Report on Environmental Plan for Vijayawada

Page 268

Environmental Management Plan for Vijayawada-2041 vital services and for the protection of the community. Festivals celebrated on the ghats generate 1500 metric tonnes of garbage. There are many unauthorised settlements along the riverbank which are more vulnerable during flood. Also these slums don't have proper sanitation facility hence they discharge sewerage directly into river. The slums also contribute more in dumping solid waste into river, 23 waste dumping areas were found along the river. This can directly affect the health of people in slums

Figure 21.10: Landuse near Krishna river

Landuse near Ryves canal

Figure 21.11: Ryves canal stretch

Ryves is the widest canal (32 m) among all , it has the highest discharge of water and it passes through the core area of city. Commercial and residential landuse is concentrated along the canal. Maximum land along the canal is either occupied by slums is slum or used as dumping place. People residing near the canal throw household waste into canal and burning waste along canal which result in clogging of canal and causing pungent smell in the surrounding. Growth of algae and growth of hyacinth in canal is seen which can cause harm to aquatic life, animals as well as humans.

Master of Environmental Planning and Management 2020-22

267


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Area of study

2min
page 284

Landuse near Ryves canal

1min
page 268

Study area analysis

2min
page 285

Observations

0
page 259

20.18.1.3 Governance and management of Biodiversity in the city

5min
pages 255-258

Biodiversity in Bhavani Isalnd

0
page 248

Biodiversity in Rivers and Canals

0
page 247

Linkage between Biodiversity & Human Well-being

1min
page 245

Problems associated with green areas

3min
pages 242-243

Land use types and green areas

5min
pages 239-241

20.13.2.2 Carbon sequestration

3min
pages 234-235

18.5.10.1 Schemes

2min
page 209

Labour Department

0
page 207

Earthquake

1min
page 194

Geology

1min
page 186

Biodiversity

0
page 184

Parks

1min
page 166

Multi-Pollutant Inventory

0
page 155

Transportation of Waste

1min
page 148

Environmental Management Systems

0
page 151

Junior Colleges

0
page 160

Peripheral Area

2min
page 146

Measures the Corporation Is taking and planning to Take in Future

2min
page 141

Technologies and Treatment Plants

5min
pages 136-140

Garbage Bins

0
page 132

Sources of Waste

1min
page 128

Four Step Solid Waste Management

1min
pages 130-131

Sewerage in Vijayawada

0
page 119

Storm water management

0
page 117

City Level Analysis

1min
pages 106-107

Trade and Commerce

0
page 92

Development History and Density

6min
pages 55-59

Population Growth

0
pages 73-74

Land use study

2min
page 85

6.1.8.2 Slums

0
page 72

Population Projection

0
pages 76-77

Existing land use scenario

0
page 84

Distribution of Population

0
page 67

Vijayawada City Vulnerability

1min
page 65
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.