sb 3/2021 (english)

Page 36

Location Oettingen, Germany Client/Operator City of Oettingen Architect JORDAN BALZER SCHUBERT Architekten PartG mbB, DE – 01127 Dresden www.jbs-a.net Open space planning STORCH.LANDSCHAFTSARCHITEKTUR DE – 01097 Dresden www.storch-la.de Structural Planning and Bridge Dr. Gollwitzer - Dr. Linse und Partner Ingenieure im Bauwesen mbB Authors Rico Schubert, Robert Storch, Dr. Thomas Gollwitzer Photos Sebastian Weingart www.wunderwaldphoto.com Official opening June 2020 Construction costs EUR 1.8 million

34

BRIDGE TO THE FUTURE REMODELLING AND REDESIGN OF OETTINGEN RIVER BATHING FACILITY The go-ahead for the redesign was given in 2015 with the announcement of a planning competition for the Mühlespan outdoor bathing facility. The park-like island of Mühlespan with its river bathing facility is a local recreation area and excursion destination for young and old in Oettingen and neighbouring communities in Bavaria. The existing bathing facility on the Wörnitz was to be upgraded and the dilapidated entrance building and the equally run-down bridge were to be replaced by new structures. The Storch/JBS/RUB consortium was awarded the contract for its overall solution. A new wooden walkway now interconnects all the existing and newly erected buildings and attractions. To give the bathing facility an appropriate entrance situation, a 35 m long and only 5 m wide entrance building has been erected. With its sharp outline, the new building stands like a piece of furniture amidst large, old trees and its placid exterior blends into the existing setting. The distinctive entrance situation is formed by a striking indentation, which is accentuated by the peak of the irregular roof. The dynamic roof shape and the building’s elongated form reflect the constantly flowing waters of the river Wör-

nitz. The covered passageway houses the cash desk and a locker area. Untreated wood materials To emphasise the natural character of the outdoor river facility, both the entire load-bearing frame and the façade have been built with untreated wood materials. The main parts of the exterior walls and the roof are thus made of 10 cm and 12 cm thick five-layer cross-laminated timber boards and, together with some of the sb 3/2021


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

“Global Anti Goal“

2min
page 67

Ice sport all year round

2min
page 68

versatile community spaces

2min
page 66

Aquarii indoor swimming pool fully equipped

2min
page 65

First ever all-glass whirlpool

2min
pages 62-63

Beijing Ice Sports Training Centre

3min
pages 60-61

Design waterslides for the world

3min
pages 58-59

“Swimming for All“ programme in Russia

6min
pages 56-57

Bürgerbad Handorf in Münster

5min
pages 50-51

Oettingen river bathing facility

3min
pages 36-39

Multifunctional Aquatic Complex in Lévis

5min
pages 40-43

in Eben am Achensee

4min
pages 32-35

Refurbishment of Mineralbad Berg in Stuttgart

4min
pages 44-47

UNC University Recreation Center in Charlotte

7min
pages 26-31

Familienbad Bornheim in Frankfurt/Main

1min
page 19

New to the IAKS Network

3min
pages 12-13

with FSB and aquanale

5min
pages 10-11

New Rebstockbad pool in Frankfurt/Main

1min
page 18

Swimming pool in Ähtäri

1min
pages 14-15

New spa at the Aquaticum Waterpark in Debrecen

7min
pages 20-25

Conversion of Alster-Schwimmhalle in Hamburg

2min
pages 16-17
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.