DUNWOODY ARCHITECTURE
YEAR 1
The Architecture Programs at Dunwoody College of Technology combine to form a five year professional Bachelor of Architecture degree focused on strengthening the profession’s capacity to realize its potential for positive global change.
DUNWOODY ARCHITECTURE The Architecture Programs at Dunwoody College of Technology combine to form a five year professional Bachelor of Architecture degree focused on strengthening the profession’s capacity to realize its potential for positive global change.
AAS ASSOCIATE IN APPLIED SCIENCE The first two years offer an associate of applied science degree with a focus on employability through the establishment of professionalism and technical competency.
Y1 PROFESSIONALISM The first year focuses on establishing professionalism through an introduction to design + building technologies, practice in critical representation, and achievement in professional behavior.
Y2 TECHNICAL COMPETENCY The second year focuses on technical competency thgouh an introduction to project management, practice in architectural collaboration, and achievement in construction documentation.
BARCH BACHELOR OF ARCHITECTURE The final three years offer a professional bachelor of architecture degree with a focus on leadership in the art, discipline, and practice of architecture through achievement in design fundamentals, architectural research, and comprehensive design.
Y3 DESIGN Year three provides and introduction to design thinking, architectural design, and practice in varying site and historical contexts, and achievement in architectural design.
Y4 RESEARCH Year four focuses on architectural research through multidisciplinary design processes while working in more comprehensive contexts including global, cultural, theoretical, political and economic.
Y5 COMPREHENSION The final year is intended to synthesize previous knowledge through the development of comprehensive architectural works. Concurrently, legal, ethical, and business aspect of professional practice are introduced.
Y1 DRAWING In collaboration with the adjacent Walker Art Center, this introductory design studio engages in technical agility through analysis, interpretation, and critical representation of the art and architecture on its site. Students focus on artists Dan Graham, Sol LeWit, and James Turrell as sculptors of space, materiality and light. Drawing begins in a primitive way, using the eye, hand and body through space to represent form and structure. This evolves into structured, mechanically drafted representations. The shift to digital involves engaging the local architecture firm HGA and their work to expand the Walker and resolve its critical circulation. Students analyze construction documents from the architect and develop 2D and 3D digital drawings. A final exercise synthesizes this evolution of drawing and representation in the form of composite section/perspective drawings with the intent of communicating a new understanding of the space, architecture, materiality and structure.
COLLABORATOR Walker Art Center HGA Architects MInneapolis Parks and Recreation STUDENTS Roman Zastavskiey Matt Yank Tyler Bares Garrett VanRoekel FACULTY John Dwyer Pablo Villamil
Y1 THE POOL HOUSE Using established architectural precedent, design and building technologies are engaged with a focus on interoperability and critical representation. A pool house is examined based on site and environmental variables to inform the proposal of a building skin. This new skin generates a perfomative response to given circumstances.
STUDENTS Devyn Smoter Eli Abnet Adam Booth Jacob Larson FACULTY Stephen Knowles
Y1 BRUNSFIELD
COLLABORATOR Snow Kreilich Architects Brunsfield Apartments STUDENTS FACULTY Paul Strother John Dwyer Pablo Villamil
T.O. Parapet 158' - 11" Roof Level 154' - 4"
Roof Parapet 169' - 7" r Roof Level 166' - 0"
3 A500
T.O. Parapet 158' - 11" Roof Level 154' - 4"
Level 5 143' - 8"
1" PLYWOOD TOPPING WOOD TRUSS
4 A500
DUNWOODY COLLEGE OF TECHNOLOGY
122' - 4"
ROOF EDGE 2 1/2" = 1'-0"
4 A500
Level 4 133' - 0"
Level 2 111' - 8"
STUDIO 2 ARCH 1202-2 WALL SECTION 1 1/8" = 1'-0"EDGE WOOD FLOOR 818 DUNWOODY BOULEVARD 3 1/2"MN = 55403 1'-0" MINNEAPOLIS,
CERAMITEX CLADDING 3/4" PLYWOOD FLOORING 1" AIR SPACE VAPOR BARRIER 1/2" PLYWOOD SHEATHING R-19 BATT INSULATION WOOD TRUSS 5/8" GYPSUM BOARD
Level 1 100' - 0"
Level 3 122' - 4"
3 Level 2 111' - 8"
WOOD FLOOR EDGE 1/2" = 1'-0" WALL SECTION 1 1/8" = 1'-0"
Level 1 100' - 0"
Lower Level 89' - 4"
ROOF EDGE 1/2" = 1'-0"
CERAMITEX CLADDING 1" AIR SPACE VAPOR BARRIER 1/2" PLYWOOD SHEATHING R-19 BATT INSULATION BUILDING WRAP 3/4" PLYWOOD SHEATHING FLASHING Level 4 ROOFING PAPER 133' - 0" SLOPE RIGID INSULATION
Level 3 5/8" GYPSUM BOARD Level 5 143' - 8"
2
4 Lower Level 89' - 4" CERAMITEX CLADDING 1" AIR SPACE VAPOR BARRIER 3/4" PLYWOOD SHEATHING R-19 BATT INSULATION BULIDING PAPER 5/8" GPYSUM BOARD 2" CAST IN PLACE CONCRETE TOPPING 8" PRECAST CONCRETE
Brunsfield Wall Section Project number Date Drawn by Checked by
4
PRECAST FLOOR EDGE 1/2" = 1'-0"
PRECAST FLOOR EDGE 1/2" = 1'-0"
100.3 16 MAY, 2017 HAF PAUL
A500 Scale
As indicated
BUILDING WRAP 3/4" PLYWOOD SHEATHING FLASHING ROOFING PAPER SLOPE RIGID INSULATION 1" PLYWOOD TOPPING Level 3 WOOD TRUSS
122' - 4" 5/8" GYPSUM BOARD
VAPOR BARRIER 1/2" PLYWOOD SHEATHING R-19 BATT INSULATION WOOD TRUSS 5/8" GYPSUM BOARD
DUNWOODY COLLEGE OF TECHNOLOGY WOOD FLOOR EDGE 3 1/2" =2 1'-0" STUDIO ARCH 1202-2
Level 2 111' - 8"
818 DUNWOODY BOULEVARD MINNEAPOLIS, MN 55403
CERAMITEX CLADDING 3/4" PLYWOOD FLOORING 1" AIR SPACE Level 1 VAPOR BARRIER 1/2" PLYWOOD 100'SHEATHING - 0" R-19 BATT INSULATION WOOD TRUSS 5/8" GYPSUM BOARD
Brunsfield Wall Section Project number Date Drawn by Checked by
4 Lower Level 89' - 4"
CERAMITEX CLADDING 1" AIR SPACE VAPOR BARRIER 3/4" PLYWOOD SHEATHING R-19 BATT INSULATION BULIDING PAPER 5/8" GPYSUM BOARD 2" CAST IN PLACE CONCRETE TOPPING 8" PRECAST CONCRETE
CERAMITEX CLADDING 1" AIR SPACE VAPOR BARRIER 3/4" PLYWOOD SHEATHING R-19 BATT INSULATION BULIDING PAPER 5/8" GPYSUM BOARD 2" CAST IN PLACE CONCRETE TOPPING 8" PRECAST CONCRETE
PRECAST FLOOR EDGE 1/2" = 1'-0"
Brunsfield Wall Section Project number Date Drawn by Checked by
100.3 16 MAY, 2017 HAF PAUL
A500 Scale
As indicated
100.3 16 MAY, 2017 HAF PAUL
A500 Scale
As indicated