Sustainable Building Competition: Re5 corroded koppargården

Page 1

Re5 Corroded Koppargården

BACKGROUND

A thorough analysis of the area shows that there is an immense disconnect between the city of Landskrona and the area of Koppargården (details in the images to the right) . There is clearly a great potential in this area due to Landskrona´s future development plan as the expansion of the new residential areas and the new transportation paths will leave Koppargården in an important spot (as seen in the first image), in between the north area and the train station and well connected by bus. Still, (as it can be seen in the third image) the functions currently present in Landskrona are mainly concentrated in the city center, leaving both Koppargården, the new areas and the outskirts with little to no function. The need for new commercial areas and an improved connection to the outskirts arises. At the same time the energy consumption of this million program area is much bigger than the current standards and an energy refurbishment is needed, both for ecological and economical reasons.

MOBILITY bus lanes proposed extension of bus lanes cycle lanes

GOALS & STRATEGIES

social nodes

n ca tio

at gr In te

on

Ec ce ur

s

opulation

so Re

Wast e

mal

Air Lig

ht

Qu

/D

ay

lig

gy issi

ation

on s

En er

o o o o

Ener

se

gy G ener

green area

Assign functions a.o. community farming Amplify the distinction between public and private spaces Structure the courtyards Appropriate scale in the area

residental area distant future

Generate a suitable density Diversify the type of apartments Raise social standard Provide variety of residences

FUNCTION DISTRIBUTION restaurants public functions

REjuvenate the sense of identity (SOCIAL INTEGRATION)

e nc

Em

industrial area

offices

s

ity

ht

t ic he

lity bi la

ri c

o o o o

y

t es

tro

rba

ct

lity

/A al

n Co

tu Dis

-u Land

Biodiversity

Re-Use

Ele

residental area close future

REplenish the urban fabric (URBANISM)

Qua

alit

su

ne rg

y

W

Ther

Vi

ural Nat ment viro En

r

e at

lity

ter

Ecolog y

ials

He at E

io n

tit

y

Rel o

Desig

Visual

en

ap ta

Ad Process

Diversity in P

In d o or Q ua

ation

c Relo

o o o o

s

Public Space

lity

Information

FUTURE DEVELOPMENT

Enhance and complement the current connections Utilize the existing node Provide social spaces Supplement the functions in the area

REdefine the green spaces (GREEN SPACES)

fety

y/Sa

rit Secu

Qua

eing

Control

on

cti

or

W

e

ra Inte

do ut

y om

lb el

s

Ma

b

str

In

o o o o

ur

t uc

fra

O

on

y ilit

Lower heating and electricity demand Employ the possibilities for renewable energy Lower the embodied energy a m3 in the building

REconnection, copper as a natural conductor (TRANSPORTATION)

Id

n

ces

o o o

Desig n

Cycle Life Cost

io

cti

Pro

Investment

fun

ial

ign

t en

Des

in

ct

nce

id es

ity

rs ye La

ers

tru

na

nR

Div

ns

rge Cha

inte

yi

g

co

Rent

Ma

rsit ve Di

rin ea Sh Re

n Qua lity

Energetic REfurbishment of the buildings (ENERGY)

Implement means for social integration Rectify the perception of the area Better the relation, functionally and socially, with the city Develop a higher employment potential

services (secondary) services (tertiary)

TRANSPORTATION MOBILITY cars & bus bicycle walking paths bus stop bicycle stop parking

URBAN DESIGN After analyzing the area of Koppergården, it was found that the most urgent problems in the area were the social problems. The bad reputation of the this area is in need of improvement, bring new potential to Koppergården in the form of economic, social and environmental development. The master plan is a result of solving the issues in the area and achieving our main goals. A new multifunction center is planned for the new Koppergården, (details about the center see charts on the right) as a node that offers new commercial and social meeting spots. As part of the solution the bicycle paths and pedestrian roads are reorganized in a way that enhances the connection between the community and the city. G

G

45

G

37

14

The green areas are reorganized, with a better distinction between public and private. To further increase the integration of the area back into the city, a new market space is planned in the central forest. L

B5

G G

G G

L

L

25

E1

G

E2

G G

E3

23

19 new buildings:

D2

10

D1

2,4,6,8,10,14,16, ..., 28,32,34, ..., 40,42

36

multifunction center, 42 green house, 34 row houses, 10,18,20 high quality apartments, 32&22,24,26,28 high & medium quality apartments, 2,8,5&7,36 new apartments for low income, 4,6,14,16, 38,40 existing apartments for low income, 1,11,12,15,....,41,43,45

41

A

Z

X

33

34

32

A

0

1st level

G

PUBLIC E4

20 18

F

5

D3

SOCIAL INTERACTION

2

G

First, the social interaction process benefits from the reorganization of public spaces, different levels of public area would be organized with different activities to improve the social interaction. courtyard meeting point forest & food market multifunction center (mainly commercial)

F1 24

Z

40

22

26

1 38

roolf dnoceS

Secondly, by building high quality apartments and row housing for medium and high income people a mix of people is created which helps the social integration. These new apartments will be located among the low income buildings.

TIMEPLAN year 0

year 1

year 2

year 3

In the first year, it is recommend to first build residential and commercial segment(no.42) along the north west main road, as it shows the new identity of Koppergården for people passing. Then continue to build the inner forest part as the future weekly market place, also renovate the building no.5&7, and nursing home, no.27&29 which will serve as a pilot for the renovation method.

The second year construct the south west part, residential buildings no.22-28, and no. 38, no.40, along the main bicycle road in the future city planning, also start renovating the rest of the old buildings, and re-arrange the courtyards on site.

Third year start constructing the buildings inside the area, including row houses, no.10, no. 18 and no. 20 in the center, and the high quality apartments around. Also re-arrange the public space in our area.

The fourth year all new constructions should be complete along with the ronovations.

new constructions

ground constructions

finished constructions

new constructions

finished constructions

refurbishment buildings

ground constructions

new constructions

14

16

42

finished constructions

ground constructions

43

37

39

41

35

8200 m2 of PV panels are installed on the roofs of the new buildings on site,

29

33

34

31

25 23

28 5

7

26

10

27 17 19

21 24

18 15

36

PV panels

20

8

13

22 40

row house (high income) mix high & medium quality apartments mix middle & low income quality apartments

PV PANELS

45

32

2nd level

4

Scale 1:1000

existing buildings

3rd level

F2

H

1

4th level

11

7

Z

2

PRIVACY

courtyard meeting point forest & food market multifunction center (mainly commercial)

6

A

42

PUBLIC SPACE

21

B

28

3

13

C

COMMUNITY AND LANDSCAPE DESIGN A, farming land B, existing forest C, weekly market D, social meeting point(please see charts right get more detailed information) E, bicycle stop, waste collection room F, private garden for high income apartments G, main bicycle road, walking paths H, place for rest and leisure, Z, service for 22,24,26,28&32, such as laundry room, stores, and small convenient shops X, playground for children

4

8

31

more details about apartments type, investments, rent, etc. please see charts below, also attached report.

m5

15

19

29

39

16

1,11,13,15, ..., 41,43,45

ROAD SYSTEM main road secondary road tertiary road

35

43

BUILDING 18 existing buildings:A 5

17

27

6 4

11 2 38 1

Investment costs 700,0

No. App Investment 40 14.35 MSEK 70 45.54 MSEK 84 54.75 MSEK 96 88.90 MSEK 43.50 MSEK

more details about payback, rent, numbers of residential, etc. please see attached the reports.

Type No. 22-28 Condominium No. 38 Rental No. 40 Rental No.1-45 Rental(Old)

Area No. App 2 12580m 152 2 2400m 32 2 3200m 40 2 42286m

more details about payback, rent, numbers of residential, etc. please see attached the reports.

Economy

Untitled-1 1

14456 SEK/m2 (Is reduced by 25 % for large scale projects) 220 SEK/m2 9 SEK/m2 (cost for electricity and heating after renovation) 3700 SEK/m2 based upon similar project 1100 SEK/m2 13806 SEK/m2 + 2.5 % +4% - 1% 1200 SEK/m2 71.98 MSEK

[MSEK]

The total investment cost and subsequent payback time was based upon average costs in Sweden and Landskrona. New construction cost – Maintenance cost – Operation cost – Work cost for renovation – Mean rent in area (before) – Condominium sales price – Increase in operations cost Increase in maintenance cost Decrease in rent income Mean rent (after) – Income from condominiums –

Investment 136.39 MSEK 26.02 MSEK 34.69 MSEK 215.01 MSEK

800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0

Type No. 2 Condominium No. 6&4 Rental No. 8 Rental No.10 Condominium No.18 Row houses No.20 Row houses No.36 Rental

Area 1800m2 3800m2 1700m2 1440m2 800m2 1120m2 1200m2

No. App 20 64 16 16 5 7 20

more details about pay back, rent, numbers of residential, etc. please see attached the reports.

Energy Concept

1

2

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20

Years Cost

Income

Investment

Investment 19.51 MSEK 41.19 MSEK 18.43 MSEK 15.61 MSEK 8.67 MSEK 12.14 MSEK 13.01 MSEK

Sales

500,0

500,0

400,0

400,0

300,0

[MSEK]

Area 2598m2 4200m2 5050m2 8200m2 3000m2

636,1 636,1

600,0

600,0

[MSEK]

Type No. 5&7 Condominium No. 14 Rental No. 16 Rental No. 32 Rental No. 42 Commercial

Investment costs

Total investment costs

300,0 233,6

200,0

281,2

FUNCTIONS existing residential new residential new commercial (including convenience shops inside community) office, community center, services green house

281,2

233,6

200,0 100,0 0,0

58,6

43,5

100,0

43,5

58,6

3,7

0,0 New rental

3,7

New Condominium

Commercial area

The area is solely heated by district heating. To reduce the total consumption of energy Groundwater heat pumps are installed in the area which have a COP of 3.5. The coldest days of the year the district heating is still needed. By doing this the energy is shifted from heat to electricity, but due to the COP the amount of CO2 produced by the area is still lowered. The electricity is supplied by the same source as the district heating, a thermal power plant in the region that runs on waste. To further reduce the use of fossil fuels PV is added to the area. The amount was designed to fully cover the need during the summer months. The reasoning behind this is to not put too much strain on the grid, due to over production. Also because PV is developing rapidly and the prices are decreasing it could be beneficial to invest in PV again in a couple of years and then there is still room for more PV.

Renovation

15,5 15,5 Heat pumps

PV

Total

Energy consumption of commercial area

Scenario A B

C D

Status The current situation After improving the thermal envelope / constructing according new standards After B and installing the heat pumps After C and installing the PV-panels

300 300

Energy B consumptionCof commercialDarea

250 250 Energy [kWh/m2/yr] Energy [kWh/m2/yr]

700,0

200 200 150 150

200 200

36 36 218 218

100 100 50 50 0

67 67

4

kWh CO2 Heat

39 39

205 205

0 0 kWh CO2

Electricity

37 37

0 0 kWh CO2

CO2 Heat

CO2 Electr

12/9/2015 9:05:49 AM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.