Manitoba Mining Review 2021-22

Page 17

CANADIAN PREMIUM SAND: A LEADER IN SOLAR GLASS Driven by an ambitious vision to add

improves clarity and allows greater

per cent of its patterned solar glass

new domestic manufacturing capacity,

light transmissivity. The quality of our

demand — even though Canada has an

CPS has initiated plans to build and

silica sand has been validated by third-

abundance of premium, accessible raw

operate an industry-leading sustainable

party laboratories leading to a glass-

materials like high-purity silica sand

solar glass manufacturing facility in

sand inferred resource estimate of 7.25

and is an energy exporter.

Manitoba. This facility will play a key

million tonnes.

role in North America’s rapidly growing

Our state-of-the-art patterned

CPS is positioned to be the first

solar glass manufacturing plant

patterned solar glass supplier in

will be an economic catalyst for the

North America. We believe long-term

industry and region, and make a

economic prosperity for Canadians

meaningful contribution to Canada’s

CPS owns rights to a high-purity, low-

requires more robust domestic primary

manufacturing sector. The facility will

iron silica sand quarry, located 160

manufacturing with responsible use

utilize the best technology available

kilometres north of Winnipeg. Low

of our resources as we work towards

and renewable electricity to set a

iron content in silica sand is essential

net-zero as a society. For too long,

new standard for sustainable glass

to produce premium solar glass as it

North America has had to import 100

manufacturing. 6

renewable energy sector providing solar module manufacturers with reliable access to high-quality solar glass.

THE POWER OF PEOPLE, FOR OVER 50 YEARS www.MacintyreMining.com

1390 Government Road West Box 517 Kirkland Lake, ON P2N 3J5 | Telephone: 705.567.6663 | Fax: 705.567.4925

MANITOBA MINING REVIEW 2021-2022

17


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Gossan Resources: A Manitoba story

2min
pages 50-51

AME Roundup 2022 is almost here

2min
pages 52-53

The future of gloves in the mining industry

4min
pages 40-41

North Star Air: Moving your cargo in 2022 (it’s what we do

3min
pages 46-47

One megawatt

4min
pages 48-49

Wolfden advances its two Nickel Island properties in Manitoba

3min
pages 38-39

We need mining, mining needs you

5min
pages 42-43

New Age Metals commences maiden drill program at its Lithium Two Project in Southeastern Manitoba, Canada

5min
pages 36-37

Solara makes communications from anywhere easy

4min
pages 28-29

Far Resources provides an update on the Zoro Lithium Project and the newly acquired Jean Lake Lithium-Gold Project

2min
pages 34-35

The United Nations Declaration on the Rights of Indigenous Peoples and the Orefinders

1min
page 26

Made in Manitoba

1min
page 27

The values placed on the Lynn Lake Gold Project

4min
pages 22-23

Mining essential to kick-start Canada’s low-carbon tech revolution

3min
pages 24-25

Hudbay enters a new golden age with startup of gold mill at Snow Lake

3min
pages 20-21

Manitoba mining activity

5min
pages 10-11

Quarry Project (gold

0
page 16

Canadian Premium Sand: A leader in solar glass

1min
page 17

Thompson East – Bryce Bay: Ni-Cu-Co-PGE Project

2min
page 14

1911 Gold Corporation: Reimagining the Historic Lake Gold District

4min
pages 18-19

In loving memory of William Douglas Fogwill

2min
page 15

Pemmican Island Project – EV/battery metal Ni/Zn/Co/Pb/Cu/Ag/Au

1min
page 13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.