Dragan Krstevski Portfolio 2014

Page 1



TY TOYOTA SHOWROOM PROTOTYPE BUILDING SOUDI ARABIA GENSLER LONDON / 2013-2014 THE ALJ TOYOTA SHOWROOM IS THE LATEST PROJECT I HAVE WORKED ON AT GENSLER. IT IS A PROTOTYPE BUILDING WHICH WILL BE BUILT ON MULTIPLE LOCATIONS IN SAUDI ARABIA. CIRCULATION DIAGRAM THE FRONT PART OF THE BUILDING IS THE SHOWROOM, Circulation Diagram - Service Car Delivery WHILE THE BACK IS THE SERVICE AREA. THE BASEMENT IS USED FOR PARKING AND THE MEZZANINE LEVEL FOR THE OFFICES. ALONG THIS SHOWROOM, VERY SIMILAR TO THIS PROJECT IS THE LEXUS SHOWROOM WHICH IS ALSO BEING DONE BY GENSLER. SERVICE DROP OFF

6

SITE EXTENT: AREA = 14,507 m2

SERVICE

SERVICED CAR PICK UP

7

COMPRESSOR ROOM

OIL STORAGE

SERVICED CAR PICK UP

SECTIONS

FIRE CONTROL ROOM

SEWAGE TANK 100m3

SLUDGE TANK 15m3

SECURITY/STOCKYARD SUPERVISOR 2 x 3.7 m 7.4 m2

CAR WASH CONTROL ROOM

ELECTRICAL ROOM

FFL +0.0

EQUIPMENT STORE 3x3.6 m 10.8 m2

FIRST AID ROOM

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

FFL +0.000

8

ELECTRICAL REPAIR ROOM

1. 2.

THE SERVICE GUARD GREATS CUSTOMER AND DIRECTS THE CUSTOMER TO THE SERVICE DRIVE

BROUGHT-OUT ROOM

WARRANTY PARTS 6.1x13.7 m 83.2 m2

WARRANTY PROCESSOR

THE SERVICE ADVISOR GREATS THE CUSTOMER ON THE SERVICE DRIVE, CUSTOMER HANDS OVER THE CAR

CUSTOMER PROCEEDS TO THE CUSTOMER LOUNGE

3.

BASED ON THE REQUIRED SERVICE, THE VEHICLE IS EITHER TAKEN TO THE APPROPRIATE STALL

4.

GJ STALL

5.

EM STALL

6.

IF NO STALL IS AVAILABLE THE VEHICLE IS TAKEN TO THE WAITING PARKING IN THE BASEMENT

1

1

FFL +0.000

SST/REPAIR/ MANUALS 3.9x4.5 m 17.83 m2

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

GJ STALL

AUTOMATED CAROUSEL STORES

5.0 x 7.1 m 35.5 m2

WHEEL BALANCER AND TYRE CHANGER

WHEEL ALIGNMENT STALL

SITE EXTENT

1

1

JOB CONTROL ROOM 3.6x4.5 m 16.3 m2

UNIT REPAIR 9.0x7.6 m 68.85 m2

STORE KEEPER

2A.

10

LARGE VEHICLE STALL

GJ STALL

GJ STALL

4

PARTS STORES 13.8 x 14 m 226 m2

9 SERVICE DELIVERY PARKING

SERVICE WAITING PARKING

DIAGNOSIS STALL

9A

3

5

PARTS RETAIL 4.5 x 13.8 m 62.1 m2

STAND/ JACKS CORNER

SERVICE LIFT LOBBY

GJ STALL

GJ STALL

EM STALL

EM STALL

EM STALL

EM STALL

FFL +0.000

ONE-WAY EXIT LANE

OPTIONAL EXIT

DRIVER'S CORNER

FINAL INSPECTION STALL

HYDRAULIC CAR LIFT

ELECTRONIC PAYMENT/ WAITING AREA

SERVICE MANAGER

KEY STORE

VIEWS TO WORKSHOP

UIS TOTAL AREA 7.2 X 7.5 m 70.1 m2

SERVICE AREA CAFE

GLASS LIFT

DN TO B1

CUSTOMER TAKES THE SERVICED CAR AND DRIVES OUT OF THE PROPERTY

/ N PTION MATIO RECE x 2 m INFOR 3.1 m2 6.2

8 SERVICE AREA ADVISORS 1.5 x 2.6 m x 8 24 m2

MEETING ROOM 2.5 x 3.6 m 9.1 m2

SHOWROOM CASHIER 2.8 x 3.2 m 9.4 m2

SERVICE RECEPTION/ APPOINTMENT LANE

PERIODIC MAINTENANCE LANE

GENERIC JOB LANE

VEHICLE DELIVERY

SERVICE CASHIER 2.8 x 3.2 m 9.4 m2

3 VEHICLE SALESMAN AREA 3x2mx3 18 m2

FFL +1.000

TOYOTA SHOWROOM 18.5 x 33.7 m 616.2 m2

VOID TO BASEMENT ACCESSORIES RETAIL WALL 2.8 m

DAIHATSU SHOP 12.8 x 18.0 m 220.8 m2

ACCESSORIES RETAIL WALL 2.8 m

ACCESSORIES RETAIL WALL 4m

SALES ENTRANCE

ACCE SHOW SSOR CAR IZED

CUSTOMER PICKS UP SERVICED CAR

10.

RECEPTION / CAR RENTAL AREA 6.6 x 2.5 m 16.4 m2

TEST DRIVE OFFICE 4.4 x 2.5 m 11.1 m2

OPEN TO ABOVE AND BELOW

2

2A

CAFE PANTRY / STORE 2.7 x 3.3 m 12 m2

SHOWROOM CAFE

UP TO MEZZ LOUNGE

SALES' PODS 3,1 X 2 m X 4 12.4 m2

FFL +0.000 DOW N

9A.

ACCESSORIES / INTERACTIVE WALL 16.6 m

SALES COORDINATOR 6.3 x 3.0 m 18.8 m2

SALES SUPERVISOR 3.0 x 5.3 m 16.1 m2

E

VEHICLE IS MOVED TO DELIVERY WAITING PARKING

FOH SALES OFFICES/ STORAGE 3.5 x 6.3 m 22 m2 RETAIL

SALES MANAGER 6.1 x 3.0 m 18.4 m2

NEW VEHICLE DELIVERY 12 x 4.1 m 49.4 m2

WASH STALL

9.

SERVICE ENTRANCE

MALE WC 4.4 x 12.4 m 54.5 m2

CONFERENCE ROOM 3.5 x 6.1 m 21.4 m2

NEW VEHICLE DELIVERY 12.0 x 4.3 m 51 m2

SLOP

8.

SERVICE CUSTOMERS' LOUNGE 16.6 X 5.1 m 84.2 m2

6 UIS SUPERVISOR 2.5 x 2.9 m 7 m2

6 UIS AREA ADVISORS 1.5 x 2.6 m x 6 23.4 m2

FFL +1.000

ONCE SERVICE HAS BEEN COMPLETED VEHICLE IS TAKEN FROM THE PARKING TO THE WASH AREA, VACUUMED, WASHED AND DRIED

SLOPE DOWN

THIS PROJECT HELPED ME UNDERSTAND THE SPATIAL PLANNING FOR CAR SHOWROOMS AND SPECIFIC REQUIREMENTS REQUIRED FOR THESE KIND OF BUILDINGS IN THE MIDDLE EAST AND ALSO BY THE CLIENT. 7.

TEST DRIVE VEHICLES

FFL +0.500

RAMP GRADIENT 1:20

RAMP GRADIENT 1:20

SALES CUSTOMER PARKING

SITE EXTENT

1

ALJ TOYOTA LONDON WORKSHOP 21/01/2014 OPTION 05

ALJ Toyota Showrooms 50% SD Workshop January 2014

I HAVE WORKED ON THE 50% AND 100% SCHEMATIC DESIGN. AMONG OTHER THINGS, I HAVE BEEN HELPING WITH THE PLANS, SECTIONS AND ELEVATION, CIRCULATION DIAGRAMS, GROSS INTERNAL AREA AND THE LANDSCAPE DESIGN.

ALJ Toyota

PROPOSED GROUND FLOOR

23

PROPOSED MEZZANINE LEVEL


SW SOWWAH CENTRAL SHOPPING MALL ABU DHABI GENSLER LONDON / 2013 SOWWAH CENTRAL (SHOPPING MALL) IS ONE OF THE BIGGEST PROJECTS I HAVE WORKED ON. IN A BIG TEAM I WAS WORKING ON THE FACADE DESIGN AND THE SLAB EDGES. ALSO I HAVE WORKED ON THE LEASE PLANS AND ROOM TAGGING. I HAD THE CHANCE TO UNDERSTAND THE DESIGN AND PLANNING FOR BIG SHOPPING MALLS AND THE COMPLEXITY OF WORK THERE MIGHT BE WHEN A HUGE PROJECT IS BEING DESIGNED. ALSO I HAVE HAD THE CHANCE TO SEE HOW A BIG TEAM WORKED AND HOW TO COORDINATE WITH MANY PEOPLE IN THE TEAM. I WAS WORKING DURING THE SCHEMATIC DESIGN. I WAS INVOLVED IN THE FACADE TEAM AND WHEN GENSLER WAS ASKED TO DO MODIFICATIONS TO THE FACADE I TOOK PART IN THAT AS WELL. ON THIS PROJECT I WAS WORKING IN REVIT.

level 04

level 03

level 02

level 01

Ground Floor

WEST ELEVATION, scale 1:500 Sowwah Central, Abu Dhabi, 2nd December 2013


SF SELFRIDGES MASTER PLAN OXFORD STREET, LONDON GENSLER LONDON / 2012 - 2013 DURING MY INTERNSHIP IN GENSLER, FOR MOST OF THE TIME, I WORKED ON THE SELFRIDGES MASTER PLAN TOGETHER WITH RENZO PIANO BUILDING WORKSHOP. WORKING FROM THE BEGINNING OF THE PROJECT I WAS ABLE TO BE INVOLVED THROUGH OUT THE WHOLE DESIGN SCHEME AND FEASIBILITY STUDY PROCESS.

3.

3.

Architecture

Architecture Sheet Notes

A

Sheet Notes

D

MODEL

D

A

Key Plan

Key Plan

SECTIONS

A 11.12.12 Date

ISSUED FOR FEASIBILITY

Deborah Nevins and Associates, INC

ISSUED FOR FEASIBILITY Modification

Deborah Nevins and Associates, INC

DNA

270 Lafayette Street New York 10012 United States of America

270 Lafayette Street New York 10012 United States of America

PFB Construction Management Services

CDM Coordinator

PFB Construction Management Services

CDM Coordinator

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

Jones Lang LaSalle

Planning Advisor

22 Hanover Square London W1S 1JA United Kingdom

Jones Lang LaSalle 22 Hanover Square London W1S 1JA United Kingdom

WSP Group

Highways Consultant

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom

WSP Group

Highways Consultant

TOGETHER WITH RPBW WE WERE WORKING ON CHANGING THE INTERIOR OF THE LISTED BUILDING ON OXFORD STREET AND ADDING A ROOF GARDEN AS A MAIN FEATURE. THE NEW PROPOSED SCHEME EXCEPT RETAIL WOULD HAVE HOTEL AND LEISURE AREAS, FOOD HALL, OFFICES AND BACK OF HOUSE.

Date

Landscape Designer

Modification

DNA

Planning Advisor

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom

Jeremy Gardner Associates

Fire Engineer

Jeremy Gardner Associates

Fire Engineer

11 Risborough Street London SE1 0HF United Kingdom

11 Risborough Street London SE1 0HF United Kingdom Construction Advisor

Blue Sky Building

Cost Consultant

EC Harris

Construction Advisor

Blue Sky Building

Cost Consultant

EC Harris

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

34 York Way London N1 9AB United Kingdom

34 York Way London N1 9AB United Kingdom

Arup

Services Engineer and Logistic Consultant

13 Fitzroy Street London W1T 4BQ United Kingdom

Arup

Services Engineer and Logistic Consultant

13 Fitzroy Street London W1T 4BQ United Kingdom

Expedition

Structural Engineer

Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

Expedition

Structural Engineer

Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

Stanhope plc

Development Manager

Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

Stanhope plc

Development Manager

Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

Gensler

Architect

Renzo Piano Building Workshop

Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

RPBW

Executive Architect

Gensler

Architect

Renzo Piano Building Workshop

Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

Executive Architect

RPBW

34, Rues des Archives 75004 Paris France

34, Rues des Archives 75004 Paris France

Selfridges & Co

Client

400 Oxford Street London W1A 1AB United Kingdom

Selfridges & Co

Client

400 Oxford Street London W1A 1AB United Kingdom

Project Title

SELFRIDGES Master Plan

Project Title

SELFRIDGES Master Plan

Discipline

ARCHITECTURAL

Discipline

Sender

Sender

Drawing Title

ARCHITECTURAL

Gensler

Gensler

OPTION B1 PROPOSED SECTION A

Drawing Title

OPTION B1 PROPOSED SECTION D

Project Stage

FEASIBILITY

Project Stage

Date

FEASIBILITY

11.12.12

Date

3. Do not scale

11.12.12

PROPOSED Architecture FLOOR PLANS

Scale @ A0

Scale @ A2

1:200

1:400

Drawing Do not scale No

A1.304

Scale @ A2

1:200

1:400 Revision

A1.301

A

GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

A

3.

Scale @ A0

Drawing No Revision

Architecture

GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

DECEMBER 2012 SELFRIDGES MASTERPLAN FEASIBILITY REPORT Sheet Notes

DECEMBER 2012

SELFRIDGES MASTERPLAN FEASIBILITY REPORT

3

Sheet Notes

EXISTING RAMP INDICATED IN GREY

S

EDWARD MEW

Key Plan

Key Plan

VOID ABOVE

C B A

17.12.12

LANDSCAPE AREA ADDED

12.12.12

ISSUED FOR FEASIBILITY

23.11.12

ISSUED AS FROZEN DESIGN

Revision

VOID 96sqm APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.

AREA SCHEDULE GIA Name Label

VOID ABOVE

PAVEMENT 1 PAVEMENT 2 RETAIL RETAIL MEP

MEZZANINE DEMOLISHED

CDM Coordinator

TEAM FACILITIES TEAM FACILITIES 2 VERTICAL CIRCULATION

48 711 1895 14203 543 124 52 1076 18653

F

Planning Advisor

Highways Consultant

REINFORCE 12 COLUMNS IN SWOD

AREA SCHEDULE GIA Name Label

VOID 138sqm

Jones Lang LaSalle

FINANCE, IT BUYING & MERCHANDISING FASHION WORKSHOP

ISSUED FOR FEASIBILITY

23.11.12

ISSUED AS FROZEN DESIGN

Date

Modification

HEAD OFFICE HEAD OFFICE MEP LEISURE / SPA MEET & EAT MEET & EAT MEP

WSP Group

RETAIL RETAIL MEP TRAINING

F

Jeremy Gardner Associates

CDM Coordinator

VERTICAL CIRCULATION

2229 70 1745 20 1817 92 8270 354 416 986 15999

Construction Advisor

Blue Sky Building

Cost Consultant

EC Harris

Planning Advisor

Structural Engineer

VOID 330sqm

Fire Engineer

VISTA CORRIDOR

OPENING IN STRUCTURAL WALL FOR VISTA CORRIDOR

VOID 84sqm

Development Manager

Blue Sky Building

Cost Consultant

EC Harris

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

34 York Way London N1 9AB United Kingdom

F

Arup

Services Engineer and Logistic Consultant

Executive Architect

Structural Engineer

Expedition

REINFORCE 6 COLUMNS IN CLASSIC

VOID 170sqm

Stanhope plc

Development Manager

RPBW Client

DOWN TO THIRD

34, Rues des Archives 75004 Paris France

VOID 59sqm

Renzo Piano Building Workshop

Architect

RPBW

UP TO FOURTH

34, Rues des Archives 75004 Paris France

Selfridges & Co

Client

Selfridges & Co

400 Oxford Street London W1A 1AB United Kingdom

REINFORCE STAIR IN CLASSIC

REINFORCE STAIR IN CLASSIC

Project Title

Project Title

SELFRIDGES Master Plan

SELFRIDGES Master Plan Sheet Orientation

Sheet Orientation

Discipline

ARCHITECTURAL Sender

Discipline

ARCHITECTURAL

Sender

Gensler

Gensler

Drawing Title

Drawing Title

OPTION B1 PROPOSED PLANS LEVEL 04

OPTION B1 PROPOSED PLANS GROUND LEVEL Project Stage

Project Stage

FEASIBILITY

FEASIBILITY Date

Date

23.11.12

23.11.12 Scale @ A0

Scale @ A2

1:200

1:400

Drawing No

A1.210 Do not scale

Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

400 Oxford Street London W1A 1AB United Kingdom

OXFORD STREET

Stanhope plc Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

Executive Architect

VOID 65sqm

Renzo Piano Building Workshop

Architect

Expedition Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom

VOID 93sqm

Arup 13 Fitzroy Street London W1T 4BQ United Kingdom

Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom

RELOCATE ENTRANCE

Jeremy Gardner Associates

Construction Advisor

VOID 88sqm VOID 88sqm

Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom

REINFORCE 6 COLUMNS IN CLASSIC

VOID 160sqm

VISTA CORRIDOR

WSP Group WSP House 70 Chancery Lane London WC2A 1AF United Kingdom

13 Fitzroy Street London W1T 4BQ United Kingdom

MEZZANINE DEMOLISHED

Jones Lang LaSalle 22 Hanover Square London W1S 1JA United Kingdom

Highways Consultant

34 York Way London N1 9AB United Kingdom Services Engineer and Logistic Consultant

270 Lafayette Street New York 10012 United States of America

PFB Construction Management Services

11 Risborough Street London SE1 0HF United Kingdom

3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom

F

Deborah Nevins and Associates, INC

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

Total Area

LEISURE MEP

WSP House 70 Chancery Lane London WC2A 1AF United Kingdom

EET

VOID 125sqm

APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.

11 Risborough Street London SE1 0HF United Kingdom

DUKE STR

VOID ABOVE

VOID ABOVE

VOID 125sqm

12.12.12

DNA

270 Lafayette Street New York 10012 United States of America

PFB Construction Management Services

22 Hanover Square London W1S 1JA United Kingdom

Fire Engineer

VOID ABOVE

A Revision

Landscape Designer

Deborah Nevins and Associates, INC

2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom

Total Area

LEISURE

B

Modification

DNA REINFORCE 12 COLUMNS IN SWOD

ET

Date

Landscape Designer

VOID 125sqm

ORCHARD STRE

WITH THE TEAM, I WAS WORKING ON THE GROSS INTERNAL AND EXTERNAL AREA OF THE EXISTING BUILDING AND THE PROPOSED SCHEME, THE MEP STRUCTURE, SECTIONS, CIRCULATION PLANNING AND MAKING THE GROUND FLOOR MODEL.

11.12.12

Revision A Revision

Landscape Designer

Revision

C

Do not scale GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

ROOF GARDEN

Scale @ A0

Scale @ A2

1:200

1:400

Drawing No

A1.214

Revision

B

GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988

3


L39 LEVEL 39 MEDIA / TECH HUB CANADA SQUARE BUILDING CANARY WHARF, LONDON GENSLER LONDON / 2012 WHILE WORKING IN GENSLER, LONDON IN 2012, FOR A SHORT PERIOD OF TIME I WAS INVOLVED IN THE LEVEL 39 MEDIA/TECH HUB PROJECT. I WAS GIVEN A TASK AT THE VERY BEGINNING OF THE PROJECT TO DO A SPACE PLANNING ACCORDING TO THE NEW REQUIREMENTS FOR THE CHANGE OF THE LEVEL 39 IN CANADA SQUARE BUILDING. THIS FLOOR WAS SUPPOSED TO BE A MEDIA/TECH HUB. MY JOB WAS TO PLAN 3 MEETING ROOMS, BIG PRESENTATIONS ROOM AND OTHER AREAS NECESSARY FOR THE PROJECT. LITTLE HAS CHANGES TO THE DESIGN OF THE SPACE AFTER OUR FIRST PROPOSAL AND TODAY THE PROJECT IS COMPLETED. FEW IMAGES HERE SHOW HOW IT LOOKS TODAY.

LEVEL 39 FLOOR PLAN


ii ii APARTMENT INTERIOR DESIGN APARTMENT IN SKOPJE PRIVATE WORK / 2012 IMMEDIATELY AFTER MY GRADUATION I WAS ASKED TO DO AN INTEROR DESIGN PROJECT FOR AN APARTMENT IN SKOPJE. AT THE FIRST STAGE WE ONLY DECIDED TO DO THE PUBLIC AREAS OF THE APARTMENT - THE ENTRANCE CORRIDOR, THE LIVING ROOM, THE DINNING ROOM AND THE KITCHEN. CHANGING THE PREVIOUS STATE OF THE APARTMENT, MY IDEA WAS TO CONNECT THESE 3 SPACES (LIVING ROOM, DINNING ROOM AND KITCHEN) IN ONE AREA, ALTHOUGH KEEPING THEM IN MIND AS A SEPARATE AREAS. I INTRODUCED A LOND SOFA WITH A FEATURE WALL IN THE LIVING ROOM, A FOLDING TABLE WITH A BAR ON THE OPPOSITE WALL FOR THE DINING ROOM AND A LONG KITCHEN WITH A MIRROR BETWEEN THE ELEMENTS SO IT WOULD EVEN MORE EXTEND THE ROOM VISUALLY. I TRIED TO MAKE THIS INTERIOR MODERN AND ELEGANT AT THE SAME TIME. THE APARTMENT IS UNDER CONSTRUCTION AT THE MOMENT.

FLOOR PLAN AND ELEVATIONS















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.