Dragan Krstevski Portfolio 2018

Page 1

DRAGAN KRSTEVSKI PORTFOLIO 2018

@zgrada zgrada@gmail.com


DRAGAN KRSTEVSKI PORTFOLIO

Freeman of the Worshipful Company of Constructors, 2017

TEDx talk ‘Rewinding architecture’, 2015

Freeman of the City of London, 2018

Ideogram, Master project 2015 Massing studies of 1 Leadenhall Street, 2016

RIBA lecture ‘Rebuilding the modern city’, 2016


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2016 -

- My involvement on this project was from RIBA stage 2 until its current stage 5-6. This building will be leased by HMRC for 25 years. The developer is ACDL. This is a Revit BIM level 2 project. - 3AC is part of the wider Arena Central masterplan designed by Make. The masterplan consists of five buildings, three of which have already been granted planning permission and two are on site. 3AC, received planning permission in December 2017 and is currently on site, due for completion in 2020. - I was able to deliver a successful planning application in a small team of 2 people and to be present at the contract negotiation meetings. Leading the legal drawings set gave me opportunity to understand the legal side of the project. In a bigger team I lead the core design. I had a close relationship with the client, the contractor and all consultants and sub-contractor and was present on all design team meetings.

3 Arena Central

Office building / Birmingham , UK / On site /// 3 basements, GF + 13 / 30,000 sqm internal area

Core studies sketch

Typical floor plan of 3AC

Commented core structural drawing General Notes 1. Dimensions are in millimetres unless stated otherwise. 2. Levels are in metres AOD unless stated otherwise.

01

02

03

04

05

06

3. Dimensions govern. Do not scale off drawing.

07

4. All dimensions to be verified on site before proceeding. 9125

9000

9000

9000

10495

5. All discrepancies to be notified in writing to Make Limited.

10630

Š Make Limited 2017

2729

H

G Goods lift lobby

Stair lobby

9396

Fire fighting lobby

Door and acc. toilet layout to alternate on every other floor

F 3000

E

Male WC Lift lobby

9000

6000

Female WC

04 01.12.17 Stage 3 Issue 03 06.10.17 GA issue 02 13.06.17 Agreement for lease 01 25.04.17 Agreement for lease 00 03.11.16 GA update REV Date Description

3000

D

RWM RWM JP JP JP Chk

STAGE 3

C

DRAWING STATUS

9000

32 Cleveland Street, London, W1T 4JY

tel +44 (0) 20 7636 5151

Office

info@makearchitects.com www.makearchitects.com Client

B

9125

Key plan

A

Project

3 Arena Central Drawing Title

Typical Office Floor Plan Levels 02-13 Scale at A1

Date

Project No.

Rev No.

1 : 100

Scale 1 : 100

0m

Visualisation of 3 Arena Central view from Bank Court

Visualisation of Arena Central Masterplan

1

1254

m 2

5

10

11/11/16

Draw No.

04

C4257-MAKE-ZZ-ZZ-DR-A-A2102

Site progress, November 2018


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2015 - 2017

- I was working on the feasibility and massing studies of this project and later I was involved in the RIBA stage 3 issue working on the core and internal areas including the basement cycle facilities. - 1 Leadenhall is a skyscraper that we worked on together with Brookfield. During the early days of the design I was able to learn the demands of the client and how this high-end projects differ from the other ones. I had a close relationship with the client and attended all design team meetings. - Developing more than 300 massing studies I also had to make sure that the building has the required office area. I worked on the design of the public terrace on level 2 and later during stage 3 I was leading the internal areas and coordinating the design with the sub-consultants. I was working on the interior of this areas which was a steep learning curve of how to design a high-end interior spaces.

1 Leadenhall Street

Office skyscraper / London , UK /// 36 storeys + basements / 65,000 sqm GEA Typical floor plan

General Notes 1. Dimensions are in millimetres unless stated otherwise. 2. Levels are in metres AOD unless stated otherwise.

M

3. Dimensions govern. Do not scale off drawing.

L

1 A2210

4. All dimensions to be verified on site before proceeding.

J

5. All discrepancies to be notified in writing to Make Limited.

1 A2211

K

Š Make Limited 2017

Based on building and topographical information by SES received on 22.02.2017

A2120

H 06

05

Public terrace plan

09 OFFICE

WC FEMALE

08

FIRE CURTAIN

FL1

PL11

PL10

PL12

PL9

PL13

PL8

PL14

PL7

PL15

PL6

PL1

04

A2123 +85.930

FIRE CURTAI N

1 A2212

FIRE CURTAI N

AWC

REFUGE

GL1

07

REFUGE

GL2

PL2

LOW & MID RISE TRANSFER LOBBY

1

PL3

A2122

A2412

PL4

WC MALE PL5

03 CW OPERATING PANEL

FIRE CURTAIN

04 03 02 01 00 REV

31.07.17 30.06.17 26.05.17 13.04.17 29.08.16 Date

Stage 3 JT Final Draft Stage 3 JT Draft Stage 3 Issue JT Interim Stage 3 Issue JT For Information JT Description Chk

STAGE 3 DRAWING STATUS

02

32 Cleveland Street, London, W1T 4JY

tel +44 (0) 20 7636 5151 info@makearchitects.com www.makearchitects.com Client

01

1 Leadenhall Limited Partnership

Keyplan

Project

1 Leadenhall A

B

C

D

A2121

E

F

G

Drawing Title

Level 12 Plan Proposed Scale at A0

1 : 100

Project No.

1007

Draw No.

Date

29.08.16 Rev No.

04

1LS-MAKE-XX-12-PL-A-A2012

Visualisation of 1 Leadenhall Street skyscraper

Visualisation of 1 Leadenhall Street skyscraper

Massing study models

Reception area 3D


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2015

40 Leadenhall Street

- 40 Leadenhall Street (Vanquish) is a 34 storey skyscraper for TIA Henderson. I was working during RIBA stage D design as part of the core team. I was leading the washrooms and cycle facilities package and helping with other parts of the core as well. - Planning was granted in 2014 but works on site haven’t started yet. When built, it will have one of the largest total office area in the city. - While working on this project in a large team I was able to understand how important coordination of the team was and how important the role of the project leader is. We had regular internal and external meetings and more often meetings between the sub-team everyone was part of. I became more confident with my work, learning how to prioritise things and answer on time to the client needs and how to present and defend the designs at a design team meetings and client presentations.

Office skyscraper / London , UK /// 34 storeys + basements Basement plan

Typical lower floor plan

Fire requirements core floor plan

Visualisation of 40 Leadenhall Street skyscraper

Visualisation of 40 Leadenhall Street skyscraper

Visualisation of lift lobby


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2016

Hisa

- Hisa was a small project that I worked individually for several months in 2016. I worked on this house up to RIBA Stage 3 after which local architects took over. - This project showed me the difference between office buildings and private residential houses. It showed how the design is more personal, the comments by the client are personal and the whole design becomes and expression of the current thoughts. There are no areas and current market trends that need to be followed. - This project allowed me to be able to plan my time and manage my workload to be able to finish everything on time and to satisfy the needs of the client.

Private residential house / Bled, Slovenia /// Basement + GF + 1st floor

Elevations

Ground and first floor plan


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2016

Fenix

- I was working on this project from its very beginning until Stage 2 in a small team of 2 people. - This is an office building on an island site in Bratislava for HB Reavis, one of the biggest Slovakian developer that is expanding in the rest of Europe as well. - Being able to develop the brief together with the client and working in a small team I was able to closely understand what are the needs for this project and what does the client want to achieve. I was developing many massing models and conceptual sketches that we would discuss with the client during the meetings. Working on a project outside London with a client that has more experience in that area it was very useful to see the differences of how the project evolves compared to a UK project. Being able to go to a site visit furthermore helped me understand the area and the potential for this project.

Office building / Bratislava, Slovakia /// 2 basements + GF + 8 floors

Massing studies models

Concept sketches

Solar studies

Final visualisation of the building


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2014 - 2015

Aranya

- This project was not done according to the RIBA stages but the stage I was working on was equivalent to stage D drawings. - This is a residential project for Piramal, a developer in India. It is on a large site just next to the zoo in Mumbai. The project consists of podium which is mainly for parking and 2 residential towers with high-end apartments. There are only 4 apartments on each floor. - I was responsible for the 8 levels of podium. The podium consists of parking, MEP spaces and landscape and clubhouse on the roof of the podium. This project was interesting experience to learn how to collaborate with consultants that are not located in the city. We regularly had client and consultants video meetings where we presented our progress. The client meetings were much more different than the ones I have had with UK clients.

Residential skyscrapers / Mumbai, India /// 8 levels podium, 62 levels towers

Typical level of the podium

3D visualisation of the building

3D visualisation interior of the podium

Roof level of the podium

Typical level of the North tower


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2017

Mitre Yard

- I worked on this project during RIBA stage 2, before submitting the planning application. - This is a mixed-use - residential building with apartments intended to be rented. It is located in West London, next to Willesden Junction on a brownfield site as part of the wider redevelopment of the area. The building is intended to attract young professionals and to have co-work facilities. - During my time on the project I was helping with the planning application. Most of the time I spent on developing the roop top terraces and the ground floor including the landscape area around the building.

Residential / Mixed use building / London , UK /// 6-19 floors

Grass on same level as paths

Greenery for privacy

Playground close to entrace

Podium

Big pots with trees

Benches Views

Roof terraces 1 GA_LEVEL_01 1 : 200 REF:2/ PA4000 SK2853 Unnamed

02/12/2016 16:12:42

Views over canal

Corridor as part of the terrace landscape

3D visualisation of the building

Playground

Floor plans with roof top terraces design GA_LEVEL_01 Roof terraces

Big pots with trees


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Make Architects / 2014

80 Charlotte Street

- This was the first project I worked on at Make. I was working on RIBA Stage C. - 80 Charlotte Street is a high-end office and residential building in central London. I was responsible for the core, atria and roof design of the office part. The project started as a refurbishment of the existing building and addition of new facade while in the end a decision was made for the existing building to be demolished and new to be built, exactly the same like the previous design. - It was a unique process to develop this project. The client was very demanding and we ended up drawing several stage C-s. This project has been many years at Make and although generally the design has stayed the same, there were constant small changes and updates. It was also the first Revit project in the studio.

Office and residential building / London , UK /// Basements, GF + 9 floors / 40,000 sqm GIA

Section / Typical plan / Roof plan

3D visualisation of the building and interior


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Gensler / 2012 - 2013

- All of my time during my internship at Gensler I worked on the Selfridges redevelopment in partnership with Renzo Piano Building Workshop. It was one of the leading projects at Gensler at the time lead by the company’s managing director. - Working from the feasibility through to the schematic design I was able to attend client meetings and design workshops which helped me a lot to gain knowledge about the high-end retail architecture and how a project of this scale is delivered through analysing the areas, circulation planning, MEP design and uses of the spaces. The new proposed scheme was changing the interior of the listed building, adding a roof top garden (forest) and adding hotel and leisure areas. As part of this project we completed a small project for the shoe terrace in Selfridges.

Selfridges

Retail / Oxford Street, London, UK 3.

Architecture Sheet Notes

Plans and sections Architecture

3.

A

3. Architecture

A

Sheet Notes

Key Plan

Sheet Notes

EXISTING RAMP INDICATED IN GREY

EDWARD MEWS

Key Plan

Key Plan

A

11.12.12

Revision

Date

ISSUED FOR FEASIBILITY Modification

Landscape Designer

DNA

VOID ABOVE

CDM Coordinator

ISSUED FOR FEASIBILITY

B

12.12.12

ISSUED FOR FEASIBILITY

23.11.12

ISSUED AS FROZEN DESIGN

A

23.11.12

ISSUED AS FROZEN DESIGN

Revision

Date

Revision

Date

Modification

DNA APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.

AREA SCHEDULE GIA Name Label

VOID ABOVE

PAVEMENT 1 PAVEMENT 2 RETAIL RETAIL MEP TEAM FACILITIES TEAM FACILITIES 2 VERTICAL CIRCULATION

F

CDM Coordinator

48 711 1895 14203 543 124 52 1076 18653

Planning Advisor

APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.

REINFORCE 12 COLUMNS IN SWOD

AREA SCHEDULE GIA Name Label

VOID 138sqm

FINANCE, IT BUYING Jones Lang LaSalle& MERCHANDISING FASHION WORKSHOP

HEAD OFFICE HEAD OFFICE MEP LEISURE / SPA MEET & EAT MEET & EAT MEP RETAIL

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom

ET

RETAIL MEP TRAINING

F

Jeremy Gardner Associates

VERTICAL CIRCULATION

2229 70 1745 20 1817 92 8270 354 416 986 15999

Planning Advisor

Blue Sky Building

Cost Consultant

EC Harris

VOID 330sqm

Structural Engineer

MEZZANINE DEMOLISHED

VISTA CORRIDOR

OPENING IN STRUCTURAL WALL FOR VISTA CORRIDOR

VOID 84sqm

Development Manager

EC Harris

F

Services Engineer and Logistic Consultant

Executive Architect

Expedition

Structural Engineer

Architect

RPBW

Development Manager

EC Harris 34 York Way London N1 9AB United Kingdom

Structural Engineer

Development Manager

VOID 65sqm

DOWN TO THIRD

VOID 59sqm Architect

34, Rues des Archives 75004 Paris France

RPBW

UP TO FOURTH

Stanhope plc Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

Expedition

Executive Architect

Gensler

Architect

Renzo Piano Build Workshop

Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

Stanhope plc

Gensler

RPBW

Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

Renzo Piano Building Workshop

Arup

Expedition Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

Arup

Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom Executive Architect

Selfridges & Co

Client

Cost Consultant

13 Fitzroy Street London W1T 4BQ United Kingdom

Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

REINFORCE 6 COLUMNS IN CLASSIC

VOID 170sqm

Stanhope plc

Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

VOID 93sqm

Blue Sky Building

Services Engineer and Logistic Consultant

13 Fitzroy Street London W1T 4BQ United Kingdom

Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

RELOCATE ENTRANCE

Construction Advisor

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

Jeremy Gardner Associates

Blue Sky Building

Cost Consultant

34 York Way London N1 9AB United Kingdom

Arup

WSP Group

Jeremy Gardner Associates 11 Risborough Street London SE1 0HF United Kingdom

WSP Group

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

REINFORCE 6 COLUMNS IN CLASSIC

VOID 160sqm

VISTA CORRIDOR

Jones Lang LaSalle

Construction Advisor

13 Fitzroy Street London W1T 4BQ United Kingdom

Jones Lang LaSal

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom Fire Engineer

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom Fire Engineer

VOID 88sqm VOID 88sqm

34 York Way London N1 9AB United Kingdom Services Engineer and Logistic Consultant

Highways Consultant

PFB Construction Management Services

22 Hanover Square London W1S 1JA United Kingdom Highways Consultant

270 Lafayette Street New York 10012 United States of America

PFB Construction Management Serv

22 Hanover Square London W1S 1JA United Kingdom

270 Lafayette Street New York 10012 United States of America

11 Risborough Street London SE1 0HF United Kingdom

Construction Advisor

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

F

Deborah Nevins and Associates, INC

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

Total Area

LEISURE MEP

WSP Group

CDM Coordinator

11 Risborough Street London SE1 0HF United Kingdom

DUKE STRE

VOID 125sqm VOID 125sqm

DNA

PFB Construction Management Services

Planning Advisor

Modification

Landscape Designer

270 Lafayette Street New York 10012 United States of America

22 Hanover Square London W1S 1JA United Kingdom Highways Consultant

Fire Engineer

VOID ABOVE

VOID ABOVE VOID ABOVE

Deborah Nevins and Associates, INC

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

Total Area

LEISURE

MEZZANINE DEMOLISHED

T

LANDSCAPE AREA ADDED

12.12.12

A

VOID 96sqm

REINFORCE 12 COLUMNS IN SWOD

ORCHARD STREE

17.12.12

B

Landscape Designer

VOID 125sqm

Deborah Nevins and Associates, IN

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

C

34, Rues des Archives 75004 Paris France

Selfridges & Co

Client

Renzo Piano Building Workshop

400 Oxford Street London W1A 1AB United Kingdom

34, Rues des Archives 75004 Paris France

Selfridges & Co

Client

400 Oxford Street London W1A 1AB United Kingdom

400 Oxford Street London W1A 1AB United Kingdom

REINFORCE STAIR IN CLASSIC

REINFORCE STAIR IN CLASSIC Project Title

Project Title

Sheet Orientation

OXFORD STREET

SELFRIDGES Master Plan Sheet Orientation

Discipline

ARCHITECTURAL

Sender

Gensler

Gensler

Drawing Title

Drawing Title

OPTION B1 PROPOSED PLANS GROUND LEVEL

OPTION B1 PROPOSED PLANS LEVEL 04

DECEMBER 2012

3D visualisations of the building

Gensler OPTION B1 PROPOSED SECTION A Project Stage

FEASIBILITY Date

FEASIBILITY

Date

11.12.12

Date

23.11.12

23.11.12

Scale @ A0

Scale @ A2

1:200

1:400

Drawing No

ARCHITECTURAL

Drawing Title

Project Stage

FEASIBILITY

A1.210

Discipline

Sender

Discipline

ARCHITECTURAL

Sender

Project Stage

Do not scale

SELFRIDGES Master Plan

Project Title

SELFRIDGES Master Plan

ROOF GARDEN

Revision

C

Do not scale GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

SELFRIDGES MASTERPLAN FEASIBILITY REPORT DECEMBER 2012

Scale @ A0

Scale @ A2

1:200

1:400

Drawing No

A1.214

B

Scale @ A2

1:200

1:400

A1.301

Do not scale

October 09

3

Scale @ A0

Drawing No Revision

GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

SELFRIDGES MASTERPLAN FEASIBILITY REPORT

Revis

A

GENSLER 2 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 19

4 3

DECEMBER 2012

Ground floor working model

SELFRIDGES MASTERPLAN FE


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Gensler / 2013 - 2014

Al Maryah Central

- Al Maryah (former Sowwah) Central shopping mall is one of the largest shopping malls in the Middle East, being completed currently. - In a large team of about 15 people I was working on the facade design, slab edges interfaces and the lease plans for the schematic design, equivalent to stage C submission. - I had the chance to understand the principles of design for big shopping centres and retail units and the complexity of work when a large project is developed by a large team. Coordination was a key priority. -

Retail (shopping mall) / Abu Dhabi

Typical floor plan

Facade elevation

level

level

level

level level

level Ground Fl

WEST ELEVATION, scale 1:5

level Sowwah Central, Abu Dhabi, 2nd December 2

level

Ground Fl

WEST ELEVATION, scale 1:5

Sowwah Central, Abu Dhabi, 2nd December 2

3D visualisations of the building


DRAGAN KRSTEVSKI PORTFOLIO

Professional work / Gensler / 2012

Level 39

- For a short period of time I was given the task to sketch the space planning layout for Level 39 Media Tech Hub at 1 Canada Square (Canary Wharf). - This project helped me understand how to develop the client’s brief into a drawing. The client and my project architect were very satisfied with the space planning and quickly the design was signed off and we continued developing the interior for the space

Co-working / Media-Tech Hub / Canary Wharf, London, UK /// one level space planning and interior design

Photographs

Floor plan


DRAGAN KRSTEVSKI PORTFOLIO

Academic work / Masters project / Faculty of Architecture - Skopje / 2015

Compact city

My Masters project was studying the principles of what makes a sustainable city. I took an existing site in the centre of Skopje that currently is used as a parking to develop a small masterplan that will present my theories about a compact city. The cite connects one big shopping centre and the main city square and the railway station and the national bank on the other site, thus it serves as a transit area mainly. My design justifies the importance and the value of the site with making it a small business and residential centre while providing a pedestrian connection route to the two points with three small squares on the way. This way it has high density of people on the site while still having more than half of open public areas.

Masterplan / Urbanism / Skopje, Macedonia /// 90,000 sqm (0.09 sq km) site area


DRAGAN KRSTEVSKI PORTFOLIO

Academic work / Graduation project / Faculty of Architecture - Skopje / 2013

Architecture centre

My graduation project is an Architectural centre for Skopje which will be a house for archiving, presenting and debating about the architecture and urbanism. It will also have a co-working spaces for small architecture companies as well and spaces fro conferences and lectures and a guest house. My inspiration for this centre was the Netherlands Architecture Institute (NAI) which I visited during my studies and I also met its former director Ole Bouman. The site for the centre is on the border of the main city park. The free and open ground floor will serve as a main entrance to the park continuing its already existing paths and will connect the park to the city.. The elevation towards the park is designed to feel more like a gate while the opposite elevation towards the city takes inspiration from a city silhouette.

Culture / Skopje, Macedonia /// Basement + GF + 2-13 floors


DRAGAN KRSTEVSKI PORTFOLIO

Academic work / Faculty of Architecture - Skopje / 2011

Football stadium

A football stadium for 6000 spectators in the residential neighbourhood Karposh in Skopje. Surrounded by residential building the main aim was to make a small sports centre that will be used by residents on daily basis. The idea was to make a ‘line’ that goes around the football field where all facilities and activities will be housed. Among the facilities are a small hotel, cafe bar and restaurant, fitness and spa centre and other spaces fro small sport activities. The spectators entrance to the stadium is from a ramp or stairs that leads them to the higher platform while the VIP entrance is from the ground floor. The design of the building also makes a small square for public use. The parking is located in a separate two storeys building.

Sport / Skopje, Macedonia


DRAGAN KRSTEVSKI PORTFOLIO

Academic work / Faculty of Architecture - Skopje / 2010

Cinema centre

A cinema centre as a part of the never completed cultural centre for Skopje. The design for this cultural centre dated from after the earthquake in 1963. This cultural centre is design by a Slovenian architecture practice and was designed to have an opera house, cinema, theatre, music school and a bank building. The Cinema and the opera house were never built. The project brief was to design a cinema centre that will take the original site location but will answer today’s needs. The cinema building for 1200 visitors was designed to have a visual connection with the existing theatre building just next to it but also to have an identity on its own. The building has folded design that creates an experience while walking to the main cinema hall.

Culture / Skopje, Macedonia


DRAGAN KRSTEVSKI PORTFOLIO

Academic work / Faculty of Architecture - Skopje / 2010

Hotel Off

The project brief was to design a 4 star boutique hotel with 70 rooms on a narrow street very close to the main city square in Skopje. The facade design has a zig-zag form that creates visually appears as two faรงades when looked from each side of the street. The hotel has different type of rooms and a sports centre in the internal courtyard between the existing buildings. The main entrance including the milti-functional hall are located on the first floor and approached by car from a ramp.

Hospitality / Retail / Skopje, Macedonia


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.