DRAMA SCHOOL
lapa/athens : architecture of integration Davide Di Capua
PRESENTAION DOCUMENTATION - FEASABILITY STUDY
HISTORY
HISTORY
Greek Drama
- Tradition of Drama - Cultural Identity - Made to promote cultural identity trough the country
HISTORY
Greek Theater
- Origin in Athens, 2’500 years ago - Theater of Dionysus (acropole) - Theater in a drama context (wiew)
TiLL
TiLL (theatre in language learning model)
- Annually approximately one million L2 learners on three continents attend performances by theatre companies producing plays which support the study of second languages.
TiLL
- the Theatre in Language Learning (TiLL) model for second language learners, , linking text study, classroom based role play and professional performance with preshow and in-performance student interaction.
4
-8
80
-7 4
70
4
-6
60
-5 4
50
4
4
-2 4
-4
40
4
-1 4
-3
30
20
10
0-
’0
20 00
40 ’0 0 0
00
’0
60 00
’0
80
TiLL
12 0’ 0’ 00 00 0 0
10
Immigrants
TiLL
Educational level
59% OF THE IMMIGRANTS ARE OR ILLITERATE OR HAVE A PRIMARY SCHOOL LEVEL
SECONDARY SCHOOL 33%
PRIMARY SCHOOL 47%
ILLITERATE 12 %
TiLL
Theatre as an educational tool for immigrants
PROGRAM
Financing and Direction 1/2 State of Greece (Minister of Culture and Minister of Education)
PROGRAM
1/2 Subventionned by private found and partners (foreigner theater, private organisation,NGO,...), but also auto-finaced through Representation
Directed by the National Theater of Greece with multiple input of minister of Education and other partners (Foreign Theaters)
Program brief DESCRIPTION
QUANTITY
M2
LOBBY,RECEPTION 1
TOTAL M2
N°
M2
TOTAL M2
352
21
Repetition rooms
2
30
60
22
Teaching rooms (reading, learning, hearing, acting)
4
45
180
23
Work rooms (mixed used, conferences, meeting, etc.)
2
30
60
24
WC, shower
4
10
40
25
small kitchen for personnal uses
1
12
12
Entrance, foyer (with sufaces for tables and small exhibitions)
1
2
Reception
1
10
10
3
Cloakrooms (open, uncontrolled)
2
10
20
4
Ticketing, administration
1
10
10
5
WC
2
6
12
6
Bar, refreshments
1
10
10
26
Workshop, stage set
1
100
100
7
Kitchen
1
12
12
27
Carpentry workshop
1
30
30
8
Storage (easy delivery from exterior)
1
14
14
28
Furniture and accesory workshop
1
25
25
9
Library
1
20
20
29
Child workshop
1
25
25
30
Stock costumes (can de divided)
1
25
25
31
Couture, masks and wigs, laundry
1
25
25
32
Light room
1
15
15
LARGE THEATRE
50
QUANTITY
SCHOOL
158 50
DESCRIPTION
574
WORKSHOPS
272
10
Large theatre room, 100 seats, modular
1
300
300
11
Gallery
1
50
50
33
Sound and video room
1
15
15
12
Stage
1
120
120
34
WC
2
6
12
13
Storage in the back stage
1
60
60
14
Lodge
2
12
24
35
Administation office for for 4 people
1
24
24
15
WC, shower
2
10
20
36
Director office
1
12
12
37
Archives
1
30
30
38
WC
2
6
12
OUTDOOR THEATRE
250
16
Small theatre, 50 seats
1
150
150
17
Stage
1
35
35
18
Storage in the back stage
1
20
19
Storage for furniture
1
20
WC
2
ADMINISTRATION
78
EQUIPMENT
96
39
General storgae with acces for delivery
1
50
50
20
40
Heating-Veintilation-Plumbing-Electrictiy room
1
14
14
25
25
41
Cleaning room
2
8
16
10
20
42
WC, shower
2
8
16
Total m2
Total: 1’780 m2 X 30 %(circulation, staircase, wall,...) = 2’300 m2 Permeable Outdoor space min. 30%. 1780 m2 x 30 % = 2‘320 m2
1'780
PROGRAM
N°
Program Admin.
School
Lobby/Entrance
Large Theater
PROGRAM
Outdoor Theater
Workshop
Equipment
Daily Organisation FREE SCHOOL PUBLIC SCHOOL REPRESENTATION PRIVATE SCHOOL
PROGRAM
PM 24
PM 22
PM 20
PM 18
PM 16
PM 14
PM 12
AM 10
8
AM
FREE MIXED-USED
SITE
SITE
Kerameikos, Gazi
SITE
SITE
Site
U
O
K
AM AI
K ER
4 SITE
IE R A O
S
U
AE
R
PI
S
D O
T
EE
2 R
ST
’S
AT O
PL
W AY
Urban Constitution
3
1
SITE
Situated on an important
SITE
Situated on an important node
2
1 S
AR T
6
R
N O AT F IO G N R A EE L C TH E EA TE
R
TE
RY
EN
LE
C
AL
G
AL
R
LT U
U
C
EN
AT H
E
C
AN
D
4
SITE
S
LI
PO
O
H N
C
TE
D
R
AM
A
C
FA C
U
LT SE Y VA TO IR E
L
O
O N
H O
SC
Piraeus Axe 5
3
SITE
Site View
SITE
Site View
Renovation needs
SITE
- 46 % of plot In KM are unused or dilapitated
SCENARIO
Program and site 287 m2 1’424 m2 337 m2
800 m2
X2
Built total footprint = 624 m2 total m2 = 1’250 m2
Parcel
Courtyard
2’300 m2
158m2 Lobby/Entrance Large Theater
352 m2 250 m2 Outdoor Theater School
272 m2 Workshop
78 m2
96 m2
Admin.
Equipment
Programm + 30 % of circulation 0m
20m
SCENARIO
574 m2
Street node
TO
OTA
OM
NIK
OS
S U E
A
TO
R PI
0m
SCENARIO
TO V
A
I N O
20m
0m
SCENARIO
Possible circulation
20m
0m
SCENARIO
Public area
20m
Gathering point
0m
SCENARIO
Public Piazza
20m
0m
SCENARIO
destroy existing garage
20m
THE PROJECT
A DRAMA SCHOOL