Internship Training And Report

Page 1

SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF SCIENCE (HONS) IN ARCHITECTURE

INTERNSHIP TRAINING AND REPORT (INT60105) 6 JANUARY 2020 - 28 FEBRUARY 2020 (8 WEEKS)

STUDENT NAME : STUDENT ID : LECTURER : INTERNSHIP COMPANY :

GAVIN TIO KANG HUI 0333373 AR. LEE SZE EE AKITEK AKIPRIMA SDN. BHD.


INT60105 Internship Training and Report

Table of Content

CONTENT 1.0

Report Overview

Page 1

2.0

Company Introduction

Page 2

3.0

Weekly Task Involvement 3.1

Week 1

DUZ - Accolade Land S/B

Page 3

DVQ - Aurelian Land S/B 3.2

Week 2

DVQ - Aurelian Land S/B

Page 8 Page

8

Page 13Page

13

EEX - Glowing Attraction S/B ERB - Low Keng Huat Holdings 3.3

Week 3

ERB - Low Keng Huat Holdings EEX - Glowing Attraction S/B ESE - Edisi Megah

3.4

Week 4

ESE - Edisi Megah

Page 16

3.5

Week 5

DEE - Memang Jati S/B

Page 20

AZB - Atria Damansara S/B 3.6

Week 6

AZB - Atria Damansara S/B

Page 23

ESE - Edisi Megah 3.7

Week 7

ESE - Edisi Megah

Page 28

DQP - Sunway Velocity Two S/B 3.8

Week 8

DQP - Sunway Velocity Two S/B

Page 33

ERS - Sunway Tianjin For Sunway China EEX - Glowing Attraction S/B 4.0

Reflection

Page 37

5.0

Appendix - Weekly Log Sheet

Page 38

i


INT60105 Internship Training and Report

1.0

1.0 Overview

Overview

The internship programme lasted for 8 weeks, starting from 6 January 2020 to 28 February 2020 at Akitek Akiprima Sdn. Bhd. In reference to weekly Log Sheets, the report will summarise the internship experience with the aid of images, drawings and documents by indicating the scope of work undertaken weekly. The experience and involvement will be expressed precisely on weekly basis and be cross-referenced to the scope of works recorded in the Log Sheets.

Page 01


INT60105 Internship Training and Report

2.0

2.0 Company Introduction

Company Introduction Name

: Akitek Akiprima Sdn. Bhd.

Location

: E-01-4, Subang Square Business Park (East Wing), Jalan SS15/4G, 47500 Subang Jaya, Selangor Darul Ehsan

Year of Establishment

: 1980

Website

: https://www.akiprima.com.my/

Email

: akiprima-kl@akiworld.com

Contact Line

: +60-3-5633 5877

Figure 1.1 Akitek Akiprima Company Logo

“Inherent in all operations is the philosophy of building from within. Just as a building without a strong structure tends to ruin, we believe in first building our company structure, then we can begin serving our clients. Weekly team meetings to discuss on-going projects, and person senior supervision on-site to ensure building and material quality are common occurrences in this company.” -

Akiprima Philosophy

Akitek Akiprima Sdn. Bhd. was founded first in Penang. Until today, the head office is located in Subang Jaya, with domestic branches in Kuantan and Johor Bahru and also internationally in Phnom Penh, Cambodia. Akiprima has been involving in an array of projects ranging from residential and service apartment to institution and town planning. Some of the projects are Sunway City Ipoh, New Atria PJ, Impiana City Penang, Sunway Lost World Hotel Tambun, Sunway Hotel Hanoi, Water Theme Park Penang, 3 Storey Bungalow SS19, Semi-D & Terrace Factory Lots Hulu Langat and so on.

Figure 1.2 3 Storey Bungalow SS19

Figure 1.3 Semi-D & Terrace Bungalow SS19

Figure 1.4 Impiana City Penang

Page 02

Figure 1.5 Sunway Lost World Hotel, Tambun


INT60105 Internship Training and Report

3.0

Weekly Task Involvement

3.1

Week 1

3.1 Weekly Task Involvement

Project Name

DUZ - Accolade Land S/B

Location

Jalan Lancang, Taman Seri Bahtera, Cheras 56100 Kuala Lumpur

Category

Project Authority Liaison

The project was at Bomba Submission Stage. I was assigned to calculate the NFA of the office & service apartment of type A, B & C. From the task, I learned that the ratio of different type of spaces such as M&E, fire staircases, circulation spaces, living units and so on are crucial in maximising the building overall profit. Also, I was assigned to tabulate number of carpark provided in respect to each floor. The total number of carpark should be wisely considered to cater to all apartment units.

Figure 1.6 8th Floor Plan Showing Typical Apartment Unit A, B & C and Office Suite at Five Different Blocks

Page 03


INT60105 Internship Training and Report

3.1 Weekly Task Involvement

Figure 1.7 Fasa 2D - Service Apartment Typical Layout

Figure 1.8 Ground Floor Plan - Carpark Layout

Page 04


INT60105 Internship Training and Report

3.1 Weekly Task Involvement

Project Name

DVQ-Aurelian Land S/B

Location

Lot 9088, Bentong, Pahang

Category

Drawing - Detailing

I was assigned to prepare tender drawings for Staircase 5 and Staircase 8. Firstly, I was to draw detail plans for the staircases up to roof level (27th floor) according to the standard drawing convention of the company. The number and height of risers were to double check with each floor height. From this I learnt further in-depth about the By-Laws regarding to fire staircases. The risers should not exceed 180mm and turning of landing should not be overlapping with fire door swing. Also, I was exposed to the construction materials and techniques of fire safety shaft such as 150mm thick brick wall and 230mm thick R.C. shear wall and beam alignment in relation to air pressurization shaft and fire rated wall placement at each floor. After that, I was to draw the section of the fire safety shaft, projecting from the plans respectively. In this case, I learnt about the minimum headroom of 2300mm for all landings and staircase construction. At Level 9A, a double landing staircase was introduced into staircase 5 whereas a triple landing staircase was introduced into staircase 8. With the guidance of my colleagues, I managed to resolved the headroom issue by taking into account of alignment of steps and height of risers. Beam alignment is crucial for precast r.c. staircase installment and drop is to be taken care of for the area with no roof at level 9A.

Figure 1.9 Detail Staircase 5 Floor Plans S

Page 05


INT60105 Internship Training and Report

3.1 Weekly Task Involvement

Figure 1.10 Detail Staircase 5 Floor Plan - Level 10 with Specifications

Figure 1.11 Detail Staircase 5 Section with Specifications

Page 06


INT60105 Internship Training and Report

3.1 Weekly Task Involvement

Figure 1.12 Detail Staircase 5 Section - Level 7 to Level 9A (Double Landing)

Figure 1.13 Staircase 5 Layout

Page 07


INT60105 Internship Training and Report

3.2

3.2 Weekly Task Involvement

Week 2

Project Name

EEX - Glowing Attraction S/B

Location

Lot 96 (GM885), Mukim Pulai, Johor Bahru, Johor

Category

Drawing - Detailing

I was assigned to draw tender drawings of detail plans and sections for toilet. I was to detail up the toilet layout plan with reference to the main drawings. I added in sanitary fittings such as water closet, water tap, basin, paper holder, soap tray, mirror, shower head, etc. accordingly. For instance, all taps for water closet are always on right hand side of water closet. Through this task, I learned about the standard specifications for toilet such as drop difference, tiles setting out, water-proofing, window louvres orientations etc. After that, I projected two sections for each detail toilet plans. I learned to position lintel with doors and windows, tile setting height in relation to ceiling height, standard drop dimension, standard height for sanitary fittings, etc. Also, I have more understanding for the construction materials and connection details of generic wall, partywall, ceiling, door and window, etc. by drawing the sections.

Figure 1.14 Detail Toilet Plans and Sections Arranged in Templates

Page 08


INT60105 Internship Training and Report

3.2 Weekly Task Involvement

Figure 1.15 Detail Plans of Bath 2 and Bath 3

Figure 1.16 Detail Sections of Bath 2 and Bath 3

Page 09


INT60105 Internship Training and Report

3.2 Weekly Task Involvement

Figure 1.17 Detail Drawings of Bath 4 and Master Bath

Figure 1.18 Detail Sections of Master Bath

Page 10


INT60105 Internship Training and Report

3.2 Weekly Task Involvement

Project Name

ERB - LOW KENG HUAT HOLDING

Location

Villa U Thant PT 2631, Mukim Ampang KL/09

Category

Drawing - Digitalising Manual Drawings

The project tasked to renovate a villa. I was given a set of manual drawings of elevations and sections. The drawings were to be digitalised for renovation design scheme proposal. From the set of manual drawings, I have better understanding on projection lines and lineweight. Manual drawings allow occurrence of errors to the extent of selected scale, hence, some of the details of the drawings were to be ďŹ gured out in the process based on other drawings.

Figure 1.19 Digitalised Front Elevation

Figure 1.20 Railing Detail

Figure 1.21 Balcony Detail

Page 11


INT60105 Internship Training and Report

3.2 Weekly Task Involvement

Figure 1.22 Rear Elevation

Figure 1.23 Sections

Page 12


INT60105 Internship Training and Report

3.3

3.3 Weekly Task Involvement

Week 3

Project Name

EEX - Glowing Attraction S/B

Location

Lot 96 (GM885), Mukim Pulai, Johor Bahru, Johor

Category

Drawing - Detailing

For this task, I was assigned to produce tender drawings such as plans, sections and details for staircase. It is a typical staircase for a residential double storey terrace house. With reference to main drawings, details such as specifications, wall material, number of risers, dimensions, arrows, etc. were being added to plans. I learned to position staircase properly according to the alignment of beam and to locate railings properly for easier construction. Door for store under staircase is better to swing outwards to provide more room for store. Next, I was to project two sections from the plan. Through this, I have better understanding on the construction of ground and first floor beams in relation to wall and staircase position whereby the construction of ground beam and ground floor slab is divided into two steps whereas first floor beam and first floor slab are being casted simultaneously. Then, details of selected part of staircase were drew under guidance of supervisor.

Figure 1.24 Residential Double Storey Terrace Staircase Tender Drawings

Page 13


INT60105 Internship Training and Report

3.3 Weekly Task Involvement

Figure 1.25 Staircase Plans and Sections

Figure 1.26 Staircase and Railing Details

Page 14


INT60105 Internship Training and Report

3.3 Weekly Task Involvement

Figure 1.25 Staircase Plans and Sections

Figure 1.26 Staircase and Railing Details

Page 15


INT60105 Internship Training and Report

3.4

3.4 Weekly Task Involvement

Week 4

Project Name

ESE - EDISI MEGAH

Location

PT 60670 and PT 60671, Cybersouth, Dengkil, Sepang

Category

Drawing - Detailing

I was assigned to produce door and window schedule for single storey terrace with reference to main drawings. All window and door types were being identified and arranged in order with numbering. I have more in-depth understanding for the window and door specifications regarding to its building material and construction method. For instance, all bath doors will have waterproofing membrane and will be 2100mm in height whereas the other will be 2400mm in height. In addition, I learned to label and provide dimension with proper drawing conventions.

Figure 1.27 Single Storey Terrace Window Schedule

Page 16


INT60105 Internship Training and Report

3.4 Weekly Task Involvement

Figure 1.28 Window Schedule with SpeciďŹ cations

Figure 1.29 Single Storey Terrace Door Schedule

Page 17


INT60105 Internship Training and Report

3.4 Weekly Task Involvement

Next, I was assigned to produce reflected ceiling plan for Community Centre and terrace detail for Double Storey Terrace. I had a better insight to ceiling materials such as plaster ceiling and aluminium strip ceiling and their functions that cater to different rooms function specifically. I learned about general ceiling height for different spaces of different buildings. For instance, toilet ceiling height for residential building is usually kept at 2400mm whereas for public building such as community centre is generally kept at 3000mm. For terrace detail of Double Storey Terrace, I learned to draw copings and sliding door details and its connection to floor slab and lintel. Natural anodised aluminium frame sliding door is usually selected as its material due to its feasibility and economy.

Figure 1.30 Reflected Ceiling Plan with Hatching and Legends

Figure 1.31 Ceiling Height Annotation

Figure 1.32 Legends with Specifications

Page 18


INT60105 Internship Training and Report

3.4 Weekly Task Involvement

Figure 1.33 Terrace (Balcony) Detail of Double Storey Terrace

Figure 1.34 Terrace Plan Showing Sliding Door Detail and Door Coping

Page 19


INT60105 Internship Training and Report

3.5

3.5 Weekly Task Involvement

Week 5

Project Name

DEE - Memang Jati S/B

Location

Lot 29015 - 29025, Jalan Wangsamas, Mukim Setapak, KL

Category

Drawing - Detailing

My task was to produce detail plans and sections for master bath, baths and powder room. I started with plan with reference with main drawings. The project was at the stage of construction drawings. Under the guidance of my supervisor, I was able to produce the construction drawings with proper drawing convention. I had better understanding for the construction of toilet, from wall and ceiling to wall tiles and sanitary fittings. Positioning of each fittings regarding to the height and separation is crucial in maximizing user’s comfort level in the toilet.

Figure 1.35 Detail Plans and Sections

Page 20


INT60105 Internship Training and Report

3.5 Weekly Task Involvement

Figure 1.36 Powder Room and Bath 3 Detail Plans and Sections

Figure 1.37 Master Bath and Bath 2 Detail Plans and Sections

Page 21


INT60105 Internship Training and Report

3.5 Weekly Task Involvement

Project Name

AZB - Atria Damansara S/B

Location

Tingkat 9, Plaza OSK, Jalan Ampang, 50450 Kuala Lumpur

Category

Drawing - Plot, Print, Fold and Documentation

The project has completed the construction stage and the management requested for the full set of construction drawings for reference for renovation. I plotted, printed, folded and documented the sets of drawings. With this task, I had the opportunity to study the full set of as-built drawings and had an insight of which drawings are to be done for a building to be constructed. For instance, expansion joint drawings, statutory signages, landscape, facade treatment drawings, carpark marking, smoke curtain, ramp details, etc.

Figure 1.38 Categorising 932 Construction Drawings

Figure 1.39 Printed Drawings To Be Folded

Figure 1.40 Completed Set of Construction Drawings

Page 22


INT60105 Internship Training and Report

3.6

3.6 Weekly Task Involvement

Week 6

Project Name

ESE - EDISI MEGAH

Location

PT 60670 and PT 60671, Cybersouth, Dengkil, Sepang

Category

Drawing - Detailing

I was assigned to produce tender drawings for Townhouse, Single Storey Terrace and Double Storey Terrace. Firstly, I worked on reflected ceiling plan detail and tile setting out. Tile setting out drawing is important to minimize material wastage with strategic setting point. Next, based on main drawings, I were to prepare door and window schedule with proper dimension and specifications. Each types of door and window were to be identified according to their location. Then, I was to produce kitchen detail plan and section drawings. Through this, I had better understanding towards the specifications of drop and how does it function at different locations within a building. Next, I was assigned to draw carporch detail plans and sections. I learned about cement render flooring and concrete imprint and their functions. The column at carporch was integrated with piping system that allows water collected from scupper drain at first floor above to be discharged into the drain. After that, I continued with yard detail plan and sections where yard is a double volume void established up to roof level. Lastly, I was assigned to colour code the main drawings for BP Submission. I learned about the different finished represented by each colour. For instance, cement render represented by light yellow, ceramic tile represented by pink, rainwater downpipe represented by blue, etc.

Figure 1.41 Reflected Ceiling Plan - Townhouse

Page 23


INT60105 Internship Training and Report

3.6 Weekly Task Involvement

Figure 1.42 Tile Setting Out - Townhouse

Figure 1.43 Door and Window Schedule - Double Storey Terrace

Page 24


INT60105 Internship Training and Report

3.6 Weekly Task Involvement

Figure 1.44 Kitchen Detail - Townhouse

Figure 1.45 Drop Detail of Door to Backyard - Townhouse

Page 25


INT60105 Internship Training and Report

3.6 Weekly Task Involvement

Figure 1.46 Carporch and Balcony Detail - Townhouse

Figure 1.47 Yard Detail - Townhouse

Page 26


INT60105 Internship Training and Report

3.6 Weekly Task Involvement

Figure 1.48 Colour-coded Double Storey Terrace Main Drawings

Figure 1.49 Colour-coded Ground Floor Plan

Page 27


INT60105 Internship Training and Report

3.7

3.7 Weekly Task Involvement

Week 7

Project Name

DQP - Sunway Velocity Two S/B

Location

Lot 135, Jalan Peel, Seksyen 90, Bandar Kuala Lumpur, KL

Category

Drawing - Detailing

My task was to constitute Statutory Signage, Directional Signage and Architectural Signage for Tower C and D. Starting from Ground Floor Plan where the carpark circulation connects with adjacent highway, I inserted pylon signages accordingly, followed by pole signages and directional signages to indicate direction towards residential and commercial carpark area. Next, I assigned architectural signage such as floor level indicator for internal staircase, room and retail signage, loading bay, carpark signage, level indicator for lift lobby, etc. After that, directional signages were established for first floor to 8A floor to indicate carpark circulation such as exit direction, one-way or two-way vehicular circulation, more parking, etc. Finally, the legends were categorised according to residence (RA & RD) and commercial (CA & CD) in excel sheet respectively.

Figure 1.50 Signages Indication on Ground Floor Plan

Page 28


INT60105 Internship Training and Report

3.7 Weekly Task Involvement

Figure 1.51 Colour-coded Double Storey Terrace Main Drawings

Figure 1.52 Documentation of Signage Legend

Page 29


INT60105 Internship Training and Report

3.7 Weekly Task Involvement

Figure 1.53 Directional Signages for Residence (RD) and Commercial (CD)

Figure 1.54 Carpark Circulation on Second Floor

Figure 1.55 Signages Detail Indication

Page 30


INT60105 Internship Training and Report

3.7 Weekly Task Involvement

Project Name

EEX - Glowing Attraction S/B

Location

Lot 96 (GM885), Mukim Pulai, Johor Bahru, Johor

Category

Drawing - Detailing

I was assigned to produce door and window schedule. With reference to main drawings, different types of doors and windows were tabulated including door roller shutter. After that, I was to produce detail sections for door, roller shutter and windows. Through this task, I learned about the sectional details of doors and window such as aluminium frame detail, galvanised steel door head details, door leaf frame offset from floor, etc.

Figure 1.56 Door and Window Schedule

Figure 1.57 Roller Shutter Door Detail

Figure 1.58 Window Schedule

Page 31


INT60105 Internship Training and Report

3.7 Weekly Task Involvement

Figure 1.59 Door and Window Detail Sections

Figure 1.60 Casement Window Detail Section

Page 32


INT60105 Internship Training and Report

3.8

3.8 Weekly Task Involvement

Week 8

Project Name

DQP - Sunway Velocity Two S/B

Location

Lot 135, Jalan Peel, Seksyen 90, Bandar Kuala Lumpur, KL

Category

Modelling

I was assigned to produce two physical 1:1 detail models for door frame detail and R.C. ramp detail whereby one of the ramp gradient was 1:35 and the other was 1:2. They were two options provided to client regarding to the bath toilet door. The option whereby the ramp gradient is 1:35 is easier to be constructed and is more economic. More tiles are needed for the other option since there are two surfaces to be tiled : 38mm at cut tile adjacent to timber capping and ramp. Through this, I have more understanding towards the details of door, drop and ramp. It is important to wisely consider each details position and evaluate them in section and plan to ensure the details to be workable, economic, eďŹƒcient and also aesthetic.

Adjacent Wall

Timber Door Frame

Timber Floor Capping

Adjacent Timber Door Frame Wall

Figure 1.61 Door Frame and Ramp 1:1 Detail Model

Page 33

Timber Floor Capping


INT60105 Internship Training and Report

3.8 Weekly Task Involvement

Figure 1.62 and Figure 1.63 Door Frame 1:1 Detail Model with Ramp of 1:35 Gradient

Figure 1.64 and Figure 1.65 Door Frame 1:1 Detail Model with Ramp of 1:2 Gradient

Page 34


INT60105 Internship Training and Report

3.8 Weekly Task Involvement

Project Name

ERS - Sunway Tianjin for Sunway China

Location

Tianjin, China

Category

Drawing - Plot, Print and Fold

I was tasked to plot and print construction drawings of the project. Through this, I have better understanding towards building constructions. Beams will be ush with column if not stated otherwise. Due to China climatic condition, heater system such as active and passive fan rooms, heater room, heater piping to all apartment units, oor section details, etc.

Figure 1.66 Printed Construction Drawings

Figure 1.67 Staircase Detail Plans

Figure 1.68 Structural Plan Showing Beam Position

Page 35


INT60105 Internship Training and Report

3.8 Weekly Task Involvement

Project Name

EEX - Glowing Attraction

Location

Lot 96 (GM885), Mukim Pulai, Johor Bahru, Johor

Category

Drawing - Detailing

I was assigned to produce detail drawings for air-con ledge. Firstly, plan was detailed up with reference to main drawing. After that, I projected sections from plan with details. The hollow steel sections were connected to R.C. slab with anchor bolt and base plate. The separation of each horizontal hollow steel sections were kept at 125mm, 5 times of the height of each steel sections.

Figure 1.69 AC. Ledge Detail Drawings

Figure 1.70 AC. Ledge Detail Plan

Figure 1.71 AC. Ledge Detail Section

Page 36


INT60105 Internship Training and Report

4.0

4.0 Reflection

Reflection

Through this module, I gained up-to-date knowledge and get the opportunity to brush up my skills in a professional working environment. I realised that all the reverie and imagination towards architecture will end up compromising under practicality and economy issue. I learned how a good design would work under real-life situation with proper construction details and reasonable dimension to all spaces. An architect must not only possess the ability to design but knowledge to all related fields. A workable building design would always come with comprehensive construction details proposal. I would like to express my sincerest appreciation towards Mr. Azmi, my supervisor at Akitek Akiprima. I gained insight towards different phases, from conceptual and schematic design stage to construction and issued drawings stage by working on different projects under his extensive guidance. I was exposed to multiple real-life issues regarding to practicality and cost-efficiency of design which were not thoroughly considered during design studio projects in university. Also, I would like to express my gratitude for Ar. Lee Sze Ee as my academic supervisor during the internship period for her enlightening encouragement and commitment.

Page 37


INT60105 Internship Training and Report

5.0

5.0 Appendix

Appendix

Page 38


INT60105 Internship Training and Report

5.0 Appendix

Page 39


INT60105 Internship Training and Report

5.0 Appendix

Page 40


INT60105 Internship Training and Report

5.0 Appendix

Page 41


INT60105 Internship Training and Report

5.0 Appendix

Page 42


INT60105 Internship Training and Report

5.0 Appendix

Page 43


INT60105 Internship Training and Report

5.0 Appendix

Page 44


INT60105 Internship Training and Report

5.0 Appendix

Page 45