TY TOYOTA SHOWROOM PROTOTYPE BUILDING SOUDI ARABIA GENSLER LONDON / 2013-2014 THE ALJ TOYOTA SHOWROOM IS THE LATEST PROJECT I HAVE WORKED ON AT GENSLER. IT IS A PROTOTYPE BUILDING WHICH WILL BE BUILT ON MULTIPLE LOCATIONS IN SAUDI ARABIA. CIRCULATION DIAGRAM THE FRONT PART OF THE BUILDING IS THE SHOWROOM, Circulation Diagram - Service Car Delivery WHILE THE BACK IS THE SERVICE AREA. THE BASEMENT IS USED FOR PARKING AND THE MEZZANINE LEVEL FOR THE OFFICES. ALONG THIS SHOWROOM, VERY SIMILAR TO THIS PROJECT IS THE LEXUS SHOWROOM WHICH IS ALSO BEING DONE BY GENSLER. SERVICE DROP OFF
6
SITE EXTENT: AREA = 14,507 m2
SERVICE
SERVICED CAR PICK UP
7
COMPRESSOR ROOM
OIL STORAGE
SERVICED CAR PICK UP
SECTIONS
FIRE CONTROL ROOM
SEWAGE TANK 100m3
SLUDGE TANK 15m3
SECURITY/STOCKYARD SUPERVISOR 2 x 3.7 m 7.4 m2
CAR WASH CONTROL ROOM
ELECTRICAL ROOM
FFL +0.0
EQUIPMENT STORE 3x3.6 m 10.8 m2
FIRST AID ROOM
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
FFL +0.000
8
ELECTRICAL REPAIR ROOM
1. 2.
THE SERVICE GUARD GREATS CUSTOMER AND DIRECTS THE CUSTOMER TO THE SERVICE DRIVE
BROUGHT-OUT ROOM
WARRANTY PARTS 6.1x13.7 m 83.2 m2
WARRANTY PROCESSOR
THE SERVICE ADVISOR GREATS THE CUSTOMER ON THE SERVICE DRIVE, CUSTOMER HANDS OVER THE CAR
CUSTOMER PROCEEDS TO THE CUSTOMER LOUNGE
3.
BASED ON THE REQUIRED SERVICE, THE VEHICLE IS EITHER TAKEN TO THE APPROPRIATE STALL
4.
GJ STALL
5.
EM STALL
6.
IF NO STALL IS AVAILABLE THE VEHICLE IS TAKEN TO THE WAITING PARKING IN THE BASEMENT
1
1
FFL +0.000
SST/REPAIR/ MANUALS 3.9x4.5 m 17.83 m2
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
GJ STALL
AUTOMATED CAROUSEL STORES
5.0 x 7.1 m 35.5 m2
WHEEL BALANCER AND TYRE CHANGER
WHEEL ALIGNMENT STALL
SITE EXTENT
1
1
JOB CONTROL ROOM 3.6x4.5 m 16.3 m2
UNIT REPAIR 9.0x7.6 m 68.85 m2
STORE KEEPER
2A.
10
LARGE VEHICLE STALL
GJ STALL
GJ STALL
4
PARTS STORES 13.8 x 14 m 226 m2
9 SERVICE DELIVERY PARKING
SERVICE WAITING PARKING
DIAGNOSIS STALL
9A
3
5
PARTS RETAIL 4.5 x 13.8 m 62.1 m2
STAND/ JACKS CORNER
SERVICE LIFT LOBBY
GJ STALL
GJ STALL
EM STALL
EM STALL
EM STALL
EM STALL
FFL +0.000
ONE-WAY EXIT LANE
OPTIONAL EXIT
DRIVER'S CORNER
FINAL INSPECTION STALL
HYDRAULIC CAR LIFT
ELECTRONIC PAYMENT/ WAITING AREA
SERVICE MANAGER
KEY STORE
VIEWS TO WORKSHOP
UIS TOTAL AREA 7.2 X 7.5 m 70.1 m2
SERVICE AREA CAFE
GLASS LIFT
DN TO B1
CUSTOMER TAKES THE SERVICED CAR AND DRIVES OUT OF THE PROPERTY
/ N PTION MATIO RECE x 2 m INFOR 3.1 m2 6.2
8 SERVICE AREA ADVISORS 1.5 x 2.6 m x 8 24 m2
MEETING ROOM 2.5 x 3.6 m 9.1 m2
SHOWROOM CASHIER 2.8 x 3.2 m 9.4 m2
SERVICE RECEPTION/ APPOINTMENT LANE
PERIODIC MAINTENANCE LANE
GENERIC JOB LANE
VEHICLE DELIVERY
SERVICE CASHIER 2.8 x 3.2 m 9.4 m2
3 VEHICLE SALESMAN AREA 3x2mx3 18 m2
FFL +1.000
TOYOTA SHOWROOM 18.5 x 33.7 m 616.2 m2
VOID TO BASEMENT ACCESSORIES RETAIL WALL 2.8 m
DAIHATSU SHOP 12.8 x 18.0 m 220.8 m2
ACCESSORIES RETAIL WALL 2.8 m
ACCESSORIES RETAIL WALL 4m
SALES ENTRANCE
ACCE SHOW SSOR CAR IZED
CUSTOMER PICKS UP SERVICED CAR
10.
RECEPTION / CAR RENTAL AREA 6.6 x 2.5 m 16.4 m2
TEST DRIVE OFFICE 4.4 x 2.5 m 11.1 m2
OPEN TO ABOVE AND BELOW
2
2A
CAFE PANTRY / STORE 2.7 x 3.3 m 12 m2
SHOWROOM CAFE
UP TO MEZZ LOUNGE
SALES' PODS 3,1 X 2 m X 4 12.4 m2
FFL +0.000 DOW N
9A.
ACCESSORIES / INTERACTIVE WALL 16.6 m
SALES COORDINATOR 6.3 x 3.0 m 18.8 m2
SALES SUPERVISOR 3.0 x 5.3 m 16.1 m2
E
VEHICLE IS MOVED TO DELIVERY WAITING PARKING
FOH SALES OFFICES/ STORAGE 3.5 x 6.3 m 22 m2 RETAIL
SALES MANAGER 6.1 x 3.0 m 18.4 m2
NEW VEHICLE DELIVERY 12 x 4.1 m 49.4 m2
WASH STALL
9.
SERVICE ENTRANCE
MALE WC 4.4 x 12.4 m 54.5 m2
CONFERENCE ROOM 3.5 x 6.1 m 21.4 m2
NEW VEHICLE DELIVERY 12.0 x 4.3 m 51 m2
SLOP
8.
SERVICE CUSTOMERS' LOUNGE 16.6 X 5.1 m 84.2 m2
6 UIS SUPERVISOR 2.5 x 2.9 m 7 m2
6 UIS AREA ADVISORS 1.5 x 2.6 m x 6 23.4 m2
FFL +1.000
ONCE SERVICE HAS BEEN COMPLETED VEHICLE IS TAKEN FROM THE PARKING TO THE WASH AREA, VACUUMED, WASHED AND DRIED
SLOPE DOWN
THIS PROJECT HELPED ME UNDERSTAND THE SPATIAL PLANNING FOR CAR SHOWROOMS AND SPECIFIC REQUIREMENTS REQUIRED FOR THESE KIND OF BUILDINGS IN THE MIDDLE EAST AND ALSO BY THE CLIENT. 7.
TEST DRIVE VEHICLES
FFL +0.500
RAMP GRADIENT 1:20
RAMP GRADIENT 1:20
SALES CUSTOMER PARKING
SITE EXTENT
1
ALJ TOYOTA LONDON WORKSHOP 21/01/2014 OPTION 05
ALJ Toyota Showrooms 50% SD Workshop January 2014
I HAVE WORKED ON THE 50% AND 100% SCHEMATIC DESIGN. AMONG OTHER THINGS, I HAVE BEEN HELPING WITH THE PLANS, SECTIONS AND ELEVATION, CIRCULATION DIAGRAMS, GROSS INTERNAL AREA AND THE LANDSCAPE DESIGN.
ALJ Toyota
PROPOSED GROUND FLOOR
23
PROPOSED MEZZANINE LEVEL
SW SOWWAH CENTRAL SHOPPING MALL ABU DHABI GENSLER LONDON / 2013 SOWWAH CENTRAL (SHOPPING MALL) IS ONE OF THE BIGGEST PROJECTS I HAVE WORKED ON. IN A BIG TEAM I WAS WORKING ON THE FACADE DESIGN AND THE SLAB EDGES. ALSO I HAVE WORKED ON THE LEASE PLANS AND ROOM TAGGING. I HAD THE CHANCE TO UNDERSTAND THE DESIGN AND PLANNING FOR BIG SHOPPING MALLS AND THE COMPLEXITY OF WORK THERE MIGHT BE WHEN A HUGE PROJECT IS BEING DESIGNED. ALSO I HAVE HAD THE CHANCE TO SEE HOW A BIG TEAM WORKED AND HOW TO COORDINATE WITH MANY PEOPLE IN THE TEAM. I WAS WORKING DURING THE SCHEMATIC DESIGN. I WAS INVOLVED IN THE FACADE TEAM AND WHEN GENSLER WAS ASKED TO DO MODIFICATIONS TO THE FACADE I TOOK PART IN THAT AS WELL. ON THIS PROJECT I WAS WORKING IN REVIT.
level 04
level 03
level 02
level 01
Ground Floor
WEST ELEVATION, scale 1:500 Sowwah Central, Abu Dhabi, 2nd December 2013
SF SELFRIDGES MASTER PLAN OXFORD STREET, LONDON GENSLER LONDON / 2012 - 2013 DURING MY INTERNSHIP IN GENSLER, FOR MOST OF THE TIME, I WORKED ON THE SELFRIDGES MASTER PLAN TOGETHER WITH RENZO PIANO BUILDING WORKSHOP. WORKING FROM THE BEGINNING OF THE PROJECT I WAS ABLE TO BE INVOLVED THROUGH OUT THE WHOLE DESIGN SCHEME AND FEASIBILITY STUDY PROCESS.
3.
3.
Architecture
Architecture Sheet Notes
A
Sheet Notes
D
MODEL
D
A
Key Plan
Key Plan
SECTIONS
A 11.12.12 Date
ISSUED FOR FEASIBILITY
Deborah Nevins and Associates, INC
ISSUED FOR FEASIBILITY Modification
Deborah Nevins and Associates, INC
DNA
270 Lafayette Street New York 10012 United States of America
270 Lafayette Street New York 10012 United States of America
PFB Construction Management Services
CDM Coordinator
PFB Construction Management Services
CDM Coordinator
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
Jones Lang LaSalle
Planning Advisor
22 Hanover Square London W1S 1JA United Kingdom
Jones Lang LaSalle 22 Hanover Square London W1S 1JA United Kingdom
WSP Group
Highways Consultant
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom
WSP Group
Highways Consultant
TOGETHER WITH RPBW WE WERE WORKING ON CHANGING THE INTERIOR OF THE LISTED BUILDING ON OXFORD STREET AND ADDING A ROOF GARDEN AS A MAIN FEATURE. THE NEW PROPOSED SCHEME EXCEPT RETAIL WOULD HAVE HOTEL AND LEISURE AREAS, FOOD HALL, OFFICES AND BACK OF HOUSE.
Date
Landscape Designer
Modification
DNA
Planning Advisor
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom
Jeremy Gardner Associates
Fire Engineer
Jeremy Gardner Associates
Fire Engineer
11 Risborough Street London SE1 0HF United Kingdom
11 Risborough Street London SE1 0HF United Kingdom Construction Advisor
Blue Sky Building
Cost Consultant
EC Harris
Construction Advisor
Blue Sky Building
Cost Consultant
EC Harris
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
34 York Way London N1 9AB United Kingdom
34 York Way London N1 9AB United Kingdom
Arup
Services Engineer and Logistic Consultant
13 Fitzroy Street London W1T 4BQ United Kingdom
Arup
Services Engineer and Logistic Consultant
13 Fitzroy Street London W1T 4BQ United Kingdom
Expedition
Structural Engineer
Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
Expedition
Structural Engineer
Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
Stanhope plc
Development Manager
Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
Stanhope plc
Development Manager
Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
Gensler
Architect
Renzo Piano Building Workshop
Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
RPBW
Executive Architect
Gensler
Architect
Renzo Piano Building Workshop
Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
Executive Architect
RPBW
34, Rues des Archives 75004 Paris France
34, Rues des Archives 75004 Paris France
Selfridges & Co
Client
400 Oxford Street London W1A 1AB United Kingdom
Selfridges & Co
Client
400 Oxford Street London W1A 1AB United Kingdom
Project Title
SELFRIDGES Master Plan
Project Title
SELFRIDGES Master Plan
Discipline
ARCHITECTURAL
Discipline
Sender
Sender
Drawing Title
ARCHITECTURAL
Gensler
Gensler
OPTION B1 PROPOSED SECTION A
Drawing Title
OPTION B1 PROPOSED SECTION D
Project Stage
FEASIBILITY
Project Stage
Date
FEASIBILITY
11.12.12
Date
3. Do not scale
11.12.12
PROPOSED Architecture FLOOR PLANS
Scale @ A0
Scale @ A2
1:200
1:400
Drawing Do not scale No
A1.304
Scale @ A2
1:200
1:400 Revision
A1.301
A
GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
A
3.
Scale @ A0
Drawing No Revision
Architecture
GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
DECEMBER 2012 SELFRIDGES MASTERPLAN FEASIBILITY REPORT Sheet Notes
DECEMBER 2012
SELFRIDGES MASTERPLAN FEASIBILITY REPORT
3
Sheet Notes
EXISTING RAMP INDICATED IN GREY
S
EDWARD MEW
Key Plan
Key Plan
VOID ABOVE
C B A
17.12.12
LANDSCAPE AREA ADDED
12.12.12
ISSUED FOR FEASIBILITY
23.11.12
ISSUED AS FROZEN DESIGN
Revision
VOID 96sqm APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.
AREA SCHEDULE GIA Name Label
VOID ABOVE
PAVEMENT 1 PAVEMENT 2 RETAIL RETAIL MEP
MEZZANINE DEMOLISHED
CDM Coordinator
TEAM FACILITIES TEAM FACILITIES 2 VERTICAL CIRCULATION
48 711 1895 14203 543 124 52 1076 18653
F
Planning Advisor
Highways Consultant
REINFORCE 12 COLUMNS IN SWOD
AREA SCHEDULE GIA Name Label
VOID 138sqm
Jones Lang LaSalle
FINANCE, IT BUYING & MERCHANDISING FASHION WORKSHOP
ISSUED FOR FEASIBILITY
23.11.12
ISSUED AS FROZEN DESIGN
Date
Modification
HEAD OFFICE HEAD OFFICE MEP LEISURE / SPA MEET & EAT MEET & EAT MEP
WSP Group
RETAIL RETAIL MEP TRAINING
F
Jeremy Gardner Associates
CDM Coordinator
VERTICAL CIRCULATION
2229 70 1745 20 1817 92 8270 354 416 986 15999
Construction Advisor
Blue Sky Building
Cost Consultant
EC Harris
Planning Advisor
Structural Engineer
VOID 330sqm
Fire Engineer
VISTA CORRIDOR
OPENING IN STRUCTURAL WALL FOR VISTA CORRIDOR
VOID 84sqm
Development Manager
Blue Sky Building
Cost Consultant
EC Harris
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
34 York Way London N1 9AB United Kingdom
F
Arup
Services Engineer and Logistic Consultant
Executive Architect
Structural Engineer
Expedition
REINFORCE 6 COLUMNS IN CLASSIC
VOID 170sqm
Stanhope plc
Development Manager
RPBW Client
DOWN TO THIRD
34, Rues des Archives 75004 Paris France
VOID 59sqm
Renzo Piano Building Workshop
Architect
RPBW
UP TO FOURTH
34, Rues des Archives 75004 Paris France
Selfridges & Co
Client
Selfridges & Co
400 Oxford Street London W1A 1AB United Kingdom
REINFORCE STAIR IN CLASSIC
REINFORCE STAIR IN CLASSIC
Project Title
Project Title
SELFRIDGES Master Plan
SELFRIDGES Master Plan Sheet Orientation
Sheet Orientation
Discipline
ARCHITECTURAL Sender
Discipline
ARCHITECTURAL
Sender
Gensler
Gensler
Drawing Title
Drawing Title
OPTION B1 PROPOSED PLANS LEVEL 04
OPTION B1 PROPOSED PLANS GROUND LEVEL Project Stage
Project Stage
FEASIBILITY
FEASIBILITY Date
Date
23.11.12
23.11.12 Scale @ A0
Scale @ A2
1:200
1:400
Drawing No
A1.210 Do not scale
Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
400 Oxford Street London W1A 1AB United Kingdom
OXFORD STREET
Stanhope plc Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
Executive Architect
VOID 65sqm
Renzo Piano Building Workshop
Architect
Expedition Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
Gensler Aldgate House 33 Aldgate High Street London EC3N 1AH United Kingdom
VOID 93sqm
Arup 13 Fitzroy Street London W1T 4BQ United Kingdom
Norfolk House 31 St James's Square London SW1Y 4JJ United Kingdom
RELOCATE ENTRANCE
Jeremy Gardner Associates
Construction Advisor
VOID 88sqm VOID 88sqm
Morley House, First Floor 320 Regent Street London W1B 3BB United Kingdom
REINFORCE 6 COLUMNS IN CLASSIC
VOID 160sqm
VISTA CORRIDOR
WSP Group WSP House 70 Chancery Lane London WC2A 1AF United Kingdom
13 Fitzroy Street London W1T 4BQ United Kingdom
MEZZANINE DEMOLISHED
Jones Lang LaSalle 22 Hanover Square London W1S 1JA United Kingdom
Highways Consultant
34 York Way London N1 9AB United Kingdom Services Engineer and Logistic Consultant
270 Lafayette Street New York 10012 United States of America
PFB Construction Management Services
11 Risborough Street London SE1 0HF United Kingdom
3rd Floor, 9 Staple Inn 337-338 High Holborn London WC1V 7QH United Kingdom
F
Deborah Nevins and Associates, INC
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
Total Area
LEISURE MEP
WSP House 70 Chancery Lane London WC2A 1AF United Kingdom
EET
VOID 125sqm
APPROXIMATE GROSS INTERNAL AREAS & PLANS BASED ON CURRENTLY AVAILABLE SURVEY INFO. FURTHER DETAILED SURVEYING REQUIRED.
11 Risborough Street London SE1 0HF United Kingdom
DUKE STR
VOID ABOVE
VOID ABOVE
VOID 125sqm
12.12.12
DNA
270 Lafayette Street New York 10012 United States of America
PFB Construction Management Services
22 Hanover Square London W1S 1JA United Kingdom
Fire Engineer
VOID ABOVE
A Revision
Landscape Designer
Deborah Nevins and Associates, INC
2nd Floor 72 Cannon Street London EC4N 6AE United Kingdom
Total Area
LEISURE
B
Modification
DNA REINFORCE 12 COLUMNS IN SWOD
ET
Date
Landscape Designer
VOID 125sqm
ORCHARD STRE
WITH THE TEAM, I WAS WORKING ON THE GROSS INTERNAL AND EXTERNAL AREA OF THE EXISTING BUILDING AND THE PROPOSED SCHEME, THE MEP STRUCTURE, SECTIONS, CIRCULATION PLANNING AND MAKING THE GROUND FLOOR MODEL.
11.12.12
Revision A Revision
Landscape Designer
Revision
C
Do not scale GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
ROOF GARDEN
Scale @ A0
Scale @ A2
1:200
1:400
Drawing No
A1.214
Revision
B
GENSLER 2012 All rights reserved, including but not limited to The Copyright, Designs and Patents Act 1988
3
L39 LEVEL 39 MEDIA / TECH HUB CANADA SQUARE BUILDING CANARY WHARF, LONDON GENSLER LONDON / 2012 WHILE WORKING IN GENSLER, LONDON IN 2012, FOR A SHORT PERIOD OF TIME I WAS INVOLVED IN THE LEVEL 39 MEDIA/TECH HUB PROJECT. I WAS GIVEN A TASK AT THE VERY BEGINNING OF THE PROJECT TO DO A SPACE PLANNING ACCORDING TO THE NEW REQUIREMENTS FOR THE CHANGE OF THE LEVEL 39 IN CANADA SQUARE BUILDING. THIS FLOOR WAS SUPPOSED TO BE A MEDIA/TECH HUB. MY JOB WAS TO PLAN 3 MEETING ROOMS, BIG PRESENTATIONS ROOM AND OTHER AREAS NECESSARY FOR THE PROJECT. LITTLE HAS CHANGES TO THE DESIGN OF THE SPACE AFTER OUR FIRST PROPOSAL AND TODAY THE PROJECT IS COMPLETED. FEW IMAGES HERE SHOW HOW IT LOOKS TODAY.
LEVEL 39 FLOOR PLAN
ii ii APARTMENT INTERIOR DESIGN APARTMENT IN SKOPJE PRIVATE WORK / 2012 IMMEDIATELY AFTER MY GRADUATION I WAS ASKED TO DO AN INTEROR DESIGN PROJECT FOR AN APARTMENT IN SKOPJE. AT THE FIRST STAGE WE ONLY DECIDED TO DO THE PUBLIC AREAS OF THE APARTMENT - THE ENTRANCE CORRIDOR, THE LIVING ROOM, THE DINNING ROOM AND THE KITCHEN. CHANGING THE PREVIOUS STATE OF THE APARTMENT, MY IDEA WAS TO CONNECT THESE 3 SPACES (LIVING ROOM, DINNING ROOM AND KITCHEN) IN ONE AREA, ALTHOUGH KEEPING THEM IN MIND AS A SEPARATE AREAS. I INTRODUCED A LOND SOFA WITH A FEATURE WALL IN THE LIVING ROOM, A FOLDING TABLE WITH A BAR ON THE OPPOSITE WALL FOR THE DINING ROOM AND A LONG KITCHEN WITH A MIRROR BETWEEN THE ELEMENTS SO IT WOULD EVEN MORE EXTEND THE ROOM VISUALLY. I TRIED TO MAKE THIS INTERIOR MODERN AND ELEGANT AT THE SAME TIME. THE APARTMENT IS UNDER CONSTRUCTION AT THE MOMENT.
FLOOR PLAN AND ELEVATIONS