Test Yourself

What Do You Know About Environmental Resource Permitting? Donna Kaluzniak

1. P er Florida Administrative Code (FAC) 62330 Environmental Resource Permitting, the environmental resource permitting (ERP) program governs construction, alteration, operation, maintenance, repair, abandonment, and removal of what type of systems? a. D rinking water systems b. Stormwater systems c. W astewater collection systems d. W astewater treatment systems 2. P er FAC 62-330, an ERP is required prior to the construction, alteration, operation, maintenance, removal, or abandonment of any project that results in a total of how many square feet of impervious or semi-impervious surface area? a. 2 ,000 square feet b. 5,000 square feet c. 9 ,000 square feet d. 1 0,000 square feet 3. P er FAC 62-330, the duration of an ERP for a general permit is how many years long to construct? a. 2 years b. 3 years c. 4 years d. 5 years 4. P er FAC 62-330, where must an individual permit be kept during the construction phase? a. At the regional office of the Florida Department of Environmental Protection (FDEP). b. At the local government building department. c. At the work site of the permitted activity. d. O nline at the FDEP ERP permit site.

5. Per FAC 62-330, a general ERP may be granted to counties, municipalities, state agencies, and water management districts to construct, operate, and maintain a stormwater project to a. add additional treatment capability to an existing stormwater management system. b. install a new stormwater pumping system. c. reduce existing flooding by discharging additional untreated stormwater. d. serve a new development. 6. P er FAC 62-330, a general ERP is granted for the installation, maintenance, repair, and removal of underground utility lines; however, the maximum width of the disturbed corridor in wetlands shall not exceed a. 15 feet. b. 20 feet. c. 3 0 feet. d. 50 feet. 7. P er FAC 62-330, a general ERP is granted to any person constructing, repairing, or replacing a subaqueous utility crossing of artificial waters and residential canal systems. What is the maximum length of the utility crossing from top of bank to top of bank? a. 75 feet b. 100 feet c. 1 50 feet d. 200 feet 8. P er FAC 62-330, a general ERP is granted to governmental entities to construct, operate, and maintain public use facilities on public natural areas. The public use facilities authorized by this permit include a parking lot or parking area and an at-grade access road. The total size of impervious surface cannot exceed a. 2 acres. b. 3 acres. c. 4 acres. d. 5 acres.

60 February 2022 • Florida Water Resources Journal

9. P er the Environmental Resource Permit Applicant’s Handbook, Volume 1, (ERP Handbook, Volume 1), some activities are exempt from the ERP program, including construction and maintenance of a. sanitary sewer collection systems. b. swales. c. swale systems. d. water treatment plants. 10. Per the ERP Handbook, Volume 1, when do construction projects under a general ERP convert to an operations and maintenance phase? a. A utomatically upon completion of permitted activities. b. Immediately upon submittal of a certification of completion form to FDEP. c. Within 30 days of submitting a certification of completion form to FDEP. d. Within 10 days of satisfactory inspection of the project by FDEP. Answers on page 78 References used for this quiz: • F lorida Administrative Code 62-330 Environmental Resource Permitting https://www.flrules.org/gateway/ChapterHome. asp?Chapter=62-330 • Environmental Resource Permit Applicant’s Handbook, Volume 1 https://www.flrules.org/Gateway/reference. asp?No=Ref-12078

Send Us Your Questions Readers are welcome to submit questions or exercises on water or wastewater treatment plant operations for publication in Test Yourself. Send your question (with the answer) or your exercise (with the solution) by email to: donna@h2owriting.com


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

The Water Tower Welcomes Wade Trim to Innovation Campus as First Sustaining Partner

2min
page 74

Display Advertiser Index

6min
pages 78-80

Classifieds

5min
pages 75-76

AWWA/WEF Young Professionals Summit

1min
page 77

UF TREEO Center Celebrates its Instructors

5min
pages 72-73

From AWWA: A Call to Arms (and Volunteers Source Water Protection in the Farm Bill

2min
page 70

Challenges and Solutions to Developing Alternative Water Supplies in Central Florida: Polk Regional Water Cooperative

16min
pages 64-68

News Beat

4min
page 69

Test Yourself—Donna Kaluzniak

2min
page 60

FSAWWA Awards

2min
page 59

Let’s Talk Safety: Message to Self: Distracted

3min
page 58

FSAWWA Speaking Out—Emilie Moore

4min
pages 56-57

FSAWWA African-American History Month

1min
page 55

State of Infrastructure Security: Protecting

10min
pages 52-54

CEU Challenge

2min
page 51

Reader Profile—Dakota Millican

2min
page 50

C Factor—Patrick “Murf” Murphy

7min
pages 48-49

FSAWWA Drop Savers Contest

1min
page 47

Incoming Chair’s Reception and Barbecue

3min
pages 44-45

Section Awards

11min
pages 36-42

Conference Sponsors

1min
page 35

Patrick Murphy Elected as FWPCOA President for 2022

5min
pages 4-5

AWWA Water Professionals Thank You

0
page 43

Addressing a 10-µg/L Lead Trigger Level for a Blended Water Supply by Evaluating Alternative Corrosion Control Inhibitors—Paula

28min
pages 16-25

General Information, Contest Winners, Events

13min
pages 28-34

FWEA Focus—Ronald R. Cavalieri

3min
page 14

New Research Shows Most Americans Unaware of Their Daily Water Consumption

5min
pages 6-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.