Georgia #06, 2011

Page 1

GEORGIA STATE EDITION

A Supplement to:

441

59

75

Cornella 19

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

March 23 2011

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus 27

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson 27 84

Moultrie

19 319

84

Bainbridge

Valdosta

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

Dorchester

341

Cuthbert

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

301

1

82

Vol. XXIII • No. 6

Savannah

McRae Cordele

Thomasville

Waycross Brunswick 82

1 441

New Bridge to Keep Trains, Cars on the Move — Separately By Peter Hildebrandt CEG CORRESPONDENT

Trains can be fun and rather interesting to watch, regardless of the plot of the recent movie Unstoppable. But though they usually coexist peacefully, trains and vehicles can often make for patience-stretching delays and the ever-lurking possibility of tragic accidents. The makeover one Chatham County, Ga., road is getting will eventually bypass the issue of trains and cars having to deal with each other by separating the two means of transport with a new bridge. Work started on SR 307, which crosses an area railroad grade, on Aug. 10, 2010. The project is slated to be completed by March 31, 2012. The prime contractor on the job is Sunbelt Structures Inc. This is the first project in Savannah for Sunbelt. Sunbelt started out in 1985 as a bridge and concrete culvert subcontractor, and has grown into a multi-dimensional contracting company that has completed hundreds of projects over the years. It does engineering and design, construction management and overall project development. It focuses on state, county and local government bridge and roadway construction. With its headquarters in Tucker, Ga., most of its work is conducted in North Georgia. Craig Weatherly is the senior project manager on this job. The project involves only .855 mi. (1.4 km) of construction and includes the erection of a bridge and approaches on SR 307, also known as Bourne Avenue, over the Norfolk Southern Railroad Line. The boundary of the project begins west of the Norfolk Southern RR and extends to U.S. Highway 17

This project is for the construction of a bridge and approaches to carry SR 307 traffic over both the existing Norfolk Southern Railroad Line and the proposed Intermodal Facility railroad tracks which will eventually be present in the area.

and SR 25. Work on this job also includes construction of a detour Road on SR 307 and an intersection improvement project to provide two through lanes, left and right turn lanes on SR 307 at the intersection with SR 25 entering and exiting the Georgia Ports Authority. Work is currently on schedule, according to Craig Solomon, communications officer of the Georgia Department of Transportation (GDOT). As of the last week in February 2011, the project was in the beginning of stage one, utility relocation work and detour road construction. Also involved on the project from the GDOT are Construction Project Manager Oscar Carlers, GDOT Area Engineer, Troy Pittman (Savannah area office) and GDOT Area Engineer George Slade Cole

(Savannah area office). This project is for the construction of a bridge and approaches to carry SR 307 traffic over both the existing Norfolk Southern Railroad Line and the proposed Intermodal Facility railroad tracks which will eventually be present in the area. SR 307 currently has an at-grade crossing with the Norfolk Southern Foundation Lead track. The Georgia Ports Authority (GPA) has plans to install up to 12 working tracks and eight storage tracks at the James D. Mason Intermodal Container Transfer Facility (ICTF). Additionally, a connection from the working tracks and storage tracks on the south end of the ICTF is necessary for train movements into and out of the facility. These connection tracks will eventually lead to 14 total tracks

that will lie across the present location of SR 307. The grade separation will provide a much safer and more efficient movement of vehicles. The grade separation of SR 307 from the rail traffic was identified in the Chatham County Intermodal Freight Study. There is nothing that will be affected or disrupted, from an archeological or historical standpoint from this work, according to Solomon. “But perhaps this project’s greatest challenge involves the relocating of Georgia Power transmission lines outside of the peak power season and reconstructing the intersection of State Road 307 and State Road 25,” explained Solomon. “This will also be taking place while maintaining truck traffic into and out of the GPA’s main gate.

That, in addition to the fact that Atlanta Gas Light will be relocating a gas line in the area, means everyone will have to be on their toes and be aware of the latest information and updates. What makes it unique too is the use of an on-site detour to maintain the existing four lanes of traffic.” GDOT currently has three personnel on the site, but more will be assigned when work on the project increases, according to Solomon. Sunbelt also has crews and subcontractors on this job that vary in size. The length of the covered distance is approximately 4,514 ft. (1,375 m). The part of the project involved with the bridge work amounts to 1,000 ft. (304 m). On the materials side, 20,000 sq. yds. (16,722 sq m) of Plain PC Concrete will be placed at a depth of 12 in. (30.5 cm) in thickness. The reason for the substantial thickness is that once completed, heavy trucks and cargo will once again travel this route. The following equipment is being used on the job: an Altec 38TN boom truck; Cat D4G dozer; Cat D6KLGP Bulldozer; Cat 325D excavator; John Deere 310SG rubber tire back hoe ; 2002 Southway crane lift; and a Komatsu 200LC loader. One of the other major contractors involved with this project is Burman Communication Tech LLC, Stockbridge, Ga. It will design and assemble the traffic signals to be installed at SR 25. Burman is a signal installing contractor that does much of the traffic signal work for the entire state of Georgia. In the years they’ve been in business, since 1998, they’ve installed quite a few signals all around the state, according to see BRIDGE page 2


Page 2 • March 23, 2011 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Sunbelt Structures Spans Railroad Tracks to ‘Save Lives’

Fourteen total tracks will lie across the present location of SR 307. The grade separation will provide a much safer and more efficient movement of vehicles.

Work started on SR 307, which crosses an area railroad grade, on Aug. 10, 2010. The project is slated to be completed by March 31, 2012.

BRIDGE from page 1

owner Emory Burman III. Just because they are in effect putting the finishing — albeit very important — touches on this project, does not mean they are not involved in planning throughout the job. “It goes back and forth; we have to be involved all the way because if there is something that changes, of course then it impacts the intersection as a whole and of course we have to make sure we understand what’s going on,” explained Burman. “This includes what the engineer has designed with the poles at the intersection itself.” Burman is certified by the state of Georgia to install traffic safety signal equipment. “We’re small but we hold our own,” said Burman. “We’ve had quite a few contracts here in Georgia.” As with other similar projects, there will be a traffic light set up before the bridge is accessed. “Usually there will be a signal before and after the bridge as it goes over the railroad tracks, not one directly on the bridge. Usually there is a street that comes into that bridge at the base of the bridge on one side or the other. A lot of times they will set that up so that if it isn’t in this plan, maybe it will be in future plans to save the taxpayers money so they will go ahead and get it done now so that it doesn’t seem like an afterthought later on,” said Burman. Once the traffic light is installed, it’s good for several years, according to Burman. “So once it’s in they don’t have to worry about the price changing, as things usually go up. It helps the taxpayer out; believe it or not, government engineers do try to think about

“We have a bridge here in Stockbridge, Georgia, which was constructed because of the fact that an ambulance containing a patient who was having a heart attack, was stopped by a train and the patient died before the hospital could be reached.”

Emory Burman III

Burman Communication Tech LLC

As of the last week in February 2011, the project was in the beginning of stage one, utility relocation work and detour road construction.

the future and costs going up. “I can personally testify to the value of such railroad bridges as the one in this project. We have a bridge here in Stockbridge, Georgia, which was constructed because of the fact that an ambulance containing a patient who was having a heart attack, was stopped by a train and the patient died before the hospital could be reached. “We get questioned during the course of work as to why the construction is there and what the purpose is, due to frustration with traffic. I try to explain that though they have a little difficulty now, this bridge will save people’s lives. As towns grow and populations grow, you just never know when an ambulance or other emergency vehicle is going to have trouble getting through.” P.T. Construction Inc. of Savannah has taken on the work of hauling the earth that will be moved and added during the course of construction. Triad Supplies & Services Inc., Pembroke, Ga., will be involved with supplying the needed materials involved in erosion control on this site. When the project is finished, motorists on SR 307 will be happy to view the passing trains below them as they’re driving, instead of waiting for them to go by — or they may take all this recent work in their midst completely for granted. In any case Georgia DOT will be making it easier for motorists and trains to reach their final destination as they travel SR 307. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • March 23, 2011 • Page 3

PUSH THE LIMITS.

550H

650K

750L

850L

1150K

1650L

1850K

To get the job done on time, you need the power, blade force and control to move a full load – even through the turns. The new Case 850L crawler dozer gets you there. Our exclusive PowerStat hydrostatic drive delivers more power to each track, while single-lever controls maximize maneuverability and keep the load under control. Plus, our new Tier III-certified, 6-cylinder electronic engine delivers extra muscle you won’t find on competitive equipment. It’s a total package designed for breakthrough productivity and profits.

SUPERIOR RELIABILITY FUEL EFFICIENCY OPERATOR ENVIRONMENT SERVICEABILITY Push your productivity with a Case 850L crawler dozer. Contact us for a demo today.

ATLANTA

AUGUSTA

SAVANNAH

2804 Wylds Road Augusta, GA 30909 706-737-9191 Fax: 706-737-3690

109 Sharon Court Pooler, GA 31322 912-748-2828 Fax: 912-748-2878

©2008 CNH America LLC. All rights reserved. Case is a registered trademark of CNH America LLC.

3185 Moreland Ave. Conley, GA 30288 770-322-6960 Fax: 770-322-6961

Georgia’s Largest Case Dealer

www.borderequipment.com


Page 4 • March 23, 2011 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • March 23, 2011 • Page 5

BIG SAVINGS. LASTING VALUE. %

0 for 42 months 0% financing for 42 months* from February 1, 2011, through May 31, 2011, towards the purchase of a new Caterpillar® Skid Steer Loader! Call your Yancey Machine Sales Representative today for more information on this offer.

0% FOR 42 MONTHS OFFER ALSO GOOD ON THESE QUALIFYING NEW CAT® MACHINES:* • Skid Steer Loaders

• Backhoe Loaders

• Multi Terrain Loaders

• Small Wheel Loaders

• Compact Track Loaders

• Small Track-Type Tractors

• Compact Wheel Loaders

• Small Hydraulic Excavators

• Mini Hydraulic Excavators

ALBANY (800) 768-2892

AUGUSTA (800) 446-5131

AUSTELL (800) 282-1562

BRUNSWICK (800) 299-5010

CALHOUN (800) 752-9804

COLUMBUS (800) 633-5240

DACULA (800) 545-2945

KENNESAW (886) 289-2228

MACON (800) 633-5180

SAVANNAH (800) 755-8382

STATESBORO (888) 764-6506

VALDOSTA (800) 755-6841

WASHINGTON (888) 678-3211

WAYCROSS (888) 948-2443

* Offer good from February 1, 2011, through May 31, 2011, on select new models at Yancey Bros. Co. Offer is available to customers in Georgia only and cannot be combined with any other offers. Financing and published rate are subject to credit approval through Caterpillar Financial Corporation. Additional terms and conditions may apply. Subject to change without prior notice. CAT, CATERPILLAR, their respective logos, “Caterpillar Yellow,” the “Power Edge” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission. ©2011, Yancey Bros. Co.

www.YanceyBros.com


Page 4 • March 23, 2011 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • March 23, 2011 • Page 5

BIG SAVINGS. LASTING VALUE. %

0 for 42 months 0% financing for 42 months* from February 1, 2011, through May 31, 2011, towards the purchase of a new Caterpillar® Skid Steer Loader! Call your Yancey Machine Sales Representative today for more information on this offer.

0% FOR 42 MONTHS OFFER ALSO GOOD ON THESE QUALIFYING NEW CAT® MACHINES:* • Skid Steer Loaders

• Backhoe Loaders

• Multi Terrain Loaders

• Small Wheel Loaders

• Compact Track Loaders

• Small Track-Type Tractors

• Compact Wheel Loaders

• Small Hydraulic Excavators

• Mini Hydraulic Excavators

ALBANY (800) 768-2892

AUGUSTA (800) 446-5131

AUSTELL (800) 282-1562

BRUNSWICK (800) 299-5010

CALHOUN (800) 752-9804

COLUMBUS (800) 633-5240

DACULA (800) 545-2945

KENNESAW (886) 289-2228

MACON (800) 633-5180

SAVANNAH (800) 755-8382

STATESBORO (888) 764-6506

VALDOSTA (800) 755-6841

WASHINGTON (888) 678-3211

WAYCROSS (888) 948-2443

* Offer good from February 1, 2011, through May 31, 2011, on select new models at Yancey Bros. Co. Offer is available to customers in Georgia only and cannot be combined with any other offers. Financing and published rate are subject to credit approval through Caterpillar Financial Corporation. Additional terms and conditions may apply. Subject to change without prior notice. CAT, CATERPILLAR, their respective logos, “Caterpillar Yellow,” the “Power Edge” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission. ©2011, Yancey Bros. Co.

www.YanceyBros.com


Page 6 • March 23, 2011 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Georgia... Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph • Oglethorpe • Columbia • Gilmer • Bryan • Effingham • Putnam • Murray •Peach • Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun •

‘Peach State’ Highway Project Bids

The Georgia State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. Counties: Clayton, Fulton Contract ID: B13967-11-000-0 District: 77703 Location: 6.309 miles of milling and plant mix resurfacing on I-75/ SR 401 beginning at I-285/SR 407 and extending to SR 54. (FOS) Project: CSNHSM00300996 Contractors and Bid Amounts: • C. W. Matthews Contracting Co. Inc. — $22,807,892 • E. R. Snell Contractor Inc. — $22,923,205 Completion Date: Nov. 30, 2011 County: Bulloch Contract ID: B13952-11-000-0 District: 75506 Location: Widening and reconstruction on SR 67 at SR 46 and Metter Road (CR 927); also includes realignment of SR 46 and Metter Road (CR 927). (E) Project: CSSTP-0006-00(077) Contractors and Bid Amounts: • Sikes Brothers Inc. — $1,399,999 • C And H Paving Inc. — $1,565,010 • Mclendon Enterprises Inc. — $1,604,652 • Everett Dykes Grassing Co. Inc. — $1,697,633 • Reeves Construction Company — $1,735,817 • G.P.’s Enterprises Inc. — $1,994,294 Completion Date: Feb. 28, 2012 County: Fulton Contract ID: B13962-11-000-0 District: 77703 Location: Bridge rehabilitation and bridge deck joint sealing on Clark Howell Hwy (Cr 220) and Loop Road (CR 1564) over I-285/SR 407 and on I-285/SR 407 at SR 14. (E) Project: M004157, M004158, M004160 Contractors and Bid Amounts: • Massana Construction Inc. — $706,032 • The L. C. Whitford Co. Inc. — $1,028,887 Completion Date: Dec. 31, 2011 County: Coweta Contract ID: B13943-11-000-0 District: 73306 Location: 6.966 miles of milling, inlay, plant mix resurfacing single surface treatment paving on SR 34 beginning at SR 14 (Jackson Street) and extending east of SR 154. (E) Project: M004211 Contractors and Bid Amounts: • C. W. Matthews Contracting Co. Inc. — $4,879,800 • Baldwin Paving Co. Inc. — $4,968,869 • E. R. Snell Contractor Inc. — $5,354,176 Completion Date: Nov. 30, 2011 County: District 1 Contract ID: B13948-11-000-0 District: 71103

Location: Sign installations on I-85/SR 403 at various locations. (E) Project: M004186 Contractors and Bid Amounts: • Sheets Construction Co. Inc. — $2,275,253 • Massana Construction Inc. — $2,360,704 • Midasco LLC — $2,560,859 • World Fiber Technologies Inc. — $2,848,455 • R. J. Haynie & Associates Inc. — $2,984,319 • Traffic Control Devices Inc. — $2,985,450 • The L. C. Whitford Co. Inc. — $2,998,887 Completion Date: Oct. 31, 2011 County: Fulton Contract ID: B13969-11-000-0 District: 77703 Location: 0.474 mile of construction of a bridge and approaches on Bethsaida Road (CR 581) over Morning Creek Tributary. (E) Project: CSBRG-0006-00(469) Contractors and Bid Amounts: • Baldwin Paving Co. Inc. — $1,645,250 • Mccarthy Improvement Company — $1,654,825 • Cmes Inc. — $1,698,290 • Rogers Bridge Company Inc. — $1,701,734 • C. W. Matthews Contracting Co. Inc. — $1,726,593 • Talley Construction Company Inc. — $1,755,337 • Pittman Construction Company — $1,755,548 • Tanner Contracting Inc. — $1,854,088 • E. R. Snell Contractor Inc. — $2,101,378 Completion Date: June 30, 2012

Counties: Gwinnett, Hall Contract ID: B13949-11-000-0 District: 71101 Location: Sign installations on I-985/SR 419 at various locations. (E) Project: M004187 Contractors and Bid Amounts: • Sheets Construction Co. Inc. — $2,156,965 • Midasco, LLC — $2,246,080 • Massana Construction Inc. — $2,269,885 • R. J. Haynie & Associates Inc. — $2,406,126 • Traffic Control Devices Inc. — $2,568,475 • World Fiber Technologies Inc. — $2,595,479 • The L. C. Whitford Co. Inc. — $2,898,887 Completion Date: Oct. 31, 2011 County: Henry Contract ID: B13946-11-000-0 District: 73305 Location: 5.08 miles of milling, plant mix resurfacing, single surface treatment paving and shoulder rehabilitation on SR 42 beginning at SR 138 and extending to the Clayton County Line. (E) Project: M004274 Contractors and Bid Amounts: • C. W. Matthews Contracting Co. Inc. — $1,667,754 • E. R. Snell Contractor Inc. — $1,696,973 • Pittman Construction Company — $1,807,369 • Stewart Brothers Inc. — $2,370,269 Completion Date: Nov. 30, 2011


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • March 23, 2011 • Page 7

GUCA Holds West Georgia Industry Meeting in Columbus Columbus Waterworks hosted more than 40 GUCA members and guests for the West Georgia Industry Meeting in Columbus, Ga., on Feb. 16, 2011. This was an open invitation event for GUCA members, prospective members, municipalities and government officials to network while receiving time sensitive information and updates regarding the association and industry. Executive Vice President of Economic Development of the Greater Columbus Chamber of Commerce Becca Hardin provided those in attendance with an informative presentation regarding Economic Development Updates. Her presentation highlighted the Valley Partnership’s strategy as a multi-government entity created by local governments from three municipalities and seven counties. She spoke of upcoming business expansions such as Pratt & Whitney. “Regions such as Columbus used to vie for other regional, state or national business but today it’s more international,” Hardin said. In addition, she mentioned that 28,000 new residents will filter into the area due to the expansion at and around Executive Vice President of Economic Development for the Greater Columbus Chamber Ft. Benning. of Commerce Becca Hardin (L) discusses the economic future for the columbus area GUCA members and guests also were with Charles Lance, Peed Bros. Inc.

addressed by GUCA President Mitch Stephens, John D. Stephens Inc. He welcomed everyone to the meeting and thanked Crawford Grading & Pipeline, Inc., Gordy Construction Co. and John D. Stephens Inc. for their generous sponsorships. Stephens also encouraged the members to stay active and participate in future GUCA functions. Those in attendance also were updated by GUCA Executive Director Vikki McReynolds about upcoming events, safety classes, and industry and legislative issues, as well as GUCA membership and the benefits provided to GUCA members. The importance of generating new membership was emphasized by promoting membership recruitment in the area to strengthen GUCA’s West Georgia membership. Helping make this meeting a success were GUCA Membership Committee Chairmen Angela Lance, Peed Bros. Inc.; Larry Gilmore, Controlled Blasting Inc.; John Morris, Heavy Constructors, Inc.; Bryan Ponder, Brock Built LLC; and the entire GUCA Membership Committee. For more information visit www.guca.com.

GUCA Awards Scholarships to Construction Students Recently, GUCA awarded scholarships to two construction management students at four-year higher education institutions in Georgia. Junior and senior level students attending four-year colleges and majoring in construction or engineering degree programs are eligible to apply for scholarships from GUCA. The association has awarded more than $141,000 in scholarships since 1995. “GUCA scholarship opportunities help open the door for students to complete their educational goals and hopefully gear their construction-related education to the much-needed utility construction industry. The utility construction industry continues to be a vibrant force in Georgia’s economy and our members are offering competitive salary and benefit packages in an effort to make the industry a viable choice for graduating college students,” said Scott Brumbelow, GUCA assistant executive director. The GUCA Education Committee awarded $2,000.00 in scholarships to area college students at the GUCA Fall Quarterly Meeting and Trade Show on Nov. 4, 2010, at the Loudermillk Center, Atlanta, Ga. Southern Polytechnic State University student Torey Benjamin Spivey, junior majoring in construction management was chosen as the scholarship receipt from SPSU. He, along with his advisor Khalid Siddiqi, attended the meeting. Georgia Southern University student, Julia Brooke West, a junior majoring in construction management was chosen as the scholarship recipient from GSU. She, along with her advisor Brian Moore also attended the meeting. For more information, visit www.guca.com.

(L-R) are SPSU Student and Scholarship Recipient Torey Benjamin Spivey, GUCA President Mitch Stephens and GSU Student and Scholarship Recipient Julia Brooke West.


Page 8 • March 23, 2011 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

ALL FROM A SINGLE SOURCE: THE WORLD’S #1 BRANDS FOR ROAD BUILDING.

Rely on the Wirtgen Group’s full range of products for new construction and rehabilitation of roads. Our sales and service experts, based close to your doorstep, offer the expertise and all-round support you need. www.wirtgenamerica.com

ROAD AND MINERAL TECHNOLOGIES

Albany, GA 1815 W. Oakridge Drive Albany, GA 31707 Toll-free: (800) 733-0982 Telephone: (229) 435-0982

Atlanta, GA 5732 Frontage Road Forest Park, GA 30297 Toll-free: (800) 488-0693 Telephone: (404) 366-0693

Calhoun, GA 160 Robinson Rd, NW Calhoun, GA 30701 Toll-free: (800) 827-3072 Telephone: (706) 879-6200

Hoschton, GA 3214 Highway 53 Hoschton, GA 30548 Toll-free: (888) 334-9850 Telephone: (706) 654-9850

Macon, GA 2727 Gray Highway Macon, GA 31211 Toll-free: (800) 786-3120 Telephone: (478) 745-6891

Augusta, GA 3809 Mike Padgett Hwy Augusta, GA 30906 Toll-free: (800) 659-3090 Telephone: (706) 798-7777

Columbus, GA 1502 Box Road Columbus, GA 31907 Toll-free: (877) 307-6439 Telephone: (706) 562-1801

Kennesaw, GA 1355 Big Shanty Road Kennesaw, GA 30144 Telephone: (678) 354-5533

Savannah, GA 1200 Highway 80 E Pooler, GA 31328 Toll-free: (800) 827-1405 Telephone: (912) 330-7500


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.