Assignment 3 Emma Kelly 950391 Tut 2, Luke Wilson Section E


East Elevation Final Elevation Groundfloor Frist Floor Platform Roof Structure


North Elevation North Facade Cladding Exposed Steelwork is Galvanised


West Elevation Bracing Doors to be installed


South Elevation Internal Partitions Raking Ceilings


Structural Support and Cladding Detail Continous Sarking Topheads Sealed Connection to window frame


Continous Sarking Detail Continous sarking behind cladding


Studwall - Cladding Detail Accoustic Insulation Sarking Tophead with double sided adhesive tape for cladding


Thermal Insulation Detail Thermal Insulation wit continous sarking on exterior with foil facing inwards


Corner Detail Double Plasterboard and accoustic insulation around downpipe


Insulation Failure Failure of insulation if gaps occur in construction process


Timber Floor and Dado Locking floorboards after leveling screed Skirting to plasterboard Gap towards wall to allow for timber expansion


Plasterboard and Resilient Floor Cover Plasterboard insallted, filled, taped, sanded, painted Floorcover rolled out on leveled ground


Precast Panel Detail Reinforcement around connection points Mesh on either ide with 30mm concrete cover Extra reinforcment around brackets


Wall tie and Connection Detail Connection detail between two panels Panel to wall tie fixture


Connection to Steel Beam and Grouting Detail Steel Beam Connection welded in place Screed on top Backing rod later grouted in


Reinforcement and Failure of Concrete Corner Perimeter Reinforcement, mesh and tie in of fins Failure of concrete if not chamfered or not reinforced


Gutter Detail Pressure flasing fixed to panel Gutter on angle towards sump and downpipe Rigid insulation under gutterboard Supported on continous steel angle Roofsheet overhang and downturn


Drain Detail Balcony Tiles overhang drain Tiles on slope


Window Frame Detail Continous sarking Sealant and Rod on either side of frame Flashing Double glazing


Reflective Foil Detail Reflective side inwards


Purlin - Safety Mesh - Ceiling Joints Safety mesh can be tied around purlin Purlins are braced at midspan Thermal spacers on purlins Hangers fixed to purlins, adjustable tile ceiling WWWWW


Purlin Failure If facing down the slope, purlins may fail under the roof load W


Roof Sheet Detail Klip Lok for ease of construction Overlaps on long and short side of roofsheet Clips on top and fixed through Insulation


Platform Detail Roofsheet is cut Sealed


Insulation Blanket Detail Insulation Blanket continous, joints taped Reflective side facing inwards