7. Business Management

Page 1

Product Description

Domain:

Business Architecture & Design

Capability:

Business Management

Business Management

Context Business Management forms part of the Business Architecture & Design domain. Description

Portfolio Management

The business management capability provides a management framework for monitoring and controlling key outcome-related aspects of the transformation programme. These typically include: portfolio, risk, benefits, and migration.

# Unit

Techniques The business management portfolio includes the following elements: •

Portfolio Management

Risk Managament

Benefits Management

Migration Management

Seg.

E'ment

Component

Del. Tr. Prob.

Imp.

29

Cntr (All)

IT App New IT (BO)

C

2

0.4

£200k

30

Cntr (All)

API

NIT(FO)-NIT(BO)

C

3

0.5

£200k

31

NA

Corp

UI

CS-NIT(BO)

C

2

0.1

£25k

32

NA

SME

UI

SS-NIT(BO)

C

2

0.1

£50k

33

EA

(All)

UI

NS-CIT(BO)

C

2

0.1

£50k

34

EA

(All)

UI

NS-SIT(BO)

C

2

0.1

£75k

35

EA

(All)

UI

NS-NIT(BO)

C

3

0.1

£125k

Risk Management (Fragment) #

Unit Seg.

10

Transformation Event

Tr. 1

(All) New Sales Intro.

11

£25k

12

Business Management is addressed throughout the programme/development lifecycle.

13

Web Introduction*

14

Cnct. Cntr. W/drawal

£75k

E-mail Withdrawal

£50k

Corp CIT to NIT Migration

EA

16

Benefits

SME

17

By providing an effective framework for managing the evolution of the business operating model, Business Management significantly de-risks the transformation programme from a business outcome perspective.

Tr. 3

£Nil

CS to NS Cut-Over

Application

15

Tr. 2

£50k £25k

SS to NS Cut-Over

£75K

Post/Fax Withdrawal

£75k

18

SIT to NIT Migration

£75k

19

Web Introduction*

£100k

Total Rev. Uplift/OpeEx Saving p.a.

£175k

£250k

£450k

Cummulative Uplift/Saving p.a.

£175k

£425k

£875k

Benefits Management (Fragment) #

Unit

1 2 3

Corp. NA SME

4 5 6 7 8

Seg.

Corp. E&A SME

Org.

Tranche 1

Tranche 2

Tranche 3

Front-O Back-O Front-O Back-O Front-O Back-O Front-O Back-O Migration Management

© 2008 Systems in Context Ltd

1

1st September 2009


Product Description

Business Management

Domain:

Business Architecture & Design

Benefits

Capability:

Business Management

Technique:

Portfolio Management

By accurately mapping the relationships within the programme and project portfolio, (as well as relative to the operating model), the portfolio management application ensures that the scope, dependencies, and impacts of programmes and projects are fully understood and clearly communicated.

Context Portfolio Management forms part of the Business Management capability within Business Architecture & Design. Description The portfolio management application describes the relationships between business initiatives within the programme and project portfolio in terms of their operational 'footprints' and inter-dependencies. Tools The portfolio management tool set includes the following elements: •

Business Impact Map

Project Dependency Map

Application Portfolio Management is carried out on an on-going basis. Project Dependency Map

Business Impact Map © 2008 Systems in Context Ltd

2

1st September 2009


Product Description

Domain:

Business Architecture & Design

Capability: Technique:

Business Management

# Unit

Seg.

E'ment

Component

Del. Tr. Prob.

Imp.

Business Management

1

NA

Corp

Med.

Post

D

2

0.2

£35k

Risk Management

2

NA

Corp

Med.

Fax

D

2

0.2

£15k

3

NA

SME

Med.

Post

D

3

0.2

£35k

4

NA

SME

Med.

Fax

D

3

0.2

£15k

5

NA

SME

Med.

Web

C

3

0.3

£75k

6

NA

SME

Org.

Cntct. Cntr.

D

1

0.2

7

NA

SME

MI

SS-CC

D

1

0.2

8

EA

Corp

Med.

Web

C

3

0.3

£25k

9

EA

SME

Med.

Post

D

3

0.2

£50k

10

EA

SME

Med.

Fax

D

3

0.2

£25k

11

EA

SME

Med.

E-mail

D

1

0.1

£50k

12

EA

SME

Med.

Web

C

3

0.3

£100k

13

EA

SME

Org.

Cntct. Cntr.

D

1

0.2

14

EA

SME

MI

SS-CC

D

1

0.2

15

EA

Corp

Org.

Corp Sales

D

2

0.3

£25k

16

EA

SME

Org.

SME Sales

D

2

0.3

£75k

17

EA

(All)

Org.

New Sales

C

2

0.4

£100k

18

Cntr (All)

IT App New IT (FO)

C

3

0.5

£200k

Geographical Locations

19

NA

Corp

IT App CIT (BO)

D

2

0.2

Customer Segments

20

NA

Corp

UI

D

2

0.1

Market Channels

21

NA

SME

IT App SIT (BO)

D

2

0.2

Interaction Mediums

22

NA

SME

UI

D

2

0.1

Business Roles

23

EA

Corp

IT App CIT (BO)

D

3

0.2

IT Applications

24

EA

Corp

UI

CS-CIT(BO)

D

3

0.1

25

Operational Interfaces

EA

SME

IT App SME E-mail

D

1

0.1

26

EA

SME

UI

D

1

0.1

Organisational Units

27

EA

SME

IT App SIT (BO)

D

3

0.2

28

EA

SME

UI

D

3

0.1

Tools

29

Cntr (All)

IT App New IT (BO)

C

2

0.4

£200k

The risk management tool set includes the following elements:

30

Cntr (All)

API

NIT(FO)-NIT(BO)

C

3

0.5

£200k

31

NA

Corp

UI

CS-NIT(BO)

C

2

0.1

£25k

32

NA

SME

UI

SS-NIT(BO)

C

2

0.1

£50k

33

EA

(All)

UI

NS-CIT(BO)

C

2

0.1

£50k

34

EA

(All)

UI

NS-SIT(BO)

C

2

0.1

£75k

35

EA

(All)

UI

NS-NIT(BO)

C

3

0.1

£125k

Context Risk Management forms part of the Business Management capability within Business Architecture & Design. Description The risk management application specifies the operational deltas, together with their type, (decommissioning, commissioning, or modification), and the programme tranche to which they are assigned. It further assigns a probability to the non-implementation of the delta in the specified tranche. Finally, it calculates the financial impact of non-implementation in terms of the forgone business benefits, (e.g. on a per annum basis). It typically includes some or all of the following elements: •

Risk Register

Application Risk Management is carried out throughout the programme lifecycle, both end-to-end and by tranche.

CS-CIT(BO)

SS-SIT(BO)

SS-SIT(FO)

SS-SIT(BO)

£50k

£75k

£25k

£50k

£50k

£50k

£75k

Risk Register Key: Del. = operational delta D = decommissioned operational component C = commissioned operational component M = modified operational component Tr.. = programme tranche, (1, 2, or 3) Prob. = probability (of non-implementation in specified tranche) Imp. = impact, (forgone benefits p.a.due to non-implementation)

Benefits The risk management application provides a rigorous and comprehensive framework for risk identification, estimation, and mitigation, based on the operating model 'bill of materials'. This serves to significantly de-risk the programme in terms of adverse business outcomes.

© 2008 Systems in Context Ltd

3

1st September 2009


Product Description

Business Management

#

Domain:

Business Architecture & Design

Capability:

Business Management

1

Technique:

Benefits Management

2

Unit Seg. Cntr (All)

3

Benefits Management forms part of the Business Management capability within Business Architecture & Design.

CIT to NIT Migration

6 NA

Cnct. Cntr. W/drawal

7

SIT to NIT Migration

9

£50k

Post/Fax Withdrawal

£50k £75k £Nil £25k

Corp CIT to NIT Migration

£50k

Web Introduction* Cnct. Cntr. W/drawal

£75k

E-mail Withdrawal

£50k

17

Benefits Roadmap

£50k

14

16

The benefits management tool set includes the following elements:

£25k

13

15

Tools

£50k

CS to NS Cut-Over

12

This is achieved by aggregating individual operational deltas into benefits-delivery 'events', linked to particular programme tranches.

£25k

(All) New Sales Intro.

11

EA

SME

Tr. 3

£Nil

Web Introduction*

10

The benefits management application tracks the planned and actual realisation of mandated business benefits over the course of the transformation programme.

Web Platform Intro.

5

SME

Tr. 2 £Nil

Corp Post/Fax Withdrawal

8

Description

Tr. 1

Indir. Ch. W/drawal

4

Context

Transformation Event NIT Platform Intro.

£25k

SS to NS Cut-Over

£75K

Post/Fax Withdrawal

£75k

18

SIT to NIT Migration

£75k

19

Web Introduction*

£100k

Total Rev. Uplift/OpeEx Saving p.a.

£175k

£250k

£450k

Cummulative Uplift/Saving p.a.

£175k

£425k

£875k

Benefits Roadmap

Application

Key:

Benefits Management is carried out throughout the programme lifecycle, both end-to-end and by tranche.

* = annual revenue uplift (less opex) other = annual opex saving

Benefits By explicitly linking benefits-delivery events to underlying operating model deltas, the benefits management application ensures that the tracking of the benefits realisation is both rigorous and comprehensive.

© 2008 Systems in Context Ltd

4

1st September 2009


Product Description

Business Management

Domain:

Business Architecture & Design

Capability:

Business Management

1

Technique:

Migration Management

2

#

3

Unit

Corp. NA SME

4

Context

5

Migration Management forms part of the Business Management capability within Business Architecture & Design.

6 7

Seg.

Corp. E&A SME

8

Description

Org.

#

Unit

Seg.

Back-O Front-O Back-O Front-O Back-O Front-O Back-O

Org.

Corp.

3 4

Geographical Locations

5

Customer Segments

6

Market Channels

7

Interaction Mediums

8

Organisational Aspects

9

Technical Aspects

NA

SME BackOffice

Corp.

14

26

Migration Detail Table

Application

E&A

SME

FrontOffice

22

By accurately plotting the operating model's evolution vis-a-vis the programme's delivery tranches and operational impacts, the migration management application enables the business implementation and rollout to be effectively planned and clearly communicated.

24 25

Org. IT

Org.

Org. IT

Org.

Org. IT Medium

21

23

Org.

IT BackOffice

20

Benefits

IT

Medium FrontOffice

19

Migration Management takes place throughout the programme lifecycle, but is concentrated at the back-end.

Org.

IT BackOffice

17 18

Org.

Medium FrontOffice

13

Migration Overview Table

Tr.3

IT

11

15

Tr.2

Medium FrontOffice

12

The migration management tool set includes the following elements:

Tr.1

IT BackOffice

10

Tools

Element Medium

FrontOffice

2

© 2008 Systems in Context Ltd

Tranche 3

Front-O

1

Both overview and detailed representations of the operational migration are afforded, and typically include some or all of the following elements:

Tranche 2

Migration Overview Table

The migration management application describes the implementation and roll-out aspects of the transformation programme in terms of their operational footprints.

Tranche 1

Centre (All)

Org. IT

BackOffice

Org. IT

Migration Detail Table

5

1st September 2009