection, it appears there is some minor separation at the first visible pipe joint. A failure of the pipe could result in flood risk to surrounding upstream homes and could risk the foundations of the two adjacent homes. Replacement of the existing culvert would be highly disruptive and challenging due to the depth of fill over it and proximity to the homes. Therefore, lining of the pipe is the most feasible option to extend its lifespan and minimize disruption.
Budget Impact/Other
Lining the culvert is a far more economical option compared to trenching while offering a comparable functional lifespan.
City of Eden Prairie, Minnesota
Project # 25203
Project Name Senior Center HVAC Replace RTU's
Description
Replace two rooftop air handling units
Justification
These units will be over 20 years old and will have reached their theoretical useful life. They should be replaced at the same time as the roof and be replaced with more efficient units with economizers.
Budget Impact/Other high efficiency units will have a savings in electric and gas utility cost
City of Eden Prairie, Minnesota
Project # 25205
Project Name Senior Center New Windows
Description
Replace Senior Center windows and storefront entrances
Justification
Senior Center windows are original to the building and should be replaced to increase building efficiency.
Budget Impact/Other
Decreased utility cost not yet quantified.
City of Eden Prairie, Minnesota
Project # 25208
Project Name Outdoor Center Windows
Description
Replacement of windows at Outdoor Center and Animal Junction
Justification
Replacing single pane inefficient windows with higher rated windows
Budget Impact/Other Utilities savings with high efficiency windows
City of Eden Prairie, Minnesota
Project # 26204
Project Name Rink 1 Ice Plant and Flooring
Useful Life 30 years
Description
Convert Rink 1 from a sand direct refrigerant system to a concrete floor indirect ammonia system. Also re-configure the way zambonis pull into garages at a 90 degree damaging concrete floor and wear on equipment.
$1.2M of costs under review-potential for grants
Justification
Rink 1 is currently a sand floor with a direct refrigerant system that is out of date and beyond its theoretical life. The refrigerant used is obsolete and deemed harmful to the environment. It is being phased out and eventually no longer available for purchase. Staff recommends updating the rink to industry standards of an indirect concrete floor using ammonia as the refrigerant. Our rinks 2 and 3 use the new standard.
Budget Impact/Other
Not quantified. Likely minimal unless a geothermal was installed. Savings to be quantified for geothermal later
City of Eden Prairie, Minnesota
Project # 27202
Project Name Art Center HVAC
Description
Replacement of Art Center HVAC- 2 Boilers and 2 Air Handlers with DX cooling
Justification
The HVAC equipment is over 30 years old and in need of replacement. Replacements will be high efficiency units.
Budget Impact/Other
High efficiency units will have a decrease in utility consumption.
City of Eden Prairie, Minnesota
Project # 27207
Description
The units that serve the varsity locker room and rink 2 team rooms are over 33 years old and are 100% outside air direct fire units. This is a very inefficient way to heat a space that does not require 100% outside air. These will be replaced with higher efficiency heat exchanger units for better air quality and energy savings.
Justification
The two units are past life expectancy being over 33 years old.
City of Eden Prairie, Minnesota
Project # 28203
Description
This is budgeting to replace as many fixtures with LED within the $400k budgeted amount. First focus will be the 4 Fire Stations then the Maintenance Facility and Park Shelters
Justification
Reduction of utility use is directly correlated to sustainability and LED lighting is the lowest cost energy reduction item in our buildings.
Budget Impact/Other
Decreased electrical usage.
of Eden Prairie, Minnesota
Project # 25703
Project Name Lift Station Rehabilitation Program (167130)
Description
Annual major maintenance rehabilitation on two of twenty-two sanitary sewer lift stations. We will perform major renovations on two lift stations per year until 2030, after which we will do one lift station for the remainder of the 10-year CIP which will enable us to perform a complete overhaul of each station in the system, and then we will start over again. Life span average before rehab is 20 years.
*Note: In 2023 we have budgeted for two lift station rehabs PLUS we plan to complete the rehab of Bluffs West lift station, which was begun but not completed. 2023 therefore has a higher expenditure than the other years.
Justification
This program will maintain all of our sanitary sewer lift station facilities. Annually we perform maintenance of the mechanical and electrical systems, but this is a refit-rehab of the structure.
Budget Impact/Other Useful Life 20 years
City of Eden Prairie, Minnesota
Project # 25706
Project Name Hydroexcavator Purchase
Department Wastewater Utility
Contact Rick Wahlen
Type Fleet Equipment, Automotive
Useful Life 10 to 15 years
Category Utility Operations
Description
Purchase of new truck mounted hydroexcavator - new utility fleet item
Justification
Growing demand for locating underground utilities in rights of way full of buried systems has made our Vactor in high demand for its vacuum suction capability. This is a type of mission creep into our sewer cleaning that would be better addressed by a hydroexcavator and would not interfere with sewer maintenance. Additionally a hydroexcavator system is better equipped for this purpose and would not negatively impact the redundancy desired for our sewer cleaning equipment. Wear and tear on our existing Vactor when used for this role makes it less likely to be available for sewer maintenance.
Budget Impact/Other
Additional fuel and maintenance cost over the life of the system. Fuel and maintenance will be charge to Utilities in the annual fleet service fees.
City of Eden Prairie, Minnesota
Project # 25707
Project Name Jetter and Vactor Purchase
Life 15 years
Description
Purchase of wastewater Jetter in 2025 and Vactor in 2030. Both of these vehicles are replacements of existing vehicles used in the maintenance of wastewater infrastructure. The Jetter will replace the existing International Vactor and the Vactor will replace the existing Mack Vactor.
Justification
These two vehicles will reach the end of their service life in the proposed purchase year. After those dates, they become more unreliable and costly to keep in operation. These vehicles perform critical tasks in keeping the wastewater system functioning and help to eliminate or reduce the number of wastewater backups.
Budget Impact/Other
Both vehicles were originally purchased by the utility enterprise. However, because they were not depreciated by Fleet Services for their future replacement, they will be purchased by the Wastewater Enterprise. Fleet Services will depreciate these two vehicles so that future replacements will be made by Fleet Services.
City of Eden Prairie, Minnesota
Project # 26700
Name Sewer Rehab - Unspecified Location
Description
Placeholder for sewer lining in locations that pop-up with problems.
Justification Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 27704
Project Name Backup Generator for Lift Stations (277131)
Description
Purchase and installation of a backup generator, most likely to be installed at the Eden Prairie Road lift station.
Justification
Prevention of sewer backups in the event of a power failure in a 100 year storm event.
Budget Impact/Other
Upon completion of installation, additional utility fees will be incurred (natural gas, electric, including monthly service fees).
City of Eden Prairie, Minnesota
Project # 33700
Project Name Lift Station Controls Upgrade - Phase II (337131)
Description
This project funds the replacement of nearly 20 year old digital control equipment at each of the lift stations. New PLC's were installed in 2016 and replacement of these systems in one year near the life-cycle end date ensures commonality of systems, parts, and support.
Justification
Digital control equipment installed outdoors in cabinets have a limited lifespan as a result of temperature extremes and other environmental conditions. This replacement project allows us to swapout the aging controllers as a system to allow a common system for ease of maintenance and standardization of user operations. Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25702
Project Name Utility Rate Study
Description
Review of water, wastewater, and stormwater expenses, capital projects, and sources of revenue for the purpose of developing a rate model that satisfies the utility's financial goals while funding future projects.
Justification
Budget Impact/Other
Project # 25711
Name Annual Well Rehabilitation (177310)
Description
Annual Major Well Maintenance Program is performed on two wells per year. Each well goes through this program every 8 years. Rehabilitation consists of test pumping the well to obtain a base-line of performance, removing all down-hole well equipment, inspecting all components, rebuilding or replacing the pump as needed, replacing all line-shaft bearings, replacing corroded column sections as needed, painting column pipe sections as required per installation, machining or replacing line-shaft sections as needed, overhauling the electric motor, televising the casing, televising the open hole, redeveloping the well as needed, and re-assembling and reinstalling all equipment. Where appropriate, the budget includes additional money for column pipe recoating and well house improvements. The well rehabilitation projects include plans to replace the variable frequency drives (VFDs), primary logic controllers (PLCs), and SCADA system components as needed, however this may be determined to be best performed for multiple wells at the same time in the future for economies of scale.
Well equipment, especially the components which are either immersed in water or are suspended within the damp, dark well column is very susceptible to corrosion and therefore must be inspected periodically to prevent failure. Additionally, moving mechanical components of the system experience fair-wear-and-tear through normal operation and must be periodically disassembled and inspected for degradation and repaired or replaced as needed. Industry practice with the water quality we have in Minnesota dictates a routine major maintenance interval of approximately 8 years. Longer periods between inspection and repair risks system performance reduction and potential system failure at times we can least afford to have a well unavailable to us.
Over time by performing these periodic maintenance projects, the life cycle electrical cost of each well will be less because the pumps will be maintained at a high state of efficiency. Without this service, well pumps experience unresolved wear and erosion which diminishes each pump's efficiency. Lower efficiency equates to
the same
of water.
City of Eden Prairie, Minnesota
Project # 25721
Project Name WTP SCADA System Software Replacement (257020)
Department Water Utility
Contact Rick Wahlen
Useful Life 20 years
Category Water Treatment Type Automation: Instrumentation (SCADA)
Description
Replace the GE iFix control system software used to provide SCADA for the water treatment plant, wells, and water storage systems with System Platform software. Project includes significant system integration work to more efficiently redesign the control architecture, streamline the system code, and make future troubleshooting and programming much simpler and less time consuming for routine system maintenance. iFix in use since the 1990s is not the most appropriate software system for water treatment, and much more compatible, well-known, and universally supported software is being selected to replace iFix when it is next due for an upgrade.
Justification
Old plant process control software has been due for an upgrade and converting from GE iFix to System Platform Plus is not only the most economical solution, but also the most efficient in terms of programming time and implementation.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25722
Description
Perform a deliberate, functional assessment of the filter systems to evaluate the integrity and performance of the media, underdrains, and surface wash system. The results of this study will determine an appropriate filter media replacement schedule and decide how the aging system components need to be replaced or refurbished.
Justification
Some filters in the treatment plant have been in continuous operation since the 1970s and require an evaluation of the integrity and performance of the filter components to make operational and budgetary decisions regarding their maintenance and potential refurbishment.
Project # 25740
Project Name Watermain Rehab & Valve Replacement (207040)
Description
This project includes the replacement of corroded bolts in gate valves in streets planned to be reconditioned in the pavement management program. Every other year of this ongoing project includes the re-lining of up-to two blocks or 1,200 feet of water main.
Justification
This annual maintenance activity will ensure water leaks will be addressed prior to the restoration of a street, thus avoiding digging up a new bituminous surface shortly after it has been installed. This is preventive maintenance. Additionally, as leaks develop in water main and lead us to see that segments of these water mains are experiencing a greater probability of failure, we are budgeting for the replacement of up to two-city blocks of water main every-other year on the even numbered years.
Budget Impact/Other
Programming intentional maintenance of these areas will hopefully reduce the amount of emergency repairs needed later, thus reducing employee overtime and contractor after hours fees.
Project # 25741
Project Name Pipeline Assessment / Leak Detection
Department Water Utility
Contact Rick Wahlen
Type Water/Sewer Mains
Useful Life 25 years
Category Water Distribution
Description
Water Distribution Project 7040 is intended to investigate segments of our public watermain to identify ductile iron pipe that can be expected to fail sooner than later. This project encompasses support by consultants and contractors using various digital assessment methods and will allow us to determine which of these techniques best facilitate our goal of proactively finding and replacing/repairing watermain before it breaks on its own.
Justification
Each year between 20 and 60 leaks occur in the public water distribution system. Repairing these leaks is costly, especially since they normally involve after-hours work by both city crews and our contractors. Additionally, these reactionary emergency repairs only address one small portion of the leaking pipe that happens to be corroded bad enough to spring a leak. Other portions of the pipe may also be decaying, but we are unable to unearth more than the area necessary to perform the repair to investigate the condition of the watermain nearby. These leaks can be very sporadic, occurring in pipe that is otherwise in excellent condition. Digital and AI guided pipeline assessment studies can hopefully identify for us these problem areas allowing us to schedule watermain repairs in a more efficient and cost-effective manner.
Budget Impact/Other
Our hope is that our annual expenditure for emergency leak repairs will diminish over time. Each repair costs us roughly $10,000 in contract costs in addition to materials, employee overtime, and equipment hours.
Project # 25750
Name Bldg Expansion & Geothermal Heat (247021)
Description
This project consists of three major improvements to the water treatment building:
1)Adds modern heat recovery HVAC using treated water in a geothermal heating/cooling system which will replace the aging, conventional system in use today.
2)Adds conference/training room above the system which can seat all the local 49 members.
3)It adds three to four additional office spaces/work rooms for staff.
The water treatment plant has several large and expensive conventional heating, cooling, and dehumidification systems which require replacement by the end of the decade. Conventional heating and cooling systems are cheaper up-front, but require more energy to operate. A geothermal system would operate efficiently and inexpensively using the city's natural supply of year-round 50degree water. Payback for geothermal systems is typically experienced within 20 years, but we believe a system of this type will achieve even greater efficiencies given the ability to capture water already pumped by the treatment process. We plan to build onto the east side of the building where the present patio is located. The structure would be sized large enough to provide a training/conference room on the second floor and up to four office spaces on the lower floor, which is included in the budget.
Impact/Other
City of Eden Prairie, Minnesota
Project # 25751
Project Name Admin Area Office Improvement
Description
Make the WTP admin area more resistant to sound influence from the noisy plant tour groups. The project consists of an architectural space assessment, design, and construction of office walls that still provide practical and convenient open support of the public at the front desk.
Justification
See Description.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 25760
Name Water Meter Change-Out System Wide (157060)
Description
Purchase and installation of a water meter system which provides continuous, ongoing water use data through integrated technology.
Justification
Our existing water meters throughout the community are nearing or exceeding their useful life due to the diminishing power of the onboard battery packs. Without replacement, we cannot gather water sales information from failed meters unless we manually read each water meter. Currently, we read our nearly 19,000 residential water meters, and just under 1000 commercial and irrigation water meters using a mobile automatic meter reading system (AMR) installed in one of our vehicles. This method requires a utility employee to drive by each address to obtain the water use data. Prior to each meter reading cycle, the mobile computer system must be uploaded with the latest route information exported from our utility billing software, the GIS map has to be verified each month, resulting from new meter installations or meter change-outs, and there is an associated 2-hours of administrative preparation and data transfer needed to perform each meter reading cycle. The water metering systems would require far less administrative set-up and data transfer time, since the system would be operating in real-time, all the time. We would also not be dependent on labor schedules to obtain meter data, and the resulting savings in labor should improve our ability to manage the field operations work-load. Additionally, users will be able to obtain information about water use more frequently which will reduce wasted water and should minimize unnecessary water consumption.
Budget Impact/Other
New technology will require a cellular service fee of approximately 65-cents per account, which will go into effect the month installation occurs. Service fees will be paid from the O&M budget. Present day AMR reading performed by our staff is at least 25-cents per account,
Project # 26710
Project Name Well 9 & Baker Road Reservoir Site Improvement
Department Water Utility
Contact Rick Wahlen
Type Wells
Useful Life 50 years
Category Water Supply / Wells
Description
This project includes funding for upgrading the site surrounding two city utility properties, including Well No. 9 and Baker Road Reservoir. In order to rehabilitate Well 9 in 2024, the sound wall on the south side of the well had to be removed to make room for the service equipment. The sound barrier was positioned close to the building, necessitating its removal for the project. When it is replaced after conclusion of the project, it will be moved approximately 40 feet to the south to prevent future access problems. Permanent earthwork and road treatment will be necessary to accommodate this change which will include a larger parking apron on which to position the service truck and a pipe transport truck. The second site included in this project is the Baker Road Water Storage Reservoir, which is located behind the Lifetime Fitness facility at the SE corner of the intersection of Baker Road and Crosstown highway (MN 62). The water storage site is overgrown with buckthorn, has a crumbling roadway surface, needs a gravel path around the base of the tank replaced by bituminous asphalt, and the aging fence (1980 vintage) needs updating. This site will serve as the access to the north Eden Prairie monument sign, and the upgrade will be performed after construction traffic is completed for the US 494 monument sign project.
Both the well site and the water storage site have needed upgrading for several years, and two unrelated construction projects have made the timing appropriate for this CIP period. When Well No. 9 started showing signs of sand in the pumped well water, it became apparent that the downhole well cavity was in need of substantial redevelopment to eliminate the loose sand. The redevelopment project has been separately coordinated for completion in 2024, however in order to gain access to the wellhouse with a large well service truck, a number of site modifications had to be temporarily made. The temporary changes were performed within the minimal budget available for the 2024 well rehabilitation CIP project, however a more permanent solution is offered in this project that will enable future well maintenance activities to be easily performed without removing sound barriers and extending the scope and duration of these maintenance projects. Replacement of an aging, wooden retaining wall and expanding the site a few feet backward into the hill slope is included in the scope of this project.
The second site at Baker Road Reservoir takes advantage of restoring the site following the use of this property to access the work area to construct the city's new monument sign along I494 adjacent to the reservoir. The budget within this project is intended to replace the access roadway, remove buckthorn and other invasive vegetation, trim trees, replace fences, and add a bituminous surface to the gravel trail surrounding the base of the water tank.
Budget Impact/Other
Project # 26722
Description
The washwater tank is a 75,000 gallon water reservoir used for backwashing each of the 13 water filters within the water treatment plant. Decades ago the vent on the washwater tank froze shut in the winter and when the water was emptied from the tank to wash a filter, the vacuum buckled the tank. Temporary repairs covered the tank with a thick foam to conceal the heavily wrinkled tank for many years. A permanent repair was made in approximately 2008 and the coating system on the exterior was redone. The interior of the tank received spot painting over the welded portions and has been periodically inspected. This particular project will recoat the entire tank inside and out which should last for another 30 years. The previous coatings even with spot painting have greatly exceeded their normal lifespan. Additionally the outside CO2 tank has been in place since the 1980s and is in need of recoating. This tank will be included in the project.
Justification
The life cyle of the coating systems of both tanks are nearing their end times. Repainting both tanks will extend the useful lifespan.
City of Eden Prairie, Minnesota
Project # 26750
Project Name Surveillance System Upgrade Utilities (257021)
Description
This project consists of upgrading the existing electronic digital video surveillance system at the water treatment plant. The scope of this system update includes new servers, software, and video cameras. It is assumed that all existing fiber optic and ethernet cable is sufficient for use by the new cameras. All of this equipment will be integrated with the city's online surveillance system that is accessible by the police.
Justification
The existing system is getting old and the cameras are requiring additional maintenance - some of which have already been replaced.
Budget Impact/Other
of Eden Prairie, Minnesota
Project # 27720
Project Name High Service Pumps & MCC Upgrade (197022)
Rick Wahlen
Description
This project replaces the existing 2800 volt high service pump motors and aging 1974 electrical motor control centers, includes constructing deeper pump wells to allow access to most of the onsite plant water storage. New pumps and 480 volt motors with variable frequency drives will operate more efficiently and save the city thousands of dollars each operational year in electrical demand charges and will allow for reduced pumping rates at lower electrical cost. Pumping capacity from this location will be increased from the previous design.
We have 5 high service pumps which operate at 2800 volts energized by what is known as 'cross-the-line-starters,' meaning that these motors receive a fully energized circuit upon start-up, and they draw full-amperage at 2800 volts the instant the switch is closed (the highest amp-draw from a motor that is not locked). This system is obsolete, and we cannot purchase variable frequency drives to power this voltage of motor because nobody manufactures them. Without a variable frequency drive, these motors consume the maximum amount of electrical power possible during the moment they start up, causing the city's electricity demand charge to be at maximum. This results in much larger electrical fees than we would have if variable frequency drives could be utilized. Additionally, the motor control cabinets are archaic and were designed before arc-flash was completely understood - thus these panels are very complicated to work on and most electricians will not service them. These pumps can be crucial during peak summer flow periods, so it is important to make the electrical systems safer to maintain and cheaper to operate.
Budget Impact/Other
Following reconstruction, this pump station will experience a much lower demand charge from Xcel Energy and ongoing operational expenses should be no greater than the previous system. Electrical Energy savings is anticipated.
City of Eden Prairie, Minnesota
Project # 27721
Project Name Filter Valve Replacement
Description
All valve actuators and valve positioners are critical components for the operation of each filter in the water treatment plant. Valve actuators are the pneumatic powered valve-turning systems enabling the filter control valves to open or close and maintain a variable position to keep each filter flowing at a steady rate. The positioners are the digital control devices establishing the amount of air applied to each actuator maintaining the valve at the prescribed position. These electronic devices were upgraded in 2010 and will be 20 years old.
Justification
Valve actuators and valve positioners are critical components of the water treatment plant's flow control system. Not only are these devices in constant use every day, but they are also in a state of continuous motion, driven by responses to changes in water pressure to achieve a constant and sustainable flow of water through the filters. As filters become laden with sediment and collect particulate matter from the softening basins, flow through the filters reduces and the control system must open the valves below the filters in small amounts, incrementally increasing the valve position in order to keep the volume of water leaving the filters at the value prescribed by the treatment plant operator. As head loss builds in the filters, the pressure differential between the top of the filters and the filter underdrains increases, but this increase is not linear. It trends linearly over time, but does so in countless small steps that result in the valves opening and closing in minor swings of open/close/open/close over and over again.
This complicated system has been in continuous service since each of the devices were installed and placed into operation in stages during the years 1977, 1982, 1988, and 1997. The oldest valve actuators are 50 years old at the time of this project being introduced. The newest ones will be 33 years old when this project begins.
Budget Impact/Other
of Eden Prairie, Minnesota
Project # 28720
Name Basin 4 Reconditioning (277021)
Description
This project provides for the sandblasting and repainting of the 10 million gallon per day lime softening and clarification basins that were constructed in the last of the plant expansion projects. All of the other clarifiers have been recoated. These basins have been in continuous service in an extremely caustic environment (pH of 12) since 1997 and after 30 years of service will be in need of recoating. The steel in these clarifiers has been maintained well by the treatment plant staff with annual cleaning and spot painting. The recoating interval for water towers which are exposed to much gentler conditions is 25 years, so for an underwater metallic system to last this long without repainting is a testament to the maintenance work of the operators maintaining these systems.
Justification
The paint coating system was installed in 1996-1997 and has been in continuous immersion since that time. Had our employees not performed such thorough annual maintenance which included rust repairs and spot-painting, the coating system would almost surely require recoating at or before 20 years. As it is, we are planning for its recoating at year 30 based on its present condition.
City of Eden Prairie, Minnesota
Project # 28721
Project Name Filter Optimization Improvements
Description
This project performs the rehabilitation work recommended by project 25722 (Filter Evaluation) on 3 filters. Following the completion of these improvements, the performance of the 3 filters will be evaluated over the next year to assess the effectiveness of the improvements before performing the remainder of the work on the rest of the filters. Anticipated work includes filter media replacement and disposal of the old media, new washwater arms, washwater pipe reconditioning, and repair of cracked or leaking underdrain tiles.
Justification
Filters approaching 50 years in service are due for reconditioning. Previous filter assessments performed in the 1990s and in 2007 suggest the timing of this project.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 28722
Life 20 years Project Name General Instrumentation & Controls Updates
Description
Replacement of aging electronic controls equipment used throughout the treatment and supply system on a planned replacement cycle based on anticipated life span.
Justification
See Description.
Budget Impact/Other
Project # 29750
Project Name WTP Garage Expansion 60x50 (297023)
Department Water Utility
Contact Rick Wahlen
Type Facilities/Buildings/Environmental Cont
Useful Life 50 years
Category Utility Operations
Description
Construction of a 60x50 foot garage structure at the water treatment plant on the southwest corner of the facility.
Justification
In both the water treatment plant building and the field operations shop, vehicles are stacked and double-stacked to make room inside during the winter cold and snow, and especially during winter thunderstorms. Some of our vehicles suffered hail damage in the past, and we are 'stuffing' vehicles into the tightest spaces to get them out of the weather. A good example is the use of our sludge dumping garage as parking spaces for many of our vehicles. The city trucks/vans/cars are pulled into the bays in front-of and adjacent to the semi-trailers and they must be moved to make room for sludge retrieval. The utility buildings were never designed to accommodate the current fleet. The cost estimate provided includes full heating, but a cold-storage option would be acceptable.
Budget Impact/Other
Vehicles will experience less wear-and-tear from startups, there will be less likelihood of accidental fender-benders, and hail dents will be far less likely. Parking indoors diminishes the ongoing winter stress on engines, etc., so we expect this could extend the lifespan of our fleet vehicles. Utility costs to heat and light the structure will increase and should be planned in the O&M budget.
City of Eden Prairie, Minnesota
Project # 30720
Project Name Chemical Storage Tank Replacement (317320)
Description
Replacement of aging water treatment plant storage tanks containing ferric chloride and fluoride. The existing tanks were installed in the building before the walls/ceiling were completed, so they are built-in. Replacement tanks would have to be installed through an opening in the roof for the water, cut large enough to allow the tank to be passed inside. The existing fiberglass tank is getting brittle and approaching the end of its useful life.
Justification
The fluoride and ferric chloride storage tanks within the water treatment plant building are constructed of fiberglass and are showing signs of becoming brittle with age and exposure to the harsh chemicals. We've been advised that replacing these tanks within the next few years would be wise. The chemicals are required in our treatment process and cannot be eliminated.
Budget Impact/Other Useful Life 25 years
City of Eden Prairie, Minnesota
Project # 30722
Project Name Chemical Feed System Update
Description
Replacement of aging chemical feed pumps and other system components, some of which were installed in the 2010-2012 process control upgrade. This is a normal wear and tear life cycle replacement plan.
Justification
Chemical feed pumps and controls will be at least 20 years old by this date and in need of replacement. Some of the system components are much older.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 32720
Project Name Lime Slaker Replacement (287021)
Description
This project replaces the existing Wallace and Tiernan Lime Slakers (chemical feed systems) after their useful life has been exceeded.
Justification
Lime slakers operate in a very caustic environment which is extremely corrosive to metal parts. We are very deliberate about cleaning the slakers frequently and replace parts as they are needed to ensure the machines function and remain in good shape. However the core body of the slakers are not replaceable, they contain the caustic paste solution which over the years corrodes away the metal. Based on industry experience, we believe we should be able to operate these systems until 2032 without having to totally replace the machines. We have four slakers, and plan to replace them sequentially in the same year to take advantage of bidding all together for the best price. We will continue doing above-average maintenance and plan to extend the life of these machines approximately 20 years beyond the industry rated lifecycle of the system.
Budget Impact/Other
City of Eden Prairie, Minnesota
Project # 34720
Project Name Filter Press Replacement (327020)
Description
This project replaces the existing old sludge blow-down and material transport system in the treatment plant with durable, energy efficient sludge handling equipment.
Justification
We have been advised that much of the filter press may be costly and a challenge to maintain in the next 5-to-10 years because the company which bought out the press manufacturer from Perrin Press has been sold again to a company that has its own dewatering technology. We are hopeful this press may be in use for years to come, but if it becomes obsolete, we will need to come up with another solution for our residuals. This line-item is a place holder which we will only use if absolutely necessary. All things degrade over time, and we will continue performing strong preventive maintenance to fend off failure.
Budget Impact/Other