sb 3/2021 (english)

Page 18

NEWS

Renderings: Geising & Böker

“ELEMENTARY” RENEWAL CONSTRUCTION OF THE NEW REBSTOCKBAD POOL IN FRANKFURT AM MAIN, GERMANY The construction of the new Rebstockbad pool is intended to replace a pool at the same location. pm.a is responsible for the project management services across all project stages and activities associated with the demo­ lition of the old pool and the entire new building project. BäderBetriebe Frankfurt GmbH operates 13 swimming pools in the city of Frankfurt am Main, including the Rebstockbad, which attracts around 600,000 users every year. The wide-ranging needs associated with a trip to the pool are to be reflected in the profile of the new facility. This includes the competitive features of a 25-metre swimming pool, teaching pool and diving pool. A variety of opportunities for leisure activities with family and friends will be offered by the wave pool, lazy river ride, water playground, slide configuration and action area coupled with a sauna zone and an attractive food and beverage ­offering. The design is rounded off by health and wellness services. 16

In addition to making the building more attractive for ­future users, the project’s primary goal is to ensure energy and resource conservation and environmentally friendly and cost-effective construction and operation. The redesign of the Rebstockbad revolves entirely around the elements; the entire new building will be themed. The four elements of water, fire, earth and air form the basis for a thematic design of the various activity areas with ­diversified attractions and elements of play, fun, e­ ducation and adventure. www.pm-agn.de www.frankfurter-baeder.de sb 3/2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.