hi! i'm hazirah, a designer
PLEASE HAVE A LOOK AT MY CV AND SOME SAMPLE OF WORKS!
ARCHITECTURE [ INTERIOR [ URBAN DESIGN [ ILLUSTRATION
contents iii
PROFILE / RESUME
01
OFFICE PROJECTS
Selected Professional Practice Projects
WISMA FAM 02
interior design, architecture, office, sports facilities, project planning & management
TTDI OFFICE 03
nterior design, architecture, office, sports facilities, project planning & management
04
SPECIAL AREA PLAN, SEC. 13 PJ
05
REPOSITIONING OF KERTIH (RANTAU)
urban design, urban planning, masterplan
urban design, urban planning, masterplan, competition
LATAR LANGIT (SKYLINES) 06
urban design, urban planning
07
UMCITY MEDINI LAKESIDE
08
TAMAN PUTRA PRIMA, PUCHONG
architecture, mix-use, retail, hotel, office, service apartment
architecture, housing, residential, masterplan
ESTUARI PARCEL 2A 09
architecture, housing, residential, masterplan
10
ACADEMIC PROJECTS
Selected M.Architecture Design Projects
11
[ME]MORY PARADOX: A MEMORY VAULT FOR THE MALAYS memorial, exhibition, archive
B-SQUARED [B2]: MARVEL LIMINAL EXPERIENCE 12
15
office, gallery, commercial
13
SPACE SIMULACRUM: A PARADOX OF CONCEPTUAL NOVELTY
14
UiTM SPORTS COMPLEX: PUNCAK ALAM CAMPUS SPORTS HUB
public plaza, marketplace, installation, urban design
community, sports centre
PUBLICATION WORK
Hazirah Hamzah GRADUATE ARCHITECT (LAM/RIBA PART II)
profile Part II Architecture Graduate with 4.5 years of accumulated experience — 2.5 years of experience in design practice, in addition to 2 years freelancing as an architectural designer, and some years working in the research field. Seeking to leverage my technical and professional expertise to grow in the new role of your company.
Hazirah Hani Hamzah Cheras, Selangor. Malaysia. +6013 233 4925 hazirahamzah@gmail.com hazirahamzah.wixsite.com/portfolio
work experience GRADUATE ARCHITECT ANTISPACE DESIGN (Selangor) May 2019 - present Responsible for monitoring design process from conception to construction administration to ensure consistency of design idea. Involve in business development meetings to target specific market, client or project opportunities. Attend on-site meetings and project meetings, and providing insights on project matters. [ Private Office Interior Renovation Works, Proposed Interior Works at Wisma FAM
education M. ARCHITECTURE (LAM/RIBA PART II) Universiti Teknologi MARA (UiTM) 2016 - 2018 CGPA: 3.54 BSC. ARCHITECTURE (LAM/RIBA PART I) Universiti Teknologi MARA (UiTM) 2009 - 2014 CGPA: 3.21 GCE A-LEVEL (AS & A2) International Education Centre (INTEC) 2007 - 2009
skills
AutoCAD Sketchup Vray Vectorworks Adobe Photoshop Adobe Illustrator Adobe Indesign Adobe Lightroom MS Office Suite
URBAN DESIGNER IZM CONSULT SDN. BHD. (Selangor) July 2018 - June 2019 Responsible for providing architectural input in urban design component, reappropriations, and professional insights, holistically. Primarily involved in devising proposed solutions, technical analysis, conceptual design, improvisations of graphical representations and communications, primarily in the scope of urban design, as well as any other relevant works. [ Proposed Repositioning of Kertih (Terengganu), Latar Langit (Selangor), Bandar Bersebelahan (PLANMalaysia), Rancangan Kawasan Khas PJ13 (Selangor)
GRADUATE RESEARCH ASSISTANT UNIVERSITI TEKNOLOGI MARA (Selangor) July 2016 - March 2017 Responsible for providing supplementary data collection, data organisation, and assisted in the production of research publications in terms of layout settings, graphical interpretations and other visual communications.
ASSISTANT ARCHITECT (PART I) ARCHICENTRE SDN. BHD. (Selangor) May 2014 - September 2015 Responsible for the production of architectural drawings, design proposals, project documentations, authority submission, assisting and supporting project architects in executing multiple architectural projects. [ UMCity Medini Lakeside (Johor), Estuari Parcel 2A (Johor), Plenitude (Selangor), Terrazza (Selangor), ...
Hazirah Hamzah GRADUATE ARCHITECT (LAM/RIBA PART II)
awards
work experience (continued)
3RD PLACE, URBAN INTERVENTION PROJECT Urban Acupuncture Design Workshop Young People's Lab (YPLab 2018) // 2018
ASSISTANT ARCHITECT (PART I) DESIGN EVOLUTION ARCHITECTS (Kuala Lumpur) February - April 2014
POST-GRADUATE FACULTY AWARD Universiti Teknologi MARA (UiTM) M.Arch Semester 01 // 2016 DEAN'S LIST AWARD Universiti Teknologi MARA (UiTM) Bsc. Arch Semester 03 // 2011 DEAN'S LIST AWARD Universiti Teknologi MARA (UiTM) Bsc. Arch Semester 01 // 2010
Gained experiences in the production of architectural drawings, basic Vectorwork software, design proposals, model-making, liaising with builder’s team, as well as exposure on project documentation. [ Samrah Resort Janda Baik (Pahang), MBPJ Gallery (Selangor), private residentials
ARCHITECTURAL TRAINEE HALIM SHAHRIMAN & ASSOCIATES (Kuala Lumpur) January - March 2013 Responsible for assisting in the production of architectural tender and construction drawings. Gained experience in conducting site visits & site meetings, preparing reports, meeting minutes, as well as project documentation. [ Briged Tengah PGA Cheras (Selangor)
languages MALAY (NATIVE) speak read / write ENGLISH (FLUENT) speak read / write
interests
[ Architecture & Design [ Culture & Languages [ Project Planning & Management [ Research & Publications [ Graphic Design & Illustrations [ Arch. History & Philosophy [ Educational Lecturing [ Travel & Photography
RESEARCH ASSISTANT UNIVERSITI TEKNOLOGI MARA (Selangor) July - September 2011 Involved in executing fieldwork and data collection, summarizing and providing graphics/visual communications. [ Baby Care Room in Shopping Malls: Accessibility to Malaysian Public.
extra curricular DELEGATE Sustainable City 2017 (Seville, Spain) Universiti Teknologi MARA UiTM // 2017
EDITOR & CONTRIBUTOR Sustainability in Urban Manifestos Universiti Teknologi MARA UiTM // 2017
CONFERENCE PRESENTER Sustainable Development & Planning 2016 (Penang, Malaysia) Universiti Teknologi MARA UiTM // 2016
PRE-DESIGN LAYOUT & IMAGE EDITOR Revue Volume 4 Universiti Teknologi MARA UiTM // 20162018
EVENT DIRECTOR RENTAS Architectural Festival Universiti Teknologi MARA UiTM // 2013
SPORTS COORDINATOR AKSI Architectural Sports Universiti Teknologi MARA UiTM // 2013
TEAM MANAGER FSPU Women's Volleyball Team Universiti Teknologi MARA UiTM // 20112013
ATHLETE FSPU Women's Volleyball Team Universiti Teknologi MARA UiTM // 20102014
DELEGATE / PARTICIPANT TERANG PAM Architectural Workshop (UTM Skudai, Johor) Universiti Teknologi MARA UiTM // 2011
VOLUNTEER Relay For Life Kuala Lumpur
**References provided upon request
sample
of works experience accumulated
FROM MY RECENT & PREVIOUS JOBS! > GRADUATE ARCHITECT > URBAN DESIGNER > PART 1 ASSISTANT ARCHITECT
1
id
wisma fam
INTERIOR RENOVATION WORKS interior design, architecture, office, sports facilities, project planning & management
2019 | Office Project Status: On-going. Stage: 1. Schematic Design. 2. Design Development. Client: Football Association of Malaysia (FAM) Ampang CIty Agency (Main contractor) Company: Antispace Design Role: Architect Skills & Softwares: Project Planning & Management Architectural Design Project Documentation 3d Modelling Sketch Up Manual sketching MS Office
2
id
ttdi office
INTERIOR RENOVATION WORKS interior design, architecture, office, project planning & management
2019 | Office Project Stage: 1. Schematic Design. 2. Design Development. 3. Tender & Construction. Client: IZM Consult Sdn. Bhd. Company: Antispace Design in collaboration with Azim Aridz Architect Role: Architect Skills & Softwares: Architectural Design & Drafting Project Documentation Vectorworks 3d Modelling Sketch Up Manual sketching Adobe Indesign MS Office
3
ud
special area plan, sec.13 pj URBAN DESIGN INTEGRATED PROJECT urban design, urban planning, masterplan
2018 - 2019 | Office Project Status: On-going. Client: MBPJ Company: IZM Consult Role: Urban Designer
03
SEKSYEN 13, PETALING JAYA
1
Projek-projek yang dicadangkan bertujuan
04
DRAF RANCANGAN KAWASAN KHAS
SEKSYEN 13, PETALING JAYA
ke seksyen 16 universiti islam antarabangsa
CADANGAN PROJEK:
LINEAR PARK
Linear Park merupakan antara projek yang difokuskan di dalam RKK Seksyen 13, Petaling Jaya (Pengubahan 1). Projek ini menumpukan pembangunan di sepanjang Sungai Penchala (monsoon drain) yang berpotensi untuk dibangunkan dan dijadikan sebagai kawasan hijau bagi tujuan rekreasi, riadah serta mewujudkan elemen hijau alam semula jadi yang menarik.
ke damansara utama
PERINCIAN PROJEK: LINEAR PARK LOKASI
: LINEAR PARK PARCEL
OBJEKTIF
: 1. Menghidupkan semula suasana mesra alam dan kawasan yang berdaya huni 2. Cadangan semula untuk menghidupkan aset semula jadi di sepanjang Sungai Penchala, sungai sedia ada, dan kawasan sekitar. 3. Mengoptimumkan sistem ‘urban hydrology’ secara menyeluruh dan secara ekologinya akan menggalakkan pertumbuhan bandar yang lebih mapan. 4. Penduduk serta pengunjung yang dapat menikmati kehijauan di tengah bandar konkrit. 5. Mengurangkan masalah pulau haba dan menstabilkan biodiversiti. 6. Menggalakkan pertumbuhan komersil sepanjang ‘linear park’. : 1. URBAN HYDROLOGY • RIVER PROMENADE • BIOSWALE POND AND TERRACE SEATING • FLOOD GATE • WIER 2. WETLAND 3. WADING POOL 4. COMMUNITY GARDEN
WETLAND
COMMUNITY GARDEN
FLOOD GATE
ke bangsar
Idea dan konsep awal Linear Park ini telah mendapat persetujuan dan sokongan hasil daripada Perbincangan Dalam Kumpulan (FGD) yang telah di adakan di MBPJ. Linear Park merupakan nadi pembangunan utama di bandar Seksyen 13, Petaling Jaya yang mampu memberi impak besar kepada pembangunan fizikal, ekonomi dan sosial.
WIER
KOMPONEN CADANGAN UTAMA
BIO-SWALE
pelan lokasi projek
DRAF RANCANGAN KAWASAN KHAS
CADANGAN PROJEK
P ke sea park
P
seksyen 19
seksyen 13
sungai penchala
PETUNJUK: badan air wetland
seksyen 12
terrace seating jambatan pejalan kaki surface parking underground parking akses keluar masuk
Skala: 0
ilustrasi cadangan
Skills & Softwares: Urban Design Guidelines Design & Planning Principles 3d Modelling Sketch Up Manual sketching Adobe Photoshop Adobe Illustrator Adobe Indesign MS Office
one-way loop
seksyen 14
10 50
100
200m
Penawaran kawasan hijau di Linear Park secara tidak langsung dapat menghidupkan suasana bandar dengan pelbagai aktiviti aktif dan pasif.
Keratan rentas Linear Park
WETLAND
WADING POOL
• Urban hydrology adalah berfungsi untuk memastikan sistem aliran sungai berjalan dengan baik di samping menambah tarikan landskap • Sub-komponen urban hydrology: Promenade, bio-swale, flood gate, dan wier.
COMMUNITY GARDEN
WIER BRIDGE
• Wading pool merupakan kolam air cetek yang dicadangkan di persisiran sungai untuk tujuan orang awam bersantai dan berekreasi. • Reka bentuk wading pool perlu selamat terutamanya untuk kanak-kanak.
URBAN MORPHOLOGY
komponen cadangan utama • Kawasan tanah lembap yang merujuk kepada sebuah kawasan yang berpaya, bergambut, berair secara buatan manusia. • Menstabilkan ekologi biodiversiti di kawasan sungai. • Cadangan tanaman landskap: Nipah dan Gelam.
• Community Garden dapat menghidupkan aktiviti sosial antara penduduk untuk menjalankan aktiviti yang sihat dan memberi manfaat. • Cadangan tanaman untuk taman komuniti: sayur-sayuran dan buahbuahan
WADING POOL
1
WALKABLE STREET
2
TRAFFIC IMPROVEMENT
3
LOKASI
: MENGHUBUNGKAN SEKSYEN 13 DENGAN SEKSYEN 52
LOKASI
: SETIAP PARCEL
KOMPONEN CADANGAN UTAMA
: 1. BRIDGE TOP GARDEN • DRY WATER FEATURE • SEATING AREA • PLANTER BOX • LIGHTING 2. INTERACTIVE ARTWORK / SCULPTURE 3. BICYCLE RACK
KOMPONEN CADANGAN UTAMA
: 1. POCKET PARK AND GREEN CONNECTOR 2. BICYCLE AGENDA 3. SEMI-PERMEABLE WALKWAY
LOKASI KOMPONEN CADANGAN UTAMA
ANGGARAN KOS KESELURUHAN
4
: JALAN UNIVERSITI, JALAN SEMANGAT, JALAN KEMAJUAN (ONE-WAY LOOP) : 1. TRANSIT LANE 2. VEHICULAR UNDERPASS 3. HENTIAN BAS 4. SISTEM TRAM
KOMPONEN PEMBANGUNAN
ANGGARAN KOS
Pampasan serahan tanah
RM 166,042,008.00
CADANGAN 1
CADANGAN 2
Tempat Letak Kenderaan Terbuka (Surface Parking)
Tempat Letak Kenderaan Bawah Tanah (Underground Parking)
LOKASI
: LINEAR PARK PARCEL
OBJEKTIF
: 1. Menyediakan tempat letak kenderaan kepada pelawat yang mengunjungi Linear Park 2. Memastikan penyediaan ruang letak kenderaan yang mencukupi bagi menampung kapasiti pelawat. 3. Tempat letak kenderaan bawah tanah mampu membantu mengawal limpahan air daripada sungai untuk mencegah banjir.
PETUNJUK: surface parking
Naik taraf sungai – riparian edge / promenade / wetland / wier
RM 59,126,173.89
Bio-swale
underground parking
P
akses keluar masuk
RM 11,096,295
Taman komuniti
P
RM 2,661,401
Landskap – terrace seating / planting
RM 100, 000. 00
Tempat Letak Kenderaan
RM 1, 000, 000. 00 KOS KESELURUHAN
19
RM 240,025,877.90
Skala: 0
10 50
100
TLK TERBUKA
ICONIC BRIDGE
: LINEAR PARK PARCEL
: 1. URBAN HYDROLOGY • RIVER PROMENADE • BIOSWALE POND AND TERRACE SEATING • FLOOD GATE • WIER 2. WETLAND 3. WADING POOL 4. COMMUNITY GARDEN
TLK BAWAH TANAH
LINEAR PARK LOKASI KOMPONEN CADANGAN UTAMA
PERINCIAN PROJEK: TEMPAT LETAK KENDERAAN AWAM • Memuatkan 90 unit TLK dengan berukuran bagi sebuah petak iaitu (2.74m x 4.80m) • Pemilihan reka bentuk tempat letak kenderaan disediakan dengan elemen lanskap.
• Eco-tank bagi membantu menjadi alat pengawalan banjir • Menggalakkan penggunaan pencahayaan semulajadi untuk mengakses ruang TLK bawah tanah.
200m
PUBLISITI AWAL
PUBLISITI AWAL
05
2
SEKSYEN 13, PETALING JAYA
CADANGAN PROJEK:
Iconic Bridge seperti yang biasa dilihat di bandar-bandar besar mahupun pekan di seluruh negara berfungsi sebagai mercu tanda bagi kawasan tersebut. Bagi penduduk tempatan, ia menghubungkan dari suatu kawasan ke kawasan lain manakala bagi pelancong, ia sebagai destinasi yang mesti dilawati. Kewujudannya di Seksyen 13 akan menambah baik imej dan fungsinya sebagai pusat bandar.
3
4
WALKABLE STREET
Walkable Street merupakan projek untuk menggalakkan orang ramai berjalan kaki dan mengurangkan kebergantungan kepada kenderaan bermotor melalui penyediaan kemudahan di sekeliling mereka. Ruangruang sedia ada yang tidak dimanfaatkan akan dinaik taraf untuk dijadikan sebagai laluan penghubung dengan persekitaran yang lebih selesa dan mesra pejalan kaki.
PETUNJUK:
Traffic Improvement adalah projek menambah baik laluan pengangkutan awam di dalam pusat bandar Seksyen 13. Projek ini bagi memudahkan pergerakan penduduk dan bagi mengatasi masalah kesesakan lalu lintas di pusat bandar.
LOKASI
: Green Connector (Setiap parcel), Pedestrian Connector (Antara Jalan 13/4, Jalan 13/6 dan Linear Park), Jalan Sehala (Jalan 13/6, Jalan 13/4, Jalan 13/2), Fully Pedestrian Street (Jalan 13/2 @ Knowledge-based Parcel) : 1. Mewujudkan ruang untuk berjalan/berbasikal yang lebih mesra pengguna, menyeluruh. 2. Menghidupkan semula laluan yang tidak dimanfaatkan dengan sebaiknya untuk kemudahan pejalan kaki. 3. Menyediakan laluan yang selesa, selamat, berfungsi, dan menghubungkan. 4. Mengurangkan penggunaan kenderaan bermotor dalam kawasan pusat bandar bagi menangani masalah kesesakan. 5. Menjadikan Seksyen 13 walkable city. KOMPONEN : 1. Pocket park and green connector CADANGAN 2. Bicycle agenda UTAMA 3. Semi-permeable walkway OBJEKTIF
PELAN LOKASI PROJEK
PERINCIAN PROJEK: ICONIC BRIDGE
Skala: 0
10 50
100
200m
ilustrasi cadangan
KOMPONEN CADANGAN UTAMA
BRIDGE TOP GARDEN
ANGGARAN KOS KESELURUHAN KOMPONEN PEMBANGUNAN
LUAS KASAR
ANGGARAN KOS
Kerja-kerja pembinaan
7,500 m2
RM 3,000, 000. 00
Kerja-kerja landskap
7,500 m2
RM 100, 000. 00
Kerja permulaan (7% jumlah kos kerja utama) KOS KESELURUHAN
-
RM 217,000 RM 3, 317, 000. 00
• Keunikan Iconic Bridge yang menjadi mercu tanda kepada Seksyen 13 adalah dengan mewujudkan taman di atas jambatan yang mampu menjadi daya tarikan dan galakan orang awam untuk berjalan kaki. • Taman di atas jambatan ini disokong dengan beberapa sub-komponen seperti: dry water feature, tempat duduk, planting, dan pengcahayaan.
INTERACTIVE ARTWORK & LANDSCAPE • Perletakan arca-arca di kawasan ‘iconic bridge’ dapat menjadi daya tarikan visual. • Orang awam terutama penduduk Seksyen 13 digalakkan untuk mereka cipta arca khas sebagai tanda ikonik kepada Seksyen 13. • Perletakkan arca haruslah diletakkan di tempat yang sesuai dan tidak menggangu pandangan visual atau laluan utama • Menyediakan landskap yang menarik di sepanjang laluan jambatan bagi menarik minat orang awam menggunakan ‘iconic bridge’ tersebut.
BICYCLE RACK • Bicycle rack disediakan di bawah jambatan yang berada bersebelahan dengan Linear Park. • Orang awam yang menunggang basikal boleh mengunci basikal di bicycle rack dan menjalankan aktiviti rekreasi di sepanjang Linear Park. • Menggalakkan orang awam menggunakan kenderan tidak bermotor di kawasan Petaling Jaya terutamanya di Seksyen 13.
cadangan fasa perlaksanaan projek
PERINCIAN PROJEK: WAYFINDING ENFORCEMENT
jejantas sedia ada hentian tram hentian bas sedia ada
laluan khas tram vehicular underpass
hentian bas cadangan
laluan tram bawah ramp
zebra crossing
jejantas sedia ada hentian tram
PETUNJUK:
PETUNJUK: pedestrian connector
fully pedestrianised street
green connector
semi pedestrianised street
promenade point / entrance
automatic bollard
taman poket / urban oasis
jalan universiti
hentian bas sedia ada
ke seksyen 16 universiti islam antarabangsa
hentian bas cadangan
ke damansara utama
ke bangsar
zebra crossing
ke sea park
jalan semangat
seksyen 19
seksyen 13
jalan kemajuan
sungai penchala
seksyen 12
Skala: 0
seksyen 14
10 50
100
one-way loop
200m
Pelepasan / Clearance
Panjang jalan (kawasan cerun)
Terowong / underpass
Pelepasan / Clearance
1 : 15
Panjang jalan (kawasan cerun)
Persimpangan jalan (atas) Terowong / Underpass (bawah)
Anggaran 150m (susur keluar ke Jalan Kemajuan)
Cerun / Jalan ke terowong
Min 60 kaki (20m) layby
LOKASI
: Seluruh kawasan pusat bandar Seksyen 13 : 1. Mewujudkan karakter dan identiti bagi pusat bandar Seksyen 13 Memberi elemen ‘sense of welcoming’ kepada penduduk dan pengunjung Mewujudkan kawasan aktif dalam pusat bandar Meningkatkan ruang awam / tempat awam untuk memberi keselesaan kepada pengguna jalan kaki Menggalakan orang ramai untuk berjalan dengan laluan yang sempurna dan selamat KOMPONEN : 1. Penunjuk arah / paCADANGAN pan UTAMA tanda 2. Seni jalanan / Arca 3. Landskap OBJEKTIF
1
2
3
FASA
FASA
FASA
• Mengekalkan hierarki jalan 66’. • Mengekalkan sistem jalan dua hala. • Mencadangkan laluan ‘green connector’. • Mencadangkan laluan ‘pedestrian connector’ di Jalan13/6A dan 13/3. • Mencadangkan laluan pejalan kaki berukuran 5’-7’ pada jalan 13/6, 13/4, 13/1 dan 13/2 (bergantung kepada ukuran jalan semasa di tapak). • Membenarkan letak kenderaan di tepi jalan.
• Mengekalkan hierarki jalan 66’. • Mengekalkan jalan dua hala bagi jalan 13/1. • Mencadangkan jalan sehala untuk jalan 13/6, 13/4, dan 13/2. • Membenarkan letak kenderaan di tepi jalan.
• Mengekalkan hierarki jalan 66’. • Mengekalkan jalan dua hala bagi jalan 13/1. • Mengekalkan jalan sehala untuk jalan 13/6 dan 13/4. • Membenarkan letak kenderaan di tepi jalan kecuali jalan 13/2. • Menutup jalan 13/2 sebagai kawasan ‘fully pedestrianised’ street’. • Cadangan laluan pejalan kaki di jalan 13/2 dilebarkan menjadi 5’-10’ (bergantung kepada ukuran jalan semasa di tapak). • Cadangan automatic bollard untuk menghalang kenderaan awam masuk. • Cadangan laluan basikal.
KOMPONEN PEMBANGUNAN Kerja-kerja naik taraf laluan pejalan kaki mengikut parcel
• Menggalakkan penggunaan pengangkutan awam di sekitar Seksyen 13 dengan menyediakan kemudahan hentian bas di setiap jarak 500m di sepanjang Jalan Kemajuan, Jalan Semangat dan Jalan Universiti. • Mengekalkan hentian bas sedia ada. • Menyediakan laluan melintas (zebra crossing) bagi pejalan kaki dari arah bertentangan Seksyen 13.
KOMPONEN PEMBANGUNAN
ANGGARAN KOS
Penambahbaikan dan naik taraf jalan 4 lorong Penambahbaikan dan naik taraf jalan 2 lorong
RM 1, 500, 000. 00 RM 750,000.00
Kerja-kerja naik taraf laluan basikal
RM 150, 000. 00
Terowong / Underpass
Penunjuk arah
RM 123,262.50
Transit lane & Hentian Bas
Seni jalanan
RM 14, 428.00 KOS KESELURUHAN
• Underpass dapat mengurangkan kesesakan lalu lintas di kawasan Seksyen 13 terutamanya di Jalan Semangat. • Mempunyai 4 lorong (2 lorong setiap arah) bagi laluan terowong (underpass), manakala 2 lorong di atas dari Jalan Utara ke Jalan Semangat dan 1 lorong dari Jalan Semangat bagi memasuki Jalan Kemajuan. • Mencadangkan pelepasan bagi 5.2m untuk semua jenis kenderaan atau 2.1m bagi kenderaan domestic sahaja. • Menaiktaraf kemudahan pengangkutan awam kepada sistem tram di Seksyen 13. • Menjadikan Seksyen 13 sebuah bandar yang aktif dan mengurangkan penggunaan kenderaan persendirian. • Menarik minat orang awam menggunakan pengangkutan awam untuk bergerak di sekitar Seksyen 13.
ANGGARAN KOS KESELURUHAN
ANGGARAN KOS KESELURUHAN
Kerja-kerja landskap dan reka bentuk bandar
komponen cadangan utama • Transit lane adalah cadangan untuk mengadakan laluan khas untuk bas awam yang melalui Seksyen 13. • Transit lane ini direzabkan sebanyak 12 meter diantara laluan bagi kenderaan bermotor kedua-dua arah bagi setiap arah (10 meter setiap laluan). • Laluan basikal juga disediakan di belah kawasan bersebelahan Seksyen 13.
UNDERPASS
seksyen 14
SISTEM TRAM
: MENGHUBUNGKAN SEKSYEN 13 DENGAN SEKSYEN 52 : 1. Mewujudkan satu mercu tanda yang ikonik bagi Seksyen 13. 2. Laluan khas untuk pejalan kaki yang menghubungkan antara dua kawasan supaya mereka tidak perlu berjalan di laluan kenderaan. 3. Juga berfungsi sebagai kawasan rekreasi untuk berjoging, berbasikal, dan sebagainya. 4. Laluannya diperindahkan dengan perabot jalan dan landskap yang bersesuaian dan selesa untuk menggalakkan interaksi sosial. 5. Jambatan pejalan kaki ini dianggar akan dibina sejauh 1.5 km. 6. Mempunyai laluan masuk keluar ke kawasan lapang (di antara Jalan Utara dan Jalan Semagat) , Plaza 33, pusat komersial Seskyen 14 dan Linear Park. : 1. BRIDGE TOP GARDEN • DRY WATER FEATURE • SEATING AREA • PLANTER BOX • LIGHTING 2. INTERACTIVE ARTWORK / SCULPTURE 3. BICYCLE RACK
BAC
PLAYLOT (taman poket)
JAYA SHOPPING CENTRE
MASJID TUN ABDUL AZIZ
laluan tram bawah ramp
jalan one-way loop jalan utama Seksyen 13
KOS KESELURUHAN
PUBLISITI AWAL
RM 1,400,000 / km RM 700,000 / km RM 4,000,000 / km2 RM30,000,000 / km
Tram
RM 2,537,690.50
RM per KM
ANGGARAN KOS RM 5,698,000 RM 1,211,000 RM 17,426,700 RM 4,293,909 RM 122,100,000
ilustrasi cadangan
LOKASI OBJEKTIF
PLAZA 33
LINEAR PARK
sungai penchala
TRANSIT LANE
SMK (L) BUKIT BINTANG
jambatan pejalan kaki
laluan khas tram
vehicular underpass
: JALAN UNIVERSITI, JALAN SEMANGAT, JALAN KEMAJUAN (ONE-WAY LOOP) OBJEKTIF 1. Melancarkan perjalanan dan perkhidmatan bas kepada orang awam. 2. Memberi keutamaan kepada laluan bas dan mengukuhkan perhubungan kawasan Seksyen 13 dan Seksyen 52 3. Mengatasi masalah lalu lintas pada waktu kemuncak 4. Mengatasi masalah kesesakan lalu lintas 5. Underpass’ dicadangkan di persimpangan antara OWL dengan Jalan Kemajuan, Jalan Kemajuan dan Jalan Universiti. 6. Jarak laluan antara 100 m – 200 m mengikut kesesuaian jalan sedia ada. 7. Dilengkapi dengan lampu jalan di disepanjang terowong underpass tersebut. KOMPONEN : 1. Transit Lane CADANGAN 2. Vehicular Underpass UTAMA 3. Hentian Bas 4. Sistem Tram Persimpangan jalan (atas)
HENTIAN BAS
iconic pedestrian skyway connecting ramp / stairs points of interest badan air
terrace seating
jalan utama Seksyen 13
PETUNJUK:
LOKASI
1 : 15
seksyen 12
wetland
jalan one-way loop
PELAN LOKASI PROJEK
PERINCIAN PROJEK
TRAFFIC IMPROVEMENT
PERINCIAN PROJEK: WALKABLE AGENDA
PETUNJUK:
06
SEKSYEN 13, PETALING JAYA
CADANGAN PROJEK:
CADANGAN PROJEK:
ICONIC BRIDGE
DRAF RANCANGAN KAWASAN KHAS
ILUSTRASI CADANGAN
DRAF RANCANGAN KAWASAN KHAS
RM 150,729,609.00
PUBLISITI AWAL
4
ud
repositioning of kertih (rantau) SUSTAINABLE COMMUNITY LIVING urban design, urban planning, masterplan
2019 | Office Project (Competition)
VIEWING DECK
ECO-BRIDGE MOSQUE COMPLEX
BAMBOO SCHOOL
LOOKOUT TOWER
Client: KLCC Holdings Company: IZM Consult Role: Urban Designer Skills & Softwares: Urban Design Guidelines Design & Planning Principles 3d Modelling Sketch Up Manual sketching Adobe Photoshop Adobe Illustrator Adobe Indesign MS Office
BOARDWALK
floating pavilion - multi-use space - urban living room
medical centre - private hospital
paradise garden - part of mosque complex - recreational activities - water promenade
private parking - for private hospital eco-bridge - elevated park - hanging garden - extended public realm
lookout tower - view corridor (towards hillside, towards sea view)
boardwalk - integrated connectivity - ease of movements - nature settings
BAMBOO SCHOOL - community engagement - knowledge incubator - informal learning - sustainability application
PROPOSED MASTERPLAN MASSING & BLOCK PLANS RESIDENTIAL PARCEL CLUSTER 3
6
*Area: 12.18 acres - Typology: cluster house (cluster 4, cluster 7) - Units: 45 units, 2 storey - Open space
5
floating pavilion - multi-use space - urban living room
medical centre - private hospital
RESIDENTIAL PARCEL CLUSTER 2
*Area: 14.59 acres - Typology: low-density apartment - Units: 60 units, 4 storey - Neighbourhood commercial - Residential facilities - Battery energy storage
paradise garden - part of mosque complex - recreational activities - water promenade
private parking - for private hospital
entrance / threshold - sense of arrival - security and safety purposes
communal yard - sense of arrival - social engagement
eco-bridge - elevated park - hanging garden - extended public realm
ingress / egress - security and safety purposes
social courtyard - sense of community
RESIDENTIAL PARCEL CLUSTER 4
*Area: 27.43 acres - Typology: townhouse - Units: 126 units, 2 storey - Residential facilities
lookout tower - view corridor (towards hillside, towards sea view)
RESIDENTIAL PARCEL CLUSTER 1
4
*Area: 12.97 acres - Typology: zero-lot bungalow - Units: 53 units, 3 storey - Open space, water bodies, and jogging track
7
RANTAU TOWN CENTRE
WETLAND SANCTUARY CENTRAL RECYCLYING CENTRE
8
RANTAU TOWN CENTRE
9
RANTAU BUKIT (RESIDENTIAL)
RESIDENTIAL PARCEL CLUSTER building
1
green
inner
circulation Road
2 main access and exit point 2 way road circulation 66 feet internal road 3 access point to the center from north, south, and the middle Parking for commercial centre located outside building
a Central Recycling Centre -S ingle storey -0 .53 acres
-L andscape -R esting place -T herapeutic garden -O utdoor classroom -P ocket park -W etland park -P aradise garden -W ater feature
a
b Zero Emission Power Plant (ZEPP) -S ingle storey (double volume) -1 .22 acres
a b
2
Connected with other facilities! housing, and surrounding area Interesting water feature, landscape, and jogging track Landscape is implemented with safe city concept
PARADISE GARDEN
10
*Area: 21.64 acres - Mosque complex - Community centre - Water promenade - Floating Pavilion - Lookout tower - Water fountain - Souq
1
walking
distance Walking distance
the distance between the building can be achieve by walking.
b
MEDICAL CENTRE
Mosque !3 storey !1 .14 acres
c
building
height
Town house
4 storey (duplex) 100 units 5.39 acres population - 478
Distance and time (5 minutes : 400m 50m 37 second 100m 1 minutes 15 second 150m 1 minutes 52 second 200m 2 minutes 30 second 250m 3 minutes 7 second 300m 3 minutes 45 second 350m 4 minutes 22 second 400m 5 minutes
Bus stop
2 unit facing school faced with housing formal bus stop design
-S ingle storey -4 5 units -0 .40 acres
c Sport Complex -S ingle storey -9 .50 acres
Connected with other facilities ! housing, and surrounding area Interesting water feature, landscape, and jogging track Landscape is implemented with safe city concept
walking
distance
4 storey (duplex ) 47 units 2.53 acres population - 224.7
Road
2 main access and exit point 2 way road circulation 40 feet internal road Access point to 3 residential block and a community facilities Parking for apartment located outside building
Distance and time (5 minutes : 400m
4 storey 80 units population - 382.4 gross floor area - 2.784
50m 100m 150m 200m 250m 300m 350m 400m
1
inner
circulation
Walking distance
Apartment
Cluster
2
green
6.24 acres
- the distance between the building can be achieve by walking.
4 storey (duplex) 59 units 3.18 acres population 282.02 -
1
2 main access and exit point 2 way road circulation 40 feet internal road Access point to 2 residential block and a community facilities Parking for apartment located inside building
Pedestrian path
area - Landscape - Resting place - Neighborhood park - Water feature
Town house bus
stop
b Eco lodge
3
double storey 27 units 1.46 acres population - 129.06
double storey 20 units 1.08 acres population - 95.6
-2 storey -5 .78 acres
-S ingle storey -4 5 units -0 .13 acres
c
Cluster
Cluster
c One stop center
Recreational a Water Homes
Distance and time (5 minutes : 400m 50m 37 second 100m 1 minutes 15 second 150m 1 minutes 52 second 200m 2 minutes 30 second 250m 3 minutes 7 second 300m 3 minutes 45 second 350m 4 minutes 22 second 400m 5 minutes
Road
walking
distance Walking distance
- the distance between the building can be achieve by walking.
-3 storey -2 .38 acres
c
Bus stop
inner
circulation
- Landscape - Resting place - Water feature - Neighborhood park
3 storey 53 units 3.20 acres population - 253.3
37 second 1 minutes 15 second 1 minutes 52 second 2 minutes 30 second 3 minutes 7 second 3 minutes 45 second 4 minutes 22 second 5 minutes
2 3
Pedestrian path
Connected with other facilities housing, and surrounding area Interesting water feature, landscape, and jogging track Landscape is implemented with safe city concept
*Area: 12.62 acres - Bamboo School - Eco-bridge (Elevated Park) - Maze Garden - Public Art - Amphitheatre
12
*Area: 8.10 acres - Private hospital - 5 blocks, 3 storey - Therapeutic garden
bus
stop
5.36 acres
Zero -lot bungalow
4 storey (duplex) 162 units 6.79 acres population - 602.3
b Mosque Complex
-2 unit -f aced with housing -f acing the bamboo school -f ormal bus stop design
green
area
double storey 45 units 2.42 acres population - 215.1
4 storey 80 units population - 382.4 gross floor area - 3.504
Town house
a Hospital -3 storey -2 .38 acres
"
KNOWLEDGE INCUBATOR
11
-2 storey -1 .51 acres
Town Center a
Cluster
Apartment
c Bamboo School
b
Pedestrian path
WETLAND SANCTUARY
building
Knowledge Incubator
14.9 acres
*Area: 4.97 acres - clean, renewable energy from wave - desalinate saltwater into freshwater and stored in water reservoir
height
height
area
ZERO-EMISSION POWER PLANT (ZEPP) AND DESALINATION CENTRE
2
*Area: 66.78 acres
*Area: 20.68 acres - Typology: water homes - 9 block, 1 storey - Typology: ecolodge - 43 units, 1 storey - management and facility buildings - on-site surface parking - Fishing pondh
RESIDENTIAL PARCEL CLUSTER 6
shared parking - residential parking
*Area: 9.81 acres - Wetland park - Floating Cafe
3
*Area: 2.68 acres - Typology: infra & public amenities - 1 block, 2 storey - waste management & recycling centre
RESIDENTIAL BLOCK - mass reduction and formulation
buffer zone - development buffer - green corridor continuity - reduce thermal heat
boardwalk - integrated connectivity - ease of movements - nature settings
BAMBOO SCHOOL - community engagement - knowledge incubator - informal learning - sustainability application
COMMUNITY ENGAGEMENT - jogging track - bike path - retention pond
ONE-STOP COMMERCIAL CENTRE *Area: 21.18 acres - Design village - Commercial hub - Pocket Park - On-site shared parking
13
KOP 1, ECRO & RANTAU KLINIK *Area: 32.52 acres
VISUALS & PERSPECTIVES SPORTS HUB
*Area: 25.66 acres - Sports complex (indoor & outdoor) - Surfer’s Camp - Active Plaza - On-site shared parking
4
INSTITUTIONAL
14
*Area: 32.31 acres - Typology: cluster house - Units: 27 units, 2 storey - Typology: townhouse - Units: 27 units, 2 storey - Residential facilities - Open space, jogging track & neighbourhood park - Battery energy storage
- SK Rantau Petronas - SMK Rantau Petronas
10 8
1 12
7
6
*Area: 3 acres
BOARDWALK
LEGENDS SITE BOUNDARY
ROADS UTILITY BUILDING LANDSCAPES GREEAN AREA (PASSIVE)
13
WATER RENEWAL CENTRE
UNAVAILABLE LANDS
PARKING
LOOKOUT TOWER
2
*Area: 23.03 - Typology: townhouse - Units: 98 units, 2 storey - Residential facilities
16
MOSQUE COMPLEX
BAMBOO SCHOOL
5
9
RESIDENTIAL PARCEL CLUSTER 7
KOP 2
VIEWING DECK
ECO-BRIDGE
13 11
RESIDENTIAL PARCEL CLUSTER 5
RESIDENTIAL PARCEL CLUSTER 6
*Area: 20.7 acres - Typology: cluster house - Units: 20 units, 2 storey - Typology: low-density apartment - Units: 80 units, 4 storey - Residential facilities - Open space, jogging track & neighbourhood park
17 15
*Area: 11.24 acres - Wastewater treatment plant - Landscaped Park
13
SKETCH IMPRESSION OF RANTAU TOWN CENTRE
3
MOSQUE AS FOCAL POINT AND CENTRE OF RANTAU DEVELOPMENT, AND THE MOSQUE COMPLEX FUNCTIONS AS COMMUNITY HUB - ENCOURAGING SOCIAL AND COMMUNITY ENGAGEMENT. THE MOSQUE IS STRATEGICALLY PLANNED AT THE CENTRE OF THE MAIN VIEW CORRIDOR TO MAXIMIZE THE VISTA TOWARDS THE HILL (BUKIT PALUS) AND THE SOUTH CHINA SEA.
13
VISUALS & IDEAS
GREEN AREA (ACTIVE)
IDEAS FOR SOME OF THE KEY FOCUS DEVELOPMENT IN RANTAU
WATER BODY
2
BOARDWALK
3
3
7
BUILDINGS PUBLIC AMENITIES
MESRA MALL
*Area: 27.9 acres
N
INSTITUTIONAL
ZERO-LOT BUNGALOW
5
270
W
225
TOWNHOUSE
E
180
CLUSTER HOUSE
90
LOW-DENSITY APARTMENTS
45
RECREATIONAL RESIDENTIALS
0
315
kiblat
1
MOSQUE COMPLEX
8
MEDICAL CENTRE
2
ECO-BRIDGE
9
ECOLODGE
3
WATER RENEWAL CENTRE
10
WATER HOMES
4
CENTRAL RECYCLING CENTRE
5
135
COMMERCIAL
S
SCALE : 1 : 3,500 0 14 28 42
70
140
210
280
350m
11
WETLAND SANCTUARY
ZERO-EMISSION POWER PLANT & DESALINATION CENTRE
12
BAMBOO SCHOOL
6
SPORTS CENTRE
13
RESIDENTIALS
7
ONE-STOP COMMERCIAL CENTRE
4
4
12
12
ud
latar langit (skylines) TOWARDS LIVABILITY & SUSTAINABILITY urban design, urban planning
2018 | Office Project Status: Completed Client: PLAN Malaysia Company: IZM Consult Role: Urban Designer Skills & Softwares: Urban Design Guidelines Design & Planning Principles Report writing 3d Modelling Sketch Up Adobe Photoshop Adobe Illustrator Adobe Indesign MS Office
6
AR
umcity medini lakeside REDEFINING METROPOLITAN LIVING
architecture, mix-use, retail, hotel, office, service apartment
2014-2015 | Office Project Stage: 1. Schematic Design. 2. Design Development. 3. Tender & Construction. Client: UMLAND Medini Lakeside Development Sdn. Bhd. Company: Archicentre Sdn. Bhd. Role: Part I Assistant Architect Skills & Softwares: Architectural Design & Drafting Drawing coordination Project Documentation Authority Submission Autodesk AutoCAD 3d Modelling Sketch Up Manual sketching Adobe Photoshop Adobe Illustrator MS Office
TOWER 1 GUIDE penthouse
CITADINES
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
pattern play
Q
P
R
S
T
U
V
W
X
195500 8500
8500
8500
8500
7441
50300
13380 17870
38650
9564
12200
6550
void
6200
FFL 114.65
L24
FFL 110.30
L18
L23
FFL 107.15
L17
L22
FFL 104.00
L16
L21
FFL 100.85
L15
L20
FFL 97.70
L14
L19
FFL 94.55
L13
L18
FFL 91.40
L12
L17
FFL 88.25
L11
L16
FFL 85.10
L15
FFL 81.95
L14
FFL 78.80
5100
L25
L19
4350
L18 L17 L16 L15
96150
L14 L13
9600
L11
L12
FFL 71.65
L6
L11
FFL 68.50
L5
L10
FFL 65.35
L4
L9
FFL 62.20
L3
L8
FFL 59.05
L2
L7
FFL 55.90
L1
L6
FFL 52.75
1200
ROOF LEV. FFL 81.95 L15 13199 5200
L9 L9 L8
L8
L7
L7
L6
L6
L5
L5
L4
L4
L3
L3
L2
L2
L1
L1
3000
L7
L10
3000
FFL 74.80
void
3000
BREAK TANK L. L13
3150
void
L8
8000
8000
3150
FFL 25.15
L1
RL 19.50
G
RL 17.10
7
3700
void
void
void
void
void
void
void
void
void
void
void
void
P3a P3 P2
P1a
void
P1
RL 17.10
2400
5650
LG2 FFL 09.90
void
void
P4
RL 14.70
3500
LG1 FFL 13.40
[FASA 1A] RUANG KEDAI & PODIUM
L1a
3300
FFL 28.85
3300
L2
34850
FFL 32.15
34850
FFL 35.45
L3
3700
L3a
3300
6000
1200
P5
1200
8000
3050
3486
TOP OF ROOF LEV. FFL 91.55 L16
L12
RL 13.40
void
void
46800
3150 3150
87750
3150
3150
3150
3150
3150
3150
L19
3150
4000
L20
3000
FFL 38.75
15641
3000
L4
[FASA 1B] BANGUNAN PEJABAT (BLOK C)
3000
FFL 44.75
8500
3000
L5
8500
3000
FFL 47.80
8500
6000
6600
L20
4000
L5a
8500
L21
3150
FFL 52.75
8500
void
6200
FFL 119.75
3150
L6
8500
void
3150
FFL 55.90
void
3150
L7
3150
FFL 59.05
3150
L8
3150
FFL 62.20
3150
FFL 65.35
L9
3150
L10
3150
FFL 68.50
void
L26
L9
3150
FFL 71.65
L11
void
L21
L10
3150
L12
8500
1800
FFL 74.80
void
3150
FFL 81.95
BREAK TANK LEV. L14 FFL 77.95 L13
8500
21764
3150
L15
8500
53250
3150
FFL 85.10
3750
FFL 88.25
L16
3150
L17
3150
FFL 91.40
3150
L18
3150
FFL 94.55
3150
L19
3150
FFL 97.70
78900
L20
3150
FFL 100.85
86900
FFL 104.00
L21
3150
L22
8500
FFL 132.50
3150
FFL 107.15
8500
8450
LIFT MTR. ROOM LEV. L27 FFL 125.95 void
4800
ROOF LEV. L26 FFL 118.85
FFL 110.30
8500
TOP OF ROOF LEV.
FFL 131.65
FFL 114.05
8500
[FASA 1B] PANGSAPURI PERKHIDMATAN 2 (BLOK B)
TOP OF ROOF LEV.
LIFT MTR. RM. LEV. L27 FFL 125.05
L23
8500
[FASA 1B] BANGUNAN HOTEL (BLOK D)
23980
L24
8500
[FASA 1C] PANGSAPURI PERKHIDMATAN 1 (BLOK A)
12200
L25
8500
BOUNDRY LINE
BOUNDRY LINE
8500
12.2M SETBACK LINE
8500
12.2M SETBACK LINE
8500
FFL 76.75
L14
FFL 73.75
L13
FFL 70.75
L12
FFL 67.75
L11
FFL 64.75
L10
FFL 61.75
L9
FFL 58.75
L8
FFL 55.75
L7
FFL 52.75
L6
AR
taman putra prima, puchong GATED & GUARDED DEVELOPMENT architecture, housing, residential, masterplan
2014-2015 | Office Project Stage: 1. Schematic Design. 2. Design Development. Client: Plenitude Permai Sdn. Bhd. Company: Archicentre Sdn. Bhd. Role: Part I Assistant Architect Skills & Softwares: Architectural Design & Drafting Project Documentation Autodesk AutoCAD 3d Modelling Sketch Up Manual sketching Adobe Photoshop Adobe Illustrator MS Office Front Elevation
Rear Elevation
Front Elevation
Rear Elevation
8
AR
estuari parcel 2a SERENE, EXCLUSIVE AND SECURE architecture, housing, residential, masterplan
2014-2015 | Office Project Stage: 1. Schematic Design. 2. Design Development. Client: UEM Sunrise Bhd. Company: Archicentre Sdn. Bhd. Role: Part I Assistant Architect Skills & Softwares: Architectural Design & Drafting Drawing coordination Project Documentation Autodesk AutoCAD 3d Modelling Sketch Up Adobe Photoshop Adobe Illustrator MS Office
Front Elevation
Rear Elevation
Ground Floor Plan Side Elevation
Ground Floor Plan
9
sample
of works what i've been doing these recent years
ACADEMIC PROJECTS FROM M.ARCHITECTURE (PART II)
10
ma
[me]mory paradox A MEMORY VAULT FOR THE MALAYS memorial, museum, civil building
2017 | Academic Project Design Thesis M.Arch 04 Supervisor: Kartini Kasmuri Studio Leader: AP. Ar. Dr. Norhati Ibrahim Tutors: Fairuz Reza Razali (panel) Dr. Zaharah Yahya
11
[Me]mory Paradox is manifested as a memorial, with an associated social platform, which expresses its need for societal place, for chance encounters. The memorial constitutes both an architectural design and narratives, in a way, whose uncertainty is integrated as a creative and social catalyst.
The fundamental questions take us back to why we are motivated to build markers to remind ourselves of the tragedies and epiphanies that effect our lives. By studying memorials, we will learn how identity is formed and gain a better understanding of the relationships between conscious and unconscious thought.
The overall scheme suggests that how people feel about a place, how they respond to it, transcends simply its appearance. People are responding to their memories, an amalgam of what they’re seeing and what they know about a place. Most memorials are placed in public spaces with the intention of maintaining an aspect of history.
This study is expected to open up a new dimension of commemoration, broader historical awareness, and collective identity, by focusing mainly on drawing together the different racial, ethnics, and cultural narratives of a richly diverse nation in an attempt to portray a nation moving forward into a transformed future.
ma
b-squared [b2] MARVEL’S LIMINAL EXPERIENCE office, gallery, commercial
2016 | Academic Project Advanced Design II M.Arch 02 Studio Leader: AP. Ar. Dr. Mariam Jamaludin Tutors: AP. Josmin Yahya Ar. Harizan Kamis
B-Squared [B2], is an architectural scheme specifically tailored for MARVEL Entertainment. Located in the heart of Cyberjaya, Malaysia - a hub catered for tech giants to make new discoveries, for small businesses to conquer the world one market at a time, and for the creative minds to express their thoughts - perfect for MARVEL new SEA Headquarters. The mix development project proposes office units, as well as commercial premises, and
+
+
recreational spaces along the pedestrian promenade, on site, to promote healthier urban environment. B-Squared [B2] also explored different sustainable approaches to engage the public especially building occupants on visual and comfort level, provoking them through its built form, technology, materiality, and the environment as a whole.
+
= 12
ma
space simulacrum A PARADOX OF CONCEPTUAL NOVELTY public plaza, market place, installation
2016 | Academic Project Advanced Design I M.Arch 01 Studio Leader: AP. Syed Sobri Syed Zubir Tutors: Fairuz Reza Razali Dr. Zaharah Yahya Fairus Kholid Jamsyid Idrus
Space Simulacrum is a manifesto of architectural protest against unjust access and usage restrictions posed on prime public realm, in the vicinity of Nguyen Hue Pedestrian Boulevard in Downtown District 1 Ho Chi Minh City. Space Simulacrum explored different visual & physical approaches to engage the public on the posed issues and consequences, as well as serves as an analytical tool to shock, instigate and awaken the community’s subconcious expectations. The methodology and strategy of plugging in social activities on some potential areas, as well
13
as constructing minor installations throughout the site, are intended to haul people into some sort of black holes, and making them forget about the passing of times. These interventions are hopefully able to make a comprehensive rediscovery of the idea of public space, and to remediate the public realm in the immediate vicinity of the Nguyen Hue Pedestrian Boulevard.
ma
uitm sports complex PUNCAK ALAM CAMPUS SPORTS HUB community building, sports centre
2017 | Academic Project Advanced Construction II M.Arch 03 Coordinator: AP. Ar. Faridah Adnan In collaboration with: Ahmad Farhan Izhan Abd Wahab Mohd Aliff Sued Nadia Fathin Syahira Ahmad Nazri Muhammad Hasif Ab Razak Che Ku Abd Salam Ab Whayab Until 2016, UiTM Puncak Alam Campus has grown with the addition of six other faculties. Despite the growing numbers of students and populations in the campus, it has yet own a proper sports hub to cater for the needs of a healthier lifestyle. Hence, the idea of overcoming and providing a proper facilities become the basis for this project. The main design approach is to create a seamless design between the the indoor sports complex
and outdoor sports area, and plaza. The idea is to blur the boundaries of the two different setting, in order for the visitors to feel that even when they are performing the spo rt activities inside the complex, they would feel the same energy as performing them outdoor. The iconic design is to create a landmark and to potray the complex as the main sports complex in UiTM Puncak Alam.
14
pub
publication work Involvement in publication works with department staffs and professors throughout the whole 2 years of M.Arch as contributor and editor.
MANIFESTATION OF THE CITY: HO CHI MINH
MANIFESTATION OF THE CITIY: HANOI
SUSTAINABILITY IN URBAN MANIFESTOS
M.ARCH 03 DESIGN BOOK
REVUE VOL. 4 15
thanks! hope to hear again from you soon!
hazirahamzah@gmail.com [ +6013.233.4925