Professional work / Make Architects / 2016 -
- My involvement on this project was from RIBA stage 2 until its current stage 5-6. This building will be leased by HMRC for 25 years. The developer is ACDL. This is a Revit BIM level 2 project. - 3AC is part of the wider Arena Central masterplan designed by Make. The masterplan consists of five buildings, three of which have already been granted planning permission and two are on site. 3AC, received planning permission in December 2017 and is currently on site, due for completion in 2020. - I was able to deliver a successful planning application in a small team of 2 people and to be present at the contract negotiation meetings. Leading the legal drawings set gave me opportunity to understand the legal side of the project. In a bigger team I lead the core design. I had a close relationship with the client, the contractor and all consultants and sub-contractor and was present on all design team meetings.
3 Arena Central
Office building / Birmingham , UK / On site /// 3 basements, GF + 13 / 30,000 sqm internal area
Core studies sketch
Typical floor plan of 3AC
Commented core structural drawing General Notes 1. Dimensions are in millimetres unless stated otherwise. 2. Levels are in metres AOD unless stated otherwise.
01
02
03
04
05
06
3. Dimensions govern. Do not scale off drawing.
07
4. All dimensions to be verified on site before proceeding. 9125
9000
9000
9000
10495
5. All discrepancies to be notified in writing to Make Limited.
10630
Š Make Limited 2017
2729
H
G Goods lift lobby
Stair lobby
9396
Fire fighting lobby
Door and acc. toilet layout to alternate on every other floor
F 3000
E
Male WC Lift lobby
9000
6000
Female WC
04 01.12.17 Stage 3 Issue 03 06.10.17 GA issue 02 13.06.17 Agreement for lease 01 25.04.17 Agreement for lease 00 03.11.16 GA update REV Date Description
3000
D
RWM RWM JP JP JP Chk
STAGE 3
C
DRAWING STATUS
9000
32 Cleveland Street, London, W1T 4JY
tel +44 (0) 20 7636 5151
Office
info@makearchitects.com www.makearchitects.com Client
B
9125
Key plan
A
Project
3 Arena Central Drawing Title
Typical Office Floor Plan Levels 02-13 Scale at A1
Date
Project No.
Rev No.
1 : 100
Scale 1 : 100
0m
Visualisation of 3 Arena Central view from Bank Court
Visualisation of Arena Central Masterplan
1
1254
m 2
5
10
11/11/16
Draw No.
04
C4257-MAKE-ZZ-ZZ-DR-A-A2102
Site progress, November 2018
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2015 - 2017
- I was working on the feasibility and massing studies of this project and later I was involved in the RIBA stage 3 issue working on the core and internal areas including the basement cycle facilities. - 1 Leadenhall is a skyscraper that we worked on together with Brookfield. During the early days of the design I was able to learn the demands of the client and how this high-end projects differ from the other ones. I had a close relationship with the client and attended all design team meetings. - Developing more than 300 massing studies I also had to make sure that the building has the required office area. I worked on the design of the public terrace on level 2 and later during stage 3 I was leading the internal areas and coordinating the design with the sub-consultants. I was working on the interior of this areas which was a steep learning curve of how to design a high-end interior spaces.
1 Leadenhall Street
Office skyscraper / London , UK /// 36 storeys + basements / 65,000 sqm GEA Typical floor plan
General Notes 1. Dimensions are in millimetres unless stated otherwise. 2. Levels are in metres AOD unless stated otherwise.
M
3. Dimensions govern. Do not scale off drawing.
L
1 A2210
4. All dimensions to be verified on site before proceeding.
J
5. All discrepancies to be notified in writing to Make Limited.
1 A2211
K
Š Make Limited 2017
Based on building and topographical information by SES received on 22.02.2017
A2120
H 06
05
Public terrace plan
09 OFFICE
WC FEMALE
08
FIRE CURTAIN
FL1
PL11
PL10
PL12
PL9
PL13
PL8
PL14
PL7
PL15
PL6
PL1
04
A2123 +85.930
FIRE CURTAI N
1 A2212
FIRE CURTAI N
AWC
REFUGE
GL1
07
REFUGE
GL2
PL2
LOW & MID RISE TRANSFER LOBBY
1
PL3
A2122
A2412
PL4
WC MALE PL5
03 CW OPERATING PANEL
FIRE CURTAIN
04 03 02 01 00 REV
31.07.17 30.06.17 26.05.17 13.04.17 29.08.16 Date
Stage 3 JT Final Draft Stage 3 JT Draft Stage 3 Issue JT Interim Stage 3 Issue JT For Information JT Description Chk
STAGE 3 DRAWING STATUS
02
32 Cleveland Street, London, W1T 4JY
tel +44 (0) 20 7636 5151 info@makearchitects.com www.makearchitects.com Client
01
1 Leadenhall Limited Partnership
Keyplan
Project
1 Leadenhall A
B
C
D
A2121
E
F
G
Drawing Title
Level 12 Plan Proposed Scale at A0
1 : 100
Project No.
1007
Draw No.
Date
29.08.16 Rev No.
04
1LS-MAKE-XX-12-PL-A-A2012
Visualisation of 1 Leadenhall Street skyscraper
Visualisation of 1 Leadenhall Street skyscraper
Massing study models
Reception area 3D
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2015
40 Leadenhall Street
- 40 Leadenhall Street (Vanquish) is a 34 storey skyscraper for TIA Henderson. I was working during RIBA stage D design as part of the core team. I was leading the washrooms and cycle facilities package and helping with other parts of the core as well. - Planning was granted in 2014 but works on site haven’t started yet. When built, it will have one of the largest total office area in the city. - While working on this project in a large team I was able to understand how important coordination of the team was and how important the role of the project leader is. We had regular internal and external meetings and more often meetings between the sub-team everyone was part of. I became more confident with my work, learning how to prioritise things and answer on time to the client needs and how to present and defend the designs at a design team meetings and client presentations.
Office skyscraper / London , UK /// 34 storeys + basements Basement plan
Typical lower floor plan
Fire requirements core floor plan
Visualisation of 40 Leadenhall Street skyscraper
Visualisation of 40 Leadenhall Street skyscraper
Visualisation of lift lobby
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2016
Hisa
- Hisa was a small project that I worked individually for several months in 2016. I worked on this house up to RIBA Stage 3 after which local architects took over. - This project showed me the difference between office buildings and private residential houses. It showed how the design is more personal, the comments by the client are personal and the whole design becomes and expression of the current thoughts. There are no areas and current market trends that need to be followed. - This project allowed me to be able to plan my time and manage my workload to be able to finish everything on time and to satisfy the needs of the client.
Private residential house / Bled, Slovenia /// Basement + GF + 1st floor
Elevations
Ground and first floor plan
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2016
Fenix
- I was working on this project from its very beginning until Stage 2 in a small team of 2 people. - This is an office building on an island site in Bratislava for HB Reavis, one of the biggest Slovakian developer that is expanding in the rest of Europe as well. - Being able to develop the brief together with the client and working in a small team I was able to closely understand what are the needs for this project and what does the client want to achieve. I was developing many massing models and conceptual sketches that we would discuss with the client during the meetings. Working on a project outside London with a client that has more experience in that area it was very useful to see the differences of how the project evolves compared to a UK project. Being able to go to a site visit furthermore helped me understand the area and the potential for this project.
Office building / Bratislava, Slovakia /// 2 basements + GF + 8 floors
Massing studies models
Concept sketches
Solar studies
Final visualisation of the building
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2014 - 2015
Aranya
- This project was not done according to the RIBA stages but the stage I was working on was equivalent to stage D drawings. - This is a residential project for Piramal, a developer in India. It is on a large site just next to the zoo in Mumbai. The project consists of podium which is mainly for parking and 2 residential towers with high-end apartments. There are only 4 apartments on each floor. - I was responsible for the 8 levels of podium. The podium consists of parking, MEP spaces and landscape and clubhouse on the roof of the podium. This project was interesting experience to learn how to collaborate with consultants that are not located in the city. We regularly had client and consultants video meetings where we presented our progress. The client meetings were much more different than the ones I have had with UK clients.
Residential skyscrapers / Mumbai, India /// 8 levels podium, 62 levels towers
Typical level of the podium
3D visualisation of the building
3D visualisation interior of the podium
Roof level of the podium
Typical level of the North tower
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2017
Mitre Yard
- I worked on this project during RIBA stage 2, before submitting the planning application. - This is a mixed-use - residential building with apartments intended to be rented. It is located in West London, next to Willesden Junction on a brownfield site as part of the wider redevelopment of the area. The building is intended to attract young professionals and to have co-work facilities. - During my time on the project I was helping with the planning application. Most of the time I spent on developing the roop top terraces and the ground floor including the landscape area around the building.
Residential / Mixed use building / London , UK /// 6-19 floors
Grass on same level as paths
Greenery for privacy
Playground close to entrace
Podium
Big pots with trees
Benches Views
Roof terraces 1 GA_LEVEL_01 1 : 200 REF:2/ PA4000 SK2853 Unnamed
02/12/2016 16:12:42
Views over canal
Corridor as part of the terrace landscape
3D visualisation of the building
Playground
Floor plans with roof top terraces design GA_LEVEL_01 Roof terraces
Big pots with trees
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Make Architects / 2014
80 Charlotte Street
- This was the first project I worked on at Make. I was working on RIBA Stage C. - 80 Charlotte Street is a high-end office and residential building in central London. I was responsible for the core, atria and roof design of the office part. The project started as a refurbishment of the existing building and addition of new facade while in the end a decision was made for the existing building to be demolished and new to be built, exactly the same like the previous design. - It was a unique process to develop this project. The client was very demanding and we ended up drawing several stage C-s. This project has been many years at Make and although generally the design has stayed the same, there were constant small changes and updates. It was also the first Revit project in the studio.
Office and residential building / London , UK /// Basements, GF + 9 floors / 40,000 sqm GIA
Section / Typical plan / Roof plan
3D visualisation of the building and interior
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Gensler / 2012 - 2013
- All of my time during my internship at Gensler I worked on the Selfridges redevelopment in partnership with Renzo Piano Building Workshop. It was one of the leading projects at Gensler at the time lead by the company’s managing director. - Working from the feasibility through to the schematic design I was able to attend client meetings and design workshops which helped me a lot to gain knowledge about the high-end retail architecture and how a project of this scale is delivered through analysing the areas, circulation planning, MEP design and uses of the spaces. The new proposed scheme was changing the interior of the listed building, adding a roof top garden (forest) and adding hotel and leisure areas. As part of this project we completed a small project for the shoe terrace in Selfridges.
Selfridges
Retail / Oxford Street, London, UK 3.
Architecture Sheet Notes
Plans and sections Architecture
3.
A
3. Architecture
A
Sheet Notes
Key Plan
Sheet Notes
EXISTING RAMP INDICATED IN GREY
EDWARD MEWS
Key Plan
Key Plan
A
11.12.12
Revision
Date
ISSUED FOR FEASIBILITY Modification
Landscape Designer
DNA
VOID ABOVE
CDM Coordinator
ISSUED FOR FEASIBILITY
B
12.12.12
ISSUED FOR FEASIBILITY
23.11.12
ISSUED AS FROZEN DESIGN
A
23.11.12
ISSUED AS FROZEN DESIGN
Revision
Date
Revision
Date
Modification
DNA APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.
AREA SCHEDULE GIA Name Label
VOID ABOVE
PAVEMENT 1 PAVEMENT 2 RETAIL RETAIL MEP TEAM FACILITIES TEAM FACILITIES 2 VERTICAL CIRCULATION
F
CDM Coordinator
48 711 1895 14203 543 124 52 1076 18653
Planning Advisor
APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.
REINFORCE 12 COLUMNS IN SWOD
AREA SCHEDULE GIA Name Label
VOID 138sqm
FINANCE, IT BUYING Jones Lang LaSalle& MERCHANDISING FASHION WORKSHOP
HEAD OFFICE HEAD OFFICE MEP LEISURE / SPA MEET & EAT MEET & EAT MEP RETAIL
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom
ET
RETAIL MEP TRAINING
F
Jeremy Gardner Associates
VERTICAL CIRCULATION
2229 70 1745 20 1817 92 8270 354 416 986 15999
Planning Advisor
Blue Sky Building
Cost Consultant
EC Harris
VOID 330sqm
Structural Engineer
MEZZANINE DEMOLISHED
VISTA CORRIDOR
OPENING IN STRUCTURAL WALL FOR VISTA CORRIDOR
VOID 84sqm
Development Manager
EC Harris
F
Services Engineer and Logistic Consultant
Executive Architect
Expedition
Structural Engineer
Architect
RPBW
Development Manager
EC Harris 34 York Way London N1 9AB United Kingdom
Structural Engineer
Development Manager
VOID 65sqm
DOWN TO THIRD
VOID 59sqm Architect
34, Rues des Archives 75004 Paris France
RPBW
UP TO FOURTH
Stanhope plc Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
Expedition
Executive Architect
Gensler
Architect
Renzo Piano Build Workshop
Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
Stanhope plc
Gensler
RPBW
Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
Renzo Piano Building Workshop
Arup
Expedition Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
Arup
Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom Executive Architect
Selfridges & Co
Client
Cost Consultant
13 Fitzroy Street London W1T 4BQ United Kingdom
Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
REINFORCE 6 COLUMNS IN CLASSIC
VOID 170sqm
Stanhope plc
Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
VOID 93sqm
Blue Sky Building
Services Engineer and Logistic Consultant
13 Fitzroy Street London W1T 4BQ United Kingdom
Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
RELOCATE ENTRANCE
Construction Advisor
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
Jeremy Gardner Associates
Blue Sky Building
Cost Consultant
34 York Way London N1 9AB United Kingdom
Arup
WSP Group
Jeremy Gardner Associates 11 Risborough Street London SE1 0HF United Kingdom
WSP Group
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
REINFORCE 6 COLUMNS IN CLASSIC
VOID 160sqm
VISTA CORRIDOR
Jones Lang LaSalle
Construction Advisor
13 Fitzroy Street London W1T 4BQ United Kingdom
Jones Lang LaSal
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom Fire Engineer
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom Fire Engineer
VOID 88sqm VOID 88sqm
34 York Way London N1 9AB United Kingdom Services Engineer and Logistic Consultant
Highways Consultant
PFB Construction Management Services
22 Hanover Square London W1S 1JA United Kingdom Highways Consultant
270 Lafayette Street New York 10012 United States of America
PFB Construction Management Serv
22 Hanover Square London W1S 1JA United Kingdom
270 Lafayette Street New York 10012 United States of America
11 Risborough Street London SE1 0HF United Kingdom
Construction Advisor
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
F
Deborah Nevins and Associates, INC
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
Total Area
LEISURE MEP
WSP Group
CDM Coordinator
11 Risborough Street London SE1 0HF United Kingdom
DUKE STRE
VOID 125sqm VOID 125sqm
DNA
PFB Construction Management Services
Planning Advisor
Modification
Landscape Designer
270 Lafayette Street New York 10012 United States of America
22 Hanover Square London W1S 1JA United Kingdom Highways Consultant
Fire Engineer
VOID ABOVE
VOID ABOVE VOID ABOVE
Deborah Nevins and Associates, INC
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
Total Area
LEISURE
MEZZANINE DEMOLISHED
T
LANDSCAPE AREA ADDED
12.12.12
A
VOID 96sqm
REINFORCE 12 COLUMNS IN SWOD
ORCHARD STREE
17.12.12
B
Landscape Designer
VOID 125sqm
Deborah Nevins and Associates, IN
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
C
34, Rues des Archives 75004 Paris France
Selfridges & Co
Client
Renzo Piano Building Workshop
400 Oxford Street London W1A 1AB United Kingdom
34, Rues des Archives 75004 Paris France
Selfridges & Co
Client
400 Oxford Street London W1A 1AB United Kingdom
400 Oxford Street London W1A 1AB United Kingdom
REINFORCE STAIR IN CLASSIC
REINFORCE STAIR IN CLASSIC Project Title
Project Title
Sheet Orientation
OXFORD STREET
SELFRIDGES Master Plan Sheet Orientation
Discipline
ARCHITECTURAL
Sender
Gensler
Gensler
Drawing Title
Drawing Title
OPTION B1 PROPOSED PLANS GROUND LEVEL
OPTION B1 PROPOSED PLANS LEVEL 04
DECEMBER 2012
3D visualisations of the building
Gensler OPTION B1 PROPOSED SECTION A Project Stage
FEASIBILITY Date
FEASIBILITY
Date
11.12.12
Date
23.11.12
23.11.12
Scale @ A0
Scale @ A2
1:200
1:400
Drawing No
ARCHITECTURAL
Drawing Title
Project Stage
FEASIBILITY
A1.210
Discipline
Sender
Discipline
ARCHITECTURAL
Sender
Project Stage
Do not scale
SELFRIDGES Master Plan
Project Title
SELFRIDGES Master Plan
ROOF GARDEN
Revision
C
Do not scale GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
SELFRIDGES MASTERPLAN FEASIBILITY REPORT DECEMBER 2012
Scale @ A0
Scale @ A2
1:200
1:400
Drawing No
A1.214
B
Scale @ A2
1:200
1:400
A1.301
Do not scale
October 09
3
Scale @ A0
Drawing No Revision
GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
SELFRIDGES MASTERPLAN FEASIBILITY REPORT
Revis
A
GENSLER 2 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 19
4 3
DECEMBER 2012
Ground floor working model
SELFRIDGES MASTERPLAN FE
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Gensler / 2013 - 2014
Al Maryah Central
- Al Maryah (former Sowwah) Central shopping mall is one of the largest shopping malls in the Middle East, being completed currently. - In a large team of about 15 people I was working on the facade design, slab edges interfaces and the lease plans for the schematic design, equivalent to stage C submission. - I had the chance to understand the principles of design for big shopping centres and retail units and the complexity of work when a large project is developed by a large team. Coordination was a key priority. -
Retail (shopping mall) / Abu Dhabi
Typical floor plan
Facade elevation
level
level
level
level level
level Ground Fl
WEST ELEVATION, scale 1:5
level Sowwah Central, Abu Dhabi, 2nd December 2
level
Ground Fl
WEST ELEVATION, scale 1:5
Sowwah Central, Abu Dhabi, 2nd December 2
3D visualisations of the building
DRAGAN KRSTEVSKI PORTFOLIO
Professional work / Gensler / 2012
Level 39
- For a short period of time I was given the task to sketch the space planning layout for Level 39 Media Tech Hub at 1 Canada Square (Canary Wharf). - This project helped me understand how to develop the client’s brief into a drawing. The client and my project architect were very satisfied with the space planning and quickly the design was signed off and we continued developing the interior for the space
Co-working / Media-Tech Hub / Canary Wharf, London, UK /// one level space planning and interior design
Photographs
Floor plan
DRAGAN KRSTEVSKI PORTFOLIO
Academic work / Masters project / Faculty of Architecture - Skopje / 2015
Compact city
My Masters project was studying the principles of what makes a sustainable city. I took an existing site in the centre of Skopje that currently is used as a parking to develop a small masterplan that will present my theories about a compact city. The cite connects one big shopping centre and the main city square and the railway station and the national bank on the other site, thus it serves as a transit area mainly. My design justifies the importance and the value of the site with making it a small business and residential centre while providing a pedestrian connection route to the two points with three small squares on the way. This way it has high density of people on the site while still having more than half of open public areas.
Masterplan / Urbanism / Skopje, Macedonia /// 90,000 sqm (0.09 sq km) site area
DRAGAN KRSTEVSKI PORTFOLIO
Academic work / Graduation project / Faculty of Architecture - Skopje / 2013
Architecture centre
My graduation project is an Architectural centre for Skopje which will be a house for archiving, presenting and debating about the architecture and urbanism. It will also have a co-working spaces for small architecture companies as well and spaces fro conferences and lectures and a guest house. My inspiration for this centre was the Netherlands Architecture Institute (NAI) which I visited during my studies and I also met its former director Ole Bouman. The site for the centre is on the border of the main city park. The free and open ground floor will serve as a main entrance to the park continuing its already existing paths and will connect the park to the city.. The elevation towards the park is designed to feel more like a gate while the opposite elevation towards the city takes inspiration from a city silhouette.
Culture / Skopje, Macedonia /// Basement + GF + 2-13 floors
DRAGAN KRSTEVSKI PORTFOLIO
Academic work / Faculty of Architecture - Skopje / 2011
Football stadium
A football stadium for 6000 spectators in the residential neighbourhood Karposh in Skopje. Surrounded by residential building the main aim was to make a small sports centre that will be used by residents on daily basis. The idea was to make a ‘line’ that goes around the football field where all facilities and activities will be housed. Among the facilities are a small hotel, cafe bar and restaurant, fitness and spa centre and other spaces fro small sport activities. The spectators entrance to the stadium is from a ramp or stairs that leads them to the higher platform while the VIP entrance is from the ground floor. The design of the building also makes a small square for public use. The parking is located in a separate two storeys building.
Sport / Skopje, Macedonia
DRAGAN KRSTEVSKI PORTFOLIO
Academic work / Faculty of Architecture - Skopje / 2010
Cinema centre
A cinema centre as a part of the never completed cultural centre for Skopje. The design for this cultural centre dated from after the earthquake in 1963. This cultural centre is design by a Slovenian architecture practice and was designed to have an opera house, cinema, theatre, music school and a bank building. The Cinema and the opera house were never built. The project brief was to design a cinema centre that will take the original site location but will answer today’s needs. The cinema building for 1200 visitors was designed to have a visual connection with the existing theatre building just next to it but also to have an identity on its own. The building has folded design that creates an experience while walking to the main cinema hall.
Culture / Skopje, Macedonia
DRAGAN KRSTEVSKI PORTFOLIO
Academic work / Faculty of Architecture - Skopje / 2010
Hotel Off
The project brief was to design a 4 star boutique hotel with 70 rooms on a narrow street very close to the main city square in Skopje. The facade design has a zig-zag form that creates visually appears as two faรงades when looked from each side of the street. The hotel has different type of rooms and a sports centre in the internal courtyard between the existing buildings. The main entrance including the milti-functional hall are located on the first floor and approached by car from a ramp.
Hospitality / Retail / Skopje, Macedonia