Engineering Department http://ci.alamogordo.nm.us/233/Engineering
ONGOING PROJECTS is the final phase of the South and McKinley Channel flood control projects. This phase will concrete-line approximately 2 miles of the channel from First Street up to the Sacramento Mountains where a large basin will be constructed. The anticipated completion timeframe is summer 2022, and the cost is approximately $24 million
GIS continued to update and enhance the City’s various location-based electronic infrastructures as follows: •
Maintained 307 GIS data layers in four geodatabases utilizing GPS, as-built records, and other methodologies.
•
Created and maintained several web-based maps serving both City staff and the public.
•
Provided the public and staff with map and information requests and inquiries.
•
Created and initiated a plan to migrate all of the GIS data to the online ArcGIS platform which, when fully implemented, will greatly make all data collection and update processes run more efficiently and ensure the online web mapping will consistently have the most up to date information for both City staff and the public.
•
Attended online ESRI International User Conference gaining tremendous insights and direction for the most advantageous value with the City’s GIS efforts.