Daniel Lam Portfolio of Work 2016

Page 1

DANIEL LAM | PORTFOLIO OF WORK


Contents 03 04 05 06 07 08 09 10 11

Feed The City | Sheffield Hallam University 2nd Year 2013 | 4 Months | London Wildlife Conservation Centre | Sheffield Hallam University 3rd Year 2013 | 4 Months | Sheffield The City Room | Sheffield Hallam University 3rd Year 2014 | 5 Months | Sheffield The Gathering Place | Arkitrek 2015 | 2 Months | Borneo The Gathering Place | Arkitrek 2015 | 2 Months | Borneo Stokewood Leisure Centre | Footprint Architects 2016 | Planning | Bournemouth Stokewood Leisure Centre | Footprint Architects 2016 | Planning | Bournemouth Cabot Lane | Footprint Architects 2016 | Building Regulations | Poole Harland Road | Footprint Architects 2016 | Planning | Bournemouth

Previous Page | Bukit Gumantong, Sabah, Malaysia

02


Site Model

Distribution and purification of Water

Elevation

Concept

Section

Section

Brief | To develop concepts based on ‘Health In The City’ as a theme. The project was broken into two stages: Concept and Design. We were to consider past, present and future contexts in our projects. Response | To purify water from the River Thames and rain water to create free drinking water for the entire city. This was inspired by the basic nutrition of water and the potential of increased efficiency from the whole city being subject to that. Past: My idea was to be implemented in the locations of historic Victorian wells around London. The concept references the historic use of rivers in settlements, which was for drinking, cleaning and feeding crops. This is then put into its 21st century context; The Water, the Land and The City. Present: My design was the first of the wells, at Blackfriars. It was physically manifested as a public space with fountains, wells and waterfalls for the public’s recreation and health. Future: Eventually the site of each historic well would have a similar space that not only provides drinking water but nutrition from hydroponic plantations. Canals would connect all the sites, visually guiding the public to the spaces. The fully realised idea would be a city where all basic nutrition is provided for free. With the increased efficiency from the nutrition the idea would be able to expand in further future contexts. This project was a medium for me to present my societal ideas in an indirect fashion. To present my concept I produced a short film: https://vimeo.com/61038174

03

FEED THE CITY | SHEFFIELD HALLAM UNIVERSITY 2ND YEAR 2013 | 4 MONTHS | LONDON


Mouth of the River Sheaf

Site Plan

Education Space

Roof Plan Site Section Brief | To design a conservation centre that is contextually and environmentally responsible along the River Don. Response | I chose the Castle Market site because of the opportunity to reverse the negative impact on the area following the relocation of the markets. My project aimed to achieve this by reopening the River Sheaf and improving the local ecosystem. The wildlife conservation centre sits at the centre of the site with green space around it. The centre houses and protects the endangered species of the local ecosystem in a enclosed floating structure on the Sheaf. It uses the river water to hold fish and other marine species. Fishing techniques are used to raise the endangered species before they are released into the Don to rejuvenate the food chain. The buildings surrounding this are for public use and education. Flexible market and workshop spaces for local trades and retailers are provided in the remaining parts of the market. This project gives positive social, environmental and urban impact on the area though a much-needed urban centre point for this historic city centre.

04

WILDLIFE CONSERVATION CENTRE | SHEFFIELD HALLAM UNIVERSITY 3RD YEAR 2013 | 4 MONTHS | SHEFFIELD


Aerial View

Front Facade

View from square

Workshop Space

Site Section

Debating Chamber

Brief | To design a civic building in Fitzalan Square, which contains a debating chamber for local people to discus civic matters. Response | To create a platform for the public to voice their opinions and ideas, which develop the city culturally, economically and socially. Workshops and studios on the upper floors allow members of the public to create their ideas and the debating chamber allows them to present them. The scheme encourages the public to enter the debating chamber through pedestrianisation of the square and by the positioning of a public resource pavilion in the square. This layout directs people in the debating chamber towards the external public space, and vice versa, creating an architectural relationship between the two. The building was designed in an environmentally considerate way, with passively heated spaces, responsibly sourced materials, solar shading and renewable energy displayed in the square. The ground floor is used to house offices and a cafĂŠ, to create active frontages that counter the cash converters and betting shops. This building will start the gradual urban change to an active public square.

05

THE CITY ROOM | SHEFFIELD HALLAM UNIVERSITY 3RD YEAR 2014 | 5 MONTHS | SHEFFIELD


Route to Bukit Gumantong

Site Plan

Truss Design

Sloping Wall Foundations

Brief | To design and build a rest house for the Rungus community on top of Bukit Gumantong. The rest house is a shelter for visitors and locals to use when hiking up Gumantong hill. Response | Our team of architects and designers worked with the Rungus community to produce a contextually sensitive rest house. This was achieved by using locally sourced materials and local construction methods. The design used appropriate architectural language by mimicking that of a longhouse, a traditional accommodation type in Sabah. The site was chosen because it was an open space close to the summit of the hill. We only used dead trees for construction to show the tribe that we respected their protected forest. The building is a very flexible space providing communal spaces and private spaces. This division came from the local culture, where males sleep in the communal spaces and the females in private spaces, and we aimed to respect that. There is an ever-growing problem of young members of the tribe losing interest in their culture and heritage. The project addresses this as schools will take students to the The Gathering Place where they will learn about Rungus traditions and culture. The overall experience was a huge step in my education and my understanding of what I want my role to be in the future. As part of our presentation I made a film of the camp. Watch it here: https://vimeo.com/141191470

06

THE GATHERING PLACE | ARKITREK 2015 | 2 MONTHS | BORNEO


Gathering Place

Gathering Place

Gathering Place

Gathering Place

Toilet

Toilet

07

THE GATHERING PLACE | ARKITREK 2015 | 2 MONTHS | BORNEO


ST L

UKE'S

ROA

D

P002

40.22

40 .4 3

40.3

9

40.19

70 69

40.38

68 67 66 65 64

40.35

40

.3

0

63

40 40 .42

40 .3

2

40.39

.36

Pine Trees on site

G

RA

FT

Precedent

O

N

CL

O

SE

Proposed Block / Site Plan Notes: Unless otherwise stated, this drawing is for information only. Do not scale. Use figured dimensions only. Check all dimensions on site and advise of any discrepancies before commencing work on site. Digital Transmissions: This data is supplied only as a means to aid you in the production of your work, the data should always be checked against the hard copy of the drawing. Some of the data may have been produced by importing data from external sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within the CAD data file. No third party shall issue footprint architects data/drawings without the written approval of FootprintArchitects. FootprintArchitects check all data for viruses but cannot accept responsibility for any loss incurred by any third party as a result of installing data.

Precedent

General Notes:

0

Revisions:

DRAFT 5

10

Project:

N 20

(1:500)

40m

Precedent

Stokewood Leisure Centre 5 Pine Court Business Centre | 36 Gervis Road Bournemouth | Dorset | BH1 3DH

Subject: Proposed Block / Site Plan Scale: 1:500@A3

Status:

Project Ref: 7174

Drawing: 7174_P002

PLANNING

Date: MARCH 16

Tel: 07725310271 | 01202 585526 email: enquiries@footprintarchitects.co.uk web: www.footprintarchitects.co.uk

Precedent

Precedent

Samples

Brief | To design a new gym and classes space over an existing gym to the back of Stokewood Leisure Centre. The client, Bournemouth Council, appointed Footprint Architects to design the new gym, by working with a building consultancy, M and E and structural engineers. The existing building is locally listed and is located in a residential area. Response | A large modular designed flexible gym space, enabling areas to be segregated by the movement of internal partitions. The extension is clad in burnt timber with varying widths. This use of timber was inspired by the density, form and setting of the pine trees on site. The extension’s varied cladding mimics the pine trees. It has less dense parts around windows to let light in and reduce views out. The charred timber comes from the idea: to ‘stoke’ wood, whilst simultaneously referencing a historic fire that burnt down the original buildings before they were replaced. Overall the design aims to create modern gym facilities to enable the centre to remain competitive in today’s market. This project gave me an insight into a conceptual and aesthetic approach to design.

08

STOKEWOOD LEISURE CENTRE | FOOTPRINT ARCHITECTS 2016| PLANNING | BOURNEMOUTH


North Elevation

P013

h2.10 h2.02

lift

down

u/s4.75

s1.20 h3.49

s2.40 h4.73

max6.

65

12

FL43.

s1.26 h5.75

min5 .16 u/s4.7 5

h2.02

s2.40 h4.73

32 FL44. ch3.79

h1.88 s0.20

down

s1.24 h3.48

up

Section

down

First Floor Plan

West Elevation Proposed First Floor Plan Notes: Unless otherwise stated, this drawing is for information only. Do not scale. Use figured dimensions only. Check all dimensions on site and advise of any discrepancies before commencing work on site. Digital Transmissions: This data is supplied only as a means to aid you in the production of your work, the data should always be checked against the hard copy of the drawing. Some of the data may have been produced by importing data from external sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within the CAD data file. No third party shall issue footprint architects data/drawings without the written approval of FootprintArchitects. FootprintArchitects check all data for viruses but cannot accept responsibility for any loss incurred by any third party as a result of installing data.

Concept Diagram

Above | Planning drawings and concept diagram showing the position of windows and rooflights in the cladding design

09

STOKEWOOD LEISURE CENTRE | FOOTPRINT ARCHITECTS 2016| PLANNING | BOURNEMOUTH

General Notes:

0

DRAFT 1

2

Revisions:

All internal layouts indicative only 4

Project:

Stokewood Leisure Centre

N (1:100)

8m

5 Pine Court Business Centre | 36 Gervis Road Bournemouth | Dorset | BH1 3DH

Subject: Proposed First Floor Plan Scale: 1:100 @ A3

Status:

Project Ref: 7174

Drawing: 7174_P013

PLANNING

Date: MARCH 16

Tel: 07725310271 | 01202 585526 email: enquiries@footprintarchitects.co.uk web: www.footprintarchitects.co.uk


A/L_(2-)003 A/L_(2-)003 Roof build-up: 30 degree pitch Marley Eternit Thrutone Fibre Roof build-up: 30 degree pitch Marley Eternit Thrutone Fibre Cement Slates as spec ref: H60/100. Laid over 25mm x Cement asover specbreathable ref: H60/100. Laid overlaid 25mm 50mm Slates battens, membrane, overxroof 50mm battens, breathable membrane, laid over roof trusses to engover spec. trusses to eng spec. + 28.30 RIDGE + 28.30 RIDGE

A/L_(2-)003 A/L_(2-)003

build-up: 30 degree Marley Eternit Thrutone Fibre RoofRoof build-up: 30 degree pitchpitch Marley Eternit Thrutone Fibre Cement Slates as spec H60/100. 25mm Cement Slates as spec ref: ref: H60/100. LaidLaid overover 25mm x x 50mm battens, breathable membrane, 50mm battens, overover breathable membrane, laid laid overover roofroof Proximity of rooflight and ridge tile to be checked on site. trusses to eng spec. Proximity of rooflight and ridge tile to be checked on site. trusses to eng spec. Double glazed rooflights. As Spec Ref: Double glazed rooflights. As Spec Ref:

+ 28.30 RIDGE + 28.30 RIDGE

Proximity of rooflight ridge tilebe tochecked be checked on site. Proximity of rooflight andand ridge tile to on site.

W-06 W-06 + 22.60 1ST FFL + 22.60 1ST FFL W-06 W-06

W-07 W-07

+ 22.60 + 22.60 1ST1ST FFLFFL

W-01 W-01

+ 19.90 FFL + 19.90 FFL W-01 W-01

+ 19.90 + 19.90 FFLFFL

W-02 W-02

D-01 D-01

W-02 W-02

Proposed South East Elevation - House type 1 Proposed South East Elevation - House type 1

+ 8.400 + 8.400 RIDGE RIDGE

+ 8.400 + 8.400 RIDGE RIDGE

WINDOW SCHEDULE Number W-01 W-02 W-03 W-04 W-05 W-06 W-07

Type 1

Proposed Section AA - House Type 1

Elevation 1050mm 1050mm 800mm 800mm 800mm 800mm 800mm

Proposed Section BB

- House Type 1

W1

W1 C1 F3

W1

F3

W1

W1

D-06

X

T 2

D-07

Rooflight above

2 way switch

2 way switch

1030

E

E

W2

F2

W2

W2

DW

rwp 675

W-01PIR

675

BEDROOM 02

DW

rwp

W-02

675

+00.000

W-06

Entrance Canopy to match roof build up 675

5400

Floor Plans

Sash Opening Awning Custom P R Custom OPOSED GROUND FLOOR PLAN S C Custom ALE 1:50 Awning Awning Custom

X

1800

Canopy Over 5400

2

2

W2

WM

X D-01

BATHROOM

3614

E

2620

W2 W2

C2 F2

W2

X

C2

W1

W2

BEDROOM 02

2

F1

W2

F3

2040

4500

E

X

C2

W2

E

X

C1 W1

X

H

W1 W1

D-10

2545

KITCHEN X

W2

Rooflight above X

3614

E

C1 Handrail to be provided W1 on W1 F3 plasterboard wall on oneW1side at D-10 900mm above the pitchline. 2040 Plasterboard wall continues to landing at 1100mm high. BATHROOM W2 2620

F2 W2

X

X

Handrail to be provided on plasterboard wall on one side at 900mm above the pitchline. Plasterboard wall continues to landing at 1100mm high.

X

C2

X

X

W-05

760 x 1200

S

1030 Staircase XTotal Rise 2700mm consisting of 14 risers at 193mm and 13 going of 240mm.

X

1480

W2

W2

W2

760 x 1200

F2

Window glazed with obscured glassW2 ENSUITE andXon restricted openers to prevent the obscured glazing being negated

900

C2

X

W2

X

1480

S

Door and frame cut to fit under stairs Staircase Total Rise 2700mm consisting of 14 risers at 193mm and 13 going of 240mm.

D-08

W2

D-09

W1

Loft hatch above. Megaflo water tank ENSUITE in X loft.

D-09

10575

900 D-04

10575

X

W-05

D-02

2

T

+22.600

X

Rooflight above

Loft hatch above. Megaflo water tank in loft.

FF X

10

W1

D-07

2

2

F1

F3 W1

D-05

W1

W-02 All ground floor opening windows to have 100mm opening restrictors 1800

Proposed Section BB

C1

W1 C1

2

4620 2

W1 C1

D-08

990

800mm min clear opening width to W2 front door. Use 932mm doors. WM Flush threshold with slot drain across opening. X

2

W1

X Dining

X

675

Door and frame cut to fit under stairs

2

W1

W1

+22.600

DINING

S

rwp

2921

Plasterboard studwork internal walls

2

F1

150

150

C2

D-01

W-01PIR

800

2800

Handrail to be provided on plasterboard wall on one side at 900mm above the pitchline. KITCHEN Plasterboard wall continues to landing at 1100mm X high. H X

10

C

700

All glazing and trickle vents BEDROOM 01 acoustic as acoustic report to comply with planning condition. 2

2

1800

Double Glazed UPVC framed W-04 W-03 windows.

2

X

X

2 T 2

FF X

2 way switch

Elevation 1050mm 1050mm 800mm 800mm 800mm 800mm 800mm

975

(1:5) 0.4m

BEDROOM 03

D-05

2

Dining

9

Provide floor drain to WC DINING S Electrical consumer unit should be positioned at a height of between 1350-1450mm. Concealed C1 W1 W1 under stairs. F1 Staircase Total Rise 2700mm consisting of 990 14 risers at 193mm and 13 going of 240mm.

Smoke Detector Handrail to be provided on Heat Detectorplasterboard wall on one side at 900mm above the pitchline. Mechanical Extract Plasterboard wall continues to landing at 1100mm high. Radiators (Size, location,

Number Sash Opening Structural Opening W-01Awning 675mm x 1200mm W-02Custom 1800mm x 1200mm W-03Custom 1125mm x 1500mm W-04Custom 1800mm x 1500mm W-05Awning 900mm x 900mm W-06Awning 900mm x 1500mm W-07Custom 1800mm x 1500mm

A

2

A T 2

Shaver Point Staircase Total Rise 2700mm consisting of Passive Infrared 14 sensor risers at 193mm and 13 going Aerial Socket of 240mm.

WINDOW SCHEDULE

Structural Opening 675mm x 1200mm 1800mm x 1200mm 1125mm x 1500mm 1800mm x 1500mm 900mm x 900mm 900mm x 1500mm 1800mm x 1500mm

0.2

M

Sections

Structural Opening 1010mm x 2100mm 910mm x 2100mm 4050mm x 2100mm 810mm x 1550mm 810mm x 2100mm 910mm x 2100mm 910mm x 2100mm 910mm x 2100mm 910mm x 2100mm 910mm x 2100mm

C

DOOR SCHEDULE 800mm min clear opening width to front door. Use 932mm doors. Number Structural Opening Flush threshold with slot drain D-01 1010mm x 2100mm across opening. D-02 910mm x 2100mm D-03 4050mm x 2100mm D-04 810mm x 1550mm D-05 810mm 2100mm Allxground floor opening windows to 910mm x 2100mm Foundations toD-06 eng spec have 100mm opening restrictors D-07 910mm x 2100mm D-08 910mm x 2100mm Canopy Over D-09 910mm x 2100mm D-10 910mm x 2100mm

0.1

Escape window in accordance with Approved Document B1 section 2.8. Opening width 450x450mm 2040

WC E

M

Foundations to eng spec

Number D-01 D-02 D-03 D-04 D-05 D-06 D-07 D-08 D-09 D-10

9

Provide floor drain to WC

design TBC by2 contractor) way switch 150

DOOR SCHEDULE

1125

W1

Flue

2545

900

+ 19.75 GL

F3

3710

En Suite

C/ H+O

E

7 Radiators (Size, location, design TBC by contractor)

Hall

150

Mechanical Extract

750

0.05

W1

X

E

7

W1 C1

Flue

X

T

H

X

2

Heat Detector

X

2

H

W1

2

S

Plasterboard studwork internal walls

W1

DRAFT

0

W1

B

A

Smoke Detector

F1

General Notes:

rwp

12.5mm plasterboard on dabs, plaster skimmed to finish, 100mm BEDROOM 01 Blockwork, 100mm cavity filled with 50mm insuation, 100mm Brickwork.

D-06

T

2465

2000

PIR

Aerial Socket

1200

900 900

1200

2465

2100 2000

2700

900

Passive Infrared sensor

A

S

W1 C1

X

+ 19.90 FFL

PIR

Entrance

2040

12.5mm plasterboard on dabs, plaster skimmed to finish, 100mm Blockwork, 100mm cavity filled with 50mm insuation, 100mm Brickwork.

X

X

8

WC

sh

X

X

ce rear terrace g on treated joists. c REF: Q55/110

Living RoomEntrance

Shaver Point

700

W-04

07725310271 | 01202 585526 Tel:Tel: 07725310271 | 01202 585526 email: enquiries@footprintarchitects.co.uk email: enquiries@footprintarchitects.co.uk www.footprintarchitects.co.uk web: www.footprintarchitects.co.uk web:

W1

X

WC

sh

1800

BEDROOM 03

Wood burning stove and flue as spec X X

X

ng Room

T

Telephone Point

X

W1

X

13a Switched Fused Connection Unit

LIVING ROOM

495

W1

WC

Electrical consumer unit 13a Switched Twin Socket Outlet at a should be positioned height Connection of between Unit 13a Switched Fused 1350-1450mm. Concealed under stairs. Telephone Point

rwp

Building Regs Status: Date: March 16 Building Regs Status: Date: March 16 Project 7169Drawing: Drawing: 7169_A/L_(2-)003 Project Ref:Ref: 7169 7169_A/L_(2-)003

12.5mm plasterboard, 100mm blockwork, 12.5mm plasterboard wall 3710 Durgo

800

800

900

800

800

900

13a Switched Twin Socket Outlet

T

F1

X

Pull Cord 2

5 Pine Court Business Centre | 36 Gervis Road | 5 Pine Court Business Centre | 36 Gervis Road | Bournemouth | Dorset | BH1 3DH Bournemouth 3DH 1125 | Dorset | BH1 975 Tel: 07725310271 | 01202 585526 Tel: 07725310271 | 01202 585526 email: enquiries@footprintarchitects.co.uk email: enquiries@footprintarchitects.co.uk web: www.footprintarchitects.co.uk www.footprintarchitects.co.uk web: 5 Pine Court Business Centre 36 Gervis Road 5 Pine Court Business Centre | 36| Gervis Road | | Bournemouth | Dorset | BH1 W-03 | Dorset | BH1 3DH3DH Bournemouth

750

Scale: 1:50@A1 Status: Building Regs Project: Date: March 16 Project: Cabot Lane Scale: 1:50@A1 Status: Building Regs Date: March 16 Cabot Lane Project Ref: 7169 Drawing: 7169_A/L_(2-)003 Project Ref: 7169 Drawing: 7169_A/L_(2-)003 Subject: Proposed Elevations Type Subject: Proposed Elevations Type 1 1 1:50@A1 Scale: 1:50@A1 Scale:

2700

Light switch

Pull Cord

rwp 8m8m (1:50) (1:50)

D-03

W1

E

Pendant. Ceiling mounted

Light switch

+ 22.60 1ST FFL

W1 C1

W1

900

Pendant. Ceiling mounted

Subject: Proposed Elevations Type 1 Subject: Proposed Elevations Type 1

8m 8m Revisions: Revisions:

4 4

2465

Luminaire. Ceiling mounted

2 2

2

X

1

D-02

Luminaire. Ceiling mounted

2

X

D-04

X

2800

Hall En Suite Luminaire. Wall Mounted

1500

1500

2485

X

(1:50) (1:50)

1:10

Notes: Unless otherwise stated, this drawing is for information only. Do not scale. Use figured dimensions only. Check all dimensions on site and advise of any discrepancies before commencing work on site. Digital Transmissions: This data is supplied only as a means to aid you in the production of your work, the data should always be checked against the hard copy of the drawing. Some of the data may have been produced by importing data from external sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within the CAD data file. No third party shall issue footprint architects data/drawings without the written approval of FootprintArchitects. FootprintArchitects check all data for viruses but cannot accept responsibility for any loss incurred by any third party as a result of installing data.

Project: Cabot Lane Project: Cabot Lane

675

X

Luminaire. Wall Mounted6

All1 glazing2 and trickle vents 1 2 44 acoustic as acoustic report to

LIVING ROOM 12.5mm plasterboard on dabs, plaster skimmed to finish, 100mm Blockwork, 100mm X X cavity filled with 50mm insuation, 100mm Brickwork.

Emulsion paint as Spec Ref: M60/110 Hygenic paint as Spec Ref: 12.5mm plasterboard, 100mm blockwork, 12.5mm plasterboard wall LIGHTING AND SMALL POWER Durgo

X

10100

3

4050

Details

Threshold Detail: Front Door

Proposed Details 1

Proposed South West Elevation - House Type 1 Proposed South West Elevation - House Type 1

Revisions: Revisions:

675

2500

C1 C2

675

C/ H+O

C1 C2

Bathroom

Air vents for beam block Air vents for beam andand block floorfloor

2

X

FLOOR

Emulsion paint as Spec Ref: M60/110 W1 Johnson Prismatic 150x150 tiles: W2 Megaflo water tank. 2 no. rows to form splashbacks to kitchen and TBC basins. Full wall tiling to walls over baths and showers. Use hygenic paint in wet areas. 5

Refer to structural engineers information for foundation design

1500mm close boarded timber fencing as spec 1500mm highhigh close boarded timber fencing as spec ref: ref: Q40 / 310 min 150mm from external ground level Q40DPC /DPC 310 min 150mm from external ground level

DRAFT DRAFT comply with planning condition. 1D-03

Weak mix concrete to infill cavity 225mm below FFL

Extract fan grille. 140x140mm plastic. Extract grille. greygrey plastic. Airfan vents for 140x140mm beam and block floor Air vents for beam and block floor

X

1500

Hall

100mm thick dense concrete blocks to below ground level

X

All glazing and trickle vents acoustic as acoustic report to comply with planning condition. FINISHES SCHEDULE

50mm thick cavity insulation secured to inner leaf with stayfix RT2 wall ties, and retaining discs. As spec ref: F30/155

2

Digital Transmissions: This data is supplied only as a means to aid you in the production of your work, the data should always be checked against the hard copy of the drawing. Some of the data may have been produced by importing data from external sources, checked against the hard copy of the drawing. Some of the data may have been produced by importing data from external sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within 00 the CAD data file. No third party shall issue footprint architects data/drawings without the written approval of FootprintArchitects. the CADUnless data file. No thirdstated, party shall issue footprint architects data/drawings without the writtendimensions approval ofonly. FootprintArchitects. Notes: otherwise this drawing for cannot information Do scale. not scale. Use figured Check alladimensions General Notes: Notes: Unless otherwise stated,all this drawing is forisbut information only.only. Do not Use figured dimensions Check all as dimensions FootprintArchitects check data for viruses accept responsibility for any loss incurred by only. any third party result of General Notes: FootprintArchitects check all data for viruses butcommencing cannot accept responsibility for any loss incurred by any third party as a result of oninstalling site advise of any discrepancies before on site. on site andand advise of any discrepancies before commencing workwork on site. data. installing data. Digital Transmissions: is supplied a means to you aid you in production the production of your work, the data should always Digital Transmissions: ThisThis datadata is supplied onlyonly as aas means to aid in the of your work, the data should always be be checked against the hard of drawing. the drawing. Some of data the data have been produced by importing external sources, checked against the hard copycopy of the Some of the maymay have been produced by importing datadata fromfrom external sources, discrepancies occurred during procedure. FootprintArchitects cannot accept responsibility for any discrepancies within discrepancies maymay havehave occurred during this this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within 0 0 the CAD No third party issue footprint architects data/drawings without written approval of FootprintArchitects. the CAD datadata file. file. No third party shallshall issue footprint architects data/drawings without the the written approval of FootprintArchitects. FootprintArchitects check all data for viruses but cannot accept responsibility for any incurred by any party a result FootprintArchitects check all data for viruses but cannot accept responsibility for any lossloss incurred by any thirdthird party as aas result of of installing data. installing data.

Brick plinth to FFL, min. 4 courses below ground level. As spec F10/385

VOID

Pp ro s e Sd o S h eW Pro op so ed uo t hu t W s te sEt l eEvl e a tv iaot ni o -n H- o H uo su e sTe y T py e p1e 1

General Notes: General Notes:

Threshold slot drain to entrance door bedded on compacked sand. Compressable foam between drain and manonry

1500mm high close boarded timber fencing as spec ref: 1500mm high close boarded timber fencing as spec ref: Q40 / 310 Q40 / 310

White UPVC french doors as spec. Flush threshold with DRAFT 4050 DRAFT raised decking.

X

10100

6

Cup'd

DPC turned up face of blockwork and lapped and sealed to DPM

North West Elevation - House Type 1

X

2485

BedroomBathroom 03

White UPVC rainwater guttering downpipes as spec White UPVC rainwater guttering andand downpipes as spec H60/100 ref: ref: H60/100

X

Hall

Celotex FR5000 100mm thick insulation 1200 gauge min DPM lapped and taped to DPC Beam and Block floor construction to specialist contractors design

150mm external ground DPCDPC min min 150mm fromfrom external ground levellevel

F1 Engineered timber floor as Spec Ref: M50/150 495 F2 Tiles as Spec Ref: M50/150 12.5mm plasterboard on dabs, F3 Carpet to clientplaster spec skimmed to finish, WALLS 100mm Blockwork, 100mm

FFL

Extract fan grille. 140x140mm grey plastic. Extract fan grille. 140x140mm grey plastic.

- House Type 1 House Type 1

X

Cup'd

Timber entrance door. Threshold to be low profile / DDA compliant. As spec L20/410

75mm thick floor screed

2

Elevations

In addition all space lighting will be only capable of accepting lamps having a luminous efficacy D-03D-03 P r o p o s e circuit d North West Elevation greater than 40 lumens P r o p o per s e d N o r t h Watt West Elevation ProposedElevations ElevationsType Type 1 Proposed P r o p o s1e d

LIGHTING AND SMALL POWER

m 03

Insulation to edge of screed to reduce cold bridging

50mm concrete or fine aggregate laid on sand.

French doors lights. As spec L20/410. French doors withwith fixedfixed sideside lights. As spec ref: ref: L20/410. Level threshold including drain Level threshold including slot slot drain lapped to underside of door carried DPCDPC lapped to underside of door andand carried wellwell into into slot slot drain drain

Foul Drainage: P r o p o s e d N o r t h W e s t E l e v a t i o n - H o u s e T y p e 1 See structural engineers information White UPVC french doors as Notes: Unless otherwiseexisting stated, this drawing is for information only. Do not scale. with Use figured dimensions only. Check all dimensions Redirect manholes close to proposed Notes: Unless otherwise stated, this drawing Type is spec. for information only.threshold Do not scale. Use figured dimensions only. Check all dimensions Elevations 1 Flush on siteProposed andProposed advise of any discrepancies before 1 commencing work on site. Type 675 on site and advise of anyElevations discrepancies before commencing work on site. building to engineers specification raised decking. Digital Transmissions: This data is supplied only as a means to aid you in the production of your work, the data should always be

Emulsion paint as Spec Ref: M60/110 Hygenic paint as Spec Ref:

DPM dressed into entrance door threshold

Jewson Renaissance Brick Jewson Renaissance RedRed MultiMulti Brick

French doors with fixed side lights. As spec ref: L20/410. French doors with fixed side lights. As spec ref: L20/410. Level threshold including slot drain Level threshold including slot drain DPC lapped to underside of door and carried well into slot External lights DPC lapped tomounted underside of door and carried well into slot External wallwall mounted lights drain drain

+ 0.000 + 0.000 FFLFFL

2500

+ 25.21 RIDGE

1:10

White UPVC rainwater guttering and downpipes as spec White UPVC rainwater guttering and downpipes as spec ref: H60/100 ref: H60/100 boards and soffits to rafter tails. Painted 18mm 18mm faciafacia boards and soffits to rafter tails. Painted as spec as spec ref: ref: Jewson Renaissance Red Multi Brick Jewson Renaissance Red Multi Brick

External wall mounted lights Brick Jewson Renaissance External wall mounted lights Jewson Renaissance RedRed MultiMulti Brick

CEILING

5

Front Door Head

2

4620

W-03 W-03

· General security lights designed to only + 0.000 + 0.000 FFL accommodate energy efficient fittings and are FFL D-03 fitted with daylight cut off sensorsD-03 or timers

2700

Megaflo water tank. Position TBC

12.5mm Plasterboard

EPDM to all window/door openings. To be dressed over internal face of masonry by min 150mm and sealed to window/door to provide air tightness

500 gauge vapour control layer between insulation and screed

UPVC framed double glazed windows. As spec UPVC framed double glazed windows. As spec ref: ref: Jewson Renaissance Red Multi Brick L10/360 Jewson Renaissance Red Multi Brick L10/360 All glazing trickle vents acoustic as acoustic All glazing andand trickle vents acoustic as acoustic report to comply planning condition. report to comply withwith planning condition.

· Burglar security lights have maximum wattage of 150w and incorporate PIR sensors with daylight cut off sensors.

cavity filled with 50mm Emulsion paintinsuation, as Spec Ref: M60/110 100mm Brickwork. Johnson Prismatic 150x150 tiles: Position 2 no. rows to form splashbacks to kitchen and basins. Full wall tiling to walls over baths and showers. Use hygenic paint in wet areas. Wood burning stove and flue CEILING as spec

W1 W2

A/L_(2-)004

2921

W-03 W-03

W-04

+ 2.700 + 2.700 1ST1ST FFLFFL

F1 Engineered timber floor as Spec Ref: M50/150 F2 Tiles as Spec Ref: M50/150 F3 Carpet to client spec WALLS

Pp ro s eN d oN ev Pro op so ed r tohr t Eh a E sa t sEt l eEvl a t iaot ni o -n H- o H uo su e stey pt y e p1e 1

18mm facia boards and soffits to rafter tails. Painted 18mm facia boards and soffits to rafter tails. Painted as spec ref: as spec ref:

18mm boards soffits to rafter Painted 18mm faciafacia boards andand soffits to rafter tails.tails. Painted as as UPVC framed double glazed windows. As spec ref: spec UPVC framed double glazed windows. As spec ref: spec ref: ref: L10/360 White UPVC rainwater guttering downpipes as spec L10/360 White UPVC rainwater guttering andand downpipes as spec AllH60/100 glazing and trickle vents acoustic as acoustic ref: ref:All H60/100 glazing and trickle vents acoustic as acoustic report to comply with planning condition. report to comply with planning condition.

2465

80

11

Fix ceiling first and seal all gaps between the ceiling and masonry wall with flexible sealant. Proprietary lintel to S.E. details, to generally be no more than 3.2mm thick, to be fully insulated and to not have base plate

B

W-04 All external space lighting will beW-04 specifically + 2.700 + 2.700 designed to accommodate only energy efficient 1ST FFL 1ST FFL fittings. All security lighting is designed for energy efficiency and is adequately controlled such that: W-04

FLOOR

80

11

1 no. layer 12.5mm Wallboard plasterboard fixed to U/S of joists. Plasterboard taped and jointed, and painted to finish. As spec ref: K10/245

2

All external space lighting will be specifically designed to accommodate only energy efficient fittings. All security lighting is designed for energy efficiency and is adequately controlled such that:

FINISHES SCHEDULE

Jewson Renaissance Red Multi Brick 1ST FLR LVL

100mm thick mineral wool acoustic insulation to floor joist zone. Between habitable rooms

X

Electrical layout to be replicated on unit 4

+ 28.30 RIDGE

Joists, wall hangers, and deck over, to structural engineers specifications

Double glazed rooflights. As Spec Double glazed rooflights. As Spec Ref:Ref:

X

4

to maintain air barrier line. As Spec Ref: P20/110

DPC to return under door threshold

+ 5.310 + 5.310 EAVES EAVES

4

1:10

Stove/burner As Spec Stove/burner flue.flue. As Spec Ref:Ref:

18mm facia boards and soffits to rafter tails. Painted as 18mm facia boards and soffits to rafter tails. Painted as spec ref: spec ref: White UPVC rainwater guttering and downpipes as spec White UPVC rainwater guttering and downpipes as spec ref: H60/100 ref: H60/100

Electrical layout to be replicated on unit 4

Foul Drainage: See structural engineers information Redirect existing manholes close to proposed building to engineers specification

Eaves

Double glazed rooflights. As Spec Ref: Double glazed rooflights. As Spec Ref:

Stove/burner As Spec Stove/burner flue.flue. As Spec Ref:Ref:

In addition all space lighting will be only capable of accepting lamps having a luminous efficacy greater than 40 lumens per circuit Watt

Timber decking to garden as Timber decking to garden as spec ref: Q55 / 110 spec ref: Q55 / 110

1

Stove/burner flue. As Spec Ref: Stove/burner flue. As Spec Ref:

Stove/burner flue. As Spec Ref: Stove/burner flue. As Spec Double glazed rooflights. AsRef: Spec Double glazed rooflights. As Spec Ref:Ref: Proximity of rooflight ridge tilebe tochecked be checked Proximity of rooflight andand ridge tile to on on site.site.

+ 5.310 + 5.310 EAVES EAVES

Site Plan

Jewson Renaissance Red Multi Brick

Timber decking to garden as Timber decking to garden 125x22mm MDF skirtings,as painted to spec / 110 SealQ55 to floor with flexible sealant specfinish. ref: ref: Q55 / 110

A/L_(2-)004 Double glazed rooflights. As Spec Ref: Double glazed rooflights. As Spec Ref: Proximity of rooflight and ridge tile to be checked on Proximity of rooflight and ridge tile to be checked on site. site.

White UPVC rainwater guttering with overflow and downpipes fixed to 18mm timber fascia board fixed to 18mm battens to rafter tails, painted to finish.

Full fill insulation

W-05 W-05

Proposed North East Elevation - House type 1 P floor. roposed North East Elevation - House type 1 Provide air bricks periscopic vents to ventilate proposed suspended Provide air bricks andand periscopic vents to ventilate proposed suspended floor. Openings should be not either 1500mm²/m of external Openings should be not lessless thanthan either 1500mm²/m run run of external wallwall or or 500mm²/m² of floor area, whichever gives greater opening area. 500mm²/m² of floor area, whichever gives the the greater opening area.

Pp ro s e Sd o S ev Pro op so ed uo t hu t Eh a E sa t sEt l eEvl a t iaot ni o -n H- o H uo su e stey pt y e p1e 1

Proprietary fascia ventilator

Fix ceiling first and seal all gaps between the ceiling and masonry wall with flexible sealant.

W-05 W-05

Air vents for beam block Air vents for beam andand block floorfloor vents to ventilate proposed suspended floor. Provide air bricks and periscopic Provide air bricks vents to ventilate proposed floor. Openings shouldand be periscopic not less than either 1500mm²/m run ofsuspended external wall or Openings should be not lesswhichever than either 1500mm²/m runopening of external wall or 500mm²/m² of floor area, gives the greater area. 500mm²/m² of floor area, whichever gives the greater opening area.

D-01D-01

Wall plate to sit on DPC on top of continuous mortar bed on top of inner leaf

12.5mm foil backed plasterboard ceiling, plaster taped, skimmed and painted to finish, fixed to underside trusses.

UPVC framed double glazed window. As spec ref: 18mm boards soffits to rafter Painted 18mm faciafacia boards andand soffits to rafter tails.tails. Painted as as UPVC framed double glazed window. As spec ref: L10/360 ref: Obscured glazing minimum level 3 specspec ref: M60M60 Obscured glazing minimum leveland 3 downpipes as spec L10/360 Window glazed with obscured glass and on White UPVC rainwater guttering White UPVC rainwater guttering and downpipes as spec Window glazed with obscured glass and on H60/100 restricted to prevent the obscured Extract fan openers grille. 140x140mm grey plastic. glazing ref: ref: H60/100 Extract fan grille. 140x140mm grey restricted openers to prevent theplastic. obscured glazing being negated. Jewson Renaissance Red Multi Brick being negated. Jewson Renaissance Red Multi Brick All glazing and trickle vents acoustic as acoustic All glazing and double trickle vents acoustic asAs acoustic UPVC framed glazed window. spec UPVC framed double glazed window. As spec ref: ref: report to comply with planning condition. report to comply with planning condition. L10/360 Obscured glazing minimum level 3 L10/360 Obscured glazing minimum Entrance canopy buildlevel up to3match roof Window glazed with obscured glass and Entrance canopy build up to match roof Entrance canopy build upglass to match roof Window glazed with obscured and on on Entrance canopy build up to match roof restricted openers to prevent obscured glazing restricted openers to prevent the the obscured glazing being negated. Jewson Renaissance Brick being negated. Boiler flue Jewson Renaissance RedRed MultiMulti Brick Boiler flue and trickle vents acoustic as acoustic All glazing External wall mounted lights on PIR All glazing and trickle vents acoustic as acoustic External wall mounted lights on PIR Extract fan grille. 140x140mm grey plastic. report to comply planning condition. report to comply withwith planning condition. Extract fan grille. 140x140mm grey plastic. 1800mmcanopy high close boarded timberroof fencing as spec Entrance build up totimber match 1800mm high close boarded fencing as spec Entrance canopy Entrance canopy build up to match roof ref: Q40 / 310build up to match roof Entrance canopy build up to match roof ref: Q40 / 310 1800mm high close boarded timber fencing as 1800mm high close boarded timber fencing as Entrance door. As spec ref: L20/410. Level Boiler flue spec ref: Q40 / 310 Boiler flue Entrance door.mounted As spec lights ref: L20/410. External on PIR Level spec ref: Q40 / 310 threshold including slot on drain External wallwall mounted lights threshold including slot drainPIR Extract fan grille. 140x140mm plastic. Extract fan grille. 140x140mm greygrey plastic. 1800mm close boarded timber fencing as spec Air vents for beam and block floor 1800mm highhigh close boarded timber fencing as spec Air vents for beam and block floor ref: Q40 / 310 ref: Q40 / 310 1800mm high close boarded timber fencing 1800mm high close boarded timber fencing as as Entrance door. As spec L20/410. Level / 310 Entrance door. As spec ref: ref: L20/410. Level specspec ref: ref: Q40Q40 / 310 threshold including slot drain threshold including slot drain

W-07 W-07

Breather membrane lapped over ventilator for vented roof

150mm thick Rockwool insulation fitted between truss rafters above ceiling level. 150mm thick Rockwool insulation laid over truss rafters. Ensure no gaps between insulation

18mm facia boards and soffits to rafter tails. Painted as 18mm facia boards and soffits to rafter tails. Painted as spec ref: M60 Photovoltaic Panels to energy consultant report to meet spec ref: M60 Photovoltaic Panels to energy consultant to meet White UPVC rainwater guttering andreport downpipes as spec planning condition White UPVC rainwater guttering and downpipes as spec planning condition ref: H60/100 Extract fan grille. 140x140mm grey plastic. ref: H60/100 Extract fan grille. 140x140mm grey plastic. Photovoltaic panels Photovoltaic panels

+ 25.21 RIDGE + 25.21 RIDGE

· General security lights designed to only accommodate energy efficient fittings and are fitted with daylight cut off sensors or timers

Proprietary eaves ventilator continuation of insulation between roof and cavity wall beneath. Maintain min. 50mm air gap between u/s battens and insulation

SVP Photovoltaic Panels to energy consultant report to meetSVP Photovoltaic Panels to energy consultant report to meet planning condition SVP planning condition SVP Photovoltaic panels Photovoltaic panels

+ 25.21 RIDGE + 25.21 RIDGE

· Burglar security lights have maximum wattage of 150w and incorporate PIR sensors with daylight cut off sensors.

Roof build-up: 30 degree pitch Marley Eternit Thrutone Fibre Cement Tiles as spec ref: H61/105, laid over 50x25mm battens, over breathable membrane, laid over roof trusses to eng spec

SVP SVP SVP SVP Double glazed rooflights. As Spec Double glazed rooflights. As Spec Ref:Ref:

900

W-07

Entrance Canopy to match roof build up 1350 1800

675

rwp

W-06

675

Escape window in accordance with Approved Document B1 section 2.8. 900Opening width 1350450x450mm 1800

rwp

W-07

675

+00.000

PROPOSED GROUND FLOOR PLAN SCALE 1:50

PROPOSED FIRST FLOOR PLAN SCALE 1:50

PROPOSED FIRST FLOOR PLAN SCALE 1:50

- House Type 1

Brief | To design a set of simple, sustainable and affordable houses. Response | I put together a Building Regulations package including construction details, electrical layouts, sanitary layouts and site setting out. In addition to this an outline specification. This project saw me develop my knowledge in construction, client and consultant liaison and detailed design. These drawings were produced in my first use of BIM software. Following approval I will also be producing construction drawings.

10

CABOT LANE | FOOTPRINT ARCHITECTS 2016 | BUILDING REGULATIONS | POOLE

g ons is for information only. Do not scale. Use figured dimensions only. Check all dimensions General Notes:

Proposed Floor Plans

General Notes:

Revisions:

Proposed Floor Plans

Notes: Unless otherwise stated, this drawing is for information only. Notes: Do not Unless scale. otherwise Use figured stated, dimensions this drawing only. Check is for information all dimensions only. DoGeneral not scale. Use figured dimensions only. Check all dimensions Notes: on site and advise of any discrepancies before commencing work on onsite. site and advise of any discrepancies before commencing work on site. Revisions: Project: Digital Transmissions: This data is supplied only as a means to aid you Digital in the Transmissions: production ofThis yourdata work, is supplied the data should only asalways a means beto aid you in the production of your work, the Project: data should always be

DRAFT

General Notes:

DRAFT

Revisions:

Revisions:

Project: Cabot Lane

N

Project: Cabot Lane

N


Site Location

Existing

proposed new proposed new additional dormer clad dormer clad additional in vertical grey zinc grey zinc in vertical proposed new proposed new additional additional dormer clad dormer clad in vertical in vertical grey zinc grey zinc

existing dormer existing dormer insulated, reclad in insulated, reclad in vertical greyvertical zinc and grey zinc and reduced in size existingindormer reduced size existing dormer insulated, reclad in insulated, reclad in vertical grey vertical zinc andgrey zinc and reduced size Existingreduced Roofline inreduced size Existing Rooflineinreduced

10 08

10 08

09 10 08 01 09

09 10 08 01 09

09 09 Existing Roofline reduced Existing Roofline reduced 09

09

02 10

01 09

01 09

01

01

FL+ 15.33

FL+ 15.33

FL+ 15.33

FL+ 15.33

P006

FL+ 15.33

10 03

02

02 02

FL+ 12.53

FL+ 12.53

FL+ 12.53

03

03

02

s1.00 h1.76

FL+ 12.53

FL+ 12.53

02

03

03

07

07

FL+ 12.53

02

02

02

02

max3.50

02 10 02

02 02

03 09

FL+ 15.33

03 01 FL+ 15.33

03 09

P007P007 P007P007

min2.32

10 03

proposed new proposed new additional dormer clad dormer clad additional in vertical grey zinc grey zinc in vertical proposed new proposed new additional additional dormer clad dormer clad in vertical in vertical grey zinc03 grey zinc03

Precedent

min2.32

FL+ 15.33

03 01

Proposed

FL9.24

FL+ 12.53

FL+ 12.53

P005 min2.03

h2.13 h2.06 FL+ 09.72

ge rid .07 17 of ro 1.88 1

8.95

9.03

737

roof light

shower ch 2.0

800

9.28

8.97

8.98

9. 02

9.45

s ca ble o/h

h1.96

able

s

h2.05

o/h c

9.47

brick wall 9.41

9.23

9.50

9.34

9.46 9.54

footpath

9.38

8.92 8.96 1.8m wood panel fence

towel rack

en-suite cupboard

g in ch at t m poin

min 2.0

9.09

min 1.7

0.7m brick wall

s0.87 h2.16

s0.84 h2.11 flashing on flat roof to be replaced

ge 0 rid 7.9 1

9.43

8.98

FL12.53 ch2.53

8

9.15 9.10 tt 6 .7 96 ia 17 8. 00d 2 05 ia 9. 00d 4

2

g in ch at t m poin

09 9.

9 8.

9.31

8.9

g in nt pla

91 ia 8. 00d 2

ed sh

arch h2.28

tt 33 . ia 20 00d 3

5

tw 8.91 9.08 8.92

5

93 8. el av gr

footpath

4

9.0 3

0 9.

8.9

9.01

9.36

1.8m close board fence 9.02

9 8.

5

95 ia 8. 00d mp 6 tu s

9 8.

tw .29 9

9.00

09 9.

ge 9 rid 2.9 1

th .24 9

8.96

h1.88

cupboard

700

master bedroom ch 2.0

provide new stair above existing stair 900mm8.wide 92

8.98

8.95

799

existing stair to be removed

s1.67 h2.10

0

3 8.9

8.97

bs sla

s ve ea 1.66 1

th .31 9

el av

9.20

gr

9.00

FL12.53 ch2.54

landing

g in nt

ss 9 8.

94 8.

h1.98

1.8m wood panel fence

tw .09 9

a gr

ss

8.98

9.09

tw .41 9

4

96 ia 8. 00d 1

2

6

9

a gr

FL12.53 ch2.52

up 9. 0

pla

9 8.

9 8.

9 8.

ROAD

p

9.01

9.01

3

05 9.

9.18 eaves 9.43 11.81

9.59

th .72 4 9 9.7

9.32

sa

9

9.02

bs sla 9.14

ge 9 rid 3.1 1

planter

9.04

9.00

9.07

tw .09 9

9 8.

ia 0d 20

8.9 4

8.95

h1.88

existing hip tiles to be replaced ch2.17 with new grey hip tiles to match existing roof tiles s ve 0 ea 4.6 1

Site Plan

30 9.

6 tw 2.1 1

10

5 tw 2.1 1

11

40 9.

11

P r o p o sPe rdo p E oa s et dE lEeavsatt iEolne v a t i o n c a l e 1S : c1 a0 l0e 1 : 1 0 0 8.00m DATUM 8.00m SDATUM

9.20

.98

9. 0

9.12

9.21

9.24

h1

FL12.53 ch2.53

1.8m wood panel fence

9.06

8.99

existing dormer insulated, reclad in vertical grey zinc and reduced in size

5 tw 2.5 1

Elevations

P r o p o sPe rdo p N oo sr e t hd EN loervt ah t iEolne v a t i o n 8.00m DATUMS c a l e 1S: c1 a0 l0e 1 : 1 0 0 DATUM

9.35

2

c a l e 1S: c1 a0 l0e 1 : 1 0 0 8.00m SDATUM 8.00m DATUM

Key Key 0 1 Brickwork 0 1 Brickwork 10 0 2 Render s0.76 0 2 Render h2.22 Key 0 3 Concrete Tiles Roof Tiles 0Key 3 Roof Concrete s0.77 041 White Brickwork Brickwork 0041 White Window Frame 0PVC PVC Window Frame h2.38 052 White Render Render 0052 White Door Frame 0PVC PVC Door Frame Concrete Concrete Tiles Roof Tiles 0063 Flat Roof 0063 Roof Flat Roof White PVC Window White00PVC Window Frame 0074 Timber Garage Door 74 Timber Garage Door Frame 0 5 White PVC Door 0 5 White PVC Door Frame 0 8 Recessed Light GreyFrame Zinc Cladding 0 8 Vertical Recessed Vertical Light Grey Zinc Cladding 6 Vertical Flat Roof Flat Roof Note Note 0096 Vertical Grey Zinc Cladding 009Dark Dark Grey Zinc Cladding PTimber r o p 0oGarage s eTimber d GDoor r Garage o u n d Door Floor Plan windows doors and replaced All white PVC PVCand windows doors replaced All white 1007 Dark Grey PVC Grey Window Frame 1e071Dark PVC Window Frame S c a l : 1 0 0 0 8 Recessed Vertical Light Grey Zinc Cladding Recessed Vertical Light Grey Zinc Cladding with grey PVC doors and to match with windows grey PVCand windows doors to10match 18 Dark Grey PVC Door Frame 1 1 Dark Grey PVC Door Frame Note Notedormer 029Dark Vertical Dark Grey Zinc Cladding Vertical Grey Zinc Cladding new windows. new dormer windows. 1029 Velux 1Rooflight Velux Rooflight PVCand windows and doors replaced All white windows doors replaced All white PVC 1 0 Dark Grey PVC Window Frame 1 0 Dark Grey PVC Window Frame Project: with grey17PVC windows and doors to1match Project: with grey PVC windows and doors to match 1 1 Dark Grey Frame PVC Door Frame Harland Road 1 Dark Grey PVC Door 17 Harland Road dormer windows. new dormernew windows. 25 Pine Velux Rooflight 1 2 Velux 1Rooflight Court Business | 36 Gervis Road| 36 Gervis Road 5 Pine Centre Court Business Centre

9.10

ch3.68 FL11.35

9.21

35 9.

tw 2.1 1

P r o p o sPerdo pE oa ss et dE E l eavsat t iEol ne v a t i o n

8.00m DATUM 8.00m DATUMS c a l e

10

th .66 9

el

10

p to 15 . 17

ge 0 rid 8.0 1

av gr

g in ch at t m poin

11

9.42

P r o p o sPerdo pNoosr et h d E N loervt ah t iEol ne v a t i o n 1S: c1 a0 l0e 1 : 1 0 0

11

FL+ 09.72

th .73 9 of 4 ro 7.5 1

of 3 ro 5.7 1

FL+ 09.72

39 9.

FL+ 09.72

FL+ 09.72

9.24

FL12.34

9.29

9.43

cl9.36

ch2.72

9.32

9.35

min 2.0

wardrobe

9.07

s1.42 h2.89

9.56 9.40

9.45

h1.98 h1.98

9.42 9.34

min 1.3

min 1.7

cupboard

up

9.40

9.41

h1.99

th .64 9

p to 56 . 17 s ve ea 4.85 1

FL+ 09.72

39 9.

FL9.72 ch2.57

9.43 tw12.39

9.41

el

FL+ 09.72

FL9.72 ch2.57 1.2m close board fence 1 9.38

9. 4

48 9.

FL+ 09.72

g in ch at t m poin

av gr

9.45

9.33

New log burner to be connected to existing chimney FL+ 09.72

5

9.45u/s2.40

41 9.

FL+ 12.53

9.43

h1.98 FL+ 12.53

ch2.56

39 9.

ch1.63

9.43 9.30

up

3 9.

gas

el av gr

u/s/c

9.50

FL+ 12.53

03 FL+ 12.53

8 .4 8 cl9il8.5 m 0m 10

min1.54

s1.10 h2.10

tw 10.38

02

FL9.72 ch2.57

s1.03

min 1.1

roof light

FL12.53 ch2.56

9.0 2

0.7m brick wall

footpath

s ve 5 ea 2.1 1

ch2.58 proposed new hatchdormer clad additional abovegrey zinc in vertical FL12.53

s1.26 h2.12

1.8m wood panel fence 9.46 9.45

9.42 concrete h2.30 9.38

9.44

FL+ 12.53

s0.91 h1.60

fence

9.48

9.52

02

9.28

FL+ 12.53

FL+ 12.53

8.00m

proposed roof lights

ge 5 rid 7.4 1

s ve ea 4.74 1

9.55

9.57

h1.96

ch2.21 h1.98

9.45

FL+ 12.53

09

FL+ 15.33

02

1.2m wood panel

s0.80 h2.14

s1.28 on chimneys flashing h2.12 to be replaced

9.39

FL+ 15.33

47 9.

10 02 03

9.44

09

FL+ 15.33

09 08

9.34 9.35

10

s1.03 h2.30

FL9.74 ch2.49

2

09 08

FL+ 15.33

02

03 02

03

FL+ 15.33

s0.91 h2.02

9.36

02

u/s2.18

5 9.

FL+ 15.33

FL+ 15.33

02

max3.20

0

FL+ 15.33

09 10

FL+ 09.72

6 9.

09

existing dormer existing dormer 11 10 insulated, reclad in 11reclad in 10 insulated, vertical greyvertical zinc and grey zinc and reduced size existingindormer reduced size existing in dormer insulated, reclad in insulated, reclad in zinc and vertical grey vertical zinc andgreyExisting Roofline reduced Existing Roofline reduced reduced in size reduced in size 10 10 Existing Roofline reduced Existing Roofline reduced 08 08 10 10

12 10 08 09 12

10

8.00m DATUM

P r o p o sPe rdo p Woesset d E W l eevsatt iEol ne v a t i o n l0e 1 : 1 0 0 l 8.00m e 1S: c1 a0 DATUM S c a DATUM 8.00m

Concept

9.50

proposed new proposed new additional dormer clad dormer clad additional in vertical grey zinc grey zinc in vertical proposed new proposed new additional additional dormer clad dormer clad in vertical in vertical grey zinc grey zinc

10

FL+ 09.72

ge 8 rid 7.1 1

8.00m DATUM

d E S loeuvt aht iEol ne v a t i o n P r o p o sPe rdo p S oo su et h a l e 1S: cDATUM 1 a0 l0e 1 : 1 0 0 8.00m 8.00mS cDATUM

10 11

s2.57 h2.92

9.40

existing dormer existing dormer insulated, reclad in insulated, reclad in vertical greyvertical zinc and grey zinc and reduced size existingindormer reduced size existing in dormer insulated, reclad in insulated, reclad in vertical grey vertical zinc andgrey zinc and reduced in size reduced in size 10 10 08 08

P r o p o sPerdo pWoesset d EW l eevsat t iEol ne v a t i o n l e 1S: c1 a0 l0e 1 : 1 0 0 S c a DATUM 8.00m

s2.57 h2.92

9.59

11

P r o p o sPerdo pS oo suet d h S Eo l euvt ah t iEol ne v a t i o n a l e 1S: c1 a0 l0e 1 : 1 0 0 8.00mS cDATUM

FL+ 09.72

min2.45

FL+ 09.72

FL+ 09.72

12 10 08 09 12

07

07

u/s2.35

FL+ 09.72

HARLAND

02

h1.60

FL+ 09.72

h1.64

02

Second Floor Plan

Proposed First Floor Plan Scale 1:100

Proposed Second Floor Plan Scale 1:100

Brief | To renovate an existing dwelling and convert an existing second floor and dormer into a comfortable master bedroom. Proposed Elevations Proposed Elevations Response | To re-clad the existing dormer in Anthra Zinc, add an new dormer to create better access to the second floor, replace existing roof tiles and render the brickwork white to match. A neutral material palette was chosen so Proposed Floor Plans the extension would be modest and not date. The second floor is arranged to have a well lit staircase, master bed and wardrobe with views out to the garden. I worked on the concept ideas, layout and planning package. I leanrt about designing for a clients needs and working with the planning process.

Proposed Elevations Proposed Elevations

Revisions:

General Notes:

1 Notes: 0 General

1

0

2 1

2

4

2

1

2

4

(1:100)

4

4

(1:100)

Revisions:

8m(1:100) 8m Revisions:

8m(1:100)

8m

Revisions:

Elevations Subject: Proposed Proposed Elevations Subject: | BH1 3DH Bournemouth | Dorset | Dorset | BH1 3DH Bournemouth Project: 17 Harland Road Project: 17 Harland Road Tel: 07725310271 585526 | 01202 585526 Tel:| 01202 07725310271 PLANNINGStatus: Date: Scale: 1:100@A3Scale:Status: PLANNING Dec 2015Date: Dec 2015 1:100@A3 email: enquiries@footprintarchitects.co.uk email: enquiries@footprintarchitects.co.uk 5 PineCentre Court Business Centre | 36 Gervis Road 5 Pine Court Business | 36 Gervis Road Proposed Site Plan Notes: Unless otherwise stated,Drawing: this drawing is for information only. Do notweb: scale.www.footprintarchitects.co.uk Use figured dimensions only. Check all dimensions General Notes: 7170 Drawing: Project Ref: 7170_P007 7170 Project Ref: 7170_P007 Proposed Elevations Subject: www.footprintarchitects.co.uk Proposed Elevations Subject: | Dorset | BH1 3DH Bournemouth | Dorset | BH1 3DH Bournemouthweb: on site and advise of any discrepancies before commencing work on site. work, the data should always585526 be Digital Transmissions: This data is supplied only as a means to aid you in the production of your Tel: 07725310271 | 01202 Tel: 07725310271 | 01202 585526 PLANNING Notes:1:100@A3 Unless otherwise stated, drawing forStatus: information only. Do notof scale. Use may figured dimensions only. Checkby all dimensions Scale: 1:100@A3 PLANNING Date: Dec 2015 Scale: Status: checked against thethis hard copyisof the drawing. Some the data have been produced importing dataGeneral from Notes: external sources, Date: Dec 2015 on site and advise of any discrepancies before commencing work on site. email: enquiries@footprintarchitects.co.uk email:cannot enquiries@footprintarchitects.co.uk discrepancies may is have occurred during this procedure. FootprintArchitects accept responsibility for any discrepancies within This data supplied only as a 7170_P007 means to aid you in the production of your work, the data should always be Digital Transmissions: 7170 Drawing: Project Ref: web: www.footprintarchitects.co.uk 7170 Drawing: Project 7170_P007 web: www.footprintarchitects.co.uk the CAD file. Nothethird partySome shall footprint architects data/drawings without the written approval of FootprintArchitects. checkedRef: against the data hard copy of drawing. ofissue the data may have been produced by importing data from external sources, FootprintArchitects for viruses but cannot accept responsibility for any loss incurred by any third party0as a result discrepancies may have occurredcheck duringall thisdata procedure. FootprintArchitects cannot accept responsibility for any discrepancies within 2 of the CAD data file. Nodata. third party shall issue footprint architects data/drawings without the written approval of FootprintArchitects. installing FootprintArchitects check all data for viruses but cannot accept responsibility for any loss incurred by any third party as a result of installing data.

11

4

Revisions:

N

Revisions:

0

1

2

8

HARLAND ROAD | FOOTPRINT ARCHITECTS 2016 | PLANNING | BOURNEMOUTH

4

(1:200)

16m

(1:100)

8m

N

Notes: Unless otherwise stated,otherwise this drawing is forthis information only. not scale. Use dimensions only. dimensions Check all dimensions Notes: Unless stated, drawing is for Do information only. Dofigured not scale. Use figured only. Check allGeneral dimensions Notes: on site and adviseonofsite anyand discrepancies before commencing workcommencing on site. advise of any discrepancies before work on site. Digital Transmissions: data is supplied means to aidasyou in the production of the yourproduction work, the of data should beshould always be Transmissions: Thisonly dataas is asupplied only a means to aid you in your work,always the data DigitalThis checked against the hard copy of the the dataSome may have importing databy from externaldata sources, checked against the drawing. hard copySome of theofdrawing. of thebeen dataproduced may havebybeen produced importing from external sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept for any discrepancies within discrepancies may occurred during this procedure. FootprintArchitects cannot accept responsibility foronly. any discrepancies within 0 Notes: Unless otherwise stated, drawing is for Do information notresponsibility scale. Use figured dimensions Check allGeneral dimensions Notes: Unless otherwise stated, thishave drawing is forthis information only. not scale.only. UseDo figured dimensions only. Check all dimensions Notes: the CAD data file.the NoCAD thirdand party shall issue footprint architects data/drawings without thesite. written approval FootprintArchitects. file. Noof third party shall issue footprint data/drawings without theof written approval of FootprintArchitects. advise any discrepancies before work on on site and adviseon ofsite anydata discrepancies before commencing workcommencing onarchitects site. FootprintArchitects check Transmissions: all data forcheck viruses cannot acceptonly responsibility forto any by any third partywork, asany a result of FootprintArchitects allbut data for viruses cannot responsibility forproduction any loss by third party as aalways result of This data is asupplied as a means aidloss youincurred in the of your the data should be Digital This data is supplied only as means but to aid you inaccept the production of your work, theincurred data should always be Digital Transmissions: installing data. installing checked against thedrawing. hard copy of theofdrawing. of the dataproduced may have produced importing from external sources, checked against the harddata. copy of the Some the data Some may have been bybeen importing databy from externaldata sources, discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within discrepancies may have occurred during this procedure. FootprintArchitects cannot accept responsibility for any discrepancies within 0 Noissue thirdfootprint party shall issue footprint architects data/drawings theofwritten approval of FootprintArchitects. the CAD data file.the NoCAD third data partyfile. shall architects data/drawings without the writtenwithout approval FootprintArchitects. FootprintArchitects data for viruses cannot accept responsibility for any lossthird incurred thirdofparty as a result of FootprintArchitects check all data for check virusesallbut cannot acceptbut responsibility for any loss incurred by any partyby as any a result installing data. installing data.

Project:

17 Harland Road

Status: PLANNING

Project Ref: 7170

Drawing: 7170_P005

17 Harland Road

5 Pine Court Business Centre | 36 Gervis Road Bournemouth | Dorset | BH1 3DH

Subject: Proposed Floor Plans

5 Pine Court Business Centre | 36 Gervis Road PLANNING Scale: 1:100@A3 | Dorset | BH1Status: 3DH Bournemouth

Subject: Proposed Site Plan Scale: 1:200@A3

Project:

Date: Dec 2015

Tel: 07725310271 | 01202 585526 Drawing: Project Ref: 7170 7170_P006 email: enquiries@footprintarchitects.co.uk web: www.footprintarchitects.co.uk

Date: Dec 2015

Tel: 07725310271 | 01202 585526 email: enquiries@footprintarchitects.co.uk web: www.footprintarchitects.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.