COLLABORATION
2006-2008 ARCHITECTURE
AT
SERÔDIO
FURTADO
&
ASSOCIADOS
ARQUITECTOS
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
dant ARCHITECTURE
This was my first and longest project developed at Serôdio, Furtado & Associados. I started alone, following the architect first idea on the site, putting together the first models, drafts and programme requirements. I continued throughout the whole project, leading when necessary a bigger team, to accomplish all the necessary phases:1:100, 1:50, 1:20 and including 1:5 detailing,. The most challenging thing was mainly getting together all information from different engineering projects and thus dealing with the necessary adjustments between dream and reality, including legal requirements that so much define architecture, and specifically hotel architecture and the Douro landscape. I was very glad to know that this project, to be opened to public in March 2012, won the “Best hotel architecture in Europe 2011” by The Villegiature Awards.
DOURO 41 RIVER MARINA HOTEL AND SPA, CASTELO DE PAIVA, PORTUGAL [7000M2] collaboration period: since january 2006 till aug 2008
CT1
CT2
CT2
CT1
Planta Piso 4
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
dant ARCHITECTURE
jan06-jun06 project leader in early studies: production of drawings and models; topographic and tipology studies
jul06-mar07
apr07-apr08
project leader in building permission process: production of drawings and models
project leader in building process production of drawings and models
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
since jun07
dant ARCHITECTURE
to assure compatibility between: architecture, engineering (structures, mechanical systems, electrical systems and security, thermic behavior, acoustic design, hydraulic systems) and landscape design
since oct07
technical assistance in the working site and in the office
11
86,000 i=2%
88.10
88,500
87,900 vão de passagem AVAC
1,500
0,250
0,600
caleira finlandesa
11
93.75
sistema de cobertura a implementar por ACIES
2,145
1,500
acesso à piscina
93,550
93,750
92,700
92,400
92,400 92,200
alinhamento destas paredes de betão dos eixos 11,12 é de 35 cm apartir do limite máximo exterior da caixilharia 90.65
88.90 (-)
0,250 3,910
87,100
vão de passagem AVAC
2,883 1,597
L6
L22
Ø3/4"(AF-0.62m3/h)
GRL 32
L22 L22
Ø3/4"(AF-0.62m3/h)
COL 2
Ø11/4"(AF-2.96m3/h)
150 m3/h
PL 14
PL 14
150x100 mm
COL 3
C3.1
L21
C2.3
C2.1
GRL 31
L21
150x100 mm
PL 14
PL 14
L18
GRL 25
L2
PL 10
PL 10
PL 4
L18
L7.A
C1.5
L2
GRL 25
C1.4
250x100 mm
150 m3/h
150x200 mm
PL 4
PL 14
RRC 30
250 m3/h
L19
300 m3/h
PL 4
12
89.50
(88.60)
88.70
grelha de insuflação
13 escada metálica
grelha de insuflação
de acesso à
piscina
(92.40?)
92.20 (88.20)
88.24
0.8.21 71,22 m2
L6
4
PL 4
4
200x200 mm
300 m3/h
L15
L15
L15
L15
L15
L15
L15
L15
RRC 38
C3.5
1
PL 4
PL 4
PL 4
L15
L15
L15
L15
L15
L15
L15
RRC 36
RRC 35
RRC 34
PL 4
PL 4
L15
L15
L15
L15
L15
L15
L15
L15
L15
L15
L15
L15
PL 4
150x100 mm
4
4
PL 4
PL 4
caleira finlandesa
94.40
14
vão
0,650
88,300 88.10
86.00
0,720
84,300
84,300
86,000
97,700
15
0,500
2,295
vão de passagem AVAC
1,500
4,690
0,250
0,600
plano horizontal do eixo da laje de piso grelha de insuflação
16
L15 L15 L15 ao nível do tecto
93.75
89.30
2,145
1,500
Corte 1.1 17
L15
93,750
93,550
92.70
90.65
89,300
0,250
89,500
2,883
L15 L15
18
0,500
87,100
vão de passagem AVAC 86.00
3,910
1,597
19
92.70
89.30
0,300
Insuflação
89,500
89,100
88,888
vão
0,050
94,400
94.40
94,112 20
93,750
3,960
93,550
92,960
92,610
Insuflação
0,350
L15
L15
L15
7
PL 3
PL 3
PL 3
PL 3
67
L11
L11
L11
L11
L11 RRC 40
RRC 39
68
L32
L11
GRL 1
PL 3
PL 3
8
4
PL 3
4
74
2
L32
L32
625 m3/h
625 m3/h
D
5
500x250 mm
450x250 mm
500x250 mm
1650 m3/h
9
250x200 mm
9
9
6
L5.R
6
L5.R
6
6
L5.R
L5.R
6
6
L5.R
L5.R
6
6
L5.R
250x200 mm
L5.R
400 m3/h
6
6
L5.R
L5.R
100 m3/h
150x100 mm
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
L5.R
750x350 mm
3000 m3/h
PL 10
650 m3/h
EVAL-PEXØ40x4.0mm-1.47m3/h
EVAL-PEXØ40x4.0mm-1.47m3/h
Ø11/2"(AF-4.39m3/h)
Ø11/2"(AF-4.39m3/h)
EVAL-PEXØ32x3.0mm-0.82m3/h
EVAL-PEXØ32x3.0mm-0.82m3/h
Ø11/2"(AF-4.41m3/h)
Ø11/2"(AF-4.41m3/h)
Ø1"(AF-1.43m3/h)
Ø1"(AF-1.43m3/h)
300x250 mm
regulação L5.R
L5.R c/
9
L5.R
L5.R
9
300x250 mm
650 m3/h
9
500x100 mm
L5.R
500 m3/h
350x250 mm
900 m3/h
L5.R
350x250 mm
9
850 m3/h
200x200 mm
300 m3/h
L5.R
400 m3/h
450x250 mm
1250 m3/h
500x100 mm
L5.R
9
400 m3/h
9
L5.R
300x150 mm
400 m3/h
L5.R
450x250 mm
9
9
450x250 mm
L5.R
1550 m3/h
L5.R
450x250 mm
10
1950 m3/h
300x100 mm
L5.R
300 m3/h
10
L5.R
10
450x250 mm
1850 m3/h
10
L5.R
2100 m3/h
L5.R
10
10
L5.R
2000 m3/h
500x250 mm
L5.R
2250 m3/h
10
10
L5.R
450x250 mm
L5.R
2150 m3/h
10
17
300x100 mm
regulação L5.R
300 m3/h
L5.R c/
L5.R
150x100 mm
100 m3/h
8
L5.R
L5.R
V6 22,41 m2 (94.20)
92.20
PROBLEMA 1
L5.R
L7
L4
L4
L4
4
L4
PL 10
A 9| 1.8.22
Q.G.SPA
RCF 14
GRL 12
5
GRL 27
L7
L5.R
Ø2"(AF-5.01m3/h)
Ø2"(AF-5.01m3/h)
Ø11/2"(AQ-4.41m3/h)
Ø11/2"(AQ-4.41m3/h)
L5.R L5.R
L5.R
L5.R
3000 m3/h - 1000x200 mm
SOBE DO PISO 0
CONDUTA DE INSUFLAÇÃO
EVAL-PEXØ40x4.0mm-1.93m3/h
EVAL-PEXØ40x4.0mm-1.93m3/h
1200
m3/h
E PAVIMENTOS RADIANTES DESENVOLVE-SE NO PAVIMENTO.
A TUBAGEM DE ALIMENTAÇÃO AOS VC`S DE PMAVIENTO
DESENVOLVE-SE NO TECTO SUSPENSO.
A TUBAGEM DE ALIMENTAÇÃO À UTAN 2 E VC 4
20
parede da grelha de retorno na rampa ao nível do pavimento
1.8.25 61,56 m2 (92.40) (89.30)
89.50
92.20
CX 2.10 | 1.8.25
2,70 9,39
6,81
corte transversal tipo B 21
PROBLEMA 1
L14
250x300 mm
900x400 mm
5000 m3/h
800x400 mm
4375 m3/h
750x400 mm
3750 m3/h
650x400 mm
3125 m3/h
550x400 mm
2500 m3/h
450x400 mm
1875 m3/h
350x350 mm
1250 m3/h
Q.BAR.P1
250x300 mm
600x250 mm
17
17
2450 m3/h
L5.R
2550 m3/h
L5.R
600x250 mm
17
2800 m3/h
17
2600 m3/h
550x250 mm
L5.R
L5.R
19
L15
L15
L15
L15
L15
66
L32
73
PL 4
600x250 mm
17
600x250 mm
3050 m3/h
17
L5.R
2750 m3/h
L5.R
17
17
600x250 mm
2900 m3/h
L5.R
L5.R
18
L15
3
PL 4
RRC 37
PL 4
C3.7
C3.6
C2.7
C2.6
RRC 31
600x300 mm
17
3200 m3/h
GRL 23
150x150 mm
200 m3/h
650x300 mm
3400 m3/h
17
L15
6
65
72
L32
L32
R4 34,51 m2
GRLP 1
L15
L15
L15
L15
5
L32
(92.40)
97.85
64
A 16 | 1.8.24
71
1.8.24 12,85 m2
L15
92.20 70
92.20
L15
L32
L32
89.50
A 16 | 1.8.24
(89.30)
L15
98,100
69
89.50
L15
PL 3
(93.55)
L15
A 16 | 1.8.24
(89.30)
L15
L15
L15
L15
L15
L15
L15
C1.3
C2.5
e
L7.A
C1.2
área de manutenção (2.90x0.90)
100 m3/h
4
L15 L15A L15
L33A A instalar no piso Inferior
300x250 mm
L15
L15
L15
C2.4
4
C1.9
C1.8
C1.6
L15 L15A L15
GRLP 2
600 m3/h
600x350 mm
2400 m3/h
550x350 mm
2100 m3/h
500x350 mm
1800 m3/h
C3.4
GRL 2
L15 L15 L15
4
QEAC 3
COL 1 COL 1
UTAN 4 (2.90x0.90)
RRC 30
L15 L15 L15 L15 L15L15 L15 L15 L15 L15 L15 L15 L15 L15
04) (VER PORMENOR
450x350 mm
1500 m3/h
350x350 mm
1200 m3/h
300x350 mm
900 m3/h
300x250 mm
600 m3/h
L33A
200x200 mm
300 m3/h
COL 3
PL 10
C3.2
(89.30)
L33
L33
L33
L33
caleira finlandesa
1.8.23 36,17 m2
1,050
+ 1.8.19 + 1.8.21
0,300
grelha de fundo
escada metálica de
0,650
300 m3/h
150x200 mm
Ø11/4"(AF-2.96m3/h)
GRL 24
GRL 24
GRL 24
GRL 24
5xL5.R
89.50
(89.30)
16
1,100
PL 9
GRL 24
GRL 24
5xL5.R
5xL5.R
5xL5.R
(93.55)
04) (VER PORMENOR
GRLP 2
L33
Ilum. no proprio equipamento do B. Turco
pav. injectores de 0.8.19 8,84 m2 92.20 parede injectores de (92.40?)
1.8.20 54,05 m2
F
1.8.12 10,06 m2
(93.55)
92.20
E
EVAL-PEXØ25x2.5mm-0.46m3/h
EVAL-PEXØ25x2.5mm-0.46m3/h
(-)
ao nível do tecto
0,150
Corte 1.1 0,650
400 m3/h
PL 14
PL 14
150x100 mm
5xL5.R
GRL 24
150x200 mm
600x250 mm
3200 m3/h
L19
GRL 24
GRL 24
5xL5.R 5xL5.R
150x100 mm
PL 14
GRL 30
GRL 30
PL 14
GRL 24
PL 14
150 m3/h
PL 9
650x300 mm
3400 m3/h
300 m3/h
3xL5.R
L7.A
GRL 24
GRL 24
150 m3/h
150x100 mm
150 m3/h
300x150 mm
caleira finlandesa
89.50
1,200
4,690 (-)
0,200
10
89.30
5,450
2,47
89.10
D
PL 9
PL 7 X 2
2xL22
01
0,200
2,295
02
GRLP 3
PL 9 x 2
2xL22
EVAL-PEXØ32x3.0mm-0.65m3/h
L6
COL 2
GRL 22
L6 L6 L22B L15 L15 L15 L15 L15A L15 L15 L15 L15 L15 L15 L15
L6
VC 4
Ø3/4"(AF-0.98m3/h)
Ø3/4"(AF-0.98m3/h)
EVAL-PEXØ32x3.0mm-0.65m3/h
GRL 29 x 2
300x100 mm
PL 10 x 4
L6
Ø3/4"(AF-0.66m3/h)
PVC Ø 32 mm
L21
C2.2
Ø3/4"(AF-0.66m3/h)
PVC Ø 32 mm
L21
Ø3/4"(AF-0.48m3/h)
Ø3/4"(AF-0.48m3/h)
03
grelha de insuflação
(89.30)
0,150
RRC 88
1.8.14 3,54 m2
1,050
GRL 28
RRC 88
L15
L15
Ø3/4"(AF-0.29m3/h)
Ø3/4"(AF-0.29m3/h)
PVC Ø 32 mm
PVC Ø 32 mm
Ø1"(AF-1.19m3/h)
Ø1"(AF-1.19m3/h)
PVC Ø 32 mm
04
0,300
9
1.8.15 4,84 m2
0,650
300x200 mm
CX 2.2 | 1.8.14
92.20
1,100
PVC Ø32mm
LIGA A CAIXA DE PAVIMENTO
500 m3/h
ESGOTOS CONDENSADOS
PL 21
PL 21
PL 7
L15 L15
250 m3/h
L15A L15
L15A
L15
92.20
0,150
490 m3/h
250x150 mm
980 m3/h
250x250 mm
C3.3
L15A
4xL15
L15A
4xL15
C1.7
3xL5.R
Ø3/4"(AF-0.98m3/h)
Ø3/4"(AF-0.98m3/h)
PVC Ø 32 mm
RRC 30
5xL5.R 5xL5.R
3xL5.R
L15.A
Ø3/4"(AF-0.67m3/h)
Ø3/4"(AF-0.67m3/h)
PVC Ø 32 mm
L15A
4xL15
4xL15
L15
Ø3/4"(AF-0.36m3/h)
Ø3/4"(AF-0.36m3/h)
PVC Ø 32 mm
L15A
4xL15
L15
89.50
1.8.18 3,53 m2
nível do pavimento
(93.55)
3,100
89,300
1.8.16 1,84 m2
grelha de retorno ao
0,850
89,300
(92.40)
1.8.17 3,52 m2
92.20
(-)
1,100
restantes lâminas de betão dos eixos 4-8 e 14 distam 50 cm deste mesmo limite 1,400
0,200
8 PVC Ø32mm
CX 2.11 | 1.8.12
1.8.13 16,68 m2
3,100
5,450
92,600 92.20
89.50
0,150
"dente"-reentrância no alçado da parede (eixo 11) de 15 cm de profundidade por 20 de altura 89.50
0,850
7 LIGA A CAIXA DE PAVIMENTO
ESGOTOS CONDENSADOS
GRL 28
CX 2.8 | 1.8.8
(92.40)
92.20
1,100
Ø1"(AF-1.56m3/h)
Ø1"(AF-1.56m3/h)
Ø1"(AF-1.38m3/h)
Ø1"(AF-1.38m3/h)
PVC Ø 32 mm
CX7
VCP1
8xL15
GRELHA A DEFENIR PELA ARQUITECTURA
ÁREA UTIL - 0.38 m2
VE 2
C1.1
RRC 32
UTAN 2 - SPA
89.50
(89.30)
V5 8,34 m2
0,430
0,430
6,53
CX 2.3 | 1.8.4 (a) 1.8.8 38,00 m2
92.20
1.8.22 11,53 m2
1,270
1,270
1,00
11
2,70 3,22
3,00 5,30
ENTRADA DE AR NOVO
CX8
12
6,15
RRC 32
ÁREA UTIL - 0.38 m2
(-)
RRC 32
A5| 1.8.1
VCP1
PL 9
CX3
GRL 21
RRC 32
SAIDA DE AR VICIADO
CX8
200x100 mm
RRC 33
200 m3/h
CX8
GRELHA A DEFENIR PELA ARQUITECTURA
(-)
12
88,200
92.20
10,95
VCP1
0,23
VCP1
6 89.50 VCP1
89,500 CX3
3,64
(92.40)
VCP1
6,00 1.8.7 21,06 m2
(-)
CX 2.3 | 1.8.7
92.96
0,280,20
92.20
Cota do limite da cobertura
0,15 89.50
(-)
5
(92.40)
980 m3/h
CX 2.3 | 1.8.6
(93.55)
A 17.1 | 1.8.22
4,08
(-)
(93.55)
1.7.12 3,20 m2
2,70
EL 5
2,70
89.50
250x250 mm
CX 2.3 | 1.8.3 (a) (92.40)
C3 79,39 m2
escada técnica de acesso ao piso 0
15
2,70
(93.55)
14
2,70
CX5
100 m3/h
i=2%
VCP1
PL 21
CX 2.6 | 1.8.5 490 m3/h
Insuflação (-)
250x150 mm
corte transversal tipo A 89.50
PL 7
4 92.20
PL 21
CX7
(92.40)
250 m3/h
CX9
1.8.10 20,92 m2
300x100 mm
1,02 VCP1
1.8.11 3,54 m2
450 m3/h
88,200 VCP1
92.20
13
2,70
VCP2
12
2,74
VCP3 150x100 mm
VCP1
1.8.9 20,49 m2
250x200 mm
92,525 VCP3
92.20
(-)
CX9
1.8.6 23,07 m2
89.50
550 m3/h
CX 2.16 | 1.8.2 200 m3/h
(-)
92.20
300 m3/h
89.50
200x150 mm
92.20
89.50
PL 10
(92.40)
(93.55)
GRL 30
1.8.3 (a) 16,79 m2 1.8.5 27,74 m2
(93.55)
100 m3/h
(-)
(-)
89.50
1.8.4 (a) 16,72 m2
89.50
250x150 mm
92.20
(-)
150x100 mm
(92.40)
89.50
VCP1
clima-canal (-)
(-)
(93.55)
VCP1
ventilação à abertura para falso cota do tecto
1.8.4 (b) 1,27 m2
VCP1
1.8.3 (b) 1,27 m2 (-)
1.8.2 22,56 m2
1.6.11 2,20 m2
PL 4
corte-alçado pelo eixo da parede3 ventilação (-)
200x150 mm
89.50 200 m3/h
(93.55)
300x200 mm
0,90
92.20
RRC 33
(-)
CX6
2,70 2,70 3,01
fundação 89.50
RRC 32
1,13 92.20
PL 4
topo destas paredes de betão: eixos 11 e 12 é de 92.40; restantes lâminas de betão dos eixos 4-8 e 14 vão até laje de betão 92.60 (93.55)
92.20
(93.55)
11
GRL 26
89.23
6,02
abertura paracota ventilação à do tecto falso sanca 100x100 para grelhas de extração e iluminação
4,34
2 para sanca 100x100 grelhas de extração e iluminação
6,85
(-) (-)
5,31
89.50 89.50
5,15
92.38 92.20
5,01
(93.55)
1,66
(92.40) CX4
2,71
VCP1
9,87
89.50 (-)
10
RRC 32
1.8.1 (b) 2,98 m2 1.14.2 8,80 m2 92.20
9
6,38
92.20
C2 40,65 m2
8
4,80
Pe 3.7 | C2 1.6.12 2,18 m2
7
2,70
92.20
6
2,70
(-)
89.50
5
2,70
(93.55)
4
2,70
1.8.1 (a) 12,10 m2
3
2,70
1
2
2,74
1 21
EL 6
89.50
R3 34,52 m2
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
may08
dant ARCHITECTURE
detail drawings of steel windows, fireplaces, hydraulic systems and elevators
DESCRIÇÃO:
Caixilharia exterior em aço corten
0,060 0,030
2,657 FERRAGENS:
1,438
Vidro duplo SGG Climaplus Cool Lite SKN 174II Securit (neutro) de 8mm + caixa de ar 13mm + SGG Planiflux Securit de 8mm.
1,167
2,908
planta esc_1/20
borracha de vedação
PV3 PV1
PV2
sistema de iluminação a confirmar com OHME
vidro duplo de 6+12+4 4.1 mm
vidro duplo de 6+12+4 4.1 mm
barra de aço de 5 mm tubo de aço de 35x35x2 mm
PV4
borracha de vedação barra de aço de 5 mm tubo de aço de 35x35x2 mm
barra de aço de 5 mm
barra de aço de 5 mm
tubo de escoamento
tubo de escoamento
Pedra Betão
chapa de aço 3 mm
Tijolo
chapa de aço 3 mm
chapa de aço 5 mm, para fixação à alvenaria e suporte da clarabóia
Isolamento térmico Isolamento acústico
chapa de aço 5 mm, para fixação à alvenaria e suporte da clarabóia
Camada de forma Godo Enchimento Betonilha armada Massame
PV2
PV1
Enrocamento Terreno vegetal Impermeabilização
ATENÇÃO: ESTE DESENHO É PROPRIEDADE DOS PROJECTISTAS E NÃO PODE SER UTILIZADO, REPRODUZIDO, ALTERADO NO TODO OU EM PARTE, OU COMUNICADO A TERCEIROS SEM A SUA EXPRESSA AUTORIZAÇÃO.
sistema de construção do paramento, a verificar em Obra, confome adjudicatário
Todas as medidas sujeitas a correcção em obra. REQUERENTE
QUINTA DAS FONTAÍNHAS Empreendimentos Turísticos, Lda. vidro duplo de 6+12+4 4.1 mm
borracha de vedação S E R Ô D I O, F U R T A D O & A S S O C I A D O S, A R Q. lda
barra de aço de 5 mm tubo de aço de 35x35x2 mm borracha de vedação
R. Nª SENHORA DE FÁTIMA N º 449, 4050 - 428 P O R T O TELEFONE:
barra de aço de 5 mm
FAX
226
005429
HOTEL QUINTA DAS FONTAÍNHAS
QUINTA DAS FONTAÍNHAS
chapa de aço 3 mm
LOCAL
|
PROJECTO
tubo de escoamento
PV3
corte transversal esc_1/20
SECTOR
TÍTULO
ESCALA
1/20_1/5
PV4
CL FIXA
0.00.(0/0)
Piso.Compartimento.(Número)
C5
QUANTIDADE
1 unidade
TIPO
1 folha fixa
DIMENSÕES
RAIVA - CASTELO DE PAIVA
HQF _ ED1
chapa de aço 5 mm, para fixação à alvenaria e suporte da clarabóia
corte longitudinal esc_1/20 DESIGNAÇÃO
226095965
jpserodio@serodiofurtado.com | ifurtado@serodiofurtado.com
sistema de apoio do gesso cartonado, a verificar em Obra, confome adjudicatário
conforme representado
CLARABÓIA
VERSÃO FINAL 08/02/22 Foi decidido em reunião de coordenação a 22/02/2008 denominar o conjunto de desenhos que constitui o projecto de Arquitectura de Versão Final de Arquitectura, apesar de não se encontrarem completos, por as especialidades não estarem concluídas, estarem em revisão ou não estarem compatibilizadas com a arquitectura. PROJECTO
ESPECIALIDADE
FASE DO PROJECTO Nº DESENHO
REVISÃO
HQF
01
03
01
623
DESCRIÇÃO:
Caixilharia exterior em aço corten do tipo SECCO SISTEMI de abrir para o interior PV1
FERRAGENS:
Fechadura, dobradiças invisíveis em aço inox em número adequado à carga e trabalho exigido, puxador tipo S&F em aço corten e todos os acessórios necessários ao correcto funcionamento do sistema. Vidro duplo SGG Climaplus Cool Lite SKN 174II Securit (neutro) de 8mm + caixa de ar 13mm + SGG Planiflux Securit de 8mm.
? PV1
PV1
Guarda em aço corten composta por dois perfis U 40x35 e barras chatas 40x5.
PV1
PV2
PV2 PV2
PV2
PV3 PV3
alçado esc_1/20 Pedra Betão Tijolo Isolamento térmico
corte esc_1/20
PV3
Isolamento acústico
PV3
Camada de forma Godo Enchimento Betonilha armada Massame Enrocamento Terreno vegetal Impermeabilização
ATENÇÃO: ESTE DESENHO É PROPRIEDADE DOS PROJECTISTAS E NÃO PODE SER UTILIZADO, REPRODUZIDO, ALTERADO NO TODO OU EM PARTE, OU COMUNICADO A TERCEIROS SEM A SUA EXPRESSA AUTORIZAÇÃO.
Todas as medidas sujeitas a correcção em obra. REQUERENTE
corte esc_1/20
QUINTA DAS FONTAÍNHAS Empreendimentos Turísticos, Lda.
S E R Ô D I O, F U R T A D O & A S S O C I A D O S, A R Q. lda R. Nª SENHORA DE FÁTIMA N º 449, 4050 - 428 P O R T O TELEFONE:
226095965
|
FAX
226
005429
jpserodio@serodiofurtado.com | ifurtado@serodiofurtado.com
PH2
PH1
PROJECTO
PH2
HOTEL QUINTA DAS FONTAÍNHAS
QUINTA DAS FONTAÍNHAS
RAIVA - CASTELO DE PAIVA
SECTOR
HQF _ ED1 PH1 Planta e pormenores escala 1:5
PH2 planta esc_1/20 CX1.7
C4
PH1 Planta e pormenores escala 1:5
TÍTULO
ESCALA
PH2
1/20_1/5 CX1.8
1.9.15
2 unidades
1 unidade
uma folha fixa
uma folha fixa
2,25 x 2,34m
5,25m x 0,84m
MAPA VÃOS EXTERIORES
VERSÃO FINAL 08/02/22 Foi decidido em reunião de coordenação a 22/02/2008 denominar o conjunto de desenhos que constitui o projecto de Arquitectura de Versão Final de Arquitectura, apesar de não se encontrarem completos, por as especialidades não estarem concluídas, estarem em revisão ou não estarem compatibilizadas com a arquitectura. PROJECTO
ESPECIALIDADE
FASE DO PROJECTO Nº DESENHO
REVISÃO
HQF
01
03
01
603
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
DOURO 41 VILLAS, HOUSING COMPLEX, CASTELO DE PAIVA, PORTUGAL [4000M2]
dant ARCHITECTURE
collaboration period: since 2006 till november 2007
dant ARCHITECTURE
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
sep 07
building permission process: housing tipology studies
oct-nov08 building process: topographic studies_sections and façades of the villas’ ensemble
S 72. 5m2
M
Forno a vapor Máq. Café
Máq. lavar-louça
122.40
M
46
M
Forno Micro-ondas
24,50 m
2
2
48
5,76 m
123.16
51
M
Fc6
Frigorífico
44
M
49
NEA RIOS
UMO
4
G
129.00
126.80
BAL
E ARR
5
G
, SER
VIÇ
OS
DE
121.35
APO
IO
122.40
125.75
Fc6 Congelador
11.13 2,85 m2
123.34
127.20
126.10
126.05
126.25
11.12 3,88 m2
11.12 5,19 m2
11.13 4,67 m2 11.11 2,88 m2
11.13 2,85 m2
11.04 1,73 6,45 m2
0,24
11.03 14,46 m2
11.04 6,56 m2
1,20
11.12 3,88 m2
0,26
47
M
0,65
11.03 13,53 m2
2,69 11.12 5,19 m2
11.13 4,67 m2 11.11 2,88 m2
11.04 1,73 6,45 m2 11.10.1 2,05 m2
?? cappotto
0,24
11.03 14,46 m2
11.13 6,56 m2
11.04 6,56 m2
1,20
11.10.1 3,49 m2
0,26 MLR
0,65
11.12 3,88 m2
11.03 13,53 m2
11.10.2 3,70 m2
123.52
11.13 6,56 m2
11.10.1 2,05 m2
2,00 11.11 2,88 m2
4,76 m2
11.10.1 3,49 m2
0,25
PISC
INA
140
m2
127.76
2,69
1,44 ?? cappotto
2,80
11.08 8,13 m2
0,30 11.13 6,56 m2
11.10.2 3,70 m2
1,20
11.03 17,33 m2
0,38
E
7
MLR
11.04 6,12 m2
4,45 m2
3,59
SE
11.05 13,61 m2
S EL.
UMO ARR
DRO 2
QUA
)
30m
FILT ROS
3,70
T3(7
49,40 m2
2,80
11.10.2 5,26 m2
2,00 11.11 2,88 m2
4,76 m2
11.05 23,83 m2
0,91
11.12 3,88 m2
11.13 6,56 m2
11.05 23,83 m2
0,38
0,25 1,44
??
0,30
123.70
cappotto
11.13 6,56 m2
11.02 30,63 m2
11.08 8,13 m2
11.02 30,63 m2
3,59
1,20
11.03 17,33 m2
4)
11.05 13,61 m2
T2(1
0,91 MLR
125.20
2,80
11.04 6,12 m2
11.12 3,88 m2
3,70
0,15
124.32
11.02 30,63 m2
0,37
(13)
0,25 1,44
11.12 6,67 m2
T2
3,71 11.08 8,13 m2
0,30
11.07 22,32 m2
115.00
1,20
11.03 17,33 m2
11.05 13,60 m2
0,91 11.12 6,67 m2
11.03 17,33 m2
)
(12
0,15
123.88
124.06
11.14 15,25 m2
2,80
11.04 6,12 m2
3,70
11.03 17,33 m2
5
11.02 30,63 m2
11.10.2 5,26 m2
2,00 11.11 2,88 m2
124.24
R
2,80 11.13 6,56 m2
T2
2,80
11.10.2 5,26 m2
0,37
11.02 29,79 m2
M
38
11.07 22,32 m2
3,71
11.05 13,60 m2 11.14 15,25 m2
2,80
0,15
) (11
2,80 11.04 4,90 m2
11.10.1 3,49 m2
120.88
11.07 22,32 m2
11.08 10,84 m2
15,50 m2
T2
11.02 29,79 m2
0,37 11.04 4,90 m2 11.10.1 3,49 m2
12,46 m2
110.62
3,71
11.08 10,84 m2
11.05 13,60 m2
4,63 m2
11.14 15,25 m2 11.10.2 5,54 m2
11.10.2 5,54 m2
111.16
11.02 29,79 m2
11.02 29,79 m2
(1)
15,62 m2
T3
11.02 29,79 m2
111.70
11.05 13,60 m2
11.05 13,60 m2 11.05 13,60 m2
11.07 18,75 m2
11.05 13,60 m2
11.07 18,75 m2
T1(4
)
T1(5
112.80
118.10
112.62
)
DESIGNAÇÃO:
DESIGNAÇÃO:
LEGENDA DE MATE
LEGENDA DE MATERIAIS
PV1 Soalho em régu
PV1 Soalho em réguas de madeira maciça de Riga Americana
PV2 Alcatifa do tipo e
PV2 Alcatifa do tipo exminster e/ou hotel elegance da ARMSTRONG
PV3 Sistema epóxico
PV3 Sistema epóxico autoalisante do tipo sikafloor 261, da SIKA
7
PV4 Mármore Sivec, ou estremoz branco tipo estatuária ou VR1
5
4
3
2
1
PV6 Betonilha armad
PV6 Betonilha armada com endurecedor de superfície
PV7 Mosaico vidrado
A
B
126,50
C
CL E4
PV7 Mosaico vidrado azul do tipo Vitrogres 127,70
12 D
E
F
10
9
8
127,18 126,98
6
RV1 Reboco de arga
RV1 Reboco de argamassa de cimento, de areado fino
G
RV2 Reboco estanha
RV2 Reboco estanhado
RV3 Mármore Sivec,
RV3 Mármore Sivec, ou estremoz branco tipo estatuária ou VR1 124,36
124,34
RV4 Gesso cartonado hidrófugo
124,36
17
2,00
RV5 Painel estofado a tecido 123,17
123,30
123,17
15
14
13
2,00
RV5 Painel estofado
123,17
RV6 Painel de madeira
5
4
RV6 Painel de made 3
2,00
22
RV10 Chapa de vidro transparente e/ou opaco e/ou corta-fogo
20
19
18
2,00
A
B
C
D
E
F
B
116,48
C
115,99
CL E2
2,00
CL E4
A
116,48
E
F
26
25
24
23
117,48 117,28
117,16 116,96
21
RV11 Granito azul
9
8
7
6
RV12 Azulejo de 100x
117,66
TC1 Reboco de arga
TC2 Reboco estucad
TC2 Reboco estucado
G
115,99
TC3 Painel de gesso cartonado e/ou hidrófugo
116,21
13
12
TC3 Painel de gesso
11
TC4 Tecto falso em a
TC4 Tecto falso em aço inox
G 114,34
114,32
TC5 Tecto falso em madeira tipo "casquinha"
114,34
113,28
2,00
TC6 Painel para isola 113,15
TC7 Mosaico vidrado azul, do tipo Vitrogres 15x15mm
113,08
TC5 Tecto falso em m
114,32
114,14 113,94
113,82 113,62
TC6 Painel para isolamento e/ou absorção sonora, conforme Acústica 113,15
RV7 Painel de aço in
RV10 Chapa de vidro 10
TC1 Reboco de argamassa de cimento D
1
RV9 Mosaico vidrado
119,33
RV12 Azulejo de 100x100 mm 117,66
121,00
120,82 120,62
120,50 120,30
16
RV11 Granito azul
119,33
2
RV8 Azulejo 100x100
RV8 Azulejo 100x100 mm tipo D'arte RV9 Mosaico vidrado azul, do tipo Vitrogres 15x15mm
120,82 120,48
RV4 Gesso cartonad
124,34
124,16 123,96
123,84 123,64
11
RV7 Painel de aço inox com 2 mm de espessura 121,00
PV4 Mármore Sivec,
PV5 Pavimento em g
PV5 Pavimento em granito azul despolido a jacto de areia ou bujardado
TC7 Mosaico vidrado
19
18
17
16
2,00
20 cota de pronto da galeria: a definir em Obra
110,98
Pedra
110,78
110,46
111,00
110,98
Betão Isolamento térmico
108,81
108,81
26
25
24
23
22
21
0,25
108,56 108,31
1,80
Godo
107,05
Enchimento
106,85
A
C
F
E
D
F
E
D
B
A 2,00
CL E2
Camada de forma
107,05 106,51
B
C
Isolamento acústico 108,00
0,25
2,68
Tijolo
106,51
106,85
Betonilha armada A
B
C
D
E
F
Massame
G
Enrocamento 104,00104,00
104,00 104,00
Terreno vegetal Impermeabilização
C
D
D
C
A
C
E
F
ESTE DESENHO É PROPRIEDADE DOS PROJECTISTAS E NÃO PODE SER UTILIZADO, REPRODUZIDO, ALTERADO NO TODO OU EM PARTE, OU COMUNICADO A TERCEIROS SEM A SUA EXPRESSA AUTORIZAÇÃO.
D
F
E
D
C
A
intercomunicação de galerias: a definir em Obra
ATENÇÃO:
B
B
B
intercomunicação de galerias: a definir em Obra
ATENÇÃO:
ESTE DESENHO É PR UTILIZADO, REPROD COMUNICADO A TERC
B
Todas as medidas su
Todas as medidas sujeitas a correcção em obra.
REQUERENTE
REQUERENTE
QUINTA DAS FON
QUINTA DAS FONTAÍNHAS Empreendimentos Turísticos, Lda. 98,10
98,10
S E R Ô D I O, F U
S E R Ô D I O, F U R T A D O & A S S O C I A D O S, A R Q. lda
R. Nª SENHORA
R. Nª SENHORA DE FÁTIMA N º 449, 4050 - 428 P O R T O 95,20
TELEFONE:
226095965
|
FAX
226
95,20
005429
TELEFONE:
jpserodio@serodi
jpserodio@serodiofurtado.com | ifurtado@serodiofurtado.com
PROJECTO
PROJECTO
HOTEL QUINTA
HOTEL QUINTA DAS FONTAÍNHAS QUINTA DAS FONTAÍNHAS
QUINTA DAS FONTA
RAIVA - CASTELO DE PAIVA
SECTOR
SECTOR
HQF _ ED1, 3
90,70
HQF _ ED1, 3
90,70
ESCALA
TÍTULO
ESCALA
TÍ
1/200
AL N_E2_E4_CT23
1/200
A
VERSÃO FINAL 08/02/22
VERSÃO F
Foi decidido em reunião de coordenação a 22/02/2008 denominar o conjunto de desenhos que constitui o projecto de Arquitectura de Versão Final de Arquitectura, apesar de não se encontrarem completos, por as especialidades não estarem concluídas, estarem em revisão ou não estarem compatibilizadas com a arquitectura.
Foi decidido em reuniã de desenhos que cons Arquitectura, apesar d não estarem concluída com a arquitectura.
PROJECTO ESPECIAL
PROJECTO ESPECIALIDADE FASE DO PROJECTO Nº DESENHO REVISÃO B
1
2
3
116,36
4
5
7
6
116,36
115,44
8
116,36
9
10
C
11
D
12
13
116,18 115,44
115,44
HQF
01
03
123
14
01
15
D
16
116,00
17
18
19
115,82
115,26
20
21
22
J.D.
C
23
HQF
B
24
25
26
27
28
113,28
113,16
113,28
113,16
113,08
113,16
112,98
112,80
113,08
32
33
34
35
36
37
38
39
40 a definir pelo paisagismo
1: 50 T1 MOB. Condicionada: E2 CT2 e CL2
1:50 T1: E2 CT2 e CL2 114,46 113,77 113,40
113,40
112,48
112,44
112,48
cota de coroamento do m a definir pelo paisagismo
cota do coroamento do muro de betão
113,40
112,85
112,62
111,95
112,48
112,32
111,82 111,26
111,62
110,57
110,46
110,46
31
114,72 114,23
113,15
30
115,15
114,90
113,54
mirror
29
115,64
115,08
lajeta de betão
110,00 109,50
cota (pronto) lav.: 110.46: eixos 1-13
cota (pronto) lav.: 110.28
cota (pronto) lav.: 110.10
cota (pronto) lav: 109.92
109,00
cota (pronto) piso 0: 109.00 cota (pronto) lav.: 109.00 20 cm para revestimento exterior + drenagem do pátio
cota (pronto) lav.: 108.64 laje rebaixada nas boxes 105,50
cota (pronto) boxes: 105.50
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
01
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
dant ARCHITECTURE
SINGLE FAMILY HOUSING AT RUA DR. LUÍS DE PINA, PORTO, PORTUGAL [1200M2] may 2008 project design at preliminary stage
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
dant ARCHITECTURE
24 STOREY HOUSING BUILDING COMPLEX, LUANDA, ANGOLA jul08 model (scale 1 200) planning (for outdoor office ellaboration)
dant ARCHITECTURE
03 COLABORATION AT S&F: SERÔDIO FURTADO ARCHITECTS ASSOCIATED
20 STOREY HOUSING TOWER, LUANDA, ANGOLA
aug08 volumetric studies through 3D modeling
+159,80 20 Planta piso 20
+159,80 Planta piso 20
habitação +156,50 19 Planta piso 19
+156,50 Planta piso 19
habitação +153,20 18 Planta piso 18
+153,20 Planta piso 18
habitação +149,90 17 Planta piso 17
+149,90 Planta piso 17
habitação +146,60 16 Planta piso 16
+146,60 Planta piso 16
habitação +143,30 15 Planta piso 15
+143,30 Planta piso 15
habitação +140,00 14 Planta piso 14
+140,00 Planta piso 14
habitação +136,70 13 Planta piso 13
+136,70 Planta piso 13
habitação +133,40 12 Planta piso 12
+133,40 Planta piso 12
habitação +130,10 11 Planta piso 11
+130,10 Planta piso 11
habitação +126,80 10 Planta piso 10
+126,80 Planta piso 10
escritórios +123,50 9 Planta piso 9
+123,50 Planta piso 9
escritórios +120,20 8 Planta piso 8
+120,20 Planta piso 8
escritórios +116,90 7 Planta piso 7
+116,90 Planta piso 7
escritórios +113,60 6 Planta piso 6
+113,60 Planta piso 6
escritórios +110,30 5 Planta piso 5
+110,30 Planta piso 5
escritórios +107,00 4 Planta piso 4
+107,00 Planta piso 4
escritórios +103,70 3 Planta piso 3
+103,70 Planta piso 3
estacionamento +100,40 2 Planta piso 2
+100,40 Planta piso 2
estacionamento +97,10 1 Planta piso 1
+97,10 Planta piso 1
estacionamento +93,80 0 Planta piso 0
átrio +93,80 Planta piso 0
estacionamento +90,80 -1 Planta piso-1
+90,80 Planta piso-1
estacionamento +87,80 -2 Planta piso-2
+87,80 Planta piso-2
estacionamento +84,80 -3 Planta piso-3
+84,80 Planta piso-3
+78,65 -4 fundações
+78,65 fundações
04 GRAPHIC DESIGN
dant ARCHITECTURE