Mai 4One Sirius Render Pump
» Ideal for use with Dulux Acratex RenderWall range of bag renders. Delivery rate of 7-35Litres/minute will help increase productivity
» Save on labour, manual handling & complete jobs faster
» Disassembled in seconds with just two motions, allowing it to be transported quickly
» Suitable for large residential and commercial applications where a compact yet powerful texture sprayer is required
» Great for spraying acrylic textures, including Dulux Acratex Coventry Coarse & Medium textures
» Delivery rate of 21 litres per minute to get the job done quickly
HIGH BUILD ROLLER TIPS & TOOLS
Plan applications in the cool of the day or in the shade
This is critically important on larger walls. In hot and/or windy conditions, the addition of Hot Weather Thinner at the rate of up to 500ml per 15L will assist.
In cold conditions the thicker application and heavy atmosphere requires more time and/or improved air movement to assist drying.
Professional heavy duty roller frame & pole
High build coatings require more precise application of pressure to even out the thicker application.
Mask up
It’s faster in the long run allowing you to focus on moving quickly across the wall wet on wet. Use exterior grade tape.
Wet cut-in only
High Build Roller - Step by Step
High Build Roller - Step
High Build Roller - Step by Step
Build Roller - Step by Step
High Build Roller - Step by Step
Cut-in only an area you can roll into wet
THIN cut-in material by 10%.
Deliver material to the wall in continuous strips
DO NOT leave gaps to back roll as you may for paint.
by Step
An area you can roll into whilst still wet. Thick dry cutting-in will show. Critically important in 1 coat applications.
1 3 2 1 4
Spread evenly then deliver a fresh wet edge strip
Back-roll to spread and even out.
TIP: Working with a partner so one person applies the coating and the other person lays off, helps to keep the wet edge moving across the wall. When working with a partner use a long nap roller for fast delivery and a shorter nap roller to lay-off for the best finish. 1 3 2 1 4
Finishing (Laying-off) Empty the roller and lay-off in one vertical direction downwards.
»
»
»
»
»
»
»
Unifies and consolidates correctly prepared glazed and unglazed terracotta roof tiles to maximise adhesion.
Conditions and evens the substrate porosity to provide maximum topcoat coverage.
FIND YOUR NEAREST ROOFING ACCESSORIES STORE
Dulux Trade Centres
Arundel DTC
Beverley PAR
Blacktown DTC
Burleigh Heads DTC
Dandenong DCC
Dandenong PS
Darwin DTC
Glynde DTC
Hobart DTC
Keilor Park DCC
Lambton DTC
Lidcombe DTC
Lismore DTC
Liverpool DTC
Inspirations Paint
Inspirations Brendale
Inspirations Paint Ballina
Inspirations Paint Coffs Harbour
Inspirations Paint Forster
Inspirations Paint Gladesville
Inspirations Paint Gregory Hills
Malaga DTC
Maroochydore DTC
Mitchell DCC
Morayfield DTC
Mornington DTC
Morphett Vale DTC
Northmead RTP
Preston DTC
Rockingham DTC
Toowoomba DTC
Townsville DTC
Tuggerah DTC
Underwood QRC
Welshpool PAR
Inspirations Paint Nerang
Inspirations Paint Penrith
Inspirations Paint Rockdale
Inspirations Paint Tamworth
Inspirations Paint Tweed Heads
ROOF
Inspirations Paint Warners Bay Acratex Roof Primer MX Plus »