Report on Environmental Plan for Vijayawada

Page 141

Environmental Management Plan for Vijayawada-2041 Besides this, the concerned authorities within VMC have shared the details regarding the current waste handling practices like community participation on ban on plastic use, awareness rallies that are conducted to address the information gaps and raise awareness amongst the citizens as well as other relevant staff within VMC. VMC has also promoted the distribution of cloth and jute bags by resident welfare associations and other volunteers to discourage the use of plastic bags in the city. In addition, the city has various waste recycling and material recovery facilities at different places within the city and depicted in the following pictures. The VMC has established the construction debris processing plant at Ajith Singh Nagar in November 2018. The plant is being jointly operated by Pro Enviro C&D Waste Management Company and the VMC. The capacity of the unit is about 200 tonnes and it processes nearly 70 tonnes of debris every day. The debris is processed into 40 mm, 20 mm and 6 mm metal filling sand and is used directly for construction as a fill material and also in manufacture of downstream products like RMC, bricks, blocks, tiles, pavers, etc. Though there are many treatment plants and processing units going in many ways to recover the waste as far as possible still there are some amounts of waste left out and being disposed to the site. In this regard, a detailed segregation of waste into categories like paper, ceramics, glass, etc. would help in recovering & recycling the wastes in a larger way leading to a greater revenue generation also.

Measures the Corporation Is taking and planning to Take in Future VMC intends to provide a holistic waste management service to the citizens of Vijayawada city. The city is able to achieve the desired objectives to some extent by introducing various initiatives like collection efficiency, use of multiple technologies and providing a green and clean city to its citizens. There still are certain bottlenecks which the city target to eradicate by use of advance technologies, ensuring public participation and raising awareness amongst the public. The city intends to establish a Material Recovery Facility at the landfill including a ballistic separator, belt conveyors, air separator, manual sorting conveyors, feeding hopper, magnetic separator, etc. The civic body has also decided to renovate the bio methanation plant at Ajith Singh Nagar and set up a new one at Jakkampudi. To streamline the existing system, VMC is planning to improve doorto-door segregation across the city and make Vijayawada garbage free. In addition, the civic body is analyzing all possibilities to enforce SWM practices through an Online Waste Management System (OWMS)- Internet of Things (IoT) and Information and Communication Technologies (ICT) tools. The city government is also in discussion with various bulk waste generators with a daily waste generation of 5 tons or more to treat their own waste by way of installing on-site composting plant where the technical support will be provided by VMC. Establishments like housing societies, big hotels, hospitals, commercial markets, industrial sites etc. fall in this category. Recently, an agency has been empaneled to segregate garbage from bulk waste generators such as marriage halls, convention centers and hotels21. Some bulk waste generators have already started decentralized composting at Suryarao peta in Benz circle area of Vijayawada city. Finally, the city intends to adopt

Master of Environmental Planning and Management 2020-22

140


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Area of study

2min
page 284

Landuse near Ryves canal

1min
page 268

Study area analysis

2min
page 285

Observations

0
page 259

20.18.1.3 Governance and management of Biodiversity in the city

5min
pages 255-258

Biodiversity in Bhavani Isalnd

0
page 248

Biodiversity in Rivers and Canals

0
page 247

Linkage between Biodiversity & Human Well-being

1min
page 245

Problems associated with green areas

3min
pages 242-243

Land use types and green areas

5min
pages 239-241

20.13.2.2 Carbon sequestration

3min
pages 234-235

18.5.10.1 Schemes

2min
page 209

Labour Department

0
page 207

Earthquake

1min
page 194

Geology

1min
page 186

Biodiversity

0
page 184

Parks

1min
page 166

Multi-Pollutant Inventory

0
page 155

Transportation of Waste

1min
page 148

Environmental Management Systems

0
page 151

Junior Colleges

0
page 160

Peripheral Area

2min
page 146

Measures the Corporation Is taking and planning to Take in Future

2min
page 141

Technologies and Treatment Plants

5min
pages 136-140

Garbage Bins

0
page 132

Sources of Waste

1min
page 128

Four Step Solid Waste Management

1min
pages 130-131

Sewerage in Vijayawada

0
page 119

Storm water management

0
page 117

City Level Analysis

1min
pages 106-107

Trade and Commerce

0
page 92

Development History and Density

6min
pages 55-59

Population Growth

0
pages 73-74

Land use study

2min
page 85

6.1.8.2 Slums

0
page 72

Population Projection

0
pages 76-77

Existing land use scenario

0
page 84

Distribution of Population

0
page 67

Vijayawada City Vulnerability

1min
page 65
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.