Re5 Corroded Koppargården
BACKGROUND
A thorough analysis of the area shows that there is an immense disconnect between the city of Landskrona and the area of Koppargården (details in the images to the right) . There is clearly a great potential in this area due to Landskrona´s future development plan as the expansion of the new residential areas and the new transportation paths will leave Koppargården in an important spot (as seen in the first image), in between the north area and the train station and well connected by bus. Still, (as it can be seen in the third image) the functions currently present in Landskrona are mainly concentrated in the city center, leaving both Koppargården, the new areas and the outskirts with little to no function. The need for new commercial areas and an improved connection to the outskirts arises. At the same time the energy consumption of this million program area is much bigger than the current standards and an energy refurbishment is needed, both for ecological and economical reasons.
MOBILITY bus lanes proposed extension of bus lanes cycle lanes
GOALS & STRATEGIES
social nodes
n ca tio
at gr In te
on
Ec ce ur
s
opulation
so Re
Wast e
mal
Air Lig
ht
Qu
/D
ay
lig
gy issi
ation
on s
En er
o o o o
Ener
se
gy G ener
green area
Assign functions a.o. community farming Amplify the distinction between public and private spaces Structure the courtyards Appropriate scale in the area
residental area distant future
Generate a suitable density Diversify the type of apartments Raise social standard Provide variety of residences
FUNCTION DISTRIBUTION restaurants public functions
REjuvenate the sense of identity (SOCIAL INTEGRATION)
e nc
Em
industrial area
offices
s
ity
ht
t ic he
lity bi la
ri c
o o o o
y
t es
tro
rba
ct
lity
/A al
n Co
tu Dis
-u Land
Biodiversity
Re-Use
Ele
residental area close future
REplenish the urban fabric (URBANISM)
Qua
alit
su
ne rg
y
W
Ther
Vi
ural Nat ment viro En
r
e at
lity
ter
Ecolog y
ials
He at E
io n
tit
y
Rel o
Desig
Visual
en
ap ta
Ad Process
Diversity in P
In d o or Q ua
ation
c Relo
o o o o
s
Public Space
lity
Information
FUTURE DEVELOPMENT
Enhance and complement the current connections Utilize the existing node Provide social spaces Supplement the functions in the area
REdefine the green spaces (GREEN SPACES)
fety
y/Sa
rit Secu
Qua
eing
Control
on
cti
or
W
e
ra Inte
do ut
y om
lb el
s
Ma
b
str
In
o o o o
ur
t uc
fra
O
on
y ilit
Lower heating and electricity demand Employ the possibilities for renewable energy Lower the embodied energy a m3 in the building
REconnection, copper as a natural conductor (TRANSPORTATION)
Id
n
ces
o o o
Desig n
Cycle Life Cost
io
cti
Pro
Investment
fun
ial
ign
t en
Des
in
ct
nce
id es
ity
rs ye La
ers
tru
na
nR
Div
ns
rge Cha
inte
yi
g
co
Rent
Ma
rsit ve Di
rin ea Sh Re
n Qua lity
Energetic REfurbishment of the buildings (ENERGY)
Implement means for social integration Rectify the perception of the area Better the relation, functionally and socially, with the city Develop a higher employment potential
services (secondary) services (tertiary)
TRANSPORTATION MOBILITY cars & bus bicycle walking paths bus stop bicycle stop parking
URBAN DESIGN After analyzing the area of Koppergården, it was found that the most urgent problems in the area were the social problems. The bad reputation of the this area is in need of improvement, bring new potential to Koppergården in the form of economic, social and environmental development. The master plan is a result of solving the issues in the area and achieving our main goals. A new multifunction center is planned for the new Koppergården, (details about the center see charts on the right) as a node that offers new commercial and social meeting spots. As part of the solution the bicycle paths and pedestrian roads are reorganized in a way that enhances the connection between the community and the city. G
G
45
G
37
14
The green areas are reorganized, with a better distinction between public and private. To further increase the integration of the area back into the city, a new market space is planned in the central forest. L
B5
G G
G G
L
L
25
E1
G
E2
G G
E3
23
19 new buildings:
D2
10
D1
2,4,6,8,10,14,16, ..., 28,32,34, ..., 40,42
36
multifunction center, 42 green house, 34 row houses, 10,18,20 high quality apartments, 32&22,24,26,28 high & medium quality apartments, 2,8,5&7,36 new apartments for low income, 4,6,14,16, 38,40 existing apartments for low income, 1,11,12,15,....,41,43,45
41
A
Z
X
33
34
32
A
0
1st level
G
PUBLIC E4
20 18
F
5
D3
SOCIAL INTERACTION
2
G
First, the social interaction process benefits from the reorganization of public spaces, different levels of public area would be organized with different activities to improve the social interaction. courtyard meeting point forest & food market multifunction center (mainly commercial)
F1 24
Z
40
22
26
1 38
roolf dnoceS
Secondly, by building high quality apartments and row housing for medium and high income people a mix of people is created which helps the social integration. These new apartments will be located among the low income buildings.
TIMEPLAN year 0
year 1
year 2
year 3
In the first year, it is recommend to first build residential and commercial segment(no.42) along the north west main road, as it shows the new identity of Koppergården for people passing. Then continue to build the inner forest part as the future weekly market place, also renovate the building no.5&7, and nursing home, no.27&29 which will serve as a pilot for the renovation method.
The second year construct the south west part, residential buildings no.22-28, and no. 38, no.40, along the main bicycle road in the future city planning, also start renovating the rest of the old buildings, and re-arrange the courtyards on site.
Third year start constructing the buildings inside the area, including row houses, no.10, no. 18 and no. 20 in the center, and the high quality apartments around. Also re-arrange the public space in our area.
The fourth year all new constructions should be complete along with the ronovations.
new constructions
ground constructions
finished constructions
new constructions
finished constructions
refurbishment buildings
ground constructions
new constructions
14
16
42
finished constructions
ground constructions
43
37
39
41
35
8200 m2 of PV panels are installed on the roofs of the new buildings on site,
29
33
34
31
25 23
28 5
7
26
10
27 17 19
21 24
18 15
36
PV panels
20
8
13
22 40
row house (high income) mix high & medium quality apartments mix middle & low income quality apartments
PV PANELS
45
32
2nd level
4
Scale 1:1000
existing buildings
3rd level
F2
H
1
4th level
11
7
Z
2
PRIVACY
courtyard meeting point forest & food market multifunction center (mainly commercial)
6
A
42
PUBLIC SPACE
21
B
28
3
13
C
COMMUNITY AND LANDSCAPE DESIGN A, farming land B, existing forest C, weekly market D, social meeting point(please see charts right get more detailed information) E, bicycle stop, waste collection room F, private garden for high income apartments G, main bicycle road, walking paths H, place for rest and leisure, Z, service for 22,24,26,28&32, such as laundry room, stores, and small convenient shops X, playground for children
4
8
31
more details about apartments type, investments, rent, etc. please see charts below, also attached report.
m5
15
19
29
39
16
1,11,13,15, ..., 41,43,45
ROAD SYSTEM main road secondary road tertiary road
35
43
BUILDING 18 existing buildings:A 5
17
27
6 4
11 2 38 1
Investment costs 700,0
No. App Investment 40 14.35 MSEK 70 45.54 MSEK 84 54.75 MSEK 96 88.90 MSEK 43.50 MSEK
more details about payback, rent, numbers of residential, etc. please see attached the reports.
Type No. 22-28 Condominium No. 38 Rental No. 40 Rental No.1-45 Rental(Old)
Area No. App 2 12580m 152 2 2400m 32 2 3200m 40 2 42286m
more details about payback, rent, numbers of residential, etc. please see attached the reports.
Economy
Untitled-1 1
14456 SEK/m2 (Is reduced by 25 % for large scale projects) 220 SEK/m2 9 SEK/m2 (cost for electricity and heating after renovation) 3700 SEK/m2 based upon similar project 1100 SEK/m2 13806 SEK/m2 + 2.5 % +4% - 1% 1200 SEK/m2 71.98 MSEK
[MSEK]
The total investment cost and subsequent payback time was based upon average costs in Sweden and Landskrona. New construction cost – Maintenance cost – Operation cost – Work cost for renovation – Mean rent in area (before) – Condominium sales price – Increase in operations cost Increase in maintenance cost Decrease in rent income Mean rent (after) – Income from condominiums –
Investment 136.39 MSEK 26.02 MSEK 34.69 MSEK 215.01 MSEK
800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0
Type No. 2 Condominium No. 6&4 Rental No. 8 Rental No.10 Condominium No.18 Row houses No.20 Row houses No.36 Rental
Area 1800m2 3800m2 1700m2 1440m2 800m2 1120m2 1200m2
No. App 20 64 16 16 5 7 20
more details about pay back, rent, numbers of residential, etc. please see attached the reports.
Energy Concept
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
Years Cost
Income
Investment
Investment 19.51 MSEK 41.19 MSEK 18.43 MSEK 15.61 MSEK 8.67 MSEK 12.14 MSEK 13.01 MSEK
Sales
500,0
500,0
400,0
400,0
300,0
[MSEK]
Area 2598m2 4200m2 5050m2 8200m2 3000m2
636,1 636,1
600,0
600,0
[MSEK]
Type No. 5&7 Condominium No. 14 Rental No. 16 Rental No. 32 Rental No. 42 Commercial
Investment costs
Total investment costs
300,0 233,6
200,0
281,2
FUNCTIONS existing residential new residential new commercial (including convenience shops inside community) office, community center, services green house
281,2
233,6
200,0 100,0 0,0
58,6
43,5
100,0
43,5
58,6
3,7
0,0 New rental
3,7
New Condominium
Commercial area
The area is solely heated by district heating. To reduce the total consumption of energy Groundwater heat pumps are installed in the area which have a COP of 3.5. The coldest days of the year the district heating is still needed. By doing this the energy is shifted from heat to electricity, but due to the COP the amount of CO2 produced by the area is still lowered. The electricity is supplied by the same source as the district heating, a thermal power plant in the region that runs on waste. To further reduce the use of fossil fuels PV is added to the area. The amount was designed to fully cover the need during the summer months. The reasoning behind this is to not put too much strain on the grid, due to over production. Also because PV is developing rapidly and the prices are decreasing it could be beneficial to invest in PV again in a couple of years and then there is still room for more PV.
Renovation
15,5 15,5 Heat pumps
PV
Total
Energy consumption of commercial area
Scenario A B
C D
Status The current situation After improving the thermal envelope / constructing according new standards After B and installing the heat pumps After C and installing the PV-panels
300 300
Energy B consumptionCof commercialDarea
250 250 Energy [kWh/m2/yr] Energy [kWh/m2/yr]
700,0
200 200 150 150
200 200
36 36 218 218
100 100 50 50 0
67 67
4
kWh CO2 Heat
39 39
205 205
0 0 kWh CO2
Electricity
37 37
0 0 kWh CO2
CO2 Heat
CO2 Electr
12/9/2015 9:05:49 AM
G
G
G G
L
5A
G
G
G G
L
5A
Plans Building 25
EXISTING CONDITION, NO.25
A
The interventions in no. 25 are minimized, due to limitation set by the structural system and the current occupation of mainly young families. The alterations will be reduced to minimal reorganisation of the spaces inside the apartments and upgrading the common spaces. Besides, the comfort level will be enhanced by improving sunlight and daylighting. To increase the resilience in time, flexibility will be provided to be able to meet future demands and keep the high occupation rate.
Balcony
Bedroom
Balcony
Bedroom Living room / Kitchen
Bedroom
WC
CONCEPT IDENTITY As a way of strengthening the identity of the different groups of blocks different minor landmarks will be added. Signs will be added in the crossroad to strengthen the sense of identity, and to improve pedestrian transit.
Bedroom
Bedroom
Bedroom
Living room / Kitchen WC
WC WC
REFURBISHMENT 1. The existing load bearing walls even as he room type and sizes will be preserved in building NO.25 (see black hatches below). 2. Reorganisation inside every apartment will occur in order to create a higher comfort and flexibility level. 3. Four existing balconies are relocated to outside of the envelope to maximize the amount of sunlight. Vertical transportation
Demolished walls
WC
Living room / Kitchen
Living roo WC Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Living room / Kitchen
Ba
Balcony
Second floor
Constructed walls
A 0
1
2
3
4
5m
Ground Floor
N
A
Ground floor
0
1
2
3
4
5m
Balcony
Balcony
SOCIAL SPACE
N
Bedroom
Courtyard
Bedroom Living room / Kitchen
Bedroom
Bedroom
Bedroom
Bedroom
Landmark, playground, rest place, etc. WC
Social meeting point
Bicycle stop Convenience shops Rest place Meeting point Recycling point (people take their waste, such as construction materials or food to the point and meet other people there)
Living room / Kitchen WC
WC WC Living room / Kitchen
WC
Living roo
WC
Ground Floor 0
1
2
3
4
Bedroom
Bedroom
5m
Bedroom
Living room / Kitchen
Bedroom
Bedroom
Bedroom
Forest & weekly market
The central forest area will be reorganized to provide space for a weekly market. This will work as another tool for social integration, as it attracts people form the city while at the same time offers business opportunities and jobs to the community. This market will be in close connection to the commercial area, and will act as an attraction point in Koppargården. The residents will also be given the opportunity and space to grow food inside the area.
Second floor First floorFloor Common
A
0
1
2
3
4
Ba
5m
N
N
0
1
2
3
4
5m
Green space, normal time Weekly market, once a week
PRIVACY
Facade Building 25
Multifunction center
4th level
et er al)
Balcony
Balcony
Area 600 m2 200 m2 400 m2 300 m2 600 m2 100 m2 100 m2 100 m2 100 m2
Supermarket Restaurant Café Repair store Systembolaget Speciality food shop Hairdresser Pharmacy Second hand store
3rd level 2nd level 1st level PUBLIC
Common Floor 0
1
2
3
4
5m
apartment type
WEEKLY MARKET
ON
amount
target group
area
A
28
120 m2
current inhabitants
B
26
90 m2
current inhabitants
C
2
90 m2
current inhabitants
FLEXIBILITY There has been aimed to increase the flexibility of the apartments in order to suffice the demand in the future. Currently, mainly young families are residing in the building who probably will expand in the future. Therefore, a room is added to every single apartment. In this manner, Koppergården will have a high occupation rate. It is recommended that the other existing building also adopt this strategy.
ion process anization of nt levels of ganized with rove the so-
et er al)
PV
high quality using for mepeople a mix ch helps the new apartmong the low
Inclination Orientation Peak PV power Total Area Cost Investment Payback -
39 ° 0 ° (S) 0.1632 [kW] 8200 m2 1889 SEK/m2 15490000 SEK 10.73 Years
Section A-A Building 25 +23100
+20200 +17500 +14800
come) m quality
Consumption vs Production of Electricity 300 000,00Consumption
vs Production of Electricity
+12100
200 000,00 300 000,00
-100 000,00 -100 000,00 -200 000,00 -200 000,00 -300 000,00 -300 000,00
+9400 jan feb mar apr maj jun jan feb mar apr maj jun
jul aug sep okt nov dec jul aug sep okt nov dec
+6700 +4000
-400 000,00 -400 000,00 -500 000,00
are inhe new
Produktion
To be able to fulfill the need for electricity during the summer and winter, adding PV panels with an inclination of 0 degrees, i.e. PV panels in the facade, was investigated. This could increase the electricity gains in the winter caused by the low position of the sun. However, the result showed that the difference in gains was minimal and thus negligible. It proved that not the inclination, but the hours of sun is the decisive factor in Sweden for the winter. The gains in the summer were drastically reduced by the inclination. PV inclination 35 30 25
kWh/m2
ncluding s inside
Scale 1:200
inclined tracking 2-axis tracking
-1225
SUNLIGHTING&SHADOWS It was found that the balcony of apartment A is shaded by the outer walls of the other apartments. To provide inhabitants of apartment A with more sunlight and a broader view, are the balconies relocated to outside the envelope as seen in the picture below. W After 13.00 p.m. , independent from the fact if it is summer or winter, the room attached to the balcony on south facade would not get direct sunlight. Therefore, the facade is relocated in line with the rest of the thermal envelope and obstructions are removed, to provide the room with direct sunlight.
N
ENERGY CONSUMPTION Energy consumption of building 25
winter
180
summer
180 160 160 140
S
E Existing condition
After refurbishment
5
40 35
160 140
35 30 30 25 25 20 20
140 120 120 100 100 80 80
15 15 10 10
0 0 kWh CO2 CO2 Heat
Untitled-1 2
0 0 kWh CO2 CO2 Electricity
60 60 40 40
5 5
20 20
0
0 Heat
26,1
70
16 14
70 60
14 12
26,1 4,6 42,0 4,6 42,0
12 10 10 8 8
97,9 9,1 97,9 9,1
13,2 13,2 2,3 2,3 29,4 29,4 19,1
kWhCO2 Hot water
6 6
3,2 3,2
kWhCO2 Electricity
4 4 4,7 4,7 26,4 kWhCO2 CO2 Heat
10,6 10,6
1,9 1,9
kWhCO2 kWhCO2
10
40 40
4 4 3 3 4,3 4,3
20 20
0
1,8 1,8
28 28
30 30
00
40 40
19,1 3,4 3,4 43,0
0 Heat
8 8 6 6
15,4 15,4 kWhCO2 Hot water
2 2
3,1 3,1 20 20
kWh CO2 Heat
Hot water
24 24
2 2
1 1
11 kWh CO2 Electricity
kWh CO2
CO2 Heat
0
CO2 Electricity
4 4
9,5 1,7 9,5 1,7 30,1 30,1
20 20
3,04 3,04
kWhCO2 kWhCO2
21,6 21,6
1,5 8,6 1,5 8,6
kWhCO2 kWhCO2
Electricity
CO2 Heat
12
10
8
6
4
2
22
3,8 3,8
kWhCO2 kWhCO2
00
-2
CO2 Electricity
450000 Renovation of building 25 800000
MEASURES TO IMPROVE ENERGY EFFICIENCY Addition of prefab elements with insulation, U-value 0.125 o Addition of 250 mm of insulation o Elimination of thermal bridges Addition of 50 mm of insulation in the basement. Switching the windows for energy efficient windows, U-value 0.58 - 0.72 Installation of exhaust and supply air ventilation system with heat recovery with a efficiency 82%.
14 12
10
43,0
9,4 100,4 9,4 100,4
14
12 10
6 5
10
50 50
10 10
6
60 60
19,1
5
60
22
CO2 Electricity
Energy D B consumption C of new buildings
140 120 120 100 100 80 80
Energy consumption of building 25 A B C D
U-VALUES After
Savings [kWh]
180 160
16
Energy [kWh/m2/yr] Energy [kWh/m2/yr]
45 40
Energy consumption of all A B Cold buildings D
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
205 205
37 37
180
Energy [kWh/m2/yr] Energy [kWh/m2/yr]
39 39
45
jul aug sep okt nov dec
Energy consumption of new buildings
Energy consumption of all old buildings
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
mptionCof commercialDarea
jan feb mar apr maj jun
MATERIALS Bricks will be the main facade material, in order to keep and respect the identity of current Koppergården. The facades are prefabricated with brick stonestrips on the exterior already attached. The bricks on facade will be made of different kinds of reused and if needed new bricks.
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
mption of commercial area
icity
Vertical tracking
15
0
218 218
0
Fixed 40deg 0deg
20
10
center,
+1300
Difference
Energy [kWh/m2/yr] Energy [kWh/m2/yr]
Consumption
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
kWh kWh
200 000,00 100 000,00 100 000,00 -
400000
700000
350000
600000
300000
Savings [kWh]
ncome
500000
250000
Building element
Before
Windows
2.87 - 3.48
0.58 - 0.72
Walls
0.412
0.125
200000
100000
Basement
0.754
0.352
100000
50000
400000 300000
0
0
200000 150000
0 4000000 1000000 2000000 0 3000000 2000000 4000 Cost [SEK] Cost[SEK]
12/9/2015 9:05:58 AM
G
G
G
G
G
G
G G
L
L
G G
L
G G
G
G
G
L
G G
G G
G
L
L
G
G
G G
G
G
G
G
L
G G
L
G G
L
G G
G
G
G
L
G G
G
L
G G
L
G
G
5A
5B
G G
G
G
5C L
G G
G G
5B
G G
L
G G
5C
G
G
L
G G
G
G
L
5A
L
7C
5A
G
G
G
G
G
L
G
G
G
5B
G G
L
L
G G
L
G G
G G L
G G
L
G G
G
L
G
L
G
G
G
L
G G
G
G G
G
L
G G
G
G G
G
G
5B
7B
5A
5C
EXISTING CONDITION, NO.5&7 G G
Plans Building 5-7 G
G
G
G
G
G
G
L
G
G
Severe adjustments will be made to no. 5&7, as nowadays, mainly migrants are residing there, and no. 5, programmed as an student apartment, is even empty. It is unlikely that students will live in the area, wherefore it is aimed to redevelop it for families. This creates a mix of high, middle and low income households, what will improve the social interaction. Besides, the surrounding environment will be improved and private gardens for high quality apartments will be provided.
L
G G
L
5A Kitchen
G G
WC
L
WC
L G G G G
Bedroom
Kitchen
G G G G
G
G G
Second floor5 A
0
Ground Floor
1
2
3
4
Balcony
5m
Balcony
5B
N
L
Balcony
5C
A Bedroom
Scale 1:200 Second floor
social meeting space, library, cafĂŠ
0
1
2
3
4
WC
5m G
7a
G
Living room
G
Bedroom
Living room
5B
L
Bedroom
G
G
Bedroom Living room / Kitchen
5A
G
G
single apartment
7b
G
WC
L
G
5a
WC
G
private garden Balcony
G G
Living room
Balcony
5b
G
G L
G G
5m
WC
G G
Kitchen
loft
Balcony
Bedroom
Living room
G L
G L G G
G
L
4
5C
G
3
m
Bedroom
G L
Kitchen
WC
G G
2
N Balcony
Kitchen
L
G
1
L
L
L G
Kitchen
G
0
G G
WC Kitchen
7B
1:200 Ground Scale floor
G G
G
WC
Bedroom
L
5B
L
Kitchen
G
Balcony
L G G
L
L
G G
G G
Bedroom
Balcony
G G
Bedroom
Balcony
G
Bedroom Living room / Kitchen
room
Balcony
G
L
Bedroom
G
L
Balcony
G
G
Bedroom
Balcony
G G
WC
G
G
G
L
WC
G G G
REFURBISHMENT 1. The existing load bearing walls will be preserved in building NO.5&7(see black hatches below). 2. On the ground and first floor the student apartments will be transformed into high quality family lofts with private gardens, in order to attract high and middle income households. Medium quality single apartments with a private kitchen will be created on the second floor to be able to adapt to the multi-need of the households. 3. A social meeting space will be set up in the previous office, that connected no.5 and no.7 before. This space will include a cafĂŠ, and library for adults and children.
Living room / Kitchen
Bedroom
Bedroom
G G
WC
Balcony
7A
WC
L
G
CONCEPT
WC
L
G G
A
G
WC
G G
G
WC
Living room / Kitchen
L
G
WC
Living room / Kitchen
L
G G
G
Bedroom
G
WC
G
L
Bedroom
G G
G
Bedroom
L
Bedroom Living room / Kitchen
G
Bedroom
7C
Bedroom
oom
G
L
Balcony
G G
Balcony
G G
Balcony
G
G
G
G
high
90 m
12
medium
40 m2
1-2, low income
12
medium
35 m2
1, low income
G G
A
1
2
3
4
5m
G
3-4, medium income
G G
5A
G
Bedroom
G
G
G
G
G
G
L Bedroom L Bedroom
G G
L
5C
G
Bedroom
Bedroom
L
G
G
L LBedroom Bedroom
G G
L
L
L
Balcony
Bedroom
L
L
5B
Balcony
4. Regarding vertical distrubution four staircases will be removed, and a staircase in the intermediate area added. 5. On the ground and first floor, the corridor will be turned into useable and comfortable space. However, on the third floor the corridor will be preserved in order to ensure safety related to fire, and comfortable transportation flows.
WC
WC
5A
G
Bedroom
G
G
G
G
L
L
WC
WC
Bedroom
Bedroom
G
G
G
G
L
L
WC
WC
G
WC
L G
G
G
Bedroom G G L
Bedroom
G G
L
G
G G
L
G G G G
3
4
7C
Plan 1
N
L
5m
7B
G
2
G
1
L
0
G
WC
Scale 1:200 Second floor
5m
L G
G
L
G G G G G G
G G
L
5C
L
4
5 BA
G GL
3
5m
7A
2
4
7C
1
3
N
vertical transportation
0
2
G G
5C
corridor
First floor
1
G
5B
0
First Floor
L
5A
G
Second floor 5 A
RULLGALLER
G G
L
G
L
G
L
Bedroom Bedroom G G L
5B
G
Bedroom
G
WC
7B
N
G
L
0
E
G
G
3-4, medium income
G G
G G
1:200 Ground Scale floor
L
G L
G
5b,7b single apartments
D
Balcony
G G
Balcony
L
G G
L
C
L
G G
4
2
L
G G
G G
90 m
G G
G G
high
L
G L
8
2
L
G G
L
4-5, high income
G
G
Bedroom
120 m2
G
G
Bedroom
high
G
G
G
Bedroom Bedroom Living room / Kitchen
target group
4
5a,7a loft
B
area
G G
Bedroom
WC
quality
G
Bedroom
A
WC
amount
7A
WC Living room / Kitchen
Bedroom
apartment type
WC
WC
tchen
Living room / Kitchen
G G
WC
WC
G
G
G L
WC
Living room / Kitchen
G
7C
WC
G
0
1
2
3
4
Living room / Kitchen
Living room / Kitchen
N
G
N
Scale 1:10
G G L
L L
G
5m
WC
Details Building 25
G
G
Ground floor
5m
Balcony
WC
G
Bedroom
WC
G
Living room / Kitchen
Bedroom
Bedroom
G
L
L
Bedroom
G G
G G
L
L
Bedroom
Bedroom
Living room / Kitchen
G G
G G
Bedroom
G
L
Bedroom
Living room / Kitchen
WC L
Bedroom
Living room / Kitchen
Bedroom
G
WC
WC
G
G
G G
Bedroom
Living room / Kitchen
Living room / Kitchen
1
2
3
4
5m
5B
A
N
G G
L
5C
G G L
0
Balcony
WC G G L
G 0
1
2
3
4
5m
7A
L G
Scale 1:200 Second floor
G
L
WC
G G
5A
Balcony
L
Second Floor
Balcony
G
Second floor
Balcony
L
Balcony
G
Balcony
L
G
Living room / Kitchen
WC
WC
WC
Living room / Kitchen
7B
WC
Living room / Kitchen
WC
G
G
WC G G
Bedroom
Living room / Kitchen
G
4
Balcony
G L
3
Balcony
G
2
Balcony
G L
1
Balcony
G
0
Balcony
Scale 1:500
Scale 1:500
1:200 Ground Scale floor
Ground Floor - After
7A
Common Floor - Before
G G L
L
G G
L
G
G
G L
G
A
0
1
2
3
4
Scale 1:500
5m
0
1
2
3
4
First floor
0
1
2
3
4
5m
5m
G
G
Second floor
G
First floor
Second Floor - After
Scale 1:500
L
7C
First Floor - After
G
G
L
G G
G G
L
SUNLIGHTING & SHADING Based on the solar heating and direct sunlighting analysis, there is differ- Section A-A and Facade Building 5-7 ent kinds and levels of shading on each facade. +10950 SE&SW, vertical wood panel shading, +9400 NE&NW, horizontal wood panel shading. more details, please see facade on the right
W
+6700
less solar heating less direct sunlighting
7B
N
+4000
+1300 0
1:200 Ground Scale floor
6 6 4 4 22
1,5 8,6 1,5 8,6
kWhCO2 WhCO2
00
100 97,9 80 60 40
42,1 32,5
20 0
7,9
29,7 12,9
7,1
7,3
5
4,1
0
15,1
3,3 3,3 -11,5-11,5
-9,6 -9,6
-20 Window Losses
Ventilation System
Exterior Walls
Floor Slab
CO2 Electricity
Thermal Bridges Initial
Roof
Internal Gains
Solar Gains
Second floor
0
1
2
3
4
5m
It is recommended that the new buildings no. 2,8,10,18,20,36, which are high quality lofts, also use the wood panels for the facade. This will interconnect the buildings. Furthermore, the panels will be identical in size. In this manner, recycling after renovation or deconstruction is more convenient.
40 40
G
4,6
8 8 100,1 9,32 100,1 9,32
0 Heat
Final
12 10 10
42,9 4,6 42,9
20 20
Total Heating Demand
14 12
26,0
140 120 120 100 100 80 80 60 60
13,3 13,3 2,4 2,4 30,0 30,0 23,6 23,6
kWh CO2 Hot water
6 6
3,5 3,5
kWh CO2 CO2 kWh Electricity
4 4 25,3 25,3
4,5 4,5 12,3 12,3
kWhCO2 CO2 kWh CO2 Heat
150000 100000 50000
0 4000000 5000000 6000000 00 2000000 0 3000000 2000000 4000000 6000000 Cost [SEK] Cost[SEK]
Untitled-1 3
100 80
99,1
60
61,6
40 33,8
20 17,2 0
15,814,2
8,3
9,8 9,8
5,6 5,6 -11,5-11,5
-20 -40
2,2 1,5
Window Losses
Ventilation System
Exterior Walls
Floor Slab
Roof Initial
21,4
-18,2 -23,7
Internal Gains Solar Gains
Others
Heating Demand
Final
Lightbulbs Fridges Laundry Room Education Facade Windows Insulation basement Ventilation system Heat pumps PV 75% Reduction
MEASURES TO IMPROVE ENERGY EFFICIENCY Addition of prefab Elements with insulation, U-value 0.128 o Addition of 250 mm of insulation o Elimination of thermal bridges Addition of 50 mm of insulation in the basement Switching the windows for energy efficient windows ,U-value 0.65-0.8. Installation of exhaust and supply air ventilation system with heat recovery,efficiency 82%. Increase of glazed areas facing south to boost solar gains.
400000
400000
U-VALUES
350000
350000
Building element
Before
Windows
2.87-3.48
After 0.58-0.72
Walls
0.412
0.125
Basement
0.754
0.352
Savings [kWh]
200000
00
120
CO2 Electricity
450000
Faucets
Savings [kWh]
Savings [kWh]
250000
22
Building 5 & 7 Annual Heat Demand (kWh/m2a)
450000 Renovation of building 5,7
400000
300000
2,2 2,2
kWhCO2 CO2 kWh
450000 enovation of building 25
350000
16 14
L
8 8
MATERIALS Wood panels will be the main material on the facades, as in nordic countries, wood is abundant and therefore cheap. Besides, it has several environmental advantages. Also, the material will create a friendly feel when people come to building no.5&7.
16
D
26,0
160 140 Energy [kWh/m2/yr] Energy [kWh/m2/yr]
10
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
12 10
Energy consumption of building 5,7 A B C
180 160
120
5m
G G
Building 25 Annual Heat Demand (kWh/m2a)
4
G
180
14 12
3
N
Energy consumption of building 5,7
14
D
2
7A
25
1
G
g 25
ENERGY CONSUMPTION
E
CO2 [kg/m2/yr] CO2 [kg/m2/yr]
S
0
L
more solar heating more direct sunlighting
G G
-1225
G G
L
summer
G
winter
300000 250000 200000 150000
300000 250000 200000 150000
100000
100000
50000
50000
0
0
Faucets Lightbulbs Fridges Laundry Room Education Facade Windows Insulation basement Ventilation system Heat pumps PV 75% Reduction
0 1000000 2000000 4000000 5000000 6000000 0 3000000 2000000 4000000 6000000 Cost[SEK]Cost[SEK]
12/9/2015 9:06:02 AM