GRC Delivery and Operational Plan 2023

Page 1

Delivery Program 2022-2026 Operational Plan 2023-2024

Acknowledgement of Traditional Owners

Georges River Council acknowledges that the Bidjigal people of the Eora Nation are the traditional inhabitants and custodians of all land and water in which the Georges River region is situated.

Council recognises Aboriginal and Torres Strait Islander people as integral to the Georges River community and highly values their social and cultural contributions. Georges River Council pays respect to Elders past, present and emerging.

Georges River Council is committed to showing respect for Aboriginal people as Australia’s first peoples. Council has adopted the practice of acknowledging the Traditional Custodians of Country at events, ceremonies, meetings and functions.

2 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
3 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 3
4 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Contents 2 Acknowledgement of Traditional Owners 5 Our vision, mission and values 6 Message from the Mayor 7 Message from the General Manager 8 Organisational structure 8 Key functions and responsibilities 9 Your Councillors 10 About Georges River 11 Georges River at a glance 12 About this strategy 15 Pillar 1 Our community 15 4 Year Deliverables 16 Operational Plan 20 Performance measures 21 2023/24 Budget 23 Pillar 2 Our green environment 23 4 Year Deliverables 24 Operational Plan 26 Performance measures 26 2023/24 Budget 29 Pillar 3 Our economy 29 4 Year Deliverables 30 Operational Plan 32 Performance measures 32 2023/24 Budget 35 Pillar 4 Our built environment 35 4 Year Deliverables 36 Operational Plan 40 Performance measures 41 2023/24 Budget 43 Pillar 5 Our place in Sydney 43 4 Year Deliverables 44 Operational Plan 45 Performance measures 46 2023/24 Budget 49 Pillar 6 Our governance 49 4 Year Deliverables 50 Operational Plan 56 Performance measures 58 2023/24 Budget 60 Financial estimates 60 About the 2023/24 Budget 68 Rating and Revenue Policies 71 Debt Management and Hardship policy 72 Rating Classification Maps 76 Waste management charges 79 2023/24 Schedule of Fees and Charges

Our vision, mission and values

Our vision

Naturally connected to place, community and Country.

Our mission

A leading, people-focused organisation delivering outstanding results for our community and city.

Our values

United

We will work collaboratively as one team with common purpose and respect

Professional

We will act with integrity and seek opportunities to learn and grow

Honest

We will be open and truthful with each other and our community

Accountable

We will own our decisions and actions as we strive for excellence

5 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 5

Message from the Mayor

I am proud to present Georges River Council’s Delivery Program 2022-2026 and Operational Plan 2023/2024 and Budget for the 2023/2024 financial year.

This document sets out the goals, strategies and actions for the year to come.

The COVID-19 pandemic and natural disasters affecting our area have had a significant impact on the entire Georges River area and have presented many challenges. However, our residents and businesses have demonstrated a resilience and willingness to maintain a strong sense of community.

The Georges River Local Government Area is not only important to our local lifestyle, but our strategic centres of Hurstville and Kogarah make us vital to Sydney’s future. Our area has proven highly liveable and our growing green canopy has ensured that the ‘heat island effect’ is not extreme in our area. Our transport corridors have proven to be adequate when people are using a combination of working from home and going to their place of work but need better connections to working hubs such as Parramatta in the future. Transport projects are a major part of our advocacy agenda.

Our Delivery Program includes a mix of economic, social and environmental programs whilst ensuring responsible corporate governance and financial management.

I look forward to implementing these actions for the future of our community.

6 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Message from the General Manager

anticipates this will be ongoing. The community wants to continue using our local parks and being able to shop locally which signals an opportunity for renaissance for our local centres and continued high use of our parks and open space.

Maintaining services is a key focus of Council during 2023/24. We will continue to work to ensure all public parks and open spaces are accessible, well maintained and managed to meet the recreational needs of current and future residents.

Despite resource constraints within Council, a challenging external environment and an increase in service expectations, Council remains committed to its long-term financial sustainability.

I am pleased to present Georges River Council’s Delivery Program 2022-2026 and Operational Plan 2023/2024. This document has been created to support our Community Strategic Plan (CSP) which identifies the community’s main priorities and aspirations over the next ten years.

The Georges River area is one of the most beautiful areas within Greater Sydney. Its unique location presents the community with a wonderful array of opportunities which was reflected in feedback provided during the development of our CSP. The community wants more trees planted and to see more greening of our local areas, including our town centres. Our community appreciates and want more upgraded open space, parks, safe cycling and walkability options. Protection of the Georges River area heritage and history, activating our town centres and providing local jobs was also important to many residents.

As a result of the COVID-19 pandemic, more residents are working from home and Council

The 2023/24 Budget will be the second year Council is forecast to achieve a surplus and difficult prioritisation of valued services, projects and programs will be essential to achieve financial sustainability and compliance with our legislative obligations.

In addition to the funding received from the Commonwealth Financial Assistance Grants (FAG) and the NSW Government Stronger Communities Fund (SCF), Council successfully applied for a number of Federal and State Government grants in 2021/22 to assist with provision of facilities and services to the community. Council received over $11 million in grant funding for operational projects and over $6 million in grant funds were awarded for a variety of capital projects. These grants are critical to sustaining and improving our local infrastructure and community events.

Council remains on track with its financial strategy despite the extensive challenges in recent years from the COVID-19 pandemic and natural disasters, and coupled with the ongoing economic challenges today, Council still remains in a strong position to deliver the services our community values.

7 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Organisational Structure

General

Manager

Office of the General Manager

Community and Culture Directorate

Business and Corporate Services Directorate

Environment and Planning Directorate

Assets and Infrastructure Directorate

Executive Manager City Futures

Director Community and Culture

Acting Director Business and Corporate Services

Director Environment and Planning

Director Assets and Infrastructure

Manager Office of the General Manager

General Counsel Legal Services

Chief Audit Executive

Acting Manager City Life

Acting Manager Cultural Engagement and Library Services

Acting Manager Community and Early Learning Centres

Chief People Officer

Chief Information Officer

Chief Financial Officer

Head of Corporate Governance and Risk

Head of Strategic Property

Manager

Development and Building

Manager Strategic Planning Manager

Environment, Health and Regulatory Services

Manager City Operational Services

Manager Premium Facilities Manager Strategic Placemaking

Manager City Technical Services

Key functions and responsibilities

Community and Culture

City Life, Cultural Engagement, Library Services, Museum and Gallery, Community and Early Learning Centres

Business and Corporate Services

People and Culture, Information Management and Technology, Financial Management, Governance and Risk and Strategic Property

Environment and Planning

Development and Building, Strategic Planning, Environmental Health and Regulatory Services

Assets and Infrastructure City Operations, Premium Facilities, Strategic Placemaking, City Technical Services

Office of the General Manager

Executive Services, Integrated Planning and Reporting, Internal Audit, City Futures and Legal Services

8 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Your Councillors

Blakehurst Ward

Councillor Sam Elmir selmir@georgesriver.nsw.gov.au

M: 0410 654 310

Hurstville Ward

Councillor Colleen Symington csymington@georgesriver.nsw.gov.au

M: 0409 546 202

Councillor Natalie Mort nmort@georgesriver.nsw.gov.au

M: 0499 522 200

Deputy Mayor, Kathryn Landsberry klandsberry@georgesriver.nsw.gov.au

M:0419 984 934

Mortdale Ward

Mayor, Nick Katris nkatris@georgesriver.nsw.gov.au

M: 0419 402 191

Councillor Nancy Liu nliu@georgesriver.nsw.gov.au

M: 0400 681 188

Councillor Benjamin Wang bwang@georgesriver.nsw.gov.au

M: 0499 366 888

Peakhurst Ward

Councillor Nick Smerdely nsmerdely@georgesriver.nsw.gov.au

M: 0431 646 321

Councillor Elise Borg eborg@georgesriver.nsw.gov.au

M: 0477 222 089

Councillor Sam Stratikopoulos sstratikopoulos@georgesriver.nsw.gov.au

M: 0438 750 355

Councillor Ashvini Ambihaipahar aambihaipahar@georgesriver.nsw.gov.au

M: 0434 494 231

Councillor Christina Jamieson cjamieson@georgesriver.nsw.gov.au

M: 0431 833 609

Veronica Ficarra vficarra@georgesriver.nsw.gov.au

M: 0403 557 562

Councillor Lou Konjarski lkonjarski@georgesriver.nsw.gov.au

M: 0421 188 896

Councillor Peter Mahoney pmahoney@georgesriver.nsw.gov.au

M: 0419 374 727

9 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Kogarah Bay Ward

About Georges River

Georges River Local Government Area is 17 kilometres from Sydney CBD and covers 38 square kilometres. It is close to Sydney Airport and the M5 Motorway, as well as the foreshores of Botany Bay and the Georges River.

10 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Georges River at a glance

Our population

152,703 ABS estimated resident population

38 Years median age

0.7% Indigenous residents make up our of population

46% Population born overseas

53% Residents speak a language other than English at home

36% Couples with children 10% Older couples without children

20% Lone person households $1,968 Median weekly household income

49% Medium and high density dwellings

Households renting

32% median weekly rent $450

Households with a mortgage

30% median weekly repayment $570

31% Residents use public transport to get to work

11 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

About this strategy

• the Delivery Program, a four-year program that covers the term of the Council. To create the Program, we reviewed the Community Strategic Plan to ascertain what we could achieve over the next four years to meet the aspirational needs of the community. Although this is a four-year program, with the postponement of the 2020 local government elections, this Delivery Program will need to be reviewed after three years in line with the local government election cycle.

These documents sit within the Integrated Planning and Reporting Framework that requires us to plan for and report on our ambitions, in consultation with our community (see figure below). While the Community Strategic Plan is a longer-term representation of the community’s aspirations for the Georges River area, this document brings together:

• the Operational Plan is in the second year of the Delivery Program 2022-2026 and outlines the actions that will be undertaken, measures for each action, accountable business units and a reference to the Community Strategic Plan strategies to which the action is contributing.

Progress of actions identified in the Operational Plan are reported to council every six months. An annual report is also prepared that reflects and reports on Council’s overall performance for the financial year.

12 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
The Delivery Program and Operational Plan set out how we will deliver the goals and strategies of our Community Strategic Plan.
DELIVERY PROGRAM 4 YEARS OPERATIONAL PLAN 1 YEAR ANNUAL REPORT PERPETUAL MONITORING AND REVIEW RESOURCING STRATEGY Contains the Workforce Management Plan, Digital Resource Management Plan, Asset Management Plan and Long Term Financial Plan COMMUNITY ENGAGEMENT COMMUNITY STRATEGIC PLAN 10 + YEARS
13 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
14 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 1 Our community

Goal 1.1 Our community is socially and culturally connected and we strive for social equity.

Goal 1.2 Diverse, vibrant community hubs and facilities are connected, well maintained and have equitable access.

Goal 1.3 The community is safe and healthy.

Goal 1.4 Georges River area heritage and history is protected.

4 Year Deliverables

Pillar 1 deliverables for 2022-2026 are:

1.1.1A Implement an annual program of Council run and Council supported events.

1.1.1B Develop and implement the Georges River Council Event Strategy 2022-2027.

1.1.1C Maximise the utility of Netstrata Jubilee as a venue for Council’s major events.

1.1.2A Provide a range of programs such as the Georges River Art Prize and the Artist in Residence Program.

1.1.3A Develop and Implement social justice strategies to build the social strengths of the Georges River community.

1.1.3B Develop and implement the Georges River Council Disability and Inclusion Action Plan 2022-2026.

1.1.4A Implement the 2021-2031 Early Learning Services Strategy to meet the educational and care needs of children and their families.

1.2.1A Implement the 2030 Library Strategy to improve service delivery, technology, collections, information services, community engagement and programs.

1.2.2A Provide a range of affordable and accessible facilities for community based activities.

1.2.2B Create community spaces to deliver enhanced programs and experiences for community members.

1.2.3A Implement the Create Georges River Cultural Strategy to support our community’s cultural activities and initiatives.

1.3.1A Increase community and road safety in Georges River Local Government Area.

1.3.1B Investigate systems to improve public safety and accessibility.

1.3.2A Adopt and implement a Fire Safety Program that maintains buildings with essential fire services to safeguard the community.

1.3.2B Liaise with the NSW Government and relevant stakeholders to keep up-to-date with legislative changes around regulatory functions.

1.3.2C Implement programs relating to food premises, skin penetration premises and regulated systems.

1.4.1A Promote the retention and conservation of heritage items within the Georges River Local Government Area.

15 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Operational Plan

We will deliver the following by June 2024

Strategy 1.1.1: Initiate, facilitate and support inclusive and accessible events that meet community aspirations and connect people, communities and diverse groups.

1.1.1A Implement an annual program of Council run and Council supported events.

1.1.1Ai Implement an annual calendar of destination and localised events.

1.1.1B Develop and implement the Georges River Council Event Strategy 2022 – 2027.

1.1.1Bi Implement the Georges River Council Event Strategy 2022 – 2027.

1.1.1Bii Develop and deliver workshops to build capacity within the community on Council’s Event Guidelines.

1.1.1C Maximise the utility of Netstrata Jubilee as a venue for Council’s major events.

1.1.1Ci Commission drafting of POM and consequently engage planning consultant to initiate DA to extend the event program at Netstrata Jubilee Stadium to include entertainment, cultural and community events.

1.1.1Cii Procure major events other than sport for Netstrata Jubilee Stadium.

1.1.1Ciii Promote Netstrata Jubilee Stadium as a venue for nonsporting group events.

Strategy 1.1.2: Foster and support programs and installations such as Art Trails and Public Art that celebrate diversity, our multicultural community, supports innovation and creativity and contributes to the creative economy.

1.1.2A Provide a range of programs such as the Georges River Art Prize and the Artist in Residence Program.

1.1.2Ai Deliver Georges River Art Prize and Artist in Residence Program.

1.1.2Aii Deliver a range of public art and cultural programs.

16 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager City Life 1.1.1
Manager City Life 1.1.1
Manager City Life 1.1.1
Manager Premium Facilities 1.1.1
Manager Premium Facilities 1.1.1
Manager Premium Facilities 1.1.1
Code Deliverables/Actions Accountable CSP reference
Manager
Engagement
Services 1.1.2
Cultural
and Library
Manager
Engagement and
Services 1.1.2
Cultural
Library

Strategy 1.1.3: Develop, support and promote programs, services and activities that foster social support, participation and wellbeing for our diverse community regardless of age, gender, physical or mental ability, sexual orientation or cultural or religious background.

and Implement social justice strategies to build the social strengths of the Georges River community.

Strategy 1.1.4: Provide high quality, affordable education, care and protection for children across Council’s Early Learning Centres.

the 2021-2031 Early Learning Services Strategy to meet the educational

17 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference 1.1.3A
1.1.3Ai
Council’s
Manager Community and Early Learning Services 1.1.3 1.1.3Aii Consult
Anti-
Manager Community and Early Learning Services 1.1.3 1.1.3Aiii Develop
Aboriginal and Torres Strait Islander
Manager Community and Early Learning Services 1.1.3 1.1.3Aiv Implement
Aboriginal and Torres Strait Islander Strategy Action Plan. Manager Community and Early Learning Services 1.1.3 1.1.3B Develop
Inclusion
1.1.3Bi Implement
Georges River Council Disability and Inclusion Action Plan 2022-2026. Manager Community and Early Learning Services 1.1.3
Develop
Develop an action plan for the Georges River
Social Justice Charter.
with the community to deliver Council’s
racism campaign “Better Together”.
and implement the
Strategy.
the
and implement the Georges River Council Disability and
Action Plan 2022-2026.
the
Code Deliverables/Actions Accountable CSP reference 1.1.4A Implement
1.1.4Ai Review and implement Child and Staff Wellbeing Action Plan. Manager Community and Early Learning Services 1.1.4 1.1.4Aii Implement Council's Child Protection Action Plan. Manager Community and Early Learning Services 1.1.4 1.1.4Aiii Implement the Early Learning Services Reconciliation Action Plan. Manager Community and Early Learning Services 1.1.4 1.1.4Aiv Review demand
needs early
Manager Community and Early Learning Services 1.1.4
and care needs of children and their families.
for an additional
learning centre.

Strategy 1.2.1: Develop our library services to provide for inclusive hubs, spaces and services, collections, programs and facilities

1.2.1A Implement the 2030 Library Strategy to improve service delivery, technology, collections, information services, community engagement and programs.

1.2.1Ai Investigate innovative ways to provide library services to the western half of the Georges River Local Government Area.

1.2.1Aii Activate the reading and sensory garden at Hurstville Library through programs and other community engagement.

1.2.1Aiv Undertake consultation to assess the current libraries at Oatley, Penshurst and South Hurstville for their suitability and community use.

1.2.1Av Continue to implement the Georges River Library Debt Recovery and Management Plan.

Strategy 1.2.2: Provide a range of affordable and accessible facilities and community hubs for communitybased activities.

1.2.2A Provide a range of affordable and accessible facilities for community based activities. 1.2.2Ai Maintain and provide for hire community properties across the Georges River Local Government Area.

Deliver actions identified in the Venue and Facilities Management Review.

Deliver actions identified in an Open Space Expansion Plan.

Create community spaces to deliver enhanced programs and experiences for community members.

Create a multi-functional, accessible and flexible programming space.

1.2.2Bii Provide opportunities for the community to engage with the Library and Hurstville Museum & Gallery outside Council buildings through outreach, online and delivery services.

18 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Cultural Engagement
Services 1.2.1
and Library
Manager Cultural Engagement
Services 1.2.1
and Library
Manager Cultural Engagement and
Services 1.2.1
Library
Manager Cultural Engagement
Services 1.2.1
and Library
Code Deliverables/Actions Accountable CSP reference
Manager City Life 1.2.2 1.2.2Aii
Manager City Life 1.2.2 1.2.2Aiii
Manager City Life 1.2.2
Manager Cultural Engagement
Services 1.2.2
Manager Cultural Engagement and
Services 1.2.2
1.2.2B
1.2.2Bi
and Library
Library

Strategy 1.2.3: Encourage and promote the arts and creativity through Council’s cultural facilities including Hurstville Museum & Gallery, Hurstville Entertainment Centre and Carss Park Artists Cottage.

1.2.3A Implement the Create Georges River Cultural Strategy to support our community’s cultural activities and initiatives.

1.2.3Ai Implement the Create Georges River Cultural Strategy to support and strengthen our community’s cultural activities and initiatives.

1.2.3Aii Increase the profile of Hurstville Museum & Gallery through the implementation of a comprehensive and diverse program of exhibitions and events.

1.2.3Aiii Establish and increase the profile of the Edgbaston Artist Studio.

Strategy 1.3.1: Implement actions to maintain and promote the community safety of our area.

Increase community and road safety in Georges River Local Government Area.

Deliver the 2023/24 Road Safety Program, focused on traffic facilities, Black Spot Funding and other safety initiatives.

Deliver a pilot Community Safety Program.

1.3.1B Investigate systems to improve public safety and accessibility.

1.3.1Bi Develop annual program to upgrade council's security and CCTV systems to improve public safety and accessibility.

Strategy 1.3.2: Conduct regulatory functions in accordance with legislative requirements.

Deliverables/Actions

1.3.2A Adopt and implement a Fire Safety Program that maintains buildings with essential fire services to safeguard the community.

1.3.2Ai Implement actions to ensure compliance with the directions set by the NSW State Government relating to external combustible cladding and Council's Fire Safety Audit.

1.3.2B Liaise with the NSW Government and relevant stakeholders to keep up-to-date with legislative changes around regulatory functions.

1.3.2Bi Implement the 2023/24 regulatory programs to ensure compliance with the relevant legislation and to address community safety concerns.

Environment, Health and Regulatory Services

1.3.2C Implement programs relating to food premises, skin penetration premises and regulated systems.

1.3.2Ci Implement the Get The Site Right Program to manage development site condition compliance.

Environment, Health and Regulatory Services

19 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Cultural Engagement and
Services 1.2.3
Library
Manager Cultural Engagement and
Services 1.2.3
Library
Manager Cultural Engagement
Services 1.2.3
and Library
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Placemaking 1.3.1
Manager
1.3.1
1.3.1A
1.3.1Ai
1.3.1Aii
Community and Early Learning Services
Chief
1.3.1
Information Officer
Code
Accountable CSP reference
Manager
1.3.2
Environment, Health and Regulatory Services
Manager
1.3.2
Manager
1.3.2

Strategy 1.4.1: Encourage and promote heritage and history through collections, programs, heritage trails and protection policies

1.4.1A Promote the retention and conservation of heritage items within the Georges River Local Government Area.

1.4.1Ai Conduct a 2023/24 Heritage Building Grants Program.*

1.4.1Aii Conduct a heritage information session for owners of heritage listed properties.*

*This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24

Performance measures

20 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 1.4.1
Manager Strategic
1.4.1
Planning
Measures Target Responsibility Utilisation of Council’s Early Learning Services > 90% Manager Community and Early Learning Services Customer satisfaction with Early Learning Services ≥ 80% Manager Community and Early Learning Services Customer satisfaction with community centres and performance venues ≥ 80% Manager City Life Customer satisfaction with Museum and Gallery ≥ 80% Manager Cultural Engagement and Library Services Customer satisfaction with Library Services ≥ 80% Manager Cultural Engagement and Library Services Customer satisfaction with Events ≥ 80% Manager City Life

2023/24 Budget

User Charges and Fees

Other Revenues from Ordinary Activities Operating Grants and Contributions

Employee Costs Depreciation Other expenses

21 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 5,753 Interest IncomeOther Operating Revenues 5,850 Operating Grants and Contributions 5,381 Profit on Sale of AssetsTotal Operating Revenue 16,984 Operating Expenditure Employee Costs 19,090 Interest ChargesMaterials and Services 7,612 Depreciation and Amortisation 2,414 Other Operating Expenses 687 Total Expenditure 29,802 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) (12,818)
Material and Services Income Expenditure
22 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 2 Our green environment

Goal 2.1 Our environmentally sustainable practices inspire us all to protect and nurture the natural environment.

Goal 2.2 Our waterways are healthy and accessible.

Goal 2.3 Greening, canopy cover and bushland and biodiversity preservation are maximised.

4 Year Deliverables

Pillar 2 deliverables for 2022-2026 are:

2.1.1A Implement the Resilience Action Plan 2022- 2040 for Council services.

2.1.1B Undertake programs and activities to educate the community on reducing energy consumption, protecting waterways, reducing waste and taking other action to improve the environment, with a focus on climate change projects.

2.1.2A Implement the Waste Strategy 2021-2040.

2.1.2B Deliver community education initiatives to support environmentally sustainable waste disposal and recycling practices.

2.1.3A Maintain and implement the Georges River Local Emergency Management Plan in collaboration with the Local Emergency Management Committee (LEMC).

2.2.1A Represent Council's ambitions for the Georges River through the GRCCC.

2.2.2A Implement the recommendations of the Foreshore Scenic Character Review into the Georges River Local Environmental Plan.

2.2.2B Maintain Council's marine and foreshore assets to be functional and safe.

2.3.1A Provide appropriate and responsive management of current and future tree assets within the Georges River Local Government Area.

2.3.2A Implement Council’s Bush Regeneration Program to protect, conserve and enhance the natural environment.

23 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Operational Plan

We will deliver the following by June 2024

Strategy 2.1.1: Prepare the Georges River area to be resilient in addressing climate change and reducing energy and water usage.

2.1.1A Implement the Resilience Action Plan 2022- 2040 for Council services.

2.1.1Ai Report on the implementation progress of the Resilience Action Plan 2022 - 2040*.

2.1.1B Undertake programs and activities to educate the community on reducing energy consumption, protecting waterways, reducing waste and taking other action to improve the environment, with a focus on climate change projects.

2.1.1Bi Implement activities to educate the community on reducing energy consumption and protecting the environment.

Strategy 2.1.2: Ensure waste is managed as a resource with minimal impacts from its disposal.

2.1.2A Implement the Waste Strategy 2021-2040.

2.1.2Ai Report on the implementation progress of the Waste Strategy 2021-2040.

2.1.2B Deliver community education initiatives to support environmentally sustainable waste disposal and recycling practices.

2.1.2Bi Implement the annual Waste Education Program.

Strategy 2.1.3: Prepare for natural disasters such as bushfires and extreme weather events.

2.1.3A Maintain and implement the Georges River Local Emergency Management Plan in collaboration with the Local Emergency Management Committee (LEMC).

2.1.3Ai Provide support to the State Emergency Service within the Georges River Local Government Area.

2.1.3Aii Achieve endorsement of Georges River Local Emergency Management Plan 2021 and facilitate quarterly LEMC meetings attended by all combat agencies.

Services

Strategy 2.2.1: Protect the Georges River and waterways to be clean and naturalised.

2.2.1A Represent Council's ambitions for the Georges River through the GRCCC.

2.2.1Ai Support the GRCCC with the development of a Foreshore Management Plan.

*The Energy Management Plan (Gas) project will not be undertaken in 2023/24 due to the project not being funded in 2023/24.

24 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Environment, Health and Regulatory Services 2.1.1
Manager Environment, Health and Regulatory Services 2.1.1
Code Deliverables/Actions Accountable CSP reference
Manager Environment, Health and Regulatory Services 2.1.2
Manager Environment, Health and Regulatory Services 2.1.2
Code Deliverables/Actions Accountable CSP reference
Manager City Operational
2.1.3
Manager City Operational Services 2.1.3
Code Deliverables/Actions Accountable CSP Reference
Manager Environment, Health and Regulatory Services 2.2.1

Strategy 2.2.2: Maintain and implement strategies to provide access to our waterways.

2.2.2A Implement the recommendations of the Foreshore Scenic Character Review into the Georges River Local Environmental Plan. 2.2.2Ai Report the results of the preliminary community consultation on the proposed implementation of the Biodiversity Study and Foreshore Scenic Character Study.

2.2.2B Maintain Council's marine and foreshore assets to be functional and safe.

2.2.2Bi Undertake programmed and reactive maintenance works of marine and foreshore assets.

Strategy 2.3.1: Increase and promote our tree canopy, shrubs and bushland coverage.

2.3.1A Provide appropriate and responsive management of current and future tree assets within the Georges River Local Government Area.

Implement Council's Tree Management Policy.

2.3.1Aii Continue expanding urban tree canopy to work towards Council’s target of 40% urban canopy by 2039 with a focus on areas on high urban heat.

2.3.1Aiii Develop a significant tree register for the LGA.

Strategy 2.3.2: Protect and reinstate our biodiversity, including endemic flora and fauna.

Implement Council's Bush Regeneration Program to protect, conserve and enhance the natural environment. 2.3.2Ai Implement the 2023/24 Bush Regeneration Program.

2.3.2Aii Implement the high priority recommendations of the Biodiversity Study 2021 including preparing a Biodiversity Strategy.*

Regulatory Services

*Aspects of this project may not be undertaken in 2023/24 due to the project not being funded in 2023/24.

25 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 2.2.2
Manager City
2.2.2
Operational Services
Code Deliverables/Actions Accountable CSP reference
Manager City Operational Services 2.3.1
Manager City
2.3.1
Manager Environment, Health and Regulatory
2.3.1
Code Deliverables/Actions Accountable CSP reference
Manager
2.3.2
2.3.1Ai
Operational Services
Services
2.3.2A
City Technical Services
Manager Environment, Health
2.3.2
and

Performance measures

2023/24 Budget

26 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 31,970 User Charges and Fees 1,295 Interest Income 335 Other Operating Revenues 222 Operating Grants and Contributions 310 Profit on Sale of AssetsTotal Operating Revenue 34,133 Operating Expenditure Employee Costs 10,273 Interest ChargesMaterials and Services 31,187 Depreciation and Amortisation 289 Other Operating Expenses 170 Total Expenditure 41,919 Capital Grants and Contributions 1,750 Operating Result before Capital Revenues - Surplus/(Deficit) (7,786)
Measures Annual Target Responsibility Number of hectares of active bush regeneration activities. ≥ 20 Manager City Technical Services Number of
activities. ≥ 2,000 Manager City Technical Services Number of volunteer hours
with Bushcare activities. ≥ 3,000 Manager City Technical Services Number of street trees planted each year. = ≥ 160 Manager City Operational Services Percentage of environmental pollution complaints responded to within two business days. > 75% Manager Environment, Health and Regulatory Services Percentage of waste customer requests responded to within 48 hours. > 98% Manager Environment, Health and Regulatory Services Percentage of food premises inspected annually. = 100% Manager Environment, Health and Regulatory Services
native plants including trees, shrubs and ground covers planted to improve habitat, biodiversity and bushland structure (or other community tree planting)
associated

Income Expenditure

Rates and Annual Charges

User Charges and Fees

Interest Income

Other Revenues from Ordinary Activites

Operating Grants and Contributions

Materials and Services

Employee Costs

Depreciation

Other Expenses

27 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
28 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 3 Our economy

Goal 3.1 Local jobs and local businesses are supported to grow.

Goal 3.2 Our town centres are green, clean, vibrant and activated and have good amenities.

Goal 3.3 Georges River is a 30 minute city.

4 Year Deliverables

Pillar 3 deliverables for 2022-2026 are:

3.1.1A Promote effective economic development initiatives that benefit the Georges River Local Government Area.

3.1.2A Deliver programs to activate and increase the night time economy in town centres.

3.1.3A Actively participate with State agencies and Bayside Council to achieve the ambitions for the Kogarah Health and Research Hub Collaboration Area.

3.1.3B Prepare and implement an action plan to market the Georges River Local Government Area's investment opportunities.

3.1.3C Maximise the potential of the Kogarah Health and Research Hub.

3.1.3D Build the cultural identity of Hurstville CBD as the Heart of the City.

3.1.3E Implement initiatives in key economic sectors in response to the Economic Development Strategy.

3.2.1A Maintain Council's green open space and town centres to be functional and safe.

3.2.2A Work with other directorates and teams to implement, promote and market long-term place-based initiatives.

3.2.3A Assist and promote the greening and creation of open space in our town centres.

3.2.4A Implement the recommendations of the Commercial Centres Strategy.

3.3.1A Advancement of the ‘River Rail’ through the identification of and protection of infrastructure corridors with Transport for NSW.

3.3.1B Influence the next iteration of district and metropolitan planning, with recognition of the untapped potential of the Southern Aerotropolis.

29 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Operational Plan

We will deliver the following by June 2024

Strategy 3.1.1: Support local businesses to help protect jobs and create employment opportunities.

3.1.1A Implement initiatives in key economic sectors in response to the Economic Development Strategy.

3.1.1Ai Perpare a strategic business case for the 'River Rail'(Kogarah to Parramatta rail link) in partnership with key stakeholders.

Strategy 3.1.2: Encourage the Night Time Economy, particularly in Hurstville, Beverly Hills and Kogarah, to grow.

3.1.2A Deliver programs to activate and increase the night time economy in town centres.

3.1.2Ai Seek programs and partnerships to activate and increase the night time economy in Hurstville and Kogarah.

Strategy 3.1.3: Target economic development in key locations and sectors within the local government area

3.1.3A Actively participate with State agencies and Bayside Council to achieve the ambitions for the Kogarah Health and Research Hub Collaboration Area.

3.1.3Ai Lead the Kogarah Collaboration Area Place Strategy Governance Group.

3.1.3B Prepare and implement an action plan to market the Georges River Local Government Area’s investment opportunities. 3.1.3Bi Implement the action plan to market the City.

3.1.3C Maximise the potential of the Kogarah Health and Research Hub.

3.1.3Ci Implement, promote and market the Kogarah Investment Attraction Strategy to grow the Kogarah Health and Education Precinct.

3.1.3D Build the cultural identity of Hurstville CBD as the Heart of the City.

3.1.3Di Continue to build and promote the identity of Hurstville as the 'Heart of the City'.

City Futures

Strategy 3.2.1: Provide regular maintenance and cleansing of town centres and public toilets.

3.2.1A Maintain Council's green open space and town centres to be functional and safe.

3.2.1Ai Undertake programmed and reactive cleansing, sportsfield and park maintenance works of Council's green open spaces and town centres.

Services

30 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.1.3
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.1.2
Code Deliverables/Actions Accountable CSP reference
Executive Manager City
3.1.3
Futures
Executive Manager City Futures 3.1.3
Executive Manager City Futures 3.1.3
Executive
3.1.3
Manager
Code
Accountable CSP reference
Deliverables/Actions
Manager City Operational
3.2.1

Strategy 3.2.2: Encourage and support targeted, place-based events and activities to activate town centres.

3.2.2A Work with other directorates and teams to implement, promote and market long-term place-based initiatives.

3.2.2Ai Continue to implement place-based public domain initiatives across the Georges River Local Government Area.

Strategy 3.2.3: Implement greening and planting strategies in town centres.

3.2.3A Assist and promote the greening and creation of open space in our town centres.

3.2.3Ai Continue to drive increased greening and creation/ improvement of open space in our town centres.

Strategy 3.2.4: Protect employment growth and services during land rezoning processes.

3.2.4A Implement the recommendations of the Commercial Centres Strategy.

3.2.4Ai Continue the work of the Commercial Centres Strategy for all centres within the Georges River Local Government Area.*

Strategy 3.3.1: Advocate to the NSW Government to support Georges River as a 30 minute city.

3.3.1A Advancement of the ‘River Rail’ through the identification of and protection of infrastructure corridors with Transport for NSW.

3.3.1Ai Prepare a business case for the ‘River Rail’ (Kogarah to Parramatta rail link).

3.3.1B Influence the next iteration of district and metropolitan planning, with recognition of the untapped potential of the Southern Aerotropolis.

3.3.1Bi Advocate for the acknowledgement of and investment in the Southern Aerotropolis through a NSW Government- led vision and plan in collaboration with local councils and key stakeholders.

*This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24

31 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.2.2
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Placemaking 3.2.3
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 3.2.4
Code Deliverables/Actions Accountable CSP reference
Executive Manager City
3.3.1
Futures
Executive Manager
3.3.1
City Futures

Performance measures

2023/24 Budget

32 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 773 Interest Income 2,440 Other Operating Revenues 6,235 Operating Grants and ContributionsProfit on Sale of AssetsTotal Operating Revenue 9,448 Operating Expenditure Employee Costs 5,744 Interest ChargesMaterials and Services 1,568 Depreciation and AmortisationOther Operating Expenses 331 Total Expenditure 7,643 Capital Grants and Contributions 10,480 Operating Result before Capital Revenues - Surplus/(Deficit) 1,805
Measures Annual Target Responsibility The percentage of reported graffiti removed within 5 days. > 80% Manager City Operational Services Kilometres of roads swept > 30,000 Manager City Operational Services Percentage of engineering operations service requests actioned against works scheduled. ≥ 80% Manager City Operational Services All 24 commercial centres cleaned daily. = 100% Manager City Operational Services

Income Expenditure

Capital Grants and Contributions

Other Operating Revenues

Interest Income

User Chargers and Fees

Employee costs

Materials and Services

Other Expenses

33 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
34 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 4

Our built environment

Goal 4.1: New development should make Georges River more liveable, vibrant and sustainable.

Goal 4.2: Affordable and quality housing options are available.

Goal 4.3: There are a range of transport options and increased walkability and cycling to connect people, goods and businesses.

Goal 4.4: Everyone has access to quality parks and open space and active and passive recreation facilities.

Goal 4.5: Council-led development and assets provide quality, long term benefits to everyone.

4 Year Deliverables

Pillar 4 deliverables for 2022-2026 are:

4.1.1A Complete a Master Plan for Beverly Hills and Mortdale Local Centre that will revitalise the centre and respond to the community's ideas and aspirations for the future of the centre.

4.1.1B Prepare a Master Plan for the Riverwood Local Centre in association with the Riverwood community and Canterbury-Bankstown Council.

4.1.1C Include the Hurstville Civic Centre site in the Georges River Local Environmental Plan 2021.

4.1.1D Develop and implement planning controls to protect the scenic character of the foreshore.

4.1.2A Monitor and standardise DA assessment reports and templates.

4.1.2B Provide ongoing education to the community about controls to the development and building approval processes.

4.2.1A Develop and implement an Affordable Rental Housing Scheme.

4.2.1B Provide affordable housing in one of Council's redevelopments.

4.3.1A Pursue State Government priority for express trains on the T4 line stop at Kogarah and T8 line to the CBD, the River Rail and Hurstville (or Kogarah) to Macquarie Park via Rhodes (through Burwood or Strathfield) rail line.

4.3.2A Maintain Council's footpath network to be functional and safe.

4.3.2B Continue to maintain Council’s walkways and cycleways to be functional and safe.

4.4.1A Maintain Council's buildings and open space to be functional and safe.

4.4.1B Incorporate design principles for parks and open spaces that promote resilience.

4.4.1C Implement the GRC Open Space, Recreation and Community Facilities Strategy.

4.4.2A Research and plan for active and passive recreation opportunities within the Georges River Local Government Area.

4.4.2B Progress construction of a new aquatic facility in the LGA.

4.4.3A Ensure our parks and reserves have updated Plans of Management and Master Plans.

4.5.1A Plan for and implement a purchasing program for property requiring compulsory acquisition in the comprehensive LEP.

4.5.1B Achieve service delivery outcomes through a 10 year Capital Works Program driven by Council Strategies.

4.5.1C Deliver Asset Management Plans for each Asset Class (Roads, Buildings, Open Space and Stormwater) which plan for the long term sustainability of Council’s Infrastructure assets.

4.5.1D Provide new and updated community assets such as new library services to the western part of our LGA.

35 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Operational Plan

We will deliver the following by June 2024

Strategy 4.1.1: Prepare Development Control Plans and Master Plans to guide liveable development and amenity.

4.1.1A Complete a Master Plan for Beverly Hills and Mortdale Local Centre that will revitalise the centre and respond to the community’s ideas and aspirations for the future of the centre.

4.1.1Ai Finalise the Master Plan for Beverly Hills and Mortdale Local Centre. Manager Strategic Planning 4.1.1

4.1.1B Prepare a Master Plan for the Riverwood Local Centre in association with the Riverwood community and Canterbury-Bankstown Council.

4.1.1Bi Commence consultation on a Master Plan for the Riverwood Local Centre.*

Manager Strategic Planning 4.1.1

4.1.1C Include the Hurstville Civic Centre site in the Georges River Local Environmental Plan 2021.

4.1.1Ci Finalise the rezoning of the Hurstville Civic Centre site.

Manager Strategic Planning 4.1.1

4.1.1D Develop and implement planning controls to protect the scenic character of the foreshore.

4.1.1Di Report the results of the preliminary community consultation on the proposed implementation of the Biodiversity Study and Foreshore Scenic Character Study.

4.1.1Dii Prepare a set of biodiversity, scenic character and foreshore controls for community consultation.

Manager Strategic Planning 4.1.1

Manager Strategic Planning

Strategy 4.1.2: Undertake rigorous assessment of development applications (DAs) by Council staff, local planning panel and Sydney South Planning Panel. Code Deliverables/Actions

4.1.2A Monitor and standardise DA assessment reports and templates.

4.1.2Ai Update report templates to reflect current planning controls. Manager Development and Building

4.1.2Aii Ensure templates are up to date and reflect any legislative changes.

Manager Development and Building

4.1.2B Provide ongoing education to the community about controls to the development and building approval processes.

4.1.2Bi Implement community information session on planning development and building sessions.

Manager Development and Building

4.1.2Bii Provide up to date self-help information on Council's website. Manager Development and Building

*This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24

36 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
4.1.1
CSP reference
Accountable
4.1.2
4.1.2
4.1.2
4.1.2

Strategy 4.2.1: Develop policies that encourage a greater supply of housing diversity and choice.

4.2.1A Develop and implement an Affordable Rental Housing Scheme.

4.2.1Ai Develop an Affordable Rental Housing Scheme that applies to precincts within the LGA.

4.2.1B Provide affordable housing in one of Council's redevelopments.

4.2.1Bi Select a Council owned site for the provision of affordable housing.

4.2.1Bii Select a Council owned site or investigate the acquisition of residential property for the provision of affordable housing.

Planning/ Head of Strategic Property

Strategy 4.3.1: Provide expert advice and lobby the State Government to provide and improve public transport options such as train and bus services.

4.3.1A Pursue State Government priority for express trains on the T4 line stop at Kogarah. and T8 line to the CBD, the River Rail and Hurstville (or Kogarah) to Macquarie Park via Rhodes (through Burwood or Strathfield) rail line.

4.3.1Ai Continue to lobby Transport for NSW and the Minister for Transport for improved public transport options.

4.3.1Aii Conduct economic modelling to explore the viablility of reinstating train services to Kogarah in peak periods.

Futures

Strategy 4.3.2: Plan for, improve and maintain safe and connected footpaths and cycleways.

Maintain Council's footpath network to be functional and safe.

Undertake programmed and reactive maintenance works of Council's footpath assets.

Services

4.3.2B Continue to maintain Council’s walkways and cycleways to be functional and safe.

Commence investigation and design for key cycle routes within the LGA.

37 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 4.2.1
Manager Strategic
4.2.1
Head of Strategic Property 4.2.1
Code Deliverables/Actions Accountable CSP reference
Executive
4.3.1
Manager City
Executive
4.3.1
Code Deliverables/Actions Accountable CSP reference 4.3.2A
Manager
4.3.2
Manager City Futures
4.3.2Ai
City Operational
Manager
4.3.2
4.3.2Bi
Strategic Placemaking

Strategy 4.4.1: Ensure public parks, open space and Council buildings are accessible, well maintained and managed.

4.4.1A Maintain Council's buildings and open space to be functional and safe.

4.4.1Ai Undertake programmed and reactive maintenance works of Council's buildings, open spaces.

4.4.1B Incorporate design principles for parks and open spaces that promote resilience.

4.4.1Bi Ensure that design principles that promote resilience are incorporated into plans for open space.

4.4.1C Implement the GRC Open Space, Recreation and Community Facilities Strategy.

4.4.1Ci Identify open space and recreation priorities based on the findings of the GRC Open Space, Recreation and Community Facilities Strategy.

4.4.1Cii Accelerate the feasibility study, concept plans and business case for a new aquatic centre in the LGA to allow Council to pursue funding sources

4.4.1Ciii Implement the 2023/24 Recreational and Open Space Capital Works Program

Strategy 4.4.2: Plan and provide active and passive recreation including skate parks, aquatic facilities and off road biking opportunities.

Research and plan for active and passive recreation opportunities within the Georges River Local Government Area. 4.4.2Ai Undertake detailed design for a skate and BMX facility at Olds Park.

4.4.2Aii Plan for increased cycling opportunities across the Georges River Local Government Area.

4.4.2B Progress the construction of a new aquatic facility in the LGA.

4.4.2Bi Undertake investigations and business cases to progress the construction of an aquatic facility at Carss Park

4.4.2Bii Seek funding to progress construction of a new aquatic facility in the LGA.

38 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP Reference
Manager City Operational Services 4.4.1
Manager City Technical Services 4.4.1
Manager City Technical Services 4.4.1
Manager City Technical Services 4.4.1
Manager City Technical Services 4.4.1
Code Deliverables/Actions Accountable CSP reference
Manager City Technical Services 4.4.2
4.4.2A
Manager Strategic Placemaking 4.4.2
Manager City Technical Services 4.4.2
Manager City
Services 4.4.2
Technical

Strategy 4.4.3: Review Plans of Management for all open space in the local government area.

4.4.3A Ensure our parks and reserves have updated Plans of Management and Master Plans. 4.4.3Ai Continue the Plans of Management for Crown Lands in accordance with the Crown Land Management Act.

Finalise the Plan of Management for Sans Souci Park.

Finalise the Master Plan for Sans Souci Park.

Strategy 4.5.1: Provide new and upgraded community assets and services to the LGA.

4.5.1A Plan for and implement a purchasing program for property requiring compulsory acquisition in the comprehensive LEP.

Acquire land for open space purposes as identified in the Local Environmental Plan.

4.5.1B Achieve service delivery outcomes through a 10 year Capital Works Program driven by Council Strategies.

Implement the 2023/24 Sportsfield Renovation Program.

Deliver the 2023/24 Critical Safety and Asset Renewal Program.

Deliver Asset Management Plans for each Asset Class (Roads, Buildings, Open Space and Stormwater) which plan for the long term sustainability of Council’s Infrastructure assets.

Develop asset class based 10 year Asset Management Plans.

Provide new and upgraded community assets such as new library services to the western part of our LGA.

Review options to provide new library services to the western part of our LGA.

39 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 4.4.3
Manager
Planning 4.4.3
Manager
4.4.3
4.4.3Aii
Strategic
4.4.3Aiii
Strategic Planning
Code Deliverables/Actions Accountable CSP reference
Head of Strategic Property 4.5.1
4.5.1Bi
Manager City
Services 4.5.1 4.5.1Bii
Manager City Technical Services 4.5.1 4.5.1Biii Deliver
Manager City Technical Services 4.5.1
4.5.1Ci
Manager
Placemaking 4.5.1
Manager Strategic Placemaking 4.5.1
4.5.1Ai
Operational
the 2022/23 Road Resheeting Program.
4.5.1C
Strategic
4.5.1D
4.5.1Di

Performance measures

40 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Measures Annual Target Responsibility Percentage of pothole requests made safe and scheduled for repair within 48 hours. = 100% Executive Manager City Operational Services Civil design for private works completed within timeframe > 90% Manager City Technical Services Maintain the Asset Renewal Ration at the Industry Benchmark = 100% Manager Strategic Placemaking Percentage of utility restorations completed within timeframe advised. ≥ 80% Executive Manager City Operational Services Percentage of occupancy across Council-owned commercial properties. > 90% Head of Strategic Property Mean gross assessment times (in days) on DAs, modifications, DA reviews. < 90 Manager Development and Building Percentage of Construction Certificates determined in 21 days. > 90% Manager Development and Building Percentage of planning proposals meeting Gateway determination timeframes. > 85% Manager Development and Building Number of DAs determined. > 800 Manager Development and Building

2023/24 Budget

Income Expenditure

User Charges and Fees

Other Revenues from Ordinary Activities

Employee Costs

Materials and Services

41 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 2,033 Interest IncomeOther Operating Revenues 10 Operating Grants and ContributionsProfit on Sale of AssetsTotal Operating Revenue 2,043 Operating Expenditure Employee Costs 4,928 Interest ChargesMaterials and Services 335 Depreciation and AmortisationOther Operating ExpensesTotal Expenditure 5,262 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) (3,219)
42 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 5

Our place in Sydney

Goal 5.1: Leadership focuses on innovation and improving the customer experience.

Goal 5.2: The three spheres of government work together to improve services and facilities in our area.

Goal 5.3: Georges River is known for being environmentally and culturally rich and enhances its metropolitan position as a destination for people and business.

4 Year Deliverables

Pillar 5 deliverables for 2022-2026 are:

5.1.1A Explore the viability of a university precinct in Georges River Local Government Area and new investment from government and private enterprise to increase the region’s competitiveness as a place for investment and innovation.

5.1.2A Improve consistency and reliability of service across all customer contact channels.

5.2.1A Develop an advocacy strategy that identifies how Georges River Council can influence government policy and secure government investment in the Georges River Local Government Area.

5.2.1B Work with neighbouring councils to facilitate major projects with long-term delivery timeframes.

5.2.2A Develop an engagement program for services and facilities where regional collaboration would assist in their delivery, including those identified in the GRC Open Space, Recreation and Community Facilities Strategy.

5.3.1A Develop and build a brand and identity for the Georges River Local Government Area.

43 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Operational Plan

We will deliver the following by June 2024

Strategy 5.1.1: Promote Georges River as a place for innovation and collaboration and a desirable location for government and private investment.

5.1.1A Explore the viability of a university precinct in Georges River Local Government Area and new investment from government and private enterprise to increase the region’s competitiveness as a place for investment and innovation.

5.1.1Ai Develop an investment prospectus for the whole Georges River Local Government Area.

5.1.1Aii Continue to support medtech startups establishing in Kogarah.

5.1.1Aiii Implement grant projects that improve place, especially in key employment centres.

Strategy 5.1.2: Provide positive experiences across all customer interactions for our community and visitors.

5.1.2A Improve consistency and reliability of service across all customer contact channels.

5.1.2Ai Develop and implement the Georges River Council Customer Experience Strategy 2022 - 2027.

5.1.2Aii Establish a new baseline for Georges River website engagement and accessability utilising new and existing analytics tools.

Strategy 5.2.1: Advocate to all levels of government to ensure critical infrastructure accompanies residential and employment growth. Code Deliverables/Actions Accountable CSP reference

5.2.1A Develop an advocacy strategy that identifies how Georges River Council can influence government policy and secure government investment in the local government area.

5.2.1Ai Implement an Advocacy Program to raise Council's reputation/profile and ultimately influence government policy to secure government investment in the Georges River Local Government Area.

5.2.1B Work with neighbouring councils to facilitate major projects with long-term delivery timeframes.

5.2.1Bi Develop strategic partnerships to influence key government policy and bring investment to the Georges Local Government Area.

5.2.1Bii Deliver an engagement program for city and council advocacy.

44 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 5.1.1
Executive Manager City Futures 5.1.1
Executive Manager City Futures 5.1.1
Code Deliverables/Actions Accountable CSP
reference
Manager City Life 5.1.2
Manager City Life 5.1.2
Executive Manager City Futures 5.2.2
Executive Manager City Futures 5.2.2
Executive Manager
5.2.2
City Futures

Strategy 5.2.2: Investigate the opportunities for government land and shared facilities being used for open space and other uses e.g. schools and health.

5.2.2A Develop an engagement program for services and facilities where regional collaboration would assist in their delivery, including those identified in the GRC Open Space, Recreation and Community Facilities Strategy.

5.2.2Ai Continue with shared and joint use program with Department of Education.

Strategy 5.3.1: Demonstrate our environmental and cultural riches through policies, programs and projects to showcase and immerse our residents and visitors in our lifestyle.

5.3.1A Develop and build a brand and identity for the local government area.

5.3.1Ai Continue to develop and build a brand and identity for the Georges River Local Government Area.

Performance measures

45 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager
City Futures 5.2.2
Code Deliverables/Actions Accountable CSP reference
Executive Manager
5.3.1
City Futures
Measures Annual Target Responsibility Level of 'place satisfaction' for key and emerging centres. Level of satisfaction increases Manager Strategic Placemaking Percentage of customers satisfied with the overall experience with their customer requests to Council. ≥ 80% Manager City Life Customer satisfaction with face-to-face interaction at Council operated facilities. ≥ 80% Manager City Life Council’s overall Customer Experience Rating. ≥ 65% Manager City Life

2023/24 Budget

User Fees and Charges

Other Revenues from Ordinary Activities

46 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 1,250 User Charges and Fees 6,302 Interest Income 30 Other Operating Revenues 695 Operating Grants and Contributions 1,465 Profit on Sale of Assets 487 Total Operating Revenue 10,228 Operating Expenditure Employee Costs 12,145 Interest ChargesMaterials and Services 12,229 Depreciation and Amortisation 23,322 Other Operating ExpensesTotal Expenditure 47,695 Capital Grants and Contributions 6,539 Operating Result before Capital Revenues - Surplus/(Deficit) (37,467)
and Contributions
and Annual
and Services
on
Assets
Operating Grants
Rates
Charges Depreciation Employee Costs Materials
Net Gain
Disposal of
Income Expenditure
47 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
48 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Pillar 6

Our governance

Goal 6.1: Our community’s voice is considered in planning the area’s future.

Goal 6.2: Our decisions are based on evidence which consider financial impacts, the environment and impacts on future generations.

Goal 6.3: Our community knows why and how decisions are made.

Goal 6.4: The workforce is inspiring, diverse and engaged.

4 Year Deliverables

Pillar 6 deliverables for 2022-2026 are:

6.1.1A Embed a culture of continuous improvement where we use the feedback provided by the community to improve our programs and services.

6.1.1B Develop a service delivery review program of Council’s services.

6.1.1C Embed Council's Engagement Strategy as an overarching process for all Council engagement activity.

6.1.1D Refer a broad range of Council and community issues for engagement to Council’s Your Say platform.

6.1.1E Develop comprehensive engagement and communication plans for Council’s community engagements.

6.1.1F Develop an Annual Community Consultation Progress report.

6.1.1G Provide opportunities for the community to engage with their ward Councillors.

6.1.2A Deliver and report on Council's financial assistance program.

6.2.1A Facilitate the Audit, Risk and Improvement Committee (ARIC) to fulfil its responsibilities under the Local Government Act and ARIC Charter.

6.2.1B Promote and assist in creating an ethical organisational environment with emphasis on internal controls, efficiency, effectiveness and good governance.

6.2.1C Implement a Councillor training program to improve decision making, facilitate better communication with the local community and assist Councillors to acquire and maintain the skills needed to perform their role.

6.2.2A Ensure financial decisions address the key financial sustainability risks to secure Council's immediate and long-term future.

6.2.2B Ensure the Long-Term Financial Plan incorporates strategic priorities and risks.

6.2.2C Ensure financial policy and process improvements focus on the integrity of controls, improved data for business decisions and customer experience.

6.2.3A Annually review Council’s enterprise and operational risks.

6.2.4A Review procurement policy and practice through the Local Government Procurement Program.

6.2.5A Implement the Digital Resourcing Management Plan.

6.3.1A Maintain online public registers as required under the Government Information (Public Access) Act 2009 (GIPA) and Designated Persons disclosure returns (section 4.21-4.27 of Council's Code of Conduct).

49 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

6.3.1B Report to the Office of Local Government and the NSW Ombudsman on Code of Conduct and Public Interest Disclosure matters in accordance with statutory reporting requirements.

6.3.1C Comply with all requirements of Integrated Planning and Reporting legislation, including progress reports for the Community Strategic Plan, Delivery Program and Operational Plan.

6.3.1D Provide live webcasting of all Council and Committee meetings.

6.3.1E Maintain online records of Council and Committee papers and minutes.

6.4.1A Implement a Workplace Health and Safety System to support a well and safe workplace.

6.4.1B Implement the 2022-2026 Workforce Management Plan.

Operational Plan

We will deliver the following by June 2024

Strategy 6.1.1: Commit to consult and engage the community on projects, initiative and issues which have an impact on their lives.

6.1.1A Embed a culture of continuous improvement where we use the feedback provided by the community to improve our programs and services.

6.1.1Ai Undertake the biannual community satisfaction survey and provide results to managers and the Executive team for action.

6.1.1B Develop a service delivery review program of Council’s services.

6.1.1Bi Redesign the process to enable faster, simpler reviews, focussed on building organisational capability and impact, and incorporating service reviews outcomes into business as usual.

6.1.1Bii Conduct an organisation wide review of Council services including commercial property, paid parking and premium facilities.

6.1.1C Embed Council's Engagement Strategy as an overarching process for all Council engagement activity.

6.1.1Ci Re-establish the Your Say panel and undertake an ongoing survey to continue to improve the Your Say platform and Council’s approach to engaging with the community.

6.1.1Cii Develop an intranet suite of resources to support all Council staff to create more opportunities for community engagement.

50 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1

6.1.1D Refer a broad range of Council and community issues for engagement to Council’s Your Say platform. 6.1.1Di Use a broad range of tools in community engagements.

Manager City Futures

6.1.1E Develop comprehensive engagement and communication plans for Council’s community engagements. 6.1.1Ei Create and implement Engagement and Communications Plans for major projects where Council is seeking community engagement utilising Council's communications channels.

Maintain on Your Say a community facing dashboard on engagement activity.

6.1.1F Develop an Annual Community Consultation Progress report.

6.1.1Fi Develop a comprehensive community engagement report for Council's annual report.

6.1.1G Provide opportunities for the community to engage with their ward Councillors. 6.1.1Gi Provide a Meet Your Ward Councillor session for each ward annually.

Office of the General Manager

Ensure Council’s financial assistance and grants programs are managed effectively.

Deliver and report on Council's financial assistance program.

Provide reports on Council's financial assistance program, including community grants, microgrants, venue hire program, heritage grants, heritage publication grants, and donations program.

51 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Executive
6.1.1
Executive
Futures 6.1.1 6.1.1Eii
Executive
6.1.1
Manager City
Manager City Futures
Executive
6.1.1
Manager
6.1.1 Strategy
Code Deliverables/Actions Accountable CSP reference 6.1.2A
6.1.2Ai
Manager Community and Early
6.1.2
Manager City Futures
6.1.2:
Learning Services

Strategy 6.2.1: Ensure the behaviour and decisions of councillors and staff is professional and ethical.

6.2.1A Facilitate the Audit, Risk and Improvement Committee (ARIC) to fulfil its responsibilities under the Local Government Act and ARIC Charter.

6.2.1Ai Facilitate ARIC reports to Council on activities and functions, including an Annual Report from the ARIC Chair.

6.2.1Aii Facilitate replacement of ARIC Chair in June 2022. Recruit 1 new ARIC member to the Committee to replace outgoing/retiring Chair.

6.2.1Aiii Prepare an annual ARIC Responsibility Calendar reflecting Local Government and ARIC Charter requirements to be completed throughout the year.

6.2.1B Promote and assist in creating an ethical organisational environment with emphasis on internal controls, efficiency, effectiveness and good governance.

6.2.1Bi Complete the 2022/23 Audit Program.

6.2.1Bii Implement any mandatory internal audit guidelines issued by the OLG.

6.2.1Biii Continue to roll out education programs, provide good governance to the organisation and implement effective safeguards in order to provide assurance that Council is delivering a high standard of ethical behaviour.

6.2.1C Implement and deliver a Councillor induction and professional development program to ensure the Mayor and Councillors are aware of the knowledge, skills and personal attributes expected of them in their civic roles under the Local Government Act 1993, and of the support Council should be providing to ensure they are able to effectively fulfil their roles.

6.2.1Ci Provide ample training and development opportunities (offered both externally and internally) to ensure diversity of choice and availability.

6.2.1Cii Provide opportunities for a recommended minimum of 12 hours of skill and/or development training to be achieved by each Councillor annually.

52 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Head of Governance and Risk 6.2.1
Manager Office of the General Manager 6.2.1
Manager Office of the General Manager 6.2.1

Strategy 6.2.2: Maintain a sustainably strong financial position balanced with demand for essential services and new projects and having regard for Section 8(b)(d)(ii) of the Local Government Act (the current generation funds the cost of its services).

6.2.2A Ensure financial decisions address the key financial sustainability risks to secure Council's immediate and long-term future.

6.2.2Ai Align the annual budget strategy to incorporate proposed new projects and programs and to facilitate financially sustainable decisions.

6.2.2B Ensure the Long-Term Financial Plan incorporates strategic priorities and risks.

6.2.2Bi Ensure the annual Long Term Financial Plan adequately highlights emerging risks and outlined actions to remediate.

6.2.2C Ensure financial policy and process improvements focus on the integrity of controls, improved data for business decisions and customer experience.

6.2.2Ci Expand payment channels and self-service online access for financial processes.

Strategy 6.2.3: Undertake effective risk management to manage risks that may arise.

6.2.3A Annually review Council’s enterprise and operational risks.

6.2.3Ai Maintain the focus on education, awareness and mitigation with respect to risk management and fraud control.

6.2.3Aii Review and report on the Governance and Risk Frameworks status to the Audit, Risk and Improvement Committee.

Strategy 6.2.4: Ensure procurement policies and practices demonstrate best practice in probity assurance and legislative compliance.

6.2.4A Review procurement policy and practice through the Local Government Procurement Program.

6.2.4Ai Focus on procurement and contracts governance strategies and practices via continued training, reporting and awareness.

53 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Chief Financial Officer 6.2.2
Chief Financial Officer 6.2.2
Chief Financial Officer 6.2.2
Code Deliverables/Actions Accountable CSP reference
Head of Governance and Risk 6.2.3
Head of Governance and Risk 6.2.3
Code Deliverables/Actions Accountable CSP reference
Chief Financial Officer 6.2.4

Strategy 6.2.5: Undertake effective management of council’s digital framework to enable responsive and timely services and information.

6.2.5A Implement the Digital Resourcing Management Plan.

6.2.5Ai Continue to implement digital transformation initiatives that improve our e-planning, regulatory and asset management services.

6.2.5Aii Engineering Trust through the implementation of the independent information security audit program, to build business resilience and safeguard Council's information.

6.2.5Aiii Implement Annual program of funded initiatives for organisational plans of Council:

- Customer and Digital Experience Program

- Cultural Program

- 2030 Library Strategy

- 2021-2031 Early Learning Services Strategy.

Chief

Information Officer

6.3.1A Maintain online public registers as required under the Government Information (Public Access) Act 2009 (GIPA) and Designated Persons disclosure returns (section 4.21-4.27 of Council's Code of Conduct).

Head of Governance and Risk 6.3.1

6.3.1B Report to the Office of Local Government and the NSW Ombudsman on Code of Conduct and Public Interest Disclosure matters in accordance with statutory reporting requirements.

Head of Governance and Risk 6.3.1

54 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Information
6.2.5
Chief
Officer
Chief Information Officer 6.2.5
Chief Information Officer 6.2.5
6.2.5Aiv Review Council’s Enterprise architecture to future proof and enable secure, scalable information services. 6.2.5
Code Deliverables/Actions Accountable CSP reference
Strategy 6.3.1: The community is informed, has access to information and Council reports and reports from other levels of government, institutions and organisations pertaining to Georges River are made public.
6.3.1Ai Continue to maintain online public registers as required including gifts and benefits and Councillor disclosures of interest returns.
6.3.1Bi Continue reporting statistics to the Office of Local Government, NSW Ombudsman and the Information Privacy Commission under provisions of related Acts and Council's Procedures for the Administration of the Code of Conduct in accordance with statutory reporting requirements.

6.3.1C Comply with all requirements of Integrated Planning and Reporting legislation, including progress reports for the Community Strategic Plan, Delivery Program and Operational Plan.

6.3.1Ci Communicate Council’s progress against the Community Strategic Plan, Delivery Program and Operational Plan.

Manager Office of the General Manager

6.3.1D Provide live webcasting of all Council and Committee meetings.

6.3.1Di Recordings of all Council and Committee meetings to be available on Council's website for a period of four years (from 2021 onwards).

Manager Office of the General Manager

6.3.1E Maintain online records of Council and Committee papers and minutes.

6.3.1Ei Ensure the unconfirmed minutes of each meeting of Council are published on Council's website within five business days.

Manager Office of the General Manager

Strategy 6.4.1: Implement leading people practices to create a high performing, capable and resilient workforce.

6.4.1A Implement a Workplace Health and Safety System to support a well and safe workplace.

Manager People and Culture

6.4.1B Implement the 2022-2026 Workforce Management Plan.

Manager People and Culture 6.4.1

Manager People and Culture 6.4.1

Manager

People

55 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
6.3.1
6.3.1
6.3.1
Code Deliverables/Actions Accountable CSP reference
6.4.1Ai Evaluate Work, Health and Safety (WH&S) procedures and implement effective controls to manage WH&S risks. 6.4.1
6.4.1Bi Design and Implement Council’s Performance Excellence Program to achieve leading practices in reviewing, managing and recognising performance, fostering an environment where employees are engaged, aligned and motivated to excel in their roles.
6.4.1Bii Deliver a Leadership Program to unite leaders of the organisation and drive a thriving culture where leaders inspire staff and teams to achieve our operational and strategic goals to provide quality outcomes for our community.
Culture 6.4.1
6.4.1Biii Implement Council’s wellness and belonging program to drive a healthier, happier and more productive and engaged workforce, and promote Council as an employer of choice.
and

Performance measures

Measures

Actual

Investment

returns for the past 12 months exceeding industry benchmark as disclosed by CPG.

Percentage

determined in accordance with Council’s corporate and strategic objectives including successful prosecutions (convictions) and/or fines for major environment offences, including tree breaches.

Attempted resolution of Class 1 merit appeals by way of alternative dispute resolution such as s34 conciliation wherever possible and appropriate.

business papers to be publicly available on Council's website at least three days prior to each meeting.

Percentage

Committee Meeting business papers publicly available on Council's website at least three days prior to each meeting.

56 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Annual Target Responsibility
year-to
-5% under budget Chief Financial Officer
-5% under budget Chief Financial Officer
Benchmark Exceeded Chief Financial Officer Rates and annual charges outstanding <5% Chief Financial Officer Percentage compliance with statutory and legislative
requirements (Office of Local Government
Calendar). = 100% Head of Governance and Risk Percentage of WHS Incident Management Corrective Actions finalised within agreed times ≥ 60% Manager People and Culture Percentage of Cyber Threats blocked =100% Chief Information Officer Cyber Threat Preparedness ≥ 80% Chief Information Officer Percentage of Critical devices on Council's network fully patched ≥ 80% Chief Information Officer
of correspondence responded to within 14
> 80% Manager City Life Percentage of complaints completed within agreed times. ≥ 90% Manager City Life Percentage of customers satisfied with the overall experience with their customer requests to Council. ≥ 80% Manager City Life Customer satisfaction with face-to-face interaction at Council operated facilities. ≥ 80% Manager City Life Council's overall Customer Experience rating ≥ 65% Manager City Life Percentage of customer requests completed within agreed times. ≥ 80% Manager City Life
date income is no more than +/- 5% from the year-to-date approved budget.
Actual year-to-date expenditure is no more than +/- 5% from the year-to-date approved budget.
portfolio
reporting
Compliance
Percentage
days.
of
> 75% Manager Legal Services
legal cases
= 100% Manager Legal Services
< 10% Manager Office of the General Manager
≥ 3 Manager Office of the
=100% Manager Office of the General Manager
Council decisions made at meetings closed to the public.
Council Meeting
General Manager
of
Measures Annual Target Responsibility Number of registered speakers at Council Meetings. > 5 Manager Office of the General Manager Number of registered speakers at Committee Meetings. > 0 Manager Office of the General Manager

2023/24 Budget

Income Expenditure

Rates and Annual Charges

Operating Grants and Contributions

Interest

Other Revenues from Ordinary Activities

Employee Costs

Materials and Services

Other Expenses

Depreciation

58 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 83,323 User Charges and Fees 176 Interest Income 2,595 Other Operating Revenues 1,052 Operating Grants and Contributions 5,090 Profit on Sale of Assets 136 Total Operating Revenue 92,372 Operating Expenditure Employee Costs 12,077 Interest ChargesMaterials and Services 12,189 Depreciation and Amortisation 1,587 Other Operating Expenses 3,315 Total Expenditure 29,168 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) 63,204
59 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Financial Estimates

About the 2023/24 Budget

The annual budget adopted by Council forms our Long-Term Financial Plan (LTFP) which is an essential tool for securing sustainability.

As per the relevant legislation, financial decision making is to give due consideration to promoting the financial sustainability of Council through:

• the progressive elimination of operating deficits;

• the establishment of a clear revenue path for all rates linked to specific expenditure proposals;

• ensuring that any proposed increase in services and/or assets is within the financial means of Council including or pursue a Special Rate Variation;

• ensuring the adequate funding of infrastructure maintenance and renewal;

• the use of borrowing is appropriate and financially responsible; and

• the fair and equitable distribution of the rate burden across all ratepayers.

The 2023/24 Budget has been developed based on the 2023/24 Budget Strategy and the Independent Pricing and Regulatory Tribunal (IPART) approval for a Special Rate Variation. A requirement of our approved Special Rate Variation from IPART is to identify $12 million in permanent cost containment and efficiencies over the period of 2022/23 to 2024/25.

The 2023/24 Budget will be the second year Council is forecast to achieve a surplus and difficult prioritisation of valued services, projects and programs will be essential in achieving financial sustainability and compliance with Council legislative obligations.

After a number of years with constraints to Council’s cash contribution to funding capital projects, the 2023/24 draft budget includes increased Council contribution to critical asset classes, such as roads, footpaths and buildings. This increase in Council’s contribution is attributed to adopted budget surplus in 2022/23. Other capital projects have been prioritised to focus on grant and contribution funded projects along with high priority critical classification.

In order to achieve the surplus target, the budget has been prepared on the following strategy:

• Objective of achieving an operating surplus with future years projection as per the adopted LTFP

• Application of the approved Special Rate Variation of 5.8%

• Prepared in accordance with the IPART approval to identify $12 million in permanent cost containment and efficiencies over the period of 2022/23 to 2024/25 (i.e. these cuts to expenditure cannot be reintroduced in future years)

• Cost reduction strategy applied to both employee costs and materials and services, with an aim of $6 million

• Service levels have been capped to align with constrained resources and achieve the operating surplus adopted in the LTFP

• Award increase is 4.5% ($2.5 million), plus Superannuation increase 0.5% ($270,000 annually)

• The employee costs reduction strategy has been amended to be based on a natural vacancy rate of 6% and a 16-week recruitment trend, rather than enforced holds

• Two-week Christmas shutdown that includes the provision of three grant days

• Historically high CPI increase of 7.8% has been applied across a broad range of materials, services and expenses (note: current trends are indicating large increases in labour, materials, fuel costs etc.)

• Income projections are based on business as usual

• Subsidies are proposed to be applied to Council’s premium facilities, commercial, community facilities

• Investment interest income has been projected to increase based on an assumed improvement in rate of return

• Domestic waste charges have increased in line with the CPI increase of 7.8%

• The mandatory (legislated) pensioner rebate has been maintained at $1 million

• Depreciation is forecast to increase by $1.9 million due to asset condition deterioration and the rising cost of replacement

60 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

• Eligible Fees and Charges have been set at a 7.8% increase to ensure cost recovery of the material cost increases

• Council’s rates default level has been assumed to stay within benchmark parameters of less than 5%.

• A Councillor Discretionary Ward fund has been included as part of the budget strategy

• Minimal disposal of underperforming/end of life assets (plant)

• Insurance premiums have been set to increase based on natural disaster, cost of replacement, etc

• Community and sporting group rental subsidies remain unchanged ($1.5 million in forgone income)

• Venue hire program remains unchanged ($420,000 in forgone income)

• Childcare fees have been set to comply with the Childcare Policy of cost neutral operating budget

• Strategic land acquisitions have been included as per the gazetted LEP

• Budget bids have been selected and prioritised based on legislative, strategic and safety drivers with over $9 million in additional operational projects, bids or other costs deferred/removed/reduced in 2023/24

• The multiyear Capital Program Budget has increased from $64.6 million to $102.1 million, which is an increase of $37.5 million, with forecast cash expenditure to be occurring across the years 2022/23 and 2025/26

• The capital program has been formulated based on the following criteria:

a. Ensure program aligns to the Long-Term Financial Plan ($35 million per year)

b. Have an eligible funding source

c. Aligns to strategic asset management principles

d. Link to a Masterplan and/or adopted Strategic Plan

e. Consideration of environmental factors

• Over $400 million in capital projects continue to have been deferred.

Based on this approach, the adopted surplus of $3.4 million remains on track to deliver future year surpluses in the medium term. The final years of the Long-Term Financial Plan (LTFP) indicate a deficit position will occur in the last 2 years (shown as Model 1 in the Resourcing Strategy), and will need to be addressed in coming years.

Full details of Council’s 10 years LTFP, which includes the budget result, are outlined in the Resourcing Strategy.

Capital Program

The revised program has been developed by established clear priorities. All projects included in the 2023/24 Capital Program:

• Align to the Resourcing Strategy 2022/23 and LongTerm Financial Plan

• Have an identified eligible funding source(s)

• Adhere to strategic asset management principles and practices

• Link to a Plan of Management (POM), Master Plan, Council Strategy/Plan and/or Stakeholder Plan

• Support Council’s recently adopted Environmental Resilience Action Plan 2022-2040.

Funding for the 2023/24 program is predominantly based on grant funding, developer contributions and external reserves, with use of general revenue focused on roads and critical safety program items and capitalised salaries. The following new projects have been proposed:

• Plant and Light Vehicle Fleet Replacement

• Road Re-sheeting Program

• Community Asset Critical Safety Program

• Footpath Critical Safety Program

• Buildings Asset Critical Safety and Renewal Program

• Recreation Asset Critical Safety and Renewal Program

• Traffic Facilities Construction and Upgrade Program

• Stormwater Drainage Critical Investigation and Renewal Program

• Annual Information Management and Technology and Library Resource Renewal

• Land acquisitions for open space

• Information Management and Technology (Cyber Security, computer/device hardware and software implementation).

The following projects will continue into 2023/24:

• Gannons Park Works – Final Stage

• Hurstville Oval Cricket Pavillion

• Olds Park Recreational and Sporting Hardscape Precinct

• Hardiman Reserve (former Oatley Bowling Club site) Master Plan Works

• Hurstville Revitalisation Program

• Kogarah War Memorial Pool Site Remediation

• Dairy Creek Stormwater Works

• Open Space Acquisition Program

61 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Budgeted Income Statement

62 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2026/28 Estimate $'000 $'000 $'000 $'000 $'000 Operating Revenue Rates and Annual Charges 116,543 122,092 127,939 130,499 133,111 User Charges and Fees 16,333 16,904 17,496 17,914 18,326 Interest and Investment Revenue 5,400 3,420 3,474 3,562 3,651 Other Revenues 14,063 14,422 14,926 15,285 15,636 Operating Grants and Contributions 12,246 11,785 12,197 12,489 12,776 Profit on Sale of Assets 623 560 560 560 560 Total Operating Revenue 165,208 169,183 176,592 180,309 184,060 Operating Expenditure Employee Costs 64,256 66,158 68,413 71,216 72,581 Interest Charges 0 5 6 7 7 Materials and Services 65,483 66,585 70,017 71,070 72,195 Depreciation and Amortisation 27,611 25,747 27,691 28,886 30,074 Other Operating Expenses 4,503 4,260 4,409 4,514 4,618 Total Expenditure 161,853 162,755 170,536 175,693 179,475 Operating Result before Capital Revenue 3,355 6,428 6,056 4,616 4,585 Capital Grants and Contributions 18,976 10,847 11,227 11,496 11,761

Budgeted Statement of Financial Position

63 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2026/28 Estimate $'000 $'000 $'000 $'000 $'000 ASSETS Current Assets Cash, Cash Equivalents and Investments 206,044 211,640 216,877 222,851 228,913 Receivables 9,841 8,488 8,844 9,038 9,232 Inventories 154 159 165 169 173 Other 550 550 550 550 550 Non-current Assets Property, Plant and Equipment 1,512,485 1,526,417 1,538,465 1,549,383 1,559,173 Investment Property 27,953 27,953 27,953 27,953 27,953 Intangible Assets 1,107 1,448 1,729 1,950 2,111 Right of Use Assets 159 99 229 164 99 Total Assets 1,758,293 1,776,754 1,794,812 1,812,058 1,828,204 LIABILITIES Current Liabilities Payables (26,429) (27,192) (27,267) (27,756) (27,265) Lease Liabilities (41) (40) (39) (39) (40) Borrowings 0 0 0 0 0 Unexpended Operating Grants (2,000) (2,000) (2,000) (2,000) (2,000) Unexpended Capital Grants (6,000) (6,000) (6,000) (6,000) (6,000) Accruals and Provisions (15,844) (16,313) (16,869) (17,560) (17,897) Non-Current Liabilities Borrowings 0 0 0 0 0 Lease Liabilities (144) (99) (244) (198) (151) Provisions 0 0 0 0 0 Total Liabilities (50,458) (51,644) (52,419) (53,553) (53,353) EQUITY Accumulated surplus 1,452,800 1,470,075 1,487,358 1,503,470 1,519,816 Revaluation Reserve 255,035 255,035 255,035 255,035 255,035 Total Equity 1,707,835 1,725,110 1,742,393 1,758,505 1,774,851

Budgeted Statement of Cash Flows

64 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2026/28 Estimate $'000 $'000 $'000 $'000 $'000 OPERATING ACTIVITIES Receipts Rates and Annual Charges 116,180 123,202 127,762 130,422 133,032 User Charges and Fees 16,491 16,825 17,415 17,857 18,270 Grants and Contributions 12,095 11,796 12,152 12,457 12,745 Cash received, not recognised as Revenue 275 500 500 500 500 Cash received in Previous year, recognised as Income in Current (575) (500) (500) (500) (500) Other 13,840 14,328 14,829 15,217 15,568 Payments Employee Benefits and On-Costs (63,855) (65,689) (67,857) (70,525) (72,244) Materials and Services (63,786) (66,273) (70,417) (70,916) (73,018) Other (4,392) (3,754) (3,886) (4,128) (4,234) Borrowing Costs (0) (5) (6) (7) (7) Net Cash Provided from Operating Activities 26,273 30,430 29,992 30,377 30,112 INVESTING ACTIVITIES Receipts Investment & Interest Revenue Received 4,752 3,773 3,464 3,547 3,635 Capital Grants & Contributions 18,976 10,847 11,227 11,496 11,761 Cash received, not recognised as Revenue 2,100 2,100 2,100 2,100 2,100 Cash received in Previous year, recognised as Income in Current (5,794) (2,100) (2,100) (2,100) (2,100) Proceeds from Sale of Assets 1,263 1,200 1,200 1,200 1,200 Payments Capital Works and Purchase of Fixed Assets (44,837) (40,608) (40,600) (40,600) (40,600) Lease Payment (Principal) on Right of Use Assets (46) (46) (46) (46) (46) Net Cash Provided from Investing Activities (23,586) (24,834) (24,755) (24,403) (24,050) FINANCING ACTIVITIES Receipts Proceeds from Borrowings 0 0 0 0 0 Payments Loan Principal Payment 0 0 0 0 0 Net Cash Provided from Financing Activities 0 0 0 0 0 Net/Increases/Decreases in Cash, Cash Equivalents and Investments 2,687 5,596 5,237 5,974 6,062 Opening Cash Balance – Beginning of the Year 203,357 206,044 211,640 216,877 222,851 Total Cash, Cash Equivalents and Investments 206,044 211,640 216,877 222,851 228,913

Projected Restricted Cash Reserves Balances

65 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2019/2020 Actual 2020/2021 Actual 2021/2022 Actual 2022/23 Revised Q2 Budget 2023/24 Budget $'000 $'000 $'000 $'000 Externally Restricted Closing Balances Developer Contributions 75,054 73,720 82,270 79,965 89,493 Specific Purpose Unexpended Grants 1,636 3,701 8,143 8,143 8,143 Domestic Waste Management Reserve 21,609 20,336 20,913 13,678 11,448 Stormwater Management 513 1,263 1,804 1,447 1,778 Environmental Levy 93 93 93 93 93 Town Improvement Levy Funds 2,932 3,402 2,234 2,126 2,150 Infrastructure Plus 176 1,203 519 203 203 Total Externally Restricted Balances 102,013 103,718 115,976 105,654 113,309 Internally Restricted Closing Balances Employee Leave Entitlements 6,561 6,126 6,126 6,126 6,126 Plant and Vehicle Replacement 4,158 6,877 7,884 3,884 2,071 Election 1,273 1,623 1,823 1,265 1,465 Childcare Equipment 1,209 1,014 956 956 566 Hurstville Golf Course 127 82 112 112 112 Financial Assistance Grant 2,290 2,350 3,614 3,614 3,614 Bonds and Damage Deposits 4,240 4,240 4,240 4,240 4,240 Merger Initiatives Allocation 2,767 1,388 1,388 218 418 Stronger Communities Fund 4,593 3,672 1,790 117 117 Assets, Roads and Infrastructure Management 6,365 3,702 6,514 14,984 14,734 Commercial Property 1,959 11,505 20,279 16,155 15,404 Strategic Centres 5,742 5,743 5,743 5,743 5,743 Revolving Energy 44 32 69 105 141 Tree Preservation 452 535 606 666 666 Aquatic Facilities 1,312 115 115 115 115 Outdoor Synthetic Sports Fields Reserve 24 124 114 114 114 Heritage Building Grants Program Reserve 0 77 67 17 17 Street Lighting Project Reserve 0 152 179 179 179 Passenger Sustainable Fleet Reserve 0 0 31 31 31 Waste Strategy Implementation Reserve 0 0 168 168 2,550 Net Zero Emissions Reserve 7 7 Pooling Contributions Reserve 0 0 0 0 10,600 Total Internally Restricted Balances 43,116 49,357 61,818 58,816 69,030 Total Restricted Cash Reserve Balances 145,129 153,075 177,794 164,471 182,339 Unrestricted Cash Balance 28 7,217 10,000 32,007 23,703

Key Performance Indicators

66 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Benchmark 2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2027/28 Estimate Operating Performance Ratio (Measures the extent of Council's Revenue (net of Capital Grants) coverage of Expenditure) 0% 2.1% 3.5% 3.1% 2.3% 2.2% Own Source Revenue Generated (w/o Grant income) (Measures Council's dependence on Grants income) > 80% 87.2% 87.4% 87.5% 87.5% 87.4% Unrestricted Current Ratio (Measures Council's liquidity) > 1.5x 1.8 1.8 1.8 1.9 1.9 Debt Service Cover Ratio (Measures Council's capacity to service debt) > 2.0x No Debt No Debt No Debt No Debt No Debt Capital Works & Asset renewals (Measures Council's expenditure on renewal of assets in relation to the annual Depreciation charge) > 1.1x 0.8 0.8 0.8 0.7 0.7 Own Source Revenue Growth (Measures Council's increase of own source revenue) > 0% 9% 3% 4% 2% 2% Debtor Days Outstanding - Rates < 30 15.0 11.0 11.0 11.0 11.0 Debtor Days OutstandingOther Debtors (net of Rates) (Measures Council's management of Debtors) < 30 45.0 44.0 44.0 44.0 44.0 Debtor Collection Rate - Rates = > 100% 99.7% 100.9% 99.9% 99.9% 99.9% Debtor Collection Rate - Other Debtors (net of Rates) (Measures Council's Collection Rate of Debtors) = > 100% 99.4% 100.3% 99.6% 99.7% 99.7% Cash Coverage Ratio (Measures Council's Cash coverage of Expenditure) > 3 Mths 7.4 7.4 7.3 7.3 7.4 Remaining useful Life of Assets (Expressed as a % of Gross Cost of Assets) > 60% 67.4% 66.6% 65.7% 64.8% 63.8% Repairs & Maintenance as a % of WDV of Assets 1% 0.5% 0.5% 0.5% 0.5% 0.5%

Budgeted 2023/24 Capital Program

*Allocated to specific projections during the financial year.

67 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Capital Program by Asset Class Current 2022/2023 Q3 Budget New Budgeted Capital Program Total Budgeted Capital Program $'000 $'000 $'000 New Assets Buildings - Non Specialised 14,441 10,110 24,551 Buildings - Specialised 485 - 485 Footpaths 2,127 505 2,632 Furniture and Fittings 24 - 24 Open Space/Recreational 4,180 1,190 5,370 Operational Land Council Owned - -Other Structures 6,401 725 7,126 Plant and Equipment - -Roads 1,652 1,027 2,679 Software Licenses and System Development - -Stormwater - -Various Plant and Equipment Other 375 - 375 Sub-Total 29,685 13,557 43,242 Renewal of Assets Buildings - Non Specialised 35 2,290 2,325 Buildings - Specialised - -Footpaths 1,436 961 2,397 Furniture and Fittings - -Library Collections 410 442 852 Office Equip 160 420 580 Open Space/Recreational 14,442 5,570 20,012 Other Structures 622 525 1,147 Plant and Equipment 4,072 2,300 6,372 Roads 10,114 8,250 18,364 Stormwater 1,749 1,591 3,340 Various Plant and Equipment Other 350 - 350 Sub-Total 33,390 22,349 55,739 Capitalised Project Salaries 1,502* 1,600 3,102 Total $64,577 37,506 $102,083

Rating and Revenue Policies

Rating Structure

Council’s rate revenue is regulated by the NSW Government and this arrangement is known as rate pegging. Rate pegging limits the amount that Council can increase its total annual rate revenue from one year to the next. Any increases above the rate peg, require approval by the Independent Pricing and Regulatory Tribunal (IPART) and are known as a Special Rate Variation.

Following extensive consultation with the community over a number of years and Council received formal approval from IPART on its New Rates application in May 2021. The New Rates application included:

• Retaining the expiring former Hurstville City Council’s Special Rate Variation;

• Increasing Council’s total rate income over the next five years to maintain service standards (5.8% per year for five years);

• A single, fair, equitable and consistent rating system for the entire Georges River Area; and

• Identifying $12 million in ongoing savings over the three year period from 2022/23 to 2024/25 ($4 million per year).

Alternatives to the New Rates application were explored with the community and Council. There was no support for a larger increase, a reduction in services and/or reduction of staff levels. The rate increase was the only feasible option to maintain existing levels of service. As without the rate increase, Council’s financial position was significantly challenged. Any new/expanded services, a larger capital works program or additional staffing level would require an additional Special Rate Variation, or corresponding reduction to the current service portfolio/levels to offset.

Land Values

Each year, the annual rate revenue distribution is calculated based on a property’s latest valuation received from the NSW Valuer-General. Council cannot make and levy a rate in respect of a parcel of land unless furnished with a valuation of that land under the Valuation Land Act 1916.

Every three years, the NSW Valuer General provides new land values for Council to use in calculating and distributing rates. For 2023/24 rating year, Council will be applying the new land values undertaken on 1 July 2022.

Changes to land valuations will impact on the distribution of rates payable by individual households or businesses. Though, increases/decreases in land values do not necessarily lead to similar increases/ decreases in rates, as land values are used to fairly distribute and calculate Council's annual rate revenue across ratepayers.

Categorisation of land for the purposes of ordinary rates Council determines rating categories for rating purposes in accordance with Sections 514 -529 of the LG Act and Local Government (General) Regulation 2005 (the Regulations).

Non-rateability

Council deems land to be non-rateable strictly in accordance with Sections 555 and 556 of the LG Act. Residential and business categories

The LG Act only allows four available categories for rateable land, including farmland and mining, which are not applicable within the Georges River Council LGA. All rateable land within this LGA are categorised as either residential or business. As noted within Section 518 of the LG Act, land that does not satisfy the criteria to be deemed residential, farmland or mining will be categorised and rated as business. The business category applies to land that is used for industrial and commercial operations and can also include car spaces and storage lots.

Council will use the plans approved under a development application or building application as a bases for determining the initial categorisation of a property, unless other more relevant information is available. The ratepayer will be advised through the issue of an annual or supplementary rate notice.

68 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Mixed development

There are instances where a property is used for both residential and business purposes. If applications are submitted to and approved by the Valuer General NSW, Council will be advised of the residential and business rate portions to enable a mixed rate to be levied.

Change of category for rating purpose

A review of the categorisation of land for rating purposes may arise in response to a ratepayer request (application), Or because Council elects to review one or a number of parcels of land or because it believes that the current categorisation may be incorrect.

Council may request further information and or access to inspect the property to assist with making this determination.

Applications for a change in categorisation of land for rating purposes must be made on the approved form that can be found on Council’s website.

The ratepayer will be formally advised in writing of the outcome and where applicable, will receive an annual or supplementary rate notice.

Ratepayers with a property that is used for both a business and residential purpose should also make an application for a change in categorisation of land for rating purposes on the approved form if they wish to change from one category to mixed use rating.

Rating new parcels of land

Council will, upon registration of a new strata plan or deposited plan re-rate the property(s) from the first day of the subsequent financial quarter in which the subdivision or consolidation was registered. Conversely, rates will be reversed off the original (parent property/s) from the last day of the financial quarter in which the plan was registered.

The application of pro-rata rates and charges is consistent with quarterly instalment billing as per Section 562 of the LG Act. The Council will issue a notice for the new parcel/s for the current rating year.

Postponement of rates

Where a property is used as a single dwelling but, due to zoning or permitted use has a land value that reflects the potential use rather than the actual use, we will provide a postponement of rates in accordance with Section 591 of the LG Act. These postponed rates, together with the accrued interest, are abandoned after five years unless the use of the property changes; at that point the rates become payable

Aggregation of land parcels (lots) for the purposes of ordinary rates – rating of car spaces and storage lots Where a lot for a strata unit includes part lots for car and/or storage lots, only one rateable valuation exists and therefore only one rate is calculated on the total value of the unit, car and storage lots.

Where car and/or storage lots are separately titled, they attract their own unit entitlement and rateable value separate from the strata unit. In this circumstance, Council may allow the rateable values to be aggregated and a single rate to be levied on the combined rateable value in accordance with Section 548A of the LG Act, subject to the limitations below.

• All lots are used in conjunction by the occupier of the unit (the Lots are not leased out separately);

• The ownership of each lot is exactly the same on the certificate of title;

• The lots are within the same strata plan;

The levying of rates on the combined rateable value will commence from the subsequent financial quarter following receipt of the application and payment of the applicable fee.

Refund of additional payments

Refunds may be made on request for overpayments. Refunds for payments made in advance for instalments may be subject to a refund fee.

69 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

Rate Structure Summary

The following table provides a summary of the 2023/24 rates structure. It shows the number of rateable properties within each of the rating categories (and subcategory), listed according to those to be rated at the minimum amount, and the rate in the dollar applicable to the category.

70 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2022/23 Rate Structure Rate in $ No. of Properties Residential Georges River Council - Ordinary Ad-valorem 0.0011298 24,521 Georges River Council - Ordinary Minimum 1,047.00 30,396 Subtotal Residential 54,917 Business Business General - Ordinary Ad-valorem 0.0026168 318 Business General - Ordinary Minimum 1,193.00 160 Business Industrial - Ordinary Ad-valorem 0.0032111 539 Business Industrial - Ordinary Minimum 1,193.00 368 Business Local - Ordinary Ad-valorem 0.0035193 652 Business Local - Ordinary Minimum 1,193.00 157 Business Major Shopping Complex - Ordinary Ad-valorem 0.0111165 8 Business Major Shopping Complex - Ordinary Minimum 1,627.00 0 Business Strategic Centres - Ordinary Ad-valorem 0.0035903 466 Business Strategic Centres - Ordinary Minimum 1,627.00 930 Subtotal Business 3,598 Total 58,515

Debt Management and Hardship policy

Pensioner rebate policy

Holders of a Pensioner Concession Card who own and occupy a rateable property are eligible for a pensioner concession. The Local Government Act provides for a pension rebate of up to 50 per cent of the aggregated ordinary rates and domestic waste management service charges, to a maximum of $250.

Under the State's mandatory Pensioner Concession Scheme, the State Government reimburses Council 55% of the rates and charges written off and Council funds the remaining 45%.

Interest on Overdue Rates

Council must set the interest payable on overdue rates and charges for 2023/24 in accordance with Section 566(3) of the LG Act. Council will apply the maximum rate (9%) as set by the Minister for Local Government, for interest payable on overdue rates and charges. Interest accrues daily on rates and charges that remain unpaid after they become due and payable.

Hardship Assistance

Council recognises that the current economic crisis is causing financial hardship to many residents and businesses within our community and there are cases of genuine financial hardship requiring respect and compassion in special circumstances. Council has a Debt Management and Hardship Policy to support the community during these situations.

The following assistance options can be sought through an application to Council.

• Extension of due date and interest free periods

• Development of a payment plan, instalment plans or deferral plans

• Waiving or reducing accrued interest

Businesses renting the property and seeking rates relief will require their landlord to apply to Council for hardship assistance.

71 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
72 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Georges River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 65 B u s i n e s s S u b - C a t e g o r y – S t r a t e g i c C e n t r e s Hurstville CBD Kogarah CBD B u s i n e s s S u b - C a t e g o r y – M a j o r S h o p p i n g C o m p l e x Business Sub-Category – Industrial Beverly Hills Carlton Kingsgrove Peakhurst
Rating Classification Maps

Business Sub-Category – Local

73 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Blakehurst Penshurst (Bridge St) Penshurst (Forest Rd) South Hurstville Kogarah (Gray Lane) South Hurstville Oatley Kogarah (local) Ramsgate
74 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Georges River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 67
Riverwood Kyle Bay Penshurst San Souci Mortdale Blakehurst Allawah Carlton Beverley Park Narwee
75 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Georges River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 68
Carss Park Kingsgrove Beverly Hills

Waste management charges

During 2023/24, Council will continue to levy a charge for residential waste management services, to recover the actual cost of the services. In accordance with Section 496 of the LG Act, a charge will be levied on each residential ratable property for which the service is available, even if the service is not used. Council also levies a charge for commercial waste services. The yield for the domestic waste management service will enable costs for the service to be fully recovered. Services acquired part way through the year will have their charges levied on a pro-rata basis.

All waste management charges are listed below:

Stormwater management charge

The Stormwater management service charge for 2023/24 is levied under Section 496A of the LG Act (as amended). The annual charges have been set in accordance with the Local Government Amendment (Stormwater) Bill 2005 and are as follows:

Non Strata - per 350 square metres of land area, or part thereof to a maximum of $1,500 per rateable property

Strata Lot - $25.00 per 350 square metres (or part thereof) of land area that would apply to the land subject to the strata scheme divided on a pro-rata basis between the lots, not less than $5.00 for any individual lot

76 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Waste Services Charges Description 2023/24 charge per annum Domestic Waste Management Services Domestic Waste Management Charge Service (1 x 120L general waste bin, 1 x 240L recycling bin + 1 x 240L garden organics bin) $511.00 Additional Volume Domestic Waste Management Charge $664.00 Extra general waste bin service (120L) $163.00 Extra general waste bin service (240L) $326.00 Special additional waste service (4 or more children or medical) $133.00 Extra recycling bin service (240L) $115.00 Extra garden organics bin service (240L) $153.00 Availability charge (dwelling with private domestic waste contractor) $70.00 Availability charge (dwelling with cancelled bin service) $70.00 Commercial Waste Services (other than domestic) Commercial general waste bin service (240L) $615.00 Commercial general waste bin service (1,100L) $2,560.00 Commercial recycling waste bin service (240L) $310.00
Stormwater Services Charges Description 2023/24 charge per annum Residential Non Strata - per rateable property $25.00 Strata – per rateable property $12.50 Business
$5.00

Loan borrowing

Council will become debt free in the 2022/23 Financial Year, with the final payment on the 10 year loan for the Jubilee Mortdale Community Centre. Council does not currently plan to borrow additional funds during the 2023/24 financial year.

Schedule of business or commercial activity

Council undertakes activities of a commercial nature for which we receive a return, including leasing agreements for golf clubs and rental properties. However, these activities have not been identified as either Category One or Category Two businesses under competitive neutrality guidelines.

Pricing goods and services

Each fee that we charge is in accordance with the following principles and revised each year by the Executive and the elected Council.

The following factors are considered by Council when setting fees and charges:

• Pricing principles (outlined below)

• Reasonable percentage increase in-line with costs increases

• Cash handling and rounding of amounts

• Cost of the service and operations

• Other revenue sources that may fund this service

• Laws and regulations

• Ability of the people using the service to pay

• Benefit to the community (possible subsidy)

• Benchmarking with like services

The pricing principles currently applied include:

Cost Recovery Includes the recovery of employee and material costs directly related to the provision of the service

External Cost Price is determined by an external party carrying out the service or works

Subsidised (Partial Cost) Pricing Council elects to recover only a portion of the costs of providing the service

Rate of Return Pricing

Prices are set to recover a surplus that can be directed into capital improvements or other services

Market Pricing Prices are set at a similar amount to like services within the community

Legislated Pricing Prices are set to comply with legislation

77 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
78 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024

2023/24 Schedule of Fees and Charges

79 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Page2of74 TableOfContents GeorgesRiverCouncil.............................................................................................................................................................................10 Assets&Infrastructure.........................................................................................................................................................................10 PrivatelyOperatedRecreationFacilities..........................................................................................................................................10 ParksideDriveTennisCourts 10 CourtHire.....................................................................................................................................................................................10 QuarryReserveTennisCourts......................................................................................................................................................10 CourtHire 10 KenRosewellTennisCentre ........................................................................................................................................................10 CourtRates 10 CoachingServices......................................................................................................................................................................10 Clubhouse....................................................................................................................................................................................10 HurstvilleAquaticLeisureCentre 10 Aquatics..........................................................................................................................................................................................10 Vouchers(swim/spa/steam) 11 AquaticMemberships.....................................................................................................................................................................11 Other 11 SwimmingLessons.........................................................................................................................................................................11 Squad 11 Schools............................................................................................................................................................................................11 KidsClub 11 Health&FitnessMembership.......................................................................................................................................................12 CasualFitness 12 Vouchers(Gym&FitnessClass)..................................................................................................................................................12 Crèche.............................................................................................................................................................................................12 Stadium...........................................................................................................................................................................................12 StadiumHire(aslistedbelow)......................................................................................................................................................13 SansSouciLeisureCentre................................................................................................................................................................13 Aquatics-Swimentry....................................................................................................................................................................13 SwimPasses...................................................................................................................................................................................14 SwimmingLessons........................................................................................................................................................................14 AquaticMemberships....................................................................................................................................................................14 CasualFitnessandPasses...........................................................................................................................................................14 Health&FitnessMembership 14 NormO'NeillCricketTrainingFacility..............................................................................................................................................14 OffPeak 15 Peak.................................................................................................................................................................................................15 OtherFacilityFees 15 EngineeringFloodInformation.........................................................................................................................................................15 EngineeringSupervision 15 InstallationofTrafficandDirectionalSignage................................................................................................................................15 IlluminatedStreetSigns....................................................................................................................................................................16 PlansofManagement 16 TrafficInformation..............................................................................................................................................................................16 TreeManagement 16 StreetTreeRemoval.......................................................................................................................................................................16 TreeManagementInspections(privateland) 16 TreeRemoval,replacementandpruning.....................................................................................................................................16 continuedonnextpage...
Page3of74 TableOfContents [continued] BeverleyParkWaterReclamation....................................................................................................................................................16 GolfCourses 17 HurstvilleGolfCourse...................................................................................................................................................................17 CasualUsers 17 CartHire(CasualUsers&Members).........................................................................................................................................17 HGCMembers..............................................................................................................................................................................17 BeverleyParkGolfCourse 18 Public&VisitorFees...................................................................................................................................................................18 StadiumHire 18 SportsfieldHire-SummerandWinterSeasonalCharges.............................................................................................................18 HurstvilleOval 18 PremiumSportingFields-HaroldFraserOval,HurstvilleOvalandOldsParkOval..............................................................18 SchoolBookings 19 NetballCourts.................................................................................................................................................................................19 SyntheticFields-PeakhurstPark;PoultonPark 19 VanessaStreetMulti-PurposeCourts..........................................................................................................................................19 CoachingClinicsandCasualHire(excludesPremiumsportingfieldsandSynthetics) 19 SchoolHolidayClinics(excludesPremiumsportsfields&Synthetics)..................................................................................20 KeyCharges 20 Bonds..............................................................................................................................................................................................20 Breachofgroundandfacilityuse................................................................................................................................................20 PersonalTrainers...........................................................................................................................................................................20 AnnualCharge.............................................................................................................................................................................20 Half-YearlyPermit 20 CasualParkHire-NonSport(Wedding,Filming,Community).................................................................................................20 OatleyParkCastle 21 PenshurstSportingHub................................................................................................................................................................21 WorkZone/ConstructionZone 21 CarShareParking..............................................................................................................................................................................21 Filming–Footpath&RoadsApplicationFee(perday) 21 DrivewayLineMarking......................................................................................................................................................................22 OccupancyofRoadRelatedArea 22 EngineeringDAInspectionFee........................................................................................................................................................22 MiscellaneousServices.....................................................................................................................................................................22 Depositsfordamageduringconstruction 22 ApplicationforDrivewayCrossingandAssociatedWorks(underSection138RoadsAct)......................................................23 CouncilDesigned(includesoneinspection) 23 Assessmentfeeforself-designMultiUnitand/orCommercial/IndustrialDevelopmentInfrastructure................................23 FeesAssociatedtoIssueofHeavyVehiclesPermit 23 RestorationCharges..........................................................................................................................................................................24 RoadOpeningChargesforRestorationsforQuantitiesUnder10sq.m 25 Roads...........................................................................................................................................................................................25 Footpaths 25 Kerb&Gutter...............................................................................................................................................................................25 RoadOpeningChargesforReinstatementforQuantitiesover10m2or10lin.M...................................................................25 Roads 25 Footpaths.....................................................................................................................................................................................25 continuedonnextpage...
Page4of74 TableOfContents [continued] Kerb&Gutter...............................................................................................................................................................................26 HoistingActivities 26 Bushcare.............................................................................................................................................................................................26 Planning&Development 26 PlanningProposals............................................................................................................................................................................26 ExternalUrbanDesignReferralFee.................................................................................................................................................27 DevelopmentControlPlanPreparation 28 PlanningAgreementsContributions/PublicPurposes.................................................................................................................28 Section7.11and7.12Contributions(formerlyS94/S94A) 28 Section7.12(formerlyS94A)DevelopmentContributions............................................................................................................28 Strategic,PlanningandDevelopmentAdvice 29 Council'sDevelopmentControlPlans,Studies&DevelopmentContributionPlans..................................................................29 LocalEnvironmentalPlans(LEPs)...............................................................................................................................................29 DevelopmentControlPlans(DCPs).............................................................................................................................................29 Section7.11&Section7.12Plans ...............................................................................................................................................29 OtherDocuments...........................................................................................................................................................................29 Section10.7(formerlySection149)PlanningCertificate 30 DevelopmentandBuilding-DevelopmentAdvisoryService........................................................................................................30 Single Dwellings, Dual Occupancies, Secondary Dwellings, Commercial Fit Outs (New alterations & additions, demolitionandancillarydevelopment) 31 AllOtherDevelopmenttypesthatdonotfallintoanyotherPreDevelopmentadvisorycategory.......................................31 OtherAdvice 31 Pre-ComplyingDevelopmentCertificateAdvice.............................................................................................................................31 UrbanDesignReview(additionaltoPreDAfee) 31 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice.............................................................32 DevelopmentandBuilding-DevelopmentApplication(DA)Fees 32 DA'sforDwellingHouses..............................................................................................................................................................32 DA'sforAdvertisements(Signage) 32 DA'sforChangeofUse(Only)......................................................................................................................................................32 DA'sfortheSubdivisionofLand(otherthanstrata) 32 DA'sforStrata/StratumSubdivision............................................................................................................................................33 AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork(basedonestimated costs)...............................................................................................................................................................................................33 DA'sforDesignatedDevelopment................................................................................................................................................34 DevelopmentandBuilding-ModificationofDevelopmentConsentApplication ......................................................................34 ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2)).........................................................................34 ReviewofDeterminationDevelopmentApplicationorModificationtoDevelopmentConsent 35 .........................................................................................................................................................................................................35 36 ReviewofDecisiontoRejectDevelopmentApplication ...........................................................................................................36 Notified&Re-notifiedApplications 36 AdvertisedandRe-advertisedApplications(inadditiontonotificationfees).............................................................................37 OtherApplicationFees-DevelopmentAssessment 37 Electronic File Management (Development applications, Modifications to Development Consents & Reviews of Determination)................................................................................................................................................................................37 LapsedConsents...........................................................................................................................................................................37 ExtensionofConsentApplication................................................................................................................................................37 ReviewofDocumentationsubmittedtoConsentConditions...................................................................................................37 continuedonnextpage...
Page5of74
[continued] ApplicationFeeRefunds/FeeWaiver.............................................................................................................................................38 ApplicationsthatFeeWaiversApply 38 SiteCompatibilityCertificateandsiteverificationcertificatesunderSEPPs..............................................................................38 DesignReviewPanelFee(notrequiredifadviceprovidedatPreDevelopmentstage) 38 FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment................................................................................38 LongServiceLevy(AllDevelopmentTypes)...................................................................................................................................39 DevelopmentandBuilding-BuildingAssessmentandDevelopmentEngineering 39 BuildingInformationCertificateApplications.............................................................................................................................39 BuildingInformationCertificatePublicNotification&Re-notificationFees 39 ElectronicFileManagement..........................................................................................................................................................39 AmendedPlans/Documentation 40 LodgementofPrivatePCAIssuedCertificatesforRecordspurposes.....................................................................................40 OutsideofStandardHoursWorkPermitapplicationfees 40 Swimmingpools(PrivateSwimmingPool)..................................................................................................................................40 FireSafety 40 AnnualFireSafetyStatementAFSS..........................................................................................................................................40 FireSafetyCompliance...............................................................................................................................................................41 Hoardings 41 PublicRoads(LicenceFee)...........................................................................................................................................................41 CouncilLandOther(LeasingFee) 41 DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty............................................................................41 Footpath/AssetInspectionFees 42 DemolitionInspectionFees...............................................................................................................................................................42 Section88GCertificate 42 ActivityApplicationsunderSection68,LocalGovernmentAct,1993.........................................................................................42 Informationrequest............................................................................................................................................................................42 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice 43 BuildingCertification.........................................................................................................................................................................43 PrincipalCertifyingServiceFee(IncludesoneOccupationCertificatefee)-Alldevelopmenttypes 43 2.17aWhereCouncilisappointedasthereplacementPrincipalCertifier...............................................................................43 ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1and10–basedonestimated costofworks-(InadditiontoPCAfee)...........................................................................................................................................44 Construction Certificate Application Fees for National Construction Code Building Classes 2 to 9 – based on estimated costofworks 44 AmendedConstructionorComplyingDevelopmentCertificates.................................................................................................44 ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1and10–based onestimatedcostofworks 45 ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuildingClasses2to9–basedon estimatedcostofworks 45 ComplyingDevelopmentCertificate.................................................................................................................................................46 PCAInspections(Mandatoryoradditional).....................................................................................................................................46 OccupationCertificate. 46 SubdivisionCertificate......................................................................................................................................................................46 LinenPlan(certification) 46 EndorsementofInstrumentundertheConveyancingActwhereCounciliscitedintheinstrument.......................................46 ComplyingDevelopmentCertificateprivatecertifierstormwaterassessmentreferralfee......................................................46 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice 46 ActivityApplicationunders.68oftheLocalGovernmentActand/ors.138oftheRoadsAct(Stormwater)............................47 continuedonnextpage...
TableOfContents
Page6of74
TemporaryRoad,LaneorFootpathClosure...................................................................................................................................47 UseofFootway 47 OutdoorDining/Restaurants.........................................................................................................................................................47 LicenceFee 47 DisplayofGoods(adjacenttobusinesspremises)....................................................................................................................47 LicenceFee 47 A-FrameAdvertisingSignage.......................................................................................................................................................48 UseofPublicSpace(non-roadreserve)..........................................................................................................................................48 OutdoorDining/Restaurants-KogarahTownSquareDecking.................................................................................................48 ActivityApplicationDetermination...................................................................................................................................................48 Section68LGAApprovals(12monthsmaximum).........................................................................................................................48 CommercialUseofPublicFootways 48 SkipBinFees-Sec68LGActManagementofWaste...................................................................................................................48 PublicHealth 48 PublicHealth-NoticesandOrders..............................................................................................................................................49 DomesticWasteManagementServices 49 CommercialWasteManagementServices......................................................................................................................................50 OtherWasteManagementServices.................................................................................................................................................50 CommunityGardens..........................................................................................................................................................................50 CompanionAnimalFees-Lifetimeregistration-microchipping................................................................................................50 AnnualSpecifiedAnimalPermitFees 51 Dangerous/RestricedDogEnclosure...............................................................................................................................................51 AnimalImpoundingandEuthanasiaFees 52 FoodPremisesRetailandhomebusiness......................................................................................................................................52 TemporaryFoodPremises(TFP)(includingmobilefoodvendingvehiclesandtemporaryfoodstalls)..................................53 Food-Notices 53 ImpoundingCharges.........................................................................................................................................................................53 Abandonedvehicles 53 ProtectionoftheEnvironmentOperationLegislation....................................................................................................................53 LocalGovernmentLegislation 54 Community&Culture...........................................................................................................................................................................54 LibraryDeliveryorcollectionfee......................................................................................................................................................54 ReplacementoflostLibrarycards 54 Photocopying,printingandscanning..............................................................................................................................................54 LostandDamagedLibraryItems 55 OtherItems.........................................................................................................................................................................................56 Inter-LibraryLoans.............................................................................................................................................................................56 LibraryOutreachPrograms 56 HirefeeforLibraryRooms................................................................................................................................................................56 HireFeeforLibraryExhibitionVenues(forfunctionsandprograms) 56 Researchfee.......................................................................................................................................................................................56 Servicefeeforreproductionofphotographs..................................................................................................................................56 LibraryProgramsEvents,ClassesandWorkshops 57 HurstvilleLibraryMediaLab.............................................................................................................................................................57 HurstvilleMuseum&Gallery 57 OrganisedTours.............................................................................................................................................................................57 continuedonnextpage...
TableOfContents [continued]
Page7of74
Contents [continued] EducationPrograms......................................................................................................................................................................57 CommunityProgramsEvents,Classes&Workshops-Museum&Gallery 58 GeorgesRiverArtPrize.................................................................................................................................................................58 HiringFeeforExhibitionVenues(forfunctionsandprograms)................................................................................................58 Dragon'sLairGallery.....................................................................................................................................................................58 MervLynchReserveArtistStudio................................................................................................................................................58 Policy,planningorotherdocuments 58 ChildCareFees..................................................................................................................................................................................58 ChildCare-OtherCharges...............................................................................................................................................................59 CommunityKeys 59 CommunityCentres...........................................................................................................................................................................60 CarssParkLifeSavingHall 60 CasualBookings.........................................................................................................................................................................60 RegularBookings 60 CarssParkStrawBaleShed.........................................................................................................................................................60 CasualBookings.........................................................................................................................................................................60 RegularBookings 60 DragonRoom..................................................................................................................................................................................60 RiverRoom 60 HurstvilleSeniorCitizensCentre..................................................................................................................................................60 CasualBookings 60 RegularBookings........................................................................................................................................................................60 KingsgroveCommunityCentre....................................................................................................................................................61 CasualBookings 61 RegularBookings........................................................................................................................................................................61 KogarahSchoolofArts.................................................................................................................................................................61 CasualBookings.........................................................................................................................................................................61 RegularBookings........................................................................................................................................................................61 MortdaleCommunityCentre 61 CasualBookings.........................................................................................................................................................................61 RegularBookings 61 OatleyCommunityHall 61 CasualBookings.........................................................................................................................................................................61 RegularBookings 62 OatleyCommunityHall-meetingrooms1&2...........................................................................................................................62 CasualBookings 62 RegularBookings........................................................................................................................................................................62 PJFerryReserveCommunityHall................................................................................................................................................62 CasualBookings 62 RegularBookings........................................................................................................................................................................62 StGeorgeCommunityCentre.......................................................................................................................................................62 CasualBookings.........................................................................................................................................................................62 RegularBookings........................................................................................................................................................................62 CommunityCentreWaste-ExtraItemsifRequired 62 WaratahRoom................................................................................................................................................................................63 BanksiaRoom 63 HurstvilleOval-PavilionRoom....................................................................................................................................................63 CasualBookings 63 continuedonnextpage...
TableOf
Page8of74 TableOfContents [continued] RegularBookings........................................................................................................................................................................63 MaranaAuditoriumandHurstvilleSeniorCitizensCentrePackage 63 MaranaAuditorium,CivicTheatreandHurstvilleSeniorCitizensCentrePackage................................................................63 Performancevenues..........................................................................................................................................................................63 MaranaAuditorium.........................................................................................................................................................................63 CivicTheatre..................................................................................................................................................................................64 MaranaAuditoriumandCivicTheatrePackage..........................................................................................................................64 PublicHolidaysurcharge..............................................................................................................................................................64 Additionalcharges.........................................................................................................................................................................64 StagingandEquipment..............................................................................................................................................................65 KogarahTownSquare,HurstvillePlazaorCivicForecourtArea 65 CharityEventFees ........................................................................................................................................................................65 PrivateEvent 65 CommercialFilmingonCouncilProperty........................................................................................................................................66 UseofPublicSpaces 66 CommercialActivitiesondesignatedCouncilfootways,publicplazas,orsquares..............................................................66 IndependentFestivalsorEventsinParksandTownCentres 66 EventManagement.............................................................................................................................................................................67 StreetstallfeeatmajorCouncilevents.......................................................................................................................................67 ExtraEventManagementProvisions........................................................................................................................................67 StreetstallfeeatotherCouncilevents 67 Events,performances,shows,cinemasandactivities..................................................................................................................67 Advertising 67 PromotionalBanners.........................................................................................................................................................................67 OtherUses..........................................................................................................................................................................................67 Corporate 68 MapProduction..................................................................................................................................................................................68 CouncilPlans 68 ElectronicMediaOutput....................................................................................................................................................................68 AddressReviewService 68 LegalProceedings.............................................................................................................................................................................68 ReimbursementofStaffInPrivateCourtActions.......................................................................................................................68 CostsinLegalProceedings 68 Subpoenas..........................................................................................................................................................................................68 SaleofContract,TenderandSimilarDocuments 69 CouncilDocuments............................................................................................................................................................................69 GovernmentInformationPublicAccess(GIPA) 69 NatureofApplication.....................................................................................................................................................................69 (a)Accesstorecordsbynaturalpersonabouttheirpersonalaffairs-Applicationfee 69 (b)AllotherGIPAApplications..................................................................................................................................................69 Internalreview 69 CreditCardservicefee......................................................................................................................................................................69 AmericanExpress 69 Visa/MasterCard.............................................................................................................................................................................69 AccrualofInterestonRates&Charges 69 ChargesonOtherCarriers................................................................................................................................................................70 RateEnquiryFees 70 continuedonnextpage...
Page9of74
UnpaidSundryDebtorAccounts......................................................................................................................................................70 DishonouredCheque 70 DishonouredDirectDebit..................................................................................................................................................................70 InformationResearchFee 70 StormwaterManagementServiceCharge.......................................................................................................................................71 Leases/Licenses/Occupation/Easements of Council Community Properties Subject to Council's Community Lease Policy 71 New/Renewals................................................................................................................................................................................71 Leases/Licences/EasementsofCouncilPropertyandStatutoryPropertyMatters 71 NewAgreements............................................................................................................................................................................71 Renewals(includingOptions)orAssignments 71 GroundAnchorsaffectingCouncilLand.....................................................................................................................................72 Keys-Leases/Licences 72 Carparking.........................................................................................................................................................................................72 KogarahTownSquare-DerbyStreet...........................................................................................................................................72 AccessControlledParking–GreenbankStreet..........................................................................................................................73 AccessControlledParking–TheAvenue 73 AccessControlledParking–EmpressLane...............................................................................................................................73 MeteredParking-TreacyStreet 73 MeteredParking-GloucesterRoad.............................................................................................................................................74 MeteredParking-Patrick/MacMahonSt.CarPark 74 Replacementcard-PermanentParkingPermit..............................................................................................................................74 EmergencyAfterHoursBoomGateorCarParkOpeningCharges 74 ParkingPermit....................................................................................................................................................................................74 CommunityGroup-DirectionalSign...............................................................................................................................................74
TableOfContents [continued]

GeorgesRiverCouncil

Assets&Infrastructure

PrivatelyOperatedRecreationFacilities

ParksideDriveTennisCourts

QuarryReserveTennisCourts

KenRosewellTennisCentre

CourtRates

CasualBookings

CoachingServices

Group Classes – Children (per hour, group of 6)

Group Classes – Adults (per hour)

$20perhour

$20forgroupof6participants

$25perpersonfor4participants

PrivateLessons(AdultsandJuniors) $80perhour

SquadClasses

$28foroneandahalfhours

Intensivesquadtrainingforourelitejuniorsusing2courtsand2coachesformostweeks.

studentspercoach Clubhouse

HurstvilleAquatic

Leisure

Centre

$300fora4hourbooking

Page10of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
DayRate(perhour) $20.00 $2.00 $22.00 NightRate(perhour,from5pm) $22.73 $2.27 $25.00
CourtHire
CourtHire DayRate(perhour) $16.36 $1.64 $18.00 NightRate(perhour,from5pm) $18.18 $1.82 $20.00
4-6
at$50perhour
Functions/Parties
Additionalhours
Aquatics Slide $2.27 $0.23 $2.50 Adult(swimonly) $9.82 $0.98 $10.80 Child/(swimonly)(5+years) $7.91 $0.79 $8.70 Concession(swimonly) $7.91 $0.79 $8.70 Adult(swim/spa/steam) $13.63 $1.36 $15.00 Concession(swim/spa/steam) $10.00 $1.00 $11.00 Nonswimmer $2.27 $0.23 $2.50 continuedonnextpage...

Servicesinclude:SchoolLaneHire,Independent SchoolUse,SchoolCarnival,SchoolFunDay includingStadiumandinflatable,WaterSportsand Gym/Aerobics

Feesdependentonnumberof students,days,etc-pleasecontact Management

Page11of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) Aquatics
Family(MedicareCard) $24.27 $2.43 $26.70  Children under 5 are free Vouchers(swim/spa/steam) Adult(20visits) $238.64 $23.86 $262.50 Adult (20 Visits – Swim Only) $171.82 $17.18 $189.00 Concession(20visits) $175.00 $17.50 $192.50 AquaticMemberships Adult-MembershipCouncilOnly(DD)-perweek $13.18 $1.32 $14.50 Membership-AllAccess-1Month $195.45 $19.55 $215.00 Membership-AllAccess-3Months $390.91 $39.09 $430.00 MembershipWorkcover-3Months $390.91 $39.09 $430.00 AquaticMembership12months $727.27 $72.73 $800.00 AquaticMembership12months(Fortnightlydirect debit) $32.73 $3.27 $36.00 AquaticMembership6months $440.91 $44.09 $485.00 AquaticMembership6months(Fortnightlydirect debit) $38.18 $3.82 $42.00 Other LaneHire(perhour) $31.82 $3.18 $35.00 BirthdayPartiesHosted(perchild) $26.36 $2.64 $29.00 Foradurationof2hours SwimmingLessons Program-PrivateLearntoSwim(Child) $94.00 $0.00 $94.00 Pre-school&Schoolage $23.50 $0.00 $23.50 Adults $23.50 $0.00 $23.50 Squad JuniorDevelopmentsquad(perfortnight) $52.73 $5.27 $58.00
[continued]
Schools
KidsClub BlueFitSwishBasketballProgram(fortnightlydirect debit) $32.64 $3.26 $35.90 continuedonnextpage...
Page12of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
BluefitStrikeSoccerProgram(fortnightlydirectdebit) $32.64 $3.26 $35.90 BlueFitGymnasticsProgram(fortnightlydirectdebit) $32.64 $3.26 $35.90 Health&FitnessMembership VisitPass-AquaSenior-10visits $143.18 $14.32 $157.50 12monthsAdult-AllAccess(one-offupfront) $1,281.82 $128.18 $1,410.00 12monthsStudent&Concession-AllAccess(one-off upfront) $1,072.73 $107.27 $1,180.00 6monthsAdult-AllAccess(one-offupfront) $736.36 $73.64 $810.00 FortnightlyDirectDebit(Adult12months) $44.55 $4.45 $49.00 FortnightlyDirectDebit(Student&Concession12 months) $37.27 $3.73 $41.00 FortnightlyDirectDebit(Adultnocontract) $48.18 $4.82 $53.00 FortnightlyDirectDebit(Student&Concessionno contract) $42.73 $4.27 $47.00 JoiningFee12months $71.82 $7.18 $79.00 JoiningFeenocontract $90.00 $9.00 $99.00 CasualFitness CasualGymEntry $21.64 $2.16 $23.80 CasualGymEntry(Student/Concession) $15.91 $1.59 $17.50 AquaAerobics $21.64 $2.16 $23.80 AquaAerobics(Student/Concession) $15.91 $1.59 $17.50 CasualAdultGroupFitness $21.64 $2.16 $23.80 CasualConcessionGroupFitness $15.91 $1.59 $17.50 Vouchers(Gym&FitnessClass) ReformerPilates(1HourClassMembers) $10.00 $1.00 $11.00 ReformerPilates(1HourClassNon-Members) $39.09 $3.91 $43.00 Crèche CrecheFamilyMembership(DD)-perweek $15.09 $1.51 $16.60 CrecheMembership(DD)-perweek $7.54 $0.75 $8.29 Non-member(perhourperchild) $8.64 $0.86 $9.50 Member(perhourperchild) $5.00 $0.50 $5.50 Stadium HalfCourtHire-PerHour $39.09 $3.91 $43.00 Badminton – per hour (peak) $29.36 $2.94 $32.30 Badminton – per hour (off peak) $24.00 $2.40 $26.40 Court Hire – per hour $78.18 $7.82 $86.00 continuedonnextpage...
KidsClub [continued]

Stadium [continued]

StadiumHire(aslistedbelow)

GeneralInformation

-Schoolchargesarecostedbasedonnumberofstudents/numberofhours/numberofstaffrequiredtorunactivities requested.

-Newregulationssay1:50ratiowithschoolchildrendoingunstructuredactivities.

StadiumHire(59orless)

StadiumHire(60ormore)

Stadium – Event Hire

Stadium – Staff Hire

Stadium – Catering Hire

ConsultationRoomHire

SansSouciLeisureCentre

-Theseswimmingpoolsareoperatedunderleaseagreement.

Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges

Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges

Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges

Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges

Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges

Feesdependentonlease arrangementapprovedbyCouncil

-Aspartoftheseagreements,Councilmayfromtimetotime,setthemaximumchargesapplicableforadmissionfees.

Aquatics-Swimentry

Children under 5 are free

Page13of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CasualEntryAdult $8.91 $0.89 $9.80 CasualEntryChild $6.91 $0.69 $7.60 Soccer (senior) – per team/game $73.45 $7.35 $80.80
Adult(swimonly) $8.64 $0.86 $9.50 Child(swimonly,5&over) $6.73 $0.67 $7.40
Concession/Student/Senior(swimonly) $6.73 $0.67 $7.40 FacilityFee(Spectator) $2.91 $0.29 $3.20 FamilyPass(2adults,2kids) $24.36 $2.44 $26.80 Swim/GymCasualAdultvisit $17.73 $1.77 $19.50 Swim/GymCasualStudent/Senior(Concession)visit $14.09 $1.41 $15.50 LaneHire(perhour) $72.73 $7.27 $80.00

NormO'NeillCricketTrainingFacility

Feesareperhour,basedon1lane

LongtermcommercialarrangementsmaybenegotiatedwithCouncilviaexpressionofinterest

Page14of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) SwimPasses AllSwimpassesvalidfor4monthsonly SwimPass-20sessions-Adult $151.14 $15.11 $166.25 SwimPass-20sessions-Concession(Student/ Senior) $117.73 $11.77 $129.50 SwimmingLessons Child $23.50 $0.00 $23.50 Adult $21.00 $0.00 $21.00 Privatelesson-child $84.00 $0.00 $84.00 AquaticMemberships MembershipWorkcover-3Months(DD) $381.82 $38.18 $420.00 CasualFitnessandPasses CasualGym/GroupClass/AquaAerobics-Adult $17.73 $1.77 $19.50 AquaPassAdult10sessions $159.55 $15.95 $175.50 CasualGym/GroupClass/AquaAerobicsConcession $14.09 $1.41 $15.50 AquaPassStudent/Senior10sessions $126.82 $12.68 $139.50 AquaPass-Adult-20Sessions $310.23 $31.02 $341.25 AquaPass-Student/Senior-20Sessions $246.59 $24.66 $271.25 Health&FitnessMembership Adult-1month-nocontract-fortnightlydirectdebit $47.27 $4.73 $52.00 Adult-12monthcontract-fortnightlydirectdebit $43.64 $4.36 $48.00 Concession-1month-nocontract-fortnightlydirect debit $41.82 $4.18 $46.00 Concession-12monthcontract-fortnightlydirect debit $36.36 $3.64 $40.00 JoiningFee-withcontract $62.73 $6.27 $69.00 JoiningFee-nocontract $90.00 $9.00 $99.00
CoachesNetHire20.00 $20.00 $2.00 $22.00 CoachesNetHire25.00 $25.00 $2.50 $27.50 CricketProgram $49.09 $4.91 $54.00 IndividualCoaching30minutes $45.45 $4.55 $50.00 IndividualCoaching60minutes $78.64 $7.86 $86.50 Level3Individual30Minutes $49.09 $4.91 $54.00 continuedonnextpage...

NormO'NeillCricketTrainingFacility

Leniencycanbeshownbetweenthehoursof3pm-4pmforschoolfinishingtimesdependginonwhetherthereis anotherbookingat3pmontheday

MondaytoFriday3pmonwards; Saturday andSunday

Page15of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
[continued] Level3Individual60Minutes $84.09 $8.41 $92.50 NetHirewithMachine $49.09 $4.91 $54.00 SundayCricketSquads $29.55 $2.95 $32.50 OffPeak
toFriday8amto3pm CoachesNetHire-OffPeak $200.00 $20.00 $220.00 TurfNetHire-OffPeak $49.09 $4.91 $54.00 Schools Free
Monday
Community $15.00 $1.50 $16.50
Peak
CoachesNetHire-Peak $25.00 $2.50 $27.50 NetHire-Peak $39.09 $3.91 $43.00 TurfNetHire-Peak $59.09 $5.91 $65.00 CricketClinics AsperOffPeakRates Schools $20.00 $2.00 $22.00 Community $20.00 $2.00 $22.00 OtherFacilityFees HolidayClinic1Day $49.09 $4.91 $54.00 HolidayClinic2Days $119.55 $11.96 $131.51 EngineeringFloodInformation FloodInformationReport $245.00 $0.00 $245.00 EngineeringSupervision Feeformiscellaneousapplicationswhichneed considerationbyEngineeringServices(perhour) $220.00 $0.00 $220.00 InstallationofTrafficandDirectionalSignage Installationoftrafficanddirectionalsignageforprivate developments Costofworks AdministrationFee 21%ofcostofworksasdetermined byCouncil

IlluminatedStreetSigns

BeverleyParkWaterReclamation

Page16of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Erectionanduseofanilluminatedstreetnamesign Asdeterminedbyagreement RoadsAct1993| Section138 PlansofManagement CopyofPlansofManagementforaPark/Reserve (peritem) $45.00 $0.00 $45.00 CopyofGenericPlansofManagement(peritem) $29.50 $0.00 $29.50 CopyofLandscapeMasterplan(peritem) $35.50 $0.00 $35.50 TrafficInformation AADT – Mid block count – Hourly count $36.36 $3.64 $40.00 AADT – Mid block daily volume – weekly count $72.27 $7.23 $79.50 Speedcountatmidblock $49.09 $4.91 $54.00 Peak hours turning volumes – cost per intersection $90.45 $9.05 $99.50 TreeManagement StreetTreeRemoval ReplacementStreetTreeFee $1,000.00 $0.00 $1,000.00 StreetTreeRemovalFee Costofworksasdeterminedby Council TreeManagementInspections(privateland) ApplicationFee1-3trees(perapplication) $165.00 $0.00 $165.00 Application Fee 4 – 6 trees (per application) $250.00 $0.00 $250.00 ApplicationFeepertree>6treesinadditionto (ApplicationFee4-6trees) $27.00 $0.00 $27.00 ReviewofTreeRemovalandPruningApplicationon PrivateLand-Stage1Review $97.50 $0.00 $97.50 ReviewofTreeRemovalandPruningApplicationon PrivateLand-Stage2Review $175.00 $0.00 $175.00
Removal,
andpruning OffsetFeeforTreeReplacement(pertree)fortrees onprivateland
Tree
replacement
AsvaluedbyThyer(2011) Tree&nbsp;ValuationMethod(fee rangebetween&nbsp;$1,000and $10,000)
Price(perkilo/litre) $1.80 $0.00 $1.80 FixedAnnualCharge Asperseparateagreementwith customer

GolfCourses

HurstvilleGolfCourse

-Tee-offfor9holeroundsmaybepermittedupuntil7:30amwhereplayerstee-offfromthetenthtee.

-Theeveningrateapplieswhentee-offoccursafter3pmnormaltimeor4pm Daylight Savingstime.

- For all Members Competition on Tuesday, Thursday, Friday and Saturday, as additional fee of $4.00 is imposed by DirectorGolfServicestocoverprizes.

-ClubMembershipfeessetbyClub,andarepayableonaproratabasis for newmembers.

Page17of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CasualUsers Adults 18holes $34.55 $3.45 $38.00 9holes $24.09 $2.41 $26.50 18holesweekend $39.09 $3.91 $43.00 9holesweekend $29.55 $2.95 $32.50 EveningRate $14.55 $1.45 $16.00 Concession-Pensioner/Student 9holes $20.00 $2.00 $22.00 18holes $29.55 $2.95 $32.50 School block booking – 18 holes (Weekdays only) $13.18 $1.32 $14.50 CartHire(CasualUsers&Members) ElectricCartHire-9holes $25.00 $2.50 $27.50 Electric Carts – Adults $35.36 $3.54 $38.90 Electric Carts – Concession (Pensioner / Student) $30.55 $3.05 $33.60 Electric Carts – Deposit $0.00 $0.00 $0.00 Buggy – Cart $5.00 $0.50 $5.50 Buggy – Deposit $0.00 $0.00 $0.00 HGCMembers Full 18holeseveryday $25.00 $2.50 $27.50 9holes $20.00 $2.00 $22.00 Pensioner
Weekdays $17.27 $1.73 $19.00 Weekendsandholidays $24.09 $2.41 $26.50 Junior18holes/9holes Weekendsandholidays $17.27 $1.73 $19.00
18holes/9holes

BeverleyParkGolfCourse

SetbyCouncil,dependentonthe requirementsoftheevent

SportsfieldHire-SummerandWinterSeasonalCharges

-AppliestoallfieldswithinLGAapartfromlocationslistedbelow

-Excludesseparatelynegotiatedlicenceaggreements

Page18of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Public&VisitorFees Monday to Friday (excl Public Holidays) – 18 holes $36.36 $3.64 $40.00 Monday to Friday (excl Public Holidays) – 9 holes $22.73 $2.27 $25.00 Saturday, Sunday and Public Holidays (am) – 18  holes $40.91 $4.09 $45.00 Saturday, Sunday and Public Holidays (pm) – 18  holes $40.91 $4.09 $45.00 Saturday, Sunday and Public Holidays – 9 holes $22.73 $2.27 $25.00 Twilight(Monday-Fridayafter3pm) $16.36 $1.64 $18.00 Twilight(Saturday,Sundayafter3pm) $18.18 $1.82 $20.00 Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) from 11am – 9/18 holes $17.27 $1.73 $19.00 Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) before 11am – 18 holes $24.55 $2.45 $27.00 Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) before 11am – 9 holes $16.36 $1.64 $18.00 Cart Hire – 18 holes $40.91 $4.09 $45.00 Cart Hire – 9 holes $22.73 $2.27 $25.00 PullBuggyHire $4.55 $0.45 $5.00 Club Hire – 18 holes $22.73 $2.27 $25.00 Club Hire – 9 holes $13.64 $1.36 $15.00 StadiumHire JubileeStadium
Fullsizedsportfield $1,354.55 $135.45 $1,490.00 Midsizedsportsfield $786.36 $78.64 $865.00 Touch/oztag $790.91 $79.09 $870.00 Minisizedsportsfield $281.82 $28.18 $310.00 Floodlightfee-perfield(non-metered) $336.36 $33.64 $370.00 HurstvilleOval SeasonalVelodromehire(cycling) $2,509.09 $250.91 $2,760.00 CasualVelodromehireperday(cycling) $445.45 $44.55 $490.00 PremiumSportingFields-HaroldFraserOval,HurstvilleOvalandOldsParkOval SeasonalRateseniors $2,454.55 $245.45 $2,700.00 SeasonalRatejuniors $1,336.36 $133.64 $1,470.00 continuedonnextpage...

PremiumSportingFields-HaroldFraser

Fields-PeakhurstPark;PoultonPark Ratesareperfield,per

Peak - Monday to Friday 3pm to close and All day weekends

CoachingClinicsandCasualHire(excludesPremiumsportingfieldsandSynthetics)

Page19of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
HurstvilleOvalandOldsParkOval [continued] Dayrate $454.55 $45.45 $500.00 Hourlyrate $113.64 $11.36 $125.00 SchoolBookings Canteen/Glasshouse $118.18 $11.82 $130.00 Linemarkingforathleticsfield $295.45 $29.55 $325.00 OvalhireforAthleticsCarnival $409.09 $40.91 $450.00 Refundablecleaningbond-Premiumsportsfields $200.00 $0.00 $200.00 Netball
Seasonalcourthire $112.73 $11.27 $124.00 NightTrainingperseason/court $95.45 $9.55 $105.00
SyntheticFeesandChargesasperContract/ManagementAgreement/Licence SeasonalClubhire $39.09 $3.91 $43.00 CasualCommunityHire $68.18 $6.82 $75.00 SchoolHire Free Commercial Hire – Peak $222.73 $22.27 $245.00
Oval,
Courts
Synthetic
hour
Commercial Hire – Off-Peak $113.64 $11.36 $125.00 OffPeak-MondaytoFriday7amto3pm FloodLighting-SyntheticFields $13.64 $1.36 $15.00 VanessaStreetMulti-PurposeCourts Schoolsinarea-Free Free Schoolsoutofarea-perhour $9.09 $0.91 $10.00 Hourlyrate $39.09 $3.91 $43.00 Hourlyratewithlights $53.18 $5.32 $58.50 Seasonalrateperhour(min2hrsperweekx20 weeks) $22.27 $2.23 $24.50 Seasonalratewithlightsperhour(min2hrsperweek x20weeks) $39.09 $3.91 $43.00
Privateclinics/training(per10weeksschoolterm) $5,972.73 $597.27 $6,570.00 Privateclinics/training(perweek) $663.64 $66.36 $730.00 Privateclinics/training(perday) $177.27 $17.73 $195.00 Non Commercial – Clubs or Association (per week) $490.91 $49.09 $540.00 Non Commercial – Clubs or Association (per day) $159.09 $15.91 $175.00 continuedonnextpage...

CoachingClinicsandCasualHire(excludesPremiumsportingfieldsandSynthetics) [continued]

SchoolHolidayClinics(excludesPremiumsportsfields&Synthetics)

Page20of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CommercialHire(perfieldperday) $281.82 $28.18 $310.00 Casualhire(perhour) $54.55 $5.45 $60.00 FloodlightFee(pernight) $18.18 $1.82 $20.00
Privateclinicsperweek $1,236.36 $123.64 $1,360.00 Privateclinicsperday $340.91 $34.09 $375.00 Key
Initialkeyissuetosportsclub Free Keybondforreturnatendofseason $250.00 $0.00 $250.00 AdditionalorreplacementforlostKey $81.82 $8.18 $90.00 Bonds Parkdamagebond-upto2fields $1,000.00 $0.00 $1,000.00 Parkdamagebond-3ormorefields $4,000.00 $0.00 $4,000.00 Temporaryparkvehicleaccess $1,000.00 $0.00 $1,000.00 Breach
1stoffence $227.27 $22.73 $250.00 2ndoffence $454.55 $45.45 $500.00 3rdandsubsequentoffence $681.82 $68.18 $750.00 Operatingcommercialoperationwithoutapermit $227.27 $22.73 $250.00 PersonalTrainers IDcard $27.27 $2.73 $30.00 ReplacementIDCard $36.36 $3.64 $40.00 AnnualCharge 6 – 18 persons $1,100.00 $110.00 $1,210.00 3 – 5 persons $550.00 $55.00 $605.00 2personsorless $277.27 $27.73 $305.00 Half-YearlyPermit 6 – 18 persons $663.64 $66.36 $730.00 3 – 5 persons $336.36 $33.64 $370.00 2personsorless $168.18 $16.82 $185.00 CasualParkHire-NonSport(Wedding,Filming,Community) Wedding Ceremony – Park hire and Photography  Permit(2hr) $265.91 $26.59 $292.50 continuedonnextpage...
Charges
ofgroundandfacilityuse

CasualParkHire-NonSport(Wedding,Filming,Community) [continued]

OatleyParkCastle

PenshurstSportingHub

Alllistedfeesareperhour.

AnnualandlongtermcommercialarrangementsmaybenegotiatedwithCouncil.

CarShareParking

Page21of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Photographypermit $70.45 $7.05 $77.50 CommunityGroupEvent<50people(perday) $154.55 $15.45 $170.00 Community Group Event ≥ 50 people (per day) SetbyCouncil,dependentonthe requirementsoftheevent Filming in Parks – < 5 crew (per day) $150.00 $15.00 $165.00 Cancellationfee $30.45 $3.05 $33.50
Venuehireweekendandpublicholidays $509.09 $50.91 $560.00 Mid-weekhire(exclpublicholidays) $266.37 $26.64 $293.00 Refundablecleaningbond $269.50 $0.00 $269.50
CommercialHire-PenshurstPark-OFFPEAK-MonFri7am-3pm $109.09 $10.91 $120.00 CommercialHire-PenshurstPark-PEAK-Mon-Fri 3pmto10pm+Weekends $245.45 $24.55 $270.00 SportsfieldHire-PenshurstPark-Lights(perhour) $14.68 $1.47 $16.15 SportsfieldHire-PenshurstPark-MatchDay $168.18 $16.82 $185.00 SportsfieldHire-PenshurstPark-SchoolHire FREE SportsfieldHire-PenshurstPark-Training $83.64 $8.36 $92.00 WorkZone/ConstructionZone ApplicationFee(nonrefundable) $225.00 $0.00 $225.00 WorkZone(perLin.mperweek)Landusezone(R2, R3,B1,IN2,SP2) $34.50 $0.00 $34.50 WorkZone(perLin.mperweek)Landusezone (R4,B2,B3,B4,B6) $69.00 $0.00 $69.00 Installandremove"WorkZones"regulatorysignsand stems-peritem $235.00 $0.00 $235.00
Carsharespaceinmeteredparkingarea(perspace peryear) $975.00 $0.00 $975.00 Installationofnewcarshareparkingspace $1,620.00 $0.00 $1,620.00 Filming–Footpath&RoadsApplicationFee(perday) High impact – 50+ crew, 10+ trucks, significant  equipment $630.00 $0.00 $630.00 continuedonnextpage...

Filming–Footpath&RoadsApplicationFee(perday) [continued]

Medium impact – 26-50 crew, 10< trucks, some  equipment

Low

-10<crew,1camera,soundandno vehicles

On-street parking when filming on private property –  unitbase/parkingplan

LineMarking

OccupancyofRoadRelatedArea

Lin.mperweek(minimumduration6months)

MiscellaneousServices

Activitiesnotcoveredbytheabovefeeschedulewillbetakenonafeeforservicebasisperhour,perofficer,plusother costsincurredinprovidingtheservices

Depositsfordamageduringconstruction

DamagebondforlargeDA's-MediumDensity/ Commercial Refertochargesunderheading Planning&Development|Security-

FeesAgainstdamagetoCouncil property

Securityagainstdamageforconstructionwithin3 metresofCouncilStormwaterInfrastructure

SecurityagainstaccessdamagetoCouncilparksor reserves

Securityagainstcompliancewithtreepreservation requirements/conditions(StreetTree)

DeterminedbyCouncilbasedon costsofworkstoreplacestormwater infrastructure

DeterminedbyCouncil,basedon works-cappedat$10,000excl.GST

AsvaluedbyThyer(2011)Tree ValuationMethod(depositrange between$1,000and$10,000)

Page22of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$390.00 $0.00 $390.00
$205.00 $0.00 $205.00 Ultra
FREE
$220.00 $0.00 $220.00 Major
offilmingapplication 75%of
fee Driveway
DrivewayLineMarking $355.00 $0.00 $355.00
ApplicationFee $180.00 $0.00 $180.00 RoadOccupancyCommercialParkingZone-
andfuneralvehicles $6.00 $0.00 $6.00
Installandremoveregulatorysignsandstems $210.00 $0.00 $210.00 EngineeringDAInspectionFee EngineeringDAInspectionFee $150.00 $0.00 $150.00
Low impact – 11-25 crew, minimal equipment
impact
revision
application
wedding
per
FirstHour $205.00 $0.00 $205.00 PerhourorpartthereofafterFirstHour $205.00 $0.00 $205.00
DamageDepositsandInspection
DamageDepositDA/CDCResidentialDwelling $2,000.00 $0.00 $2,000.00 DamagedepositfordrivewaywithoutDA $900.00 $0.00 $900.00
continuedonnextpage...

Depositsfordamageduringconstruction [continued] Damagebondforpublicdomainworks

ApplicationforDrivewayCrossingandAssociatedWorks(underSection138RoadsAct)

CouncilDesigned(includesoneinspection)

Page23of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
DeterminedbyCouncilbased
on works
DrivewayAsphaltRestoration-perdriveway $1,210.00 $0.00 $1,210.00 UpgradeExistingDriveway/FootpathWorks(without DA) $522.73 $52.27 $575.00 Driveway / Footpath Works – single residential  dwellingDA/CDCwithboundarylevelissue $763.64 $76.36 $840.00 Driveway / Footpath Works – medium density /  commercialDA/CDCwithboundarylevelissue $1,118.18 $111.82 $1,230.00 Driveway / Footpath Modification – sketch only  (excludeslevelissue) $218.18 $21.82 $240.00 AdditionalDriveway(where2ormoredrivewaysare permitted/approved) $390.91 $39.09 $430.00 AdditionalInspectionFeeperhourorpartthereof afterfirsthour $185.00 $0.00 $185.00 Assessmentfeeforself-designMultiUnitand/orCommercial/IndustrialDevelopmentInfrastructure Assessmentofdesignssubmittedbydevelopersfor vehicularcrossingandinfrastructureupgradeworks (PublicDomainWorks) $1,790.00 $0.00 $1,790.00 FeesAssociatedtoIssueofHeavyVehiclesPermit IssueofpermitforClass1&3vehiclesusinglocal roads $93.00 $0.00 $93.00

RestorationCharges

GeneralInformation

-RoadOpeningPermitapplicationfeeisnon-refundableandmustbechargedperapplication.

-AdministrationFeeiscalculatedtocovertheCouncilcostoftheRestorationsOfficerat16%and5%sinkingfunds.

-Footpathtoberestoredatfullslabwidth.Drivewayfromjointtojoint.

-Minimumareais1msquaredforjobslessthan1msquaredperitem.Minimum1mforkerbandgutter.

-Asphaltrestorationsshallbeminimum1.5morfulllanewidth.TheextenttobedeterminedbyCouncil.

-Ifroadopeningiswithin1mofthelipofagutterorwherenokerbexists,therestorationistoextendtothelipofthe gutteroredgeofthebitumen.

-Whereanypartoftheroadopeningiswithin1mofanexistingroadrestoration,thenewrestorationistoextendtothe farsideoftheexistingrestoration.

-TheminimumwidthforpaverrestorationwillbedeterminedbyCouncil.

-Damaged/missingpaverswillbereplacedandchargedatcostplusadministrationfee.

-Wherethetypeofworkisnotcoveredintheschedule,ortheworkscomprisecapitalisedworkswheretheutilityhasthe righttocompletetheirownrestoration,thecostwillbesubjecttocostplusadministration,andtheextenttobedetermined byCouncil.

-AllpermanentreinstatementtobecarriedoutbyGeorgesRiverCouncilunlessapprovedbyCouncil.

-AllrestorationsforPublicUtilityworksare GST exempt.

Page24of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
AdditionalInspectionforDamagedCouncilAsset $163.64 $16.36 $180.00 MakeSafeCharge/EmergencySafetyWorks(Other) Tobedetermineduponcompletion MakeSafeCharge/EmergencySafetyWorks (Standard) $181.82 $18.18 $200.00 RestorationScopeandSignOffFee(persite) $272.73 $27.27 $300.00 TrafficControl(1person) $718.18 $71.82 $790.00 TrafficControl(2ormorepeople) $1,854.55 $185.45 $2,040.00 ApplicationFee $136.36 $13.64 $150.00 AdministrationFee 21%ofcostofworksasdetermined byCouncil ConcretePlantOpeningfeefornightworks(per night) $2,563.64 $256.36 $2,820.00 StormwaterPitlid $227.27 $22.73 $250.00 StormwaterPitReconstruction $5,900orcostofworksasdetermined byCouncil,whicheverisgreater Standardconcretegullypitupto1.5mdeepincludingsupplyoflintel(upto3.6mopening)andgalvanisedgratewhere required.  SupplyandinstallStormwaterPitLintel(perM opening) $1,363.64 $136.36 $1,500.00 Nightworksurcharge 25%ofcostofworksasdetermined byCouncil

RoadOpeningChargesforReinstatementforQuantitiesover10m2or10lin.M

Page25of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) RoadOpeningChargesforRestorationsforQuantitiesUnder10sq.m Roads Asphalticconcretewithflexiblepavement(persq.m) $309.09 $30.91 $340.00 Cementconcrete(persq.m.) $590.91 $59.09 $650.00 Footpaths Concretepersq.m(<5sq.m;minimumcharge1 sq.m) $295.45 $29.55 $325.00 Concretepersq.m.(5-10sq.m) $272.73 $27.27 $300.00 Brickorblockpavers(persq.m) $386.36 $38.64 $425.00 Brick or Block Pavers – on concrete base (per sq.m) $463.64 $46.36 $510.00 Asphalticconcreteonflexiblepavement(persq.m) $290.91 $29.09 $320.00 Formedorgrassarea(persq.m) $118.18 $11.82 $130.00 Concreteresidentialdriveways(130mmreinforced) (Under5sq.m) $331.82 $33.18 $365.00 Concreteresidentialdriveways(130mmreinforced) (5-10m2persq.m) $331.82 $33.18 $365.00 Concreteindustrialdriveways(150mmreinforced) (Under5sq.m) $340.91 $34.09 $375.00 Concreteindustrialdriveways(150mmreinforced) (5-10m2persq.m) $345.45 $34.55 $380.00 Kerb&Gutter Concretekerbandgutter(perm.) $390.91 $39.09 $430.00 Laybackandgutter(perm.) $390.91 $39.09 $430.00 Sawcutting(perm.) $25.91 $2.59 $28.50 Concretekerbramp(each) $2,081.82 $208.18 $2,290.00 Stormwateroutletreconnection90mm.dia.(per metre) $263.64 $26.36 $290.00
Roads Asphalticconcretewithflexiblepavement(11-50 sq.m) $250.00 $25.00 $275.00 Asphalticconcretewithflexiblepavement(51+sq.m) $236.36 $23.64 $260.00 Cementconcrete(11-50sq.m.) $372.73 $37.27 $410.00 Cementconcrete(51+sq.m.) $318.18 $31.82 $350.00
Concretepersq.m.(11-50sq.m) $209.09 $20.91 $230.00 Concretepersq.m.(51+sq.m) $172.73 $17.27 $190.00 Brickorblockpavers(11-50sq.m) $345.45 $34.55 $380.00 Brickorblockpavers(51+sq.m) $304.55 $30.45 $335.00 continuedonnextpage...
Footpaths

Footpaths [continued]

HoistingActivities

HoistingActivitiesoverroadwayfromsiteinstalleddevicesegTowerCranes

week(minimumcharge12weeks)

Planning&Development

PlanningProposals

Page26of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Brickorblockpaversconcretebasecourse(per sq.m) $82.27 $8.23 $90.50 Asphalticconcreteonflexiblepavement(11-50sq.m) $259.09 $25.91 $285.00 Asphalticconcreteonflexiblepavement(51+sq.m) $168.18 $16.82 $185.00 Formedorgrassarea(11-50sq.m) $85.91 $8.59 $94.50 Formedorgrassarea(51+sq.m) $71.82 $7.18 $79.00 Concreteresidentialdriveways(130mmreinforced) (11-50sq.m) $300.00 $30.00 $330.00 Concreteresidentialdriveways(130mmreinforced) (51+sq.m) $213.64 $21.36 $235.00 Concreteindustrialdriveways(150mmreinforced) (11-50sq.m) $309.09 $30.91 $340.00 Concreteindustrialdriveways(150mmreinforced) (51+sq.m) $222.73 $22.27 $245.00 Kerb&Gutter Concretekerbandgutter(11-50m.) $318.18 $31.82 $350.00 Concretekerbandgutter(51+m.) $290.91 $29.09 $320.00 Laybackandgutter(11-50m.) $318.18 $31.82 $350.00 Laybackandgutter(51+m.) $290.91 $29.09 $320.00
ApplicationFee $180.00 $0.00 $180.00 OccupancyFee $200.00 $0.00 $200.00
CorporateVolunteerProgram-Bushcare $72.73 $7.27 $80.00 perpersonpersession/event
per
Bushcare
lodgementfee) $2,145.45 $214.55 $2,360.00 Pre-Lodgement Consultation (initial) – Major nonComplex(costwillbedeductedfromlodgementfee) $4,236.36 $423.64 $4,660.00 continuedonnextpage...
Pre-Lodgement Consultation (initial) – Minor (cost will  bedeductedfrom

PlanningProposals [continued]

fromlodgementfee)

Note:

Minor - Planning Proposal with no map change ie no zone, FSR or height change; Majornon-Complex-OutsideKogarah&HurstvilleCBD's; MajorCBDorComplex-withinKogarah&HurstvilleCBD'siezonedMU1andE2ordeferredmatter

from applicant – Major non-Complex (per study)

from applicant – Major CBD or Complex (per study)

studies(requiredbyandcommissionedby council)

External

DesignReferralFee

Page27of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
(cost
$7,045.45 $704.55 $7,750.00
Pre-Lodgement Consultation (initial) – Major CBD or  Complex
willbededucted
Pre-Lodgement Consultation (subsequent) – Minor $1,427.27 $142.73 $1,570.00 Pre-Lodgement Consultation (subsequent) – Major  non-Complex $2,118.18 $211.82 $2,330.00 Pre-Lodgement Consultation (subsequent) – Major  CBDorComplex $3,527.27 $352.73 $3,880.00 Assessment of Proposal – Minor $19,300.00 $0.00 $19,300.00 Assessment of Proposal – Major non-Complex $38,500.00 $0.00 $38,500.00 Assessment of Proposal – Major CBD or Complex $51,400.00 $0.00 $51,400.00 Consultation – Minor $7,690.00 $0.00 $7,690.00 Consultation – Major non-Complex $15,500.00 $0.00 $15,500.00 Consultation – Major CBD or Complex $20,600.00 $0.00 $20,600.00 Review and Finalisation – Minor $11,600.00 $0.00 $11,600.00 Review and Finalisation – Major non-Complex $23,100.00 $0.00 $23,100.00 Review and Finalisation – Major CBD or Complex $30,800.00 $0.00 $30,800.00 AssessmentofAdditionaland/orAmendedStudies from applicant – Minor (per study) $3,850.00 $0.00 $3,850.00 AssessmentofAdditionaland/or
Studies
$7,690.00 $0.00 $7,690.00 AssessmentofAdditionaland/or
Studies
$10,300.00 $0.00 $10,300.00 NotificationPerLetter $4.00 $0.00 $4.00 Advertising(peradvertisement,
$3,300.00 $0.00 $3,300.00 Additional
Fullcostrecovery DeedofAgreementrequiredtopay Councilcosts CostofDeedpreparationat proponentscost Holding
Fullcostrecovery Companysearch(includingadministrationfee) $40.00orat
greater Titlesearch(includingadministrationfee) $20.00 $0.00 $20.00
Amended
Amended
asrequiredby Counciland/ortheGatewayDetermination)
PublicHearing(e.g.reclassificationofland) andassessmentofhearingreport
cost,whicheveristhe
ExternalUrbanDesignReferralFee $5,420.00 $0.00 $5,420.00
Urban

DevelopmentControlPlanPreparation

DCP Preparation or Amendment – Minor  (accompaniesminorplanningproposals)

DCP Preparation or Amendment – Major  (accompaniesmajorplanningproposals)

Note:feebreakdown-Assessment60%;Consultation20%andReviewandFinalisation20%

Note:ifre-exhibitionoftheplanningproposalisrequired,thenanadditionalnotificationfeewillbechargedconsistent withtheabove

Preparationofadditionalstudiesasrequiredby CounciltosupporttheDCPpreparation

PlanningAgreementsContributions/PublicPurposes

exhibitionandexecution,ordeedofvariation,ordeed ofnovationincludingindependentassessmentof reportsandvaluationsprovidedaspartof negotiations

Planning Agreement – monitoring, enforcing and  administeringtheplanningagreement.

PlanningAgreementContributions/PublicPurpose

Fullcostrecovery

Fullcostrecoveryorasspecifiedin executedPlanningAgreement

Fullcostrecoveryorasspecifiedin executedPlanningAgreement

AsspecifiedintheexecutedPlanning Agreement

Section7.11and7.12Contributions(formerlyS94/S94A)

Section7.11Contributions(FormerHurstvilleCity CouncilLGA)

Section7.11and7.12DevelopmentContributions

Pleaserefertothe"GeorgesRiver CouncilLocalInfrastructure ContributionsPlan2021(s7.11and s7.12)"forinformationoncontribution rates

Section7.11Contributions(FormerKogarahCity CouncilLGA)

Section7.12(formerlyS94A)DevelopmentContributions

Development (including complying development) that is not subject to a section 94 contribution under any other contributionsplanthatisinforceundertheEP&AAct,andtheproposedcostofcarryingoutthedevelopmentis:

Totalcostsamount$100,000orless

Total costs amount between $100,001 – $200,000

Totalcostsamountis$200,001ormore

Page28of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$6,420.00 $0.00 $6,420.00
$19,300.00 $0.00 $19,300.00
Notification
$4.00 $0.00 $4.00 Advertising
$3,300.00 $0.00 $3,300.00
fee(perpropertynotified)
fee(peradvertisement)
PreliminaryAssessment $1,620.00 $0.00 $1,620.00
Planning Agreement – negotiation, preparation,

Strategic,PlanningandDevelopmentAdvice

Generalstrategicplanningwrittenadvicerequiring researchand/orsiteinspection(perhourorpart thereof)

Council'sDevelopmentControlPlans,Studies&DevelopmentContributionPlans

Local

(LEPs)

DevelopmentControlPlans(DCPs)

OtherDocuments

Page29of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$220.00 $0.00 $220.00
EnvironmentalPlans
HardcopyofGeorgesRiverLEPInstrumentonly (each) $57.50 $0.00 $57.50 Environmental Planningand Assessment Regulation2021 Hardcopy(A3)ofGeorgesRivermaponly(each) $10.80 $0.00 $10.80 Environmental Planningand Assessment Regulation2021 HardcopyofHurstville/KogarahLEPInstrumentonly (each) $57.50 $0.00 $57.50 Environmental Planningand Assessment Regulation2021 Hardcopy(A3)ofHurstville/KogarahLEPmaponly (each) $10.80 $0.00 $10.80 Environmental Planningand Assessment Regulation2021 Hardcopy(A3)ofHurstville/KogarahLEPmaponly (each) $10.00 $0.00 $10.00
HardcopyofGeorgesRiverDCP(Fullcopyof1 DCP) $93.00 $0.00 $93.00 HardcopyofGeorgesRiverDCP(sectiononly) $31.00 $0.00 $31.00 HardcopyofHurstville/KogarahDCP(FullCopyof1 DCP) $98.50 $0.00 $98.50 hardcopyofHurstville/KogarahDCP(sectiononly) $33.00 $0.00 $33.00 Section7.11&Section7.12Plans HardcopyofSection7.11orSection7.12Plan(1Full Copy) $35.50 $0.00 $35.50 Environmental Planningand Assessment Regulation2021
HardcopyofHurstvilleCityCentreUrbanDesign Strategy $124.50 $0.00 $124.50 HardcopyofKogarahNorthUrbanDesignStrategy $124.50 $0.00 $124.50 VoluntaryPlanningAgreementPolicy(each) $40.00 $0.00 $40.00 continuedonnextpage...

OtherDocuments [continued]

Section10.7(formerlySection149)PlanningCertificate

DevelopmentandBuilding-DevelopmentAdvisoryService

Page30of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
HardcopyofStrategicPlanningReports/Documents (each) $54.00 $0.00 $54.00 Environmental Planningand Assessment Regulation2021 Certifieddocuments(each) $62.00 $0.00 Environmental Planningand Assessment Regulation2021 HardcopyofLocalEnvironmentalStudies(each) $54.00 $0.00 $54.00 Environmental Planningand Assessment Regulation2021 HardcopyofHurstvillePublicDomainPlan $160.00 $0.00 $160.00 HardcopyofHurstvilleCommunityBasedHeritage StudyReview2013(TwoVolumes) $145.00 $0.00 $145.00 HardcopyofEmploymentlandsStudy $135.00 $0.00 $135.00 HardcopyofGeorgesRiverIndustrialLandReview $135.00 $0.00 $135.00 HardcopyofKogarahNorthPublicDomainPlan $135.00 $0.00 $135.00 HardcopyofHurstvilleCityCentreTransport ManagementandAccessibilityPlan(TMAP) $135.00 $0.00 $135.00 HardcopyofGeorgesRiverTidalInundationStudy $49.50 $0.00 $49.50 HardcopyofStage1CentresAnalysis $135.00 $0.00 $135.00 Hard copy of Georges River Evidence Base   $49.50 $0.00 $49.50 HardcopyofLocalHousingStrategy $135.00 $0.00 $135.00 HardcopyofInclusiveHousingStrategyandDelivery Plan $135.00 $0.00 $135.00 HardcopyofGeorgesRiverLocalStrategicplanning Statement $135.00 $0.00 $135.00 HardcopyofGeorgesRiverCouncilCarParking Strategy/PositionPaper $135.00 $0.00 $135.00 HardcopyofForeshoreScenicCharacterStudy $124.50 $0.00 $124.50 CD-ROM/USBofabovePlans(perplan) $20.00 $0.00 $20.00
Section10.7(2)(includespostage) $62.00 $0.00 $62.00 Environmental Planningand Assessment Regulation2021 Section10.7(2)&(5)(includespostage) $156.00 $0.00 $156.00 Environmental Planningand Assessment Regulation2021 Section10.7UrgencyFee(includingfaxfee) $150.00 $0.00 $150.00
Pre-DevelopmentApplicationAdvice  $62.00

SingleDwellings,DualOccupancies,SecondaryDwellings,CommercialFitOuts(Newalterations& additions,demolitionandancillarydevelopment)

AllOtherDevelopmenttypesthatdonotfallintoanyotherPreDevelopmentadvisorycategory

FollowupPreDAapplication/considerationof additionalinformation/amendeddesign

Pre-ComplyingDevelopmentCertificateAdvice

Adviceaswhetheraproposalwouldconstitutea CDC,perproposal(IfapplicationlodgedwithCouncil, feetobecreditedfromCDCapplicationfee)

UrbanDesignReview(additionaltoPreDAfee)

Costof

<$10Million(per review)

Page31of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
PreDAAdvice
works
$263.64 $26.36 $290.00 PreDAAdviceforworksvaluedbetween$0-$200,000 –Advice & meeting $359.09 $35.91 $395.00 PreDAAdviceforworksvaluedbetween$200,001
$500,000 – Advice & meeting $463.64 $46.36 $510.00 PreDAAdviceforworksvaluedbetween
$868.18 $86.82 $955.00 PreDAAdviceforworksvaluedgreaterthan $1,000,000-Advice&meeting $1,536.36 $153.64 $1,690.00 FollowupPreDAapplication
Considerationof additionalinformation/amendeddesign 50%oftheoriginalPreDAfee
for
valuedbetween$0-100,000 –Advice only & no meeting
-
$500,001$1,000,000 – Advice & meeting
-
$463.64 $46.36 $510.00 PreDAAdviceforworksvaluedbetween$0
$1,000,000 – Advice & meeting $1,536.36 $153.64 $1,690.00 PreDAAdviceforworksvaluedbetween$1,000,001$3,000,000 – Advice & meeting $2,036.36 $203.64 $2,240.00 PreDAAdviceforworksvaluedbetween$3,000,001$10,000,000 – Advice & meeting $3,054.55 $305.45 $3,360.00 PreDAAdviceforworksvaluedgreaterthan $10,000,000 – Advice & meeting $5,081.82 $508.18 $5,590.00
Pre DA Advice for works valued between $0 –  100,000 – Advice only no meeting
-
50%
DA
Other
Singleissueonly-perhour $309.09 $30.91 $340.00 Additionalhours $272.73 $27.27 $300.00 Confirmationinwritingthatdevelopmentisexempt $272.73 $27.27 $300.00 Generalresearch&interpretationadvice(perhour) $272.73 $27.27 $300.00
oftheoriginalPre
fee
Advice
$363.64 $36.36 $400.00
$5,030.00 $0.00 $5,030.00 EstimatedCostofConstruction
$10
(per review) $6,700.00 $0.00 $6,700.00
Estimated
Construction
>
Million

ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice

ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,fire engineering,geotechnical,flood,bushfire,heritage, ecology, traffic, landscape assessment etc.) – Peer  review,Reportandoradvice.WhereCouncilhasto engagetheservicesofanoutsideconsultancyfor specialistconsultancyadviceorpeerreview,thecost ofthisservicewillbeforwardedtothepartycausing theneedfortheinspection,report,peerreviewandor advice. In accordance with Council’s Procurement  PolicyandPractices.

‘As invoiced’ plus 10% for Council  AdministrationofConsultant Engagement andContractManagement

DevelopmentandBuilding-DevelopmentApplication(DA)Fees

20%discountonDevelopmentApplicationFeewhenlodgedtogetherwithacouncilassessedConstructionCertificate

DA'sforDwellingHouses

Developmentapplicationsforadwellinghousewith anestimatedcostof$100,000orless

DA'sforAdvertisements(Signage)

FeemustnotexceedthefeebasedonthefeesscheduleforDA's

DA'sforChangeofUse(Only)

Developmentapplicationnotinvolvingerectionofa building,carryingoutofwork,thesubdivisionofland ordemolitionofabuildingorwork

DA'sfortheSubdivisionofLand(otherthanstrata)

Page32of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$532 00 $0.00 $532 00 Environmental Planningand Assessment Regulation2021
Base $333 00 $0.00 $333.00 Environmental Planningand Assessment Regulation2021 plusperadvertisement $93.00 $0.00 $93.00 Environmental Planningand Assessment Regulation2021
$333 00 $0.00 $333 00 Environmental Planningand Assessment Regulation2021
Opening of Public Road – base $777.00 $0.00 $777.00 Environmental Planningand Assessment Regulation2021 plusperadditionallot $65.00 $0.00 $65.00 Environmental Planningand Assessment Regulation2021 continuedonnextpage...

AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork (basedonestimatedcosts)

partof $1,000)oftheestimatedcostofthedevelopment

anadditionalamountforeach$1,000

plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds$50,000

anadditionalamountforeach

(orpartof

bywhichtheestimatedcostexceeds

Page33of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) DA's
No Opening of Public Road – base $386 00 $0.00 $386 00 Environmental Planningand Assessment Regulation2021 plusperadditionallot $53.00 $0.00 $53.00 Environmental Planningand Assessment Regulation2021 DA'sforStrata/StratumSubdivision Strata/Stratum – base $386 00 $0.00 $386 00 Environmental Planningand Assessment Regulation2021 plusperlot $65.00 $0.00 $65.00 Environmental Planningand Assessment Regulation2021
fortheSubdivisionofLand(otherthanstrata) [continued]
Upto$5,000 $129.00 $0.00 $129.00 Environmental Planningand Assessment Regulation2021 Base fee – $5,001 – $50,000 $198.00 $0.00 $198.00 Environmental Planningand Assessment Regulation2021 plus
$3.00 $0.00 $3.00 Environmental Planningand Assessment Regulation2021 Base fee – $50,001 – $250,000 $412.00 $0.00 $412.00 Environmental Planningand Assessment Regulation2021
$3.64 $0.00 $3.64 Environmental Planningand Assessment Regulation2021 Base fee – $250,001 – $500,000 $1,356.00 $0.00 $1,356.00 Environmental Planningand Assessment Regulation2021 plus
$1,000
$2.34 $0.00 $2.34 Environmental Planningand Assessment Regulation2021 continuedonnextpage...
(or
$1,000)
$250,000

AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork (basedonestimatedcosts) [continued]

anadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds

plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds

Page34of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Base fee – $500,001 – $1,000,000 $2,041 00 $0.00 $2,041.00 Environmental Planningand Assessment Regulation2021
$500,000 $1.64 $0.00 $1.64 Environmental Planningand Assessment Regulation2021 Base fee – $1,000,001 – $10,000,000 $3,008.00 $0.00 $3,008.00 Environmental Planningand Assessment Regulation2021
$1.44 $0.00 $1.44 Environmental Planningand Assessment Regulation2021 Morethan$10,000,000 $18,565.00 $0.00 $18,565.00 Environmental Planningand Assessment Regulation2021 plus
$1,000(or
of $1,000)
which
estimatedcost
$10,000,000 $1.19 $0.00 $1.19 Environmental Planningand Assessment Regulation2021 DA'sforDesignatedDevelopment DesignatedDevelopment-AdditionalFee $1,076.00 $0.00 $1,076.00 Environmental Planningand Assessment Regulation2021 DevelopmentandBuilding-ModificationofDevelopmentConsentApplication Modification(Minorerror,mis-descriptionor miscalculation) $83.00 $0.00 $83.00 Environmental Planningand Assessment Regulation2021 Modification(MinimalEnvironmentalImpact) $754.00 or50%oftheoriginalfee, whicheveristhelesser Environmental Planningand Assessment Regulation2021 ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2)) Originalfeelessthan$100 50%oftheoriginalapplicationfee Environmental Planningand Assessment Regulation2021 continuedonnextpage...
plus
$1,000,000
anadditionalamountforeach
part
by
the
exceeds

ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2)) [continued]

Original fee $100 or more – for development that  doesnotinvolvetheerectionofabuilding,the carryingoutofaworkorthedemolitionofaworkor building

Fordevelopmentthatinvolvestheerectionofa dwelling-housewithanestimatedcostofconstruction of$100,000orless

For other development – Based on the original cost of  constructionUpto$5,000

plusanadditional$0.50for each$1,000(orpartthereof)by whichtheestimatedcostexceeds

plusanadditional$0.40for each$1,000(orpartthereof)by whichtheestimatedcostexceeds

plusanadditional$0.27for each$1,000(orpartthereof)by whichtheestimated

ReviewofDeterminationDevelopmentApplicationorModificationtoDevelopmentConsent

Fordevelopmentthatdoesnotinvolvetheerectionof abuilding,thecarryingoutofaworkorthedemolition ofabuilding

developmentthatinvolvestheerectionofa dwelling-housewithanestimatedcostofconstruction of$100,000orless

Page35of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
50%
Environmental Planningand Assessment Regulation2021
oftheoriginalapplicationfee
$222.00 $0.00 $222.00 Environmental Planningand Assessment Regulation2021
$64.00 $0.00 $64.00 Environmental Planningand Assessment Regulation2021 $5,001 – $250,000 $99.00
estimatedcost Environmental Planningand Assessment Regulation2021 $250,001 – $500,000 $585.00
estimatedcostexceeds $250,000 Environmental Planningand Assessment Regulation2021 $500,001 – $1,000,000 $833.00
$500,000 Environmental Planningand Assessment Regulation2021 $1,000,001 – $10,000,000 $1,154.00
$1,000,000 Environmental Planningand Assessment Regulation2021 Morethan$10,000,000 $5,540.00
$10,000,000 Environmental Planningand Assessment Regulation2021 DesignVerificationAssessmentfee(Modification Applications) $958.34 $0.00 $958.34 Environmental Planningand Assessment Regulation2021
plusanadditional$1.50for each$1,000(orpartthereof)ofthe
plusanadditional$0.85for each$1,000(orpartthereof)by whichthe
costexceeds
50%oforiginalfee Environmental Planningand Assessment Regulation2021
$222.00 $0.00 $222.00 Environmental Planningand Assessment Regulation2021 Upto$5,000 $64.00 $0.00 $64.00 Environmental Planningand Assessment Regulation2021 continuedonnextpage...
For
Page36of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) [continued] Base fee $5,001 – $250,000 $100.00
the basefee Environmental Planningand Assessment Regulation2021 Base fee $250,001 – $500,000 $585.00
basefee Environmental Planningand Assessment Regulation2021 Base fee $500,001 – $1,000,000 $833.00
basefee Environmental Planningand Assessment Regulation2021 Base fee $1,000,001 – $10,000,000 $1,154.00
basefee Environmental Planningand Assessment Regulation2021 Basefeegreaterthan$10,000,000 $5,540.00
$0.27
thereof)by
costexceedsthe basefee Environmental Planningand Assessment Regulation2021 Reviewofmodificationdetermination 50%ofmodificationapplicationfee ReviewofDecisiontoRejectDevelopmentApplication Uptoandlessthan$100,000 $64.00 $0.00 $64.00 Environmental Planningand Assessment Regulation2021 $100,001 – $1,000,000 $175.00 $0.00 $175.00 Environmental Planningand Assessment Regulation2021 Greaterthan$1,000,000 $292.00 $0.00 $292.00 Environmental Planningand Assessment Regulation2021 Notified&Re-notifiedApplications Development with estimated cost up to $500,000 $395.00 $0.00 $395.00 Environmental Planningand Assessment Regulation2021 Development with estimated cost greater than $500,000 up to $1,000,000 $670.00 $0.00 $670.00 Environmental Planningand Assessment Regulation2021 Development with estimated cost greater than $1,000,000 $1,230.00 $0.00 $1,230.00 Environmental Planningand Assessment Regulation2021
plusanadditional$1.50for each$1,000(orpartthereof)by whichtheestimatedcostexceeds
plusanadditional$0.85for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe
plusanadditional$0.50for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe
plusanadditional$0.40for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe
plusanadditional
for each$1,000(orpart
whichtheestimated

AdvertisedandRe-advertisedApplications(inadditiontonotificationfees)

OtherApplicationFees-DevelopmentAssessment

ElectronicFileManagement(Developmentapplications,ModificationstoDevelopmentConsents& ReviewsofDetermination)

Feeperapplicationfortheelectronicfilemanagementofapplicationsandaccompanyinginformation

Page37of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Designateddevelopment $2,569.00 $0.00 $2,596.00 Environmental Planningand Assessment Regulation2021 AdvertisedDevelopment $1,292.00 $0.00 $1,292.00 Environmental Planningand Assessment Regulation2021 Prohibiteddevelopment $1,292.00 $0.00 $1,292.00 Environmental Planningand Assessment Regulation2021 NominatedIntegratedDevelopment,Threatened SpeciesDevelopmentorClass1Aquaculture $1,292.00 $0.00 $1,292.00 Environmental Planningand Assessment Regulation2021
DocumentManagement/Scanningestimatedcostof works<$10,000 $35.00 $0.00 $35.00 DocumentManagement/Scanningestimatedcostof works$10,000to$100,000 $50.00 $0.00 $50.00 DocumentManagement/Scanningestimatedcostof works$100,001to$300,000 $80.00 $0.00 $80.00 DocumentManagement/Scanningestimatedcostof works$300,001to$500,000 $130.00 $0.00 $130.00 DocumentManagement/Scanningestimatedcostof works$500,001to$1,000,000 $220.00 $0.00 $220.00 DocumentManagement/Scanningestimatedcostof works$1,000,001to$5,000,000 $400.00 $0.00 $400.00 DocumentManagement/Scanningestimatedcostof works>$5,000,000 $600.00 $0.00 $600.00 LapsedConsents Confirmationinwritingwhether
consenthas lapsed $360.00 $0.00 $360.00 Extensionof
ExtensionofConsent $360.00 $0.00 $360.00 ReviewofDocumentationsubmittedtoConsent
Determineifoperationalconsentactive(Deferred commencementconditions) $360.00 $0.00 $360.00 continuedonnextpage...
ornot
ConsentApplication
Conditions

ReviewofDocumentationsubmittedtoConsentConditions

Determineifdocumentationsubmittedtosatisfy conditioniscompliance

ApplicationFeeRefunds/FeeWaiver

ApplicationFeeRefunds-Proportionastotimespent assessingtheapplicationuptotimeofwithdrawal/ cancellation.-AdditionalPercentageRefundcanbe appliedwheretheManagerDevelopmentand Building,DirectorEnvironment&PlanningorGeneral ManagerdeterminesthatCouncilerroridentifiedor significantfailureincustomerserviceleveloccurred

100%-wherenoassessmenthas occurred

Max80%-wherepreliminary assessmenthasbeenundertakenand noreporthasbeenprepared

Max50%-wherecomplete assessmenthasbeenundertakenand noreporthasbeenprepared

Max25%-whereassessmentand reporthavebeencompleted

100%ofNotification/advertisingfeeif notoccured

ApplicationsthatFeeWaiversApply

FullorPartialFeeWaiver/Refundcanbeapplied wheretheManagerDevelopmentandBuilding, DirectorEnvironment&PlanningorGeneralManager determinesthatCouncilerroridentifiedorsignificant failureincustomerserviceleveloccurred

SiteCompatibilityCertificateandsiteverificationcertificatesunderSEPPs

Fee

Currentfeeassetoutinclause262AofEPAReg2000:

(1)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPHousing2021) is$310,plus$42foreachdwellinginthedevelopmentinrespectofwhichthecertificatewasissued.

(2)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPTransport 2021)is$310,plus$265foreachhectare(orpartofahectare)oftheareaofthelandinrespectofwhichthecertificate wasissued.

(3)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPResourcesand Energy2021Part2.4)is$4,370.

DesignReviewPanelFee(notrequiredifadviceprovidedatPreDevelopmentstage)

EstimatedCostofConstruction(perapplication) $3,360.00

FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment FeetoCouncilforDevelopmentApplicationsfor IntegratedDevelopment

Page38of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
[continued]
$360.00 $0.00 $360.00
Upto100%ofApplicationFee
$0.00 $3,360.00
$
$0.00 $164.00 Environmental Planningand Assessment Regulation
continuedonnextpage...
164.00
2021

FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment

concurrence

LongServiceLevy(AllDevelopmentTypes)

BuildingServicesLongServiceLevyPaymentsAct AsLegislated(Notecurrently0.25%of thetotalcostoftheworkforbuilding andconstructionworkthatisequalor over$250,000,nochargeforcostof workunder$250,000)

DevelopmentandBuilding-BuildingAssessmentandDevelopmentEngineering

BuildingInformationCertificateApplications

ApplicationforanyNationalConstructionCode (BuildingCodeofAustralia)class1building(together withanyclass10buildingsonthesite)oranyother NationalConstructionCode(BuildingCodeof Australia)classofbuildingwithafloorareanot exceeding200m2

ApplicationforanyNationalConstructionCode (BuildingCodeofAustralia)classofbuilding(except Class1building,togetherwithanyclass10buildings onthesite)whereFloorAreaexceeds200m2

ChargeRates:

a.$250plus$0.50perm²forareaof200m²to2000m²;

b.$1165plus$0.08perm²forarea2001m²orgreater

AdditionalFeeforallBuildingInformationCertificate Applicationswhereworksundertakeninprevious24 monthsrequiredDevelopmentConsent/CDC howeverwasnotobtained

AdditionalFeeforallBuildingInformationCertificate Applicationswherebuildingworkshavebeencarried outandPrivateCertifierhasnotissuedanoccupation certificate

Costbyquotationbystipulatedcharge rates

$250plusapplicableDevelopment Application&ConstructionCertificate feesifapprovalhadbeensought

$250plusConstructionCertificate feesifapprovalhadbeensought

BuildingInformationCertificatePublicNotification&Re-notificationFees

ElectronicFileManagement

Fee per application for the electronic file management of Building Information Certificates, Subdivision Certificates, CouncilCDC's,CouncilConstructionCertificates,HoardingandAnchorapplicationsandaccompanyinginformation

Page39of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
[continued] Fee
CouncilforDevelopmentApplicationsrequiring
$374.00 $0.00 $374.00
to
$250.00 $0.00 $250.00
AdditionalInspectionfee $90.00 $0.00 $90.00
Modification $834.56 $0.00 $834.56 Environmental Planningand Assessment Regulation2021 DevelopmentApplication $1,385.93 $0.00 $1,385.93 Environmental Planningand Assessment Regulation2021
continuedonnextpage...

ElectronicFileManagement [continued]

ThefeeforanassessmentofanamendmenttoBuildingInformationCertificates,SubdivisionCertificates,Hoardingand Anchorapplicationspriortoitsdeterminationis:

ofPrivatePCAIssuedCertificatesforRecordspurposes

Swimmingpools(PrivateSwimmingPool)

FireSafety

AnnualFireSafetyStatementAFSS

*30-daydiscountfeeisappliedifpaidwithin30daysoftheAFSSduedate

Page40of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
DocumentManagementestimatedcostofworks< $10,000 $35.00 $0.00 $35.00 DocumentManagementestimatedcostofworks $10,000to$100,000 $50.00 $0.00 $50.00 DocumentManagementestimatedcostofworks $100,001to$300,000 $80.00 $0.00 $80.00 DocumentManagementestimatedcostofworks $300,001to$500,000 $130.00 $0.00 $130.00 DocumentManagementestimatedcostofworks $500,001to$1,000,000 $220.00 $0.00 $220.00 DocumentManagementestimatedcostofworks $1,000,001to$5,000,000 $400.00 $0.00 $400.00 DocumentManagementestimatedcostofworks> $5,000,000 $600.00 $0.00 $600.00
AmendedPlans/Documentation
Allamendments 50%oforiginalassessmentfee Lodgement
Outsideof
Class1aDwelling(eachdwelling) $225.00 $0.00 $225.00 Class 2-9 Building – up to 3 Stories $545.00 $0.00 $545.00 Class 2-9 Building – 4 Stories and above $760.00 $0.00 $760.00 Class2-9Buildingwhereconcretepourexceeds500 squaremetres $1,090.00 $0.00 $1,090.00
StandardHoursWorkPermitapplicationfees
ApplicationforexemptionunderClause22of SwimmingPoolsAmendmentAct2012 $250.00 $0.00 $250.00 SwimmingPoolAct CertificateofComplianceunderSchedule1of SwimmingPoolsAmendmentAct2012 $150.00 $15.00 $165.00 SwimmingPoolAct Re-inspection $100.00 $10.00 $110.00 SwimmingPoolAct SwimmingPoolsRegistrationOnline $10.00 $1.00 $11.00 ResuscitationCharts $30.00 $3.00 $33.00
RegistrationofAFSS $150.00 $15.00 $165.00

Fire

Public

permonth(perlinealmetre)

CouncilLandOther(LeasingFee)

Note-anyadministrationcostsindevelopingaleaseagreementforHoardingonCouncilLandwillbebepassedontothe applicant

permonth(perlinealmetreor commercialrateviavaluation-which everisthehigher)

TypeB(overheadtype) $145permonth(perlinealmetreor commercialrateviavaluation-which everisthehigher)

Page41of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Fire
$455.00 $0.00 $455.00 Registrable Boarding Houses – Boarding House first
Registrationand
Inspection Fee $455.00 $0.00 $455.00 RegistrableBoardingHousesAnnualInspectionFee perhourorpartthereofafter $400.00 $0.00 $400.00 RegistrableBoardingHousesRe-inspectionFeeper hourorpartthereofafter $400.00 $0.00 $400.00
Baseapplicationfee $495.00 $0.00 $495.00 Amendedapplication/plans/detail $495.00 $0.00 $495.00 Extensiontoapprovalapplication $495.00 $0.00 $495.00 Lateapplicationfee $495.00 $0.00 $495.00
SafetyCompliance
SafetyComplianceProgramInspectionandReinspectionfee(i.e.SharedAccommodation, EntertainmentVenues,Industrial&Commercial premisesetc.)
12months
Compliance
Hoardings
A
$55
TypeB(overheadtype) $75
Roads(LicenceFee) Type
(fencetype)
permonth(persquaremetre)
TypeA(fencetype) $105
DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty MinorBuildingWorktothevalueof$25,000 $550.00 $0.00 $550.00 Dualoccupancyanddomesticbuildingworkincluding dual occupancy – value between $20,500 and  $2,000,000 $1,900.00 $0.00 $1,900.00 Allindustrialandcommercialbuildingworkvalue between$20,000and$2,000,000 $3,750.00 $0.00 $3,750.00 SecurityagainstaccessdamagetoCouncilparksor reserves $2,300.00 $0.00 $2,300.00 Securityagainstcompliancewithtreepreservation requirements/conditions $2,250.00 $0.00 $2,250.00 Securityagainstaccessdamageforconstruction within3metresofCouncilStormwaterInfrastructure Depositamounttobedetermined basedoncostsofworkstoreplace stormwaterinfrastructure continuedonnextpage...

DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty

Major Developments – Damage Deposit Works  greaterthan$2,000,000invalue

feesofMajordevelopments(min2 inspections) – Non refundable

$1,236.00permetreofeachstreet frontageofproperty

WhereexcavationistobesupportedbytheuseofbelowgroundcableanchorsthatareconstructedunderCouncil's roadways/footpaths

Informationrequest

Page42of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
[continued]
Inspection
$371.00 $0.00 $371.00 GroundAnchorDeposit $1,000.00
permetreofeachstreet frontageofproperty
Footpath
FirstHourorpartthereof $200.00 $0.00 $200.00 PerhourorpartthereofafterFirstHour $200.00 $0.00 $200.00 MinorBuildingWork $140.00 $0.00 $140.00 Other $200.00 $0.00 $200.00 DemolitionInspectionFees PreDemolitionInspectionFee $250.00 $0.00 $250.00 PostDemolitionInspectionFee $250.00 $0.00 $250.00 Section
Certificate Fee $35.00 $0.00 $35.00 ConveyancingAct| Section88G ActivityApplicationsunderSection68,LocalGovernmentAct,1993 ApplicationFee $400.00 $0.00 $400.00 Perhourorpartthereof $340.00 $0.00 $340.00 GroundAnchorApplication(minimum4hours) $1,360.00 $0.00 $1,360.00
OutstandingNoticesCertificate-Environmental PlanningandAssessmentAct $230.00 $0.00 $230.00 OutstandingNoticesCertificate $230.00 $0.00 $230.00 Informationcompiledfromfilesincludingwritten responseandsearch/miscellaneousservices(per hour) $340.00 $0.00 $340.00
/AssetInspectionFees
88G

ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice

ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,urbandesign, fireengineering,geotechnical,flood,bushfire, heritage, ecology etc.) – Peer review, Report and or  advice.WhereCouncilhastoengagetheservicesof anoutsideconsultancyforspecialistconsultancy adviceorpeerreview,thecostofthisservicewillbe forwardedtothepartycausingtheneedforthe inspection,report,peerreviewandoradvice.In accordance with Council’s Procurement Policy and  Practices.

BuildingCertification

‘As invoiced’ plus 10% for  CouncilAdministrationofConsultant Engagement andContractManagement

PrincipalCertifyingServiceFee(IncludesoneOccupationCertificatefee)-Alldevelopment types

The Manager Development & Building has the authority to adjust the fee applicable (maximum 10%) based on assessmentoftheextentoftheproposedworksandjustificationofthenumberofinspections

2.17aWhereCouncilisappointedasthereplacementPrincipalCertifier

WhereCouncilisappointedasthereplacementPrincipalCertifier,thePrincipalCertifyingServicefeeisasoutlinedinthe abovetablemultipliedby4

Page43of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Upto$5,000 $227.27 $22.73 $250.00 $5,001 – $25,000 $250.00Plus0.70%foreach$1 greaterthan$5k $25,001 – $50,000 $425.00Plus0.65%foreach$1 greaterthan$25k $50,001 – $75,000 $587.50Plus0.50%foreach$1 greaterthan$50k $75,001 – $100,000 $712.50Plus0.35%foreach$1 greaterthan$75k $100,001 – $250,000 $800.00Plus0.25%foreach$1 greaterthan$100k $250,001 – $500,000 $1,175.00Plus0.15%foreach$1 greaterthan$250k $500,001 – $1,000,000 $1,550.00Plus0.13%foreach$1 greaterthan$500k $1,000,001 – $5,000,000 $2,175.00Plus0.06%foreach$1 greaterthan$1mil $5,000,001 – $10,000,000 $4,675.00Plus0.03%foreach$1 greaterthan$5mil $10,000,001andabove $5,875.00Plus0.01%foreach$1 greaterthan$10mil

ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1 and10–basedonestimatedcostofworks-(InadditiontoPCAfee)

20%discountonConstructionCertificatefeewhenlodgedtogetherwithDevelopmentApplication.

-feecalculatedusingthefeetablethena20%discountisapplied

Plus0.35%foreach$1 greaterthan$75k

ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses2 to9–basedonestimatedcostofworks

AmendedConstructionorComplyingDevelopmentCertificates

AmendedConstructionorComplyingDevelopment Certificates

oforiginalfee

Page44of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Upto$5,000 $227.27 $22.73 $250.00 $5,001 – $25,000 $250.00
$5k $25,001 – $50,000 $425.00
$25k $50,001 – $75,000 $587.50
$75,001 – $100,000 $712.50
$100,001 – $250,000 $800.00
$250,001 – $500,000 $1,175.00
$500,001 – $1,000,000 $1,550.00
$1,000,001 – $5,000,000 $2,175.00
$5,000,001 – $10,000,000 $4,675.00
$5mil $10,000,001andabove $5,875.00
$1
$10mil
Plus0.70%foreach$1 greaterthan
Plus0.65%foreach$1 greaterthan
Plus0.50%foreach$1 greaterthan$50k
Plus0.25%foreach$1 greaterthan$100k
Plus0.15%foreach$1 greaterthan$250k
Plus0.13%foreach$1 greaterthan$500k
Plus0.06%foreach$1 greaterthan$1mil
Plus0.03%foreach$1 greaterthan
Plus0.01%foreach
greaterthan
Upto$50,000 $715.91 $71.59 $787.50 $50,001-$100,000 $750plus
$50,000 $100,001-$500,000 $1,750
0.5%
$100,000 $500,001-$1,000,000 $3,750
0.3%
$1
than$500,000 $1,000,001-$5,000,000 $5,250
$1,000,000 $5,000,001andabove $11,250
$5,000,000
2%foreach$1greaterthan
plus
foreach$1greater than
plus
foreach
greater
plus0.15%foreach$1greater than
plus0.07%foreach$1 greaterthan
50%
continuedonnextpage...

foreach$1 greaterthan$10mil

DevelopmentCertificateApplicationFeesforNationalConstructionCodeBuilding Classes2to9–basedonestimatedcostofworks

plus0.15%foreach$1greater than$1,000,000

Page45of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) AmendedConstructionorComplyingDevelopmentCertificates [continued] AmendedConstructionorComplyingDevelopment Certificates(MinorWorks) $590.91 $59.09 $650.00 ComplyingDevelopmentCertificateApplication
forNationalConstructionCodeBuilding Classes1and10–
PreCDCAssessment/Review “Pre-Complying Development  Certificate Advice” fee to be credited  toComplyingDevelopmentCertificate Application Upto$5,000 $227.27 $22.73 $250.00 $5,001 – $25,000 $250.00Plus1%foreach$1greater than$5k $25,001 – $50,000 $500.00Plus0.70%foreach$1 greaterthan$25k $50,001 – $75,000 $675.00Plus0.58%foreach$1 greaterthan$50k $75,001 – $100,000 $818.80Plus0.50%foreach$1 greaterthan$75k $100,001 – $250,000 $943.80Plus0.30%foreach$1 greaterthan$100k $250,001 – $500,000 $1,393.80Plus0.20%foreach$1 greaterthan$250k $500,001 – $1,000,000 $1,893.80Plus0.15%foreach$1 greaterthan$500k $1,000,001 – $5,000,000 $2,643.80Plus0.08%foreach$1 greaterthan$1mil $5,000,001 – $10,000,000 $5,643.80Plus0.03%foreach$1 greaterthan$5mil $10,000,001andabove $7,143.80Plus0.01%
ComplyingDevelopmentCertificateNeighbour NotificationFee $76.82 $7.68 $84.50 Complying
Upto$50,000 $681.82 $68.18 $750.00 $50,001-$100,000 $750
$100,001-$500,000 $1,750
$500,001
$1,000,000 $3,750
$1,000,001-$5,000,000 $5,250
$5,000,001andabove $11,250
Fees
basedonestimatedcostofworks
plus2%foreach$1greaterthan $50,000
plus0.5%foreach$1greater than$100,000
-
plus0.3%foreach$1greater than$500,000
plus0.07%foreach$1 greaterthan$5,000,000

ComplyingDevelopmentCertificate

LinenPlan(certification)

EndorsementofInstrumentundertheConveyancingActwhereCounciliscitedinthe instrument

ComplyingDevelopmentCertificateprivatecertifierstormwaterassessmentreferralfee

StormwaterAssessmentforCDCapplicationsasper Council'sStormwaterManagementPolicy

Perapplication(perhour)$250

ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice

ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,fire engineering,geotechnical,flood,bushfire,heritage, ecology, traffic, landscape assessment etc.) – Peer  review,Reportandoradvice.WhereCouncilhasto engagetheservicesofanoutsideconsultancyfor specialistconsultancyadviceorpeerreview,thecost ofthisservicewillbeforwardedtothepartycausing theneedfortheinspection,report,peerreviewandor advice. In accordance with Council’s Procurement  PolicyandPractices.

‘As invoiced’ plus 10% for Council  AdministrationofConsultant Engagement and Contract  Management

Page46of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CommercialChangeofuse $727.27 $72.73 $800.00 ModificationofComplyingDevelopmentCertificate 50%oforiginalfee PCAInspections(Mandatory
Perinspection $309.09 $30.91 $340.00 Occupation
OccupationCertificateapplication $409.09 $40.91 $450.00 SubdivisionCertificate Wherenonewallotments(e.g.boundary adjustments) $500.00 $0.00 $500.00 Feeperlotcreatedorperunitproposed(Torrensor CommunityTitle) $285.00 $0.00 $285.00 StrataCertificate $1,000.00 $0.00 $1,000.00 StratumCertificate $1,000.00 $0.00 $1,000.00
oradditional)
Certificate.
CertificationFee $450.00 $0.00 $450.00 InspectionFee $380.00 $0.00 $380.00
CertificationFee $450.00 $0.00 $450.00 InspectionFee $380.00 $0.00 $380.00

ActivityApplicationunders.68oftheLocalGovernmentActand/ors.138oftheRoadsAct (Stormwater)

Page47of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
ApplicationFee(perapplication) $470.00 $0.00 $470.00 InspectionFee(perhourorpartthereof) $150.00 $0.00 $150.00 DamageDepositforworksonCouncilStormwater Infrastructure Priceonapplicationbasedoncostof works-tobedeterminedbyCouncil TemporaryRoad,LaneorFootpathClosure CarParkClosure(perbayperday) $32.50 $0.00 $32.50 TemporarycompoundClosure(perm2permonth) $165.00 $0.00 $165.00 UrgentProcessingFee(within48businesshours) $270.00 $0.00 $270.00 ApplicationFee(nonrefundable) $180.00 $0.00 $180.00 RoadClosureFee(perLin.mperlaneperday) $43.50 $0.00 $43.50 Road Closure Fee – Section 68 LG Act – Cranes,  Pumpsetc.(perlin.mperlaneperday) $59.50 $0.00 $59.50 FootpathOccupancyFee(persq.mperday) $11.00 $0.00 $11.00 UseofFootway UseofFootwayApplicationFee $200.00 $0.00 $200.00 Licencetouseroadwayforpermanentstructures Marketratetobedeterminedby valuation-Legal,Surveyand Valuationfeesatcost LocalGovernment Act1993|Section 68 OutdoorDining/Restaurants ApplicationFee $220.00 $0.00 $220.00 LicenceFee OutdoorDining-HurstvillePlaza(persquaremetre perannum) $350.00 $0.00 $350.00 Hurstville & Kogarah CBD – Without Fixed Council  Umbrellas(persquaremetreperannum) $320.00 $0.00 $320.00 Hurstville & Kogarah CBD – With Fixed Council  Umbrellas(persquaremetreperannum) $390.00 $0.00 $390.00 Oatley/BeverlyHills/Mortdale/Penshurst(per squaremetreperannum) $250.00 $0.00 $250.00 OtherAreas(persquaremetreperannum) $250.00 $0.00 $250.00 DisplayofGoods(adjacenttobusinesspremises) ApplicationFee $130.00 $0.00 $130.00 LicenceFee Hurstville&KogarahCBD(persquaremetreper annum) $169.50 $0.00 $169.50 OtherAreas(persquaremetreperannum) $140.00 $0.00 $140.00

A-FrameAdvertisingSignage

UseofPublicSpace(non-roadreserve)

OutdoorDining/Restaurants-KogarahTownSquareDecking

ActivityApplicationDetermination

Section68LGA

Approvals(12months

maximum)

regulationsor anactivityofaclassordescriptionprescribedbythe regulations

SkipBinFees-Sec68LGActManagementofWaste

PublicHealth

(note:includesCoolingTowersorWarmWaterSystems(regulatedsystems),PublicSwimmingPool&Spas,Mortuaries andSkinPenetrationPremises)

Collection&analysisofwatersamplesbyNATA approvedlaboratory

Page48of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
A-FrameAvertisingSignage(persignperannum) $220.00 $0.00 $220.00
UseofPublicSpace
day)(GST
$1,318.18 $131.82 $1,450.00
ApplicationFee $220.00 $0.00 $220.00 LicencePreparationFee(newandrenewals)(per stallholder) $69.00 $0.00 $69.00 Rental/UseofSpace(persquaremetreperannum) $330.00 $0.00 $330.00
Fee UnderSection100LocalGovernment Act – 30% of Fee with minimum fee of  $75.00
-KogarahTownSquareand HurstvillePlaza-Rental/Useofspace(maximum feepayablepereventper
inclusive
Commercial
Installoroperateamusementdevices(perevent) $358.00 $0.00 $358.00 Useastandingvehicleoranyarticleforthepurpose ofsellinganyarticleinapublicplacefortheperiod specifiedintheapproval $358.00 $0.00 $358.00 Carryoutanactivityprescribedbythe
$358.00 $0.00 $358.00
UseofPublicFootways
SkipBinApplicationFee $55.00 $0.00 $55.00 SkipBinsonPublicLand(perbinperweek) $110.00 $0.00 $110.00
Invoicecost+10% Pre-occupationCertificateInspection $260.00 $0.00 $260.00 PublicHealthNotificationFee $90.91 $9.09 $100.00 InspectionFee(firsthour) $205.00 $0.00 $205.00 InspectionFee(perhalfhourorpartthereofafterfirst hour) $102.00 $0.00 $102.00 Re-InspectionFee(firsthour) $102.00 $0.00 $102.00 continuedonnextpage...

DomesticWasteManagementServices

Page49of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) PublicHealth [continued] Re-InspectionFee(perhalfhourorpartthereofafter firsthour) $50.00 $0.00 $50.00 Hair,SkinBeautySalon(nonskinPenetration) $125.00 $0.00 $125.00 PublicHealth-NoticesandOrders Improvement Notice – Regulated System $620.00 $0.00 $620.00 PublicHealth Regulation2012| Part9Clause97 Prohibition Orders – Regulated System $620.00 $0.00 $620.00 PublicHealth Regulation2012| Part9Clause97 Improvement Notice – Public Swimming pool & Spa  andSkinPenetrationPremises $290.00 $0.00 $290.00 PublicHealth Regulation2012| Part9Clause98(b) Prohibition Orders – Public Swimming pool & Spa and  SkinPenetrationPremises $290.00 $0.00 $290.00 PublicHealth Regulation2012| Part9Clause97 ProhibitionOrderReinspectionFee(perhour) $135.00 $0.00 $135.00 PublicHealth Regulation2012| Part9Clause98(b)
StandardDomesticWasteManagementCharge $511.00 $0.00 $511.00 LocalGovernment Act1993|Section 496 1x120Lgeneralwastebin,1x240Lrecyclingbin+1x240Lgardenorganicsbin AdditionalVolumeDomesticWasteManagement Charge $664.00 $0.00 $664.00 LocalGovernment Act1993|Section 496 1x240Lgeneralwastebin,1x240Lrecyclingbin+1x240Lgardenorganicsbin Extrageneralwastebinservice(120L) $163.00 $0.00 $163.00 LocalGovernment Act1993|Section 496 Extrageneralwastebinservice(240L) $326.00 $0.00 $326.00 LocalGovernment Act1993|Section 496 ChangeofService(bins)AdministrationFee $22.00 $0.00 $22.00 ThisfeemaybeappliedtotheRatesAccountforbinchangesthatexceedoneperfinancialyear SpecialAdditionalwasteservice(4ormorechildren ormedicalcondition) $133.00 $0.00 $133.00 LocalGovernment Act1993|Section 496 Extrarecyclingbinservice(240L) $115.00 $0.00 $115.00 LocalGovernment Act1993|Section 496 Extragardenorganicsbinservice(240L) $153.00 $0.00 $153.00 LocalGovernment Act1993|Section 496 continuedonnextpage...

AnimalFees-Lifetimeregistration-microchipping

AnimalFeesaresetbyOfficeofLocalGovernmentandmaychangewithoutpriornotice

Page50of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) DomesticWasteManagementServices [continued] Availabilitycharge(dwellingwithprivatedomestic wastecontractor) $70.00 $0.00 $70.00 LocalGovernment Act1993|Section 496 Availabilitycharge(dwellingwithcancelledbin service) $70.00 $0.00 $70.00 LocalGovernment Act1993|Section 496 CommercialWasteManagementServices Commercialgeneralwastebinservice(240L)-once weekly $615.00 $0.00 $615.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(1100L)-once weekly $2,560.00 $0.00 $2,560.00 LocalGovernment Act1993|Section 501 Commercialrecyclingbinservice(240L)-once weekly $310.00 $0.00 $310.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(240L)-twice weekly $1,230.00 $0.00 $1,230.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(1100L)-twice weekly $5,120.00 $0.00 $5,120.00 LocalGovernment Act1993|Section 501 Commercialrecyclingbinservice(240L)-twice weekly $620.00 $0.00 $620.00 LocalGovernment Act1993|Section 501 OtherWasteManagementServices SharedCommunityWasteStorageAreas-Security Bond $400.00 $0.00 $400.00 CommunityGardens CommunalGardenBed $46.82 $4.68 $51.50 IndividualGardenBed $93.64 $9.36 $103.00 Family/HouseholdMembership-CommunalGarden Bed $68.18 $6.82 $75.00 Family / Household Membership – Individual Garden  Bed $113.64 $11.36 $125.00 Companion
Companion
Dog – Desexed (by relevant age) $75.00 $0.00 $75.00 CompanionAnimals Act Dog – Desexed (by relevant age eligible pensioner) $32.00 $0.00 $32.00 CompanionAnimals Act Dog – Desexed (sold by pound/shelter) $0.00 $0.00 $0.00 CompanionAnimals Act continuedonnextpage...

Companion

AnnualSpecified

Page51of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
microchipping [continued] Dog – Not Desexed or Desexed (after relevant age) $252.00 $0.00 $252.00 CompanionAnimals Act Dog – Not Desexed (not recommended) $75.00 $0.00 $75.00 CompanionAnimals Act Dog – Not Desexed (not recommended – pensioner) $32.00 $0.00 $32.00 Dog – Not Desexed (recognised breeder) $75.00 $0.00 $75.00 CompanionAnimals Act Dog-Working $0.00 $0.00 $0.00 CompanionAnimals Act Dog-ServiceoftheState $0.00 $0.00 $0.00 CompanionAnimals Act AssistanceAnimal $0.00 $0.00 $0.00 CompanionAnimals Act Cat – Desexed (sold by pound/shelter) $0.00 $0.00 $0.00 CompanionAnimals Act Cat – Desexed (Eligible Pensioner) $32.00 $0.00 $32.00 CompanionAnimals Act Cat – Desexed or Not Desexed $65.00 $0.00 $65.00 CompanionAnimals Act Cat – Not Desexed (not recommended) $65.00 $0.00 $65.00 CompanionAnimals Act Cat – Not Desexed (not recommended – pensioner) $32.00 $0.00 $32.00 Cat – Not Desexed (recognised breeder) $65.00 $0.00 $65.00 CompanionAnimals Act RegistrationLateFee $22.00 $0.00 $22.00 CompanionAnimals Act
AnimalFees-Lifetimeregistration-
Animal
DangerousDog $221.00 $0.00 $221.00 CompanionAnimals Act RestrictedDog $221.00 $0.00 $221.00 CompanionAnimals Act Catnotdesexedbyfourmonthsofage $92.00 $0.00 $92.00 CompanionAnimals Act Permitlatefee $21.00 $0.00 $21.00 Dangerous/Restriced
ComplianceCertificate $150.00 $0.00 $150.00
PermitFees
DogEnclosure

AnimalImpoundingandEuthanasiaFees

Dailyboardingcharge&VetCareperanimalperdayforcostofcareforallanimalsnotreclaimedbytheirowneruntil thereisanoutcome,uptoamaximumcappedperiod:

Dogs&Cats-74daycaponboardingfees(14daystatholdplusmax60daysforrehoming)

SmallAnimals-30daycaponboardingfees

Allanimalsunder8weeksofageonentrywillhaveBoardingfeescappedat14daystathold.

CouncilHolddogswillbechargedfortheirentirelengthofstay– cappedfeesdonotapply. Dogsheldas‘Council Hold’ i.e.declareddangerous,menacingorrestrictedbreed,orunderinvestigationwillbecharged atthesamedailyrateuntilthereisanoutcome.

Dailychargesincludeboardingcosts,veterinarycare,exitfees,publicholidayrates.

Any animal requiring euthanasia will incur a euthanasia fee. Includes euthanasia and disposal of animal declared dangerous,menacingorrestrictedbreed.Feesareasperbelow

FoodPremisesRetailandhomebusiness

Registered Charities and Not for Profit School Canteens (P&C run) are not subject to these Food Premises Fees and Charges.

Page52of74 • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
ImpoundedAnimalDailyBoardingCharge-Dogs(per day) $85.00 $8.50 $93.50 Impounded Animal Daily Boarding Charge – Cats (per  day) $34.00 $3.40 $37.40 Impounded Animal Daily Boarding Charge – Small  Animals(perday) $34.00 $3.40 $37.40 ImpoundedAnimalVeterinaryTreatmentCharge Atinvoicedcost Impounded Animal Transport Charge – Strathfield $160.00 $16.00 $176.00 Impounded Animal Transport Charge – Austral $260.00 $26.00 $286.00 AfterHoursEmergencyAnimalTransportChargeRosebery $200.00 $20.00 $220.00 AnimalIntakeAdministrationFee $75.00 $7.50 $82.50 Reducedto$35
gst
EuthanisiaFee-Kitten $100.00 $10.00 $110.00 EuthanisiaFee-Animal<10kg $250.00 $25.00 $275.00 EuthanisiaFee-Animal10kgto20kg $300.00 $30.00 $330.00 EuthanisiaFee-Animal>20kg $350.00 $35.00 $385.00
plus
foranimalsthatarereclaimedtocovervaccinationonentry
AnnualAdministrationFee $125.00 $0.00 $125.00 Notification(registration)offoodpremises $60.00 $0.00 $60.00 Inspection Fee – First hour $205.00 $0.00 $205.00 Inspection Fee – Per half hour thereof after first hour $102.00 $0.00 $102.00 Re-inspection Fee – First hour $102.00 $0.00 $102.00 Re-inspection Fee – Per half hour thereof after first  hour $50.00 $0.00 $50.00 PreOccupationCertificate $260.00 $0.00 $260.00

TemporaryFoodPremises(TFP)(includingmobilefoodvendingvehiclesandtemporaryfood stalls)

mobilefoodvendingvehiclesresidingwithinGeorgesRiverCouncilLGA)

Food-Notices

ImpoundingCharges

Abandonedvehicles

Feeisthecontractor'scostwhichvariesbasedoncircumstancesandvehicletype

Towingfee

Towing fee – deemed dangerous location

Impounding

Fee to release to owner – all impounded items

Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype

Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype

Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype

Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype

Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype

ProtectionoftheEnvironmentOperationLegislation

ThesefeesareissuedundertheProtectionoftheEnvironmentOperationsAct

Act

Act

Act

Act

Act

Page53of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
ApplicationFee-LifetimeTemporary
$125.00 $0.00 $125.00
Re-issuingofTemporaryFoodPremisesPermitchangeofdetails $60.00 $0.00 $60.00 Inspection fee – Individual temporary food premises –  Firsthour $102.00 $0.00 $102.00
foodPremises Permit
(exclude
ImprovementNotice(pernotice) $330.00 $0.00 $330.00 FoodRegulation 2015|Part3 Clause11
Trolleys(perday) $120.00 $0.00 $120.00 ImpoundingAct OtherItems(perday) $120.00 $0.00 $120.00 ImpoundingAct AdministrationFee $28.50 $0.00 $28.50 ImpoundingAct Fee to release to owner – all impounded items $105.00 $0.00 $105.00 ImpoundingAct DisposalFee(ifnotclaimed) $66.00 $0.00 $66.00 ImpoundingAct
Impounding
Impounding
Impounding
Fee(perday)
Impounding
fee
Holding
Impounding
continuedonnextpage...

Services

Page54of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) ProtectionoftheEnvironmentOperationLegislation [continued] CleanUpNotice(UnderPOEOAct1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 NoiseControlNotice(underPOEO1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 PreventionNotice(UnderPOEO1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 ComplianceCostNotice Costofworksorservices(Invoice)+ 10% Protectionofthe Environment Operations (General) Regulation2022| Clause151 EnvironmentalAudits/Inspection-includingvapor recoveryprogram $205.00 $0.00 $205.00 LocalGovernmentLegislation RecoveryCostNotice Varies-dependingoncostofworks LocalGovernment Act1993|Section 197and678 Community&Culture LibraryDeliveryorcollectionfee Deliveryorcollectionfee(morethan20items) $30.00 $0.00 $30.00 Deliveryorcollectionfee(upto5bulkyitems) $30.00 $0.00 $30.00 Deliveryorcollectionfee(upto20items) $20.00 $0.00 $20.00 ReplacementoflostLibrarycards Replacementcardfee(percard) $6.50 $0.00 $6.50
printingandscanning
Photocopying,
performedatLibrary A4blackandwhite(perpage) $0.27 $0.03 $0.30 A3blackandwhite(perpage) $0.55 $0.05 $0.60 A4colour(perpage) $0.64 $0.06 $0.70 continuedonnextpage...

LostandDamagedLibraryItems

Page55of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) Photocopying,printingandscanning [continued] A3colour(perpage) $1.18 $0.12 $1.30 A4colourscan(perpage) $0.09 $0.01 $0.10 A3colourscan(perpage) $0.09 $0.01 $0.10
Lostordamagedcollectionitems Replacementcostofitem ProcessingFee(peritem) $20.00 $0.00 $20.00 Cleaningfeeforitemsreturneddirty(peritem) $20.00 $0.00 $20.00 Damagedpackagingreplacementfee(peritem) $12.50 $0.00 $12.50
Page56of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) OtherItems USBflashdrive(16GB) $5.45 $0.55 $6.00 Librarybooksaleitems Pricemarkedonitem Inter-LibraryLoans ItemloanedfromanotherpubliclibraryinSydney(per item) $6.82 $0.68 $7.50 Itemloanedfromauniversityorpubliclibraryoutside Sydney(peritem) Atcost Lostordamageditemsloanedfromanotherlibrary Replacementcostofitem Processingfeeforlostordamageditemsloanedfrom anotherlibrary $20.00 $0.00 $20.00 LibraryOutreachPrograms Programsdeliveredoffsite(perhour) $68.18 $6.82 $75.00 HirefeeforLibraryRooms KogarahLibraryActivityRoom(perhour) $23.64 $2.36 $26.00 HurstvilleLibraryMilesFranklinMeetingRoom(per hour) $23.64 $2.36 $26.00 OatleyLibraryHall(perhour) $23.64 $2.36 $26.00 SouthHustvilleMeetingRoom(perhour) $18.18 $1.82 $20.00 HurstvilleLibraryGrevilleaRoom(perhour) $7.27 $0.73 $8.00 Audiovisualequipmentincludinglaptop,projector (perhour) $14.55 $1.45 $16.00 HireFeeforLibraryExhibitionVenues(forfunctionsandprograms) Audiovisualequipmentincludinglaptop,projector, PA,microphone(perhour) $14.55 $1.45 $16.00 HireofKogarahLibraryExhibitionSpace(perhour) $72.73 $7.27 $80.00 HireofHurstvilleLibraryExhibitionSpace(perhour) $72.73 $7.27 $80.00 AfterhoursfunctionincludingtwoCouncilstaff(per hour) $118.18 $11.82 $130.00 CancellationFee $45.45 $4.55 $50.00 UseofKitchen(perhour) $24.55 $2.45 $27.00 Researchfee ResearchFee(perhour,firsthalfhourfree) $118.18 $11.82 $130.00 Servicefeeforreproductionofphotographs Servicefeeforreproductionofphotographs(per order) $29.55 $2.95 $32.50 PhotographLicenceFee(perimage) $21.82 $2.18 $24.00

LibraryProgramsEvents,ClassesandWorkshops

MediaLabandSoundBoothequipmentpacksavailableforin-househireinclude:ElectricGuitarPack,ElectronicDrum Pack,PercussionPack,DJPack,VocalMicrophonePack,StudioRecordingPack,ElectronicMusicPack,PodcastPack, PhotographyPack,VoxPopPack,FilmMakerPack,FieldRecordingPack

Page57of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
SpecialEvents Variesdependingoncost Basic $7.27 $0.73 $8.00 Intermediate $10.91 $1.09 $12.00 Advanced $22.73 $2.27 $25.00 Custommadeprograms(perhour) $68.18 $6.82 $75.00
LibraryMediaLab
Hurstville
HireofMediaLaborSoundBoothequipmentpackfor commercialusein-house(perpack,perhour) $27.27 $2.73 $30.00 HireofMediaLaborSoundBoothequipmentpackfor non-commercialusein-house(perpack,perhour) $9.09 $0.91 $10.00 HireofMediaLabStudio(commercialuseperhour) $81.82 $8.18 $90.00 HireofMediaLabStudio(non-commercialuseper hour) $27.27 $2.73 $30.00 HireofSoundBooth(commercialuseperhour) $40.91 $4.09 $45.00 HireofSoundBooth(non-commercialuseperhour) $13.64 $1.36 $15.00 HurstvilleMuseum&Gallery Museum on the Move – Travelling education kits (per  kit) $59.09 $5.91 $65.00 ReminiscingTherapykits(perkit) $59.09 $5.91 $65.00 DragonfliesKids'ClubActivities(perchildperactivity) $9.09 $0.91 $10.00 ArtAttackKids'Workshops(perchildperactivity) $9.09 $0.91 $10.00 Commissiononsaleofartworks 20%ofsaleprice Bookandmerchandisesales Pricemarkedonitem Event & Classes – Materials Kit Pricemarkedonitem OrganisedTours Organisedtours $5.00perperson(minimumcharge $50.00) Tea/coffee $2.00perperson EducationPrograms Highschooleducationprograms $6.50perperson(minimumcharge $65.00) Primaryschooleducationprograms $6.50perperson(minimumcharge $65.00) Preschool/daycareeducationprograms $6.50perperson(minimumcharge $65.00) ProfessionalServicesfee(perhour) $118.18 $11.82 $130.00

CommunityProgramsEvents,Classes&Workshops-Museum

ExhibitionVenues(forfunctionsandprograms)

perweek(inclGST).

Policy,planningorotherdocuments

ChildCareFees

Page58of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
&
SpecialEvents Variesdependingoncost Basic $7.27 $0.73 $8.00 Intermediate $10.91 $1.09 $12.00 Advanced $22.73 $2.27 $25.00 Custommadeprograms(perhour) $68.18 $6.82 $75.00
Entryfeeforpeopleaged18yearsandover(per artwork) $45.45 $4.55 $50.00 Entryfeeforpeopleagedunder18years(perart work) $18.18 $1.82 $20.00 HiringFee
HireofMainGallery(perhour) $72.73 $7.27 $80.00 Dragon's
Gallery FrameHire(perframe) $4.55 $0.45 $5.00 Framerepairorreplacement AtCost Exhibitionofartwork-commercialrateifselling artwork(perweek) $63.64 $6.36 $70.00 Exhibitionofartwork-Non-Commercialrateifnot sellingartwork(perweek) $36.36 $3.64 $40.00
HiringFeeforMervLynchReserveArtistStudio(per day) $31.82 $3.18 $35.00 HiringFeeforMervLynchReserveArtistStudio(per week-MondaytoSunday) $159.09 $15.91 $175.00
Gallery
GeorgesRiverArtPrize
for
Lair
MervLynchReserveArtistStudio
$250
NotforProfitCommunityGroups(each) $39.00 $0.00 $39.00 Other(each) $64.00 $0.00 $64.00
Oatley West Early Learning Centre – from 1 July 2023 $135.00 $0.00 $135.00 Ocean Street Kindergarten – from 1 July 2023 $115.00 $0.00 $115.00 Carss Park Narani Long Day Care – from 1 July 2023 $127.00 $0.00 $127.00 Penshurst Long Day Care – from 1 July 2023 $127.00 $0.00 $127.00 Jack High Long Day Care – from 1 July 2023 $127.00 $0.00 $127.00 SouthHurstvilleKindergarten-From1July2023(not declaringStartStrongFeeRelief) $55.00 $0.00 $55.00 continuedonnextpage...

ChildCareFees [continued] SouthHurstvilleKindergartenEquityFee

HurstvilleKindergarten-2DayEnrolment(with signedStartStrongFeeReliefDeclarationForm nominatingSHK)-perweek

SouthHurstvillePreschoolfeesforchildrenagedatleast3yearsonorbefore31Julyofyearenrolled

HurstvilleKindergarten-3DayEnrolment(with signedStartStrongFeeReliefDeclarationForm nominatingSHK)-perweek

HurstvillePreschoolfeesforchildrenagedatleast3yearsonorbefore31Julyofyearenrolled

ChildCare-OtherCharges

Enrolment:Twoweeksfeesinadvancetobepaid priortocommencementofschoolyearoron acceptanceofplacement(tobeheldasrefundable bondperchild)

2weeksoffees(proratabasedon numberofenrolleddays)

forthefirst10minutesorpart thereof,plus$20.00persubsequent5 minutes

Note:

EnrolmentcancellationinTerm4at South Hurstville Kindergarten – full  termfeesmustbepaid. Enrolmentcancellationsreceivedprior tocommencementofattendance$200cancellationfee.

Page59of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$20.00 $0.00 $20.00 South
$7.07 $0.00 $7.07
South
$62.07 $0.00 $62.07 South
South
$10.00 $0.00 $10.00
HurstvilleKindergartenAfterSchoolCare
Excursionfee(perchild) $25.00 $0.00 $25.00 SouthHurstvilleKindergarten
fee (perterm) $20.00 $0.00 $20.00 OccasionalCare(per
Kindergarten $18.00 $0.00 $18.00 ChildcareWaitingListRegistrationFee(non-
$30.00 $3.00 $33.00
-Eventprogram
hour)-OceanStreet
refundable)
Late
fee $50.00
Latepaymentoffees(perweek) $30.00 $0.00 $30.00 DirectDebitDishonourFee(chargedperfamilyper transaction) $30.00 $0.00 $30.00 EnrolmentCancellation
weeks
pickup
2
notice.
Children'sHat $13.64 $1.36 $15.00 WetBags $9.09 $0.91 $10.00 CommunityKeys MasterLocksmithAccessKey(MLAK) $25.91 $2.59 $28.50 SeniorsCentreLockerKey $36.36 $3.64 $40.00

Centres

CarssParkLifeSavingHall

Bookings RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

CarssParkStrawBaleShed

Bookings

Hirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

SeniorCitizensCentre

RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

Page60of74 • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) Community
LateKeyreturn(perWeek) $22.73 $2.27 $25.00 SecurityBond $400.00 $0.00 $400.00 KeyDeposit $50.00 $0.00 $50.00
CasualBookings MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
Monday
Friday(perhour) $29.09 $2.91 $32.00
Regular
to
Casual
Perhour $20.00 $2.00 $22.00 Regular
Perhour $11.77 $1.18 $12.95 DragonRoom MondaytoFriday(perhour) $56.36 $5.64 $62.00 Saturday(perhour) $68.18 $6.82 $75.00 Sunday(perhour) $68.18 $6.82 $75.00 RiverRoom Monday
Friday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
Casual
MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $62.73 $6.27 $69.00 Sunday(perhour) $62.73 $6.27 $69.00
Bookings
Regular
to
Hurstville
Bookings
RegularBookings
continuedonnextpage...

RegularBookings [continued]

KingsgroveCommunityCentre

RegularBookings

RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

KogarahSchoolofArts

RegularBookings

RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

MortdaleCommunityCentre

RegularBookings

RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

OatleyCommunityHall

Page61of74 • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
MondaytoFriday(perhour) $45.45 $4.55 $50.00 Sunday(perhour) $57.27 $5.73 $63.00
Casual
MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $62.73 $6.27 $69.00 Sunday(perhour) $62.73 $6.27 $69.00
Bookings
MondaytoFriday(perhour) $45.45 $4.55 $50.00
MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $64.09 $6.41 $70.50 Sunday(perhour) $62.73 $6.27 $69.00
CasualBookings
Monday
Friday(perhour) $45.45 $4.55 $50.00
to
Casual
MondaytoFriday(perhour) $60.00 $6.00 $66.00 Saturday(perhour) $65.45 $6.55 $72.00 Sunday(perhour) $65.45 $6.55 $72.00
Bookings
Monday
Friday(perhour) $48.18 $4.82 $53.00
to
Casual
MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
Bookings

RegularBookings RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

OatleyCommunityHall-meetingrooms1&2

RegularBookings

Hirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

PJFerryReserveCommunityHall

Bookings

Hirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

StGeorgeCommunityCentre

Bookings RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

CommunityCentreWaste-ExtraItemsifRequired

Page62of74 • • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Monday
$29.09 $2.91 $32.00
toFriday(perhour)
Casual
Monday
Friday(perhour) $17.05 $1.70 $18.75
Monday
hour) $11.77 $1.18 $12.95
Bookings
to
Regular
toFriday(per
Casual
Monday
Friday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
MondaytoFriday(perhour) $29.09 $2.91 $32.00
Bookings
to
Regular
Regular
Casual
MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
MondaytoFriday(perhour) $29.09 $2.91 $32.00 Sunday(perhour) $34.55 $3.45 $38.00
Bookings
Regular
1100L
As
240LCommercialRecyclingBin(PerBin) AsperCommercial
Servicesfee 240LCommercialWasteBin(PerBin) AsperCommercialWaste ManagementServicesfee
CommercialWasteBin(PerBin)
perCommercialWaste ManagementServicesfee
Waste Management

RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod

MaranaAuditoriumandHurstvilleSeniorCitizensCentrePackage FeesincludeTechnicalOfficerforMaranaAuditorium.

CivicTheatreandHurstvilleSeniorCitizensCentrePackage FeesIncludeTechnicalOfficer

Page63of74 • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) WaratahRoom MondaytoFriday(perhour) $28.64 $2.86 $31.50 Saturday(perhour) $33.64 $3.36 $37.00 Sunday(perhour) $33.64 $3.36 $37.00 BanksiaRoom MondaytoFriday(perhour) $14.36 $1.44 $15.80 Saturday(perhour) $19.09 $1.91 $21.00 Sunday(perhour) $19.09 $1.91 $21.00 HurstvilleOval-PavilionRoom CasualBookings MondaytoFriday(perhour) $60.00 $6.00 $66.00 SaturdayandSunday(perhour) $65.45 $6.55 $72.00
RegularBookings
MondaytoFriday(perhour) $48.18 $4.82 $53.00
Monday-Friday(Minimum3hours) $276.36 $27.64 $304.00 Saturday,SundayandPublicHolidays(Minimum3 hours) $368.18 $36.82 $405.00
Auditorium,
Monday-Friday(Minimum3hours) $431.82 $43.18 $475.00 Saturday,SundayandPublicHolidays(Minimum3 hours) $495.45 $49.55 $545.00
venues MaranaAuditorium WeekdaysMonday-Friday(perhour,minimum3 hours)-
TechnicalOfficer $245.45 $24.55 $270.00 Weekends&publicholidays(perhour,minimum3 hours)-
TechnicalOfficer $336.36 $33.64 $370.00 CommercialKitchenHire(perhour,minimum3hours) -includesTechnicalOfficer $131.82 $13.18 $145.00 HireofLargeLEDScreen(perday) Priceonrequest
Marana
Performance
includes
includes
Page64of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) CivicTheatre MondaytoFriday(perhour)-includesTechnical Officer $172.73 $17.27 $190.00 Weekends&publicholidays(perhour)-includes TechnicalOfficer $195.45 $19.55 $215.00 MaranaAuditoriumandCivicTheatrePackage WeekdaysMonday-Friday(perhour,minimum3 hours) $409.09 $40.91 $450.00 Weekends&publicholidays(perhour,minimum3 hours) $522.73 $52.27 $575.00 VideoPackage1 $1,372.73 $137.27 $1,510.00 VideoPackage2 $1,700.00 $170.00 $1,870.00 RecordedVideoFile $54.09 $5.41 $59.50 StreamingOption(livestreamtheevent) $109.09 $10.91 $120.00 LiveProjectionOption(projectyoureventliveonthe screen)RequiresAudioVisualTechniciancostper hour(minimum4hours) $61.36 $6.14 $67.50 MusiciansPackage1 $222.73 $22.27 $245.00 MusiciansPackage2(WirelessOption) $331.82 $33.18 $365.00 CrossStageLightingPackage $813.64 $81.36 $895.00 Furtheradditionalaudiovisualequipmentavailable Priceonrequest PublicHolidaysurcharge Flatratesurchargeforvenuehirebookingsona PublicHoliday(per3hourblockorpartthereof) $118.18 $11.82 $130.00 Additionalcharges FrontofHouseOfficer(Minimum4hoursplus overtimeandpenaltyratesifapplicable) $59.09 $5.91 $65.00 MovingLightingPackage:6xMovingHeads $909.09 $90.91 $1,000.00 Multicorecablehire $45.45 $4.55 $50.00 TechnicalOfficer(Minimum4hoursplusovertimeand penaltyratesifapplicable) $59.09 $5.91 $65.00 Breachoftermsandconditions(perbreach) $109.09 $10.91 $120.00 Standarddataprojector(CivicTheatre)(perday) $0.00 $0.00 $0.00 Dataprojector(allothervenues) $65.00 $6.50 $71.50 Allotherstagingandequipment Priceonrequest PianoHireorRemoval(includestuning) $240.91 $24.09 $265.00 Securityguard(perhour,4hourminimumplus overtimeandpenaltyratesifapplicable) $61.36 $6.14 $67.50 AdditionalAudiovisualtechnician-mandatoryforthe MaranaAuditorium(perhour,4hourminimumplus overtimeandpenaltyratesifapplicable) $54.55 $5.45 $60.00 MovingLightingPackage:2xMovingHeads $281.82 $28.18 $310.00 continuedonnextpage...

Additionalcharges [continued]

orCivicForecourtArea

Page65of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Catering Drinksandcateringpackages availableuponrequest Cleaninginexcessofnormalcleaningafterafunction (perhour,minimum2hours) $118.18 $11.82 $130.00 StagingandEquipment FlyPerson-MaranaAuditorium(Minimum4Hours) $59.09 $5.91 $65.00 Flipchart/whiteboard(chargeperitem) $20.00 $2.00 $22.00 TV(perday) $39.55 $3.95 $43.50 Drapes(1set,maximum4sets)perset $64.09 $6.41 $70.50 Projectorscreen $39.55 $3.95 $43.50 SmallPortablePASystem(subjecttoavailability, including1xcordedmicrophone) $73.64 $7.36 $81.00 Tablecloths(peritem) $12.14 $1.21 $13.35 Portableurn(perday) $39.55 $3.95 $43.50 AdditionalcordedmicrophonesShureSM58orSM57 (perday) $24.55 $2.45 $27.00 Additionalwirelesshandheldmicrophone(peritem) $86.36 $8.64 $95.00 Additionalwirelessheadsetmicrophone(peritem) $86.36 $8.64 $95.00 Additionalwirelesslapelmicrophone(peritem) $86.36 $8.64 $95.00 Choirmicrophone(setof3) $122.73 $12.27 $135.00 CondenserMicrophonesSetof2 $81.36 $8.14 $89.50 Hazemachine $109.09 $10.91 $120.00 Equipmentstoragefee(perdayorpartthereof) $56.36 $5.64 $62.00 TemporaryvinyldancefloorhireforMarana Auditorium – first day of hire $218.18 $21.82 $240.00 TemporaryvinyldancefloorhireforMarana Auditorium – subsequent days $122.73 $12.27 $135.00 Temporary vinyl dance floor labour – install and  removal(flatratecoversinstallationandremoval) $268.18 $26.82 $295.00 FrontofHouseMixRecording(clienttoprovide portableHardDrive) $118.18 $11.82 $130.00 Multitrackrecording(clienttoprovideportableHard Drive) $272.73 $27.27 $300.00 KogarahTownSquare,HurstvillePlaza
CharityEventFees AdditionalGarbageBins(onapplication) Priceonrequest RequestedCouncilServiceseg.Barricadesetc. Priceonrequest PrivateEvent OnApplication Determinedperapplication,minimum charge$800for4hrs

CommercialFilmingonCouncilProperty

UseofPublicSpaces

Conditions

-Organisationscanapplyforamaximumof12occasionsinaCalendaryearbutnotmorethanoneoccasionpermonth

- Not for Profit Organisations seeking a further reduction in fees, refer to guidelines in accordance with the Grants, Donations&SponsorshipPolicy

-CommercialorganisationsthatconductStreetStallactivitiesonbehalfofnotforprofitorganisationsarenoteligiblefora 50%reductionontheStreetStallfee

CommercialActivitiesondesignatedCouncilfootways,publicplazas,orsquares

IndependentFestivalsorEventsinParksandTownCentres

Note:

- Additional charges will apply for any Street Stall activities that require temporary food inspections, access to water, electricity,Councilwasteservicesorroadclosures

-StreetStallsoreventsinCouncilsParksandReservesorstallsassociatedwithCouncilfestivalsandevents(suchas AustraliaDayandLunarNewYear)areconsideredseparatelytothispolicy

Page66of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
PublicLiability $36.50 $0.00 $36.50 ApplicationFee $285.00 $0.00 $285.00 Bond $515.00 $0.00 $515.00 Daily Rental Fee (Note – Major Projects) $820.00 $0.00 $820.00 Daily Rental Fee (Note – Minor Projects) $250.00 $0.00 $250.00
Application $168.18 $16.82 $185.00 ApplicationdiscountedfeeforLocalBusinesses withinLGA $122.73 $12.27 $135.00 ApplicationdiscountedfeeforNon-Profitand CommunityGroupswithinLGA $81.36 $8.14 $89.50 Rental/UseofSpace(maximumfeepayableper eventperday) $1,481.82 $148.18 $1,630.00 StreetStallFee(perday) $75.45 $7.55 $83.00 StreetStalldiscountedfeeforNon-Profitand CommunityGroupswithinLGA(perday) $37.27 $3.73 $41.00
Perhour(minimumtwohours) $100.00 $10.00 $110.00 Perday $409.09 $40.91 $450.00
Bond $1,070.00 $0.00 $1,070.00 DailyRentalFee $472.73 $47.27 $520.00 ToiletCleaningFee $409.09 $40.91 $450.00 ElectricityandWaterFee $159.09 $15.91 $175.00 WasteRemoval Priceonrequest

EventManagement

StreetstallfeeatmajorCouncilevents

ExtraEventManagementProvisions

stallfeeatotherCouncilevents

Events,performances,shows,cinemasandactivities

Ticketingand/orbookingfeesforCouncilrunevents, performances,shows,cinemasandactivities

Ticketingand/orbookingfeesfor Councilrunorsupportedevents, performances,shows,cinemas andactivities

Perday,oratCouncil'sdiscretion

Page67of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
EventApplicationFormFee(Non-refundable) $50.00 $5.00 $55.00 Busking/Streetperformancepermit $16.60excludingGST Min.Fee:$16.00
Power(per10amps,availableonrequest) $109.09 $10.91 $120.00
SiteFeeonly(3mx3m) $187.27 $18.73 $206.00 SitefeediscountedforLocalBusinesseswithinLGA $140.45 $14.05 $154.50 SitefeediscountedforNon-ProfitandCommunity GroupswithinLGA $112.27 $11.23 $123.50
Street
StreetPerformancePermit $16.60 $0.00 $16.60
Advertising
$0.00-$100.00(ex. GST)
Any flagpole/Banner Poles – Users From LGA $9.60 $0.00 $9.60 Flagpole/BannerPoleToddPark(PrincesHwy) $13.40 $0.00 $13.40 BannerPole(CoxReserveCarwarAve/PrincesHwy) $13.40 $0.00 $13.40 BannerPole(ClaydonReserve) $13.40 $0.00 $13.40 BannerPole(ArrowsmithReserve) $13.40 $0.00 $13.40 CorporateUsers(atCouncil'sdiscretion) $18.00 $0.00 $18.00 PromotionalBanners Other
Application $126.45 $12.65 $139.10 Rental/UseofSpace(maximumfeepayableper eventperday) $608.64 $60.86 $669.50 PublicLiability $25.36 $2.54 $27.90
Uses

Legal

Page68of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) Corporate MapProduction CouncilPlans FirstHour(minimum1Hour) $130.00 $0.00 $130.00 Per30Minutesorpartthereofafterfirsthour $34.00 $0.00 $34.00 ElectronicMediaOutput USBorDigitalImage $25.00 $0.00 $25.00 AddressReviewService
ReviewServiceFee
hourthereafter
Address
Firsthourfreetoassessandquote, then$35per
Proceedings Reimbursementof
GeneralManager(perday) $735.00 $0.00 $735.00 Directors(perday) $615.00 $0.00 $615.00 Managers(perday) $490.00 $0.00 $490.00 Anyotherstaff(perday) $370.00 $0.00 $370.00 Solicitor $250-$350,dependingon experiencelevel CostsinLegalProceedings In-HouseGeneralCounsel(perhour) $635.00 $0.00 $635.00 In-HouseSeniorSolicitor(perhour) $510.00 $0.00 $510.00 In-HouseSolicitor(perhour) $350.00 $0.00 $350.00 In-HouseInternalParalegal/LegalOfficer(perhour) $230.00 $0.00 $230.00 In-HouseLegalAdministrative/SupportOfficer(per hour) $85.00 $0.00 $85.00 CouncilOfficer/InternalExpert(perhour) $510.00 $0.00 $510.00 ExternalLegalFees(asincurred) Asincurred ExternalExpert(asincurred) Asincurred Subpoenas Conduct Money – deposit payable on application $39.00 $0.00 $39.00 FirstHourorpartthereof $40.00 $0.00 $40.00 PerhourorpartthereofafterFirstHour $40.00 $0.00 $40.00 CostofCouncilOfficertoattendasWitnessandfor CourtAppearances(perpersonandperhour) includingtravellingtime $200.00 $0.00 $200.00
StaffInPrivateCourtActions

SaleofContract,TenderandSimilarDocuments

GovernmentInformationPublicAccess(GIPA)

NatureofApplication

(a)Accesstorecordsbynaturalpersonabouttheirpersonalaffairs-Applicationfee

ProcessingChargeafterfirst20hours

(b)AllotherGIPAApplications

ApplicationFee

Internalreview

ApplicationFee

CreditCardservicefee

AmericanExpress

Fee

Visa/MasterCard

Fee

AccrualofInterestonRates&Charges

Interestrate

$30.00perhourafterfirst20hours

$30.00,subjecttoa50%reductionfor financialhardship,non-profit organisationsshowingfinancial hardshipandholdersofpensioner healthbenefitscardandchildren. Reductionmayapplyforpublic interestreason.

$40.00,subjecttoa50%reductionfor financialhardship,non-profit organisationsshowingfinancial hardshipandholdersofpensioner healthbenefitscardandchildren. Reductionmayapplyforpublic interestreason.

1.40%oftotaltransactionvalue

0.45 % of total transaction value.

ThemaximumratesetbytheMinister forLocalGovernment,calculatedona dailybasis

Government Act1993|Section 197and678

Page69of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Contractvalue<$500,000(percopy) $0.00 $0.00 $0.00 Contractvalue>=$500,000(percopy) $0.00 $0.00 $0.00
Minutes/AgendasMailingList(peryear) $730.00 $0.00 $730.00 Audiotape/CDofmeetings(pertape/CDper meeting) $2.80 $0.00 $2.80
CouncilDocuments
ProcessingChargeafterfirsthour(perhour) $30.00 $0.00 $30.00 Retrievaloffilesheldoffsite(perfile) $35.50 $0.00 $35.50
Local

ChargesonOtherCarriers

Undergroundgas,waterandsewermainsandpipes Annuallevybasedonaformulathat includesthelengthofpipesand volume

Postboxes/mailcollectionpointsonroadreserve AsperagreementwithAustraliaPost RateEnquiry

Enquiry

-includingwrittenreplies(per hour,perofficer(minimum1hour,followedby15min increments)

TheratesetbytheMinisterforLocal Government,calculatedonadaily basis

Government Act1993|Section 197and678

Page70of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Fees Rates
$60.00 $0.00 $60.00 RatesEnquirySearch $135.00 $0.00 $135.00 RatesNoticeAmended(pernotice) $38.00 $0.00 $38.00 RateNoticeRe-print(prioryears,pernotice) $38.00 $0.00 $38.00 Section603Certificate $95.00 $0.00 $95.00 Section 603 Certificate – urgency fee $75.00 $0.00 $75.00 Section603CertificateCopy/Reissue(where certificatehasbeenissuedmorethan30daysprior) $44.00 $0.00 $44.00 Section603CertificateCancellationFee(ifnot alreadyissued) $44.00 $0.00 $44.00 AggregationOfLandValuesForRatingPurposesPerTitle $295.00 $0.00 $295.00 RatesBalanceConfirmationLetter $60.00 $0.00 $60.00 RefundApplicationFee(excludespensioners) $44.00 $0.00 $44.00 ItemisedStatementofRateAccount(perproperty/ perfinancialyear) $60.00 $0.00 $60.00 UrgencyFee-RatesConfirmationLettersAnd Itemised Statements – 72 Hour Response $75.00 $0.00 $75.00 RatesPaymentProcessing-Over10ratesaccounts (perratesaccount) $4.40 $0.00 $4.40 UnpaidSundryDebtorAccounts ReminderNoticeFeeforunpaidaccounts $13.64 $1.36 $15.00 Interestchargesforunpaidaccounts
Fee
Local
DishonouredCheque Fee $80.00 $0.00 $80.00 DishonouredDirectDebit Fee(Nochargeisappliedforfirstoccurrence) $54.00 $0.00 $54.00 InformationResearchFee Fee $70.00 $0.00 $70.00

StormwaterManagementServiceCharge

per350squaremetres(orpartthereof)oflandareathatwouldapplytothelandsubjecttothestratascheme dividedonapro-ratabasisbetweenthelots,notlessthan$5.00foranyindividuallot

Page71of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Residential(perrateableproperty) $25.00 $0.00 $25.00 ResidentialStrata(perrateableproperty) $12.50 $0.00 $12.50 Business – Non Strata $25.00 per350squaremetresofland area,orpartthereoftoamaximumof $1,500perrateableproperty Business – Strata Lot $5.00 $0.00 $5.00 $25.00
Leases/Licenses/Occupation/Easements
CouncilCommunityPropertiesSubjectto
CommunityLeasePolicy New/Renewals Lease/LicenceAgreementsAdministrationFee (includesadvertisingforPublicNotice) $360.00 $36.00 $396.00 ReimbursementtoCouncilforincurredlegalcosts AsdeterminedbyCouncil'sSolicitor (cappedat$5,000) ValuationFee AtMarketValue-Asdeterminedby registeredvaluerorCouncilProperty Consultant SurveyFee AsdeterminedbyCouncil'sSurveyor MinimumAnnualRentGroundLease/Community Building $556.36 $55.64 $612.00 Leases/Licences/EasementsofCouncilPropertyandStatutoryPropertyMatters NewAgreements CommercialAgreements Atmarketvalueasdeterminedby registeredvaluerorproperty consultant AdministrationFee $354.55 $35.45 $390.00 ReimbursementofCouncil'sLegalFees AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant ValuationFee AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant SurveyFee AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant Renewals(includingOptions)orAssignments AdministrationFee $177.27 $17.73 $195.00 ReimbursementtoCouncilforincurredlegalcosts AsdeterminedbyCouncil'sSolicitor continuedonnextpage...
of
Council's

Renewals(includingOptions)orAssignments [continued]

ValuationFee

SurveyFee

Roadclosures(permanent)feesasdeterminedby relevant authority and statutory provisions – at cost

GroundAnchorsaffectingCouncilLand

AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant

AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant

AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant

Keys-Leases/Licences First

Thecarparkingfeeslistedbelowstatethemaximumamountsthatwillbechargedateachsite.Councilhasthediscretion toreducethesefeesfromthestatedamountsifrequired.

Page72of74 FeeName
23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Year
FeetoInstallGroundAnchor-peranchor $2,120.00 $0.00 $2,120.00 Permit to install Ground Anchors on Council Land –  AdministrationandAssessmentFee $400.00 $0.00 $400.00
set Replacement&Additionalset/s(peradditionalkey) $60.45 $6.05 $66.50
parking
Car
KogarahTown
0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $22.73 $2.27 $25.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight
Square-DerbyStreet
Page73of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) AccessControlledParking–GreenbankStreet 0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $13.64 $1.36 $15.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight PermanentParking(perweek) $63.64 $6.36 $70.00 AccessControlledParking–TheAvenue 0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $22.73 $2.27 $25.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight AccessControlledParking–EmpressLane 0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $10.91 $1.09 $12.00 OvernightFlatRate $9.09 $0.91 $10.00 PermanentParking(perweek) $45.45 $4.55 $50.00 MeteredParking-TreacyStreet 0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00
Page74of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) MeteredParking-GloucesterRoad 0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00 MeteredParking-
CarPark 0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00 Replacementcard
PermanentParkingPermit Fee $28.64 $2.86 $31.50 Emergency
MooreReserve,BaldFacePointReserve,Donnelly Park,OatleyPark,OldsPark(peropening) $192.73 $19.27 $212.00 Commercial Car Parks – Kogarah Town Square,  GreenbankStreet,TheAvenueandEmpressLane (peropening) $113.64 $11.36 $125.00 ParkingPermit 1stResidentParkingPermit $20.00 $0.00 $20.00 2ndResidentParkingPermit $20.00 $0.00 $20.00 1stVisitorParkingPermit $30.00 $0.00 $30.00 2ndVisitorParkingPermit $50.00 $0.00 $50.00 ReplacementFeeCost atthecostoforiginalpermit atthecostoforiginalpermit CommunityGroup-DirectionalSign Fee $240.91 $24.09 $265.00
Patrick/MacMahonSt.
-
AfterHoursBoomGateorCarParkOpeningCharges

Georges River Council acknowledges the Bidjigal people of the Eora Nation, who are the Traditional Custodians of all lands, waters and sky in the Georges River area. We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples who live, work and meet on these lands.

For more information on this document, please visit georgesriver.nsw.gov.au

Georges River Civic Centre

Corner MacMahon and Dora Streets, Hurstville

Phone 9330 6400

Email mail@georgesriver.nsw.gov.au

Postal address PO Box 205, Hurstville NSW 1481

georgesriver.nsw.gov.au

Language Assistanc e

131 450

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.