PORTFOLIO 2014 - 2019 ENEA SAMPAOLESI ARCHITECT
INDEX CANADIAN WORKS
P 04
NEW BROADVIEW HOTEL
retail / hospitality interior
P 06
DADELAND
residential / hospitality interior
P 08
APPLIANCE LOVE
retail interior
BRITISH WORKS
P 10
TK MAXX HIGH WYCOMBE
retail building and interior
P 12
FISHERGATE CENTRE
retail / cinema building and interior
P 16
FISHERGATE PRIMARK
retail building and interior
P 18
THE PLAZA OXFORD ST.
retail / office building renovation and interior
P 20
VANCOUVER QUARTER
retail building
P 22
LEWIS BUILDING
office renovation and interior
AUSTRIAN WORKS
P 24
ALPENHOTEL ZIMBA
hospitality building and interior
P 28
AM JAHNPLATZ
residential / retail / office building and interior
P 30
IN DER RIEBE
residential building and interior
PORTFOLIO / ONGOING / NEW BROADVIEW HOTEL project
design and visualization for lobby, restaurant, café, rooftop terrace and common spaces in hospitality structure.
location
106 Broadview Avenue, Toronto, Canada
project designer
with THE DESIGN AGENCY and ERA ARCHITECTS
GROUND FLOOR PLAN / out of scale
ROOFTOP PLAN / out of scale
PORTFOLIO / ONGOING / DADELAND - THE STATION project
design and visualization for lobby, restaurant, café, rooftop terrace and common spaces in hospitality structure.
location
Dadeland neighborhood, Miami, USA
project designer
with THE DESIGN AGENCY
DREAM ON MODELNUMBER TRADENAME PRODUCT MATERIAL
PORTFOLIO / BUILT / APPLIANCE LOVE refurbishment of an existing retail space for house appliances | 950 Dupont St., Toronto, Canada | with the Design Agency | as project designer
2 ID-2.02
SPLIT BOX DISPLAY - CULTIVATOR, COFFEE, WINE
5'-4 7/8"
11'-8 3/8"
BOSCH
JENNAIR
2 ID-2.01
4'-6"
6'-0"
3 ID-2.01
1 ID-2.02
FLIP DOWN TABLES
3'-10 7/8"
3 ID-2.02
SCREENS 20'-6 1/2"
8'-11 3/8"
6'-0"
5'-8 1/4"
4'-6"
5
HATCHED AREA INDICATED "BOX" DISPLAY
1 ID-3.20 TYP.
7
ID-2.00
11 ID-3.20 TYP.
3'-7 1/2"
4
GAGGENEAU
ID-2.00 6
SCREEN 5'-6"
10" 6'-7 3/8" 4'-0 3/8"
RECEPTION DESK
4'-0"
LIVE LAUNDRY 1 ID-3.40
MISC. 8 ID-2.00
1 ID-3.30
3'-0"
7'-6"
4'-0 3/8"
KITCHENETTE 4'-6"
3'-0" 6"
25'-3 1/4"
2'-8"
2'-4"
3'-2 1/4"
SUB ZERO/WOLF 1'-6"
3'-0" 4'-3"
11'-9"
9 ID-3.30
16'-0"
MIELE
EXISTING ISLAND
COUNTER ADDED TO EXISTING ISLAND
13'-4 1/2"
3'-5 5/8"
10'-6 1/4"
3'-11 3/8"
SUB ZERO SHOE FRIDGE 5'-7 1/2"
7'-0 1/8"
12'-0"
3'-6 3/8"
1 ID-3.10
BBQ 3'-11"
9'-0 3/8"
5'-0 3/4"
GLASS RAILINGS
NEW PLATFORM ADDED OVER STAIRS
1 ID-2.00
3 ID-2.00
4'-6 1/8"
1 ID-2.01
EXISTING WHITE KITCHEN
2 ID-2.00
7'-0"
DOTTED LINE INDICATES BOXES OVERHEAD
PORTFOLIO / BUILT / TK MAXX HIGH WYCOMBE project
Refurbishment of viability and interiors of a shopping centre with the creation of a bigger unit for a TK Maxx shop
location
High Wycombe, England, UK
architect
with COLMAN ARCHITECTS
5
AD
7
9
10
Section B-B L(--)301
11
Section A-A L(--)300
0D04
New F.E. doors. Leave 1050 mm clear exit
Unit 85
Unit 74 Goods lift to be set adjacent to wall/structure on grid AE +69.20
AE
F.E.
New F.E. Ascot door. Leave 1800 mm clear exit
0D03
Realize lift pit to S.E. details. Install goods lift in new slab opening and make all nishes good
Elevation B L(--)201
External Service Yard
0W08
Unit 84
02 A(66)02
AF Openings to be inlled to match existing. Make nishes good Section C-C L(--)302
0W07
Section C-C L(--)302
AG
1
2
Elevation C L(--)201
Inll wall leaving pilaster exposed. Check setting out on site
3
RBS Sta Entrance
4
Openings to existing Emergency Staircase to be inlled
+69.20
New F.E. Ascot doors. Leave 1050 mm clear exit
AH
Unit 83
0W06
Typical Section A(31.4)02
Existing Emergency Staircase to be retained F.E.
F.E.
0D05
Install new display window on Eden Walk. Realize new re-rated bulkhead above
0D02
+69.32 Openings to be inlled to match existing. Make nishes good
Eden Walk
Roller shutter mechanical services. Please align to existing column
02 A(66)01
Unit 82
0W05
01 A(31)02
AJ Wall o new lift as shown Elevation D L(--)203
Install new roller shutter
Realize lift pit to S.E. details. Install customer lift to t in new slab opening and make all nishes good
AK
0D01
TK Maxx G.I.A. approx. 884.00 sq.m.
Dumb Waiter Riser
+69.32 Dotted line indicates structural opening above
AL
Metro Bank
RBS
Paul's Row
Lift
Realize escalator pit to S.E. details. Install new escalators to t in new slab opening and make all nishes good. For escalator details refer to A(66)03
Lobby
Install new display window on Eden Walk. Realize new re-rated 0W04 bulkhead above
F.E. Entrance mat to be adapted to suit new layout
AM
Existing hatch to Landlord's area. Install new loft ladder
0W01 0W02 0W03
Paul's Row 1
2
3
Install new display window into existing openings
4
Elevation A L(--)200-202
6
Typical Section A(31.4)03
Cornmarket Entrance
Display window to be retained
8
10
Section B-B L(--)301
11
Section A-A L(--)300
t ar
te
W
hi
H
et
re
St
PORTFOLIO / ONGOING / FISHERGATE CENTRE project
Refurbishment of viability and interiors of a shopping centre with the construction of building for leisure and food quarter
location
Preston, England, UK
architect
with COLMAN ARCHITECTS
New parking spaces in thermoplastic paint
Security Office
P
Construct new pavement with concrete slabs and concrete kerbs.Shape to follow existing
CAR PARK
f Road
East Clif
Install new F.E. doors. Leave min. clear exit to comply with regulations. Please refer to Schedule S(31.5)01
Realize New F.E. staircase core from Auditoria on upper floor
f Road
Realize New F.E. staircase core from Auditoria on upper floor
Construct New Substation with brickwork walls. For Wall Types please refer to A(21)01 Install Stainless steel Bike stand by Bikedock Solutions
C1D09
Install new galvanised steel fencing to F.E. exit area
F.E.
+21.000
C1D08
F.E.
G2
+21.000
Construct New Substation with brickwork walls. For Wall Types please refer to A(21)01
C1W08
New Substation C1D03
Stair 1
Construct new blockwork partition walls between F.E. staircases. For wall Types please refer to A(22)01
+21.000
F.E. New Staff Bicycle stands
C1D10
Bin Store
C1D07 Realize New F.E. staircase core from Auditoria on upper floor
Parking drainage gulleys to be retained
Install new galvanised steel fencing to F.E. exit area
C1D01
Parking slots and circulation to be arranged to suit new layout. For further details please refer to L(90)01
F.E.
C1D06 C1D05
C1D04
F
1D11
Install new F.E. doors. Leave min. clear exit to comply with regulations. Please refer to Schedule S(31.5)01
C1D13
New concrete floor
New steel supporting structure to S.E. details
Covered Service Yard
New tarmac on covered service yard
F.E.
+20.800
Service Yard
Restaurant 3
C1D14
Restaurant 1
New steel supporting structure to S.E. details
Stair 5
3,450 sq.ft. approx.
4,200 sq.ft. approx.
+21.000
Wall to be finished with reconstituted stone cladding. Please refer to A(21)01 for further details
Realize New F.E. staircase core from Auditoria on upper floor
3,850 sq.ft. approx.
Construct new stud partition walls between Restaurant Units. For wall Types please refer to A(22)01
Construct new stud partition walls between Restaurant Units. For wall Types please refer to A(22)01
Restaurant 5 3,800 sq.ft. approx. B
CO2 Room
C1D15
D C
+21.000
+21.000
3,200 sq.ft. approx.
Construct new blockwork partition walls to Service and CO2 Rooms. For wall Types please refer to A(22)01
Potential plant spaces for Unit 1&2
E
C1W07
Restaurant 4
+21.000
+21.000
+21.000
Wall to be finished with reconstituted stone cladding. Please refer to A(21)01 for further details
Install new SmartSystem shopfront with folding-sliding doors to New Restaurant Units into front openings as shown
Restaurant 2
Potential plant spaces for Unit 1&2
C1D16
Install new F.E. doors. Leave min. clear exit to comply with regulations. Please refer to Schedule S(31.5)01
Construct new blockwork partition walls between F.E. staircases. For wall Types please refer to A(22)01
C1D12
Existing
+20.700
New pavement to be installed around new building on car park level. For further details please refer to L(90)01
New concrete floor
G1
H
Stair 4
+20.900
Install new galvanised steel fencing to Staff Bicycle stands
Lockable gate
Install new bollards. For further details please refer to L(90)01
Cafe
New Service Bay
Construct new pavement with concrete slabs.
Stair 2
P
Install new SmartSystem shopfront with folding-sliding doors to New Restaurant Units into front openings as shown
New tarmac paving on covered service bay
Stair 3
P
+21.000
F.E.
afe L( Ele --) va 20 ti 8 on
East Clif Construct new pavement with concrete slabs and concrete kerbs.Paving to follow existing
P
1,000 sq.ft. approx.
C1D04
C
Ground floor wall to be finished with red bricks to match existing Centre's. For wall Types please refer to A(21)01
Cafe rear wall to be finished with red bricks to match existing Centre's. For wall Types please refer to A(21)01
+20.900
P
Wall to be finished with reconstituted stone cladding. Finish to be wrapped around corner as shown. Please refer to A(21)01 for further details
Install new shopfront to New Restaurant Units into front openings as shown
Meter Cupb'd
C1W06
Car Park C1D17
Install new SmartSystem shopfront with folding-sliding doors to New Restaurant Units into front openings as shown
Cinema CO2 Storage Room Cold Water Tank
Elec. intake Room
Typical shopfront bay: see 1252/L(31)05
C1W01
New Sub-Station 1 (Large units & cinema)
C1W02
C1W03
Unit 1 +20.870
1
2
3
4
5
6
Pilasters to be finished with reconstituted stone cladding. Please refer to L(31)05 for further
7
C1W04
C1W05
A
Pilasters to be finished with reconstituted stone cladding. Please refer to A(21)01 for further details
8
9
New pavement to be installed around new building on car park level. For further details please refer to L(90)01
10
11
GROUND LEVEL
FOYER LEVEL
PROJECTOR LEVEL
ROOF LEVEL
1
2
Proprietary powder coated aluminium acoustic screening to tenant plant. Colour: Light grey
3
4
5
New window on cinema foyer. SmartSystems frame with toughened double glazing and Pilkington Solar Control glass pane
6
7
8
Cinema wall to be clad with Trespa "Meteon" rainscreen . Please refer to A(21)01 for further details
9
Galvanised steel grillage plant deck over Kalzip roof. For steel structure please refer to S.E. details
10
Proprietary powder coated aluminium acoustic screening to tenant plant. Colour: Light grey
+40.400
11
New signage by Tenant
+40.000
+37.300
New roller shutter to Cinema entrance
Level 4 - Rooftop +37.030
Level 3 - Projection +33.240
Lower Mall Level 2 - Auditoria +27.020
Level 2 - Cinema +26.850
Newly refurbished shopfronts. Please refer to X(--)XXX for further details
New Unit 1 Level 1 +21.000
Restaurant 1
Restaurant 2
Restaurant 3
Restaurant 4
Restaurant 5
Unit 1
Pilasters to be finished with reconstituted stone cladding. Please refer to A(21)01 for further details
Double glazed laminated shopfront SmartSystem frame or equal advised to Restaurant Units on Ground Floor. Glass support fins and solar control glass TBC
Install iGuzzini Kris downlight to be installed on Restaurant Pilasters
Upper fascia to new shopfronts to be finished with reconstituted stone cladding. Please refer to A(21)01 for further details
Upper glazing pane to be spandrel panels or Alucobond panel insulated to the back
B
Dotted line indicates approximate location of roof plant area. Refer to Specialist's details Trespa "Meteon" proprietary roof border covering Roof Plant Deck Level 4 +37.030 (avg.)
Proprietary aluminium powder-coated acoustic screen to be installed on plant decks. For layout please refer to L(--)443. Acoustic screening height to exceed any equipment by 500mm as per Specialist's specifications Proprietary Kalzip standing seam roof. Refer to Manufacturer's details
600mm walkways by membrane Manufacturer
Primary structure and steel purlins to S.E. details
Single ply warm deck to form walkable roof decks.
Proprietary Kalzip standing seam roof. Refer to Manufacturer's details Tenant Service Area Leave clear
Structural concrete slab to S.E. details
Acoustic deflection head to be realized on Auditoria wall partitions
Decorative sound absorbent ceiling to be installed by Tenant
Backwall to projector room to be realized by Tenant
Leave min. 20mm clear air gap between wall lining and concrete structure
Projector Room Level 3 +33.240
Trespa proprietary ventilation system Trespa "Meteon" reveals New window on cinema foyer. SmartSystems frame with toughened double glazing and solar control glass pane
Construct plywood stadia seating on steel raking to S.E. details. Steel secondary support system to S.E. details
Enclose disabled ramp with acoustic partition walls. Please refer to A(22)01 for wall details Disabled ramp supporting structure to S.E. details Box disabled ramp to leave foyer window clear New steel raking structure to S.E. details Acoustic lining below steel raking to Specialist's specifications. Leave clear gap to steel raking to Specialist's specifications
Dotted line indicates Tenant's signage area.
Steel raking to be installed on steel baseplates resting on acoustic resilient pads. Refer to Specialist's details
Metsec wall studs to sit on top of structural upstand on outer leaf
Trespa proprietary ventilation system
Additional acoustic lining to interaction point between different wall cladding. Please refer to Specialist's specifications All internal finishes to be provided by Tenant
Construct upstand to S.E. detail for cladding support
Cinema Foyer Level 2 +26.850
Facade to be finished with reconstituted stone cladding. Proprietary Halfen steel support system Spandrel panels or aculobond insulated panels to upper glazing panel Reveals to be finished with reconstituted stone cladding. iGuzzini Kris downlight to be installed on Restaurant Pilasters
Structural concrete slab to S.E. details Steel structure to be enclosed in fire-lined boxing. All plasterboard to be lapped and adequately sealed with intumescent sealant
Primary steel structure to S.E. details
Construct Restaurant blockwork and studwork partition walls as per L(22)111
Install new SmartSystem shopfront with folding-sliding doors to New Restaurant Units into front openings as shown on main layout. Refer to L(--)413-414
New pavement to be installed around new building on car park level. For further details please refer to L(90)01
Foundation concrete structure and floor slab to S.E. details
Restaurant 2 Level 1 +21.000
PORTFOLIO / ONGOING / FISHERGATE PRIMARK extention of existing building into shopping centre and construction of new retail image and faรงade for a Primark shop
location
Preston, England, UK
architect
with COLMAN ARCHITECTS
N
project
New Primark Extension +31.450
Primark
Fishergate
+31.450
www.CADKnowHow.co.uk
www.CADKnowHow.co.uk
Unit 3.2b
www.CADKnowHow.co.uk
Unit 3.5 Unit 3.8
Unit 3.6 Unit 3.4
www.CADKnowHow.co.uk
Unit 3.2a
www.CADKnowHow.co.uk
Unit 3.7 www.CADKnowHow.co.uk www.CADKnowHow.co.uk
Fishergate Mall Entrance Fishergate B www.CADKnowHow.co.uk
www.CADKnowHow.co.uk
Unit 3.3a+b
Debenhams
C
D
E
Unit 3.9
FISHERGATE - DAY VIEW
FISHERGATE - NIGHT VIEW
44.51
40.99
40.99
36.35
36.05
31.42
36.09
36.09
36.09
31.28
31.23
31.45
31.51
PRIMARK
39.93
31.68
PORTFOLIO / ONGOING / THE PLAZA OXFORD STREET project
Refurbishment of an historical building for the formation of new shops, Arcadia offices and a Gym on upper levels.
location
London, England, UK
assistant
with COLMAN ARCHITECTS
BASEMENT FLOOR LEVEL
FIRST FLOOR LEVEL
EASTCASTLE STREET
OXFORD STREET
WELLS STREET
GROUND FLOOR LEVEL
BE R N E R S S T R E E T
0
10
20m
N
SECOND FLOOR LEVEL
New Retail Unit MSU1
Colegrave House Demise
Gymnasium Demise
New Retail Unit MSU2
Extension to Colegrave Demise
Extension to Gymnasium Demise
Landlord Demise
17 1
4
CL
5
6
7
8
10
11
12
13
18
19
14
Elevation D L(--)145
Section B L(--)302
Elevation D L(--)144
Section C L(--)303
WELLS STREET
Section D L(--)304
WELLS STREET A
SSL SSL +27.050 +27.050
Ventilation riser providing smoke extract from the Basement to be retained
Oce Entrance
Fire Escape FFL +26.830
Riser
Fire Escape FFL +26.540
New shopfront glazing to be installed by others
Ground Floor Fire Escape to be retained
CORE 3
Fire Escape
A
Fire Escape
Loading Bay
New shop display window
Refer to Drawing 1110/L(--)120
Oce demise outside of Project Scope
New shop display window CORE 5
Relocated Compactor
Fire Escape stairs from Basement to be retained
New shop display window
Boiler Flue Riser
C
Baler
New shopfront glazing to be installed by others New slab openings for MSU1 Tenant escalator pits to serve Ground to First Floor to the Structural Engineer's design and specication
Fire Escape stairs from Upper Levels to be retained
Riser
CORE 4
Goods Lift
New opening formed to provide access to existing riser
New Type 1 partition separating wall as per Drawing 1110/A(22)01
OXFORD STREET
D
Riser
CORE 4
Refer to Drawing 1110/L(--)122 for Details of this area
Line of First Floor void above
E
B
FFL +27.190 Riser
FFL FFL +27.190 +27.190
Vehicle Lift
Pass Lift
Oce demise outside of Project Scope
Vehicle Lift
New shop display window Lightwell Fire Escape over lightwell
F G
New opening to Structural Engineer's details to provide MSU1 access to Loading Bay
Existing Means of Escape to be maintained within Tenant shop-t to suit adjusted oor levels
Existing loading bay opening to be retained and new door to be installed Step in slab
Elevation C L(--)143
H FFL +27.600
New service riser openings to Services Engineer's specication and Structural Engineer's details
New Retail Unit (MSU1)
Section A L(--)300
Approx. 25,700sq.ft (2,393sq.m)
New glazed Entrance with ush threshold to be installed by others FFL +26.250
New lift shaft for MSU1 Tenant goods lift as per Drawing 1110/L(66)01 to serve Basement to First Floor to the Structural Engineer's design and specication
New Retail Unit (MSU1)
Plasterboard nishes to pass ush past columns
Step in slab
New oor construction as per the Structural Engineer's design and specication
Elevation A L(--)140
L FFL +26.250
FFL +27.283
New inll oor slab in location of removed Tenant lift
P New oor slab to Structural Engineer's design and specication to inll the void where the escalators have been removed with all existing void dimensions to be checked on site New shopfront glazing to be installed by others
R
FFL +27.283
New Type 2 partition wall as per Drawing 1110/A(22)01 and access doors to riser
New oor construction as per the Structural Engineer's design and specication
M New oor slab to Structural Engineer's design and specication to inll the void where the escalators have been removed with all existing void dimensions to be checked on site
New fully glazed frameless doorset and shopfront glazing to provide Primary Entrance to MSU2 as per Drawing 1110/L(31)152
Approx. 10,100sq.ft (942sq.m)
FFL +26.250
Line of First Floor void above
K
Escape Stair FFL +27.375
Oce demise outside of Project Scope Existing opening to be inlled
New opening formed to provide access to existing riser
Oce demise outside of Project Scope
Existing Means of Escape to be maintained within Tenant shop-t to suit adjusted oor levels New glazed Entrance with ush threshold to be installed by others
Riser
New lift shaft and suspended lift pit for MSU1 Tenant passenger lift as per Drawing 1110/L(66)03 to serve Ground to First Floor to the Structural Engineer's design and specication
CORE 2
Colegrave House Reception
Colegrave House Reception
Ventilation riser providing smoke extract from the Basement to be retained
New Type 1 partition separating wall as per Drawing 1110/A(22)01
Riser
Line of First Floor void above to allow for installation of Ground to First Floor Stairs by the incoming Tenant
New fully glazed frameless doorset with ush threshold to provide Secondary Entrance to MSU2
Step in slab
New shopfront glazing system as detailed in 1110/A(31) Series Drawings
New shopfront glazing to be installed by others
Q
Oce demise outside of Project Scope
Oce Entrance R
BERNERS STREET Elevation B L(--)141
Please Refer to 1110/L(--)104 for Continuation of Drawing
9
N
CORE 1
Fire Escape
BERNERS STREET
J
Section A L(--)301
New Retail Unit (MSU2)
Riser
CL
EASTCASTLE STREET
New shopfront glazing to be installed by others
Elevation B L(--)142
15
16
PORTFOLIO / UNDER CONSTRUCTION / VANCOUVER QUARTER project
design of a new retail building to replace former structure with five units, planning and construction coordination
location
King’s Lynn, England, UK
architect
with COLMAN ARCHITECTS
PORTFOLIO / BUILT / LEWIS BUILDING project
design and working drawings for the demolition of unused buildings andrealization of a new square in a shopping centre.
location
Renshaw Street, Liverpool, UK
architect
with COLMAN ARCHITECTS
PORTFOLIO / BUILT / ALPENHOTEL ZIMBA project
design, detailing and construction for the recovery and restoration with extension for a hotel in the alps
location
Studa 54, Brand, Österreich
architect
with NIKOLUSSI HÄNSLER ARCHITEKTEN
E+2
+3.60
ZIMMERTRAKT BEST.
E+0
BUFFET
362.0
E+1
HOTELZIMMER
E+0
GÄSTE ZUGANG
HOTELZIMMER
E-1
GÄSTE ZUGANG
HOTELZIMMER
E-2
GÄSTE ZUGANG
FRÜHSTÜCKSRAUM
FOYER
REZEPTION
-0.02
284.0
ZUGANG
E-1
GANG
GANG
-2.86
289.0
VORRAUM
-5.75
270.0
ZIMMER
E-3
GÄSTE ZUGANG
E-1
PERSONAL BESTAND
TECHNIK
-8.45
249.0
TECHNIK
-10.94
ALPENHOTEL
ZIMBA
OK ATTIKA +3.60
OK ATTIKA +3.60
+2.18 362.0 285.0
-2.21 OK FFB -2.87 -3.55
288.0
-5.10 OK FFB -5.75 -6.36 270.0
OK FFB -8.45
252.0
OK FFB -10.97
-11.78
ALPENHOTEL
-0.66
ZIMBA
+0.63 OK FFB -0.02
B
A
B
C
D
E
C
D
E
1
2
3
4
5
6
7
8
8
B1
B2
A
0 1
5
10
20
ALPENHOTEL
OK ATTIKA +3.60
OK FFB -0.02
OK FFB -2.87
OK FFB -5.75 -6.36
OK FFB
OK FFB -8.45
OK FFB -10.97 -11.58
-11.78
ZIMBA
LEVEL -4 / + 988.71m
LEVEL -1 / + 996.82m
LEVEL -3 / + 991.23m
LEVEL +0 / + 999.66m
LEVEL -2 / + 993.93m
HOTEL ROOMS FITNESS AND FREE TIME SAUNA AND WELLNESS INDOOR POOL BREAKFAST ROOM RESTAURANT STAFF SERVICE AREAS STAFF WORKING AREAS FOYER / AISLE TECHNIC / SERVICES 0
5
10
20
50
PORTFOLIO / BUILT / AM JAHNPLATZ project
detailing for the shell construction phases, preparation of building site documentation
location
am Jahnplatz 1, Feldkirch, Österreich
mitarbeiter
with NIKOLUSSI HÄNSLER ARCHITEKTEN
JAHNPLATZ / WICHNERGASSE 3.O.G.
PORTFOLIO / IN PROGRESS / IN DER RIEBE project
design, detailing and construction of a residential building with twenty apartments and area landscaping
location
in der Riebe, Götzis, Österreich
architect
with NIKOLUSSI HÄNSLER ARCHITEKTEN
E+0
E+1
E+2
E+3
E+4
E+5
224/1
322/2
6
468
408/1 408/2
224/2
223/2
322/1
403
4 223/1 /2
98
44
AS ITT
f
HAUS B.
UL
B
6
SE
AS
TR
223/3
5
1
409/2
2
3
e
F E HAUS A.
d
409/1
c
D BA IMM BE HW IE SC ER R D IN
322/4
4690
D b
C a 246
B 411
410
A
407 405 4453/1 IN DER RIEBE T SPOR RING WEST
419/1
4613
+19.52
TOP 20
+16.20 +15.04 TOP 16
TOP 9
E+4
+13.14
E+4
+11.70
E+3
TOP 4
E+2
E+3
+10.08
+8.64 TOP 12
+7.20
+5.76
E+1
TOP 2 E+1 EINFAHRT
E+1
E+1
TIEFGARAGE
E0
E+0
TIEFGARAGE
+2.88
E+0
-0.05
E+2
TIEFGARAGE
+4.35
GRUNDGRENZE
GRUNDGRENZE
TOP 14 TOP 6
DACH THERMISCHE SOLARANLAGE LT. BAUFIRMA IN ABSPRACHE GRÖSSE WIRD LT. EAW BERECHNET
RUNDKIES GULLY LT. HLS PLANUNG
OK ATTIKA
+15.04 OK ROH
+14.925 +14.915
JUN.
OK RD
21
33.0
36.0
- 65
°
DACH DÄMMUNG DURCHSCHNITTSLINIE
28.0
OK RD
+14.46
22.0
+14.46
DETAIL 13 16015/3-003
16.0
2%
6.0
25.0
24.0
+14.79
6.0
2%
ATTIKA VERBLECHUNG LT. SPENGLER FARBE LT. WAHL ARCHITEKT
6,0 cm RUNDKIESSCHUTTUNG 0,2 cm SARNAFIL TG 66 ABICHTUNGSBAHN 28,0 cm EPS-W (WLG 031) 0,0 cm EPS-W IM GEFÄLLE 0,5 cm ALU-BITUMEN DAMPFSPERRE 22,0 STAHLBETONDECKE
BETONSTEINE FÜR SOLARANLAGE
+14.24
+14.24
UK RD
UK RD
ALLE FENSTERANSCHLÜSSE INNEN DAMPF- UND LUFTDICHT AUSFÜHREN LT. BAUPHYSIK
Z. -
21 DE
19°
JALOUSIENKASTE AUSGEDÄMMT LT. FENSTERBAU
+13.85 UK KANTE JALOUSIENKASTE PUTZTRÄGERPANEEL VERPUTZT LT. WAHL ARCHITEKT
PVC FENSTER LT. FENSTERBAU FARBE LT. WAHL ARCHITEKT
TOP 9 254.0
E+4
40x10mm STAHL GELÄNDER LT. SCHLOSSER
OK BRÜ.
+12.60
RIGOLRINNE LT. HLS PLANUNG DETAIL 09 16015/3-003
OK FFB
OK FFB
+11.70
+11.70
OK RD
25.0 101.0
OK BRÜ.
GULLY LT. HLS PLANUNG
OK ROH
+12.35 +12.32 18,0 cm STB-WAND 0,1 cm KLEBER MINERALISCH 4,0 cm EPS-F weiß 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
DETAIL 10 16015/3-003
ABDICHTUNG LT. SPENGLER
DETAIL 11 16015/3-003
OK FFB
+11.69
BETON TROPFNASE 1,5 %
30.0
OK FFB
+11.73
BLECH VOM SPENGLER
91.0
1,0 cm PARKETT 7,0 cm ZEMENTESTRICH 0,1 cm SARNAVAP 1000 E DAMPFBR. 3,0 cm EPS-T 950 TRITTSCHALLDÄMM. 19,0 cm EPS-W 0,1 cm SCHÜTTUNG 22,0 cm STB-DECKE
4,0 cm RUNDKIES WEISS 0,5 cm UNKRAUTVLIES 8,0 cm SCHUTTUNG 0,2 cm SARNAFIL TG 66 ABICHTUNGSBAHN 8,0 cm EPS-W 25 IM GEFÄLLE 10,0 cm EPS-W 25 0,5 cm ALU-BITUMEN DAMPFSPERRE 22,0 STAHLBETONDECKE
66.0
4,0 cm BETONPLATTEN 4,0 cm SCHUTTUNG / UNTERKONSTRUKTION 0,8 cm GUMMIGRANULATMATTE 0,2 cm SARNAFIL TG 66 ABICHTUNGSBAHN 8,0 cm EPS-W 25 IM GEFÄLLE 10,0 cm EPS-W 25 0,5 cm ALU-BITUMEN DAMPFSPERRE 22,0 STAHLBETONDECKE
OK RD
OK RD
+11.40
+11.40
21
JUN.
- 65
°
25.0
+11.40
ABDICHTUNG UND VERBLECHUNG VOM SPENGLER
1,5 %
+11.15
36.0
UK RD
+11.15
ALLE FENSTERANSCHLÜSSE INNEN DAMPF- UND LUFTDICHT AUSFÜHREN LT. BAUPHYSIK
UK RD BALKON BELEUCHTUNG IN ABSPRACHE
JALOUSIENKASTE AUSGEDÄMMT LT. FENSTERBAU
DECKE UMRANDUNG 3-S PLATTE MIT STAHLWINKEL
21
JALOUSIENKASTE PUTZTRÄGERPANEEL VERPUTZT LT. WAHL ARCHITEKT
DETAIL 02 16015/3-002
DEZ.
19°
TROPFKANTE
+10.79 UK KANTE
PVC FENSTER LT. FENSTERBAU FARBE LT. WAHL ARCHITEKT
TYP A TROCKENBAUWAND 16015 / 3-001
METALL SICHTSCHUTZ LT. SCHLOSSER 40x10mm STAHL GELÄNDER LT. SCHLOSSER
215.0
251.0
TYP B TROCKENBAUWAND 16015 / 3-001
DETAIL 05 16015/3-002
+9.54
DETAIL 16 16015/3-004
OK FFB
DETAIL 17 16015/3-004
OK FFB
DETAIL 01 16015/3-002
OK FFB
+8.63
OK RD
+9.26
BETON TROPFNASE ABDICHTUNG UND VERBLECHUNG VOM SPENGLER
OK GULLY
+8.45
OK RD
+8.48
DETAIL 06 16015/3-002
+8.26
+8.26 UK RD
35.0
37.0
UK RD
DETAIL 08 16015/3-002
BALKON BELEUCHTUNG IN ABSPRACHE
TYP A TROCKENBAUWAND
5.0
+7.89
OK ROH
DETAIL 04 16015/3-002
DETAIL 03 16015/3-002
2%
+8.48
22.0
16.0
16.0
OK RD
+9.29
18,0 cm STB-WAND 0,1 cm KLEBER MINERALISCH 4,0 cm EPS-F weiß 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
ABDICHTUNG LT. SPENGLER
+8.64
+8.48
101.0
RIGOLRINNE LT. HLS PLANUNG
OK FFB
+8.64
OK BRÜ.
66.0
GULLY LT. HLS PLANUNG
1,0 cm PARKETT 7,0 cm ZEMENTESTRICH 0,1 cm SARNAVAP 1000 E DAMPFBR. 3,0 cm EPS-T 950 TRITTSCHALLDÄMM. 5,0 cm EPS-W 0,1 cm SCHÜTTUNG 22,0 cm STB-DECKE
BLECH VOM SPENGLER
91.0
4,0 cm BETONPLATTEN 11,0 cm UNTERKONSTRUKTION 0,1 cm BITUMENABDICHTUNG ALUKASCHIERT 22,0 cm STAHLBETON
+8.67
OK BRÜ.
TOP 5 25.0
E+3
DECKE UMRANDUNG 3-S PLATTE MIT STAHLWINKEL
+7.91 UK KANTE
UK TÜR DETAIL 19 16015/3-006
DETAIL 21 16015/3-006
REGENWASSERROHR LT. HLS PLANUNG
TÜR METALLZARGEN LT. TÜRBAU
TROPFKANTE
TÜR METALLZARGEN LT. TÜRBAU
40x10mm STAHL GELÄNDER LT. SCHLOSSER
TOP 3
4,0 cm BETONPLATTEN 11,0 cm UNTERKONSTRUKTION 0,1 cm BITUMENABDICHTUNG ALUKASCHIERT 22,0 cm STAHLBETON
OK BRÜ.
+6.66 BLECH VOM SPENGLER
25.0
E+2
215.0
205.0
250.0
20,0 cm STB-WAND 0,1 cm KLEBER MINERALISCH 22,0 cm EPS-F weiß 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
1,0 cm PARKETT 7,0 cm ZEMENTESTRICH 0,1 cm SARNAVAP 1000 E DAMPFBR. 3,0 cm EPS-T 950 TRITTSCHALLDÄMM. 5,0 cm EPS-W 0,1 cm SCHÜTTUNG 22,0 cm STB-DECKE
DETAIL 18 16015/3-006
OK FFB
DETAIL 20 16015/3-006
OK FFB
DÄMMPLATTE ALUPROFIL LT. VERPUTZER TROPFKANTE
DETAIL 07 16015/3-002
ABDICHTUNG UND VERBLECHUNG LT. SPENGLER PERIMETER SOCKELDÄMMUNG LT. VERPUTZER OK FFB
OK FFB
+5.76
+6.41
+5.75
OK RD
+6.38
BETON TROPFNASE ABDICHTUNG UND VERBLECHUNG VOM SPENGLER
OK GULLY
2%
+5.60
OK ROH
18,0 cm STB-WAND 0,1 cm KLEBER MINERALISCH 4,0 cm EPS-F weiß 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
+5.57
OK RD
+5.60
21
JUN. -
65°
22.0
+5.60
16.0
OK RD
16.0
+5.76
3.0
+5.79
101.0
TÜR TRITTBLECK LT. TÜRBAU
OK BRÜ.
GULLY LT. HLS PLANUNG
91.0
INNENTÜR LT. TÜRBAU FARBE LT. WAHL ARCHITEKT
66.0
EINGANGSTÜR LT. TÜRBAU FARBE LT. WAHL ARCHITEKT
+5.38
ALLE FENSTERANSCHLÜSSE INNEN DAMPF- UND LUFTDICHT AUSFÜHREN LT. BAUPHYSIK
UK RD
+5.38 Z. -
21 DE
BALKON BELEUCHTUNG IN ABSPRACHE
JALOUSIENKASTE AUSGEDÄMMT LT. FENSTERBAU
19°
UK RD
+5.03 UK KANTE JALOUSIENKASTE PUTZTRÄGERPANEEL VERPUTZT LT. WAHL ARCHITEKT
DECKE UMRANDUNG 3-S PLATTE MIT STAHLWINKEL TROPFKANTE
PVC FENSTER LT. FENSTERBAU FARBE LT. WAHL ARCHITEKT
E+1
TOP 1
METALL SICHTSCHUTZ LT. SCHLOSSER
TYP A TROCKENBAUWAND 16015 / 3-001
250.0
TYP B TROCKENBAUWAND 16015 / 3-001
40x10mm STAHL GELÄNDER LT. SCHLOSSER
OK BRÜ.
+3.78
DETAIL 14 16015/3-004
OK FFB
DETAIL 15 16015/3-004
OK FFB
+2.91
RIGOLRINNE LT. HLS PLANUNG
16.0
+2.50 UK RD
25.0 101.0
BETON TROPFNASE ABDICHTUNG UND VERBLECHUNG VOM SPENGLER
OK GULLY
2%
+2.69
DECKE UMRANDUNG 3-S PLATTE MIT STAHLWINKEL
AUSKRAGENDE DECKE AUSGEDÄMMT LT. BAUPHYSIK
94.0
247.0
ENTWÄSSERUNGSSCHACHT LT. HLS PLANUNG
FUNDAMENT UND BODENPLATTE LT. ANGABE STATIKER OK FFB
±0.00
XPS PERIMETERDÄMMUNG LT. BAUMEISTER BITTE SIEH 16015/2-047
ENTWÄSSERUNG LT. HLS PLANUNG 1,5 % 1,5 %
OK RD
25.0
-0.16
-0.41 UK RD
DETAIL 12 16015/3-003
C
B
A
FUNDAMENT UND BODENPLATTE LT. ANGABE STATIKER
UK KANTE TROPFKANTE
EINGANGSBEREICH
BETONPLATTE KANTE AUSGEDÄMMT UND ABGEDICHTET
OK FFB
+0.03
+2.30
16.0
AUSSENANLAGE BELEUCHTUNG IN ABSPRACHE
ALLE TROCKENBAUWÄNDE AUF AUSKRAGENDEN UND ERDBERÜHRENDEN DECKEN MIT 4 cm XPS UNTERLEGEN LT. BAUPHYSIK
E+0
+2.50
UK RD
+2.34 UK DECKE
1,0 cm FLIESEN 7,0 cm ZEMENTESTRICH 0,1 cm SARNAVAP 1000 E DAMPFBR. 3,0 cm EPS-T 650 9,0 cm EPS-W (WLG 036) 0,1 cm SCHÜTTUNG 0,5 cm ABDICHTUNGSBAHN 25,0 cm STAHLBETON BODENPLATTE 0,5 cm PE SCHUTZSCHICHT FOLIE 5,0 cm MAGERBETON SAUBERKEITSSCHICHT 25,0 cm KIES SCHUTTUNG
19.0
OK RD
+2.72
+2.50
+2.34 UK DECKE
PVC FENSTER LT. FENSTERBAU FARBE LT. WAHL ARCHITEKT
5.0
+3.50
OK FFB
+2.87
OK RD
+2.72
ALLE FENSTERANSCHLÜSSE INNEN DAMPF- UND LUFTDICHT AUSFÜHREN LT. BAUPHYSIK
25.0
OK ROH
22.0
22.0
OK RD
+3.53
18,0 cm STB-WAND 0,1 cm KLEBER MINERALISCH 4,0 cm EPS-F weiß 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
ABDICHTUNG LT. SPENGLER OK FFB
+2.88
+2.72
16.0
+2.88
OK BRÜ.
91.0
ALLE TROCKENBAUWÄNDE AUF AUSKRAGENDEN UND ERDBERÜHRENDEN DECKEN MIT 4 cm XPS UNTERLEGEN LT. BAUPHYSIK
BLECH VOM SPENGLER
66.0
1,0 cm PARKETT 7,0 cm ZEMENTESTRICH 0,1 cm SARNAVAP 1000 E DAMPFBR. 3,0 cm EPS-T 950 TRITTSCHALLDÄMM. 5,0 cm EPS-W 0,1 cm SCHÜTTUNG 22,0 cm STB-DECKE 0,1 cm KLEBER MINERALISCH 16,0 cm MINERALWOLLE (WLG 036) 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ)
4,0 cm BETONPLATTEN 11,0 cm UNTERKONSTRUKTION 0,1 cm BITUMENABDICHTUNG ALUKASCHIERT 22,0 cm STAHLBETON 0,1 cm KLEBER MINERALISCH 16,0 cm MINERALWOLLE (WLG 036) 0,5 cm SILIKATPUTZ (INKL. UNTERPUTZ) GULLY LT. HLS PLANUNG
1,5 %
UK RD